A beam-rail integrated maglev track assembly
By using an integrated beam-track maglev track assembly, which employs a factory prefabrication and on-site assembly mode for prefabricated composite beams and bridge decks, combined with the design of UHPC webs and T-shaped steel beams, the problems of high engineering cost, heavy weight, and difficulty in ensuring accuracy in traditional maglev track systems have been solved. This has enabled efficient, lightweight, and high-precision track control, improving operational stability and passenger comfort.
Patent Information
- Application Number
- CN202522705610.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-22
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2035-12-22
AI Technical Summary
In existing maglev track systems, the traditional beam-rail separation structure results in high engineering costs, heavy weight, and difficulty in maintaining millimeter-level precision over the long term. Furthermore, traditional construction techniques cannot achieve prefabricated construction, affecting operational stability and passenger comfort.
The maglev track assembly adopts an integrated beam-track system, including prefabricated composite beams and prefabricated bridge decks. Through a construction mode of factory prefabrication and on-site assembly, combined with the design of UHPC web and T-shaped steel beams, the track achieves millimeter-level precision control. Bolted connections and assembly gap adjustment are used to simplify the construction process and reduce the self-weight.
It improves construction efficiency and project quality, reduces the total life-cycle maintenance cost, ensures millimeter-level precision of the track, reduces triple coupling vibration of the train-track-beam system, and enhances running smoothness and ride comfort.
Smart Images

Figure CN224981985U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of maglev rail transit technology, specifically to a maglev track assembly that integrates beam and track. Background Technology
[0002] Maglev transportation, with its unique advantages such as low operating noise, strong climbing ability, and small turning radius, has shown great application potential in urban transportation, airport connections, and suburban railways. However, maglev systems impose stringent requirements on track geometry accuracy control at the millimeter level, far exceeding the requirements of conventional rail transit. This technological hurdle has led to two major core technological bottlenecks in existing maglev engineering projects: First, the structural limitations are prominent: traditional maglev track beams generally adopt a beam-track separation structure. The main reason is that the manufacturing precision of conventional prestressed concrete beams is difficult to meet the millimeter-level requirements of maglev systems, and operational precision can only be achieved through subsequent track adjustments. This passive precision control method not only requires additional auxiliary facilities such as sleepers, significantly increasing project costs, but also suffers from triple coupling vibration problems among the train, track, and beam, seriously affecting operational stability and passenger comfort.
[0003] Secondly, there are technical constraints in traditional construction techniques: existing maglev track beams mostly use prestressed concrete box girder structures, which suffer from problems such as excessive weight, relatively poor durability, and difficulties in transportation and hoisting. More importantly, traditional cast-in-place concrete technology cannot achieve prefabricated construction, resulting in long construction cycles and low efficiency; ordinary concrete undergoes large shrinkage and creep deformation, making it difficult to maintain millimeter-level precision over the long term; once the structure is formed, precision adjustments and component replacements cannot be made, and demolition and reconstruction would result in huge economic losses.
[0004] In addition, existing technologies have also developed integrated beam-track maglev track assemblies. Although the integrated beam-track structure has significant advantages in theory, the track accuracy depends entirely on the beam accuracy because traditional construction techniques cannot guarantee the millimeter-level manufacturing precision of the beam. This technical bottleneck severely restricts the application of integrated beam-track structures in practical engineering.
[0005] In conclusion, there is an urgent need for an integrated beam-track maglev track assembly to solve the problems existing in the current technology. Utility Model Content
[0006] The purpose of this utility model is to provide an integrated beam-track maglev track assembly, aiming to solve the problems of high cost, heavy weight, and difficulty in maintaining millimeter-level accuracy over a long period of time in existing beam-track separated maglev beams. The specific technical solution is as follows: A maglev track assembly integrating beam and track, comprising: A precast composite beam includes a composite web, end diaphragms and intermediate diaphragms. Two composite webs are arranged parallel to each other between two end diaphragms. Multiple intermediate diaphragms are arranged longitudinally between two composite webs. A connecting part is provided at the upper end of the composite web. The upper surfaces of the intermediate diaphragms and end diaphragms are flush with the upper surface of the connecting part. A prefabricated bridge deck, wherein the prefabricated bridge deck is fixedly connected to connecting portions located on its lower sides; The prefabricated bridge panel has track units on both sides, and each track unit has a motor reaction plate.
