A combined frame structure for highway slope protection
By combining the I-beam frame with anchor bars in a multi-node connection structure, the problem of weak connection between the frame and the base and mountain was solved, thus improving the overall stability and anti-overturning ability, adapting to complex slope environments, and reducing construction and maintenance costs.
Patent Information
- Application Number
- CN202522536338.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-28
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2035-11-28
AI Technical Summary
The existing highway slope protection frame has a single connection method with the base and mountain, which is not strong enough to adapt to slope deformation, resulting in poor stability and insufficient anti-overturning capacity.
The I-beam frame and anchor bars are cast in one piece, combined with multi-level steel wire rope anchoring and universal joints to form a multi-node collaborative connection, which enhances the stability of the frame to the base and the mountain, and enhances the overall rigidity through the combination of color steel plates and vertical I-beams.
It improves the overall stability and anti-overturning capacity of the frame, adapts to complex slope environments, reduces construction and maintenance difficulties, and enhances the protective effect and connection flexibility.
Smart Images

Figure CN224982209U_ABST
Abstract
Description
Technical Field
[0001] This utility model belongs to the field of slope engineering technology and relates to a combined frame structure for highway slope protection. Background Technology
[0002] In highway construction, slope protection is a crucial aspect of ensuring road safety and engineering stability, especially in mountainous and hilly areas where slopes are often adjacent to traffic lanes and have complex geological conditions, making them prone to risks such as rock and soil collapses and landslides. To prevent falling rocks and slope instability from impacting highway traffic during construction, protective frames, as active protection structures, are widely used in highway slope engineering. Their core function is to intercept falling objects through the frame structure and ensure their own stability through reliable connections with the base and the mountain, thereby achieving safety protection for highway traffic and construction areas. However, existing highway slope protection frames still have significant technical defects in production and actual use: On the one hand, the connection methods between the frame and the base and mountain are relatively simple, mostly relying on direct fixing with a single anchor or simple welding. The connection strength is insufficient and the adaptability is poor. It is difficult to cope with the stress changes caused by small deformations of the slope, and problems such as loosening and falling off are prone to occur. As a result, the overall stability of the frame is poor, and there is a safety hazard of tilting towards the highway side. On the other hand, the rigidity design of the frame structure of some protection frames is unreasonable, and the cooperation between the protection components and the frame is not tight enough. This not only affects the protection effect, but also causes problems such as cumbersome installation and inconvenient maintenance, and cannot meet the dual requirements of safety and convenience for highway slope protection. After reviewing relevant materials, there are currently two main solutions to the stability problem of highway slope protection frames: One is to use a structure combining double-row steel pipe frames with passive protection nets. For example, the patent disclosed in patent number CN210946836U, entitled "A Double-Row Wall-Mounted Protection Frame for High Slope Rock Surfaces," works by using vertical and horizontal steel pipes to form the main frame, fixing the frame to the slope and ground with anchor bolts, and using ground anchors and a protective net at the top to form a passive protection system, creating a structure combining active and passive protection. The second solution is to use a simple frame structure fixed with a single concrete foundation or simply anchored with steel wire ropes, improving stability by enhancing the foundation's bearing capacity or using flexible ropes to distribute stress. The advantages of existing solutions are: the double-row steel pipe frame structure is simple, possesses a certain degree of synergistic effect between active and passive protection, and the anchor bolt fixing method can initially ensure the connection between the frame and the slope; the simple frame structure has lower cost and faster construction speed. However, it also has obvious drawbacks: relying on the direct rigid connection between steel pipes and anchor rods, its anti-overturning capacity is limited, and the steel pipe frame has a weak ability to adapt to slope deformation. The protective components such as dense mesh netting are fixed, making maintenance and replacement inconvenient. The frame structure fixed by a single concrete foundation is cumbersome, difficult to construct, and lacks flexibility, making it unable to adapt to complex slope environments. The frame anchored by steel wire ropes is not rigid enough, and the frame is prone to shaking, resulting in poor protection and interception effects.Based on a comprehensive analysis of the advantages and disadvantages of existing technologies, in order to solve the core problems of weak connection between the scaffold and the base and mountain, poor overall stability, and insufficient anti-overturning capacity, a protective scaffold structure that adopts multi-node collaborative connection and combines rigid frame with flexible anchoring is needed. Therefore, this utility model proposes to achieve a reliable connection between the scaffold and the base and mountain through the design of I-beam frame, integrated casting of anchor bars, multi-level anchoring of steel wire ropes, and universal connector adaptation, thereby improving overall stability and preventing the scaffold from overturning towards the roadside. Utility Model Content
[0003] This utility model provides a combined frame structure for highway slope protection, which solves the problems of connection and fixation between the highway slope protection frame and the base and mountain, as well as the overall stability, and prevents the frame from tilting towards the highway side.
