A pneumatic rod chrysanthemum core tensile testing device

By designing a pneumatic rod chrysanthemum core tensile testing device with an electrical control box and bottom buffer structure, the problems of inaccurate testing and bulky equipment in the existing technology have been solved. This device achieves simple, accurate and stable tensile testing, adapts to different environments, and extends the equipment's lifespan.

CN224985222UActive Publication Date: 2026-11-17FOSHAN SHUNDE FENGYI HARDWARE PROD CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522636502.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-12
Publication Date
2026-11-17
Estimated Expiration
2035-12-12

AI Technical Summary

Technical Problem

Existing methods for testing the tensile strength of pneumatic rod chrysanthemum cores suffer from significant human error, inaccurate data, poor repeatability, high equipment costs, cumbersome operation, and are uneconomical, thus failing to meet the needs of mass production.

Method used

A pneumatic rod chrysanthemum core tensile testing device was designed, comprising an electrical control box, a fixed baffle, a weighing sensor, a chrysanthemum core test sleeve, and a tensile test piece. The weighing sensor and the bottom buffer structure are controlled by the electrical control box to achieve accurate testing and stable operation. A fan and a light are provided to adapt to different environments, and the bottom buffer structure absorbs vibration to protect the precision measuring components.

Benefits of technology

It achieves simple operation, accurate testing, stable operation, environmental adaptability, improved testing accuracy and equipment lifespan, and meets the needs of mass production.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224985222U_ABST
    Figure CN224985222U_ABST
Patent Text Reader

Abstract

This utility model provides a pneumatic rod chrysanthemum core tensile testing device, belonging to the technical field of tensile testing equipment. It includes an electrical control box with two symmetrically distributed fixed baffles mounted on its top. The combination of the control box, bottom support frame, and fixed baffles disperses any dust that may fall. In low-light environments, a light can be turned on to illuminate the clamping and observation areas. During operation, especially during sudden tensile changes such as the vibration generated when the workpiece is pulled out, internal springs and dampers buffer and dissipate the vibration, effectively protecting the precision measuring components and electronic equipment above. The bottom buffer structure is designed specifically for the impact vibration generated when the workpiece is pulled out during tensile testing. Unlike ordinary equipment vibration damping, it aims to protect the high-precision weighing sensor and ensure the accuracy of instantaneous data acquisition, a crucial element in improving testing accuracy. Four support feet provide overall support for the device.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the technical field of tensile testing equipment, and in particular to a pneumatic rod chrysanthemum core tensile testing equipment. Background Technology

[0002] In the production and quality inspection of pneumatic rods (such as gas springs used in car trunks and office chair lifts), the connection reliability of one of its core components—the daisy core (a metal sleeve with internal threads and a special groove structure)—is crucial. The pull-out force of this part is a key performance indicator for measuring the overall safety and service life of the pneumatic rod.

[0003] In practical applications, common practices for tensile testing of such small, irregularly shaped parts in existing technologies include:

[0004] The test was conducted manually using hooks, clamps, and a simple force gauge. This method is highly susceptible to human error, resulting in inaccurate data, poor repeatability, and low efficiency, making it unsuitable for mass production.

[0005] Using a large general-purpose material testing machine requires the design of complex non-standard fixtures to fix the chrysanthemum core. This method is costly, occupies a large area, and is cumbersome to operate. It is also cumbersome and uneconomical for rapid and specialized production line testing. Dust in the testing environment may interfere with the moving parts of the equipment, causing many inconveniences.

[0006] Therefore, this utility model provides a pneumatic rod chrysanthemum core tension testing device. Utility Model Content

[0007] The purpose of this invention is to overcome the shortcomings of the existing technology and provide a special chrysanthemum core tensile testing device that is easy to operate, accurate in testing, stable in operation, and has a certain degree of environmental adaptability.