[0007] Preferably, the combined web includes a UHPC web and a T-shaped steel beam. The upper end of the UHPC web is provided with a connecting part, which forms a T-shaped structure with the UHPC web. The upper edge of the T-shaped steel beam is embedded in the lower end of the UHPC web.
[0008] Preferably, the intermediate diaphragm is disposed between two UHPC webs, and the UHPC webs, end diaphragms and intermediate diaphragms are cast together using UHPC concrete.
[0009] Preferably, the T-shaped steel beam includes a steel base plate and a steel web plate disposed on the steel base plate. The upper edge of the steel web plate is alternately provided with steel pins and mortises along the longitudinal direction. The steel pins and mortises are embedded in the concrete at the lower end of the UHPC web plate and are connected to the web plate steel skeleton in the UHPC web plate.
[0010] Preferably, the UHPC web includes a web concrete layer and a web steel skeleton located in the web concrete layer; The web steel frame includes lower open stirrups, upper open stirrups, web longitudinal reinforcement and bottom longitudinal reinforcement; the upper open stirrups and lower open stirrups are alternately arranged along the longitudinal direction, the lower open stirrups are arranged in a one-to-one correspondence with the steel pins, the steel pins are inserted into the openings at the lower ends of the lower open stirrups, the upper open stirrups are arranged in a one-to-one correspondence with the mortises, and the lower ends of the upper open stirrups are placed in the mortises. Multiple longitudinal reinforcement bars in the web are arranged vertically at intervals inside the upper and lower open stirrups, and a single longitudinal reinforcement bar in the web passes through the alternating upper and lower open stirrups in the longitudinal direction. The bottom ends of each bottom-opening stirrup are connected by bottom longitudinal steel bars on both sides.
[0011] Preferably, the web of the UHPC is thickened at the locations where steel pins and mortises are embedded.
[0012] Preferably, the track unit includes a steel pad and a track. The steel pad has a first mounting hole and is fixed to the upper surface of the precast bridge panel by a first fixing bolt. The motor reaction plate is mounted on the steel pad. The track has a second mounting hole and is fixed to the lower surface of the precast bridge panel by a second fixing bolt. Assembly gaps are provided between the first mounting hole and the first fixing bolt, and between the second mounting hole and the second fixing bolt.
[0013] Preferably, the track unit includes multiple track segments arranged sequentially along the longitudinal direction, and each track segment includes a steel pad and a track section.
[0014] Preferably, both the precast bridge panel and the connecting part are provided with mounting through holes. After passing the fixing bolt through the mounting through holes on the precast bridge panel and the connecting part, a fixing nut is used to tighten it. An assembly gap is left between the fixing bolt and the mounting through hole.
[0015] Preferably, the precast bridge deck includes multiple precast bridge deck segments, which are sequentially arranged longitudinally on the precast composite beam.
[0016] The application of the technical solution of this utility model has the following beneficial effects: This utility model adopts a construction mode of factory prefabrication + on-site assembly. Prefabricated composite beams and prefabricated bridge decks can be standardized in the factory, and only assembly and connection are required on site. Compared with the traditional cast-in-place construction method, it can significantly improve construction efficiency and project quality.
[0017] In this invention, the prefabricated bridge deck, steel pad, and track are all fastened together with bolts, which enables rapid disassembly and maintenance of the track unit and prefabricated bridge deck in the later stage, and significantly reduces the maintenance cost throughout the entire life cycle.