[0004] To solve the above problems, the technical solution adopted by the utility model is as follows: A combined frame structure for highway slope protection includes a base. Multiple I-beams, including transverse and vertical I-beams, are installed on one side of the slope along the base. The transverse I-beams are welded to anchor bars. A connector with a detachable joint is provided on one side of each anchor bar. A universal joint is provided on each vertical I-beam, with a two-part connector fixedly mounted on it. A steel wire rope is attached to the two-part connector and fixedly connected to the connector on the connector. Another steel wire rope is connected to an anchor rod embedded in the slope via an anchor rod connector. A color steel plate is installed on the side of the vertical I-beam away from the universal joint, and the color steel plate is connected to the vertical I-beam in conjunction with it.
[0005] The principle and advantages of this scheme are as follows: The horizontal and vertical I-beams installed along the slope on the base form the main support frame of the scaffold. The horizontal I-beams are fixed to the anchor bars by welding. The anchor bars penetrate deep into the base to provide lateral tensile strength at the bottom of the scaffold, ensuring a stable connection between the frame and the base and preventing the scaffold from sliding along the base surface. Secondly, the vertical I-beams are connected to steel wire ropes through universal joints and two-way joints. One steel wire rope is detachably connected to the connector on the side of the anchor bar, forming a lateral tensile balance structure. The tensile strength of the steel wire rope is used to offset the overturning moment of the scaffold towards the road side. The other steel wire rope is fixed to the anchor rod embedded in the mountain through the anchor bolt joint. With the help of the stability of the mountain, it provides longitudinal anchoring tension to the scaffold, forming a rigid connection between the scaffold and the mountain, further restricting the displacement of the scaffold. Meanwhile, the color steel plate on the side of the vertical I-beam away from the universal joint not only serves to protect against falling gravel, but its connection with the vertical I-beam also enhances the overall rigidity of the frame and reduces frame deformation, thereby improving overall stability through structural synergy.
[0006] Compared to existing technologies, existing slope protection scaffolding often uses single anchor bolts for fixing or simple steel pipe splicing structures. For example, traditional double-row scaffolding is only fixed by bottom and front anchor bolts. The connection method is rigid but has poor adaptability. When there is slight deformation or external force fluctuation on the slope, the connection is prone to loosening, and the scaffolding may even collapse because it cannot offset the lateral overturning force. In addition, traditional scaffolding is mostly in indirect contact with the mountain and lacks direct rigid anchoring, resulting in weak overall anti-slip and anti-overturning capabilities. This solution overcomes the limitations of traditional single-fixation methods by using a multi-stage connection structure of anchor bars, I-beams, wire ropes, and mountain anchors. On the one hand, the welded connection between the transverse I-beams and anchor bars, combined with the detachable connection between the wire ropes and connectors, ensures the stability of the frame and the base. On the other hand, the angle adjustment capability of the universal joints allows it to adapt to slopes with different gradients, solving the problem that traditional frames are difficult to adapt to complex slope structures. For example, in the construction of slopes with large gradient changes, traditional frames need to frequently adjust the support angle, and the connection stability decreases. However, the universal joints in this solution can flexibly adjust the direction of the wire rope tension, always maintaining the force balance of the frame. On the other hand, by directly connecting the scaffolding to the mountain anchor bolts via steel wire ropes, the force of the scaffolding is transferred to the stable interior of the mountain. Compared to traditional scaffolding that relies solely on its own structural weight and bottom fixation, the anti-overturning moment is significantly improved. For example, under strong winds or minor rockfall impacts on the slope, traditional scaffolding is prone to overturning towards the roadside due to excessive lateral force. However, this solution, with the anchoring force of the mountain anchor bolts, can effectively offset the impact load and prevent scaffolding displacement. In addition, the combination of color steel plates and vertical I-beams not only achieves the protective function but also enhances the overall rigidity of the scaffolding, solving the defect of traditional scaffolding that only focuses on protection and neglects the structural stability itself, thus achieving the dual functions of protection and stability. At the same time, the detachable design of the connectors facilitates construction, installation, and subsequent maintenance.
