A natural gas pipeline installation auxiliary device
By combining the centering component and the dust extraction component, coaxial centering of natural gas pipelines and purification of the welding environment are achieved, solving the problem of insufficient centering accuracy of existing equipment, improving welding quality and installation efficiency, and reducing the risk of leakage.
Patent Information
- Application Number
- CN202522504017.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-26
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2035-11-26
AI Technical Summary
The existing natural gas pipeline installation equipment lacks precision control in alignment, resulting in large coaxiality deviations, which affect welding quality and installation efficiency, and pose a risk of leakage.
A natural gas pipeline installation auxiliary device, including a centering component and a dust extraction component, is adopted. The coaxial centering of the pipeline is achieved by driving the lead screw and clamping frame with a servo motor, and the dust generated during welding is cleaned by a dust extraction fan, ensuring the stability of the pipeline position and the cleanliness of the welding environment.
It improves the coaxial alignment accuracy of pipeline installation, reduces welding defects, lowers the risk of leakage, and improves installation efficiency and environmental friendliness.
Smart Images

Figure CN224977899U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of pipeline installation technology, and in particular to an auxiliary device for natural gas pipeline installation. Background Technology
[0002] Natural gas pipelines, also known as gas transmission pipelines, are pipeline systems that transport natural gas from extraction sites or processing plants to urban gas distribution centers or users. They have advantages such as low transportation costs, high safety, and low losses. During the installation of natural gas pipelines, the welding process requires high alignment accuracy. If the alignment deviation is too large, it can easily lead to welding quality defects and leave potential leakage hazards.
[0003] A search revealed Chinese patent CN221210488U, which provides an auxiliary installation device for natural gas pipelines. By rotating the handle, the threaded rod of the clamp plate is rotated, which in turn pushes the clamp plate to move. This allows the natural gas pipeline to be fixed inside the U-shaped placement plate, facilitating subsequent welding of the pipeline. This solves the problems of the current device lacking support and fixation and the current device not being able to securely fix the natural gas pipeline.
[0004] However, during use, it was found that the device is insufficient in controlling the alignment accuracy of the pipeline, making it difficult to guarantee the alignment accuracy and prone to coaxiality deviation, which in turn affects the welding quality and installation efficiency, and is not conducive to the auxiliary use of natural gas pipeline installation. Utility Model Content
[0005] To address the shortcomings of existing technologies, this utility model provides an auxiliary device for natural gas pipeline installation, which achieves coaxial alignment during natural gas pipeline installation, reduces coaxiality deviation, improves alignment accuracy, shortens alignment adjustment time, reduces welding defects caused by alignment deviation, reduces leakage risks in subsequent use of natural gas pipelines, and meets the accuracy and safety requirements of pipeline installation.
[0006] To solve the above-mentioned technical problems, the present invention provides the following technical solution: a natural gas pipeline installation auxiliary device, including a pipeline body, an alignment component installed on the outer wall of the pipeline body, and a dust suction component provided on the alignment component;
[0007] The centering assembly includes a first clamping frame, with insert rods installed at the four corners of the first clamping frame. Movable blocks are slidably connected to two insert rods located on the same side. A first lead screw is rotatably connected to the first clamping frame. A second servo motor is installed on the first clamping frame. The output shaft of the second servo motor is coaxially connected to the first lead screw. A second clamping frame is provided on one side of the first clamping frame. The second clamping frame is inserted and engaged with the insert rods respectively. The upper and lower ends of the second clamping frame are threadedly connected to the two first lead screws respectively.
[0008] The movable block is slidably connected to a U-shaped block at the end away from the insertion rod. An arc-shaped clamping block is fixed on the U-shaped block, and the inner walls of the two arc-shaped clamping blocks abut against the outer peripheral wall of the pipe body, respectively.
[0009] Preferably, a protective box is installed on the movable block, and a gear is rotatably connected inside the protective box. A rack is installed on one of the insert rods on the same side, and the gear meshes with the rack.
