A high voltage generator testing system
Through integrated design and automated workflow, the problems of low efficiency and safety hazards caused by the dispersion of multiple systems in high-voltage generator testing have been solved, and an efficient and safe testing process has been achieved.
Patent Information
- Application Number
- CN202522691447.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-18
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2035-12-18
Smart Images

Figure CN224958045U_ABST
Abstract
Description
Technical Field
[0001] This utility model belongs to the field of electrical equipment testing technology, specifically relating to a high-voltage generator testing system. Background Technology
[0002] An X-ray high-voltage generator is an industrial device that converts low voltage into high voltage to drive an X-ray tube to generate X-rays. Its core advantages include high stability, power efficiency, and precise control capabilities, making it widely used in medical diagnostics, industrial non-destructive testing, and scientific research. Before leaving the factory, the equipment undergoes sequential functional tests, including insulation, dielectric properties, and no-load loss, to ensure reliable operation in large medical imaging equipment. Current conventional testing methods rely on multiple independent functional testing systems, requiring the use of transport vehicles to move equipment between different testing stations. This approach not only leads to frequent line changes for testing personnel, cumbersome operations, low testing efficiency, and safety hazards, but also occupies a large area due to the dispersed placement of each platform, limiting the overall efficiency and space utilization of the testing process. Utility Model Content
[0003] In view of the shortcomings of the prior art described above, the purpose of this utility model is to provide a high voltage generator testing system that can improve testing efficiency and safety.
[0004] To achieve the above and other related objectives, this utility model provides a high-voltage generator testing system, comprising: Test cabinet; A receiving section is provided inside the test cabinet to house the high voltage generator to be tested, and the test cabinet has a door on at least one side of the receiving section; A power supply module, located in the test cabinet, is used to supply power to the high-voltage generator under test; The testing device, located in the testing cabinet, is used to perform functional tests on the high-voltage generator under test. A transfer device is located on the outside of the cabinet door. The transfer device is configured to guide or transport the high voltage generator under test from the upstream workstation of the test cabinet to the outside of the cabinet door, and to guide or transport the high voltage generator under test from the outside of the cabinet door to the downstream workstation of the test cabinet.
[0005] In an optional embodiment of this utility model, the testing device includes: The detection module is used to detect multiple operating parameters of the high-voltage generator under test required for various functional tests. The control module is configured to communicate with the high-voltage generator under test to control the high-voltage generator under test to complete the operations required for functional testing; the control module is also communicated with the power supply module and the detection module to control the operation of the power supply module and the detection module, and to receive multiple operating parameters of the high-voltage generator under test detected by the detection module to determine the test results of multiple functional tests.
[0006] In an optional embodiment of this invention, the test cabinet includes a radiation shielding chamber for housing the test load.
[0007] In an optional embodiment of this utility model, the test cabinet is provided with a door lock on the side where the cabinet door is located for locking the cabinet door.
[0008] In an optional embodiment of this utility model, the door lock is an electric door lock, which is communicatively connected to the testing device to respond to the control signal issued by the testing device to keep the cabinet door in a closed state or release the cabinet door from the closed state.
[0009] In an optional embodiment of this utility model, an electrical connector is further included for connecting the power supply port of the high voltage generator under test, the electrical connector being electrically connected to the power output port of the power supply module; the electrical connector is configured to also be electrically connected to the test port of the safety testing equipment.
[0010] In an optional embodiment of this utility model, the testing device is configured to communicate with a safety testing device to control the operation of the safety testing device and receive the test data from the safety testing device.
[0011] In an optional embodiment of this utility model, an interaction module is further included. The interaction module is communicatively connected to the testing device. The interaction module is used to send test control commands input by the user through the interaction module to the testing device, and to receive and display functional test options and / or functional test results issued by the testing device.
[0012] In an optional embodiment of the present invention, the transfer equipment includes a non-powered transfer platform and a lifting device disposed at at least one end of the non-powered transfer platform.
[0013] In an optional embodiment of this utility model, the test cabinet includes an electrical cabinet, a protection cabinet, and a protective cabinet; the power supply module and the test device are installed in the electrical cabinet; the receiving part is disposed in the protection cabinet; and the protective cabinet is used to house the test load.
