Simulated airport lighting optimization method and device based on digital twinborn and energy efficiency simulation

By generating a digital twin model of the airport using digital twin and energy efficiency simulation technologies, and combining this with energy efficiency simulation software to evaluate various lighting design schemes, the problem of low efficiency and high cost in traditional airport lighting design has been solved, enabling rapid and accurate lighting design and energy consumption optimization.

CN118965763APending Publication Date: 2024-11-15SHENZHEN ZHONGFUNENG ELECTRIC EQUIPMENT CO LTD
View PDF 0 Cites 4 Cited by

Patent Information

Application Number
CN202411037768.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

Existing airport lighting design methods rely on tedious calculations and experiments, which are inefficient and costly, and are prone to design deviations, especially in complex and ever-changing environments.

Method used

By employing digital twin and energy efficiency simulation technologies, the system acquires airport environment and lighting equipment parameter data, generates digital twin models using 3D modeling software, and conducts multi-scheme simulation and evaluation using energy efficiency simulation software to select the target lighting design scheme with the highest comprehensive score.

Benefits of technology

It enables rapid and accurate lighting design, avoids design deviations, reduces costs, and significantly reduces energy consumption in airports while ensuring aircraft takeoff and landing safety and operational efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118965763A_ABST
    Figure CN118965763A_ABST
Patent Text Reader

Abstract

The invention provides a simulation airport lighting optimization method and device based on digital twinning and energy efficiency simulation, computer equipment and a storage medium. The method comprises the following steps: acquiring environment data of an airport and parameter data of lighting equipment; modeling the environmental data based on target three-dimensional modeling software to obtain a three-dimensional model; based on the parameter data, performing accurate modeling on the lighting equipment in the three-dimensional model to obtain a digital twin model; integrating the obtained energy efficiency simulation software and the digital twin model; performing simulation operation on the acquired lighting design scheme through energy efficiency simulation software to generate energy consumption simulation data of the lighting design scheme; generating a comprehensive scheme score of the lighting design scheme based on the energy consumption simulation data; and screening out a specified scheme with the highest comprehensive scheme score from the illumination design schemes as a target illumination design scheme of the airport. Based on the digital twinning technology and the energy efficiency simulation technology, the target lighting design scheme adaptive to the airport is rapidly and accurately constructed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of artificial intelligence technology, and in particular to a method, device, computer equipment and storage medium for optimizing simulated airport lighting based on digital twins and energy efficiency simulation. Background Art

[0002] In the field of airport construction and operation, lighting capacity has always been highly valued as a key factor in ensuring aircraft take-off and landing safety and improving operational efficiency. At present, the industry generally adopts traditional lighting design methods, which rely on tedious calculations and experimental processes to optimize lighting layout and light intensity distribution in order to achieve the desired lighting effect. Although this approach meets basic lighting needs to a certain extent, it is inefficient and costly, especially when dealing with complex and changing airport environments, there will be design deviations. Summary of the invention

[0003] The main purpose of the present invention is to provide a simulated airport lighting optimization method, device, computer equipment and storage medium based on digital twin and energy efficiency simulation, aiming to solve the problem that the lighting design method applied to airports in the prior art relies on cumbersome calculation and experimental processes to optimize the lighting layout and light intensity distribution, which is inefficient and costly, and especially has technical problems of design deviation when dealing with complex and changeable airport environments.

[0004] To achieve the above objectives, the present invention provides a simulated airport lighting optimization method based on digital twin and energy efficiency simulation, the method comprising:

[0005] Acquire environmental data of an airport, and acquire parameter data of lighting equipment in the airport;

[0006] Modeling the environmental data based on target three-dimensional modeling software to obtain a three-dimensional model corresponding to the airport;

[0007] Based on the parameter data, the lighting equipment is accurately modeled in the three-dimensional model to obtain a digital twin model corresponding to the airport;

[0008] Obtaining preset energy efficiency simulation software, and integrating the energy efficiency simulation software with the digital twin model;

[0009] Obtaining a lighting design scheme corresponding to the airport; wherein the number of the lighting design schemes includes a plurality;

[0010] Inputting each of the lighting design schemes into the energy efficiency simulation software, simulating each of the lighting design schemes through the energy efficiency simulation software, and generating energy consumption simulation data for each of the lighting design schemes;

[0011] Based on the energy consumption simulation data, generating a comprehensive scheme score for each lighting design scheme according to a preset generation rule;

[0012] A designated scheme with the highest comprehensive scheme score is screened out from all the lighting design schemes, and the designated scheme is used as a target lighting design scheme corresponding to the airport.

[0013] Optionally, the modeling process of the environmental data based on the target three-dimensional modeling software to obtain a three-dimensional model corresponding to the airport includes:

[0014] Select target 3D modeling software from a plurality of preset 3D modeling software;

[0015] Performing modeling processing on the environmental data based on the target three-dimensional modeling software to obtain a corresponding basic model;

[0016] Invoking an adjustment tool in the target three-dimensional modeling software;

[0017] Performing adjustment processing on the basic model based on the adjustment tool to obtain an adjusted basic model;

[0018] The adjusted basic model is used as the three-dimensional model.

[0019] Optionally, based on the parameter data, accurately modeling the lighting equipment in the three-dimensional model to obtain a digital twin model corresponding to the airport includes:

[0020] Based on the parameter data, accurately modeling the lighting device in the three-dimensional model to obtain a corresponding specified three-dimensional model;

[0021] Call the preset test tool;

[0022] Performing simulation test processing on the digital twin model based on the test tool to obtain corresponding simulation results;

[0023] Acquiring real operation data corresponding to the airport;

[0024] Performing accuracy verification on the simulation result based on the real operation data;

[0025] If the simulation result passes the accuracy check, the designated three-dimensional model is used as the digital twin model corresponding to the airport.

[0026] Optionally, generating a comprehensive scheme score of each lighting design scheme based on the energy consumption simulation data according to a preset generation rule includes:

[0027] Obtaining specified energy consumption simulation data of a specified lighting design scheme; wherein the specified lighting design scheme is any one of all the lighting design schemes;

[0028] Acquire lighting effect data obtained after simulating the specified lighting design scheme;

[0029] Obtaining cost data of the specified lighting design solution;

[0030] The designated energy consumption simulation data, the lighting effect data and the cost data are evaluated and processed based on a preset evaluation model to generate a designated comprehensive scheme score for the designated lighting design scheme.

[0031] Optionally, obtaining cost data of the specified lighting design solution includes:

[0032] Obtaining the initial investment assessment cost corresponding to the specified lighting design solution;

[0033] Obtaining an estimated maintenance cost corresponding to the specified lighting design solution;

[0034] Obtaining an operating evaluation cost corresponding to the specified lighting design solution;

[0035] Cost data for the designated lighting design solution is generated based on the initial investment assessment cost, the maintenance cost assessment cost, and the operation assessment cost.

[0036] Optionally, the evaluating and processing the specified energy consumption simulation data, the lighting effect data, and the cost data based on a preset evaluation model to generate a specified comprehensive scheme score for the specified lighting design scheme includes:

[0037] Constructing a first weight, a second weight, and a third weight corresponding to the energy consumption index, the lighting effect index, and the cost index, respectively;

[0038] Get the preset calculation formula;

[0039] Calling the evaluation model, and calculating and processing the specified energy consumption simulation data, the lighting effect data, the cost data, the first weight, the second weight, and the third weight based on the calculation formula to obtain a corresponding calculation result;

[0040] The calculation result is used as the designated comprehensive solution score of the designated lighting design solution.