[0010] Preferably, a first servo motor is mounted on the movable block, and the output shaft of the first servo motor is coaxially connected to the central shaft of the gear.
[0011] Through the above technical solution, the output shaft of the first servo motor drives the gear to rotate. Since the gear meshes with the rack on the insert rod, and the movable block is inserted into the first lead screw through the through hole, when the gear rotates, it drives the movable block to slide linearly along the two insert rods on the same side, thereby realizing the adjustment of the position of the movable block.
[0012] Preferably, the movable block has a through hole, the first lead screw is inserted into the through hole, and the inner walls of the first clamping frame and the second clamping frame abut against the outer peripheral wall of the pipe body, respectively.
[0013] Preferably, a third servo motor is mounted on the movable block, and a second lead screw is coaxially connected to the output shaft of the third servo motor.
[0014] Preferably, a positioning block is threaded onto the second lead screw, the positioning block is fixedly connected to the movable block, and one end of the second lead screw is rotatably connected to the arc-shaped clamping block.
[0015] Through the above technical solution, the output shaft of the third servo motor drives the second lead screw to rotate. Since the positioning block is fixedly connected to the movable block and threadedly engaged with the second lead screw, the second lead screw generates axial thrust when rotating, which pushes the arc-shaped clamping block to slide along the movable block through the U-shaped block, so that the two arc-shaped clamping blocks are clamped from both sides of the pipe body.
[0016] Preferably, the dust collection assembly includes a first arc tube and a second arc tube, with two of each. The middle portions of the two first arc tubes are fixedly connected to the middle portions of the first clamping frame and the second clamping frame, respectively, and the two second arc tubes are fixedly connected to the arc-shaped clamping block, respectively.
[0017] Preferably, the two first arc tubes and the two second arc tubes are connected by a connecting pipe, and the connecting pipe is provided with a telescopic pipe in the middle. The first arc tube and the second arc tube are respectively connected to multiple dust collection nozzles.
[0018] Preferably, a vacuum fan is installed on one of the movable blocks, and the input end of the vacuum fan is connected to two vacuum pipes, one of the vacuum pipes being connected to a first arc pipe and the other vacuum pipe being connected to a second arc pipe.
[0019] Through the above technical solution, the vacuum fan delivers negative pressure to the first and second arc pipes through two suction pipes respectively. The negative pressure covers the welding area between the two pipe bodies through multiple dust collection nozzles, collecting pollutants such as metal dust and fumes generated during welding.
[0020] The beneficial effects of this utility model are as follows: The pipeline body is placed between the first clamping frame and the second clamping frame. After the first clamping frame abuts against the outer wall of the pipeline body, the second clamping frame is inserted and slid along multiple insert rods. At this time, the second clamping frame is threadedly connected to the first lead screw. The output shaft of the second servo motor drives the first lead screw to rotate. When the first lead screw rotates, it drives the second clamping frame to move along the insert rods towards the first clamping frame, achieving initial clamping and limiting of the pipeline body. After moving the movable block to a suitable position, the inner walls of the two arc-shaped clamping blocks are tightly abutted against the outer peripheral wall of the pipeline body, further calibrating the position of the pipeline body. This achieves coaxial alignment during natural gas pipeline installation, reduces coaxiality deviation, improves alignment accuracy, shortens alignment adjustment time, reduces welding defects caused by alignment deviation, reduces leakage risks in subsequent use of the natural gas pipeline, and meets the accuracy and safety requirements of pipeline installation. Attached Figure Description
[0021] Figure 1 This is a schematic diagram of the overall structure of this utility model;
[0022] Figure 2 This is a schematic diagram of the first clamping frame structure of this utility model;
[0023] Figure 3 This is a schematic diagram of the gear structure of this utility model;
[0024] Figure 4 This is a schematic diagram of the arc-shaped clamping block structure of this utility model;
[0025] Figure 5 This is a schematic diagram of the dust collection component structure of this utility model.
