Water leakage test fixture

By combining a centrifugal pump and an electromagnetic flow meter with an independent control valve, the problem of unstable flow and pressure in automotive air conditioning unit water leakage testing equipment has been solved, achieving high-precision and reliable test results and equipment versatility, suitable for quality control in multiple stages.

CN224985002UActive Publication Date: 2026-11-17SOUTH AIR INT
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522338274.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-04
Publication Date
2026-11-17
Estimated Expiration
2035-11-04

AI Technical Summary

Technical Problem

Existing automotive air conditioning unit water leakage testing equipment suffers from problems such as unstable flow and pressure, poor repeatability of test results, and insufficient versatility and flexibility.

Method used

Using a centrifugal pump as the power source, combined with an electromagnetic flow meter and an independent control valve design, a comprehensive parameter monitoring system is constructed. The PLC controller enables precise control and real-time monitoring of flow and pressure, and a modular design is adopted to adapt to the testing needs of different vehicle models.

Benefits of technology

It achieves high-precision and quantifiable control of test parameters, ensuring the accuracy and repeatability of test results, improving the versatility and flexibility of the equipment, reducing costs, and is suitable for quality control in multiple stages.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224985002U_ABST
    Figure CN224985002U_ABST
Patent Text Reader

Abstract

This utility model relates to a water leakage testing fixture, belonging to the field of sealing test devices. The fixture includes an inlet pipe, a water pump, an outlet pipe, and a water supply distribution pipe connected in sequence. The water supply distribution pipe is located at the end of the outlet pipe to divide the single flow path of the outlet pipe into multiple parallel outlet branches. Each outlet branch has a corresponding water injection nozzle at its end. A flow meter is installed on the outlet pipe, and a pressure gauge is installed on each water injection nozzle. This solution innovatively integrates the water pump, flow meter, pressure gauge, control valve, and modular multi-way distribution spray system to construct a cost-effective, easy-to-operate, precise, and highly versatile water leakage testing fixture. It fundamentally overcomes the two major shortcomings of existing technologies—namely, the "insufficient accuracy" of simple systems and the "insufficient flexibility" of specialized equipment—and has high industrial application value. It is worthy of promotion.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model belongs to the field of sealing test devices and relates to a water leakage test fixture. Background Technology

[0002] The automotive air conditioning system is a key component ensuring driving and passenger comfort, and its performance and reliability directly affect the overall quality of the vehicle. Among these components, the air conditioning unit, as the core carrier of the air conditioning system, has particularly important sealing performance. During actual vehicle operation, especially in rainy weather or high-pressure car wash environments, the air intake and various seams of the air conditioning unit are highly susceptible to water intrusion. If the seal is not tight, external water can leak into the passenger compartment, causing a series of serious problems such as interior mold, electrical short circuits, corrosion of metal parts in the vehicle body, and malfunction of delicate components inside the air conditioning system (such as the blower motor and damper actuators), posing significant safety hazards and quality risks.

[0003] Therefore, during the research and development and production stages of automotive air conditioning units, it is essential to conduct water leakage tests simulating rainfall environments, in accordance with the stringent standards of the OEMs. The core purpose of this test is to verify the sealing reliability of the air conditioning unit housing, dampers, and joint surfaces of various components under specific water flow conditions (such as constant flow rate and pressure). A standard testing procedure typically requires continuously and evenly spraying water at a specific flow rate and pressure through a dedicated water nozzle onto a specific test area of ​​the air conditioning unit (such as the fresh air / recirculation damper inlet), and then checking for any internal leaks.

[0004] However, the quality of tooling and equipment used for water leakage testing of automotive air conditioning units varies greatly within the industry, mainly falling into the following two categories: The first type is a simple spray system based on fixed pipelines. This type of system typically consists of a water source, a water pump, and a set of nozzles with pre-fixed angles. While simple in structure and low in cost, it has significant drawbacks. Due to the lack of a high-precision flow and pressure monitoring and control mechanism, the output water flow (total flow and pressure of each nozzle) is extremely unstable, making it impossible to accurately match the specific parameters required by the test standards. Test results are greatly affected by fluctuations in water source pressure and changes in pipeline resistance, resulting in poor repeatability and comparability of test data from different batches, and even from the same batch at different times, making it impossible to provide an objective and reliable basis for evaluating the sealing performance of the product.

