A drainage and noise reduction asphalt pavement structure
By introducing structures such as support pads, water collection components, and drainage components into asphalt pavements, the problems of noise and rainwater accumulation are solved, achieving noise reduction and drainage effects, and enhancing the stability and crack resistance of the pavement structure.
Patent Information
- Application Number
- CN202522540606.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-29
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2035-11-29
AI Technical Summary
Existing asphalt pavements generate noise due to friction between vehicle tires and the road surface and airflow disturbances. Under natural conditions, rainwater can easily accumulate or seep in, causing the base layer to soften and leading to water damage.
It adopts a combined structure of support pad, water collection component, drainage component, aggregate layer, bonding layer, mesh pad and asphalt layer, combined with hollow pipe, branch component and drainage joint, and realizes rapid rainwater discharge and noise reduction through the setting of porous particles and ceramics.
It effectively reduces noise, prevents base layer softening, improves rainwater drainage efficiency, and enhances pavement structural stability and crack resistance.
Smart Images

Figure CN224981996U_ABST
Abstract
Description
Technical Field
[0001] This utility model belongs to the field of asphalt pavement structure technology, and in particular relates to an asphalt pavement structure for drainage and noise reduction. Background Technology
[0002] Asphalt pavement refers to various types of pavement constructed by incorporating road asphalt materials into mineral materials. Asphalt binders improve the ability of paving aggregates to resist damage to the pavement from traffic and natural factors.
[0003] Although the surface smoothness of existing asphalt pavements is strictly controlled, the high-frequency friction between vehicle tires and the road surface and the airflow disturbance still generate a lot of noise. In addition, under natural conditions, the accumulation or infiltration of rainwater can easily cause pumping in the base layer, which can lead to softening and other adverse changes in the base layer, and thus easily cause water damage to the asphalt pavement. Utility Model Content
[0004] The purpose of this utility model is to provide a drainage and noise reduction asphalt pavement structure to address the aforementioned technical problems, thereby solving the issues raised in the background art.
[0005] In view of this, the present invention provides a drainage and noise reduction asphalt pavement structure, including a ground layer; Support pads are laid at intervals on the ground layer, and water collection and drainage components are installed on the upper surface of the support pads; Aggregate layer 3 is laid and leveled on top of water collection components and drainage components; A bonding layer is provided on the upper surface of the aggregate layer; Mesh pad, a mesh pad is laid on the bonding layer; An asphalt layer is provided on the upper surface of the mesh mat.
[0006] In the above technical solution, the mesh pad further includes a mesh component and a rubber sheet attached to the upper and lower surfaces of the mesh component, the rubber sheet having through holes.
[0007] In the above technical solution, furthermore, a number of porous clay particles are provided in the bonding layer.
[0008] Furthermore, in the above technical solution, a number of plate-shaped ceramics are also provided in the bonding layer.
[0009] In the above technical solution, the water collection component further includes: Hollow tube, with a hollow tube fixedly connected to the upper surface of the support pad; Water inlet: Water inlet holes are provided on both ends of the hollow tube for water seepage and introduction. Water collection pipe, the end of the hollow pipe is connected to the water collection pipe; Branching components: Several branching components are fixedly installed on the outer surface of the hollow tube.
[0010] In the above technical solution, the drainage component further includes: Drainage connectors: Several drainage connectors are connected to one side of the water collection pipe. The drain pipe has a drain connector on the other side that is buried along the roadside.
[0011] In the above technical solution, the branch component further includes: The plate part is fixedly attached to the outer wall of the hollow tube; The rod and plate are vertically and fixedly connected to the rod. The branch tube has several branch tubes evenly distributed on the outer surface of the rod.
[0012] Furthermore, in the above technical solution, a partition for supporting the hollow tube is provided inside the hollow tube.
[0013] The beneficial effects of this utility model are as follows: 1. A mesh pad is laid on the upper surface of the bonding layer for further noise reduction.
[0014] 2. Several porous clay particles are set in the bonding layer to absorb rainwater, and the porous particles can be superimposed with the noise reduction mechanism of the asphalt layer and the mesh mat to avoid noise being reflected and amplified between layers.
