Water conservancy project dredging equipment

By employing multiple suction hoods and filter screens in the dredging device for water conservancy projects, the problems of work stoppage and inconvenient disassembly caused by pipeline blockage have been solved, achieving efficient operation and convenient maintenance of the device.

CN224982276UActive Publication Date: 2026-11-17GUANGDONG HONGSEN CONSTR ENG CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202522581761.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-04
Publication Date
2026-11-17
Estimated Expiration
2035-12-04

AI Technical Summary

Technical Problem

Existing dredging devices for water conservancy projects cannot function properly when pipelines are blocked and are inconvenient to disassemble, making it difficult to clean the filter screen and affecting dredging efficiency.

Method used

It adopts a structure with multiple sludge suction hoods and filter screens. The position of the front tube is adjusted by adjusting the screw, which avoids blockage of a single pipeline. The first and second filter screens respectively block and filter solid particles and impurities in the sludge, increasing convenience and preventing damage to the sludge pump.

Benefits of technology

This technology enables the device to continue operating normally even when the pipeline is blocked, improving dredging efficiency and convenience, preventing damage to the upstream pipe and sludge pump, and simplifying the disassembly and cleaning process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224982276U_ABST
    Figure CN224982276U_ABST
Patent Text Reader

Abstract

This utility model relates to the field of dredging in water conservancy projects, specifically to a dredging device for water conservancy projects. It includes a base platform and a sludge pump. A collection box is installed on the upper surface of the base platform, and the sludge pump is installed on the upper surface of the collection box. An upper chamber is installed on the upper surface of the sludge pump via a fixed pipe. A cover plate is installed on the upper surface of the upper chamber via a snap-fit ​​mechanism. Multiple rear pipes are installed from left to right on the upper surface of the cover plate. A front pipe is installed at the front end of each rear pipe via a sliding fit. A suction hood is installed at the front end of each front pipe. A first filter screen is installed on the inner wall of the suction hood. A second filter screen is installed in the upper chamber via a snap-fit ​​mechanism. This utility model employs a multiple suction hood structure to prevent the device from malfunctioning due to blockage in a single pipe. By rotating the adjusting screw, the multiple front pipes slide back and forth, thereby adjusting the position of the suction hood and improving the ease of use of the device.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of dredging in water conservancy projects, and specifically to a dredging device for water conservancy projects. Background Technology

[0002] Water conservancy projects are engineering projects built to control and regulate surface water and groundwater in nature to achieve the purpose of eliminating harm and promoting benefits. They are also called water projects. Water is an essential and precious resource for human production and life, but its natural state does not fully meet human needs. Only by building water conservancy projects can we control water flow, prevent floods, and regulate and distribute water to meet the needs of people's life and production for water resources.

[0003] Chinese patent discloses a dredging device for water conservancy projects (authorization announcement number CN 217204358 U). This patented technology, through the activation of a drive device, allows the cylinder to automatically move to a suitable position, facilitating the cleaning of sludge in different locations, improving dredging efficiency and reducing the workload of operators. The installed crushing blades can crush large particles in the sludge, reducing the probability of clogging and improving the working efficiency of the dredging device. The installed filter screen can filter out some small gravel and solid impurities mixed in with the sludge, further improving the filtration effect. However, it uses a single pipeline extraction method, which means that when the pipeline is blocked, the device cannot operate normally. Furthermore, disassembling the device is inconvenient, making it difficult to disassemble and clean the extraction front end, resulting in inconvenience in cleaning the filter screen. Utility Model Content

[0004] To solve the above-mentioned technical problems, this utility model provides a dredging device for water conservancy projects, including a base platform and a dredging pump. A collection box is installed on the upper surface of the base platform, and the dredging pump is installed on the upper surface of the collection box. An upper chamber is installed on the upper surface of the dredging pump through a fixed pipe. A cover plate is installed on the upper surface of the upper chamber by a snap-fit. Multiple rear pipes are installed on the upper surface of the cover plate from left to right. A front pipe is installed at the front end of the rear pipes by a sliding fit. A suction hood is installed at the front end of the front pipe. A first filter screen is installed on the inner wall of the suction hood. A second filter screen is installed in the upper chamber by a snap-fit.

[0005] Preferably, the front end face of the collection box is provided with an adjustment cavity, which is arranged at an angle. An adjustment screw is rotatably installed in the adjustment cavity through a bearing. An adjustment slider is screwed to the outer wall of the adjustment screw. A positioning seat is installed on the upper end face of the adjustment slider. A fixing plate is installed on the upper end face of the positioning seat. A first motor is installed on the front side of the adjustment screw. A front position tube is installed on the upper end face of the fixing plate.

