MIGRATION FROM AN EXISTING RAILWAY SYSTEM TO A NEW RAILWAY SYSTEM
Patent Information
- Application Number
- DE502020009482
- Authority / Receiving Office
- DE · DE
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-04-21
- Publication Date
- 2024-11-07
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Migrating from an existing railway system to a new system is complex, requiring multiple operational breaks and comprehensive conformity checks, as existing methods cannot test the new system without dismantling it, and simulation circuits cannot fully replace real field element tests.
A method using a changeover switch that alternately connects field elements to either the existing or new field element control devices via a multi-wire interface, allowing for detailed testing without dismantling, with a compliance check only needed once, and a bridge device for permanent connection after testing.
Enables secure, highly available connections to the new field element control device without further compliance checks, allowing seamless switching between systems and reducing operational disruptions.
Description
TECHNICAL FIELD
[0001] The present invention relates to a method for migrating from an existing railway system to a new railway system and to a railway device designed for use in such a method. STATE OF THE ART
[0002] A signal box typically controls a large number of field elements. The term "field element" is a generic term for railway equipment such as signals, switches, pushbuttons, and beacons, which are typically located along the railway line. Each field element is controlled by an assigned field element control unit.
[0003] Migrating from an existing interlocking system to a new system during ongoing operation presents a significant challenge. The new system is being constructed in parallel with the existing system. Converting and commissioning the new system during a single shutdown (typically a single night) is usually not possible for acceptance purposes. Therefore, various subsystems are typically tested and accepted individually during several shutdowns. At the end of each shutdown, the system is returned to its original state ("reconversion / deconstruction"). This process is very complex, as each conversion and decommissioning requires a comprehensive compliance check of all affected subsystems.
[0004] It is known from the state of the art to first test the field element control units of a new system before migrating to a new system by equipping them with simulation circuits ("operational replacement plugs") that simulate the behavior of the respective field element. The operational replacement plugs are plugged directly onto the field element control units. The wiring is therefore not simulated. While trial operation with these simulation circuits is useful for verifying functional sequences and testing the operating software, it cannot replace test operation with the real field elements. Therefore, modification and dismantling are still required for tests with the real field elements. This is often unavoidable, especially with switches.
[0005] EP3539845A1 discloses a method and a system for connecting a control module for a decentralized functional element in rail transport to a new interlocking instance while temporarily maintaining a connection of the control module to a previous interlocking instance. The control module is connected to the decentralized functional element and the new interlocking instance. A transformation instance is provided, which translates control-relevant data to be sent from the control module to the previous interlocking instance or received from the previous interlocking instance into the format required by the previous interlocking instance and / or the control module. Furthermore, a switching unit is provided, which switches the operating authorization between the previous interlocking instance and the new interlocking instance.This allows a new control module to be tested sufficiently in parallel with the operation of the previous interlocking instance in conjunction with the new interlocking instance. The transformer instance converts all signals to and from the control module into the format required by the previous interlocking instance, so that the previous interlocking instance is not aware that, for example, a completely new control module has taken over control of a switch or signal.
[0006] WO2014187627A2 discloses a method for replacing a first interlocking system, to which field elements of an external installation are connected via first control elements, with a second interlocking system, to which the field elements of the external installation are connected via second control elements. To enable the interlocking system replacement without interrupting operations, the following steps are provided: 1. Construction of the second interlocking system with the second control elements; 2. Coupling the second interlocking system to the first interlocking system for transmitting messages from the field elements of the external installation to the second interlocking system; 3. Connecting the second interlocking system to an operator station for controlling the field elements of the external installation via the first control elements; 4. Successively deactivating the first control elements and activating the second control elements assigned to the same field elements of the external installation; and 5. Separating the first interlocking system with the first control elements from the second interlocking system. PRESENTATION OF THE INVENTION
[0007] It is an object of the present invention to provide a method for migrating from an existing railway system (specifically an existing interlocking system) to a new system, which allows the new system to be tested thoroughly without having to carry out a dismantling.
[0008] This object is achieved by a method according to claim 1. Further embodiments are specified in the dependent claims.
[0009] A method for migrating from an existing railway system to a new railway system is specified. The existing railway system has an existing field element control device for controlling a field element. The new railway system has a new field element control device for controlling the same field element. The new field element control device can, in particular, be arranged decentrally and can be controlled via a data connection from a central interlocking system. The proposed method comprises the following steps: (a) Providing a changeover switch that can be switched between a first operating state and a second operating state; and (b) Connecting the changeover switch to the field element, the existing field element control device, and the new field element control device such that the changeover switch electrically connects the field element to the existing field element control device in the first operating state and to the new field element control device in the second operating state, wherein the changeover switch electrically connects the field element alternately to the existing field element control device or the new field element control device via a multi-wire interface, in particular a four-wire interface.
[0010] The invention thus makes it possible to alternately connect the field element to the existing system and the new system without the need for a conversion or dismantling. Switching back and forth between the existing system and the new system can, for example, be carried out multiple times and during multiple operational breaks. A compliance test is only required once, when the changeover switch is put into operation for the first time, i.e., after step (b). During this compliance test, the wiring of the field element and the existing and new field element control devices is tested with the changeover switch in both positions, i.e., in the first and second operating states. In practice, the compliance test can be very complex.However, it only needs to be done once because the wiring does not need to be changed afterwards, even if switching back and forth between the existing system and the new system.