[0041] Optionally, after selecting a designated scheme with the highest comprehensive scheme score from all the lighting design schemes and using the designated scheme as a target lighting design scheme corresponding to the airport, the method further includes:

[0042] Obtaining airport information for the airport;

[0043] Obtain a target comprehensive solution score for the target lighting design solution;

[0044] Generate a corresponding lighting design scheme evaluation result report based on the airport information, the target lighting design scheme and the target comprehensive scheme score;

[0045] Identify the management personnel corresponding to said airport;

[0046] Send the lighting design scheme evaluation result report to the management personnel.

[0047] In addition, to achieve the above-mentioned purpose, the present invention also provides a simulated airport lighting optimization device based on digital twin and energy efficiency simulation, and the simulated airport lighting optimization device based on digital twin and energy efficiency simulation includes:

[0048] A first acquisition module, used to acquire environmental data of an airport and parameter data of lighting equipment in the airport;

[0049] A first processing module, used for performing modeling processing on the environmental data based on target three-dimensional modeling software to obtain a three-dimensional model corresponding to the airport;

[0050] A second processing module is used to perform accurate modeling processing on the lighting equipment in the three-dimensional model based on the parameter data to obtain a digital twin model corresponding to the airport;

[0051] An integration module, used to obtain preset energy efficiency simulation software and integrate the energy efficiency simulation software with the digital twin model;

[0052] A second acquisition module is used to acquire a lighting design scheme corresponding to the airport; wherein the number of the lighting design schemes includes multiple;

[0053] A first generating module, used for inputting each of the lighting design schemes into the energy efficiency simulation software, simulating and running each of the lighting design schemes through the energy efficiency simulation software, and generating energy consumption simulation data of each of the lighting design schemes;

[0054] A second generating module is used to generate a comprehensive scheme score of each lighting design scheme based on the energy consumption simulation data and according to a preset generating rule;

[0055] The screening module is used to screen out a designated scheme with the highest comprehensive scheme score from all the lighting design schemes, and use the designated scheme as a target lighting design scheme corresponding to the airport.

[0056] In order to solve the above technical problems, the embodiment of the present application further provides a computer device, which adopts the following technical solution:

[0057] The computer device includes a memory and a processor, the memory stores a computer program, and the processor implements the steps of any one of the methods for optimizing simulated airport lighting based on digital twins and energy efficiency simulation proposed in the embodiments of the present application when executing the computer program.

[0058] In order to solve the above technical problems, the embodiment of the present application further provides a computer-readable storage medium, which adopts the following technical solution:

[0059] The computer-readable storage medium stores a computer program, and when the computer program is executed by the processor, the steps of the simulated airport lighting optimization method based on digital twin and energy efficiency simulation proposed in any one of the embodiments of the present application are implemented.

[0060] Compared with the prior art, the embodiments of the present application have the following beneficial effects:

[0061] The present invention provides a method, device, computer equipment and storage medium for optimizing lighting of a simulated airport based on digital twin and energy efficiency simulation. The method comprises: firstly obtaining environmental data of the airport and obtaining parameter data of lighting equipment in the airport; then modeling the environmental data based on target three-dimensional modeling software to obtain a three-dimensional model corresponding to the airport; then, based on the parameter data, accurately modeling the lighting equipment in the three-dimensional model to obtain a digital twin model corresponding to the airport; subsequently obtaining preset energy efficiency simulation software and integrating the energy efficiency simulation software with the digital twin model; subsequently obtaining a lighting design scheme corresponding to the airport; and inputting each lighting design scheme into the energy efficiency simulation software, simulating and running each lighting design scheme through the energy efficiency simulation software, and generating energy consumption simulation data of each lighting design scheme; finally, based on the energy consumption simulation data, generating a comprehensive scheme score for each lighting design scheme according to a preset generation rule; and screening out a designated scheme with the highest comprehensive scheme score from all the lighting design schemes, and using the designated scheme as the target lighting design scheme corresponding to the airport. This application uses digital twin technology and energy efficiency simulation technology to generate a digital twin model to truly simulate the complex airport environment, and then use energy efficiency simulation software to more accurately predict and evaluate the energy consumption simulation data of various lighting design solutions, and then generate a comprehensive solution score for each lighting design solution based on the energy consumption simulation data. Subsequently, the designated solution with the highest comprehensive solution score is selected from all lighting design solutions as the target lighting design solution corresponding to the airport, so as to quickly and accurately construct a target lighting design solution that is suitable for the airport, avoiding the design deviation caused by the inability of traditional methods to accurately simulate complex environmental factors, and reducing the cost of lighting design processing for the airport. The subsequent application of the target lighting design solution in the airport can significantly reduce energy consumption while ensuring the safety of aircraft take-off and landing and operating efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0062] In order to more clearly illustrate the scheme in the present application, a brief introduction is given below to the drawings required for use in the description of the embodiments of the present application. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0063] Figure 1 is an exemplary system architecture diagram to which the present application may be applied;

[0064] Figure 2 is a flow chart of a simulated airport lighting optimization method based on digital twin and energy efficiency simulation provided by an embodiment of the present invention;

[0065] Figure 3 It is a structural schematic diagram of an embodiment of a simulated airport lighting optimization device based on digital twin and energy efficiency simulation according to the present application;

[0066] Figure 4 This is a basic structural block diagram of the computer device in this embodiment. DETAILED DESCRIPTION

[0067] The simulated airport lighting optimization method based on digital twin and energy efficiency simulation provided by the embodiment of the present invention is applied to the simulated airport lighting optimization device based on digital twin and energy efficiency simulation. Unless otherwise defined, all technical and scientific terms used in this article have the same meaning as those generally understood by technicians in the technical field of this application; the terms used in the specification of the application herein are only for the purpose of describing specific embodiments and are not intended to limit this application; the terms "including" and "having" in the specification and claims of this application and the above-mentioned drawings and any variations thereof are intended to cover non-exclusive inclusions. The terms "first", "second", etc. in the specification and claims of this application or the above-mentioned drawings are used to distinguish different objects, not to describe a specific order.

[0068] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.

[0069] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the accompanying drawings.

[0070] like Figure 1 As shown, the system architecture 100 may include terminal devices 101, 102, 103, a network 104 and a server 105. The network 104 is used to provide a medium for communication links between the terminal devices 101, 102, 103 and the server 105. The network 104 may include various connection types, such as wired, wireless communication links or optical fiber cables, etc.

[0071] Users can use terminal devices 101, 102, 103 to interact with server 105 through network 104 to receive or send messages, etc. Various communication client applications can be installed on terminal devices 101, 102, 103, such as web browser applications, shopping applications, search applications, instant messaging tools, email clients, social online platform software, etc.

[0072] Terminal devices 101, 102, 103 can be various electronic devices with display screens and supporting web browsing, including but not limited to smart phones, tablet computers, e-book readers, MP3 players (Moving Picture Experts Group Audio Layer III), MP4 (Moving Picture Experts Group Audio Layer IV) players, laptop computers, desktop computers, etc.

[0073] The server 105 may be a server that provides various services, such as a background server that provides support for web pages displayed on the terminal devices 101 , 102 , and 103 .