[0007] Furthermore, a drainage channel is provided at the lower end of the transverse H-beam. Anchor bars and connectors are symmetrically arranged along both sides of the drainage channel. The anchor bars and connectors are vertically embedded in the stable rock strata on both sides of the ditch. The top of the anchor bars is welded to the transverse H-beam. The transverse H-beam spans the ditch and has a drainage channel reserved below. One end of the anchor bar is fully welded to the lower flange of the transverse H-beam. The connector on one side of the anchor bar is detachably connected to the transverse H-beam via bolts and flanges. The central axes of the anchor bars and connectors are aligned with the central axis of the universal joint of the vertical H-beam, with a deviation of no more than 5mm. The transverse H-beam spans the ditch and has a reserved drainage channel, fully preserving the original drainage function of the ditch and avoiding the problems of increased slope moisture content and decreased bearing capacity caused by rainwater accumulation. This eliminates the risk of scaffold foundation instability caused by water accumulation at the source. Simultaneously, the transverse H-beam is directly arranged across the ditch without damaging the ditch structure, reducing the disturbance to existing site facilities during construction. The anchor bars and connectors are arranged along the drainage channel... The anchor bars are symmetrically embedded in stable rock layers on both sides. On the one hand, the symmetrical arrangement ensures that the transverse I-beams are subjected to balanced forces, avoiding lateral bending or tilting caused by unilateral stress. On the other hand, embedding the anchor bars in stable rock layers significantly increases the anchoring depth and bearing capacity, making the anchoring effect more reliable than the original ditch in soft ditch areas. This effectively resists the tensile forces generated by slope deformation of the scaffold. The connectors are detachably connected by flanges and bolts, ensuring tightness and facilitating individual disassembly and replacement of damaged connectors without dismantling the entire scaffold structure, reducing maintenance costs and time. The center axes of the anchor bars, connectors, and universal joints are aligned (deviation ≤ 5mm), ensuring that the tension transmitted by the wire rope acts directly on the anchor bars and connectors along the axial direction, avoiding lateral forces caused by axial offset. This prevents stress concentration in local areas of the scaffold, which can lead to node cracking and wire rope loosening, making the overall stress distribution of the scaffold more reasonable and further enhancing its anti-overturning capacity, adapting to the complex geological and stress environment around the ditch.
[0008] Furthermore, the connector is provided with an internal threaded hole, which is threadedly connected to the connector head. The self-locking characteristic of the threaded connection has obvious advantages, which can ensure the tightness of the connection between the connector and the connector head, effectively resist the risk of loosening caused by external forces such as slope vibration and wind, and ensure that the tension of the wire rope is stably transmitted to the anchor bar, avoiding the impact on the overturning resistance of the frame due to connection failure. Compared with fixed connection methods such as welding, the threaded connection does not require professional welding equipment and technology. During construction, assembly can be completed simply by rotation, which greatly improves the installation efficiency and facilitates the adjustment of wire rope tension according to the actual stress conditions, or the quick disassembly and replacement of connector head and wire rope when components are damaged, reducing maintenance difficulty and cost. In addition, the threaded connection has strong adaptability. By replacing the threaded connector of different specifications, it can be adapted to wire ropes of different diameters or the connection length can be adjusted to meet the needs of different slope protection scenarios. In contrast, the fixed connection structure in the existing technology is often difficult to adjust flexibly and has poor adaptability. This design achieves the universality and operability of the connection structure through simple threaded mating.
[0009] Furthermore, transverse bamboo planks are installed between the transverse I-beams, and sandbag walls are built on these planks. The sandbag walls are stacked in an alternating pattern. The transverse bamboo planks serve as a foundational load-bearing layer, connecting adjacent transverse I-beams to form transverse support and enhance the overall rigidity of the frame. They also provide a flat and stable base for the sandbag walls. The staggered stacking of the sandbag walls not only enhances their overall integrity and anti-slip capability, preventing individual sandbags from falling off, but also forms a flexible buffer layer through the particle filling characteristics. When gravel rolls down the slope, the deformation of the sandbags absorbs the impact energy, significantly reducing the impact. Compared to existing technologies that rely solely on dense mesh netting or bamboo planks for protection, the impact force of falling objects on the scaffolding is significantly reduced, providing superior protection and interception. This effectively blocks falling objects of varying particle sizes from soil and rock. Furthermore, the sandbag walls themselves have a certain weight, which increases the downward load on the scaffolding, further mitigating the tendency for it to tilt towards the roadside. Together with the wire rope anchoring system, they form a synergistic force distribution, enhancing overall anti-overturning stability. Moreover, both bamboo planks and sandbag walls are readily available materials, making them easy to assemble and disassemble, resulting in low construction costs. Additionally, the height and thickness of the sandbag walls can be flexibly adjusted according to protection needs, adapting to the protection strength requirements of different slopes.