[0014] The technical advantages of this utility model are as follows: This utility model integrates functional testing hardware into the testing cabinet, eliminating the need for testing personnel to frequently change lines and move equipment, thereby significantly simplifying the operation process, improving testing efficiency, and reducing safety hazards; at the same time, by connecting the transfer equipment to the outside of the testing cabinet door, the high-voltage generator under test is quickly transferred in the testing process, significantly reducing manual labor and operation time, improving the overall production line cycle time, and eliminating the risk of bumps and safety hazards during manual handling. Attached Figure Description
[0015] Figure 1 This is a structural block diagram of the high-voltage generator testing system provided in an embodiment of this utility model; Figure 2 This is a three-dimensional structural diagram of the high-voltage generator testing system provided in an embodiment of this utility model. Detailed Implementation
[0016] The following specific examples illustrate the implementation of this utility model. Those skilled in the art can easily understand other advantages and effects of this utility model from the content disclosed in this specification. This utility model can also be implemented or applied through other different specific embodiments, and various details in this specification can also be modified or changed based on different viewpoints and applications without departing from the spirit of this utility model. It should be noted that, unless otherwise specified, the following embodiments and features described therein can be combined with each other.
[0017] It should be noted that the illustrations provided in the following embodiments are only schematic representations of the basic concept of the present invention. Therefore, the illustrations only show the components related to the present invention and are not drawn according to the number, shape and size of the components in actual implementation. In actual implementation, the form, quantity and proportion of each component can be arbitrarily changed, and the layout of the components may also be more complex.
[0018] To ensure that the core performance, safety, and reliability of X-ray high-voltage generators fully meet the extremely stringent requirements of critical applications such as clinical diagnostics and industrial non-destructive testing, a series of functional tests, such as insulation performance testing, dielectric performance testing, and no-load loss testing, are required before shipment. These functional tests often require independent specialized instruments, each with its own dedicated hardware architecture. Furthermore, given the high voltage, high power, and precision measurement requirements of high-voltage generator testing, it is difficult to highly integrate multiple high-power output and high-sensitivity acquisition circuits onto a single platform while ensuring safety isolation, signal interference immunity, and measurement accuracy. Therefore, some solutions employ multiple independent functional testing systems, requiring the use of transport vehicles to move equipment between different testing stations to perform various functions of the X-ray high-voltage generator. This approach not only leads to frequent line changes for testing personnel, cumbersome operations, low testing efficiency, and safety hazards, but also occupies a large area due to the dispersed placement of each platform, restricting the overall efficiency and space utilization of the testing process. To address this, this invention provides a high-voltage generator testing system. The system integrates the hardware architecture for multiple functional tests. A testing module samples the operating parameters of the high-voltage generator required for various functional tests, enabling the control module to automatically call the necessary operating parameters based on preset test items, thereby achieving the testing of specific functions. Furthermore, the integrated design of the cable connectors significantly reduces wiring difficulty and improves testing efficiency. More importantly, it ensures reliable electrical isolation between the communication link and the high-voltage cable, improving signal anti-interference capability and measurement accuracy.
[0019] The technical solution of this utility model will be described in detail below with reference to specific embodiments: Please see Figure 1 , 2As shown, an embodiment of this utility model provides a high-voltage generator testing system. The high-voltage generator testing system includes a test cabinet 200, and a housing 201, a test load 31, a power supply module 12, and a testing device 110 disposed within the test cabinet 200. The housing 201 is used to house the high-voltage generator 100 under test. The test load 31 is used to connect the load drive port and the load sampling port of the high-voltage generator 100 under test. The power supply module 12 is connected to an external power supply 80 and is used to supply power to the high-voltage generator 100 under test. Specifically, the power supply module 12 is used to convert the electrical energy provided by the external power supply 80 into the electrical energy required for the high-voltage generator 100 to operate. The testing device 110 is used to test the high-voltage generator 100 under test. The high-voltage generator 100 undergoes functional testing. In a specific embodiment, the testing device 110 includes a detection module 13 and a control module 11. The detection module 13 is used to detect multiple operating parameters of the high-voltage generator 100 required for various functional tests. The control module 11 is configured to communicate with the high-voltage generator 100 to control the high-voltage generator 100 to complete the operations required for the functional tests. The control module 11 is also communicated with the power supply module 12 and the detection module 13 to control the operation of the power supply module 12 and the detection module 13, and to receive multiple operating parameters of the high-voltage generator 100 detected by the detection module 13 to determine the test results of various functional tests.