[0005] The second category is dedicated integrated test benches with relatively high integration. These devices are mostly integrated into large environmental simulation chambers. Although they are comprehensive in function and can control flow and pressure, their design is usually tailored to specific models of air conditioning units. They generally suffer from poor versatility, inflexible configuration, and high purchase and maintenance costs. For R&D stages that require rapid switching between testing different product models or for quality control scenarios involving multiple varieties and small batches of production, this type of equipment has obvious limitations in applicability and is not economically viable.

[0006] In summary, existing technologies either fail to meet the core requirements of stable, accurate, and adjustable control of flow and pressure in testing standards, leading to inaccurate test results; or, while capable of achieving these requirements, the systems are overly complex, highly specialized, and costly, lacking flexibility. Therefore, there is an urgent need in this field for a novel water leakage testing fixture that can accurately and stably provide and monitor the required flow and pressure parameters to ensure the scientific rigor and repeatability of the test, while also possessing good versatility, modularity, and a reasonable cost to meet the efficient and flexible testing needs of modern automotive component R&D and quality control. Summary of the Invention

[0007] In view of this, the purpose of this utility model is to provide a new type of tooling for testing water leakage in automotive air conditioning systems, which ensures high precision, high efficiency and high reliability of the testing process while being low-cost and highly flexible.

[0008] To achieve the above objectives, this utility model provides the following technical solution: A water leakage testing fixture includes an inlet pipe 1, a water pump 5, an outlet pipe 6, and a water supply distribution pipe 9 connected in sequence. The water supply distribution pipe 9 is located at the end of the outlet pipe 6 to divide the single flow path of the outlet pipe 6 into multiple parallel outlet branches. Each outlet branch is provided with a water injection nozzle 12 at its end. A flow meter 7 is provided on the outlet pipe 6. A pressure gauge 11 is provided on each water injection nozzle 12.

[0009] Furthermore, each water outlet branch is equipped with a control valve 10, and each control valve 10 is located at the front end of the water injection nozzle 12.

[0010] Furthermore, it also includes a main control valve 8, which is located at the inlet end of the water supply distribution pipe 9.

[0011] Furthermore, a filter 2 is provided at the inlet end of the water inlet pipe 1.

[0012] Furthermore, pump 5 is a centrifugal pump.

[0013] Furthermore, flow meter 7 is an electromagnetic flow meter.

[0014] Furthermore, it also includes an open-top water tank 3, inside which is a mounting bracket 4, and the water pump 5, the outlet pipe 6, and the water supply distribution pipe 9 are all mounted on the mounting bracket 4.

[0015] Furthermore, it also includes a PLC controller, which is electrically connected to the water pump 5, flow meter 7, main control valve 8, each control valve 10 and each pressure gauge 11 through its I / O module.

[0016] The beneficial effects of this utility model are as follows: (1) This solution achieves high-precision, quantifiable control, and real-time monitoring of test parameters, fundamentally ensuring the accuracy and repeatability of the test. By installing high-precision electromagnetic flowmeters on the outlet pipe and pressure gauges at the front end of each injection nozzle, a comprehensive parameter monitoring system is constructed. This allows operators to accurately and in real-time grasp the total water supply flow and the outlet pressure of each nozzle, changing the traditional, crude method of "rough spraying and visual judgment." Test conditions can be accurately reproduced and recorded, making the test results from different batches and at different times highly comparable and repeatable, providing objective and reliable data support for product quality.

[0017] (2) This design solves the problems of stability and matching of flow rate and pressure in the testing system, and can strictly meet the requirements of the test standards. By using a centrifugal pump as the power source and combining it with the design of water supply distribution pipes and multiple parallel water outlet branches, this design can provide a stable and sufficient water flow. More importantly, by setting an independent control valve on each water outlet branch, the operator can independently adjust the flow rate and pressure of any nozzle. This design effectively solves the problem of pressure interference in the multi-nozzle system, so that each nozzle can work under the set pressure, thereby ensuring that the total flow rate and impact intensity (pressure) of the water curtain sprayed on the air conditioning unit test piece can be adjusted simultaneously and independently with precision, perfectly matching the stringent test specifications.

