A constant temperature difference cooling crystallization device
By introducing a PLC control system and temperature sensor into the cooling crystallization device, constant temperature difference control between cooling water and materials is achieved, solving the crystal adhesion problem and improving crystallization speed and production efficiency.
Patent Information
- Application Number
- CN202522700837.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-19
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2035-12-19
AI Technical Summary
Existing cooling crystallization devices are inadequate in controlling the adhesion of crystals to the inner wall of the crystallization vessel and the crystallization rate, resulting in low heat transfer efficiency and low production efficiency.
A constant temperature difference cooling crystallization device is adopted. The temperature difference between the material and the cooling water is monitored by a PLC control system and a temperature sensor. The flow rate of the cooling water is controlled by a regulating valve to achieve a constant temperature difference between the cooling water and the material, preventing crystals from adhering to the reactor wall. The crystallization speed is controlled by internal and external circulation paths.
It effectively prevents crystals from adhering to the inner wall of the crystallization vessel, improves production efficiency and the controllability of crystallization speed, adapts to the cooling requirements of different materials, and improves production efficiency.
Smart Images

Figure CN224975842U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the technical field of chemical cooling crystallization equipment, specifically to a constant temperature difference cooling crystallization device. Background Technology
[0002] Cooling crystallization is a common unit operation in the chemical and environmental protection fields, utilizing the principle that the solubility of a substance decreases as temperature decreases. The usual practice is to circulate cooling water through a jacket or coil to cool the high-temperature saturated solution in the crystallizer. As the solution temperature decreases, crystals gradually precipitate. Once a certain temperature is reached, cooling is stopped, and solid-liquid separation yields the crystals. The driving force for cooling is the temperature difference between the solution and the cooling water. If the temperature difference is too large, the solution cools too quickly, causing a large number of crystals to form in a short time. These crystals tend to adhere to the inner wall of the crystallizer, hindering heat transfer and making production difficult. Conversely, if the temperature difference is too small, the solution cools too slowly, affecting production efficiency.
[0003] Chinese patent CN117462987A discloses a chemical cooling crystallization vessel. This vessel has a central cooling cylinder installed at the center of the vessel body, with a scraper elastically connected to it. As the central cooling cylinder rotates with the stirring shaft, the scraper removes crystals adhering to the inner wall of the vessel, solving the problem of crystal adhesion. However, it cannot control the crystallization rate. Chinese patent CN120154936A discloses a crystallization vessel with an adjustable crystallization rate. This invention, by adding an L-shaped scraper and an arc-shaped striking rod to the stirring rod, can scrape away crystals adhering to the inner wall of the vessel. The arc-shaped striking rod further removes crystals from the L-shaped scraper, thus solving the problem of crystal adhesion to the inner wall of the vessel. However, this device is relatively complex, requiring many additional components inside the vessel. On the one hand, crystals are prone to adhering to these components; on the other hand, the complex structure is more prone to malfunctions, causing more trouble for equipment maintenance.
[0004] Therefore, there is an urgent need to develop a device that can effectively solve the problem of crystals adhering to the inner wall of the crystallization vessel and preventing heat transfer, while also making the crystallization rate easier to control. Utility Model Content
[0005] To address at least one deficiency in the existing technology, the present invention aims to provide a constant temperature difference cooling crystallization device that can control the temperature difference between the cooling water and the material according to the actual needs of the material, thereby controlling the crystallization rate and allowing the crystals to grow and crystallize at the required speed; at the same time, it can prevent the formation of a large number of crystals in a short period of time, prevent the crystals from adhering to the inner wall of the crystallization vessel and hindering heat transfer, thereby improving production efficiency.