[0015] 3. The branch assembly is fixed to the outer surface of the hollow tube to enhance the exchange efficiency between the aggregate layer and rainwater. Attached Figure Description
[0016] Figure 1 This is a schematic diagram of the structure of this utility model; Figure 2 This is a utility model Figure 1 A magnified view of a section at point A in the middle; Figure 3 This is a schematic diagram of the mesh pad structure of this utility model; Figure 4 This is a schematic diagram of the water collection component and drainage component of this utility model; Figure 5 This is a utility model Figure 4 A magnified view of a section at point B in the middle; The markings in the diagram are as follows: 1-Ground layer, 2-Support pad, 3-Aggregate layer, 4-Bond layer, 5-Mesh pad, 6-Asphalt layer, 7-Mesh component, 8-Rubber sheet, 9-Through hole, 10-Porous clay particles, 11-Plate ceramic, 12-Hollow pipe, 13-Water inlet hole, 14-Water collection pipe, 15-Drainage joint, 16-Drainage pipe, 17-Plate section, 18-Stem section, 19-Branch pipe body, 20-Partition plate. Detailed Implementation
[0017] The technical solutions of the embodiments of this application will be clearly described below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of this application. All other embodiments obtained by those skilled in the art based on the embodiments of this application are within the scope of protection of this application.
[0018] Example 1: This embodiment provides a drainage and noise reduction asphalt pavement structure, including: Ground floor 1; Support pad 2: Several support pads 2 are laid at intervals on the ground layer 1. Water collection components and drainage components are provided on the upper surface of the support pads 2. Aggregate layer 3 is laid and leveled above the water collection component and the drainage component; Bonding layer 4 is provided on the upper surface of aggregate layer 3; Mesh pad 5, the bonding layer 4 is covered with mesh pad 5; Asphalt layer 6 is provided on the upper surface of mesh pad 5.
[0019] As can be seen in this embodiment, the ground layer 1, as the basic bearing layer of the pavement structure, adopts a graded crushed stone or lime-soil base course with a compaction degree ≥96% to provide stable support for the upper structure and prevent roadbed settlement caused by rainwater infiltration. Support pads 2, made of high-strength polyethylene or rubber, are laid intermittently on the ground layer 1. Water collection and drainage components are installed on the upper surface of the support pads 2 to collect and drain rainwater. The aggregate layer 3, laid above the water collection and drainage components, uses single-size basalt aggregate. The porosity of the aggregate layer 3 is set at 20%-25% to ensure that rainwater can quickly infiltrate to the lower water collection components. Simultaneously, the inter-particle friction of the aggregate achieves initial noise reduction. A bonding layer 4 is installed on the upper surface of the aggregate layer 3 to enhance the bonding strength between the aggregate layer 3 and the mesh pad 5, achieving secondary noise reduction and resistance. The bonding layer 4 consists of asphalt microparticles, emulsifiers, and stabilizers. The asphalt microparticles provide core bonding performance and are a micronized form of traditional asphalt materials, ensuring compatibility with asphalt concrete. The emulsifier reduces the interfacial tension between asphalt and water (or other solvents), allowing the asphalt microparticles to be stably dispersed in the solution, forming a uniform emulsion state, which is convenient for construction and application, while also improving the storage stability of the emulsion. The stabilizer prevents the emulsion from delamination or demulsification during storage or construction, ensuring the structural uniformity of the bonding layer after it is formed and avoiding local performance failure. The mesh mat 5 is laid on the upper surface of the bonding layer 4 for further noise reduction. The asphalt layer 6, as the road surface layer, is laid on the upper surface of the mesh mat 5. The porosity of the asphalt layer 6 is controlled at 18-22%, ensuring that rainwater can quickly penetrate to the lower mesh mat in rainy weather, avoiding water accumulation on the road surface.
[0020] Example 2: This embodiment provides a drainage and noise reduction asphalt pavement structure, which, in addition to the technical solutions of the above embodiments, also has the following technical features.
[0021] The mesh pad 5 includes a mesh component 7 and a rubber sheet 8 attached to the upper and lower surfaces of the mesh component 7. The rubber sheet 8 has through holes 9.
[0022] As can be seen from this embodiment, the mesh pad 5 includes a mesh 7 and a rubber sheet 8. The mesh 7 is made of fiberglass mesh cloth, which is used to enhance the crack resistance of the road structure. The rubber sheet 8 is attached to the upper and lower surfaces of the mesh 7 and is made of styrene-butadiene rubber. The rubber sheet 8 has through holes 9 for rainwater infiltration. At the same time, the elastic deformation of the rubber material reduces the vibration noise generated by the vehicle driving.
