A type of stepped prefabricated slope protection component

The design of tiered precast slope protection components solves the problems of slope stability and drainage, improves the stability and durability of the slope, has a short construction period, and provides good drainage.

CN224982202UActive Publication Date: 2026-11-17CHINA RAILWAY 11TH BUREAU GRP CORP LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202521547704.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-07-23
Publication Date
2026-11-17
Estimated Expiration
2035-07-23

AI Technical Summary

Technical Problem

In existing technologies, the problems of poor slope stability and poor drainage make slopes prone to landslides, collapses, and have low drainage efficiency.

Method used

The tiered prefabricated slope protection components include the slope body, the prefabricated component body, the horizontal section and the vertical section. They are produced in a standardized factory and quickly assembled on site to form an L-shaped structure. The prefabricated component body is made of reinforced concrete and has internal drainage trenches and pre-embedded PVC pipes to achieve effective drainage and enhanced stability.

Benefits of technology

It improves the stability and durability of the slope, reduces the erosion of the slope by water, and enhances construction and drainage efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224982202U_ABST
    Figure CN224982202U_ABST
Patent Text Reader

Abstract

This utility model discloses a tiered precast slope protection component, comprising a slope body, precast component bodies, horizontal sections, and vertical sections. A road surface is provided at the top of the slope body, and a main drainage ditch is provided at the bottom. A primary slope, a secondary slope, and a tertiary slope are sequentially arranged on the slope body, with precast component bodies provided at the connection points of the primary, secondary, and tertiary slopes. A seepage ditch is provided on the inner side of each precast component body. The precast component body consists of horizontal and vertical sections, and a secondary drainage ditch is provided at one end of each horizontal section. This utility model, by installing a slope body, precast component bodies, horizontal sections, vertical sections, seepage ditches, secondary drainage ditches, and a main drainage ditch, utilizes precast L-shaped components as the locking structure for each level of slope, and provides transverse seepage ditches on the inner side of the L-shaped precast components, connecting to drainage holes in the wall surface, effectively draining seepage water from the roadbed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the technical field of slope protection components, specifically a stepped prefabricated slope protection component. Background Technology

[0002] Multi-stage slope filling is a construction technique used in civil engineering projects such as road engineering and water conservancy projects to fill earth or rock in a layered and graded manner for high or steep slopes. The stability and drainage performance of multi-stage slope filling are key factors to ensure the long-term safe service of the roadbed.

[0003] For slope stability assurance, conventional protection methods often employ cast-in-place concrete toe stones and masonry rubble masonry slope protection. Cast-in-place structures have long construction cycles, are greatly affected by weather and other environmental factors, and the quality of on-site pouring is difficult to control precisely. Masonry rubble masonry slope protection has poor overall integrity and is prone to problems such as loosening of rubble and cracking of the slope protection under the action of lateral soil pressure. It cannot effectively form a continuous and reliable lateral constraint on the horizontal soil pressure at the toe of the slope, which makes the slope prone to diseases such as landslides and collapses under long-term loads and rainwater erosion. Moreover, traditional roadbed drainage often relies on a combination of surface drainage ditches and simple blind ditches. Surface drainage ditches are easily blocked by debris, resulting in low drainage efficiency. Utility Model Content

[0004] The purpose of this utility model is to provide a stepped prefabricated slope protection component to solve the problems of poor stability and poor drainage mentioned in the background art.

[0005] To achieve the above objectives, this utility model provides the following technical solution: a stepped prefabricated slope protection component, comprising a slope body, a prefabricated component body, a horizontal section, and a vertical section. A road surface is provided at the top of the slope body, and a main drainage ditch is provided at the bottom of the slope body. A primary slope, a secondary slope, and a tertiary slope are sequentially arranged on the slope body, and a prefabricated component body is provided at the connection points of the primary, secondary, and tertiary slopes. A seepage ditch is provided on the inner side of each prefabricated component body. The prefabricated component body is composed of a horizontal section and a vertical section, and a secondary drainage ditch is provided at one end of the horizontal section.

[0006] As a further technical solution of this utility model, the horizontal segment and the vertical segment form an L-shaped structure, and both the horizontal segment and the vertical segment are made of reinforced concrete.

[0007] As a further technical solution of this utility model, the horizontal and vertical sections are evenly distributed with protrusions on the side near the main body of the slope, and the cross-section of each protrusion is triangular.