[0006] A constant temperature difference cooling crystallization device includes a crystallization kettle, a cooling system, and a PLC control system; The crystallization vessel and the cooling system are connected by pipes; The cooling system includes a chilled water return pipe, a chilled water supply pipe, an internal circulation pipe, a regulating valve, a pipeline pump, and a temperature sensor; The chilled water return pipe and the chilled water supply pipe are respectively connected to the crystallization vessel; one end of the internal circulation pipe is connected to the chilled water return pipe, and the other end is connected to the chilled water supply pipe; A first ball valve is installed on the chilled water return pipe; a second ball valve and a pipeline pump are installed on the chilled water supply pipe; a third ball valve is installed on the internal circulation pipe. The regulating valve is located at one end of the chilled water supply pipe near the inner circulation pipe; the temperature sensor is located at one end of the chilled water supply pipe near the crystallization vessel. The PLC control system is electrically connected to the crystallization vessel, the regulating valve, and the temperature sensor.
[0007] The regulating valve in this invention can control the flow rate of chilled water into the crystallizer by controlling the opening of the regulating valve, thereby controlling the temperature of the cooling water and maintaining a constant temperature difference between it and the material.
[0008] This invention features a pipeline pump installed on the chilled water supply pipe. When the constant temperature difference cooling crystallization device is operating in the internal circulation path, it can accelerate the flow rate of cooling water in the jacket and increase the crystallization speed.
[0009] In a preferred embodiment of this utility model, the pipeline pump is disposed between the temperature sensor and the internal circulation pipe.
[0010] In a preferred embodiment of this utility model, the crystallization vessel includes a motor assembly, a feed inlet, a temperature assembly, an upper end cap, a jacket, a stirring paddle, a discharge port, a discharge valve, a cooling water inlet, and a cooling water outlet. The motor assembly extends through the top of the crystallization vessel and is connected to the stirring paddle inside the vessel. The temperature assembly is mounted on the crystallization vessel, extends through the upper end cap, and contacts the material inside the vessel, used to indicate the temperature of the material inside the vessel. The feed inlet is located at the top of the crystallization vessel. The discharge port is located at the bottom of the crystallization vessel and is connected to the discharge valve. A cooling water inlet is located at the bottom of the crystallization vessel, through which cooling water enters the jacket and exits from the cooling water outlet at the top of the jacket.
[0011] In a preferred embodiment of this utility model, the chilled water return pipe is connected to the cooling water outlet; and the chilled water supply pipe is connected to the cooling water inlet.
[0012] In a preferred embodiment of this utility model, the temperature component is electrically connected to the PLC control system.
[0013] In a preferred embodiment of this utility model, the water path in the constant temperature difference cooling crystallization device includes an internal circulation path and an external circulation path. The internal circulation path passes sequentially through the cooling water outlet of the crystallizer, the chilled water return pipe, the internal circulation pipe, the chilled water supply pipe, the pipeline pump, the temperature sensor, and the cooling water inlet of the crystallizer. The external circulation path passes sequentially through the chilled water supply pipe, regulating valve, pipeline pump, temperature sensor, cooling water inlet of the crystallizer, cooling water outlet of the crystallizer, and chilled water return pipe.
[0014] In this invention, the temperature components installed in the crystallizer and the temperature sensors installed on the chilled water supply pipe can monitor the temperature of the material and cooling water in the crystallizer in real time. Based on the temperature difference between the two (ΔT1 = material temperature t1 - cooling water temperature t2) and the set temperature difference (ΔT2), the circulation path of the cooling water and the flow rate of the chilled water can be controlled.
[0015] In this invention, the water flowing into the chilled water supply pipe is chilled water. The chilled water mixes with the water passing through the internal circulation path in the pipe to become cooling water. Chilled water has a lower temperature than cooling water.
[0016] In a preferred embodiment of this invention, when multiple crystallization vessels need to operate simultaneously, multiple sets of the constant temperature difference cooling crystallization devices can be connected in parallel to the chilled water supply pipe and the chilled water return pipe. The opening degree of the regulating valve of each device in this invention is related to the magnitude of the actual temperature difference (ΔT1) and the set temperature difference (ΔT2) of the corresponding device. Therefore, they can all be controlled independently without affecting each other.