[0020] This invention integrates multiple functional testing hardware into a single test cabinet 200. By setting up a unified detection module 13 to centrally sample multiple operating parameters, and having the control module 11 automatically call up parameters and control the test process according to preset test items, it can realize automated testing of multiple functions. This design eliminates the need for testers to frequently change lines and move equipment, thus significantly simplifying the operation process, improving testing efficiency, and reducing safety hazards. At the same time, the integrated structure reduces the space occupation caused by the dispersed layout of multiple platforms, improves space utilization, and effectively overcomes the defects of traditional multi-system dispersed testing, such as low efficiency, cumbersome operation, large footprint, and insufficient security.
[0021] Please see Figure 2As shown, in a specific embodiment, in order to better achieve electrical isolation between the operating end (i.e., the test station of the high voltage generator 100 under test), the test load 31, and each functional module, the test cabinet 200 may include three independent compartments, namely the electrical cabinet 10, the protection cabinet 20, and the protective cabinet 30; wherein the electrical cabinet 10 is used to install functional modules such as the power supply module 12, the detection module 13, and the control module 11; the housing 201 is formed in the protection cabinet 20, which is used to house the high voltage generator 100 under test, while ensuring the safety of equipment and personnel during the test; the protective cabinet 30 is used to house the test load 31, on the one hand to avoid external signals from interfering with the test load 31, and on the other hand, when the test load 31 is an X-ray tube, it can safely isolate X-rays. By dividing the test cabinet 200 into three independent compartments—an electrical cabinet 10, a protection cabinet 20, and a protective cabinet 30—physical zoning and functional isolation of the test system are achieved. This design concentrates the power supply module 12, detection module 13, and control module 11, which are responsible for high-power power supply and precision measurement, in the electrical cabinet 10, places the test object in the protection cabinet 20, and independently houses the test load 31 in the protective cabinet 30. At the physical level, this ensures effective electrical isolation and electromagnetic shielding between the high-voltage, control, and load circuits, significantly suppressing mutual interference between modules during high-power operation and ensuring the purity and measurement accuracy of the signal sampled by the detection module 13. At the same time, the protective cabinet 30 provides radiation isolation for the test load 31, such as the X-ray tube, improving the safety of personnel and the environment during the testing process. In addition, the zoning design also facilitates heat dissipation management and fault isolation, further enhancing the stability and reliability of the entire test system under harsh operating conditions.
[0022] It should be understood that in some other embodiments, the test cabinet 200 may not be physically divided. For example, the internal space of the test cabinet 200 may be a whole. In this case, it is only necessary to set a reliable shielding structure on each functional module, the high voltage generator under test 100 and the test load 31 to achieve the most basic functions of electrical isolation and radiation protection.
[0023] In specific embodiments, the various functional tests include, but are not limited to, no-load loss testing, high-voltage output stability testing, dynamic response testing, and communication and protection function testing. The operating parameters required for these various functional tests include, but are not limited to, input voltage, input current, output voltage, output current, and power factor (which can be used for no-load loss testing); high-voltage output ripple coefficient, voltage fluctuation rate, and long-term drift (which can be used for high-voltage output stability testing); output voltage rise / fall time, overshoot amplitude, and recovery stabilization time during load step changes (which can be used for dynamic response testing); control command response status, accuracy of fault alarm signals, and trigger thresholds and action times of overvoltage, overcurrent, and other protection circuits (which can be used for communication and protection function testing), etc.
[0024] Please see Figure 1 As shown, in an optional embodiment of this utility model, the test load 31 includes an X-ray tube. This embodiment directly uses an X-ray tube as the test load 31, which can most realistically simulate the actual working state of the high-voltage generator in terminal applications such as medical imaging or industrial inspection. This design ensures that when the system performs tests such as no-load loss, high-voltage output stability, and dynamic response, all electrical parameters (such as output characteristics, ripple, and response time) are generated and measured under real load conditions, thereby significantly improving the accuracy of the test results and their correlation with clinical / operational conditions. It effectively overcomes the test deviations that may be caused by using simulated or equivalent loads, ensuring that factory testing can more reliably verify the core performance and reliability of the high-voltage generator in extremely harsh real-world application scenarios.