[0018] This utility model uses H-beams symmetrically cut to form T-shaped steel beams with built-in shear connectors (i.e., steel pins and mortises). The upper edge of the T-shaped steel beam is directly embedded in the web of the UHPC, eliminating the need for on-site welding of shear connectors, thus completely avoiding quality hazards such as welding defects and residual stress, and improving fatigue performance. The beam body does not require prestressing, eliminating complex processes such as prestressing tensioning and grouting, greatly simplifying the construction process and improving structural reliability.
[0019] This invention utilizes a rational material configuration: precast bridge deck bearing the pressure, UHPC web resisting the shear and bearing part of the tensile stress, and T-shaped steel beams bearing the tension, fully leveraging the advantages of each material. Compared to traditional prestressed concrete box girders, the structure's self-weight is reduced by approximately 50%, significantly lowering the beam's weight and achieving lightweighting, while also reducing transportation and hoisting difficulties and project costs. Finally, UHPC concrete has the advantage of low shrinkage and creep, effectively solving the problem of large shrinkage and creep deformation in ordinary concrete, making it difficult to maintain millimeter-level precision over long periods.
[0020] This invention provides a triple precision adjustment system to ensure millimeter-level precision control of the track. Specifically, it adjusts the installation precision of the beam through the pier supports, adjusts the installation precision of the precast bridge panel through the assembly gap between the precast bridge panel and the precast composite beam, and adjusts the position of the track unit on the precast bridge panel through the assembly gap between the track unit and the precast bridge panel. Furthermore, the precast bridge panel is designed to consist of multiple precast bridge panel segments, and the track unit consists of multiple track segments. The positioning precision of each precast bridge panel segment and track segment can be adjusted independently. Through this triple precision adjustment system, millimeter-level geometric precision control of the track can be comprehensively achieved, meeting the stringent precision requirements of maglev transportation systems and breaking through the technical bottleneck of traditional beam-track integrated structures that cannot guarantee construction precision.
[0021] This invention avoids the need for additional sleepers and other facilities in traditional beam-track separation structures, transforming the triple-coupled vibration of the train, track, and beam into a dual-coupled vibration of the train and track-beam, thus improving the structure's dynamic performance. Through innovative designs such as prefabricated construction, adjustable track precision, and rapid assembly and disassembly of each track unit, this invention successfully solves the technical challenges of lightweight, high-precision, and maintainable maglev track beams, providing crucial technical support for the industrialization and promotion of maglev transportation.
[0022] In addition to the objectives, features, and advantages described above, this utility model has other objectives, features, and advantages. The present utility model will now be described in further detail with reference to the figures. Attached Figure Description
[0023] The accompanying drawings, which form part of this application, are used to provide a further understanding of the present invention. The illustrative embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an undue limitation of the present invention. In the drawings: Figure 1 This is an isometric drawing of the magnetic levitation track assembly of this utility model; Figure 2 This is a cross-sectional view of the magnetic levitation track assembly of this utility model along the transverse direction; Figure 3 yes Figure 2 A magnified view of a section at point A in the middle; Figure 4This is a schematic diagram showing the connection between the T-shaped steel beam and the web steel frame in the composite web; Figure 5 yes Figure 4 A magnified view of a section at point B in the middle; Among them, 1. Precast composite beam, 11. T-shaped steel beam, 111. Steel bottom plate, 112. Steel web, 113. Steel pin, 114. Mortise, 12. UHPC web, 121. Lower opening stirrup, 122. Upper opening stirrup, 123. Longitudinal reinforcement of web, 124. Bottom longitudinal reinforcement, 125. Connection part, 126. Longitudinal reinforcement of connection part, 127. Transverse reinforcement of connection part, 13. End diaphragm, 14. Intermediate diaphragm, 2. Precast bridge deck, 21. Longitudinal reinforcement of bridge deck, 22. Transverse reinforcement of bridge deck, 3. Motor reaction plate, 4. Track unit, 41. Steel pad, 42. Fixing bolt one, 43. Track, 44. Fixing bolt two, 5. Fastening bolt assembly, 51. Fixing bolt, 52. Fixing nut. Detailed Implementation
[0024] To facilitate understanding of this invention, a more comprehensive description is provided below, along with preferred embodiments. However, this invention can be implemented in many different forms and is not limited to the embodiments described herein. Rather, these embodiments are provided to provide a more thorough and complete understanding of the disclosure of this invention.