[0017] In this invention, when the PLC control system detects that the temperature difference between the material temperature t1 measured by the temperature component and the cooling water temperature t2 measured by the temperature sensor is lower than a set temperature value, the PLC control system increases the opening of the regulating valve, thereby increasing the amount of chilled water flowing into the crystallizer jacket. When the temperature difference between the material temperature and the cooling water temperature is higher than the set temperature value, the PLC control system decreases the opening of the regulating valve. When the temperature difference between the temperature component and the temperature sensor equals the set temperature value, the PLC control system keeps the opening of the regulating valve unchanged. This effectively controls the cooling and crystallization rate in the crystallizer, avoids crystal adhesion on the inner wall of the reactor, and prevents the need for crystal scraping and cleaning, further improving production efficiency.
[0018] The opening degree of the regulating valve described in this invention refers to the extent to which the valve is open, used to indicate the flow rate of cooling water. The larger the opening degree, the greater the flow rate.
[0019] This invention allows for control of the crystallization rate of materials by setting a temperature difference (ΔT2). A higher set temperature results in a faster crystallization rate, but excessively high temperatures lead to a large number of crystals forming in a short time, which easily adhere to the inner wall of the crystallization vessel, hindering heat transfer. Setting an appropriate set temperature according to production needs controls both the crystallization rate and prevents crystals from adhering to the inner wall of the crystallization vessel.
[0020] Compared with the prior art, the beneficial effects of this utility model are as follows: (1) The constant temperature difference cooling crystallization device of this utility model, based on the setting of the chilled water return pipe, chilled water supply pipe, internal circulation pipe, regulating valve, temperature sensor, multiple ball valves, etc., can effectively cool the material in the crystallization kettle while avoiding problems such as crystal adhesion.
[0021] (2) The constant temperature difference cooling crystallization device of this utility model can control the temperature difference between cooling water and material according to the actual needs of the material, including segmented temperature difference control. For example, the constant temperature difference is relatively small in metastable state, and the constant temperature difference can be larger in other temperature ranges, thereby controlling the crystallization speed so that the crystal grows and crystallizes at the required speed; at the same time, it can prevent the crystal from forming a large number of crystals in a short time, prevent the crystals from adhering to the inner wall of the crystallization vessel, prevent heat transfer, and thus improve production efficiency.
[0022] (3) It can be customized to meet the different cooling water volume and temperature requirements of multiple crystallizers. When multiple crystallizers are used at the same time and share a set of chilled water, the cooling water volume and temperature requirements are different because the material temperature in each crystallizer is different. The materials in each crystallizer can even be different, and different temperature differences can be set. This utility model device can dynamically change the opening of the electric regulating valve to dynamically match the cooling water volume requirements of each crystallizer, so that multiple crystallizers can maintain the corresponding constant temperature difference at the same time. Attached Figure Description
[0023] The accompanying drawings are for illustrative purposes only and should not be construed as limiting the scope of this patent. To better illustrate this embodiment, some components in the drawings may be omitted, enlarged, or reduced, and do not represent the actual dimensions of the product. It is understandable to those skilled in the art that some well-known structures and their descriptions may be omitted in the drawings.
[0024] Appendix Figure 1 This is a schematic diagram of a constant temperature difference cooling crystallization device according to an embodiment of the present invention.
[0025] Appendix Figure 2 This is a schematic diagram of the structure of the multiple constant temperature difference cooling crystallization devices of this utility model.