[0006] Preferably, a lower seat is symmetrically installed at the bottom of the upper cavity. A first lead screw is rotatably installed in the positioning seat through a bearing. A first slider is symmetrically screwed to the outer side wall of the first lead screw. A limit frame is installed at the bottom of the first slider. The limit frame is screwed to the upper end face of the upper cavity through an adjusting bolt. The adjusting seat consists of an upper seat and a lower seat, which are screwed together by a first bolt.

[0007] Preferably, casters are installed at the bottom of the platform near the four corners.

[0008] The technical effects and advantages of this utility model are as follows: 1. This utility model adopts a structure of multiple suction hoods to avoid the device being unable to work when a single pipeline is blocked. By driving the adjusting screw to rotate, multiple front pipes slide back and forth, thereby adjusting the position of the suction hoods and improving the convenience of using the device.

[0009] 2. This utility model adopts a first filter screen and a second filter screen structure. The first filter screen blocks solid particles in the sludge to prevent them from clogging the front and rear pipes. The second filter screen performs secondary filtration of impurities in the sludge to prevent them from damaging the sludge pump. Attached Figure Description

[0010] Figure 1 This is a front view of the structure of the dredging device for water conservancy projects provided in the embodiments of this application; Figure 2 This is a rear view of the structure of the dredging device for water conservancy projects provided in the embodiments of this application; Figure 3 This is a first sectional left view of the dredging device for water conservancy projects provided in the embodiments of this application; Figure 4 This is a second sectional left view of the dredging device for water conservancy projects provided in the embodiments of this application; Figure 5 This application provides a water conservancy project dredging device. Figure 3 A magnified view of a portion of region A in the middle; In the diagram: 1. Base platform; 2. Sludge pump; 11. Collection box; 12. Upper chamber; 13. Cover plate; 14. Rear pipe; 15. Front pipe; 16. Sludge suction hood; 17. First filter screen; 18. Second filter screen; 19. Adjustment chamber; 21. Adjusting screw; 22. Positioning seat; 23. Fixing plate; 24. First motor; 25. Lower seat; 26. First screw; 27. Limiting frame; 28. Adjusting bolt; 29. ​​Casters. Detailed Implementation

[0011] The present invention will now be described in further detail with reference to the accompanying drawings and specific embodiments. The embodiments of the present invention are given for illustrative and descriptive purposes only, and are not intended to be exhaustive or to limit the present invention to the disclosed forms. Many modifications and variations will be apparent to those skilled in the art. The embodiments were chosen and described to better illustrate the principles and practical applications of the present invention, and to enable those skilled in the art to understand the present invention and design various embodiments with various modifications suitable for a particular purpose.

[0012] Please see Figures 1-5 This embodiment provides a dredging device for water conservancy projects, including a base platform 1 and a sludge pump 2. A collection box 11 is installed on the upper surface of the base platform 1, and the sludge pump 2 is installed on the upper surface of the collection box 11. An upper chamber 12 is installed on the upper surface of the sludge pump 2 through a fixed pipe. A cover plate 13 is installed on the upper surface of the upper chamber 12 by a snap-fit. Multiple rear pipes 14 are installed on the upper surface of the cover plate 13 from left to right. A front pipe 15 is installed at the front end of the rear pipe 14 by a sliding fit. A sludge suction hood 16 is installed at the front end of the front pipe 15. A first filter screen 17 is installed on the inner wall of the sludge suction hood 16. The upper chamber 12 is connected by a snap-fit... The system is equipped with a second filter screen 18. During operation, the sludge pump 2 starts and draws the sludge through the sludge suction hood 16, through the front pipe 15, and into the rear pipe 14. The first filter screen 17 removes solid particles from the sludge to prevent blockage of the front and rear pipes 15 and 14. The system uses multiple suction hoods 16 to prevent the device from malfunctioning if a single pipe becomes blocked. The sludge then enters the upper chamber 12 and undergoes secondary filtration of impurities through the second filter screen 18 to prevent damage to the sludge pump 2. Finally, the sludge enters the collection box 11 for storage.

[0013] An adjustment cavity 19 is installed on the front end face of the collection box 11. The adjustment cavity 19 is arranged at an angle. An adjustment screw 21 is rotatably installed in the adjustment cavity 19 through a bearing. An adjustment slider is screwed to the outer wall of the adjustment screw 21. A positioning seat 22 is installed on the upper end face of the adjustment slider. A fixing plate 23 is installed on the upper end face of the positioning seat 22. A first motor 24 is installed on the front side of the adjustment screw 21. A front tube 15 is installed on the upper end face of the fixing plate 23. During operation, the fixing plate 23 connects and fixes multiple front tubes 15. The first motor 24 starts and drives the adjustment screw 21 to rotate, causing multiple front tubes 15 to slide back and forth, thereby adjusting the position of the sludge suction cover 16 and improving the convenience of using the device.