[0011] In this context, the term "new" is to be understood as synonymous with the expression "intended to replace something existing." Therefore, the term "new" does not necessarily imply that the item in question is unused.
[0012] The first operating state of the changeover switch is preferably a stable operating state. A changeover switch operating state is referred to as "stable" if it is assumed by the changeover switch even when the changeover switch is not actively controlled. By ensuring that the first operating state of the changeover switch is a stable operating state, it is prevented that the changeover switch inadvertently enters the second operating state, e.g., due to an unintentional voltage drop. The second operating state can also be a stable operating state. In this case, the changeover switch is referred to as bistable. However, the changeover switch can also be monostable, i.e., it can be designed such that it assumes the second operating state only as long as it receives a corresponding signal.
[0013] As already explained, the process may involve switching between the existing system and the new system one or more times. The process may therefore comprise the following steps: (c) controlling the field element by the existing field element control device while the changeover switch is in the first operating state; (d) switching the changeover switch from the first operating state to the second operating state; and (e) controlling the field element by the new field element control device while the changeover switch is in the second operating state.
[0014] Optionally, the method may further comprise the following steps: switching the changeover switch from the second operating state to the first operating state; and repeating steps (c) to (e).
[0015] The switch may be configured to be switched in one of the following ways: manual switching; or controlled switching based on an analog or digital electrical signal.
[0016] The method preferably concludes with the following step: (f) replacing the changeover switch with a bridge device that permanently connects the field element to the new field element control device. The wiring and coding of the bridge device are approved by the competent authority prior to the entire process. "Coding" here refers to a design intended to ensure that the bridge device is used in exactly the intended manner instead of the changeover switch. Coding can be implemented by color or in another way, e.g., mechanically by designing complementary elements that prevent connection in an unintended manner.
[0017] This ensures a secure, highly available connection between the field element and the new field element controller after the new field element controller tests are completed. Even after this step, no further comprehensive compliance testing is required because the remaining wiring does not need to be changed.
[0018] The field element is controlled via a multi-pole interface. A widely used multi-pole interface is the standardized four-wire interface, which allows both controlling the field element and monitoring its status. The switch connects the field element alternately to the existing field element control device or the new field element control device via a multi-wire interface, particularly a four-wire interface.
[0019] To connect the field element to the changeover switch, a cable termination can be assigned to the field element. The procedure in this case may include: (b1) Providing a cable termination associated with the field element; (b2) Connecting a first multi-core cable to the cable termination for connection to the existing field element control device; (b3) Connecting a second multi-core cable to the cable termination for connection to the field element; (b4) Connecting at least one third multi-core cable to the cable termination for connection to the changeover switch; and (b5) Connecting the first, second, and third cables in the cable termination such that the changeover switch, in the first operating state, electrically connects the field element to the existing field element control device.
[0020] In this case, the cable termination serves to connect the various cables together in such a way that the field element can continue to be controlled by the existing system via the changeover switch.
[0021] Furthermore, a device for migrating from an existing railway system with an existing field element control device to a new railway system with a new field element control device according to claim 8 is proposed. In addition to the new field element control device, the device has the aforementioned changeover switch, which can be switched between a first operating state and a second operating state and which is designed to electrically connect the field element to the existing field element control device in the stable first operating state and to electrically connect the field element to the new field element control device in the second operating state.
[0022] As already explained, the changeover switch is designed to electrically connect the field element alternately to the existing field element control device or new field element control device via a multi-wire interface, in particular a four-wire interface.
[0023] For this purpose, the changeover switch can have at least one relay with a plurality of positively guided switching contacts. The relay has two switching states. The first switching state is assigned to the first operating state of the changeover switch, the second switching state to the second operating state of the changeover switch. The relay is preferably bistable, but can also be monostable. In a monostable relay, the first switching state is preferably the stable state. Generally speaking, the first switching state is the output state of the relay. The relay has a plurality of switching contacts. The switching contacts are referred to as "normally closed" (NC) when they are closed in the first switching state. They are referred to as "normally open" (NO) when they are open in the first switching state.
[0024] In some cases, a relay with a sufficient number of positively guided switching contacts may not be available to switch all of the field element's terminals together and simultaneously monitor the relay's switching state. Therefore, instead of a single relay, the changeover switch may have a first and second relay with positively guided switching contacts. The first relay may have a plurality of first switching contacts for alternately connecting a first portion of the field element's terminals to the existing field element control device or the new field element control device. In particular, the first relay may have a plurality of first normally open contacts for connecting a first portion of the field element's terminals to the new field element control device, and a plurality of first normally closed contacts for disconnecting the first portion of the field element's terminals from the existing field element control device.Accordingly, the second relay can have a plurality of second switching contacts for alternately connecting a second portion of the field element's terminals to the existing field element control device or the new field element control device. Specifically, the second relay can have a plurality of second normally open contacts for connecting a second portion of the field element's terminals to the new field element control device, as well as a plurality of second normally closed contacts for disconnecting the second portion of the field element's terminals from the existing field element control device. The first relay can also have third switching contacts, and the second relay can have fourth switching contacts.The third switching contacts can be connected in series with the second switching contacts, and the fourth switching contacts can be connected in series with the first switching contacts in such a way that galvanic isolation between the existing field element control device and the new field element control device is ensured in every switching state of the first and second relays. Specifically, a fourth make contact of the second relay can be connected in series with each first make contact of the first relay, and a third make contact of the first relay can be connected in series with each second make contact of the second relay. Alternatively or additionally, a fourth or third break contact of the other relay can be connected in series with each of the first or second break contacts. Mixed forms are also possible.Selected switching contacts of the two relays are always connected crosswise in series to ensure galvanic isolation between the existing and the new field element control device in all switching states of the two relays. This continues the mechanical forced operation of the two relays in the form of an electrical interlock, so to speak.