[0025] It should be understood that in some other embodiments, when the functional test items are not significantly affected by the test load type 31, or when the X-ray tube cannot be used directly due to environmental limitations, the X-ray tube can be replaced by a simulated load or an equivalent load. For example, a high-resistivity load (such as a high-power water-cooled or oil-cooled high-voltage resistor) can be used to simulate the static operating current and power consumption of the X-ray tube under high voltage; or a capacitive load (high-voltage capacitor bank) can be used to simulate the equivalent capacitance of the X-ray tube and the response of the test generator under capacitive load; or a combination of high-voltage diodes and resistors can be used to simulate the generation of high-voltage DC pulsations; and a dynamically programmable resistor network can be used to simulate the dynamic operating characteristics of the X-ray tube. These alternatives can simulate the electrical characteristics of a real X-ray tube to varying degrees for specific test purposes, in order to achieve the most basic test requirements for a specific test purpose.
[0026] Please see Figure 1 , 2 As shown, in an optional embodiment of this utility model, the test cabinet 200 includes a radiation shielding chamber 301, and the test load 31 is housed within the radiation shielding chamber 301. In a specific embodiment, the radiation shielding chamber 301 is formed within the protective cabinet 30. This embodiment houses the test load 31 within a dedicated radiation shielding chamber 301, a safety enhancement design specifically for the test load 31 being a high-radiation source such as an X-ray tube. This structure uses lead plates or lead-containing composite materials to form a physical barrier, effectively absorbing and blocking the ionizing radiation generated by the X-ray tube during testing, preventing radiation leakage. This design fundamentally eliminates radiation safety hazards around the testing station, ensuring the absolute safety of operators and the surrounding environment, and enabling the entire automated testing process to proceed continuously and reliably while meeting safety standards.
[0027] Please see Figure 1 , 2As shown, in an optional embodiment of this utility model, the test cabinet 200 is provided with a cabinet door 21 and an electric door lock 22 on at least one side of the receiving part 201. The electric door lock 22 is communicatively connected to the control module 11 to respond to the control signal issued by the control module 11, keeping the cabinet door 21 in a closed state or releasing the cabinet door 21 from the closed state. This embodiment achieves a safety interlock for the testing process by setting an electric door lock 22 controlled by the control module 11 in the receiving part 201. This design ensures that the cabinet door 21 is forcibly locked in a closed state during high-voltage testing, effectively preventing personnel from accidentally entering or touching the high-voltage area, eliminating safety risks. The cabinet door 21 will only be automatically unlocked or unlocked in response to an instruction after the control module 11 determines that the current test item has safely ended or the system has entered a standby state. This intelligently binds the equipment operation permission with the safety status of the testing process, improving operational convenience while building a safe testing environment. In some other embodiments, if the linkage between the door lock and the testing process is not considered, a mechanical door lock can be used instead of the electric door lock 22 to achieve the most basic safety protection function.
[0028] Please see Figure 1 As shown, in an optional embodiment of this utility model, an electrical connector 40 is further included for connecting the power supply port of the high-voltage generator 100 under test. The electrical connector 40 is electrically connected to the power output port of the power supply module 12. The electrical connector 40 is also configured to be electrically connected to the test port of the safety testing equipment 50. This embodiment achieves a high degree of integration and reuse of the test interface through a multi-functional electrical connector 40 that can be compatible with connecting the power supply module 12 and the safety testing equipment 50. The connector is directly connected to the power supply port of the high-voltage generator 100 under test, which can be used as a power supply interface for conventional functional tests and can be quickly switched to an input port for safety tests (such as withstand voltage tests, leakage current tests, etc.). This eliminates the need to repeatedly disconnect or replace different cables during the test, simplifies the operation process, and reduces interface wear, wiring errors, or poor contact that may be caused by frequent plugging and unplugging. This not only improves test efficiency but also further ensures the reliability of the electrical connection and the safety of the test process.
[0029] Safety testing can include, for example, withstand voltage testing and leakage current testing, to assess the insulation strength and leakage safety of the high-voltage generator's internal components and its enclosure. It should be understood that safety testing generally requires specialized equipment to apply the test voltage, and the relevant technologies are relatively mature. Therefore, this invention can utilize existing mature safety testing equipment 50 for testing, and by optimizing the electrical coupling structure between the two, the wiring process for safety testing is simplified.
