A prestressed beam-slab integrated prefabricated structure
Through the factory prefabrication design and innovative connection mechanism of the prestressed beam-slab integrated prefabricated structure, the problems of insufficient integrity and low construction efficiency in the existing beam-slab separate design have been solved. This has achieved efficient modular connection and shortened construction cycle, meeting the requirements of high load-bearing capacity and crack resistance.
Patent Information
- Application Number
- CN202522592545.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-06
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2035-12-06
AI Technical Summary
In existing technologies, the beam-slab separation design suffers from insufficient overall integrity, complex node connections, low construction efficiency, the need for on-site operation for prestressing application, long construction cycle, limited connection strength in node areas, difficulty in meeting high load-bearing and crack resistance requirements, and lack of efficient splicing methods between beams and slabs, resulting in a low degree of prefabrication.
The prestressed beam-slab integrated prefabricated structure is adopted. By prefabricating the beam-slab integrated design in the factory, positioning and connection mechanisms are used to achieve rapid positioning and initial fixation of the modules. Corrugated grooves and reinforcing ribs are combined to improve crack resistance and overall rigidity. The use of threaded sleeves and screws to achieve a stable connection and positioning pins to prevent loosening simplifies the construction process and improves assembly efficiency.
It significantly enhances the overall integrity and load-bearing capacity of the structure, improves construction efficiency, shortens the construction cycle, ensures the reliability and stability of node connections, meets the requirements for high load-bearing capacity and crack resistance, and improves the degree of prefabrication.
Smart Images

Figure CN224955304U_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of prefabricated building technology, and in particular to a prestressed beam-slab integrated prefabricated structure. Background Technology
[0002] National policies promote the industrialization of construction, improve quality and efficiency, conserve energy and protect the environment, and promote green construction. They also promote the modernization and technological upgrading of the construction industry. Large-span and heavy-load application scenarios are common in industrial park projects. How to give full play to and explore the advantages of beam-slab integration technology and achieve technological innovation and iterative upgrading? In cast-in-place concrete structures, the main beams, secondary beams and floor slabs are cast separately. Although they are a whole, the construction process is complicated and requires the erection of complex formwork. Integrated design refers to the prefabrication of the "beam" (rib beam) as the main bending member and the "slab" (flat plate) as the covering member into a complete whole component in the factory.
[0003] In existing technologies, the separate beam-slab design and the simple integrated beam-slab design have the following problems: insufficient integrity, complex node connections, and low construction efficiency; the prestressing application method is mostly post-tensioning, which requires on-site operation and has a long construction period; the connection strength in the node area is limited, making it difficult to meet the requirements of high load-bearing capacity and crack resistance; and there is a lack of efficient splicing methods between beams and slabs, resulting in a low degree of prefabrication. To address these issues, we propose a prestressed beam-slab integrated prefabricated structure. Utility Model Content
[0004] The purpose of this utility model is to address the shortcomings of existing technologies, such as insufficient overall integrity, complex node connections, low construction efficiency, the fact that prestressing is mostly applied by post-tensioning, which requires on-site operation and has a long construction period, the limited connection strength in the node area, which makes it difficult to meet the requirements of high load-bearing capacity and crack resistance, and the lack of efficient splicing methods between beams and slabs, resulting in a low degree of assembly. Therefore, this utility model proposes an integrated prestressed beam-slab prefabricated structure.
[0005] This application provides a prestressed beam-slab integrated prefabricated structure using the following technical solution:
[0006] An integrated prestressed beam-slab prefabricated structure includes a flat slab and two ribs, both of which are connected to the flat slab. The two ribs and the flat slab are prefabricated as a single unit. Multiple truss reinforcement bars are connected to the top of the flat slab, and multiple rib stirrups are connected to the top of each of the two ribs. The structure also includes:
[0007] The positioning mechanism is set on two ribs and is used for the rapid positioning and initial assembly of adjacent modules.
[0008] The connecting mechanism is located on two ribs and is used to initially fix the module.
[0009] Furthermore, corrugated grooves are provided at both ends of the two ribs, and the shape of the corrugated grooves is a continuous waveform.
[0010] Furthermore, the inner walls of both corrugated grooves are connected with reinforcing ribs, which are made of wire mesh. The corrugated grooves and reinforcing ribs are used to improve the crack resistance and overall stiffness of the rib beam side.
[0011] Furthermore, the screw engages with the first threaded sleeve, and one end of the screw has an internal hexagonal groove for tightening with a tool.