[0010] Furthermore, grooves are provided between the vertical I-beams, and vertical bamboo planks are installed within these grooves. These vertical bamboo planks slide and connect with the grooves, and then connect with the horizontal bamboo planks. The groove structure provides precise positioning guidance for the vertical bamboo planks. The sliding fit design eliminates the need for complex fasteners; installation is completed simply by sliding and inserting, significantly reducing construction difficulty and time consumption. It also facilitates later disassembly, replacement, or adjustment of the bamboo plank positions. The connection between the vertical and horizontal bamboo planks creates a crisscrossing, closed protective surface for the scaffolding, eliminating blind spots in protection. Compared to existing... In cases where the protective components are loosely spliced, this method can more comprehensively intercept falling objects from the slope. Furthermore, this connection method allows the bamboo planks to fit tightly against the I-beam frame, improving the overall rigidity of the frame and preventing individual components from detaching under stress. In addition, the sliding fit connection can accommodate slight structural deformations. When the frame experiences minor displacement due to slope stress, the vertical bamboo planks can slide slightly within the grooves, preventing breakage or connection failure due to rigid tension. Simultaneously, it works in synergy with the horizontal bamboo planks to further distribute the load, enhancing the frame's impact resistance and service life.
[0011] Furthermore, a limiting groove is provided on the side of the I-beam away from the sandbag wall. A detachable color steel plate is installed on this limiting groove, and the color steel plate slides into the limiting groove. The limiting groove provides precise installation positioning for the color steel plate. The sliding fit design eliminates the need for complex fasteners; assembly is completed simply by pushing the plate into the groove, significantly improving construction efficiency. The detachable structure allows for quick and individual replacement of damaged color steel plates without disassembling the entire frame, reducing maintenance costs and time. The color steel plate itself has strong sealing properties, effectively blocking small stones compared to existing protective materials such as dense mesh netting. The structure is protected from dust and rain, preventing falling objects from disrupting traffic and reducing the corrosion of metal components such as I-beams and anchor bars by rainwater, thus extending the structure's service life. Furthermore, the tight fit between the limiting slots and the color steel plates enhances the overall rigidity of the scaffold, forming a closed protective surface. Together with horizontal and vertical bamboo planks and sandbag walls, it constitutes a multi-layered protective system. The sliding connection accommodates slight deformations of the scaffold, preventing cracking of the color steel plates due to structural stress and ensuring continuous and stable protection. The color steel plates can also be flexibly disassembled and reassembled according to construction needs, meeting the protection and operational requirements at different stages.
[0012] Furthermore, two square steel bars are welded to the vertical I-beams on the side near the sandbag wall between the universal joints. These square steel bars, welded to the vertical I-beams, form an integrated reinforcement structure, effectively enhancing the bending and shear resistance of the vertical I-beams in the universal joint installation area. This prevents deformation or cracking caused by concentrated stress from wire rope anchoring in this area. Compared to structures without square steel bars, the local load-bearing capacity is significantly improved. The two square steel bars, symmetrically distributed between the universal joints, form an auxiliary support surface, providing support for adjacent vertical bamboo planks and sandbags. The wall serves as a lateral restraint, preventing it from shifting under stress or external impact. It also disperses the vertical load transmitted by the sandbag wall, ensuring that the force is evenly distributed to the vertical I-beams and the foundation below, thus avoiding localized overload. In addition, the square steel structure optimizes the stress environment of the wire rope anchor points. By sharing some of the stress of the universal joints through its own rigidity, it reduces wear and fatigue damage at the connection nodes, extends the service life of the anchoring system, and forms a synergistic force distribution with the bidirectional anchoring of the wire ropes and the I-beam frame, further enhancing the overall stability and anti-overturning capacity of the frame. Attached Figure Description
[0013] Figure 1 This is a schematic diagram of the structure of this utility model.