[0030] Please see Figure 1As shown, in an optional embodiment of this utility model, the control module 11 is configured to communicate with the safety testing equipment 50 to control the operation of the safety testing equipment 50 and receive the test data from the safety testing equipment 50. This utility model achieves system-level integration and centralized control of this independent professional instrument by enabling the control module 11 to communicate and control the external safety testing equipment 50. The control module 11 can automatically send instructions to the safety testing equipment 50, start the test, and directly receive the returned test data according to a preset test procedure. This integrates the originally scattered safety testing into an automated test sequence, eliminating the need for manual operation of the independent safety testing equipment 50 and avoiding manual data recording and transcription. This not only significantly improves testing efficiency and process continuity but also enhances the safety of the testing process and the consistency of results through system-level interlocking.
[0031] Please see Figure 1 , 2 As shown, in an optional embodiment of this utility model, an interaction module 14 is further included. The interaction module 14 is communicatively connected to the control module 11. The interaction module 14 is used to send test control commands input by the user through the interaction module 14 to the control module 11, and to receive and display functional test options and / or functional test results issued by the control module 11. The interaction module 14 provides users with a centralized and intuitive test control and information feedback interface. Users can use this interface to select or arrange test items, start test processes, and view the options, status, and final results of each functional test in real time. This integrates operations that were originally scattered across various independent instruments or required complex commands into a unified human-computer interaction entry point, greatly simplifying the complexity of operation, lowering the professional threshold for personnel, and ensuring the accuracy of test command transmission and the immediacy and completeness of test result display.
[0032] In specific embodiments, the interaction module 14 may be, for example, an industrial touch screen, an embedded industrial control screen, an industrial computer with a display, a physical control panel, or a remote terminal.
[0033] Please see Figure 2As shown, in an optional embodiment of the present invention, a transfer device 300 is provided on the outside of the cabinet door 21. The transfer device 300 is configured to guide or transport the high voltage generator 100 under test from the upstream workstation of the test cabinet 200 to the outside of the cabinet door 21, and to guide or transport the high voltage generator 100 under test from the outside of the cabinet door 21 to the downstream workstation of the test cabinet 200. This embodiment achieves automated flow of the high-voltage generator 100 under test in the testing process by connecting the transfer device 300 to the outside of the cabinet door 21 of the test cabinet 200. This allows the device under test to be guided from the upstream station (such as the assembly or buffer station) to the door of the test cabinet 200 and transferred to the downstream station (such as the packaging or repair station) after the test is completed. This connection seamlessly integrates the originally independent material handling link with the core testing link, replacing the traditional method of relying on manual transfer vehicles for movement. This not only significantly reduces the physical labor and operation time of personnel and improves the overall production line cycle time, but also eliminates the risk of bumps and safety hazards during manual handling.
[0034] Please see Figure 2 As shown, in an optional embodiment of this utility model, the transfer device 300 includes a non-powered transfer platform 60 and a lifting device 70 disposed at at least one end of the non-powered transfer platform 60. This utility model provides a low-cost, high-reliability transfer solution by combining a non-powered transfer platform 60 with an end lifting device 70 in the transfer device 300. The non-powered transfer platform 60 can achieve stable movement of the equipment using gravity or minor external forces, with a simple structure and convenient maintenance. The lifting device 70, disposed at one or both ends, is used to transfer the equipment between upstream and downstream conveyor lines at different heights, enabling automatic reception and delivery of the tested equipment. This combination achieves efficient connection and transmission of materials between workstations, significantly reducing equipment costs and energy consumption while ensuring smooth transfer and accurate positioning, further improving the overall automation and operating efficiency of the testing production line.
[0035] Please see Figure 2 As shown, to further optimize the testing workflow, the cabinet door 21 and the interaction module 14 can be located on the same side of the testing cabinet 200, i.e., one side of the X direction in the diagram, while the non-powered transfer platform 60 can be arranged along the Y direction in the diagram, reserving standing space for operators. Operators can concentrate on loading and unloading equipment, performing testing operations, and monitoring status in a safe area on the X side, while the Y direction is used for the assembly line transfer of the equipment under test. This layout effectively avoids the cross-interference between personnel activities and material flow routes, reserving a safe and dedicated standing and operating space for operators within a limited space, significantly improving the safety and convenience of human-machine interaction, thereby optimizing the overall layout of the testing station and improving space utilization and operational efficiency.