[0012] Furthermore, a sliding hole is provided on the protrusion, and a positioning pin is slidably installed in the sliding hole.
[0013] Furthermore, the screw has a positioning hole that cooperates with a positioning pin. When the screw is tightened to the designated position, the positioning pin can be inserted into the positioning hole to prevent the screw from loosening.
[0014] Furthermore, the connecting mechanism includes a first threaded sleeve and a second threaded sleeve, which are respectively fixedly installed inside two rib beams, and a screw is installed on the inner thread of the second threaded sleeve.
[0015] Furthermore, the positioning mechanism includes multiple grooves and multiple protrusions, which are respectively disposed on two ribs, and the grooves and protrusions cooperate with each other.
[0016] In summary, this application includes at least one of the following beneficial technical effects:
[0017] 1. This scheme significantly enhances the integrity and load-bearing capacity of the structure by connecting multiple truss reinforcements and the top of the flat plate, as well as connecting multiple rib stirrups and the top of the rib beam. The combined design of corrugated grooves and reinforcing bars improves the crack resistance and overall stiffness of the rib beam sides, ensuring the stability and durability of the structure.
[0018] 2. This solution achieves a stable connection of modules through the design of the connection mechanism, which uses the cooperation of the first threaded sleeve, the second threaded sleeve, and the screw. The positioning pin cooperates with the positioning hole on the screw to prevent the screw from loosening and ensure the reliability of the node connection.
[0019] This utility model simplifies the construction process and reduces on-site wet work through the integrated prefabrication design of beams and slabs, thereby shortening the construction cycle. The combination of positioning and connecting mechanisms enables rapid positioning and initial fixing of modules, improving assembly efficiency. Attached Figure Description
[0020] Figure 1 This is a front view structural schematic diagram of an integrated prestressed beam-slab prefabricated structure proposed in this utility model.
[0021] Figure 2 This utility model proposes an integrated prestressed beam-slab assembly structure. Figure 1 Enlarged structural diagram of part A in the middle;
[0022] Figure 3 This utility model proposes an integrated prestressed beam-slab assembly structure. Figure 1 Enlarged structural diagram of section B;
[0023] Figure 4 This utility model proposes an integrated prestressed beam-slab assembly structure. Figure 1 An enlarged structural diagram of section C.
[0024] Reference numerals: 1. Flat plate; 2. Rib beam; 3. Rib beam stirrup; 4. Truss reinforcement; 5. Groove; 6. Protrusion; 7. First threaded sleeve; 8. Screw; 9. Internal hexagonal groove; 10. Second threaded sleeve; 11. Locating pin; 12. Sliding hole; 13. Locating hole; 14. Corrugated groove; 15. Reinforcing bar. Detailed Implementation
[0025] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present utility model. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments.
[0026] Example 1
[0027] Reference Figures 1-4 A prestressed beam-slab integrated prefabricated structure includes a flat plate 1 and two rib beams 2, both of which are connected to the flat plate 1. The two rib beams 2 and the flat plate 1 are prefabricated as a single unit. Multiple truss reinforcing bars 4 are connected to the top of the flat plate 1, and multiple rib beam stirrups 3 are connected to the top of each of the two rib beams 2. The structure also includes:
[0028] The positioning mechanism is set on the two ribs 2 and is used for the rapid positioning and initial assembly of adjacent modules.
[0029] The connecting mechanism is set on the two ribs 2 and is used to initially fix the module.
[0030] In this embodiment, both ends of the two rib beams 2 are provided with corrugated grooves 14. The shape of the corrugated grooves 14 is a continuous wave. The inner walls of the two corrugated grooves 14 are connected with reinforcing ribs 15. The reinforcing ribs 15 are steel wire mesh. The corrugated grooves 14 and the reinforcing ribs 15 are used to improve the crack resistance and overall rigidity of the rib beam side. The screw 8 is engaged with the first threaded sleeve 7. One end of the screw 8 is provided with an internal hexagonal groove 9. The internal hexagonal groove 9 is used for tightening operation by a tool. The positioning mechanism includes multiple grooves 5 and multiple protrusions 6. The multiple grooves 5 and multiple protrusions 6 are respectively arranged on the two rib beams 2. The grooves 5 and protrusions 6 are engaged.
