Method for installing an elevator installation and elevator installation

The implementation of a rope safety device with a safety rope and rope stop device addresses the safety concerns of raising the lifting platform in elevator systems without guide rails, ensuring stability and preventing accidents by controlling the descent and maintaining horizontal positioning during braking.

EP4172096B1Active Publication Date: 2024-10-02INVENTIO AG
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
EP2021735271
Authority / Receiving Office
EP · EP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2020-06-26
Filing Date
2021-06-23
Publication Date
2024-10-02
Estimated Expiration
2041-06-23

AI Technical Summary

Technical Problem

The existing elevator systems in construction phases face challenges in safely raising the lifting platform without guide rails, leading to a risk of accidents and equipment damage due to the inability to use safety brakes for fall protection.

Method used

A rope safety device with a safety rope and rope stop device is installed between the lifting platform and a rope pulley support, allowing the safety rope to be arranged outside the free space above the center of gravity, preventing further lowering after exceeding a predetermined speed, and ensuring the lifting platform maintains a horizontal position during braking.

Benefits of technology

This solution effectively minimizes the risk of the lifting platform falling and reduces the risk of accidents for assembly personnel by ensuring the lifting platform remains stable and secure, even in areas without guide rails, while allowing for unhindered crane operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure IMGF0001
    Figure IMGF0001
  • Figure IMGF0002
    Figure IMGF0002
  • Figure IMGF0003
    Figure IMGF0003
Patent Text Reader

Abstract

The invention relates to a method for building a lift system (1) in a building which is currently being built, in which method a usable lifting height of the lift system is adapted to an increasing height of the building, and in which method - in the lift shaft (2), a liftable and temporarily lockable machine platform (10) is installed, on which a lift-driving machine (11) having a traction drive (12) is located, - a lift car (3) and a counterweight (4) are suspended from the machine platform (10) via suspension means (15), so that the lift car (3) and the counterweight (4) can be moved upwards and downwards along guide rails in the lift shaft (2) by means of the traction drive (12) via the suspension means (15), - above the machine platform (10), a lifting platform (17) is installed which is liftable and temporarily lockable in the lift shaft (2) and by means of which the machine platform (10) is lifted with the lift car (3) or the counterweight (4) when the usable lifting height of the lift car is intended to be adapted to a current height of the lift shaft (2), and wherein - prior to lifting the machine platform (10), the lifting platform (17) is lifted to a higher level by means of a building crane (40) or another lifting device (35), and wherein the lifting platform (17) is equipped with a cable catch device (25.1) which comprises a safety cable (31), at least two load-bearing cable sections of which are arranged, according to the Bowden cable principle, between the lifting platform (17) and a cable pulley support (26) fixed above the lifting platform in the lift shaft (2), wherein a first load-bearing cable section of the safety cable (31) is fixed to the lifting platform (17) or is fixed in a stationary manner above the lifting platform, and a last load-bearing cable section is guided through a cable stop apparatus (30) which is fastened to the lifting platform (17) and by means of which the last load-bearing cable section is blocked and further lowering of the lifting platform (17) is thereby prevented after the speed of the last load-bearing cable section has exceeded a specified limit in relation to the cable stop apparatus (30).
Need to check novelty before this filing date? Find Prior Art

Description

[0001] The invention relates, on the one hand, to a method for erecting an elevator system in a building under construction, in which method a usable lifting height of the elevator system is adapted to an increasing height of the building, and, on the other hand, to an elevator system suitable for carrying out the method. Such an elevator system typically comprises a machine platform with an elevator drive machine that is movable along an elevator shaft and can be temporarily locked therein, as well as at least one elevator car suspended from the machine platform via support means and driven by the elevator drive machine. During the installation of the elevator system, the usable lifting height of the elevator car is adapted from time to time to an increasing height of the building by raising at least the machine platform supporting the elevator car to a higher level with the aid of a lifting platform temporarily fixed above the machine platform.