[0008] As a further technical solution of this utility model, a first steel mesh is embedded inside each of the horizontal sections, and a second steel mesh is embedded inside each of the vertical sections.

[0009] As a further technical solution of this utility model, a pre-embedded PVC pipe is provided between the horizontal section and the vertical section. One end of the pre-embedded PVC pipe is located above the secondary drainage ditch, and the other end of the pre-embedded PVC pipe is connected to the seepage ditch.

[0010] As a further technical solution of this utility model, drainage holes are evenly distributed in the main body of the slope on both sides of the seepage ditch, and the drainage holes are all connected to the seepage ditch.

[0011] As a further technical solution of this utility model, a filter screen is provided at the end of the pre-embedded PVC pipe near the seepage trench, and the filter screen is made of stainless steel.

[0012] As a further technical solution of this utility model, buckles are provided at the four corners on one side of the filter screen, and fixing blocks are provided around the inside of the pre-embedded PVC pipe, with slots opened on the side of the fixing blocks near the buckles.

[0013] Compared with existing technologies, the beneficial effects of this utility model are as follows: This tiered precast slope protection component comprises a slope body, a primary slope, a secondary slope, a tertiary slope, a precast component body, horizontal sections, vertical sections, seepage ditches, secondary drainage ditches, and a main drainage ditch. The precast component body serves as the locking structure for each level of slope. The precast component body is composed of horizontal and vertical sections, and can be produced in a standardized factory, allowing for rapid on-site assembly and a short construction period. The precast component body has an L-shaped structure, with the vertical sections embedded in the slope soil and the horizontal sections bearing the load of the upper soil, acting like an "anchor" to hold the slope toe. The prefabricated components prevent lateral slippage of the slope soil, enhancing the overall anti-sliding stability of multi-level slopes. Especially when the soil is subjected to water erosion and load changes, they maintain the stability of the slope shape, resulting in better stability for each level of slope. The inner side of the prefabricated components is equipped with transverse seepage trenches that connect to drainage holes in the wall. Furthermore, the prefabricated components have embedded PVC pipes inside, which can actively collect seepage water from the slope soil. Through the connected drainage holes in the wall, the seepage water is guided to the secondary drainage ditch and then flows into the main drainage ditch for discharge. This not only prevents the soil from softening and losing strength due to water accumulation, but also reduces the erosion of the slope by water, thus improving the durability of the slope. Attached Figure Description

[0014] To more clearly illustrate the technical solutions of the embodiments of this utility model, the drawings used in the embodiments will be briefly introduced below. It should be understood that the following drawings only show some embodiments of this utility model and should not be regarded as a limitation on the scope. For those skilled in the art, other related drawings can be obtained based on these drawings without creative effort.

[0015] Figure 1This is a front view cross-sectional structural diagram of the present invention;

[0016] Figure 2 This is a partially enlarged structural schematic diagram of the present invention;

[0017] Figure 3 For the present utility model Figure 2 Enlarged structural diagram at point A in the middle;

[0018] Figure 4 This is a schematic cross-sectional view of the main body of the prefabricated component of this utility model;

[0019] Figure 5 This is a partial cross-sectional structural diagram of the pre-embedded PVC pipe of this utility model.

[0020] In the diagram: 1. Main slope; 2. Primary slope; 3. Secondary slope; 4. Tertiary slope; 5. Road surface; 6. Main drainage ditch; 7. Main precast component; 8. Seepage ditch; 9. Drainage hole; 10. Secondary drainage ditch; 11. Horizontal section; 12. Vertical section; 13. Embedded PVC pipe; 14. Protrusion; 15. First steel mesh; 16. Second steel mesh; 17. Filter screen; 18. Fixing block; 19. Clip; 20. Slot. Detailed Implementation

[0021] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of the present utility model without creative effort are within the scope of protection of the present utility model.

[0022] Please see Figure 1-5 The present invention provides an embodiment of a stepped prefabricated slope protection component, comprising a slope body 1, a prefabricated component body 7, a horizontal section 11 and a vertical section 12. A road surface 5 is provided on the top of the slope body 1, and a main drainage ditch 6 is provided at the bottom of the slope body 1. A first-level slope 2, a second-level slope 3 and a third-level slope 4 are sequentially provided on the slope body 1, and a prefabricated component body 7 is provided at the connection of the first-level slope 2, the second-level slope 3 and the third-level slope 4.