[0074] It should be noted that the simulated airport lighting optimization method based on digital twin and energy efficiency simulation provided in the embodiment of the present application is generally executed by a server / terminal device, and accordingly, the simulated airport lighting optimization device based on digital twin and energy efficiency simulation is generally arranged in a server / terminal device.

[0075] It should be understood that Figure 1 The number of terminal devices, networks and servers in the embodiment is only for illustration. Any number of terminal devices, networks and servers may be provided according to implementation requirements.

[0076] Continue to refer Figure 2 , shows a flow chart of an embodiment of a simulated airport lighting optimization method based on digital twin and energy efficiency simulation proposed in this application. The embodiment of this application can acquire and process relevant data based on artificial intelligence technology.

[0077] The simulated airport lighting optimization method based on digital twin and energy efficiency simulation provided by the embodiment of the present invention includes the following steps:

[0078] S210, obtaining environmental data of an airport, and obtaining parameter data of lighting equipment in the airport.

[0079] In this step, the present invention can be applied to the business scenario of lighting design for an airport during its construction and operation, and the executor of the present invention can be specifically an airport lighting optimization system. Specifically, detailed data of the airport can be collected through various methods such as on-site surveys, aerial photos, CAD drawings, etc. The detailed data at least includes building data, material properties, roads, equipment locations, lighting equipment parameters and other data. The environmental data of the airport and the parameter data of the lighting equipment in the airport are then extracted from the detailed data. The above-mentioned environmental data at least includes the buildings, equipment, roads, etc. of the airport, as well as the spatial relationships and physical properties between them. The above-mentioned lighting equipment may include LED lamps, high-pressure sodium lamps, etc. The parameter data of the lighting equipment may at least include parameters such as the light source type, brightness, and illumination angle of the lighting equipment.

[0080] S220, performing modeling processing on the environmental data based on target three-dimensional modeling software to obtain a three-dimensional model corresponding to the airport.

[0081] In this step, the above-mentioned target-based three-dimensional modeling software performs modeling processing on the environmental data to obtain a specific implementation process of a three-dimensional model corresponding to the airport. This application will provide further detailed descriptions of this in subsequent specific embodiments and will not be elaborated on here.

[0082] S230: Based on the parameter data, accurately model the lighting equipment in the three-dimensional model to obtain a digital twin model corresponding to the airport.

[0083] In this step, the lighting equipment is accurately modeled in the three-dimensional model based on the parameter data to obtain the specific implementation process of the digital twin model corresponding to the airport. This application will provide further detailed descriptions of this in subsequent specific embodiments and will not be elaborated on here.

[0084] S240, obtaining preset energy efficiency simulation software, and integrating the energy efficiency simulation software with the digital twin model.

[0085] In this step, the energy efficiency simulation software can be any one of EnergyPlus, PHOENICS or Dialux, and these software energy efficiency simulations can simulate the energy consumption under different lighting schemes and provide detailed energy consumption reports. After the energy efficiency simulation software is determined, the energy efficiency simulation software is integrated with the digital twin model by configuring it to complete the data input and setting processing of the energy efficiency simulation software based on the digital twin model. The data input and setting processing specifically include: input building physical information: input detailed physical information of the buildings in the airport in the energy efficiency simulation software, such as the material, thickness, thermal conductivity coefficient, etc. of the walls, roofs, and floors. Input information such as the spatial layout and furniture arrangement inside the building. Set up the lighting system: configure the lighting system in the digital twin model, including the type, power, distribution location, etc. of the lamps. According to the lighting scheme to be evaluated (all turned on, interval turned on, timed turned on), set the corresponding lighting control strategy in the energy efficiency simulation software. Input climate conditions: obtain meteorological data (such as temperature, humidity, solar radiation, etc.) during the study period from the meteorological database or local meteorological station. Input these meteorological data into the energy efficiency simulation software so that the subsequent energy efficiency simulation software can perform accurate energy consumption simulation.

[0086] S250, obtaining a lighting design scheme corresponding to the airport; wherein the number of the lighting design schemes includes multiple.

[0087] In this step, according to the actual needs of the airport, a variety of lighting design schemes corresponding to the airport are pre-formulated, such as all-on, interval-on, timed-on, etc. Each lighting design scheme clearly sets parameters such as the lighting equipment's on time, on quantity, and brightness setting.

[0088] S260: Input each of the lighting design schemes into the energy efficiency simulation software, simulate each of the lighting design schemes through the energy efficiency simulation software, and generate energy consumption simulation data of each of the lighting design schemes.

[0089] In this step, each of the lighting design schemes is input into the energy efficiency simulation software, a simulation program is started in the energy efficiency simulation software, and energy consumption simulation is performed according to the set lighting design scheme and climatic conditions, and the simulation operation process is monitored to ensure that the data input is correct and the simulation operation is stable, thereby generating energy consumption simulation data for each of the lighting design schemes.

[0090] S270: Based on the energy consumption simulation data, generate a comprehensive solution score for each lighting design solution according to a preset generation rule.

[0091] In this step, the specific implementation process of generating the comprehensive scheme score of each lighting design scheme based on the energy consumption simulation data according to the preset generation rules will be further described in detail in the subsequent specific embodiments of this application, and will not be elaborated here.

[0092] S280, selecting a designated solution with the highest comprehensive solution score from all the lighting design solutions, and using the designated solution as a target lighting design solution corresponding to the airport.

[0093] In this step, the comprehensive scheme scores of all the lighting design schemes are compared to select a designated scheme with the highest comprehensive scheme score from all the lighting design schemes, and the designated scheme is used as the final target lighting design scheme corresponding to the airport.

[0094] In an embodiment of the present invention, first, environmental data of an airport is obtained, and parameter data of lighting equipment in the airport is obtained; then, the environmental data is modeled based on target three-dimensional modeling software to obtain a three-dimensional model corresponding to the airport; then, based on the parameter data, the lighting equipment is accurately modeled in the three-dimensional model to obtain a digital twin model corresponding to the airport; subsequently, a preset energy efficiency simulation software is obtained, and the energy efficiency simulation software and the digital twin model are integrated; subsequently, a lighting design scheme corresponding to the airport is obtained; and each lighting design scheme is input into the energy efficiency simulation software, and each lighting design scheme is simulated and run through the energy efficiency simulation software to generate energy consumption simulation data for each lighting design scheme; finally, based on the energy consumption simulation data, a comprehensive scheme score for each lighting design scheme is generated according to a preset generation rule; and a designated scheme with the highest comprehensive scheme score is screened out from all the lighting design schemes, and the designated scheme is used as the target lighting design scheme corresponding to the airport. This application uses digital twin technology and energy efficiency simulation technology to generate a digital twin model to truly simulate the complex airport environment, and then use energy efficiency simulation software to more accurately predict and evaluate the energy consumption simulation data of various lighting design solutions, and then generate a comprehensive solution score for each lighting design solution based on the energy consumption simulation data. Subsequently, the designated solution with the highest comprehensive solution score is selected from all lighting design solutions as the target lighting design solution corresponding to the airport, so as to quickly and accurately construct a target lighting design solution that is suitable for the airport, avoiding the design deviation caused by the inability of traditional methods to accurately simulate complex environmental factors, and reducing the cost of lighting design processing for the airport. The subsequent application of the target lighting design solution in the airport can significantly reduce energy consumption while ensuring the safety of aircraft take-off and landing and operating efficiency.

[0095] Optionally, the target-based three-dimensional modeling software performs modeling processing on the environmental data to obtain a three-dimensional model corresponding to the airport, including:

[0096] Filter out target 3D modeling software from a variety of preset 3D modeling software.