[0026] In the diagram: 100, pipe body; 200, centering assembly; 201, first clamping frame; 202, insertion rod; 203, movable block; 204, protective box; 205, gear; 206, first servo motor; 207, rack; 208, first lead screw; 209, second servo motor; 210, second clamping frame; 211, through hole; 212, U-shaped block; 213, arc-shaped clamping block; 214, third servo motor; 215, second lead screw; 216, positioning block; 300, dust collection assembly; 301, first arc tube; 302, second arc tube; 303, connecting pipe; 304, telescopic pipe; 305, dust collection nozzle; 306, dust collection fan; 307, dust collection pipe. Detailed Implementation
[0027] To make the above-mentioned objectives, features and advantages of this utility model more apparent and understandable, the specific embodiments of this utility model will be described in detail below with reference to the accompanying drawings.
[0028] like Figure 1-5 As shown, this embodiment provides a natural gas pipeline installation auxiliary device, including a pipeline body 100, an alignment component 200 installed on the outer wall of the pipeline body 100, and a dust suction component 300 provided on the alignment component 200.
[0029] The centering component 200 includes a first clamping frame 201, with insert rods 202 installed at the four corners of the first clamping frame 201. Movable blocks 203 are slidably connected to two insert rods 202 on the same side. A first lead screw 208 is rotatably connected to the first clamping frame 201. A second servo motor 209 is installed on the first clamping frame 201. The output shaft of the second servo motor 209 is coaxially connected to the first lead screw 208. A second clamping frame 210 is provided on one side of the first clamping frame 201. The second clamping frame 210 is inserted and engaged with the insert rods 202 respectively. The upper and lower ends of the second clamping frame 210 are threadedly connected to the two first lead screws 208 respectively.
[0030] A U-shaped block 212 is slidably connected to one end of the movable block 203 away from the insertion rod 202. An arc-shaped clamping block 213 is fixed on the U-shaped block 212, and the inner walls of the two arc-shaped clamping blocks 213 respectively abut against the outer peripheral wall of the pipe body 100.
[0031] A protective box 204 is installed on the movable block 203. A gear 205 is rotatably connected inside the protective box 204. A rack 207 is installed on one of the insert rods 202 on the same side. The gear 205 and the rack 207 are meshed together. A first servo motor 206 is installed on the movable block 203. The output shaft of the first servo motor 206 is coaxially connected to the central shaft of the gear 205. The output shaft of the first servo motor 206 drives the gear 205 to rotate. Since the gear 205 is meshed with the rack 207 on the insert rod 202, and the movable block 203 is inserted into the first lead screw 208 through the through hole 211, when the gear 205 rotates, it drives the movable block 203 to slide linearly along the two insert rods 202 on the same side, thereby adjusting the position of the movable block 203.
[0032] The movable block 203 has a through hole 211. The first lead screw 208 is inserted into the through hole 211. The inner walls of the first clamping frame 201 and the second clamping frame 210 abut against the outer peripheral wall of the pipe body 100, respectively. A third servo motor 214 is installed on the movable block 203. A second lead screw 215 is coaxially connected to the output shaft of the third servo motor 214. A positioning block 216 is threaded onto the second lead screw 215. The positioning block 216 is fixedly connected to the movable block 203. One end of the second lead screw 215 is rotatably connected to the arc-shaped clamping block 213. The output shaft of the third servo motor 214 drives the second lead screw 215 to rotate. Since the positioning block 216 is fixedly connected to the movable block 203 and threadedly engaged with the second lead screw 215, the second lead screw 215 generates an axial thrust when rotating, pushing the arc-shaped clamping block 213 to slide along the movable block 203 through the U-shaped block 212, so that the two arc-shaped clamping blocks 213 are clamped from both sides of the pipe body 100.