[0025] The device can further comprise a monitoring device designed to monitor the changeover switch with regard to its first and second operating states. Additional switching contacts of the relay or of the two relays can serve this purpose. If the changeover switch has a first and a second relay, wherein the first relay is designed to alternately connect some of the wires of the connecting cable to the existing field element control device or the new field element control device, and wherein the second relay is designed to alternately connect another part of the wires of the connecting cable to the existing field element control device or the new field element control device, the monitoring device can be designed to monitor the switching states of at least one switching contact of the first and second relay used for monitoring.This can be achieved with the aid of a suitable logic circuit that emits an output signal based on the switching states of the switching contacts used for monitoring. The output signal preferably indicates whether the changeover switch is in the first operating state, the second operating state, or a fault state. In particular, the monitoring device can be designed to monitor the switching states of a normally open contact of the first and second relay used for monitoring, as well as of a normally closed contact of the first and second relay used for monitoring. Preferably, the monitored normally open contacts of the first and second relay are connected in series, and the monitored normally closed contacts of the first and second relay are connected in series.
[0026] The device can comprise a plurality of new field element control devices and associated changeover switches. The changeover switches can be linked together in a "daisy chain" fashion. In this case, a global monitoring device can be provided for the changeover switches, wherein the global monitoring device comprises a logic circuit configured to output a first global monitoring signal when all changeover switches assume the first operating state and to output a second global monitoring signal when all changeover switches assume the second operating state. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Preferred embodiments of the invention are described below with reference to the drawings, which are for illustrative purposes only and are not to be construed as limiting. In the drawings: Fig. 1 an existing railway system together with a new railway system in a first reconstruction phase; Fig. 2 the two railway systems of the Fig. 1 in a second reconstruction phase; Fig. 3 the two railway systems of the Fig. 1 in a third reconstruction phase; Fig. 4the two railway systems of the Fig. 1 in a fourth conversion phase; Fig. 5 a schematic circuit diagram of a four-wire interface with an associated switch drive in the left end position; Fig. 6 a schematic circuit diagram of a four-wire interface with the associated switch drive in the right end position; Fig. 7 a functional sketch of a switch according to a first embodiment; Fig. 8 a functional sketch of a switch according to a second embodiment; Fig. 9 a functional sketch of the actuators of the switch of the Fig. 8; Fig. 10 a functional diagram of a plurality of changeover switches with associated monitoring device; Fig. 11 a changeover switch according to a first embodiment in a schematic side view; Fig. 12 the changeover switch of the Fig. 11 in a schematic plan view; Fig. 13 a switch according to a second embodiment in a schematic side view; and Fig. 14 the switch of the Fig. 13 in a schematic plan view. DESCRIPTION OF PREFERRED EMBODIMENTS
[0028] Migration from an existing railway facility to a new railway facility
[0029] The Figures 1 to 4 illustrate the various conversion phases during the migration from an existing railway system to a new railway system using a method according to the present invention.
[0030] In this example, the existing system is a conventional interlocking system 20, which houses a variety of existing field element control devices for field elements such as switches, signals, and beacons. In this example, one of the existing field element control devices controls a field element in the form of a switch 10.
[0031] In this example, the new system is a modern "Smart Rail" system with a decentralized control unit 50 that communicates with a central interlocking system 60 via a wired or wireless digital data connection 62, e.g., using the IP protocol. In particular, the control unit 50 can be a so-called "Distributed Power - Object Controller" (DP-OC). The control unit 50 comprises several individual field element control devices 30, i.e., individual "object controllers." In this example, one of these field element control devices 30 is intended to control the switch 10 after the migration. The control unit 50 further comprises several changeover switches 40, the function of which is explained in more detail below. Each field element control device 30 is assigned a changeover switch 40. The respective changeover switch 40 is connected to the field element control device 30 via a multi-pole line 32, e.g.,in the form of a cable or, in the case of high integration density, in the form of a printed circuit.
[0032] The switch 10 has a drive 12. The drive 12 is controlled via a connecting cable 14, and the operating status of the switch is read via the same cable. In this example, the switch 10 is operated via the so-called four-wire interface. For this purpose, the connecting cable 14 has four wires. The four-wire interface is explained in more detail below. However, the switch could also be controlled and read via a different multi-wire interface, e.g., the well-known seven-wire interface. Accordingly, cables with a different number of wires would be used. First renovation phase
[0033] A first phase of reconstruction is in the Figure 1illustrated. The existing system is described below. The four-wire connecting cable 14 of the switch 10 is connected to an existing, four-pole cable termination (KEV) 24. A four-wire connecting cable 22 connects the cable termination 24 to the existing interlocking system 20. The cable termination 24 serves to electrically connect the wires of the two cables 14, 22 in pairs. In this way, the existing interlocking system 20 controls the switch 10 via the connecting cable 22 and the connecting cable 14.