[0097] In this step, the 3D modeling software may include at least AutoCAD, SketchUp or Revit, etc. There is no specific limitation on the method of determining the target 3D modeling software, and one software may be randomly selected from the multiple 3D modeling software to be used as the target 3D modeling software.

[0098] The environmental data is modeled based on the target three-dimensional modeling software to obtain a corresponding basic model.

[0099] In this step, the above environmental data at least includes the airport's buildings, equipment, roads, etc., as well as the spatial relationship and physical characteristics between them. By using the target three-dimensional modeling software to model the airport's buildings, equipment, roads, etc. according to the actual layout and size of the airport, the airport environment can be truly simulated to obtain a digital model that is completely consistent with the real airport environment, i.e., the above basic model. In addition, more advanced sensor technologies (such as lidar, infrared sensors, etc.) and meteorological data interfaces are introduced to obtain the airport's meteorological conditions (such as wind direction, wind speed, cloud thickness, etc.) and light intensity changes in real time, and these data are integrated into the basic model to achieve more accurate environmental simulation. In addition, the digital twin technology is integrated into the three-dimensional model, including the setting of virtual devices such as sensors and data acquisition systems to simulate the data collection and transmission process of the airport in the actual environment.

[0100] Invoke the adjustment tool in the target 3D modeling software.

[0101] In this step, the adjustment tool refers to a tool in the target 3D modeling software that has adjustment functions such as stretching, rotating, and scaling.

[0102] The basic model is adjusted based on the adjustment tool to obtain an adjusted basic model.

[0103] In this step, the adjustment process includes fine modeling and fine adjustment. Fine modeling includes fine modeling on the basic model using adjustment tools, including fine modeling of building details (such as doors, windows, decorations, etc.) and precise positions of equipment (such as lighting equipment, monitoring equipment, etc.). Fine adjustment includes fine adjustment of the basic model using adjustment tools to ensure that it is consistent with the actual environment of the airport. Among them, optical simulation software (such as RayTracing tools) can also be used to optimize the modeling of building surface materials and reflection characteristics, accurately calculate the occlusion and reflection of light between buildings, and further improve the accuracy of lighting simulation.

[0104] The adjusted basic model is used as the three-dimensional model.

[0105] In this embodiment, the target three-dimensional modeling software is selected from a plurality of preset three-dimensional modeling software; then the environmental data is modeled based on the target three-dimensional modeling software to obtain a corresponding basic model; then the adjustment tool in the target three-dimensional modeling software is called; the basic model is subsequently adjusted based on the adjustment tool to obtain an adjusted basic model, and the adjusted basic model is used as the three-dimensional model. This application performs modeling on the environmental data using the target three-dimensional modeling software selected from a plurality of preset three-dimensional modeling software to obtain a corresponding basic model, and then uses the adjustment tool in the target three-dimensional modeling software to adjust the basic model to achieve rapid and accurate completion of the modeling of the environmental data of the airport, thereby ensuring the accuracy of the obtained three-dimensional model.

[0106] Optionally, based on the parameter data, accurately modeling the lighting equipment in the three-dimensional model to obtain a digital twin model corresponding to the airport includes:

[0107] Based on the parameter data, the lighting device is accurately modeled in the three-dimensional model to obtain a corresponding designated three-dimensional model.

[0108] In this step, accurate modeling of lighting equipment in the 3D model means setting corresponding properties in the 3D model according to the parameter data of the lighting equipment (i.e., light source type, brightness, irradiation angle and other parameters). Then, use the light source tools in the 3D modeling software, such as point light source, parallel light source, etc., to simulate the lighting effect of the lighting equipment and ensure that the light source type, brightness, irradiation angle and other parameters of the light source are consistent with the actual equipment in the airport.

[0109] Invoke the preset test tool.

[0110] In this step, the above-mentioned testing tool is a pre-built tool with the testing function of performing simulation testing on the digital twin model.

[0111] Based on the test tool, a simulation test is performed on the digital twin model to obtain corresponding simulation results.

[0112] In this step, the actual operation scenario of the airport is simulated by using a test tool, and the digital twin model is subjected to simulation test processing, thereby recording the simulation results output during the simulation test process.

[0113] Acquire real operation data corresponding to the airport.

[0114] In this step, the above-mentioned real operation data is obtained by collecting the operation data of the airport in the actual environment.

[0115] The simulation result is verified for accuracy based on the actual operation data.

[0116] In this step, the simulation result is compared and analyzed with the real operation data. If the numerical difference between the real operation data and the simulation result is within a preset numerical range, the real operation data is determined to be similar to the simulation result, indicating that the simulation result is reliable, and then the simulation result is determined to have passed the accuracy check. If the numerical difference between the real operation data and the simulation result exceeds the maximum value endpoint of the above numerical range, it is determined that the real operation data is significantly different from the simulation result, indicating that the simulation result is not reliable, and then the simulation result is determined to have failed the accuracy check.

[0117] If the simulation result passes the accuracy check, the designated three-dimensional model is used as the digital twin model corresponding to the airport.

[0118] In this step, if the simulation result passes the accuracy check, it is determined that the simulation result is reliable, and then the specified three-dimensional model is used as the digital twin model corresponding to the airport. In addition, if the simulation result does not pass the accuracy check, the reason why the real operation data is different from the simulation result can be analyzed, and the specified three-dimensional model can be optimized and adjusted. Specifically, the optimization and adjustment process includes: 1. Identify optimization requirements: According to the simulation results and actual needs, identify the parts of the model that need to be optimized, such as the brightness and illumination angle of the lighting equipment. 2. Formulate an optimization plan: Design an optimization plan, clarify the optimization goals and specific measures. Evaluate the feasibility and expected effect of the optimization plan. 3. Parameter adjustment: According to the optimization plan, adjust the settings of relevant parameters in the model, such as the brightness and illumination angle of the light source. The effect of parameter adjustment can be verified by simulation testing. 4. Iterative optimization: According to the simulation results and actual effects, continuously iterate and optimize the model parameters and structure. Repeat the simulation test, comparative analysis, parameter adjustment and other steps until a satisfactory optimization effect is achieved. 5. Optimization verification: Verify the optimized model again to ensure its accuracy and reliability. Evaluate the optimization effect, including the improvement of simulation accuracy, the reduction of energy consumption, etc. 6. Implementation and optimization: Apply the optimized model to the actual system, observe the actual effect and make necessary adjustments. Collect actual operation data to provide reference for subsequent model optimization.

[0119] In this embodiment, based on the parameter data, the lighting equipment is accurately modeled in the three-dimensional model to obtain the corresponding designated three-dimensional model; then the preset test tool is called, and the digital twin model is simulated and tested based on the test tool to obtain the corresponding simulation result; then the real operation data corresponding to the airport is obtained; the simulation result is subsequently verified for accuracy based on the real operation data; if the simulation result passes the accuracy verification, the designated three-dimensional model is used as the digital twin model corresponding to the airport. The present application is based on the parameter data, and after accurately modeling the lighting equipment in the three-dimensional model to obtain the designated three-dimensional model, the test tool is intelligently called to simulate and test the digital twin model to obtain the simulation result, and then the obtained real operation data corresponding to the airport is used to verify the accuracy of the simulation result. Only when it is detected that the simulation result passes the accuracy verification, the designated three-dimensional model will be used as the digital twin model corresponding to the airport, effectively ensuring the accuracy of the constructed digital twin model.