[0008] To achieve the above objectives, this utility model adopts the following technical solution: a pneumatic rod chrysanthemum core tensile force testing device, including an electrical control box,

[0009] The top of the electrical control box is equipped with two symmetrically distributed fixed baffles. A top fixed plate is fixedly connected to the top of the two fixed baffles. A reset shaft is slidably connected to the bottom of the top fixed plate. A load cell is fixedly connected to one end of the bottom of the reset shaft. A chrysanthemum core test sleeve is installed at the bottom of the load cell. The top of the chrysanthemum core test sleeve has through holes that are evenly spaced and arranged in a circular structure. A tensile test piece for connection with the load cell is installed inside the chrysanthemum core test sleeve. A toggle block is installed on the outside of the tensile test piece. A limiting slot is provided on the outside of the chrysanthemum core test sleeve to cooperate with the toggle block for limiting, thereby enabling normal connection between the chrysanthemum core test sleeve and the tensile test piece. A fan mounting frame is fixedly connected to one side of one of the fixed baffles. A fan is fixedly connected inside the fan mounting frame. The fan is used for auxiliary heat dissipation during on-site operation. At the same time, it can also be used to remove dust from the surface of some equipment on-site when not in operation, improving the flexibility of equipment use.

[0010] The bottom of the electrical control box is equipped with a bottom buffer structure, which includes a bottom support frame. A bottom shock-absorbing frame is installed at the bottom of the bottom support frame. Symmetrically distributed buffer blocks are installed between the bottom support frame and the bottom shock-absorbing frame. Equally spaced springs are fixedly connected inside each buffer block. The top end of each spring is fixedly connected to the bottom of the bottom support frame. A shock-absorbing damper is fixedly connected inside each spring. The bottom end of each buffer block is fixedly connected to the bottom shock-absorbing frame. The buffer blocks, springs, and shock-absorbing dampers work together to buffer vibrations in the overall equipment, providing a certain degree of protection and extending the equipment's service life.

[0011] In a preferred embodiment, connecting plates are fixedly connected to the top four sides of the bottom support frame, and positioning connecting blocks are fixedly connected to the top four sides of the bottom shock-absorbing frame. Each connecting plate has a threaded connection to a first positioning bolt extending into the corresponding positioning connecting block. A top fixing block is fixedly connected to the top end of each first positioning bolt. The top of each top fixing block is fixedly connected to the bottom of the electrical control box. Multiple first positioning bolts reinforce the connection between the top fixing block and the positioning connecting block, thereby reinforcing the connection between the bottom support frame and the bottom shock-absorbing frame and improving the overall support stability of the equipment. A connecting circuit is installed on one side of the load cell. A test piece positioning block that limits the top of the through hole is installed at the bottom of the load cell. A third positioning bolt for use with the through hole is provided on the outer side of the test piece positioning block. The test piece positioning block and the third positioning bolt limit the installation at the top of the through hole until it contacts the load cell for subsequent tensile testing.

[0012] In a preferred embodiment, a sealing plate is installed at the bottom of the top fixing plate. The bottom of the sealing plate is threaded with second positioning bolts that are evenly distributed and extend into the interior of the top fixing plate. The sealing plate is used to limit the movement trajectory of the reset shaft. The second positioning bolts are used to reinforce the connection between the sealing plate and the top fixing plate. An electric telescopic rod is fixedly connected to the top of the top fixing plate. The output end of the electric telescopic rod passes through the sealing plate and is fixedly connected to one end of the top of the reset shaft. A lighting lamp is fixedly connected to the top of the electric telescopic rod for on-site illumination, facilitating nighttime operations. The electric telescopic rod is used to drive the reset shaft to move downwards or to perform a reset motion, facilitating tensile testing. A control panel is fixedly connected to the outside of the electrical control box. Evenly distributed control switches are fixedly connected to one side of the control panel. The electrical control box, control switches, fan, electric telescopic rod, lighting lamp, and weighing sensor are all electrically connected to the control panel. The control panel is used to control the operation of the electrical control box, control switches, fan, electric telescopic rod, lighting lamp, and weighing sensor, achieving unified management of the electrical equipment.

[0013] In a preferred embodiment, the bottom shock-absorbing frame is fixedly connected to four support feet on all four sides of its bottom, and the four support feet are used to support the overall equipment.

[0014] In one preferred embodiment, the top of the electrical control box is fixedly connected to a top dustproof platform for operation, and another fixed baffle is threadedly connected to a recycling box on the side near the chrysanthemum core test sleeve. The recycling box is equipped with an adsorption pad to adsorb some dust at the work site, which facilitates unified cleaning later.