[0026] Figure label: 1. Crystallization vessel; 2. Cooling system; 101. Motor assembly; 102. Feed inlet; 103. Temperature assembly; 104. Upper end cap; 105. Jacket; 106. Agitator; 107. Discharge port; 108. Discharge valve; 109. Cooling water inlet; 110. Cooling water outlet; 201. Chilled water return pipe; 202. Chilled water supply pipe; 203. First ball valve; 204. Second ball valve; 205. Third ball valve; 206. Internal circulation pipe; 207. Regulating valve; 208. Pipeline pump; 209. Temperature sensor; 1-1 Crystallization vessel 1; 2-1 Cooling system 1; 1-2 Crystallization vessel 2; 2-2 Cooling system 2; The arrows in the diagram indicate the direction of water flow in the pipes. Detailed Implementation
[0027] In the description of this utility model, it should be noted that, unless otherwise explicitly specified and limited, the terms "installation" and "connection" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can be described as the internal communication between two components. Those skilled in the art can understand the specific meaning of the above terms in this utility model based on the specific circumstances. The technical solution of this utility model will be further described below with reference to the accompanying drawings and embodiments.
[0028] Example 1 See Figure 1 A constant temperature difference cooling crystallization device is used to cool ferrous sulfate solution and prepare ferrous sulfate heptahydrate crystals, including a crystallization kettle 1, a cooling system 2 and a PLC control system (not shown in the figure). The crystallization vessel 1 and the cooling system 2 are connected by pipes; The cooling system 2 includes a chilled water return pipe 201, a chilled water supply pipe 202, an internal circulation pipe 206, a regulating valve 207, a pipeline pump 208, and a temperature sensor 209; The chilled water return pipe 201 and the chilled water supply pipe 202 are respectively connected to the crystallization vessel 1; one end of the internal circulation pipe 206 is connected to the chilled water return pipe 201, and the other end is connected to the chilled water supply pipe 202; A first ball valve 203 is installed on the chilled water return pipe 201; a second ball valve 204 and a pipeline pump 208 are installed on the chilled water supply pipe 202; and a third ball valve 205 is installed on the internal circulation pipe 206. The regulating valve 207 is located on the chilled water supply pipe 202 near one end of the internal circulation pipe 206; The temperature sensor 209 is located at one end of the chilled water supply pipe 202 near the crystallizer 1; The PLC control system is electrically connected to the crystallizer 1, the regulating valve 207, and the temperature sensor 209.
[0029] The regulating valve 207 in this invention can control the flow rate of chilled water flowing into the crystallizing kettle 1 by controlling the opening of the regulating valve 207, thereby controlling the temperature of the cooling water and maintaining a constant temperature difference with the ferrous sulfate solution.
[0030] See Figure 1 The working process of this embodiment is as follows: When the crystallization vessel 1 is in operation, the first ball valve 203, the second ball valve 204, and the third ball valve 205 remain open, the opening of the regulating valve 207 is 0%, and the pipeline pump 208 remains open. At this time, the movement path of the cooling water is A→B→C→D→A, which is called the internal circulation path. The cooling water cools the ferrous sulfate solution through the vessel wall, causing the ferrous sulfate solution temperature t1 to decrease, the cooling water temperature t2 to increase, and ΔT1 to decrease. When the actual temperature difference ΔT1 is less than the set temperature difference ΔT2, the PLC control system automatically controls the opening of the regulating valve 207 to increase, increasing the amount of chilled water flowing into the crystallization vessel 1, causing t2 to decrease, and thus ΔT1 to increase until ΔT1=ΔT2. At this point, the opening of the regulating valve 207 no longer increases, thereby maintaining a constant temperature difference between the material and the cooling water. At this point, the chilled water flows through a path I→H→G→C, merging with a portion of the internal circulating cooling water via path A→B→C at point C, before flowing into crystallizing vessel 1 to warm the ferrous sulfate solution. Another portion of the cooling water is discharged via path A→B→E→F. The chilled water's path is I→H→G→C→D→A→B→E→F, which is referred to as the external circulation path.
[0031] In this embodiment, a pipeline pump 208 is installed on the chilled water supply pipe 202. When the constant temperature difference cooling crystallization device is running in the internal circulation path, it can accelerate the flow rate of cooling water in the crystallization kettle 1 and increase the crystallization speed.