[0120] Optionally, generating a comprehensive scheme score of each lighting design scheme based on the energy consumption simulation data according to a preset generation rule includes:

[0121] Acquire designated energy consumption simulation data of a designated lighting design scheme; wherein the designated lighting design scheme is any one of all the lighting design schemes.

[0122] In this step, the above-mentioned designated lighting design scheme is any one of all the lighting design schemes. The designated energy consumption simulation data of the designated lighting design scheme can be extracted from the generated energy consumption simulation data of each lighting design scheme according to the scheme identifier of the designated lighting design scheme. The scheme identifier can refer to the name information or number information of the scheme. The scheme identifier is unique.

[0123] Acquire lighting effect data obtained after simulating the specified lighting design solution.

[0124] In this step, the lighting effect data can be composed of indicators such as illuminance evaluation, illuminance uniformity evaluation, and color reproduction evaluation. The process of illuminance evaluation processing includes: Measuring tools: Use equipment such as photometers or illuminometers to select multiple typical positions and heights in the target area for measurement. Measuring method: Ensure that the measurement points are evenly distributed and can represent the illuminance level of the entire area. Record the illuminance value of each measurement point and perform data analysis to evaluate whether the overall illuminance meets the design requirements. Evaluation criteria: Determine whether the illuminance value meets the standard based on national standards or industry standards. The process of illuminance uniformity evaluation processing includes: Calculation method: Illuminance uniformity is usually measured by the ratio of minimum illuminance to average illuminance. Use the point-by-point calculation method to calculate the minimum illuminance and average illuminance in the entire area, and then calculate the ratio. Evaluation criteria: The closer the illuminance uniformity is to 1, the better, indicating that the light distribution is more uniform and the visual experience is more comfortable. Determine a reasonable range of illuminance uniformity according to the needs of specific application scenarios. The process of color reproduction evaluation includes: measuring tools: using equipment such as a spectrometer or a color rendering index meter to measure the ability of the lighting system to restore the color of an object. Measuring method: selecting a representative color sample, measuring it under the lighting system, and recording the color rendering index (Ra) or other related parameters. Evaluation criteria: the higher the color rendering index, the better the color reproduction. According to the needs of the application scenario, determine the appropriate color rendering index range. After obtaining the illuminance evaluation index value, the illumination uniformity evaluation index value, and the color reproduction evaluation index value obtained after the simulation operation of the specified lighting design scheme, the corresponding weighted total score is obtained by weighted summing the illuminance evaluation index value, the illumination uniformity evaluation index value, and the color reproduction evaluation index value, and the weighted total score is used as the lighting effect data of the specified lighting design scheme. Among them, the weight values ​​corresponding to the above-mentioned illuminance evaluation index value, the illumination uniformity evaluation index value, and the color reproduction evaluation index value are not specifically limited, and a weight value can be assigned to each indicator according to the importance and priority of the evaluation criteria of the lighting effect. The weight values ​​can be allocated based on expert opinions, historical data, industry standards and decision maker preferences. The sum of the weight values ​​is 1 to ensure the fairness and accuracy of the weighted total score.

[0125] Obtain cost data for the specified lighting design solution.

[0126] In this step, the specific implementation process of obtaining the cost data of the specified lighting design solution will be further described in detail in subsequent specific embodiments of the present application, and will not be elaborated on here.

[0127] The designated energy consumption simulation data, the lighting effect data and the cost data are evaluated and processed based on a preset evaluation model to generate a designated comprehensive scheme score for the designated lighting design scheme.

[0128] In this step, the specific implementation process of evaluating and processing the specified energy consumption simulation data, the lighting effect data and the cost data based on the preset evaluation model to generate the specified comprehensive scheme score of the specified lighting design scheme will be further described in detail in the subsequent specific embodiments of this application and will not be elaborated on here.

[0129] In this embodiment, the specified energy consumption simulation data of the specified lighting design scheme is obtained; then the lighting effect data obtained after the simulation operation of the specified lighting design scheme is obtained; and the cost data of the specified lighting design scheme is obtained; and then the specified energy consumption simulation data, the lighting effect data and the cost data are evaluated and processed based on a preset evaluation model to generate a specified comprehensive scheme score for the specified lighting design scheme. The present application obtains the specified energy consumption simulation data and the lighting effect data obtained after the simulation operation of the specified lighting design scheme, and obtains the cost data of the specified lighting design scheme, and then evaluates and processes the specified energy consumption simulation data, the lighting effect data and the cost data based on the use of the evaluation model, so that the specified comprehensive scheme score of the specified lighting design scheme can be generated quickly and accurately, thereby improving the generation efficiency of the specified comprehensive scheme score and ensuring the data accuracy of the obtained specified comprehensive scheme score.

[0130] Optionally, obtaining cost data of the specified lighting design solution includes:

[0131] Obtain an initial investment assessment cost corresponding to the specified lighting design solution.

[0132] In this step, the initial investment evaluation costs include the purchase cost, installation cost, and commissioning cost of lighting equipment. Collect the quotation sheets and cost details of the lighting design plan, conduct comparative analysis, and consider the impact of factors such as equipment brand, quality, and performance on the initial investment, so as to pre-calculate the initial investment evaluation costs corresponding to the lighting design plan.

[0133] Obtaining an estimated maintenance cost corresponding to the specified lighting design solution.

[0134] In this step, the maintenance cost assessment costs include daily maintenance, regular inspections, replacement of parts, etc. The maintenance costs of the lighting design can be estimated by referring to the maintenance records and market price levels of similar projects, and the impact of factors such as the durability of the equipment and the service life of wearing parts on the maintenance costs can be considered, so as to pre-calculate the maintenance cost assessment costs corresponding to the lighting design.

[0135] An operation evaluation cost corresponding to the specified lighting design solution is obtained.

[0136] In this step, the above-mentioned operation evaluation cost includes the cost of electricity consumption. The electricity consumption of the lighting design is calculated based on the power and expected usage time of the lighting equipment, and the operation cost is estimated in combination with the local electricity price level. The impact of factors such as the energy efficiency ratio of the equipment and the intelligent control strategy on the operation cost is considered, so as to pre-calculate the operation evaluation cost corresponding to the lighting design.

[0137] Cost data for the designated lighting design solution is generated based on the initial investment assessment cost, the maintenance cost assessment cost, and the operation assessment cost.

[0138] In this step, the initial investment evaluation cost, the maintenance cost evaluation cost and the operation evaluation cost can be summed to obtain a corresponding sum value, and the sum value can be used as the cost data of the above-mentioned specified lighting design solution.

[0139] In this embodiment, the initial investment evaluation cost corresponding to the designated lighting design scheme is obtained; then the maintenance cost evaluation cost corresponding to the designated lighting design scheme is obtained; then the operation evaluation cost corresponding to the designated lighting design scheme is obtained; and subsequently the cost data of the designated lighting design scheme is generated based on the initial investment evaluation cost, the maintenance cost evaluation cost and the operation evaluation cost. This application obtains the initial investment evaluation cost, the maintenance cost evaluation cost and the operation evaluation cost corresponding to the designated lighting design scheme, and then can quickly and accurately generate the cost data of the designated lighting design scheme based on the initial investment evaluation cost, the maintenance cost evaluation cost and the operation evaluation cost, thereby improving the efficiency of generating the cost data of the designated lighting design scheme and ensuring the accuracy of the cost data of the designated lighting design scheme. This is conducive to the subsequent quick and smooth completion of the generation process of the designated comprehensive scheme score of the designated lighting design scheme based on the cost data of the designated lighting design scheme obtained.