[0002] WO2010 / 100319 discloses such an elevator system or method, in which an elevator car and a counterweight are suspended via flexible traction mechanisms from a machine platform that can be raised and temporarily fixed in the elevator shaft. The traction mechanisms are guided via a traction sheave of an elevator drive machine, so that the traction mechanisms are driven by the traction sheave, allowing the elevator car and counterweight to be moved up and down the elevator shaft in opposite directions. From time to time, the machine platform is raised to a higher level corresponding to the increasing building height and fixed there in the elevator shaft.This ensures that the elevator system can, on the one hand, transport people and material up to the currently highest area of ​​the building during its construction phase, and, on the other hand, that users from lower, already developed floors, as well as their furniture, for example, can be transported by the elevator system.

[0003] EP 3 390 263 B1 discloses a method according to the preamble of claim 1 and an elevator installation according to the preamble of claim 13.

[0004] To raise the machine platform, a lifting platform is installed above the machine platform, which can also be raised and temporarily secured in the elevator shaft. A group of pulleys is attached to both the lifting platform and the machine platform. A multi-reeved lifting cable is arranged between the pulley group of the lifting platform and the pulley group of the machine platform so that the machine platform can be raised using two cable pulling devices mounted on the machine platform. Before each lifting of the machine platform, the lifting platform must be raised to a higher level in the elevator shaft. This is done using a hoist that is attached to another support structure that can be moved and secured in the elevator shaft and can lift the lifting platform via a hoist cable.

[0005] When raising the machine platform, the risk of the machine platform falling is typically reduced by equipping it with safety brakes that act on the guide rails of the elevator car, along which the machine platform is also guided. If, in any situation, a maximum permissible downward speed is exceeded, the safety brakes are activated, and the braking action between the guide rails and the safety brakes brings the machine platform to a stop.

[0006] Even when raising the lifting platform, there is a risk of it falling into the elevator shaft. However, the lifting platform cannot be guided along guide rails because no guide rails are installed in the uppermost section of the elevator shaft, where the lifting platform must be positioned before the machine platform is raised. Safety brakes as fall protection are therefore not applicable.

[0007] The object of the present invention is to provide a method and a lift installation of the type described above which is suitable for carrying out the method and in which the risk of the lifting platform falling and thus also the risk of accidents for the assembly personnel is minimized when the lifting platform is raised.

[0008] The solution to the problem consists, on the one hand, in a method for erecting an elevator system in an elevator shaft of a building under construction, in which method a usable lifting height of the elevator system is adapted to an increasing height of the building, wherein a machine platform which can be raised along car guide rails and temporarily locked is installed in the elevator shaft, on which machine platform an elevator drive machine with a traction sheave is arranged, wherein an elevator car and a counterweight are suspended from the machine platform via suspension means, wherein the suspension means are guided at least via the traction sheave of the elevator drive machine, so that the elevator car and the counterweight can be moved upwards and downwards in opposite directions to each other by the traction sheave via the suspension means along guide rails in the elevator shaft,wherein a lifting platform is installed above the machine platform, which can be raised and temporarily locked in the elevator shaft, with which the machine platform - usually with the elevator car coupled to it - is raised when the usable lifting height of the elevator car is to be adjusted to a current height of the elevator shaft, wherein before lifting the machine platform, the lifting platform is raised to a higher level by means of a construction crane or other lifting device, and wherein the lifting platform is equipped with a rope arrester comprising a safety rope arranged between the lifting platform and a rope pulley support fixed above the lifting platform in the elevator shaft according to the principle of a pulley block with at least two load-bearing rope sections,wherein a first load-bearing rope section of the safety rope is fixed to the lifting platform or stationary above the lifting platform and a last load-bearing rope section is guided through a rope stop device attached to the lifting platform, which blocks the last load-bearing rope section and thus prevents further descent of the lifting platform after the speed of the last load-bearing rope section has exceeded a predetermined limit relative to the rope stop device.

[0009] The term "load-bearing rope sections" refers to sections of the safety rope arranged according to the pulley principle. These sections, after activation of the rope arresting device or its rope stop device, each transfer equal portions of the total braking force occurring during the arresting process between the rope pulley support and the lifting platform. A commercially available device (e.g., a "Bloc-Stop") can be used as the rope stop device.