[0025] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention pertains. The terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention.
[0026] Example: See Figures 1-5 This embodiment provides a beam-track integrated maglev track assembly, including: A precast composite beam 1 includes a composite web, end diaphragms 13 and intermediate diaphragms 14. Two composite webs are arranged parallel to each other between two end diaphragms 13. Multiple intermediate diaphragms 14 are arranged longitudinally between two composite webs. A connecting part 125 is provided at the upper end of the composite web. The upper surfaces of the intermediate diaphragms 14 and the end diaphragms 13 are flush with the upper surface of the connecting part 125. Precast bridge deck 2, which is fixedly connected to the connecting parts 125 located on its lower sides; Track unit 4, both sides of the prefabricated bridge panel 2 are provided with track unit 4, and each track unit 4 is provided with motor reaction plate 3.
[0027] In this embodiment, both the prefabricated composite beam 1 and the prefabricated bridge deck 2 are factory-prefabricated components, which can ensure the dimensional accuracy of the components and help ensure the accuracy of the track alignment. At the same time, the construction method of factory prefabrication and on-site assembly can significantly improve the construction efficiency of the maglev track assembly.
[0028] like Figure 2 , Figure 3 As shown, the combined web includes a UHPC web 12 and a T-shaped steel beam 11. The upper end of the UHPC web 12 is provided with a connecting part 125, and the connecting part 125 and the UHPC web 12 form a T-shaped structure. The upper edge of the T-shaped steel beam 11 is embedded in the lower end of the UHPC web 12.
[0029] Furthermore, the intermediate diaphragm 14 is disposed between the two UHPC webs 12. Both ends of the UHPC webs 12 and the T-shaped steel beams 11 are respectively connected to the end diaphragms 13 located at both ends. The UHPC webs 12, end diaphragms 13 and intermediate diaphragms 14 are cast together using UHPC concrete. UHPC concrete has the advantage of low shrinkage and creep, which can effectively solve the problem that ordinary concrete has large shrinkage and creep deformation and it is difficult to ensure the millimeter-level accuracy of the track for a long time.
[0030] like Figure 4 , Figure 5 As shown, the T-shaped steel beam 11 includes a steel base plate 111 and a steel web plate 112 disposed on the steel base plate 111. The upper edge of the steel web plate 112 is longitudinally provided with alternating steel pins 113 and mortises 114. The steel pins 113 and mortises 114 are embedded in the concrete at the lower end of the UHPC web plate 12 and are connected to the web steel skeleton in the UHPC web plate 12.
[0031] Specifically, the UHPC web 12 includes a web concrete layer and a web steel frame located in the web concrete layer; the web steel frame includes a lower open stirrup 121, an upper open stirrup 122, a web longitudinal reinforcement 123, and a bottom longitudinal reinforcement 124; the upper open stirrup 122 and the lower open stirrup 121 are alternately arranged longitudinally, the lower open stirrup 121 is arranged in a one-to-one correspondence with the steel pin 113, the steel pin 113 is inserted into the opening at the lower end of the lower open stirrup 121, the upper open stirrup 122 is arranged in a one-to-one correspondence with the mortise 114, and the lower end of the upper open stirrup 122 is placed in the mortise 114; Furthermore, multiple longitudinal reinforcing bars 123 are arranged vertically at intervals inside the upper open stirrups 122 and the lower open stirrups 121, and a single longitudinal reinforcing bar 123 passes through the alternating upper open stirrups 122 and the lower open stirrups 121 in the longitudinal direction. Furthermore, the lower ends of each bottom-opening stirrup 121 are connected by bottom longitudinal steel bars 124 on both sides. The UHPC web 12 is thickened at the embedded steel pins 113 and mortises 114 to completely wrap the lower end of the web steel skeleton.