[0033] The vacuuming assembly 300 includes a first arc-shaped tube 301 and a second arc-shaped tube 302. Two first arc-shaped tubes 301 and two second arc-shaped tubes 302 are provided. The middle portions of the two first arc-shaped tubes 301 are fixedly connected to the middle portions of the first clamping frame 201 and the second clamping frame 210, respectively. The two second arc-shaped tubes 302 are fixedly connected to the arc-shaped clamping blocks 213, respectively. The two first arc-shaped tubes 301 and the two second arc-shaped tubes 302 are connected by connecting pipes 303. A telescopic tube 304 is provided in the middle of the connecting pipe 303. Multiple dust collection devices are connected to the first arc-shaped tubes 301 and the second arc-shaped tubes 302, respectively. The nozzle 305 has a vacuum fan 306 installed on one of the movable blocks 203. The input end of the vacuum fan 306 is connected to two vacuum pipes 307. One vacuum pipe 307 is connected to one of the first arc pipes 301, and the other vacuum pipe 307 is connected to one of the second arc pipes 302. The vacuum fan 306 delivers negative pressure to the first arc pipe 301 and the second arc pipe 302 through the two vacuum pipes 307 respectively. The negative pressure covers the welding area between the two pipe bodies 100 through multiple dust collection nozzles 305, collecting pollutants such as metal dust and fumes generated during welding.
[0034] Working principle: The pipe body 100 is placed between the first clamping frame 201 and the second clamping frame 210. After the first clamping frame 201 abuts against the outer wall of the pipe body 100, the second clamping frame 210 is inserted and slid along the multiple insert rods 202. At this time, the second clamping frame 210 is threadedly connected to the first lead screw 208. The output shaft of the second servo motor 209 drives the first lead screw 208 to rotate. When the first lead screw 208 rotates, it drives the second clamping frame 210 to move along the insert rods 202 toward the first clamping frame 201, thereby achieving the initial clamping and limiting of the pipe body 100.
[0035] After moving the movable block 203 to the appropriate position, the inner walls of the two arc-shaped clamping blocks 213 are tightly abutted against the outer peripheral wall of the pipeline body 100, further calibrating the position of the pipeline body 100. This achieves coaxial alignment during the installation of the natural gas pipeline, reduces coaxiality deviation, improves alignment accuracy, shortens alignment adjustment time, reduces welding defects caused by alignment deviation, reduces leakage risks in the subsequent use of the natural gas pipeline, and meets the accuracy and safety requirements of pipeline installation.
[0036] The output shaft of the first servo motor 206 drives the gear 205 to rotate. Since the gear 205 is meshed with the rack 207 on the insert rod 202, and the movable block 203 is inserted into the first lead screw 208 through the through hole 211, when the gear 205 rotates, it drives the movable block 203 to slide linearly along the two insert rods 202 on the same side, thereby adjusting the position of the movable block 203.
[0037] After the movable block 203 moves to the target position, the output shaft of the third servo motor 214 drives the second lead screw 215 to rotate. Since the positioning block 216 is fixedly connected to the movable block 203 and threadedly engaged with the second lead screw 215, the second lead screw 215 generates axial thrust when it rotates, pushing the arc-shaped clamping block 213 to slide along the movable block 203 through the U-shaped block 212, so that the two arc-shaped clamping blocks 213 are clamped from both sides of the pipe body 100, forming a multi-point positioning together with the inner walls of the first clamping frame 201 and the second clamping frame 210, ensuring the coaxiality of the pipe body 100 is stable, reducing the displacement of the pipe body 100 during the welding process, and further ensuring the welding quality.
[0038] During pipeline welding, the output end of the dust extraction fan 306 collects the extracted dust through a dust collection bag. The dust extraction fan 306 delivers negative pressure to the first arc pipe 301 and the second arc pipe 302 through two suction pipes 307. Since the two first arc pipes 301 are fixed to the first clamping frame 201 and the second clamping frame 210 respectively, and the two second arc pipes 302 are fixed to the arc-shaped clamping block 213, and each arc pipe is connected through a connecting pipe 303 and a telescopic pipe 304, the negative pressure covers the welding area between the two pipeline bodies 100 through multiple dust collection nozzles 305, collecting pollutants such as metal dust and fumes generated during welding, realizing real-time purification of the installation environment, protecting the health of operators, and improving the environmental friendliness of natural gas pipeline installation and welding.