[0023] Example 3: This embodiment provides a drainage and noise reduction asphalt pavement structure, which, in addition to the technical solutions of the above embodiments, also has the following technical features.
[0024] Several porous clay particles 10 are provided in the bonding layer 4.
[0025] As can be seen from this embodiment, a number of porous clay particles 10 are provided in the bonding layer 4 to absorb rainwater, and the porous particles can be superimposed with the noise reduction mechanism of the asphalt layer 6 and the mesh pad 5 to avoid noise being reflected and amplified between layers.
[0026] Example 4: This embodiment provides a drainage and noise reduction asphalt pavement structure, which, in addition to the technical solutions of the above embodiments, also has the following technical features.
[0027] Several plate-shaped ceramics 11 are also provided in the bonding layer 4.
[0028] As can be seen in this embodiment, several plate-shaped ceramics 11 are also provided in the bonding layer 4. The alumina ceramics are used. The plate-shaped ceramics 11 extend the sound energy path through reflection and scattering, thereby further enhancing the noise reduction effect.
[0029] Example 5: This embodiment provides a drainage and noise reduction asphalt pavement structure, which, in addition to the technical solutions of the above embodiments, also has the following technical features.
[0030] The water collection components include: Hollow tube 12, and hollow tube 12 are fixedly connected to the upper surface of support pad 2; Water inlet 13: Water inlet 13 is provided on both ends of the hollow tube 12 for water infiltration and introduction. Water collection pipe 14, the end of hollow pipe 12 is connected to water collection pipe 14; Branch components: Several branch components are fixedly installed on the outer surface of the hollow tube 12.
[0031] As can be seen in this embodiment, a hollow tube 12 is fixedly connected to the upper surface of the support pad 2. The hollow tube 12 is made of PVC material and its cross-section can be rectangular or hexagonal. A water inlet hole 13 is opened on the end wall of the hollow tube to collect rainwater that permeates from the aggregate layer 3. The water collection pipe 14 is connected to the end of the hollow tube 12 and is made of HDPE material to collect rainwater from each hollow tube 12. The branch component is fixed to the outer surface of the hollow tube 12 to enhance the exchange efficiency between the aggregate layer 3 and the rainwater.
[0032] Example 6: This embodiment provides a drainage and noise reduction asphalt pavement structure, which, in addition to the technical solutions of the above embodiments, also has the following technical features.
[0033] The drainage components include: Drainage connector 15, several drainage connectors 15 are connected to one side of the water collection pipe 14; The other side of the drain pipe 16 and the drain connector 15 are connected to the drain pipe 16 buried on the roadside.
[0034] As can be seen in this embodiment, a number of drainage joints 15 are connected to one side of the water collection pipe 14. The drainage joints 15 are made of PVC material. The other side of the drainage joints 15 is connected to a drainage pipe 16 buried on the roadside. The drainage pipe 16 is buried under the road shoulder and connected to the urban rainwater pipe network to discharge the rainwater collected by the water collection pipe 14 in a directional manner.
[0035] Example 7: This embodiment provides a drainage and noise reduction asphalt pavement structure, which, in addition to the technical solutions of the above embodiments, also has the following technical features.
[0036] The branching components include: Plate 17, hollow tube 12 outer wall is fixedly attached to plate 17; The rod portion 18 and the plate portion 17 are vertically and fixedly connected to the rod portion 18; The branch tube 19 has several branch tubes 19 evenly distributed on the outer surface of the rod 18.
[0037] As can be seen in this embodiment, a plate 17 is fixedly attached to the outer wall of the hollow tube 12, and a rod 18 is vertically fixedly connected to the plate 17. Several branch tubes 19 are evenly distributed on the outer surface of the rod 18. Both the rod 18 and the branch tubes 19 are rigid structures that can resist the extrusion and deformation of the aggregate particles and maintain the interconnected pores of the aggregate layer 3. Even if the aggregate pores are partially blocked, rainwater can still flow to the hollow tube 12 through the branch tubes 19. Example 8: This embodiment provides a drainage and noise reduction asphalt pavement structure, which, in addition to the technical solutions of the above embodiments, also has the following technical features.
[0038] The hollow tube 12 has a partition 20 inside for supporting the hollow tube 12.
[0039] As can be seen from this embodiment, the hollow tube 12 is provided with a partition 20 for supporting the hollow tube 12, which enhances the structural strength and prevents deformation under pressure.