[0023] The connection points of the first-level slope 2, the second-level slope 3, and the third-level slope 4 are all secured by precast main components 7 as locking structures. The precast main components 7 can be produced in a standardized factory and quickly assembled on site, resulting in a short construction cycle.

[0024] The precast component 7 is composed of a horizontal section 11 and a vertical section 12, which form an L-shaped structure. The vertical section 12 is embedded in the slope soil, and the horizontal section 11 bears the load of the upper soil, like an "anchor" to hold the slope toe and restrict the lateral slippage of the slope soil, so that the slopes at all levels have better stability.

[0025] Both horizontal section 11 and vertical section 12 are made of reinforced concrete, which can withstand the pressure of the slope soil and the upper load. They are resistant to moisture and have good impermeability, making them suitable for long-term buried environments.

[0026] The horizontal section 11 and the vertical section 12 have protrusions 14 evenly distributed on the side close to the main body of the slope 1, and the cross section of the protrusions 14 is triangular, which increases the friction with the main body of the slope 1 and enhances the connection stability with the main body of the slope 1.

[0027] The horizontal section 11 is embedded with a first steel mesh 15, and the vertical section 12 is embedded with a second steel mesh 16. The steel bars have high tensile strength, which can effectively suppress shrinkage cracks in concrete when subjected to stress or temperature changes, and ensure the stability of the component for long-term use.

[0028] The inner side of the precast component body 7 is provided with seepage grooves 8, and one end of the horizontal section 11 is provided with a secondary drainage ditch 10;

[0029] Pre-embedded PVC pipes 13 are installed between the horizontal section 11 and the vertical section 12. One end of each pre-embedded PVC pipe 13 is located above the secondary drainage ditch 10, and the other end of each pre-embedded PVC pipe 13 is connected to the seepage ditch 8. Drainage holes 9 are evenly distributed in the main body 1 of the slope on both sides of the seepage ditch 8, and the drainage holes 9 are all connected to the seepage ditch 8.

[0030] Drainage holes 9 are evenly distributed in the slope body 1 on both sides of the seepage ditch 8 and are connected to the seepage ditch 8. Water in the slope enters the seepage ditch 8 through the drainage holes 9, then flows into the secondary drainage ditch 10 through the pre-embedded PVC pipe 13, and finally is discharged through the main drainage ditch 6. This not only avoids the soil from softening and reducing its strength due to water accumulation, but also reduces the scouring and erosion of the slope body 1 by water, and improves the durability of the slope body 1.

[0031] A filter screen 17 is installed at one end of the pre-embedded PVC pipe 13 near the seepage trench 8, and the filter screen 17 is made of stainless steel.

[0032] The inside of the seepage ditch 8 usually contains soil particles or debris. If it enters the pre-buried PVC pipe 13 directly, it is easy to cause blockage. Installing a filter screen 17 near the inlet end of the seepage ditch 8 can intercept most of the impurities and ensure that the pipe is unobstructed.

[0033] As a further technical solution of this utility model, buckles 19 are provided at the four corners on one side of the filter screen 17, and fixing blocks 18 are provided around the inside of the pre-embedded PVC pipe 13. The fixing blocks 18 are provided with slots 20 on the side of the fixing blocks 18 near the buckles 19. The filter screen 17 is fixed in the pre-embedded PVC pipe 13 by the cooperation of the buckles 19 and the slots 20, which facilitates disassembly and assembly.