[0010] With the method according to the invention and the elevator system according to the invention, which includes the described rope arresting device for the lifting platform, the requirement to minimize the risk of the lifting platform falling can be met with relatively little effort, even if the lifting platform must be positioned in the uppermost area of ​​the elevator shaft that does not yet have guide rails. Advantageous, supplementary, or alternative embodiments and further developments of the invention are described below.

[0011] In an advantageous embodiment of the method according to the invention, the load-bearing cable sections of the safety cable are arranged such that, upon activation of the cable arrester, the line of action of the resultant of the cable forces of all load-bearing cable sections essentially passes through the center of gravity of the lifting platform. This measure ensures that when the cable arrester stops a lifting platform moving downwards at an impermissibly high speed, the lifting platform, which is not guided by guide rails, does not tip over but maintains its horizontal position. This prevents injuries to assembly personnel and damage to the lifting platform and the walls of the elevator shaft.

[0012] In a further possible embodiment of the method according to the invention, the entire safety rope of the rope arresting device is arranged such that it runs completely outside a free space extending upwards above the center of gravity of the lifting platform, which free space enables the lowering of a crane hook of the construction crane to a coupling element on the lifting platform mounted above the center of gravity.

[0013] Such an arrangement of the safety rope enables an unhindered vertical lowering of a crane rope to the center of gravity of the lifting platform and its coupling to a coupling element present on the lifting platform in or above its center of gravity.

[0014] In a further possible embodiment of the method according to the invention, the free space is dimensioned such that a cylinder with a diameter of at least 0.4 m extending upwards from the center of gravity of the lifting platform can be arranged in the free space.

[0015] This also makes it possible to lower a crane hook rope block with a crane hook attached to it to the coupling element on the lifting platform.

[0016] In a further possible embodiment of the method according to the invention, the rope pulley support is attached to a protective platform that can be vertically displaced and fixed above the lifting platform in the elevator shaft.

[0017] This is a particularly advantageous solution for attaching the rope pulley support in the elevator shaft, since such a protective platform must be present anyway to protect the assembly personnel from falling objects.

[0018] In a further possible embodiment of the method according to the invention, the protective platform is provided with a passage opening arranged in the area of ​​the free space explained above, through which the crane hook is lowered to the coupling element on the lifting platform.

[0019] In a further possible embodiment of the method according to the invention, the rope pulley support is equipped with four vertically and four horizontally arranged deflection pulleys. The definition of the installation position of the deflection pulleys - vertical or horizontal - refers to the position of the rope pulley plane. In this embodiment, the safety rope is guided through these deflection pulleys and through at least one support roller of a support roller arrangement coupled to the lifting platform in such a way that the safety rope forms four load-bearing rope sections and runs completely outside the free space. This embodiment has the advantage that all coupling points between the rope arrester and the lifting platform are located close to a reference plane extending vertically through the center of gravity of the lifting platform, so that more space is available on both sides of the reference plane for assembly personnel and auxiliary equipment.

[0020] In a further possible embodiment of the method according to the invention, the rope pulley support is equipped with only four vertically arranged deflection pulleys, wherein the safety rope is guided through these deflection pulleys and through at least one support roller of a support roller arrangement coupled to the lifting platform in such a way that the safety rope forms four supporting rope sections and runs completely outside the free space.

[0021] With this embodiment, lower manufacturing costs can be achieved if sufficient space is available to the side of the above-mentioned reference plane extending vertically through the center of gravity of the lifting platform.

[0022] In a further possible embodiment of the method according to the invention, the safety rope - with reference to a reference plane extending vertically through the center of gravity of the lifting platform - is guided vertically upwards from a safety rope fixed point on the lifting platform to a first deflection pulley which is vertically positioned and arranged at right angles to the reference plane in the rope pulley support, after the first deflection pulley at right angles to the reference plane and away from this to a horizontally positioned second deflection pulley, after the second deflection pulley horizontally and parallel to the vertical reference plane to a horizontally positioned third deflection pulley, after the third deflection pulley at right angles to the reference plane and towards this to a fourth deflection pulley which is vertically positioned and arranged at right angles to the reference plane, after the fourth deflection pulley vertically downwards to a support roller arrangement connected to the lifting platform, which support roller arrangement comprises at least one support roller,whose roller plane is arranged vertically and transversely to the reference plane, after the support roller arrangement vertically upwards to a fifth deflection pulley arranged vertically and at right angles to the reference plane in the rope pulley support, after the fifth deflection pulley at right angles to the reference plane and away from this to a horizontally arranged sixth deflection pulley, after the sixth deflection pulley horizontally and parallel to the vertical reference plane to a horizontally arranged seventh deflection pulley opposite the second deflection pulley and mirror-symmetrical to the reference plane, after the seventh deflection pulley at right angles to the reference plane and towards this to an eighth deflection pulley arranged vertically and at right angles to the reference plane, and after the eighth deflection pulley vertically downwards to the rope stop device attached to the lifting platform.