[0014] Figure 2 This is a schematic diagram of the axial structure of this utility model. Detailed Implementation
[0015] The reference numerals in the accompanying drawings include: 1. Base; 2. Ditch; 3. I-beam; 4. Anchor bar; 5. Connector; 6. Connector head; 7. Anchor rod; 8. Steel wire rope; 9. Two-way connector; 10. Groove; 11. Bamboo plank; 12. Limiting slot; 13. Color steel plate; 14. Sandbag wall; 15. Universal connector; 16. Horizontal I-beam; 17. Vertical I-beam; 18. Horizontal bamboo plank; 19. Vertical bamboo plank; 20. Square steel; 21. Example 1 like Figure 1-2 As shown, a combined frame structure for highway slope protection includes a base 1. The base 1 is made of natural rock strata of the highway slope or a reinforced foundation structure. Multiple I-beams 3 are evenly arranged along one side of the slope at a spacing of 2.5m. The I-beams 3 are made of Q235B steel and include transverse I-beams 17 and vertical I-beams 18. The transverse I-beams 17 and vertical I-beams 18 are perpendicularly welded to form the main frame. The welding joints adopt a full welding process, and the weld height is not less than 8mm to ensure the connection strength.
[0016] The lower flange of the transverse I-beam 17 is fully welded to the anchor bar 4. The anchor bar 4 is made of HRB400 grade threaded steel with a diameter of 25mm and a length of 3-5m depending on the geological conditions of the slope. It is vertically embedded into the stable rock layer of the base 1 on both sides of the ditch 2, with an embedding depth of not less than 2m. A connector 5 is set on one side of the anchor bar 4. The connector 5 is made of No. 45 steel and is detachably connected to the transverse I-beam 17 through a flange and bolts. The flange is made of 12mm thick steel plate and the bolts are M20 high-strength bolts. The center axis of the anchor bar 4 and the connector 5 are aligned with the center axis of the universal joint 16 of the vertical I-beam 18, with the deviation controlled within 5mm.
[0017] The connector 5 has an internal threaded hole for threaded connection with the detachable connector 6. The connector 6 adopts a ball head structure and is galvanized for corrosion protection. A universal connector 16 is welded and fixed on the vertical I-beam 18. The universal connector 16 is a cast steel part that can rotate 360°. A two-part connector 10 is welded to its top. Two steel wire ropes 9 are fixed on the two-part connector 10 by clips. The steel wire ropes 9 are galvanized steel wire ropes with a diameter of 15mm and a breaking tensile strength of not less than 150kN. One of the steel wire ropes 9 is fixed to the connector 6 on the connector 5 by a shackle, and the other steel wire rope 9 is fixed to the anchor rod 7 embedded in the mountain through the anchor rod connector 8. The anchor rod 7 is a hollow grouting anchor rod with a diameter of 32mm and an embedding depth in the mountain of not less than 4m. The grouting material is cement grout with a water-cement ratio of 1:1.
[0018] A 30cm wide drainage channel is reserved at the lower end of the horizontal I-beam 17 to ensure that the drainage function of the original ditch is not affected. Anchor bars 4 and connectors 5 are symmetrically arranged on both sides of the drainage channel. Horizontal bamboo planks 19 are laid between the horizontal I-beams 17. The horizontal bamboo planks 19 are made of 5cm thick bamboo and are fixed to the horizontal I-beams 17 by wire binding. Sandbag walls 15 are stacked alternately on the horizontal bamboo planks 19. The sandbag walls 15 are made of woven bags filled with medium-coarse sand, with each bag weighing 30kg and stacked to a height of 1.2m to form a flexible buffer layer.
[0019] A 15cm wide groove 11 is reserved between the vertical I-beams 18. A vertical bamboo plank 20 is installed in the groove 11. After the vertical bamboo plank 20 is slidably connected to the groove 11, its top end is tied to the horizontal bamboo plank 19 with iron wire to form a crisscrossing closed protective surface. A limiting groove 13 is welded on the side of the vertical I-beam 18 away from the universal connector 16. The limiting groove 13 is made of angle steel and its width is adapted to the thickness of the color steel plate 14. The color steel plate 14 is made of 0.8mm thick colored profiled steel plate and is slidably connected to the limiting groove 13 to achieve quick assembly and disassembly. The snap-fit connection between the limiting groove and the color steel plate allows the color steel plate to be better limited and fixed, preventing the color steel plate from falling off and improving the safety of use.
[0020] Two square steel pieces are welded on the vertical I-beam 18, between the universal joints 16 and on the side near the sandbag wall 15. The square steel pieces are 50mm×50mm×5mm hot-rolled square steel pieces with a length of 30cm. They are arranged on one side of the vertical I-beam 18, and the welding joint is a fillet weld to enhance the local load-bearing strength of the vertical I-beam 18. At the same time, they play a lateral limiting role for the vertical bamboo plank 20 and the sandbag wall 15.