[0140] Optionally, the evaluating and processing the specified energy consumption simulation data, the lighting effect data, and the cost data based on a preset evaluation model to generate a specified comprehensive scheme score for the specified lighting design scheme includes:

[0141] Construct a first weight, a second weight, and a third weight corresponding to the energy consumption index, the lighting effect index, and the cost index, respectively.

[0142] In this step, there is no specific limitation on the values ​​of the first weight, the second weight and the third weight corresponding to the above energy consumption index, the lighting effect index and the cost index. A corresponding weight can be assigned to each index according to the importance and priority of each index. The weight allocation can be based on expert opinions, historical data, industry standards and decision makers' preferences. The sum of the weights is 1 to ensure the fairness and accuracy of the weighted processing.

[0143] Get the preset calculation formula.

[0144] In this step, the above calculation formula specifically includes: S = a / X+b*Y+c / Z, where S is the comprehensive solution score, X is the specified energy consumption simulation data, a is the first weight, Y is the lighting effect data, b is the second weight, Z is the cost data, and c is the third weight.

[0145] The evaluation model is called, and based on the calculation formula, the specified energy consumption simulation data, the lighting effect data, the cost data, the first weight, the second weight and the third weight are calculated and processed to obtain a corresponding calculation result.

[0146] In this step, the calculation result can be obtained by calling the above-mentioned evaluation model and substituting the specified energy consumption simulation data, the lighting effect data, the cost data, the first weight, the second weight and the third weight into the corresponding positions in the above-mentioned calculation formula for calculation processing. In particular, in processing large-scale data, such as the building model of the airport, the lighting equipment model, the energy consumption simulation data, etc., the distributed computing technology can be specifically used to decompose the computing tasks to multiple computing nodes, realize parallel computing, improve computing efficiency and real-time performance, and thus quickly provide the airport with the best lighting design solution to meet the needs of airport operations. Exemplarily, by using distributed computing frameworks such as Hadoop and Spark, the computing tasks are distributed to multiple servers to achieve efficient computing.

[0147] The calculation result is used as the designated comprehensive solution score of the designated lighting design solution.

[0148] In this embodiment, by constructing the first weight, the second weight and the third weight corresponding to the energy consumption index, the lighting effect index and the cost index respectively; then obtaining the preset calculation formula; then calling the evaluation model, and calculating and processing the specified energy consumption simulation data, the lighting effect data, the cost data, the first weight, the second weight and the third weight based on the calculation formula to obtain the corresponding calculation result; subsequently using the calculation result as the specified comprehensive scheme score of the specified lighting design scheme. This application utilizes the first weight, the second weight and the third weight corresponding to the energy consumption index, the lighting effect index and the cost index respectively, and calls the evaluation model to process the specified energy consumption simulation data, the lighting effect data and the cost data based on the calculation formula, so as to realize the rapid and accurate generation of the specified comprehensive scheme score of the specified lighting design scheme, improve the generation efficiency of the specified comprehensive scheme score, and ensure the data accuracy of the obtained specified comprehensive scheme score.

[0149] Optionally, after selecting a designated scheme with the highest comprehensive scheme score from all the lighting design schemes and using the designated scheme as a target lighting design scheme corresponding to the airport, the method further includes:

[0150] Get airport information for the stated airport.

[0151] In this step, the above airport information may refer to the airport name or airport number of the airport.

[0152] A target comprehensive scheme score of the target lighting design scheme is obtained.

[0153] In this step, the target comprehensive scheme score of the target lighting design scheme can be extracted from the generated comprehensive scheme scores of the lighting design schemes according to the scheme identifier of the target lighting design scheme. The scheme identifier can refer to the scheme name or scheme number.

[0154] A corresponding lighting design scheme evaluation result report is generated based on the airport information, the target lighting design scheme and the target comprehensive scheme score.

[0155] In this step, the airport information, the target lighting design scheme and the target comprehensive scheme score can be filled into a preset scheme evaluation result report template to generate a lighting design scheme evaluation result report corresponding to the target lighting design scheme. The lighting design scheme evaluation result report can be set according to the actual report display requirements, and the lighting design scheme evaluation result report at least includes a fill area corresponding to the airport information, a fill area corresponding to the lighting design scheme, and a fill area corresponding to the comprehensive scheme score of the lighting design scheme.

[0156] Identify the management personnel corresponding to the airport.

[0157] In this step, the above-mentioned management personnel may be the operation and maintenance personnel responsible for the lighting management of the airport.

[0158] Send the lighting design scheme evaluation result report to the management personnel.

[0159] In this step, the lighting design scheme evaluation result report can be sent to the management personnel by using a preset notification method. The notification method can include email, text message, instant message, etc. In addition, after the target lighting design scheme is applied to the airport, intelligent control can be implemented on the lighting equipment in the airport. Specifically, the lighting equipment can be monitored and adjusted in real time through intelligent control technology. Exemplarily, sensor technology, such as photoresistors, brightness sensors, etc., can be used to monitor the ambient brightness in real time, and then control algorithms, such as PID control, fuzzy control, etc., can be used to automatically adjust the working state of the lighting equipment, such as switch, brightness, irradiation angle, etc., to achieve the best lighting effect and the lowest energy consumption.

[0160] In this embodiment, the airport information of the airport is obtained; then the target comprehensive scheme score of the target lighting design scheme is obtained; then the corresponding lighting design scheme evaluation result report is generated based on the airport information, the target lighting design scheme and the target comprehensive scheme score; the manager corresponding to the airport is subsequently determined; and finally the lighting design scheme evaluation result report is sent to the manager. After the application uses the target three-dimensional modeling software and the energy efficiency simulation software to complete the comprehensive evaluation of various lighting design schemes for the airport and screen out the target lighting design scheme corresponding to the airport, the airport information of the airport and the target comprehensive scheme score of the target lighting design scheme are intelligently obtained, and then the corresponding lighting design scheme evaluation result report is generated based on the airport information, the target lighting design scheme and the target comprehensive scheme score, so as to realize the automatic and rapid generation of the lighting design scheme evaluation result report corresponding to the airport, so that there is no need to finish the work to generate the scheme evaluation result report for the lighting design scheme, which reduces the workload of generating the scheme evaluation result report and improves the generation efficiency and intelligence of the scheme evaluation result report. In addition, the lighting design scheme evaluation result report will be automatically and intelligently sent to the management personnel corresponding to the airport, so that the management personnel can timely check the evaluation results of the lighting design scheme from the lighting design scheme evaluation result report, and then can carry out adaptive lighting design processing for the airport according to the target lighting design scheme, which is conducive to improving the work experience of the management personnel, and further helps to improve the safety and operation efficiency of aircraft take-off and landing in the airport.

[0161] Due to the advanced nature of the present invention, it can be widely used in application fields such as airport construction, urban planning, and energy management. First, for the field of airport construction, the present invention can provide a more accurate lighting design solution to improve the safety and operating efficiency of aircraft takeoff and landing. Secondly, for the field of urban planning, the present invention can provide a scientific basis for urban lighting design, optimize urban lighting layout, and improve the city's image and the quality of life of residents. Thirdly, for the field of energy management, the present invention can effectively evaluate and optimize energy utilization efficiency, reduce energy consumption, and achieve sustainable development. In general, this technical solution has broad market demand and good application prospects.