[0023] In a further possible embodiment of the method according to the invention, the safety rope - with reference to a reference plane extending vertically above the lifting platform through its center of gravity - is guided vertically upwards from a safety rope fixed point on the lifting platform to a vertically standing first deflection pulley of the rope pulley support arranged parallel to the reference plane, after the first deflection pulley horizontally and parallel to the reference plane to a vertically standing second deflection pulley arranged parallel to the reference plane, after the second deflection pulley vertically downwards to a support roller arrangement connected to the lifting platform with at least one vertically standing support roller arranged transversely to the reference plane, after the support roller arrangement vertically upwards to a vertically standing third deflection pulley of the rope pulley support arranged parallel to the reference plane,after the third deflection pulley, horizontally and parallel to the vertical reference plane to a fourth deflection pulley, which is vertically positioned and parallel to the reference plane and opposite the first deflection pulley and mirror-symmetrical to the reference plane, and after the fourth deflection pulley, vertically downwards to the rope stop device attached to the lifting platform.

[0024] In a further possible embodiment of the method according to the invention, the lifting platform is equipped with a lifting device in which a lifting rope is guided within the free space above the lifting platform from a lifting rope holder on the lifting platform upwards to a lifting rope deflection pulley of a lifting rope deflection device fixed at least temporarily in the free space and from a lifting rope deflection pulley of the lifting rope deflection device downwards to a cable pulling device arranged on the lifting platform.

[0025] The term "cable pulling device" refers to any device capable of pulling on a cable—especially a wire rope—and moving it in the direction of its longitudinal axis, even against resistance. The cable pulling device can be manually driven, but preferably electrically driven.

[0026] This design variant has the advantage that the lifting platform and thus also the machine platform can be raised even if the construction crane is not available for a longer period of time.

[0027] In a further possible embodiment of the method according to the invention, in order to lift the lifting platform with the aid of the lifting device, the lifting rope deflection device comprising at least one lifting rope deflection pulley is arranged in the area of ​​the free space on the protective platform, and in order to lift the lifting platform with the aid of the construction crane, the lifting rope deflection device is removed from the area of ​​the free space.

[0028] This design variant has the advantage, on the one hand, that the fastening of the lifting rope deflection device in the elevator shaft can be implemented simply and cost-effectively, and, on the other hand, the temporary arrangement of the lifting rope deflection device in the said free space in this design variant enables the resultant of all load-bearing rope forces of the lifting rope of the lifting device to pass through the center of gravity of the lifting platform.

[0029] A further aspect of the invention relates to an elevator system in an elevator shaft of a building under construction, in which elevator system a usable lifting height of the elevator system can be adapted to an increasing height of the building. This elevator system is preferably designed such that it is suitable for carrying out the method described above.