[0036] In summary, the high-voltage generator testing system provided by this utility model integrates the control module 11, electrical cabinet 10, protective cabinet 30, and a conveyor line that integrates a non-powered transfer platform 60 and a pneumatic lifting device 70 into a single design, creating a comprehensive testing platform with a small footprint. This system supports a one-stop automated testing process, significantly reducing operational complexity and labor intensity, and improving testing efficiency. The integrated connector reduces the number of wiring connections and protects the equipment interfaces. The linkage design between the electric door lock 22 and the testing process fully ensures the safety of testing personnel. Furthermore, by seamlessly connecting upstream assembly and downstream packaging stations, the platform optimizes the overall production line layout, further saving space and reducing overall costs.
[0037] The above embodiments are merely illustrative of the principles and effects of this utility model and are not intended to limit the scope of this utility model. Any person skilled in the art can modify or alter the above embodiments without departing from the spirit and scope of this utility model. Therefore, all equivalent modifications or alterations made by those skilled in the art without departing from the spirit and technical concept disclosed in this utility model should still be covered by the claims of this utility model.
[0038] Throughout this description, numerous specific details, such as examples of components and / or methods, are provided to provide a complete understanding of embodiments of the present invention. However, those skilled in the art will recognize that embodiments of the present invention may be practiced without one or more of these specific details or by other devices, systems, components, methods, parts, materials, components, etc. In other instances, well-known structures, materials, or operations have not been specifically shown or described in detail to avoid obscuring aspects of embodiments of the present invention.
Claims
1. A high-voltage generator test system, characterized by The application relates to a high-voltage generator testing device. The device comprises: a testing cabinet; a receiving part arranged in the testing cabinet and used for receiving a high-voltage generator to be tested, wherein the testing cabinet is provided with a cabinet door on at least one side of the receiving part; a power supply module arranged in the testing cabinet and used for supplying power to the high-voltage generator to be tested; a testing device arranged in the testing cabinet and used for testing the function of the high-voltage generator to be tested; 2. The high-voltage generator test system of claim 1, wherein, a transfer device arranged outside the cabinet door, wherein the transfer device is configured to guide or transport the high-voltage generator to be tested from a station upstream of the testing cabinet to outside the cabinet door and to guide or transport the high-voltage generator to be tested from outside the cabinet door to a station downstream of the testing cabinet. The testing device comprises: a detection module used for detecting a plurality of operating parameters of the high-voltage generator to be tested required for various function tests; 3. The high-voltage generator test system according to claim 1 or 2, characterized in that a control module configured to be communicatively connected with the high-voltage generator to be tested so as to control the operation of the high-voltage generator to be tested required for the function test; the control module is communicatively connected with the power supply module and the detection module, and is used for controlling the operation of the power supply module and the detection module, receiving the plurality of operating parameters of the high-voltage generator to be tested detected by the detection module, and determining the test results of the various function tests.
4. The high-voltage generator test system of claim 1 or 2, wherein The testing cabinet comprises a radiation shielding cabin used for receiving a test load.
5. The high-voltage generator test system of claim 4, wherein, The testing cabinet is provided with a door lock used for locking the cabinet door on the side where the cabinet door is located.
6. The high-voltage generator test system of claim 1 or 2, wherein, The door lock is an electric door lock, and the electric door lock is communicatively connected with the testing device so as to keep the cabinet door in a closed state or release the cabinet door from the closed state in response to a control signal sent by the testing device.
7. The high-voltage generator test system of claim 1 or 2, wherein, The device further comprises an electrical connector used for connecting a power supply port of the high-voltage generator to be tested, wherein the electrical connector is electrically connected with a power output port of the power supply module; and the electrical connector is further configured to be electrically connected with a test port of a safety regulation testing device.
8. The high-voltage generator test system of claim 1 or 2, wherein, The testing device is configured to be communicatively connected with the safety regulation testing device so as to control the operation of the safety regulation testing device and receive test data of the safety regulation testing device.
9. The high-voltage generator test system of claim 1 or 2, wherein, The device further comprises an interaction module communicatively connected with the testing device, wherein the interaction module is used for sending a test control instruction input by a user through the interaction module to the testing device, and receiving and displaying a function test option and / or a function test result sent by the testing device.
10. The high-voltage generator test system of claim 1 or 2, wherein, The transfer device comprises a power-free transfer platform and a lifting device arranged at least one end of the power-free transfer platform. The testing cabinet comprises an electrical cabinet, a protection cabinet and a protection cabinet; the power supply module and the testing device are installed in the electrical cabinet; the receiving part is arranged in the protection cabinet; and the protection cabinet is used for receiving a test load.