[0014] The lower seat 25 is symmetrically installed on the bottom of the upper cavity 12. The first lead screw 26 is rotatably installed in the positioning seat 22 through the bearing. The first slider is symmetrically screwed to the outer wall of the first lead screw 26. The bottom of the first slider is installed with a limit frame 27. The limit frame 27 is screwed to the upper end face of the upper cavity 12 through the adjusting bolt 28. The adjusting seat consists of an upper seat and a lower seat. The upper seat and the lower seat are screwed together by the first bolt. The threads of the first lead screw 26 are symmetrical and opposite in direction. During operation, the limit frame 27 plays a role in positioning and fixing the upper end of the cover plate 13. The adjusting bolt 28 and the first bolt are removed by rotating. Then the first lead screw 26 is rotated, thereby causing the limit frame 27 to move outward. This allows the front tube 15 and the rear tube 14 to be disassembled for cleaning.

[0015] The base platform 1 is equipped with casters 29 near the four corners, which facilitates the movement of the base platform 1.

[0016] In operation, the sludge pump 2 is started, and the sludge is drawn through the sludge suction hood 16, through the front pipe 15, and into the rear pipe 14. The first filter screen 17 removes solid particles from the sludge to prevent them from clogging the front pipe 15 and the rear pipe 14. The use of multiple sludge suction hoods 16 prevents the device from malfunctioning if a single pipe becomes blocked. The sludge then enters the upper chamber 12 and undergoes secondary filtration of impurities through the second filter screen 18 to prevent damage to the sludge pump 2. Finally, the sludge enters the collection box 11 for storage.

[0017] Obviously, the described embodiments are only a part of the embodiments of this utility model, and not all of them. All other embodiments obtained by those skilled in the art and related fields based on the embodiments of this utility model without creative effort should fall within the protection scope of this utility model. Structures, devices, and operating methods not specifically described and explained in this utility model, unless otherwise specified or limited, shall be implemented according to conventional means in the art.

Claims

1. A device for dredging waterworks, comprising a bottom platform (1) and a mud pump (2), characterized in that, A collection box (11) is installed on the upper surface of the base (1), a mud pump (2) is installed on the upper surface of the collection box (11), and an upper cavity (12) is installed on the upper surface of the mud pump (2) through a fixed pipe. The upper end face of the upper cavity (12) is fitted with a cover plate (13) by snap-fit. Multiple rear tubes (14) are installed on the upper end face of the cover plate (13) from left to right. The front end of the rear tubes (14) is fitted with a front tube (15) by sliding fit. The front end of the front tube (15) is fitted with a mud suction hood (16). The inner wall of the mud suction hood (16) is fitted with a first filter screen (17).

2. The dredging device for water conservancy projects according to claim 1, characterized in that... The upper cavity (12) is equipped with a second filter screen (18) by means of snap-fit.

3. The dredging device for water conservancy projects according to claim 1, characterized in that, The collection box (11) has an adjustment cavity (19) installed on the front end face. The adjustment cavity (19) is arranged at an angle. An adjustment screw (21) is installed in the adjustment cavity (19) through a bearing. An adjustment slider is screwed to the outer wall of the adjustment screw (21). A positioning seat (22) is installed on the upper end face of the adjustment slider. A fixing plate (23) is installed on the upper end face of the positioning seat (22). A first motor (24) is installed on the front side of the adjustment screw (21). A front position tube (15) is installed on the upper end face of the fixing plate (23).

4. The dredging device for water conservancy projects according to claim 2, characterized in that, The lower seat (25) is symmetrically installed on the bottom of the upper cavity (12). The first lead screw (26) is rotatably installed in the positioning seat (22) through the bearing. The first slider is symmetrically screwed to the outer side wall of the first lead screw (26). The bottom of the first slider is equipped with a limit frame (27).

5. The dredging device for water conservancy projects according to claim 4, characterized in that, The limiting frame (27) is screwed to the upper end face of the upper cavity (12) by adjusting bolts (28). The adjusting seat consists of an upper seat and a lower seat, which are screwed together by a first bolt.

6. The dredging device for water conservancy projects according to claim 1, characterized in that, The base (1) is equipped with casters (29) near the four corners.

Citation Information

Patent Citations

  • Desilting device for water conservancy project

    CN217204358U