[0032] In a preferred embodiment of the present invention, the pipeline pump 208 is disposed between the temperature sensor 209 and the internal circulation pipe 206.
[0033] In a preferred embodiment of this utility model, the crystallization vessel 1 includes a motor assembly 101, a feed inlet 102, a temperature assembly 103, an upper end cap 104, a jacket 105, a stirring paddle 106, a discharge port 107, a discharge valve 108, a cooling water inlet 109, and a cooling water outlet 110. The motor assembly 101 extends through the top of the crystallization vessel 1 and is connected to the stirring paddle 106 inside the crystallization vessel 1. The temperature assembly 103 is disposed on the crystallization vessel 1, extends through the upper end cap 104, and is in contact with the ferrous sulfate solution inside the vessel, used to indicate the temperature of the material inside the vessel. The feed inlet 102 is located at the upper part of the crystallization vessel 1. The discharge port 107 is located at the bottom of the crystallization vessel 1 and is connected to the discharge valve 108. The lower part of the crystallization vessel has a cooling water inlet 109, through which cooling water enters the jacket 105 and exits from the cooling water outlet 110 at the upper part of the jacket 105.
[0034] In a preferred embodiment of this utility model, the chilled water return pipe 201 is connected to the cooling water outlet 110; the chilled water supply pipe 202 is connected to the cooling water inlet 109.
[0035] In a preferred embodiment of this utility model, the temperature component 103 is electrically connected to the PLC control system.
[0036] In a preferred embodiment of this utility model, the water path in the constant temperature difference cooling crystallization device includes an internal circulation path and an external circulation path. The internal circulation path passes sequentially through the cooling water outlet 110 of the crystallizer, the chilled water return pipe 201, the internal circulation pipe 206, the chilled water supply pipe 202, the pipeline pump 208, the temperature sensor 209, and the cooling water inlet 109 of the crystallizer. The external circulation path passes sequentially through chilled water supply pipe 202, regulating valve 207, pipeline pump 208, temperature sensor 209, cooling water inlet 109 of crystallizer, cooling water outlet 110 of crystallizer, and chilled water return pipe 201.
[0037] In this invention, the temperature of the ferrous sulfate solution and the cooling water in the crystallizer 1 can be monitored in real time by the temperature component 103 installed in the crystallizer 1 and the temperature sensor 209 installed on the chilled water supply pipe 202. The circulation path of the cooling water and the flow rate of the chilled water can be controlled according to the temperature difference between the two (ΔT1 = ferrous sulfate solution temperature t1 - cooling water temperature t2) and the set temperature difference (ΔT2).
[0038] In this embodiment, the crystallization rate of the ferrous sulfate solution can be controlled by setting the temperature value (ΔT2). The higher the set temperature value, the faster the crystallization rate. However, if the set temperature value is too high, a large number of ferrous sulfate heptahydrate crystals will form in a short time, which are prone to adhering to the inner wall of the crystallization vessel and hindering heat transfer. A suitable set temperature can be set according to production needs to control the crystallization rate and prevent crystals from adhering to the inner wall of the crystallization vessel.
[0039] In this embodiment, the water flowing in from the chilled water supply pipe is chilled water, and the chilled water mixes with the water passing through the internal circulation path in the pipe to become cooling water.
[0040] Example 2 See Figure 2 When multiple crystallization vessels 1 need to operate simultaneously, multiple sets of the aforementioned constant temperature difference cooling crystallization devices can be connected in parallel to the chilled water supply pipe 202 and the chilled water return pipe 201. Each set of constant temperature difference cooling crystallization devices can have the same or different set temperature differences, and automatically change the opening of the regulating valve 207 according to the actual temperature difference between the material and the cooling water in each crystallization vessel 1, thereby adjusting the external circulating chilled water flow rate and changing the internal circulating cooling water temperature, so that the material and the cooling water maintain a corresponding constant temperature difference.