[0018] (3) Significantly improved the versatility and flexibility of the testing fixture, achieving "one machine for multiple uses". Addressing the issues of poor versatility and high cost of dedicated integrated test benches, this solution adopts a modular design. This allows for easy simulation of test conditions required by different vehicle models and different test standards (such as different rainfall intensity levels) by adjusting the number of water outlet branches on the water supply distribution pipe, replacing different types (flow rate, angle) of water injection nozzles, and independently adjusting the control valves of each branch. This high degree of configurability enables its widespread application in multiple stages such as R&D verification, incoming material inspection on the production line, and product sampling inspection, greatly expanding the application scenarios of the equipment and reducing the cost for enterprises to repeatedly purchase dedicated equipment for different product lines.

[0019] (4) Enhanced reliability and maintainability of the tooling system. A filter is installed at the inlet pipe end, which can effectively remove impurities in the water, prevent nozzle clogging and wear and damage to precision components such as flow meters and water pumps, ensure the long-term stability and measurement accuracy of the system, and reduce maintenance costs. At the same time, the standard components such as water pumps, valves, flow meters, and pressure gauges are rationally laid out and integrated, making the entire system structure clear, the pipeline connection simple, and facilitating later inspection, calibration and maintenance.

[0020] In summary, this solution innovatively integrates water pumps, flow meters, pressure gauges, control valves, and a modular multi-channel spray system, successfully constructing a cost-effective, easy-to-operate, precise, and highly versatile water leakage testing fixture. It fundamentally overcomes two major shortcomings of existing technologies—the "insufficient accuracy" of simple systems and the "insufficient flexibility" of specialized equipment—providing an efficient and reliable solution for quality control of automotive air conditioning units, possessing significant industrial application value. It is worthy of widespread promotion.

[0021] Other advantages, objectives, and features of this invention will be set forth in part in the description which follows, and in part will be apparent to those skilled in the art from the following examination and study, or may be learned from practice of this invention. The objectives and other advantages of this invention can be realized and obtained through the following description. Attached Figure Description

[0022] To make the objectives, technical solutions, and advantages of this utility model clearer, the preferred embodiments of this utility model will be described in detail below with reference to the accompanying drawings, wherein: Figure 1 This is a schematic diagram of the structure of this utility model.

[0023] Attached reference numerals: 1. Inlet pipe; 2. Filter; 3. Water tank; 4. Mounting bracket; 5. Water pump; 6. Outlet pipe; 7. Flow meter; 8. Main control valve; 9. Water supply distribution pipe; 10. Control valve; 11. Pressure gauge; 12. Water injection nozzle. Detailed Implementation

[0024] The following specific examples illustrate the implementation of this utility model. Those skilled in the art can easily understand other advantages and effects of this utility model from the content disclosed in this specification. This utility model can also be implemented or applied through other different specific embodiments, and various details in this specification can also be modified or changed based on different viewpoints and applications without departing from the spirit of this utility model. It should be noted that the illustrations provided in the following embodiments are only schematic representations of the basic concept of this utility model. Unless otherwise specified, the following embodiments and features can be combined with each other.

[0025] The accompanying drawings are for illustrative purposes only and are schematic diagrams, not actual pictures. They should not be construed as limiting the present invention. To better illustrate the embodiments of the present invention, some parts in the drawings may be omitted, enlarged, or reduced, and do not represent the actual product dimensions. It is understandable to those skilled in the art that some well-known structures and their descriptions may be omitted in the drawings.

[0026] In the accompanying drawings of this utility model, the same or similar reference numerals correspond to the same or similar components. In the description of this utility model, it should be understood that if terms such as "upper," "lower," "left," "right," "front," and "rear" indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, they are only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, the terms used to describe positional relationships in the drawings are only for illustrative purposes and should not be construed as limiting this utility model. For those skilled in the art, the specific meaning of the above terms can be understood according to the specific circumstances.

[0027] Please see Figure 1 This is a water leakage testing fixture, which includes an inlet pipe 1, a water pump 5, an outlet pipe 6, and a water supply distribution pipe 9 connected in sequence. The water supply distribution pipe 9 is located at the end of the outlet pipe 6 to divide the single flow path of the outlet pipe 6 into multiple parallel outlet branches. Each outlet branch is equipped with a water injection nozzle 12 at its end. A flow meter 7 is installed on the outlet pipe 6. A pressure gauge 11 is installed on each water injection nozzle 12.