[0032] like Figure 2 and Figure 3 As shown, the connecting part 125 is pre-embedded with longitudinal reinforcing bars 126 and transverse reinforcing bars 127. Multiple longitudinal reinforcing bars 126 are arranged at transverse intervals, and multiple transverse reinforcing bars 127 are arranged at longitudinal intervals. The longitudinal reinforcing bars 126 and the transverse reinforcing bars 127 are lapped together, and the transverse reinforcing bars 127 are lapped together with the uppermost longitudinal reinforcing bar 123 of the web. If necessary, some of the longitudinal reinforcing bars 126 can be lapped with the upper and lower open stirrups. The arrangement of the reinforcing bars in the connecting part is not limited to that listed in this embodiment. Those skilled in the art can flexibly set the arrangement of the reinforcing bars in the connecting part 125.
[0033] like Figures 1-3 As shown, the track unit 4 includes a steel pad 41 and a track 43. The steel pad 41 has a first mounting hole and is mounted on the upper surface of the precast bridge deck 2 by a first fixing bolt 42. The motor reaction plate 3 is mounted on the steel pad 41. The track 43 has a second mounting hole and is mounted on the lower surface of the precast bridge deck 2 by a second fixing bolt 44. There are assembly gaps between the first mounting hole and the first fixing bolt 42, and between the second mounting hole and the second fixing bolt 44. The alignment of the track can be adjusted well through the assembly gaps to achieve millimeter-level precision control of the track.
[0034] Furthermore, in order to better ensure the linearity of the track, the track unit 4 in this embodiment includes multiple track segments arranged sequentially along the longitudinal direction. Each track segment includes a steel pad 41 and a track 43. That is, the track unit on the precast bridge deck 2 is composed of multiple track segments. The steel pad 41 and track 43 in each track segment can be individually adjusted in installation position by assembly gap, which can better control the track accuracy.
[0035] Preferably, the assembly gap in this embodiment is 2-5mm; after the steel pad 41 and the track 43 are installed, material can be filled in the assembly gap (referring to the gap between the mounting through hole one and the bolt head of the fixing bolt one, and the gap between the mounting through hole two and the bolt head of the fixing bolt two) to ensure that the steel pad 41 and the track 43 are completely limited after installation, and to prevent changes in track positioning during later operation.
[0036] like Figure 2and Figure 3 As shown, the precast bridge panel 2 and the connecting part 125 are connected and fixed by a fastening bolt assembly 5. The fastening bolt assembly 5 includes a fixing bolt 51 and a fixing nut 52. Both the precast bridge panel 2 and the connecting part 125 are provided with mounting through holes. After the fixing bolt 51 is passed through the mounting through holes on the precast bridge panel 2 and the connecting part 125, it is fastened by the fixing nut 52. An assembly gap is left between the fixing bolt 51 and the mounting through hole. The installation position of the precast bridge panel can be adjusted through the assembly gap to ensure the positioning accuracy of the precast bridge panel.
[0037] The precast bridge deck 2 is provided with longitudinal steel bars 21 and transverse steel bars 22. Multiple longitudinal steel bars 21 are arranged at intervals along the transverse direction, and multiple transverse steel bars 22 are arranged at intervals along the longitudinal direction. The longitudinal steel bars 21 and transverse steel bars 22 are lapped together, thereby providing sufficient stress strength for the precast bridge deck.