[0034] During this first reconstruction phase, a new, eight-pole cable termination 70 will be installed nearby in addition to the existing cable termination 24. The associated switch 40 will be connected to the new cable termination 70 via two four-wire connecting cables 72, 74 or an eight-wire connecting cable. However, the new cable termination 70 is not yet connected to the switch 10. Second renovation phase
[0035] The second phase of reconstruction is in the Figure 2 illustrated. In the second conversion phase, the connecting cable 14 of the switch 10 is connected to the connecting cable 74 in the new cable termination 70. The connecting cable 22 from the existing signal box 20 is connected to the connecting cable 72 in the new cable termination 70. The switch 40 is in a stable first operating state. In this operating state, it connects the connecting cables 72 and 74.
[0036] Overall, after this conversion phase, the existing interlocking system 20 still controls point 10, but now via connecting cables 22 and 72, the switch 40, the connecting cable 74, and the connecting cable 14. The new field element control devices 30 are therefore not yet active. They can still be modified without restrictions. The same applies to other parts of the new interlocking architecture.
[0037] After this conversion phase, a thorough compliance test is performed according to a predefined protocol. This checks whether all wires of all cables have been correctly connected. In practice, this test is usually very complex and requires the involvement of several people. However, it only needs to be performed once. Third renovation phase
[0038] The third reconstruction phase is in the Fig. 3 illustrated. During this phase, a test operation of the new system takes place. For this purpose, the switch 40 is placed in a second operating state. In this state, it connects the switch 10 to the new field element control device 30 via cables 14, 74, and line 32. The switch 10 is now controlled by the new field element control device 30. However, if necessary, it can be switched back to the previous state at any time.
[0039] The switch can be controlled in different ways: Local operation with an operating switch within the control unit (DP-OC) 50; control with electrical signals generated within the control unit 50; direct control using digital signals from the new interlocking point 60 via a temporary cable 64; direct control via a radio network channel from the new interlocking point 60; or direct control from another location, e.g., from the existing interlocking point 20.
[0040] During this test operation phase, switching back and forth between the existing system and the new system takes place. No changes to the physical cabling are necessary. This is very important, as otherwise a new, time-consuming compliance test would have to be performed. However, the present invention makes it possible to perform this test only once, namely after the second conversion phase, thus eliminating the need for further compliance tests. Fourth renovation phase
[0041] The fourth reconstruction phase is in the Fig. 4illustrated. After successful commissioning of the new system, the existing interlocking system 20, including the connecting cable 22 and the previous cable termination 24, can be dismantled. The switch 40 is now replaced by a bridge device 80, which ensures a permanent, stable, and highly available connection between the new field element control device 30 and the switch 10. Background: Four-wire interface
[0042] For several decades, a standardized electrical interface for railway field elements, particularly switches, has existed in the form of the so-called four-wire interface. This interface is widely used in German-speaking countries. The interface has four connections. If the field element is a switch, the four connections transmit both the drive power for the switch drive and currents for monitoring the switch position in the idle state. Modern field element control devices for switches also detect wire faults, i.e., short circuits between the individual wires in the cable.
[0043] The Figures 5 and 6 illustrate an example of a point machine with a four-wire interface. The four-wire interface has four connectors X1, X2, X3, and X4. In practice, the wires of a connecting cable for the point machine are connected to it, in the example of the Figures 1 to 4the wires of cable 14. These wires are also referred to below as X1 to X4.
[0044] The point machine has a three-phase drive motor with motor windings L1, L2, and L3. A first end of motor winding L1 is connected to terminal X1 of the four-wire interface, a first end of motor winding L2 is connected to terminal X2, and a first end of motor winding L3 is connected to terminal X3. The second end of motor winding L1 is alternately connected to terminal X4 or to the second end of motor winding L3 via a first end position contact m1, which acts as a changeover contact. The second end of motor winding L2 is alternately connected to terminal X4 or to the second end of motor winding L3 via a second end position contact m2, which also acts as a changeover contact.
[0045] In the Figure 5The end position contacts are in a position corresponding to the left end position of the switch. In this position, terminal X1 of the four-wire interface is connected to terminal X3 via motor winding L1, the first end position contact m1, and motor winding L3, and terminal X2 is connected to terminal X4 via motor winding L2 and the second end position contact m2.
[0046] In switching mode, a three-phase current with a suitable phase position is applied to terminals X1 to X4. This causes the drive motor to switch the switch from the left to the right end position.
[0047] In traditional monitoring operation, a DC monitoring voltage is applied to terminals X2 and X3 to monitor the left end position, and the resulting current through terminal X3 and the voltage between terminals X1 and X4 are measured. When the switch is in the left end position, the measured voltage between terminals X1 and X4 essentially corresponds to the monitoring voltage, and the measured current is very low. If the left end position has not been reached or the switch has been opened, the second end position contact m2 is in a different position. In this case, the measured voltage between terminals X1 and X4 is zero, and the measured current is significantly increased.