[0031] In this embodiment, a sliding hole 12 is provided on the protrusion 6, and a positioning pin 11 is slidably installed in the sliding hole 12. A positioning hole 13 is provided on the screw 8, and the positioning hole 13 cooperates with the positioning pin 11. When the screw 8 is tightened to the designated position, the positioning pin 11 can be inserted into the positioning hole 13 to prevent the screw 8 from loosening. The connecting mechanism includes a first threaded sleeve 7 and a second threaded sleeve 10. The first threaded sleeve 7 and the second threaded sleeve 10 are respectively fixedly installed in the two rib beams 2. The screw 8 is threadedly installed in the second threaded sleeve 10.
[0032] The implementation principle of the prestressed beam-slab integrated prefabricated structure in this application embodiment is as follows: During the factory prefabrication process, the two rib beams 2 and the flat plate 1 are designed as an integrated unit to form a modular component. Multiple truss steel bars 4 and multiple rib beam stirrups 3 can enhance the integrity and load-bearing capacity of the structure. The prefabricated module is transported to the design position by hoisting equipment. The initial positioning and splicing are completed by the groove 5 and the protrusion 6. By setting the internal hexagonal groove 9, the screw 8 is rotated by a tool. The screw 8, together with the first threaded sleeve 7 and the second threaded sleeve 10, are tightened together (this structure is used to connect two modules). When the screw 8 is tightened to the designated position, the positioning pin 11 can be inserted into the positioning hole 13 to prevent the screw 8 from loosening. Then, the node area is filled with fast-curing grout. After the grout flows into the corrugated groove 14, it forms an interlocking structure to enhance the connection stability.
[0033] Example 2
[0034] The difference between this embodiment and embodiment one is that an electromagnetic induction positioning auxiliary device is installed at the groove 5 and the protrusion 6. The device monitors the splicing position in real time through electromagnetic induction and transmits the data to the control system of the hoisting equipment to realize automatic adjustment of the module position and improve splicing accuracy and efficiency.
[0035] The above description is only a preferred embodiment of the present utility model, but the protection scope of the present utility model is not limited thereto. Any equivalent substitutions or changes made by those skilled in the art within the technical scope disclosed in the present utility model, based on the technical solution and the inventive concept of the present utility model, should be included within the protection scope of the present utility model.
Claims
1. A prestressed beam-slab integrated fabricated structure, comprising a flat slab (1) and two ribbed girders (2), characterized in that: Both ribs (2) are connected to the flat plate (1). The two ribs (2) and the flat plate (1) are prefabricated as a whole. The top of the flat plate (1) is connected to multiple truss steel bars (4), and the top of both ribs (2) is connected to multiple rib stirrups (3). It also includes: The positioning mechanism is set on two ribs (2) and is used for rapid positioning and initial splicing of adjacent modules. The connecting mechanism is set on two ribs (2) and is used to initially fix the module.
2. The pre-stressed beam-slab integrated fabricated structure according to claim 1, characterized in that: The positioning mechanism includes multiple grooves (5) and multiple protrusions (6), which are respectively arranged on two ribs (2), and the grooves (5) and protrusions (6) cooperate with each other.
3. The pre-stressed beam-slab integrated fabricated structure according to claim 2, characterized in that: Both ends of the two ribs (2) are provided with corrugated grooves (14), and the shape of the corrugated grooves (14) is a continuous waveform.
4. The pre-stressed beam-slab integrated fabricated structure according to claim 3, characterized in that: The inner walls of both corrugated grooves (14) are connected with reinforcing ribs (15), which are made of wire mesh. The corrugated grooves (14) and reinforcing ribs (15) are used to improve the crack resistance and overall stiffness of the rib beam side.
5. The pre-stressed beam-slab integrated fabricated structure according to claim 4, characterized in that: The connecting mechanism includes a first threaded sleeve (7) and a second threaded sleeve (10). The first threaded sleeve (7) and the second threaded sleeve (10) are respectively fixedly installed in two rib beams (2). A screw (8) is threadedly installed in the second threaded sleeve (10).
6. The pre-stressed beam-slab integrated fabricated structure according to claim 5, characterized in that: The screw (8) is engaged with the first threaded sleeve (7). One end of the screw (8) is provided with an internal hexagonal groove (9), which is used for tightening by a tool.
7. The pre-stressed beam-slab integrated fabricated structure according to claim 6, characterized in that: The protrusion (6) has a sliding hole (12), and a positioning pin (11) is slidably installed in the sliding hole (12).
8. The prestressed beam-slab integrated prefabricated structure according to claim 7, characterized in that: The screw (8) has a positioning hole (13) which is engaged with the positioning pin (11).