[0030] The elevator system comprises a machine platform installed in the elevator shaft, which can be raised and temporarily locked along car guide rails. An elevator drive machine with a traction sheave is arranged on the machine platform. The elevator system further comprises an elevator car and a counterweight suspended from the machine platform via suspension means. The suspension means are guided at least via the traction sheave of the elevator drive machine, so that the elevator car and the counterweight can be moved upwards and downwards in opposite directions along guide rails in the elevator shaft by the traction sheave via the suspension means.The elevator system further comprises a lifting platform installed above the machine platform in the elevator shaft. This platform can be lifted and temporarily locked. The lifting platform can be used to raise the machine platform with the elevator car or counterweight if the usable lifting height of the elevator car needs to be adjusted to the current height of the elevator shaft. The lifting platform is designed so that it can be raised to a higher level using a construction crane or other lifting device before raising the machine platform.The lifting platform is equipped with a rope arrester comprising a safety rope that is arranged or can be arranged between the lifting platform and a rope pulley support fixed above the lifting platform in the elevator shaft according to the principle of a pulley block with at least two load-bearing rope sections, wherein a first load-bearing rope section of the safety rope is fixed or can be fixed to the lifting platform or stationary above the lifting platform and a last load-bearing rope section is guided or can be guided through a rope stop device attached to the lifting platform, by means of which the last load-bearing rope section can be blocked and thus a further descent of the lifting platform can be prevented after the speed of the last load-bearing rope section has exceeded a predetermined limit compared to the rope stop device.

[0031] The elevator system may include a vertically movable and fixable safety platform above the lifting platform in the elevator shaft, to which the rope pulley support is attached. The safety platform may be provided with a passage through which a crane hook can be lowered to a coupling element on the lifting platform.

[0032] The rope pulley support can be equipped with four vertically and four horizontally arranged deflection pulleys, wherein the safety rope is guided through these deflection pulleys and through at least one support roller of a support roller arrangement coupled to the lifting platform in such a way that the safety rope forms four load-bearing rope sections and runs completely outside a free space which allows the crane hook of a construction crane to be lowered to the coupling element.

[0033] Alternatively, the rope pulley support can be equipped with only four vertically arranged deflection pulleys, wherein the safety rope is guided through these deflection pulleys and through at least one support roller of a support roller arrangement coupled to the lifting platform in such a way that the safety rope forms four supporting rope sections and runs completely outside the said free space.

[0034] The lifting platform can be equipped with a lifting device comprising a lifting rope, a lifting rope holder, a lifting rope deflection pulley and a rope pulling device, wherein the lifting rope is guided within the said free space above the lifting platform from the lifting rope holder on the lifting platform upwards to a lifting rope deflection pulley of the lifting rope deflection device temporarily fixed in the free space and from the lifting rope deflection pulley downwards to the rope pulling device arranged on the lifting platform.

[0035] Embodiments of the invention are explained in more detail in the following description with reference to the accompanying drawings. They show: Fig. 1 shows a cross-section through an elevator shaft with an elevator system whose usable lifting height is adjustable to an increasing height of the building. The elevator system comprises a machine platform, an elevator car suspended from the machine platform with a counterweight, and a lifting platform used to raise the machine platform. The lifting platform is equipped with a rope arrester and a lifting device that interact with a protective platform. Furthermore, a construction crane is indicated, which serves as an alternative to the lifting device for raising the lifting platform. Fig. 2 shows a side view of part of the elevator system according to Fig. 1 with a section through this part, showing the lifting platform used to lift the machine platform, which is equipped with the first variant of the rope arrester device interacting with the protective platform and can only be lifted by the construction crane. Fig. 3 a side view of part of the lift system according to Fig. 1 with a section through this part, showing the lifting platform used to lift the machine platform, which is equipped with the first variant of the rope arrester and with a lifting device that also interacts with the protective platform and can be lifted alternatively with the lifting device or by the construction crane. Fig. 4 a side view of a part of the lift system according to Fig. 1 with a section through this part, showing the lifting platform used to lift the machine platform, which is equipped with a second variant of the rope arrester and with a lifting device that also interacts with the protective platform and can be lifted alternatively with the lifting device or by the construction crane.

[0036] Fig. 1 shows an elevator installation 1 according to the invention and suitable for carrying out the method according to the invention, which is installed in an elevator shaft 2 of a building under construction. The elevator installation 1 is designed such that the usable lifting height of an elevator car 3 of the elevator installation 1 can be adjusted from time to time to accommodate an increasing height of the building or the elevator shaft 2.