[0040] Construction steps: Lay a layered base course of graded crushed stone or lime-soil, using a heavy roller to achieve a compaction degree of over 96% to provide stable support for the upper structure. Lay a support pad 2 on the ground layer 1, calibrating its height with a level to ensure its flatness. Fix the prefabricated hollow pipe 12 to the upper surface of the support pad 2, which can be done by welding with HDPE welding rods. Connect the end of the hollow pipe 12 to the water collection pipe 14. Excavate a drainage ditch below the road shoulder and lay a drainage pipe 16, connecting it to the water collection pipe 14 through a drainage connector 15. Connect the end of the drainage pipe 16 to the urban stormwater network. Perform a sealing test on the water collection pipe 14 and the drainage pipe 16. Evenly spread basalt aggregate on the support pad 2, hollow pipe 12, branch components, drainage connector 15, and drainage... Above pipe 16, a light roller is used to compact the aggregate layer twice to ensure that the porosity of the aggregate layer is ≥20%. The raw material of the bonding layer 4 is heated and mixed evenly with porous clay particles 10 and plate ceramics 11. The mixed bonding layer 4 material is evenly spread on the upper surface of the aggregate layer 3 and leveled manually to ensure that the plate ceramics 11 are staggered. The prefabricated mesh mat 5 is laid flat on the upper surface of the bonding layer 4, with the mesh mats 5 overlapping and fixed with asphalt binder to ensure that the through holes 9 of the mesh mat 5 are not blocked and are tightly attached to the bonding layer 4. The raw material of the asphalt layer 6 is heated and spread at a uniform speed using an asphalt paver. A 10t roller is used to compact the asphalt layer 6 to ensure that the porosity of the asphalt layer 6 is ≥18%. After construction, the thickness, smoothness, porosity, noise reduction efficiency, and drainage efficiency of each layer of the road are tested.
[0041] The embodiments of this application have been described above with reference to the accompanying drawings. Unless otherwise specified, the embodiments and features in the embodiments of this application can be combined with each other. This application is not limited to the specific embodiments described above. The specific embodiments described above are merely illustrative and not restrictive. Those skilled in the art can make many other forms under the guidance of this application without departing from the spirit and scope of the claims, and all of these forms are within the protection scope of this application.
Claims
1. A drainage and noise reduction asphalt pavement structure, characterized in that, include: Ground layer (1); Support pad (2), several support pads (2) are laid at intervals on the ground layer (1), and water collection components and drainage components are provided on the upper surface of the support pad (2); Aggregate layer (3), an aggregate layer (3) is laid and spread out on top of the water collection component and the drainage component; A bonding layer (4) is provided on the upper surface of the aggregate layer (3); Mesh pad (5), the mesh pad (5) is laid on the bonding layer (4); Asphalt layer (6), the upper surface of the mesh pad (5) is provided with asphalt layer (6); The mesh pad (5) includes a mesh (7) and a rubber sheet (8) attached to the upper and lower surfaces of the mesh (7), and the rubber sheet (8) has through holes (9).
2. The asphalt pavement structure for drainage and noise reduction according to claim 1, characterized in that, The water collection assembly includes: Hollow tube (12), the upper surface of the support pad (2) is fixedly connected to the hollow tube (12); Water inlet (13): The hollow tube (12) has water inlet holes (13) on both ends of its walls for water infiltration. Water collection pipe (14), the end of the hollow pipe (12) is connected to the water collection pipe (14). Branch components, a number of branch components are fixedly provided on the outer surface of the hollow tube (12).
3. The drainage and noise reduction asphalt pavement structure according to claim 2, characterized in that, The drainage assembly includes: Drainage connector (15), a number of drainage connectors (15) are connected to one side of the water collection pipe (14); Drainage pipe (16), and the other side of the drainage connector (15) is connected to a drainage pipe (16) buried on the roadside.
4. The drainage and noise reduction asphalt pavement structure according to claim 3, characterized in that, The branch component includes: Plate part (17), the outer wall of the hollow tube (12) is fixedly attached to the plate part (17); The rod (18) is vertically fixed to the plate (17). Branch tube (19), a number of branch tubes (19) are evenly distributed on the outer surface of the rod (18).
5. The drainage and noise reduction asphalt pavement structure according to claim 4, characterized in that, The hollow tube (12) is provided with a partition (20) for supporting the hollow tube (12).