[0021] The installation process in this embodiment is as follows: Construction preparation: Clean the surface soil and loose rock of the slope, test the bearing capacity of the base 1 to ensure that it meets the design requirements; process and manufacture components such as I-beams 3, anchor bars 4, and connectors 5, and carry out anti-corrosion treatment.
[0022] Frame installation: First, fix the horizontal I-beams 17 according to the design spacing, then embed the anchor bars 4 into the base 1 to stabilize the rock layer and fix them with grout. After completion, weld the vertical I-beams 18 to form the main frame.
[0023] Anchoring system installation: Fix universal connector 16 and two-way connector 10 on vertical I-beam 18, install wire rope 9, connect connector 6 of connector 5 and mountain anchor 7 respectively, adjust the tension of wire rope 9 by tensioner to ensure uniform stress on frame.
[0024] Installation of protective components: Lay horizontal bamboo planks 19 and vertical bamboo planks 20, build sandbag walls 15, and finally slide the color steel plate 14 into the limiting slot 13 for fixation.
[0025] Acceptance and commissioning: Check the firmness of each connection node, test the anti-overturning performance of the frame, and put it into use after ensuring that it meets the design requirements. The above are merely embodiments of this utility model. Commonly known structures and characteristics are not described in detail here. Those skilled in the art are aware of all common technical knowledge in the field prior to the application date or priority date, are aware of all existing technologies in that field, and have the ability to apply conventional experimental methods prior to that date. Those skilled in the art can, based on the guidance provided in this application, improve and implement this solution in combination with their own capabilities. Some typical known structures or methods should not be obstacles for those skilled in the art to implement this application. It should be noted that those skilled in the art can make several modifications and improvements without departing from the structure of this utility model. These should also be considered within the scope of protection of this utility model, and will not affect the effectiveness of the implementation of this utility model or the practicality of the patent. The scope of protection claimed in this application should be determined by the content of its claims, and the specific embodiments described in the specification can be used to interpret the content of the claims.
Claims
1. A highway side slope protection composite bent structure, characterized in that, The structure includes a base, on which multiple I-beams are installed along one side of the slope. These I-beams include transverse and vertical I-beams. The transverse I-beams are welded to anchor bars. A connector with a detachable joint is provided on one side of each anchor bar. A universal connector is provided on each vertical I-beam, and a two-part connector is fixedly installed on the universal connector. A steel wire rope is installed on the two-part connector and fixedly connected to the connector on the connector. Another steel wire rope is connected to an anchor rod embedded in the mountain body via an anchor rod connector. A color steel plate is installed on the side of the vertical I-beam away from the universal connector, and this color steel plate is connected to the vertical I-beam in conjunction with it.
2. A highway side slope protection combined bent structure according to claim 1, characterized in that, The lower end of the transverse I-beam is provided with a drainage channel. Anchor bars and connectors are symmetrically arranged on both sides of the drainage channel. The anchor bars and connectors are vertically embedded in the stable rock strata of the matrix on both sides of the ditch. The top of the anchor bars is welded and fixed to the transverse I-beam. The transverse I-beam spans the ditch and a drainage channel is reserved below. One end of the anchor bar is fully welded to the lower flange of the transverse I-beam. The connector on one side of the anchor bar is detachably connected to the transverse I-beam by bolts and flanges. The central axis of the anchor bar and connector is aligned with the central axis of the universal joint of the vertical I-beam, with a deviation of no more than 5mm.
3. The highway slope protection combined bent structure according to claim 1, characterized in that, The connector has an internal threaded hole, which is threaded to the connector head.
4. The highway slope protection combined bent structure according to claim 1, characterized in that, A transverse bamboo plank is installed between the transverse I-beams, and a sandbag wall is installed on the transverse bamboo plank. The sandbag walls are stacked in an alternating manner.
5. The highway slope protection combined bent structure according to claim 1, characterized in that, A groove is provided between the vertical I-beams, and a vertical bamboo plank is provided in the groove. The vertical bamboo plank is slidably connected to the groove and then connected to the horizontal bamboo plank.
6. A highway slope protection combined bent structure according to claim 1, characterized in that, A limiting groove is provided on the side of the I-beam away from the sandbag wall. A detachable color steel plate is provided on the limiting groove, and the color steel plate is slidably connected to the limiting groove.
7. The highway slope protection combined bent structure according to claim 1, characterized in that, Two square steel bars are welded to the vertical I-beam on the side near the sandbag wall between the universal joints.