[0015] Compared with the prior art, the advantages and positive effects of this utility model are as follows:

[0016] Equipped with an electrical control box, a bottom support frame, and a fixed baffle, the tensile test piece is placed into the daisy-core test sleeve. The actuating block on the tensile test piece inside the daisy-core test sleeve engages with a specific slot structure inside the sleeve. Simultaneously, the actuating block embeds into a limiting slot on the outside of the sleeve, thus achieving a reliable connection between the workpiece and the test sleeve. The assembled test sleeve is aligned with the test piece positioning block through the through hole at its top and secured below the load cell using a third positioning bolt. The equipment is started via the control switch on the control panel. Upon receiving the command, the electric telescopic rod moves downwards, causing the fixedly connected reset shaft and the load cell and test sleeve mounted at its lower end to move downwards synchronously, gradually applying downward tension. The device can be used for tensile testing and to blow away any dust that may fall. In low-light environments, the lighting can be turned on to provide illumination for the clamping and observation areas. During equipment operation, especially vibrations caused by sudden changes in tensile force, such as the instant the workpiece is pulled out, the bottom buffer structure absorbs the vibration energy. The vibration energy is transferred to the buffer block through the bottom support frame, where it is buffered and dissipated by internal springs and shock absorbers, effectively protecting the precision measuring components and electronic equipment above. The bottom buffer structure is designed for the specific impact vibrations generated when the workpiece is pulled out during tensile testing. Unlike the vibration damping purpose of ordinary equipment, it aims to protect the high-precision weighing sensor and ensure the accuracy of instantaneous data acquisition. This is a key factor in improving testing accuracy. The four support feet provide support for the entire device. Attached Figure Description

[0017] Figure 1 A schematic diagram of the overall structure of a pneumatic rod chrysanthemum core tensile testing device provided by this utility model. Figure 1 ;

[0018] Figure 2 A schematic diagram of the overall structure of a pneumatic rod chrysanthemum core tensile testing device provided by this utility model. Figure 2 ;

[0019] Figure 3 A schematic diagram of the overall structure of a pneumatic rod chrysanthemum core tensile testing device provided by this utility model. Figure 3 ;

[0020] Figure 4 An exploded view of the bottom buffer structure of a pneumatic rod chrysanthemum core tensile testing device provided by this utility model;

[0021] Figure 5 An enlarged structural diagram of the chrysanthemum core test sleeve of a pneumatic rod chrysanthemum core tension testing device provided by this utility model.

[0022] Legend:

[0023] 1. Electrical control box; 11. Control panel; 12. Control switch; 13. Top dustproof platform;

[0024] 2. Bottom support frame; 21. Bottom shock-absorbing frame; 22. Support feet; 23. Buffer block; 24. Spring; 25. Shock absorber; 26. Positioning connecting block; 27. Top fixing block; 28. First positioning bolt; 29. ​​Connecting plate;

[0025] 3. Fixed baffle; 31. Top fixed plate; 32. Recycling box; 33. Fan mounting frame; 34. Fan; 35. Electric telescopic rod; 36. Lighting light; 37. Reset shaft; 38. Second positioning bolt; 39. Sealing plate;

[0026] 4. Weighing sensor; 41. Connecting circuit; 42. Test piece positioning block; 43. Third positioning bolt;

[0027] 5. Chrysanthemum core test sleeve; 51. Through hole; 52. Limiting slot; 53. Tensile test piece. Detailed Implementation

[0028] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0029] like Figures 1-5 As shown, this embodiment provides a technical solution: a pneumatic rod chrysanthemum core tensile testing device, including an electrical control box 1. Two symmetrically distributed fixed baffles 3 are installed on the top of the electrical control box 1. A top fixed plate 31 is fixedly connected to the top of the two fixed baffles 3. A reset shaft 37 is slidably connected to the bottom of the top fixed plate 31. A weighing sensor 4 is fixedly connected to one end of the bottom of the reset shaft 37. A chrysanthemum core testing sleeve 5 is installed at the bottom of the weighing sensor 4. The top of the chrysanthemum core testing sleeve 5 has equidistantly spaced through holes 51 arranged in a circular structure. The interior of the chrysanthemum core testing sleeve 5 is equipped with... The device is equipped with a tensile test piece 53 for use in connection with a weighing sensor 4. A toggle block is installed on the outside of the tensile test piece 53. A limit slot 52 is provided on the outside of the chrysanthemum core test sleeve 5 to cooperate with the toggle block for limiting, so that the chrysanthemum core test sleeve 5 and the tensile test piece 53 are normally connected. A fan mounting frame 33 is fixedly connected to one side of a fixed baffle 3. A fan 34 is fixedly connected inside the fan mounting frame 33. The fan 34 is used for auxiliary heat dissipation during on-site operation. At the same time, it can also be used to remove dust from the surface of some equipment on-site when not in operation, thus improving the flexibility of equipment use.