[0162] Further references Figure 3 , as a response to the above Figure 2 In order to realize the method shown in the figure, the present application provides an embodiment of a simulated airport lighting optimization device 300 based on digital twin and energy efficiency simulation. Figure 2 Corresponding to the method embodiment shown, the device can be specifically applied to various electronic devices.

[0163] An embodiment of the present invention provides a simulated airport lighting optimization device 300 based on digital twin and energy efficiency simulation. The simulated airport lighting optimization device 300 based on digital twin and energy efficiency simulation includes:

[0164] A first acquisition module 310 is used to acquire environmental data of an airport and parameter data of lighting equipment in the airport;

[0165] A first processing module 320 is used to perform modeling processing on the environmental data based on target three-dimensional modeling software to obtain a three-dimensional model corresponding to the airport;

[0166] A second processing module 330 is used to perform accurate modeling processing on the lighting equipment in the three-dimensional model based on the parameter data to obtain a digital twin model corresponding to the airport;

[0167] An integration module 340 is used to obtain preset energy efficiency simulation software and integrate the energy efficiency simulation software with the digital twin model;

[0168] A second acquisition module 350 is used to acquire a lighting design scheme corresponding to the airport; wherein the number of the lighting design schemes includes multiple;

[0169] A first generating module 360 ​​is used to input each of the lighting design schemes into the energy efficiency simulation software, simulate each of the lighting design schemes through the energy efficiency simulation software, and generate energy consumption simulation data of each of the lighting design schemes;

[0170] A second generating module 370 is used to generate a comprehensive scheme score of each lighting design scheme based on the energy consumption simulation data and according to a preset generating rule;

[0171] The screening module 380 is used to screen out a designated scheme with the highest comprehensive scheme score from all the lighting design schemes, and use the designated scheme as a target lighting design scheme corresponding to the airport.

[0172] Optionally, the first processing module 320 includes:

[0173] A first screening submodule is used to screen out target 3D modeling software from a plurality of preset 3D modeling software;

[0174] A first processing submodule is used to perform modeling processing on the environmental data based on the target three-dimensional modeling software to obtain a corresponding basic model;

[0175] A first calling submodule is used to call an adjustment tool in the target three-dimensional modeling software;

[0176] An adjustment submodule, used for adjusting the basic model based on the adjustment tool to obtain an adjusted basic model;

[0177] The first determination submodule is used to use the adjusted basic model as the three-dimensional model.

[0178] Optionally, the second processing module 330 includes:

[0179] A second processing submodule is used to perform accurate modeling processing on the lighting device in the three-dimensional model based on the parameter data to obtain a corresponding specified three-dimensional model;

[0180] The second calling submodule is used to call a preset test tool;

[0181] A testing submodule, used to perform simulation testing on the digital twin model based on the testing tool to obtain corresponding simulation results;

[0182] A first acquisition submodule is used to acquire real operation data corresponding to the airport;

[0183] A verification submodule, used to verify the accuracy of the simulation result based on the real operation data;

[0184] The second determination submodule is used to use the designated three-dimensional model as the digital twin model corresponding to the airport if the simulation result passes the accuracy check.

[0185] Optionally, the second generating module 370 includes:

[0186] A second acquisition submodule is used to acquire specified energy consumption simulation data of a specified lighting design scheme; wherein the specified lighting design scheme is any one of all the lighting design schemes;

[0187] A third acquisition submodule is used to acquire lighting effect data obtained after simulating the specified lighting design scheme;

[0188] A fourth acquisition submodule is used to acquire cost data of the specified lighting design solution;

[0189] A generation submodule is used to evaluate and process the specified energy consumption simulation data, the lighting effect data and the cost data based on a preset evaluation model to generate a specified comprehensive scheme score for the specified lighting design scheme.

[0190] Optionally, the fourth acquisition submodule includes:

[0191] A first acquisition unit, configured to acquire an initial investment evaluation cost corresponding to the specified lighting design solution;

[0192] A second acquisition unit, configured to acquire an estimated maintenance cost corresponding to the specified lighting design solution;

[0193] A third acquisition unit, configured to acquire an operation evaluation cost corresponding to the specified lighting design solution;

[0194] A generating unit is used to generate cost data of the designated lighting design solution based on the initial investment evaluation cost, the maintenance cost evaluation cost and the operation evaluation cost.

[0195] Optionally, the generating submodule includes:

[0196] A construction unit, used to construct a first weight, a second weight and a third weight corresponding to the energy consumption index, the lighting effect index and the cost index respectively;

[0197] A fourth obtaining unit, used to obtain a preset calculation formula;

[0198] a calculation unit, configured to call the evaluation model, and calculate the specified energy consumption simulation data, the lighting effect data, the cost data, the first weight, the second weight, and the third weight based on the calculation formula to obtain a corresponding calculation result;

[0199] The determination unit is used to use the calculation result as a designated comprehensive scheme score of the designated lighting design scheme.

[0200] Optionally, the simulated airport lighting optimization device 300 based on digital twin and energy efficiency simulation further includes:

[0201] A third acquisition module is used to acquire the airport information of the airport;

[0202] A fourth acquisition module is used to obtain a target comprehensive scheme score of the target lighting design scheme;

[0203] A third generating module, configured to generate a corresponding lighting design scheme evaluation result report based on the airport information, the target lighting design scheme and the target comprehensive scheme score;

[0204] A determination module, used to determine the management personnel corresponding to the airport;

[0205] The sending module is used to send the lighting design scheme evaluation result report to the management personnel.

[0206] To solve the above technical problems, the present application also provides a computer device. Figure 4 , Figure 4 This is a basic structural block diagram of the computer device in this embodiment.

[0207] The computer device 4 includes a memory 41, a processor 42, and a network interface 43 that are interconnected through a system bus. It should be noted that the figure only shows a computer device 4 with components 41-43, but it should be understood that it is not required to implement all the components shown, and more or fewer components can be implemented instead. Among them, those skilled in the art can understand that the computer device here is a device that can automatically perform numerical calculations and / or information processing according to pre-set or stored instructions, and its hardware includes but is not limited to microprocessors, application specific integrated circuits (Application Specific Integrated Circuit, ASIC), programmable gate arrays (Field-Programmable Gate Array, FPGA), digital processors (Digital Signal Processor, DSP), embedded devices, etc.

[0208] The computer device may be a computing device such as a desktop computer, a notebook, a PDA, a cloud server, etc. The computer device may interact with a user through a keyboard, a mouse, a remote controller, a touch pad, or a voice control device.

[0209] The memory 41 includes at least one type of readable storage medium, and the readable storage medium includes flash memory, hard disk, multimedia card, card-type memory (for example, SD or DX memory, etc.), random access memory (RAM), static random access memory (SRAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), programmable read-only memory (PROM), magnetic memory, disk, optical disk, etc. In some embodiments, the memory 41 can be an internal storage unit of the computer device 4, such as a hard disk or memory of the computer device 4. In other embodiments, the memory 41 can also be an external storage device of the computer device 4, such as a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (FlashCard), etc. equipped on the computer device 4. Of course, the memory 41 can also include both the internal storage unit of the computer device 4 and its external storage device. In this embodiment, the memory 41 is generally used to store the operating system and various application software installed on the computer device 4, such as the program code of the simulated airport lighting optimization method based on digital twins and energy efficiency simulation. In addition, the memory 41 can also be used to temporarily store various types of data that have been output or are to be output.