[0028] Specifically, in this fixture, the inlet pipe 1 connects the water source (referred to as the "water tank" in this design) to the inlet of the water pump 5, serving as the entry channel for water into the pump body. The water pump 5 is the power core of the entire fixture system. A centrifugal pump is used here, utilizing the centrifugal force generated by the high-speed rotation of its impeller during operation to increase the kinetic energy and pressure of the water, thereby providing a stable water flow (with the required flow rate and pressure) for the entire testing system. This is crucial for meeting the required water flow intensity for the test. In other words, this design utilizes the "filling the pump casing" characteristic of the centrifugal pump to ensure the continuity of the water flow and the stability of the pressure. The outlet pipe 6 connects to the outlet of the water pump 5, serving as the main delivery channel for the high-pressure water flow output by the water pump 5.

[0029] The flow meter 7 is an electromagnetic flow meter, installed on the outlet pipe 6. Based on Faraday's law of electromagnetic induction, it accurately measures the instantaneous flow rate of water by measuring the induced voltage generated when the conductive medium (water) cuts magnetic field lines. The advantages of the electromagnetic flow meter are high measurement accuracy, good reliability, and low resistance to water flow. It can accurately reflect whether the total flow rate of the system meets the test standards, thus providing crucial feedback data for the flow control of the entire system.

[0030] The water supply distribution pipe 9 is installed at the end of the outlet pipe 6. Its function is to distribute the single flow path from the outlet pipe 6 into multiple parallel outlet branches, making it a key distributor for achieving synchronous spraying from multiple nozzles. Each outlet branch is equipped with a water injection nozzle 12, and a pressure gauge 11 is installed at the front end of each water injection nozzle 12. The pressure gauge 11 can monitor and display the water supply pressure at the inlet of each water injection nozzle 12 in real time. This data is the direct basis for verifying whether the working status of each water injection nozzle 12 meets the design requirements and for adjusting the branch pressure balance.

[0031] Each water injection nozzle 12 serves as the execution terminal of the test fixture. Its special internal structure converts the pressure energy of the water into a high-speed, specifically shaped (such as fan-shaped or cone-shaped) water jet to simulate the impact and coverage of natural raindrops on the air intake of the car's air conditioning unit, ensuring that the test conditions match the actual working conditions.

[0032] As a further optimization of the above scheme, each water outlet branch is equipped with an independent control valve 10, located at the front end of the water injection nozzle 12. The core function of each control valve 10 is to achieve independent and precise control of each branch. Operators can adjust the opening degree of each valve to control the flow rate and pressure flowing to each nozzle, thereby achieving uniform spraying or simulating specific non-uniform spraying conditions. This enhances the versatility and flexibility of this testing fixture.

[0033] As a further optimization of the above scheme, a main control valve 8 is also included, which is located at the inlet end of the water supply distribution pipe 9. The main control valve 8 serves as the master switch for the entire test fixture, controlling the on / off state of all outlet branches to facilitate the overall start-up, shutdown, and maintenance of the equipment.

[0034] As a further optimization of the above scheme, a filter 2 is provided at the inlet end of the water inlet pipe 1. The filter 2 can filter impurities and particulate matter in the water, preventing them from entering subsequent precision components (such as water pump 5, electromagnetic flow meter 7, water injection nozzle 12, etc.), avoiding blockage, wear or damage, thereby ensuring the long-term reliability and measurement accuracy of the system.

[0035] As a further optimization of the above scheme, an open-top water tank 3 is also included. The water tank 3 houses a mounting frame 4, on which the water pump 5, outlet pipe 6, and water supply distribution pipe 9 are all mounted. The water tank 3 serves as the water source and structural base for the entire testing system. Its open-top design facilitates observation of the water level, cleaning, and maintenance. The mounting frame 4 is fixed inside or above the water tank and is used to integrate and install core components such as the water pump 5, outlet pipe 6, and water supply distribution pipe 9. On the one hand, this arrangement makes the entire system structure compact and stable, facilitating movement and operation; on the other hand, it promotes water recovery and recycling.

[0036] This solution also includes a PLC controller, which serves as the "brain" of the entire testing fixture. It is electrically connected to the water pump 5, flow meter 7, main control valve 8, various control valves 10, and pressure gauges 11 via I / O modules, forming a closed-loop automatic control system. This enables signal acquisition, processing, judgment, and control. Specifically, it can receive signals from the flow meter and pressure gauges in real time, compare the collected data with preset target values, and automatically output control signals based on the comparison results. For example, it can adjust the water pump speed (via a frequency converter) to control the total flow, or adjust the opening of each branch control valve to balance the pressure of each nozzle, thereby achieving full automation and high precision in the testing process.

