Display screen panel of the user interface of the Xinzhiyue intelligent environment controller

CN309071172SActive Publication Date: 2025-01-14BEIJING XINZHIYUE TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202330707973.9
Authority / Receiving Office
CN · China
Patent Type
Designs(China)
Current Assignee / Owner
Filing Date
2023-10-31
Publication Date
2025-01-14
Estimated Expiration
2038-10-31

Smart Images

  • Figure 000001_ABST
    Figure 000001_ABST
Patent Text Reader

Abstract

1. The name of this design product: Display screen panel of the user interface of the Xinzhiyue intelligent environment controller. 2. Purpose of this design product: used to perform interface operations on environmental controller equipment. 3. The design key points of this appearance design product are: design 1 main view. 4. The picture or photo that best illustrates the key points of the design: Main view of Design 1. 5. Other views are of conventional design and are therefore omitted. 6.Purpose of the graphical user interface: used to perform interface operations on environmental controller equipment. 7. The area of ​​the graphical user interface in the product: the display screen of the user interface of the intelligent environment controller. 8. Human-computer interaction method of graphical user interface: key switching. 9. Description of the changing status of the graphical user interface: The main view of Design 1 is the display screen after startup. Click the "Air Conditioning" button in the main view of Design 1, and the interface will jump to the interface change status diagram of Design 1. The interface status diagram of Design 1 shows the display interface of the corresponding parameters of Design 1; the main view of Design 2 is the display screen after startup. Click the "Fresh Air" button in the main view of Design 2, and the interface will jump to the interface change status diagram of Design 2. The interface status diagram of Design 2 shows the display interface of the corresponding parameters of Design 2; the main view of Design 3 is the display screen after startup. Click the "Floor Heating" button in the main view of Design 3, and the interface will jump to the interface change status diagram of Design 3. The interface status diagram of Design 3 shows the display interface of the corresponding parameters of Design 3. 10. Designate Design 1 as the base design.
Need to check novelty before this filing date? Find Prior Art