[0037] The elevator installation 1 comprises, firstly, the elevator car 3 and a counterweight 4, which are vertically displaceable along car guide rails 6 and counterweight guide rails 7 in the elevator shaft 2, respectively. Secondly, the elevator installation 1 comprises a machine platform 10, on which an elevator drive machine 11 with a traction sheave 12 and a deflection pulley 13 is mounted, wherein the elevator car 3 and the counterweight 4 are suspended from the machine platform such that support means 15 are guided at least over the traction sheave 12, so that the elevator car 3 and the counterweight 4 can be moved upwards and downwards in opposite directions to one another by the traction sheave 12 via the support means 15 along car guide rails 6 and counterweight guide rails 7 in the elevator shaft 2.The machine platform 10 is guided along the car guide rails 6 and arranged in the elevator shaft 2. It can be lifted along these car guide rails 6 in the elevator shaft 2 and temporarily locked therein via horizontally extendable supports. Third, the elevator system 1 comprises a lifting platform 17 arranged above the machine platform 10, which is vertically displaceable and lockable in the elevator shaft 2. The lifting platform 17 serves to lift the machine platform 10, which typically weighs several thousand kilograms. It is dimensioned accordingly and equipped with a sufficiently powerful lifting mechanism 18.

[0038] Of course, before each lifting of the machine platform 10, the lifting platform 17 itself must be raised to a higher level and fixed there, whereby the lifting can be carried out with the aid of a construction crane 40 or another means of transport in connection with Fig. 3 The lifting device 35 is explained in more detail. Unlike the machine platform 10, however, the lifting platform 17 is not guided on guide rails, since the lifting platform must be temporarily locked in areas of the elevator shaft 2 where no guide rails have yet been installed. The car guide rails 6 as well as the counterweight guide rails 7 are extended upwards to the next higher locking position of the machine platform before each lifting of the machine platform 10, which is preferably accomplished from an assembly platform (not shown here) that can be installed between the machine platform 10 and the lifting platform 17.

[0039] Fourthly, the elevator system 1 comprises a protective platform 20 that can be fixed in the elevator shaft 2 or on the elevator shaft, which is essential for protecting the installation personnel and the elevator system from falling objects. In the elevator system 1 according to the invention, the protective platform 20 also serves as a support for a rope pulley support 26 of a rope arrester 25.1, which serves as a fall protection device for the lifting platform 17. The components of the rope arrester are Fig. 1 In addition, a safety rope fixed point 29, a rope stop device 30 and a safety rope 31 comprising four supporting rope sections can be seen. Details and functionality of the rope arrester 25.1 are described below in connection with Fig. 2 described in more detail.

[0040] The protective platform 20 can also form a support for a lifting rope deflection device 36 of a lifting device 35, which serves to raise the lifting platform 17. The lifting device 35 comprises a cable pulling device 37 mounted on the lifting platform 17, which interacts with a lifting rope 38 and the lifting rope deflection device 36 such that the lifting device can raise the lifting platform 17 without the use of a construction crane.

[0041] Above the protective platform 20 or above the currently upper end of the elevator shaft 2, a construction crane 40 is indicated, with the aid of which the lifting platform 17 can be lifted with less effort than with the lifting device 35, if the construction crane is available when the lifting platform is to be lifted.

[0042] In the lowest part of the elevator shaft 2, a suspension element storage unit 50 is shown in a niche in the shaft wall of the elevator shaft 2. This storage unit serves to hold the additional suspension element length required when the usable lifting height of the elevator car 3 is increased and to release it when needed.

[0043] Adapting the elevator system 1 to a newly available, greater height of the elevator shaft 2 is essentially achieved by first raising the safety platform 20 to a higher level, if necessary. This is typically done with the aid of a construction crane 50 or a hoist suspended from, for example, a temporarily installed crossbeam. The lifting platform 17 is then raised with the construction crane or the lifting device 35 and fixed at a height in the elevator shaft 2 that allows the machine platform 10 to be transported to the planned new level with the lifting mechanism 18 of the lifting platform and to lock the machine platform there.Before raising the machine platform 10, the counterweight 4 is positioned on its lower buffers, the elevator car 3 is coupled to the machine platform 10, and the suspension elements of the elevator car and the counterweight are released from the suspension element fixed point 52 on the machine platform 10. When the machine platform and the elevator car 3 are raised, the amount of suspension element required to extend the suspension elements 15 is automatically withdrawn from the suspension element storage unit 50. After the lifting process is complete, the suspension elements 15 are re-secured to the suspension element fixed point 52, and after performing some adjustment work, the elevator system 1 is ready for operation again with a usable lifting height of the elevator car 3 adapted to the current building height.