[0048] In the Figure 6The end position contacts are in a position corresponding to the right end position of the switch. In this position, terminal X1 of the four-wire interface is connected to terminal X4 via motor winding L1 and the first end position contact m1, and terminal X2 is connected to terminal X3 via motor winding L2, the second end position contact m2, and the motor winding L3.
[0049] In traditional monitoring operation, a DC monitoring voltage is applied to terminals X1 and X3 to monitor the right end position, and the resulting current through terminal X3 and the voltage between terminals X2 and X4 are measured. When the switch is in the right end position, the measured voltage between terminals X2 and X4 essentially corresponds to the monitoring voltage, and the measured current is very low. If the right end position has not been reached or the switch has been opened, the first end position contact m1 is in a different position. In this case, the measured voltage between terminals X2 and X4 is zero, and the measured current is greatly increased. In this way, the operating status of the switch can be reliably determined.
[0050] However, the four-wire interface is symmetrical with respect to the X1 and X2 connections, meaning that a reversal of these connections cannot be easily detected. Such a reversal can have fatal consequences. Therefore, special attention must be paid to the correct wiring of the four-wire interface during the compliance test. First embodiment of a switch
[0051] In the Figure 7 A functional diagram of a changeover switch 40 according to a first embodiment is illustrated by way of example. The changeover switch has a relay 90 whose contacts are positively guided for safety reasons. The purpose of the positive guidance is to ensure that normally open contacts can never be in the same state as normally closed contacts.
[0052] Reference is made to the following standards: DIN EN 50205:2003-01 or the superseding standard DIN EN 61810-3:2016-01 "Electromechanical elementary relays - Part 3: Relays with (mechanically) positively guided contacts"; DIN EN 61810-1:2015-10 "Electromechanical elementary relays - Part 1: General and safety requirements" and DIN EN 61810-2:2018-06 "Electromechanical elementary relays - Part 2: Functionality (reliability)" as well as DIN EN 60664-1:2008-01 "Insulation coordination for electrical equipment in low-voltage installations - Part 1: Principles, requirements and tests".
[0053] In the present example, relay 90 has five changeover contacts, i.e. five normally closed contacts and five normally open contacts, which are wired in pairs to form changeover contacts. These switching contacts are coupled via a mechanical guide 91, only shown schematically. Four of the changeover contacts are used to alternately connect wires X1 to X4 of cable 74 to the corresponding wires of cable 72 (first switching state, connection of the field element to the existing system) or line 32 (second switching state, connection of the field element to the new system). The fifth changeover contact 101 is used to monitor the switching state of relay 90. It is connected to a monitoring device 100, which is only shown schematically. Based on the position of changeover contact 101, the monitoring device can determine whether relay 90 is in its first or second switching state, i.e. whether changeover switch 40 is in its first or second operating state. Second embodiment of a switch
[0054] The first design of the changeover switch requires a relay with five normally closed and five normally open contacts. Unfortunately, relays with a total of ten positively guided switching contacts are rarely available in practice because the mechanical complexity required for a large number of positively guided switching contacts is very high. In practice, therefore, multiple relays often have to be used to achieve the same functionality. However, this requires additional effort to ensure that, even in the event of a malfunction of one of the relays, no galvanic connection can be established between the existing field element control device and the new field element control device, and to monitor the switching states of both relays.
[0055] In the Figure 8Illustrated by way of example is a functional diagram of a changeover switch 40 according to a second embodiment, in which two relays 90a, 90b are used, these relays being interconnected ("electrically interlocked") in such a way that the above-mentioned requirements are met.
[0056] The first relay 90a has two normally closed and two normally open contacts, which are interconnected to form two changeover contacts 92a, 93a. These changeover contacts 92a, 93a serve to alternately connect the wires X1 and X4 of cable 74 to the corresponding wires of cable 72 (first switching state) or line 32 (second switching state). Another normally closed contact 101a and normally open contact 102a monitor the switching state of this relay. Two further normally open contacts 94a, 95a serve to specifically connect the wires X2 and X3 of line 32 to changeover contacts of the second relay 90b. A positive guide 91a guides all of the aforementioned contacts of the first relay 90a.
[0057] The second relay 90b is constructed and wired in a similar manner. This relay also has two normally closed and two normally open contacts, which are wired to form two changeover contacts 92b, 93b. These changeover contacts 92b, 93b serve to alternately connect the wires X2 and X3 of cable 74 to the corresponding wires of cable 72 (first switching state) or line 32 (second switching state). Another normally closed contact 101b and normally open contact 102b monitor the switching state of this relay. Two further normally open contacts 94b, 95b serve to specifically connect the wires X1 and X4 of line 32 to the changeover contacts of the first relay 90a. A positive guide 91b guides all of the aforementioned contacts of the second relay 90b.
[0058] Each relay 90a, 90b now has only eight switching contacts: five normally open contacts and three normally closed contacts. Such relays with positively driven contacts are readily available commercially, for example, as a contact configuration variant of the OB 5623 model from E. Dold & Söhne KG, Furtwangen, Germany.
[0059] In the Fig. 8 Both relays 90a, 90b are shown in their first switching state. This corresponds to the first operating state of the changeover switch 40. All wires X1 to X4 of cable 74 are connected to the corresponding wires of cable 72. The field element is thus connected to the existing field element control device.