[0030] In this design, a bottom buffer structure is installed at the bottom of the electrical control box 1. The bottom buffer structure includes a bottom support frame 2, a bottom shock-absorbing frame 21, and symmetrically distributed buffer blocks 23 between the bottom support frame 2 and the bottom shock-absorbing frame 21. Equally spaced springs 24 are fixedly connected inside each buffer block 23. The top end of each spring 24 is fixedly connected to the bottom of the bottom support frame 2, and a shock-absorbing damper 25 is fixedly connected inside each spring 24. The bottom end of each buffer block 23 is fixedly connected to the bottom shock-absorbing frame 21. The buffer blocks 23, springs 24, and shock-absorbing dampers 25 work together to buffer vibrations in the overall equipment, providing a certain degree of protection and extending the equipment's service life.

[0031] Going a step further, such as Figures 1-4 As shown: In this scheme, the bottom support frame 2 is fixedly connected to the top four sides of the bottom support frame 2, and the bottom shock-absorbing frame 21 is fixedly connected to the top four sides of the bottom support frame 2. The connecting plates 29 are threaded with first positioning bolts 28 extending into the corresponding positioning blocks 26. The top end of each first positioning bolt 28 is fixedly connected to a top fixing block 27. The top of each top fixing block 27 is fixedly connected to the bottom of the electrical control box 1. The top fixing block 27 and the positioning connecting block 26 are reinforced by multiple first positioning bolts 28, thereby achieving a reinforced connection between the bottom support frame 2 and the bottom shock-absorbing frame 21, and improving the overall support stability of the equipment.

[0032] Going further, such as Figures 1-5 As shown: In this scheme, a connection circuit 41 is installed on one side of the load cell 4, and a test piece positioning block 42 that limits the top of the through hole 51 is installed at the bottom of the load cell 4. A third positioning bolt 43 that is used to cooperate with the through hole 51 is provided on the outside of the test piece positioning block 42. The top of the through hole 51 is limited by the test piece positioning block 42 and the third positioning bolt 43 until it contacts the load cell 4 to cooperate with the subsequent tensile test.

[0033] Going a step further, such as Figures 1-5As shown, in this scheme, a sealing plate 39 is installed at the bottom of the top fixing plate 31. The bottom of the sealing plate 39 is threaded with second positioning bolts 38 that are evenly distributed and extend into the interior of the top fixing plate 31. One end of the top of the reset shaft 37 passes through the sealing plate 39. The sealing plate 39 is used to limit the movement trajectory of the reset shaft 37. The second positioning bolts 38 are used to reinforce the connection between the sealing plate 39 and the top fixing plate 31. An electric telescopic rod 35 is fixedly connected to the top of the top fixing plate 31. The output end of the electric telescopic rod 35 passes through the sealing plate 39 and is fixedly connected to the top end of the reset shaft 37. A lighting lamp 36 is fixedly connected to the top of the electric telescopic rod 35. The lighting lamp 36 is used for on-site lighting to facilitate nighttime operations. The electric telescopic rod 35 is used to drive the reset shaft 37 to move downwards or reset, in conjunction with tensile testing.

[0034] In this scheme, a control panel 11 is fixedly connected to the outside of the electrical control box 1. Control switches 12 are fixedly connected to one side of the control panel 11 at equal intervals. The electrical control box 1, control switches 12, fan 34, electric telescopic rod 35, lighting lamp 36 and weighing sensor 4 are all electrically connected to the control panel 11. The control panel 11 is used to control the operation of the electrical control box 1, control switches 12, fan 34, electric telescopic rod 35, lighting lamp 36 and weighing sensor 4, realizing unified management of power equipment.