[0210] The processor 42 may be a central processing unit (CPU), a controller, a microcontroller, a microprocessor, or other data processing chips in some embodiments. The processor 42 is generally used to control the overall operation of the computer device 4. In this embodiment, the processor 42 is used to run the program code stored in the memory 41 or process data, such as running the program code of the simulated airport lighting optimization method based on digital twins and energy efficiency simulation.

[0211] The network interface 43 may include a wireless network interface or a wired network interface. The network interface 43 is generally used to establish a communication connection between the computer device 4 and other electronic devices.

[0212] The present application also provides another embodiment, namely, providing a computer-readable storage medium, which stores the application crash processing program, and the application crash processing program can be executed by at least one processor to enable the at least one processor to perform the steps of the simulated airport lighting optimization method based on digital twins and energy efficiency simulation as described above.

Claims

1. A simulated airport lighting optimization method based on digital twin and energy efficiency simulation, It is characterized in that include: Acquire environmental data of an airport, and acquire parameter data of lighting equipment in the airport; Modeling the environmental data based on target three-dimensional modeling software to obtain a three-dimensional model corresponding to the airport; Based on the parameter data, the lighting equipment is accurately modeled in the three-dimensional model to obtain a digital twin model corresponding to the airport; Obtaining preset energy efficiency simulation software, and integrating the energy efficiency simulation software with the digital twin model; Obtaining a lighting design scheme corresponding to the airport; wherein the number of the lighting design schemes includes a plurality; Inputting each of the lighting design schemes into the energy efficiency simulation software, simulating each of the lighting design schemes through the energy efficiency simulation software, and generating energy consumption simulation data for each of the lighting design schemes; Based on the energy consumption simulation data, generating a comprehensive scheme score for each lighting design scheme according to a preset generation rule; A designated scheme with the highest comprehensive scheme score is screened out from all the lighting design schemes, and the designated scheme is used as a target lighting design scheme corresponding to the airport.

2. The method according to claim 1, It is characterized in that The target-based three-dimensional modeling software performs modeling processing on the environmental data to obtain a three-dimensional model corresponding to the airport, including: Select target 3D modeling software from a plurality of preset 3D modeling software; Performing modeling processing on the environmental data based on the target three-dimensional modeling software to obtain a corresponding basic model; Invoking an adjustment tool in the target three-dimensional modeling software; Performing adjustment processing on the basic model based on the adjustment tool to obtain an adjusted basic model; The adjusted basic model is used as the three-dimensional model.

3. The method according to claim 1, It is characterized in that Based on the parameter data, the lighting equipment is accurately modeled in the three-dimensional model to obtain a digital twin model corresponding to the airport, including: Based on the parameter data, accurately modeling the lighting device in the three-dimensional model to obtain a corresponding specified three-dimensional model; Call the preset test tool; Performing simulation test processing on the digital twin model based on the test tool to obtain corresponding simulation results; Acquiring real operation data corresponding to the airport; Performing accuracy verification on the simulation result based on the real operation data; If the simulation result passes the accuracy check, the designated three-dimensional model is used as the digital twin model corresponding to the airport.

4. The method according to claim 1, It is characterized in that The step of generating a comprehensive scheme score for each lighting design scheme based on the energy consumption simulation data and according to a preset generation rule includes: Obtaining specified energy consumption simulation data of a specified lighting design scheme; wherein the specified lighting design scheme is any one of all the lighting design schemes; Acquire lighting effect data obtained after simulating the specified lighting design scheme; Obtaining cost data of the specified lighting design solution; The designated energy consumption simulation data, the lighting effect data and the cost data are evaluated and processed based on a preset evaluation model to generate a designated comprehensive scheme score for the designated lighting design scheme.

5. The method according to claim 4, It is characterized in that The obtaining cost data of the specified lighting design solution includes: Obtaining the initial investment assessment cost corresponding to the specified lighting design solution; Obtaining an estimated maintenance cost corresponding to the specified lighting design solution; Obtaining an operating evaluation cost corresponding to the specified lighting design solution; Cost data for the designated lighting design solution is generated based on the initial investment assessment cost, the maintenance cost assessment cost, and the operation assessment cost.

6. The method according to claim 4, It is characterized in that The step of evaluating the designated energy consumption simulation data, the lighting effect data, and the cost data based on a preset evaluation model to generate a designated comprehensive scheme score for the designated lighting design scheme includes: Constructing a first weight, a second weight, and a third weight corresponding to the energy consumption index, the lighting effect index, and the cost index, respectively; Get the preset calculation formula; Calling the evaluation model, and calculating and processing the specified energy consumption simulation data, the lighting effect data, the cost data, the first weight, the second weight, and the third weight based on the calculation formula to obtain a corresponding calculation result; The calculation result is used as the designated comprehensive scheme score of the designated lighting design scheme.

7. The method according to claim 1, It is characterized in that After selecting a designated solution with the highest comprehensive solution score from all the lighting design solutions and using the designated solution as a target lighting design solution corresponding to the airport, the method further includes: Obtaining airport information for the airport; Obtain a target comprehensive solution score for the target lighting design solution; Generate a corresponding lighting design scheme evaluation result report based on the airport information, the target lighting design scheme and the target comprehensive scheme score; Identify the management personnel corresponding to said airport; Send the lighting design scheme evaluation result report to the management personnel.

8. A simulated airport lighting optimization device based on digital twin and energy efficiency simulation, It is characterized in that include: A first acquisition module, used to acquire environmental data of an airport and parameter data of lighting equipment in the airport; A first processing module, used for performing modeling processing on the environmental data based on target three-dimensional modeling software to obtain a three-dimensional model corresponding to the airport; A second processing module is used to perform accurate modeling processing on the lighting equipment in the three-dimensional model based on the parameter data to obtain a digital twin model corresponding to the airport; An integration module, used to obtain preset energy efficiency simulation software and integrate the energy efficiency simulation software with the digital twin model; A second acquisition module is used to acquire a lighting design scheme corresponding to the airport; wherein the number of the lighting design schemes includes multiple; A first generating module, used for inputting each of the lighting design schemes into the energy efficiency simulation software, simulating and running each of the lighting design schemes through the energy efficiency simulation software, and generating energy consumption simulation data of each of the lighting design schemes; A second generating module is used to generate a comprehensive scheme score of each lighting design scheme based on the energy consumption simulation data and according to a preset generating rule; The screening module is used to screen out a designated scheme with the highest comprehensive scheme score from all the lighting design schemes, and use the designated scheme as a target lighting design scheme corresponding to the airport.

9. A computer device, It is characterized in that It includes a memory and a processor, wherein the memory stores a computer program, and when the processor executes the computer program, the steps of the simulated airport lighting optimization method based on digital twin and energy efficiency simulation as described in any one of claims 1 to 7 are implemented.

10. A computer-readable storage medium, It is characterized in that The computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps of the simulated airport lighting optimization method based on digital twin and energy efficiency simulation as described in any one of claims 1 to 7.

Citation Information

Cited By

  • Hotel guest room light control method, system and device based on digital twinning and storage medium

    CN119946934A

  • Environmental design work display system

    CN120765883A

  • Park lighting engineering construction management method and system based on image recognition

    CN121119619A

  • Park lighting engineering construction management method and system based on image recognition

    CN121119619B