[0044] Fig. 2 shows on the left a side view of a part of the elevator system according to Fig. 1 in the uppermost area of ​​the elevator shaft 2, and on the right side a section AA through this area. Shown is the device used to raise the machine platform 10 ( Fig. 1 ) and vertically displaceable lifting platform 17 in a situation in which it is lifted by a construction crane 40. The lifting platform is equipped with a first embodiment of a rope arrester 25.1 serving as a fall protection device for the lifting platform. The rope arrester 25.1 comprises the rope pulley support 26, in which a group of four vertically and four horizontally arranged rope pulleys 27.1-27.8 is arranged. The definition of the installation position - vertical or horizontal - refers to the position of the rope pulley level. The rope pulley support 26 with the rope pulleys is fixed to the protective platform 20, which has been positioned in or on the currently uppermost area of ​​the elevator shaft at the latest when the usable lifting height of the elevator system 1 is adjusted to the current height of the building or the elevator shaft 2. The rope arrester 25 also comprises1 the safety rope fixing point 29 attached to the lifting platform 17, a support roller arrangement 32 coupled to the lifting platform, the rope stop device 30 and the safety rope 31 comprising four supporting rope sections 31.1-31.4.

[0045] At the Fig. 2 In the embodiment of the rope arrester 25.1 shown, the safety rope is arranged between the lifting platform 17 and the rope pulley support 26 fixed above the lifting platform in the elevator shaft according to the principle of a pulley with the four supporting rope sections 31.1-31.4, wherein a first supporting rope section 31.1 of the safety rope 31 is fixed to the safety rope fixing point 29 attached to the lifting platform 17, and wherein a last supporting rope section 31.4 is guided through a rope stop device 30 attached to the lifting platform.

[0046] In the event of a fall of the lifting platform 17, in which the last supporting rope section 31.4 moves at four times the speed of the lifting platform relative to the rope stop device 30 due to the pulley effect, the last supporting rope section 31.4 is blocked by the rope stop device 30 after the speed of the last supporting rope section 31.4 relative to the rope stop device has exceeded a predetermined limit. This prevents further descent of the lifting platform before the speed of the lifting platform becomes unacceptably high. Fig. 2 The arrangement shown of the load-bearing cable sections 31.1 - 31.4 of the cable arrester 25.1 enables the line of action of the resultant of the cable forces of all load-bearing cable sections of the cable arrester 25.1 to pass essentially through the center of gravity S of the lifting platform 17 upon activation of the cable arrester, even if the safety cable 31 - as explained below - must be arranged completely outside a cylindrical free space extending vertically upwards above the center of gravity S so that a crane cable of a construction crane 40 can be coupled to the lifting platform 17 at the center of gravity S or above the center of gravity. This is important for stable lifting of the lifting platform, particularly because the lifting platform is not guided on guide rails during lifting.

[0047] The arrangement of the safety rope 31 of the rope arrester 25.1 according to Fig. 2 enables the entire safety rope to run outside a free space extending upwards above the center of gravity S of the lifting platform 17. To lift the lifting platform 17 with the aid of the construction crane 40, a crane hook of the construction crane can be lowered through this free space to a coupling element (42) attached to the lifting platform above the center of gravity. For this purpose, on the one hand, the safety rope 31 is arranged such that a free space is created in which a cylinder with a diameter of at least 0.4 m extending upwards from the center of gravity S of the lifting platform 17 could be arranged. On the other hand, for the aforementioned purpose, the protective platform, to which the rope pulley support 26 is fixed, is provided with a closable passage opening 21.