[0035] Going a step further, such as Figures 1-5 As shown in the figure, in this scheme, the bottom shock-absorbing frame 21 is fixedly connected with support feet 22 on all four sides of the bottom, and the four support feet 22 are used to support the overall equipment.

[0036] In this solution, the top of the electrical control box 1 is fixedly connected to a top dustproof platform 13 for operation. Another fixed baffle 3 is threadedly connected to a recycling box 32 on the side near the chrysanthemum core test sleeve 5. The recycling box 32 is equipped with an adsorption pad to adsorb some dust at the work site, which is convenient for unified cleaning later. The specifications of the tensile test piece 53 can be changed to cylindrical, strip or other structures as needed, as long as there is a limit block on the outside for easy positioning.

[0037] Working principle:

[0038] like Figures 1-5 As shown:

[0039] The system includes an electrical control box 1, a bottom support frame 2, and a fixed baffle 3. During use, the control panel 11 is opened. The control panel 11 controls the operation of the electrical control box 1, control switch 12, fan 34, electric telescopic rod 35, lighting 36, and weighing sensor 4, achieving unified management of the electrical equipment. The specific workflow is as follows:

[0040] Clamping and positioning:

[0041] The tensile test piece 53 to be tested is placed into the chrysanthemum core test sleeve 5. The actuating block on the tensile test piece 53 designed inside the chrysanthemum core test sleeve 5 engages with the specific slot 52 structure inside the chrysanthemum core test sleeve 5. At the same time, the actuating block is embedded in the limiting slot 52 on the outside of the sleeve, thereby achieving a reliable connection between the workpiece and the test sleeve. The assembled test sleeve 5 is aligned with the test piece positioning block 42 through the through hole 51 at its top, and is fastened to the bottom of the weighing sensor 4 using the third positioning bolt 43.

[0042] Test execution and data collection:

[0043] The device is started by the control switch 12 on the control panel 11. After receiving the command, the output end of the electric telescopic rod 35 moves downward, which drives the reset shaft 37 fixedly connected to it and the weighing sensor 4 and test sleeve 5 installed at its lower end to move downward synchronously. The downward pulling force is gradually applied to the tensile test piece 53. This pulling force is transmitted to the weighing sensor 4 through the chrysanthemum core test sleeve 5 and the tensile test piece 53. The weighing sensor 4 converts the received tensile force signal into an electrical signal in real time, and transmits it to the electrical control box 1 for data processing through the connection circuit 41. The tensile force value is continuously recorded until it is pulled off or the preset tensile force limit is reached, and finally the peak tensile force is recorded and displayed.

[0044] Reset and auxiliary functions:

[0045] After the test is completed, the electric telescopic rod 35 moves in the reverse direction, driving the reset shaft 37 and the measuring components to reset upwards, ready for the next test. During or between tests, the fan 34 can be turned on to force-cool the heat-generating components such as the weighing sensor 4 and the electric telescopic rod 35, ensuring that the electronic components work at a suitable temperature, and at the same time blowing away any dust that may fall. In environments with insufficient light, the lighting lamp 36 can be turned on to provide illumination for the clamping and observation areas.

[0046] The vibration generated during equipment operation, especially during sudden changes in tension such as the instant of workpiece pull-out, is absorbed by the bottom buffer structure. The vibration energy is transmitted to the buffer block 23 through the bottom support frame 2, and is buffered and dissipated by the internal spring 24 and shock absorber 25, effectively protecting the precision measuring components and electronic equipment above. The bottom buffer structure is designed for the specific impact vibration generated at the instant of workpiece pull-out during tensile testing. Unlike the vibration reduction purpose of ordinary equipment, it aims to protect the high-precision weighing sensor and ensure the accuracy of instantaneous data acquisition. This is a key link in improving the test accuracy. The four support feet 22 are used to support the overall equipment.

[0047] The above description is merely a preferred embodiment of the present utility model and is not intended to limit the present utility model in any other way. Any person skilled in the art may make changes or modifications to the above-disclosed technical content to create equivalent embodiments for application in other fields. However, any simple modifications, equivalent changes, and modifications made to the above embodiments based on the technical essence of the present utility model without departing from the technical solution of the present utility model shall still fall within the protection scope of the technical solution of the present utility model.