[0034] Working Principle: In this embodiment, the slope body 1 has a road surface 5 at the top and a main drainage ditch 6 at the bottom. The connection points of the upper-level slope 2, secondary slope 3, and tertiary slope 4 are all secured by precast main body 7 as a locking structure. The precast main body 7 can be standardized in a factory and quickly assembled on-site, resulting in a short construction cycle. The precast main body 7 consists of a horizontal section 11 and a vertical section 12, forming an L-shaped structure. The vertical section 12 is embedded in the slope soil, while the horizontal section 11 bears the load of the upper soil, acting as an "anchor" to hold the slope toe and restrict lateral slippage of the slope soil, thus improving the stability of each level of slope. The horizontal section 11 and vertical section 12 have triangular protrusions 14 evenly distributed on the side near the slope body 1 to increase friction with the slope body 1, enhancing the connection stability. A pre-embedded PVC pipe 13 is installed between the horizontal section 11 and the vertical section 12, with one end located above the secondary drainage ditch 10 and the other end connected to the seepage ditch 8 inside the precast main body 7. The drainage holes 9 are evenly distributed within the slope body 1 on both sides of the seepage ditch 8 and are connected to the seepage ditch 8. Water in the slope enters the seepage ditch 8 through the drainage holes 9, then flows into the secondary drainage ditch 10 through the pre-embedded PVC pipe 13, and finally is discharged through the main drainage ditch 6. This not only avoids the soil from softening and reducing its strength due to water accumulation, but also reduces the erosion of the slope body 1 by water, thus improving the durability of the slope body 1. A stainless steel filter screen 17 is installed inside the pre-embedded PVC pipe 13 near the seepage ditch 8. The seepage ditch 8 usually contains soil particles or debris, which can easily cause blockage if they directly enter the pre-embedded PVC pipe 13. Installing the filter screen 17 near the inlet end of the seepage ditch 8 can intercept most of the impurities and ensure that the pipe is unobstructed. Clips 19 are installed at the four corners on one side of the filter screen 17. Fixing blocks 18 are installed around the inside of the pre-embedded PVC pipe 13. The fixing blocks 18 have slots 20 on the side near the clips 19. The filter screen 17 is fixed inside the pre-embedded PVC pipe 13 by the cooperation of the clips 19 and the slots 20, which facilitates the installation and removal of the filter screen 17.

[0035] It will be apparent to those skilled in the art that this invention is not limited to the details of the exemplary embodiments described above, and that it can be implemented in other specific forms without departing from the spirit or essential characteristics of this invention. Therefore, the embodiments should be considered illustrative and non-limiting in all respects, and the scope of this invention is defined by the appended claims rather than the foregoing description. Thus, it is intended that all variations falling within the meaning and scope of equivalents of the claims be included within this invention. No reference numerals in the claims should be construed as limiting the scope of the claims.

Claims

1. A stepped prefabricated slope protection component, characterized in that, The structure includes a slope body (1), a precast component body (7), a horizontal section (11), and a vertical section (12). A road surface (5) is provided on the top of the slope body (1), and a main drainage ditch (6) is provided at the bottom of the slope body (1). A first-level slope (2), a second-level slope (3), and a third-level slope (4) are arranged sequentially on the slope body (1). A precast component body (7) is provided at the connection of the first-level slope (2), the second-level slope (3), and the third-level slope (4). A seepage ditch (8) is provided on the inner side of the precast component body (7). The precast component body (7) is composed of a horizontal section (11) and a vertical section (12), and a secondary drainage ditch (10) is provided at one end of the horizontal section (11).

2. The stepped prefabricated slope protection component according to claim 1, characterized in that: The horizontal segment (11) and the vertical segment (12) form an L-shaped structure, and both the horizontal segment (11) and the vertical segment (12) are made of reinforced concrete.

3. The stepped prefabricated slope protection component according to claim 1, characterized in that: The horizontal section (11) and the vertical section (12) have protrusions (14) evenly distributed on the side of the slope body (1) and the cross section of the protrusions (14) is triangular.

4. The stepped prefabricated slope protection component according to claim 1, characterized in that: The horizontal section (11) is embedded with a first steel mesh (15), and the vertical section (12) is embedded with a second steel mesh (16).

5. A stepped prefabricated slope protection component according to claim 1, characterized in that: A pre-embedded PVC pipe (13) is provided between the horizontal section (11) and the vertical section (12). One end of the pre-embedded PVC pipe (13) is located above the secondary drainage ditch (10), and the other end of the pre-embedded PVC pipe (13) is connected to the seepage ditch (8).

6. A stepped prefabricated slope protection component according to claim 1, characterized in that: Drainage holes (9) are evenly distributed in the slope body (1) on both sides of the seepage ditch (8), and the drainage holes (9) are all connected to the seepage ditch (8).

7. A stepped prefabricated slope protection component according to claim 5, characterized in that: Place The pre-embedded PVC pipe (13) is equipped with a filter screen (17) at one end near the seepage trench (8), and the filter screen (17) is made of stainless steel.

8. A stepped prefabricated slope protection component according to claim 7, characterized in that: The filter screen (17) has four corners with buckles (19) and the pre-embedded PVC pipe (13) has four sides with fixing blocks (18) and the fixing blocks (18) have slots (20) on the side near the buckles (19).