[0038] Preferably, the precast bridge deck 2 can be installed using vertical support components. Multiple vertical support components are spaced longitudinally on the precast composite beam 1 to support the precast bridge deck. Each vertical support component includes support units symmetrically arranged on two UHPC webs 12. Each support unit includes a fixing part, an adjusting part, and a supporting part connected in sequence. The fixing part is used to install the supporting unit on the UHPC web 12 (e.g., by opening through holes in the UHPC web 12 and installing the supporting unit on the UHPC web using bolt assemblies). The supporting part is used to support the bottom surface of the UHPC web 12. The adjusting part can adjust the position of the supporting part in the lateral, longitudinal, and vertical directions, thereby enabling precise adjustment of the installation position of the precast bridge deck 2 on the precast composite beam 1 in the lateral, longitudinal, and vertical directions.
[0039] Of course, it is also feasible for the adjustment part to only realize the vertical position adjustment of the support part. After the precast bridge panel 2 is supported by the vertical support component, a horizontal force can be applied to the precast bridge panel 2 to achieve the effect of adjusting the position of the precast bridge panel 2 in the horizontal and vertical directions.
[0040] Preferably, the mounting through hole on the precast bridge deck 2 can be set as a countersunk hole to ensure that the bolt head of the fixing bolt 51 does not protrude from the upper surface of the precast bridge deck 2. The countersunk hole can be sealed with a waterproof cover to prevent rainwater from entering the mounting through hole and corroding the fixing bolt 51.
[0041] After the precast bridge deck 2 is precisely positioned, the vertical gap between the precast bridge deck 2 and the precast composite beam 1 can be filled with material to ensure the precise vertical positioning of the precast bridge deck 2; furthermore, the gap between the countersunk hole and the bolt head of the fixing bolt 51 can be filled with material to ensure that the horizontal displacement of the precast bridge deck 2 is completely limited.
[0042] Furthermore, to better ensure the linear accuracy of the track after installation, the prefabricated bridge deck 2 in this embodiment includes multiple prefabricated bridge deck segments, which are sequentially arranged longitudinally on the prefabricated composite beam 1. That is, the prefabricated bridge deck 2 is constructed by laying multiple prefabricated bridge deck segments longitudinally on the prefabricated composite beam 1. In this structural form, the installation position of each prefabricated bridge deck segment on the prefabricated composite beam 1 can be adjusted individually, making the accuracy adjustment of the prefabricated bridge deck more flexible and better ensuring the track alignment accuracy.
[0043] Furthermore, it is preferable that the length of the prefabricated bridge deck section is an integer multiple of the length of the track section. Therefore, there will be no situation where a certain track section needs to be installed across two prefabricated bridge deck sections at the same time. At the same time, it is beneficial to assemble the track section onto the prefabricated bridge deck section in advance in the prefabrication plant, thereby improving the efficiency of on-site construction.
[0044] Furthermore, adjacent bridge deck prefabricated sections are connected by wet joints or bolt assemblies. When bolt assemblies are used for connection, a connecting steel plate needs to be welded to the end of the bridge deck prefabricated section, and through holes are opened on the connecting steel plate. After the connecting steel plates of the two bridge deck prefabricated sections are butted together, bolt assemblies are used to lock the connection.
[0045] Preferably, since the precast bridge deck is mainly under pressure during operation, the precast bridge deck in this embodiment can be made of ordinary concrete or UHPC concrete.
[0046] The above description is merely a preferred embodiment of this utility model and is not intended to limit the utility model. Various modifications and variations can be made to this utility model by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this utility model should be included within the protection scope of this utility model.
Claims
1. A maglev track assembly integrating beam and track, characterized in that, include: A precast composite beam (1) includes a composite web, end diaphragms (13) and intermediate diaphragms (14). Two composite webs are arranged parallel to each other between the two end diaphragms (13). Multiple intermediate diaphragms (14) are arranged longitudinally between the two composite webs. A connecting part (125) is provided at the upper end of the composite web. The upper surfaces of the intermediate diaphragms (14) and the end diaphragms (13) are flush with the upper surface of the connecting part (125). Precast bridge deck (2), the precast bridge deck (2) is fixedly connected to the connecting parts (125) located on both sides below it; Track unit (4), both sides of the prefabricated bridge panel (2) are provided with track unit (4), and each track unit (4) is provided with motor reaction plate (3).