[0039] The above description is only a preferred embodiment of the present utility model, but the protection scope of the present utility model is not limited thereto. Any equivalent substitutions or changes made by those skilled in the art within the technical scope disclosed in the present utility model, based on the technical solution and the inventive concept of the present utility model, should be included within the protection scope of the present utility model.
Claims
1. A natural gas pipeline installation aid, characterized in that, include: The pipe body (100) has an alignment component (200) installed on its outer wall, and the alignment component (200) is provided with a dust suction component (300). The centering component (200) includes a first clamping frame (201), with insert rods (202) installed at the four corners of the first clamping frame (201). Movable blocks (203) are slidably connected to two insert rods (202) on the same side. A first lead screw (208) is rotatably connected to the first clamping frame (201). A second servo motor (209) is installed on the first clamping frame (201). The output shaft of the second servo motor (209) is coaxially connected to the first lead screw (208). A second clamping frame (210) is provided on one side of the first clamping frame (201). The second clamping frame (210) is inserted into the insert rods (202) respectively. The upper and lower ends of the second clamping frame (210) are threadedly connected to the two first lead screws (208) respectively. The movable block (203) is slidably connected to a U-shaped block (212) at one end away from the insertion rod (202). An arc-shaped clamp (213) is fixed on the U-shaped block (212), and the inner walls of the two arc-shaped clamps (213) respectively abut against the outer peripheral wall of the pipe body (100).
2. The natural gas pipeline installation aid of claim 1, wherein: A protective box (204) is installed on the movable block (203). A gear (205) is rotatably connected inside the protective box (204). A rack (207) is installed on one of the insert rods (202) on the same side. The gear (205) meshes with the rack (207).
3. The natural gas pipeline installation aid of claim 2, wherein: The movable block (203) is equipped with a first servo motor (206), and the output shaft of the first servo motor (206) is coaxially connected to the central shaft of the gear (205).
4. The natural gas pipeline installation aid of claim 3, wherein: The movable block (203) has a through hole (211), the first lead screw (208) is inserted into the through hole (211), and the inner walls of the first clamping frame (201) and the second clamping frame (210) abut against the outer peripheral wall of the pipe body (100).
5. The natural gas pipeline installation aid of claim 4, wherein: A third servo motor (214) is installed on the movable block (203), and a second lead screw (215) is coaxially connected to the output shaft of the third servo motor (214).
6. The natural gas pipeline installation aid of claim 5, wherein: The second lead screw (215) is threaded with a positioning block (216), which is fixedly connected to the movable block (203). One end of the second lead screw (215) is rotatably connected to the arc-shaped clamping block (213).
7. The natural gas pipeline installation aid of claim 1, wherein: The dust collection assembly (300) includes a first arc tube (301) and a second arc tube (302). There are two of each of the first arc tube (301) and the second arc tube (302). The middle parts of the two first arc tubes (301) are fixedly connected to the middle parts of the first clamping frame (201) and the second clamping frame (210), respectively. The two second arc tubes (302) are fixedly connected to the arc-shaped clamping block (213).
8. The natural gas pipeline installation auxiliary device as described in claim 7, characterized in that: The two first arc tubes (301) and the two second arc tubes (302) are connected by a connecting tube (303), and the connecting tube (303) is provided with a telescopic tube (304) in the middle. The first arc tube (301) and the second arc tube (302) are respectively connected to a plurality of dust collection nozzles (305).
9. The natural gas pipeline installation auxiliary device as described in claim 8, characterized in that: A vacuum cleaner fan (306) is installed on one of the movable blocks (203). The input end of the vacuum cleaner fan (306) is connected to two vacuum pipes (307). One of the vacuum pipes (307) is connected to one of the first arc pipes (301), and the other vacuum pipe (307) is connected to one of the second arc pipes (302).
Citation Information
Patent Citations
Auxiliary mounting device for natural gas pipeline
CN221210488U