[0060] When the changeover switch enters its second operating state, both relays 90a, 90b are in their second switching state. In this state, all wires X1 to X4 of cable 74 are connected to the corresponding wires of line 32. The field element is thus connected to the new field element control device.
[0061] If, due to a defect, only the first relay 90a switches to the second switching state, while the second relay 90b remains in the first switching state, the following situation occurs: The changeover contacts 92a, 93a of the first relay are now switched; however, the make contacts 94b, 95b are still open. As a result, the wires X1, X4 of line 32 are neither connected to the corresponding wires of cable 72 nor to the corresponding wires of cable 74. The changeover contacts 92b, 93b of the second relay are still in the state of Fig. 8As a result, wires X2 and X3 of line 32 are neither connected to the corresponding wires of cable 72 nor to the corresponding wires of cable 74. Overall, there is still a galvanic isolation between the old field element control device and the new field element control device. This also applies analogously if only the second relay 90b switches to the second switching state, while the first relay 90a remains in the first switching state.
[0062] This creates an electrical interlock that electrically complements the mechanical positive control of the two relays. In every switching state, even faulty, galvanic isolation between the old field element control device and the new field element control device is ensured.
[0063] The monitoring switching contacts 101a, 101b of the two relays 90a, 90b are connected in series. This allows the monitoring device 100 to determine whether both relays are in the first switching state. The switching contacts 102a, 102b of both relays are also connected in series. This allows the monitoring device 100 to determine whether both relays are in the second switching state. In a normal operating state, either both switching contacts 101a, 101b or both switching contacts 102a, 102b are closed. This allows monitoring to determine whether the changeover switch is in its first or second operating state. If at least one contact is open in both branches at the same time, a malfunction can be concluded. Of course, monitoring can also be performed in a different way, e.g.with the help of a logic circuit that monitors one switching contact (normally closed or normally open) of each relay and whose output signal depends on the positions of these switching contacts (e.g. for normally closed contacts: both normally closed contacts closed means first operating state, both normally closed contacts open means second operating state, one normally closed contact open and one closed means error).
[0064] The Figure 9illustrates a possible wiring of the actuators (windings) of the two relays 90a, 90b. In this embodiment, both relays are bistable. The first relay 90a has a first actuator 96a to bring the relay into the first switching state, and a second actuator 97a to bring the relay into the second switching state. Accordingly, the second relay 90b also has a first actuator 96b and a second actuator 97b. The first actuators 96a, 96b of the two relays are connected in series. An actuating element 121 in the form of a mechanical or electrical switch connects the two actuators 96a, 96b to a supply voltage to bring both relays into the first switching state. If the circuit should be interrupted anywhere, neither of the two relays 90a, 90b can switch due to the series connection. The second actuators 97a, 97b of the two relays are also connected in series.An actuating element 122 connects the two actuators 97a, 97b to a supply voltage to switch both relays to the second switching state. If the circuit is interrupted anywhere, neither of the two relays 90a, 90b can switch due to the series connection. This prevents incorrect switching. The switches or actuating elements 121, 122 are each operated only briefly, i.e., the voltage is applied as a switching pulse. Chaining several switches
[0065] Several changeover switches, e.g. all changeover switches of a control unit (DP-OC) 50, can be linked together in a "daisy chain" manner so that they can be operated and monitored together.
[0066] This is in the Fig. 10illustrated. In this example, three changeover switches 40 are chained together, with six wires connecting the successive switches. The actuators 96a, 96b of the two relays 90a, 90b of each changeover switch 40 are each connected according to the Fig. 9 connected in series in pairs. The pairs 96a, 96b of different changeover switches are connected in parallel and are all activated jointly by an actuating element 121. Similarly, the actuators 97a, 97b are also connected in series in pairs, and these pairs of different changeover switches are connected in parallel and are all activated jointly by an actuating element 122. In this way, all changeover switches can be switched back and forth between the first and second operating states simultaneously.
[0067] Each changeover switch 40 has an individual monitoring device. In this case, this is formed, for example, by two lamps or LEDs 103, 104, to which a supply voltage of, for example, +48 VDC relative to ground (0 VDC) is applied when the contacts are closed. When contacts 101a, 101b are both closed, lamp 103 illuminates, indicating that the changeover switch is in the first operating state. When contacts 102a, 102b are both closed, lamp 104 illuminates, indicating that the changeover switch is in the second operating state.
[0068] The switches also share a global monitoring device 110. This device comprises a first logic gate 111 (an AND gate in the present example) for each switch. This gate receives a monitoring signal for the first operating state from the individual monitoring device of the respective switch and links it to the output of the corresponding logic gate of the preceding switch. Furthermore, the global monitoring device 110 comprises a second logic gate 112 (also an AND gate in the present example) for each switch. This logic gate links the monitoring signal for the second operating state of the respective switch to the output of the corresponding logic gate of the preceding switch.
[0069] The logic circuit comprising logic gates 111, 112 outputs a first global monitoring signal when all switches 40 are in the first operating state. This is indicated by a first lamp 113. The logic circuit outputs a second global monitoring signal when all switches 40 are in the second operating state. This is indicated by a second lamp 114. The global monitoring signals can also be read from a remote location. If none of these monitoring signals is active, this indicates a malfunction in at least one of the switches. In this case, the operating states of the individual switches can be monitored using the individual
[0070] Monitoring devices 100 must be checked on site to determine the source of the error. First design variant for the construction of a switch
[0071] In the Figures 11 and 12 a first embodiment of a switch 40 is illustrated.