Claims

1. A pneumatic rod chrysanthemum core tensile testing device, comprising an electrical control box (1), characterized in that, The top of the electrical control box (1) is equipped with two symmetrically distributed fixed baffles (3). The top of the two fixed baffles (3) is fixedly connected to a top fixed plate (31). The bottom of the top fixed plate (31) is slidably connected to a reset shaft (37). One end of the bottom of the reset shaft (37) is fixedly connected to a weighing sensor (4). The bottom of the weighing sensor (4) is equipped with a chrysanthemum core test sleeve (5). The top of the chrysanthemum core test sleeve (5) has equidistant and circular knots. The chrysanthemum core test sleeve (5) has a through hole (51) distributed in the structure. The inside of the chrysanthemum core test sleeve (5) is a tensile test piece (53) that is connected to the weighing sensor (4). The outside of the tensile test piece (53) is equipped with a toggle block. The outside of the chrysanthemum core test sleeve (5) is provided with a limiting slot (52) that cooperates with the toggle block for limiting. One side of one of the fixed baffles (3) is fixedly connected to a fan mounting frame (33). The inside of the fan mounting frame (33) is fixedly connected to a fan (34). The bottom of the electrical control box (1) is equipped with a bottom buffer structure, which includes a bottom support frame (2). The bottom of the electrical control box (1) is equipped with a bottom support frame (2), and a bottom shock absorber frame (21) is installed at the bottom of the bottom support frame (2). Symmetrically distributed buffer blocks (23) are installed between the bottom support frame (2) and the bottom shock absorber frame (21). The buffer blocks (23) are all fixedly connected with equidistantly distributed springs (24) and vibration dampers (25).

2. The air rod chrysanthemum core tension testing equipment according to claim 1, characterized in that: The bottom support frame (2) is fixedly connected to the top four sides of the bottom support frame (2), and the bottom shock absorption frame (21) is fixedly connected to the top four sides of the bottom support frame (21). The connecting plate (29) is threaded with the first positioning bolt (28) extending into the corresponding positioning block (26). The top end of the first positioning bolt (28) is fixedly connected to the top fixing block (27). The top of the top fixing block (27) is fixedly connected to the bottom of the electrical control box (1).

3. The air rod chrysanthemum core tension testing apparatus according to claim 1, characterized by: A connection circuit (41) is installed on one side of the weighing sensor (4), and a test piece positioning block (42) that limits the top of the through hole (51) is installed on the bottom of the weighing sensor (4). A third positioning bolt (43) for use with the through hole (51) is provided on the outside of the test piece positioning block (42).

4. The air rod chrysanthemum core tension testing apparatus according to claim 2, characterized by: A sealing plate (39) is installed at the bottom of the top fixing plate (31). The bottom of the sealing plate (39) is threaded with second positioning bolts (38) that are evenly distributed and extend into the interior of the top fixing plate (31). An electric telescopic rod (35) is fixedly connected to the top of the top fixing plate (31). The output end of the electric telescopic rod (35) passes through the sealing plate (39) and is fixedly connected to the top end of the reset shaft (37). A lighting lamp (36) is fixedly connected to the top of the electric telescopic rod (35).

5. The air rod chrysanthemum core tension testing apparatus according to claim 4, characterized by: A control panel (11) is fixedly connected to the outside of the electrical control box (1). A control switch (12) is fixedly connected to one side of the control panel (11). The electrical control box (1), control switch (12), fan (34), electric telescopic rod (35), lighting lamp (36) and weighing sensor (4) are all electrically connected to the control panel (11).

6. The air rod chrysanthemum core tension testing apparatus according to claim 1, characterized by: The bottom shock-absorbing frame (21) is fixedly connected to four support feet (22) on all four sides of its bottom. The four support feet (22) are used to support the overall equipment.

7. The pneumatic rod chrysanthemum core tensile force testing device according to claim 6, characterized in that: The top of the electrical control box (1) is fixedly connected to a top dustproof platform (13) for operation. Another fixed baffle (3) is threadedly connected to a recycling box (32) on the side near the chrysanthemum core test sleeve (5). An adsorption pad is installed inside the recycling box (32).