[0037] The water leakage testing fixture described in this solution has the following working process: 1. System Preparation and Start-up: Fill the water tank with sufficient clean water. Connect the power supply, and power on the PLC controller. Set the target total flow rate and target pressure values ​​for each water injection nozzle using the PLC. Start the system; the PLC issues commands to open the main control valve 8 and the designated branch control valves 10.

[0038] 2. Water Supply and Power Setup: Water pump 5 starts, drawing water from water tank 3 through inlet pipe 1. The water first passes through filter 2 for purification. The clean water is then pressurized by a centrifugal pump and delivered to water distribution pipe 9 through outlet pipe 6.

[0039] 3. Distribution, Monitoring, and Initial Spraying: Water is distributed to various outlet branches within the water supply distribution pipe 9. The total water flow passes through the electromagnetic flowmeter 7, and its real-time flow value is converted into an electrical signal and transmitted to the PLC. After being regulated by the control valve 10, the water flow in each branch reaches the water injection nozzle 12, and its inlet pressure is monitored in real time by the pressure gauge 11 and fed back to the PLC. The water flow finally forms a standardized water jet through the nozzle and is sprayed onto the vehicle air conditioning unit to be tested.

[0040] The control process of the PLC controller for the water leakage testing fixture described in this solution is as follows: Flow control loop: The PLC will continuously compare the actual total flow rate fed back by the flow meter 7 with the preset target total flow rate. If there is a deviation, the PLC will immediately adjust the control signal output to the water pump (if it is a variable frequency pump) or the control signal of the main valve 8, increasing or decreasing the speed of the water pump 5 or the valve opening of the main valve 8, until the actual flow rate matches the target flow rate.

[0041] Pressure control and balancing loop: Simultaneously, the PLC monitors the data from all pressure gauges 11. If the pressure of a certain nozzle deviates from its target value, the PLC will fine-tune the opening of the control valve 10 on that branch, adjusting the flow resistance of that branch individually, thereby achieving precise control and balance of the pressure of each nozzle.

[0042] Throughout the entire test, the aforementioned closed-loop control process will continue to ensure that the flow and pressure remain stable within the preset range, thereby guaranteeing the consistency and reliability of the test conditions.

[0043] After the preset test time is reached, the PLC issues a command to shut down the water pump, the main control valve, and the control valves of each branch, thus ending the test. All key data (flow rate, pressure curves) can be recorded and output.

[0044] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of this utility model and are not intended to limit it. Although this utility model has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can be made to the technical solution of this utility model without departing from the spirit and scope of this technical solution, and all such modifications or substitutions should be covered within the scope of the claims of this utility model.

Claims

1. A water leak test tool, characterized by, It includes an inlet pipe (1), a water pump (5), an outlet pipe (6), and a water supply distribution pipe (9) connected in sequence; the water supply distribution pipe (9) is located at the end of the outlet pipe (6) to divide the single flow path of the outlet pipe (6) into multiple parallel outlet branches; each outlet branch is provided with a water injection nozzle (12) at its end; a flow meter (7) is provided on the outlet pipe (6); and a pressure gauge (11) is provided on each water injection nozzle (12).

2. The water leak test tooling of claim 1, wherein: Each water outlet branch is equipped with a control valve (10), and each control valve (10) is located at the front end of the water injection nozzle (12).

3. The water leak test tooling of claim 2, wherein: It also includes a main control valve (8), which is located at the inlet end of the water supply distribution pipe (9).

4. The water leak test tooling of claim 1, wherein: A filter (2) is provided at the inlet end of the water inlet pipe (1).

5. The water leak test tooling of claim 1, wherein: The water pump (5) is a centrifugal pump.

6. The water leak test tooling of claim 1, wherein: The flow meter (7) is an electromagnetic flow meter.

7. The water leak test tooling of claim 1, wherein: It also includes an open water tank (3) with a mounting bracket (4) inside the water tank (3), and the water pump (5), water outlet pipe (6) and water supply distribution pipe (9) are all mounted on the mounting bracket (4).

8. The water leak test tooling of claim 3, wherein: It also includes a PLC controller, which is electrically connected to the water pump (5), flow meter (7), main control valve (8), each control valve (10) and each pressure gauge (11) through its I / O module.