[0072] The switch 40 has a base plate 41. The base plate 41 is mounted on a guide rail 52.
[0073] Three terminal or plug-in connection groups 42, 43, and 44 are mounted on this base plate. Connection group 42 connects the changeover switch to cable 72 to the existing field element control device. Connection group 43 connects the changeover switch to cable 32 to the new field element control device. Cable 74 to the field element (here, switch 10) is connected to connection group 44. These connection groups will be connected according to the procedure proposed here during the second conversion phase, and the correctness of the cabling will be checked by several people. The wiring of these connection groups will never be changed again and will remain in place until the existing system is completely decommissioned.
[0074] During the third conversion phase, the switch receives its commands for switching between the existing system and the new system at another port 48. In the fourth conversion phase, this switch is no longer required, and port 48 is taken out of service.
[0075] Sockets 45 for relays 90a, 90b are mounted on base plate 41. Relays 90a, 90b are plugged into these sockets. Additional components 49 may also be present on base plate 41.
[0076] In the fourth conversion phase 4, which concludes the migration, the relays 90a, 90b are replaced with hard-wired jumper plugs 81. This transforms the changeover switch 40 into a bridge device. The hard wiring of these jumper plugs 81 is symbolically represented as wires 83, but is usually implemented as printed circuit boards 82. The remaining components 49 remain on the base plate. Second variant for the construction of a switch
[0077] In the Figures 13 and 14 A second embodiment of a switch 40 is illustrated. Equivalent elements are given the same reference numerals as in the Figures 11 and 12 designated.
[0078] In this version, the base plate 41 also carries the three connection groups 42, 43, and 44 described above. However, the sockets 45 do not directly accommodate the relays 90a and 90b. Instead, the relays 90a and 90b are mounted on a top plate 46, which is plugged into the sockets 45 as a whole. The top plate also carries the connection 48 for the switching commands and optionally additional components 49. The plug connection of the top plate 46 in the sockets 45 is mechanically designed ("coded") in such a way that incorrect plugging is impossible.
[0079] In the fourth conversion phase 4, which concludes the migration, the entire top plate 46 is replaced with a hard-wired bridge connector plate 84. This transforms the switch 40 into a bridge device. The hard wiring of this bridge connector plate 84 is again symbolically represented as wires 83, but is usually implemented as printed circuit boards 82. The no longer required connection 48 for the switching commands and the other components 49 are removed together with the top plate 46. The top plates 46 can thus be reused for future conversion projects. Variations
[0080] It goes without saying that a multitude of modifications of the above-described embodiments are possible without departing from the scope of the invention defined in the claims. Figures 1 to 4The existing system and the new system can also be constructed differently than described above. Instead of a switch, another type of field element can also be controlled. The interface to the field element does not necessarily have to be a four-wire interface. The relays can also be wired in a way other than that described above; however, mechanical positive guidance and / or electrical interlocking is preferably ensured. The relays can be bistable or monostable, whereby in a monostable design the stable operating state is preferably used for the connection to the existing system. The operating states can also be monitored in a way other than that described above. In particular, other types of logic circuits, as are known to those skilled in the art, are also possible for global monitoring.Of course, the operating states can also be detected in ways other than simple lamps or LEDs. The switches can also be constructed differently than described above. LIST OF REFERENCE SYMBOLS
[0081] 10 Switch 12 Switch drive 14 Connecting cable 20 Existing interlocking system 22 Connecting cable 24 Cable termination 30 Control device 32 Cable 40 Changeover switch 41 Base plate 42 Connection group 43 Connection group 44 Connection group 45 Base 46 Top plate 48 Connection 49 Component 50 Control unit 60 New interlocking system 62 Data connection 64 Temporary cable 70 Cable termination 72 Connecting cable 74 Connecting cable 80 Bridge element 81 Bridge plug 82 Circuit board 83 Wires 84 Bridge plug plate 90 Relay 90a, 90b Relay 91 Forced guide 91a, 91b Forced guide 92a, 92b Changeover contact 93a, 93b Changeover contact 94a, 94b Make contact 95a, 95b make contact 96a, 96b actuator 97a, 97b actuator 100 monitoring device 101 changeover contact 101a, 101b break contact 102a, 102b make contact 103 lamp 104 lamp 110 global monitoring device 111 logic gate 112Logic gate 113Lamp 114Lamp 121Actuating element 122Actuating element X1, X2, X3, X4Connection / wire +48 VDCSupply voltage 0 VDCGround
Claims
1. A method for migrating from an existing railroad installation to a new railroad installation, wherein the existing railroad installation has an existing field element control device (20) for controlling a field element (10), and wherein the new railroad installation has a new field element control device (30) for controlling the same field element (10), the method comprising: (a) providing a changeover switch (40) which can be switched between a preferably stable first operating state and a second operating state, characterized in that the method comprises: (b) connecting the changeover switch (40) to the field element (10), the existing field element control device (20) and the new field element control device (30) such that the changeover switch (40) electrically connects the field element (10) to the existing field element control device (20) in the first operating state and to the new field element control device (30) in the second operating state, wherein the changeover switch (40) electrically connects the field element (10) alternately to the existing field element control device (20) or the new field element control device (30) via a multi-wire interface, in particular a four-wire interface.