2. The integrated beam-track maglev track assembly according to claim 1, characterized in that, The combined web includes a UHPC web (12) and a T-shaped steel beam (11). The upper end of the UHPC web (12) is provided with a connecting part (125). The connecting part (125) and the UHPC web (12) form a T-shaped structure. The upper edge of the T-shaped steel beam (11) is embedded in the lower end of the UHPC web (12).
3. The integrated beam-track maglev track assembly according to claim 2, characterized in that, The intermediate diaphragm (14) is disposed between two UHPC webs (12), and the UHPC webs (12), end diaphragms (13) and intermediate diaphragms (14) are cast together using UHPC concrete.
4. The integrated beam-track maglev track assembly according to claim 2, characterized in that, The T-shaped steel beam (11) includes a steel base plate (111) and a steel web plate (112) disposed on the steel base plate (111). The upper edge of the steel web plate (112) is alternately provided with steel pins (113) and mortises (114) along the longitudinal direction. The steel pins (113) and mortises (114) are embedded in the concrete at the lower end of the UHPC web plate (12) and are connected to the web steel skeleton in the UHPC web plate (12).
5. The integrated beam-track maglev track assembly according to claim 4, characterized in that, The UHPC web (12) includes a web concrete layer and a web steel skeleton located in the web concrete layer; The web steel frame includes a lower open stirrup (121), an upper open stirrup (122), a web longitudinal reinforcement (123), and a bottom longitudinal reinforcement (124); the upper open stirrup (122) and the lower open stirrup (121) are alternately arranged along the longitudinal direction, the lower open stirrup (121) is arranged in a one-to-one correspondence with the steel pin (113), the steel pin (113) is inserted into the opening at the lower end of the lower open stirrup (121), the upper open stirrup (122) is arranged in a one-to-one correspondence with the mortise (114), and the lower end of the upper open stirrup (122) is placed in the mortise (114); Multiple longitudinal reinforcement bars (123) are arranged vertically at intervals inside the upper open stirrup (122) and the lower open stirrup (121), and a single longitudinal reinforcement bar (123) passes through the alternating upper open stirrup (122) and lower open stirrup (121) in the longitudinal direction. The bottom ends of each bottom-opening stirrup (121) are connected by bottom longitudinal steel bars (124) on both sides.
6. The integrated beam-track maglev track assembly according to claim 5, characterized in that, The UHPC web (12) is thickened at the locations where steel pins (113) and mortises (114) are embedded.
7. The integrated beam-track maglev track assembly according to any one of claims 1-6, characterized in that, The track unit (4) includes a steel pad (41) and a track (43). The steel pad (41) is provided with a first mounting hole. The steel pad (41) is set on the upper surface of the precast bridge panel (2) by a first fixing bolt (42). The motor reaction plate (3) is set on the steel pad (41). The track (43) is provided with a second mounting hole. The track (43) is set on the lower surface of the precast bridge panel (2) by a second fixing bolt (44). There are assembly gaps between the first mounting hole and the first fixing bolt (42) and between the second mounting hole and the second fixing bolt (44).
8. The integrated beam-track maglev track assembly according to claim 7, characterized in that, The track unit (4) includes multiple track segments arranged sequentially along the longitudinal direction. Each track segment includes a steel pad (41) and a track (43).
9. The integrated beam-track maglev track assembly according to claim 8, characterized in that, Both the precast bridge panel (2) and the connecting part (125) are provided with mounting through holes. After passing the fixing bolt (51) through the mounting through hole on the precast bridge panel (2) and the mounting through hole on the connecting part (125), the fixing nut (52) is used to tighten it. An assembly gap is left between the fixing bolt (51) and the mounting through hole.
10. The integrated beam-track maglev track assembly according to claim 9, characterized in that, The precast bridge deck (2) includes multiple precast bridge deck sections, which are arranged longitudinally on the precast composite beam (1).