[0041] In this embodiment, the water flowing in from the chilled water supply pipe is chilled water, and the chilled water mixes with the water passing through the internal circulation path in the pipe to become cooling water.
[0042] The positional relationships described in the figures are for illustrative purposes only and should not be construed as limiting this patent. Clearly, the above embodiments of this utility model are merely examples to clearly illustrate the present utility model, and are not intended to limit the implementation of the present utility model. Those skilled in the art can make other variations or modifications based on the above description. It is neither necessary nor possible to exhaustively list all possible implementations here. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of this utility model should be included within the scope of protection of the claims of this utility model.
Claims
1. A thermostatic differential cooling crystallization apparatus, characterized by, Includes crystallization kettle, cooling system and PLC control system; The crystallization vessel and the cooling system are connected by pipes; The cooling system includes a chilled water return pipe, a chilled water supply pipe, an internal circulation pipe, a regulating valve, a pipeline pump, and a temperature sensor; The chilled water return pipe and the chilled water supply pipe are respectively connected to the crystallization vessel; one end of the internal circulation pipe is connected to the chilled water return pipe, and the other end is connected to the chilled water supply pipe; A first ball valve is installed on the chilled water return pipe; a second ball valve and a pipeline pump are installed on the chilled water supply pipe; a third ball valve is installed on the internal circulation pipe. The regulating valve is located at one end of the chilled water supply pipe near the inner circulation pipe; the temperature sensor is located at one end of the chilled water supply pipe near the crystallization vessel. The PLC control system is electrically connected to the crystallization vessel, the regulating valve, and the temperature sensor.
2. The apparatus of claim 1, wherein the temperature difference is about 10°C. The pipeline pump is located between the temperature sensor and the internal circulation pipe.
3. The apparatus of claim 1, wherein the temperature difference is about 10°C. The crystallization vessel includes a motor assembly, a feed inlet, a temperature assembly, an upper end cap, a jacket, a stirring paddle, a discharge port, a discharge valve, a cooling water inlet, and a cooling water outlet. The motor assembly extends through the top of the crystallization vessel and is connected to the stirring paddle inside the vessel. The temperature assembly is located on the crystallization vessel, extends through the upper end cap, and is in contact with the material inside the vessel, used to indicate the temperature of the material inside the vessel. The feed inlet is located at the top of the crystallization vessel. The discharge port is located at the bottom of the crystallization vessel and is connected to the discharge valve. A cooling water inlet is located at the bottom of the crystallization vessel, through which cooling water enters the jacket and exits from the cooling water outlet at the top of the jacket.
4. The apparatus of claim 3, wherein the temperature difference is about 10°C. The chilled water return pipe is connected to the cooling water outlet; the chilled water supply pipe is connected to the cooling water inlet.
5. The apparatus of claim 3, wherein the temperature difference is about 10°C. The temperature component is electrically connected to the PLC control system.
6. The constant temperature difference cooling crystallization apparatus as described in claim 3, characterized in that, The water path in the constant temperature difference cooling crystallization device includes an internal circulation path and an external circulation path. The internal circulation path passes sequentially through the cooling water outlet of the crystallizer, the chilled water return pipe, the internal circulation pipe, the chilled water supply pipe, the pipeline pump, the temperature sensor, and the cooling water inlet of the crystallizer. The external circulation path passes sequentially through the chilled water supply pipe, regulating valve, pipeline pump, temperature sensor, cooling water inlet of the crystallizer, cooling water outlet of the crystallizer, and chilled water return pipe.
7. The constant temperature difference cooling crystallization apparatus as described in claim 1, characterized in that, When multiple crystallization vessels are running simultaneously, multiple sets of the constant temperature difference cooling crystallization devices are connected in parallel on the chilled water supply pipe and the chilled water return pipe.
Citation Information
Patent Citations
Chemical crystallization kettle
CN117462987A
Crystallization kettle with adjustable crystallization rate
CN120154936A