2. The method according to claim 1, wherein after step (b) a compliance test is carried out, in which the connection between the field element (10), the changeover switch (40), the existing field element control device (20) and the new field element control device (30) is tested in the first and in the second operating state.
3. The method according to claim 1 or 2, comprising the following steps: (c) actuating the field element (10) by the existing field element control device (20) while the changeover switch (40) is in the first operating state; (d) switching the changeover switch (40) to the second operating state; and (e) actuating the field element (10) by the new field element control device (30) while the changeover switch (40) is in the second operating state.
4. The method according to any one of the preceding claims, wherein the changeover switch (40) is configured to be switched over in one of the following ways: manual switching; or controlled switching based on an analog or digital electrical signal.
5. The method according to any one of the preceding claims, further comprising: (f) replacing the changeover switch (40) with a bridge device (80) which permanently connects the field element (10) to the new field element control device (30).
6. The method according to any one of the preceding claims, wherein step (b) comprises: (b1) providing a cable termination (70) associated with the field element (10); (b2) plugging a first multi-core cable (22) to the cable termination (70) for connection to the existing field element control device (20); (b3) plugging a second multi-core cable (14) to the cable termination for connection to the field element (10); (b4) plugging at least a third multi-core cable (72, 74) to the cable termination for connection to the changeover switch (40); and (b5) connecting the cores of the first, second and third cable in the cable termination (70) in such a way that the changeover switch (40) electrically connects the field element (10) to the existing field element control device (20) in the first operating state.
7. A device for migration from an existing railroad installation with an existing field element control device (20) for controlling a field element (10) to a new railroad installation with a new field element control device (30) for controlling the same field element (10), comprising: the new field element control device (30); and a changeover switch (40) which can be switched between a preferably stable first operating state and a second operating state, characterized in that the changeover switch is configured to electrically connect the field element (10) to the existing field element control device (20) in the first operating state and to electrically connect the field element (10) to the new field element control device (30) in the second operating state, wherein the changeover switch (40) is configured to electrically connect the field element (10) alternately to the existing field element control device (20) or the new field element control device (30) via a multi-wire interface, in particular a four-wire interface.
8. The device according to claim 7, wherein the changeover switch (40) has at least one relay (90; 90a, 90b) with a plurality of force-guided switching contacts, wherein the relay (90; 90a, 90b) is preferably bistable.
9. The device according to claim 8, wherein the field element (10) has a plurality of terminals (X1-X4), wherein the changeover switch (40) has a first and second relay (90a, 90b) with force-guided switching contacts, wherein the first relay (90a) comprises a plurality of first switching contacts (92a, 93a) for alternately connecting a first part of the terminals (X1, X4) of the field element (10) to the existing field element control device (20) or the new field element control device (30), wherein the second relay (90b) comprises a plurality of second switching contacts (92b, 93b) for alternately connecting a second part of the terminals (X2, X3) of the field element (10) to the existing field element control device (20) or the new field element control device (30), wherein the first relay (90a) has third switching contacts (94a, 95a) and the second relay has fourth switching contacts (94b, 95b), and wherein the third switching contacts (94a, 95a) are connected in series with the second switching contacts (92b, 93b) and the fourth switching contacts (94b, 95b) are connected in series with the first switching contacts (92a, 92b) such that that galvanic isolation between the existing field element control device (20) and the new field element control device (30) is ensured in each switching state of the first and second relays (90a, 90b).
10. The device according to claim 7 or 8, comprising a monitoring device (100) which is configured to monitor the changeover switch (40) with regard to its first and second operating state.
11. The device according to claim 10, wherein the field element (10) has a plurality of terminals (X1-X4), wherein the changeover switch (40) has a first and second relay (90a, 90b), wherein the first relay (90a) is configured to alternately connect a first part of the terminals (X1, X4) of the field element (10) to the existing field element control device (20) or the new field element control device (30), wherein the second relay (90b) is configured to alternately connect a second part of the terminals (X2, X3) of the field element (10) to the existing field element control device (20) or the new field element control device (30), and wherein the monitoring device (100) is configured to monitor the switching states of at least one switching contact of the first and second relay (90a, 90b) used for monitoring.
12. The device according to claim 11, wherein the first and second relays (90a, 90b) each comprise a normally closed contact (101a, 101b) used for monitoring and a normally open contact (102a, 102b) used for monitoring, wherein the normally closed contacts (101a, 101b) of the first and second relays (90a, 90b) serving for monitoring are connected in series, and wherein the normally open contacts (102a, 102b) of the first and second relays (90a, 90b) used for monitoring are connected in series.
13. The device according to any one of claims 10 to 12, comprising a plurality of new field element control devices (30) and associated changeover switches (40) as well as a global monitoring device (110) for the changeover switches (40), wherein the global monitoring device (110) has a logic circuit (111, 112) which is configured to output a first global monitoring signal (113) when all the changeover switches (40) assume the first operating state, and to output a second global monitoring signal (114) when all the changeover switches (40) assume the second operating state.