[0048] At the Fig. 2 The illustrated rope arresting device 25.1 for the lifting platform 17 achieves the object of ensuring that, on the one hand, the arresting force resulting from an arresting operation passes through the center of gravity S of the lifting platform, and, on the other hand, that a free space extending upwards from the center of gravity S can be realized. In detail, this object is achieved in that the safety rope 31 - with reference to an imaginary reference plane extending vertically through the center of gravity S of the lifting platform 17 - is guided vertically upwards from a safety rope fixed point 29 on the lifting platform to a first deflection pulley 27.1 arranged vertically and at right angles to the aforementioned reference plane in the rope pulley support 26, after the first deflection pulley at right angles to the reference plane and away from this to a horizontally positioned second deflection pulley 27.2, after the second deflection pulley horizontally and parallel to the vertical reference plane to a horizontally positioned third deflection pulley 27.3, after the third deflection pulley at right angles to the reference plane and towards this to a vertically standing fourth deflection pulley 27.4 arranged at right angles to the reference plane, after the fourth deflection pulley vertically downwards to a support roller arrangement 32 connected to the lifting platform, which comprises at least one support roller 33 whose roller plane is arranged vertically and transversely to the reference plane, after the support roller arrangement 32 vertically upwards to a vertically standing fifth deflection pulley 27.5 arranged in the cable pulley support at right angles to the reference plane, after the fifth deflection pulley at right angles to the reference plane and away from this to a horizontally lying sixth deflection pulley 27.6, after the sixth deflection pulley horizontally and parallel to the vertical reference plane to a horizontally lying seventh deflection pulley 27, opposite the second deflection pulley 27.2 and mirror-symmetrically to the reference plane.7, after the seventh deflection pulley at right angles to the reference plane and towards this to a vertically standing eighth deflection pulley 27.8 arranged at right angles to the reference plane, and after the eighth deflection pulley vertically downwards to the rope stop device 30 attached to the lifting platform.

[0049] In Fig. 2 the lifting platform 17 is without the Fig. 1 shown lifting device 35, either because the lifting device has been dismantled in order to enable the coupling of a crane rope to the lifting platform in order to lift the lifting platform 17, or because a lifting device is not present at all, since it is intended to lift the lifting platform exclusively with the construction crane 40.

[0050] Fig. 3 shows how Fig. 2 on the left side a side view of part of the lift system 1 according to Fig. 1 in the currently uppermost area of ​​the elevator shaft 2, and on the right side a section AA through this area. The lifting platform 17 is equipped with the rope arrester 25.1 according to the Fig. 2 shown first embodiment. In contrast to Fig. 2 shows Fig. 3 However, the elevator system is Fig. 1 indicated lifting device 35, which serves to lift the lifting platform 17 when no construction crane is available, or when the construction crane is not available within a reasonable time at the time of adjusting the usable lifting height of the elevator system.

[0051] Compared with the Fig. 2 The elevator system 1 equipped with the lifting device 35 has the following Fig. 3 additionally a lifting rope deflection device 36, a cable pulling device 37, a lifting rope 38 and a lifting rope holder 39. The lifting rope deflection device, which comprises at least one lifting rope deflection pulley 36.1, is advantageously attached to the Fig. 1 described protective platform 20 in the area of ​​the passage opening 21 provided therein. A first supporting section of the lifting rope 38 is fixed to the lifting platform 17 by means of the lifting rope holder 39. From this lifting rope holder, the lifting rope is guided vertically upwards to the at least one lifting rope deflection pulley 36.1 of the lifting rope deflection device 36, wraps around it by 180 degrees and then runs as the second supporting section of the lifting rope 38 downwards to the cable pulling device 37 fastened to the lifting platform 17, through which it is guided. The two supporting sections of the lifting rope 38 run within the in connection with Fig. 2 described free space, bypassed by the sections of the safety rope 31, extending upwards from the center of gravity S of the lifting platform. In the lifting device 35 explained here, the resultant of the rope forces of the load-bearing sections of the lifting rope 38 also passes through the center of gravity S of the lifting platform 17. To lift the lifting platform 17 with the aid of the construction crane 40, the lifting rope 38 and the lifting rope deflection device 36 must be removed from the said free space. The rope pulling device 37 is advantageously electrically driven and comprises, for example, driven friction rollers pressed against the lifting rope, with which the lifting rope 38 is pulled through the rope pulling device. The lifting platform 17 is raised through the interaction of the rope pulling device 37, the lifting rope 38, the lifting rope deflection device 36 and the lifting rope holder 39.

[0052] Fig. 4 shows how Fig. 2 and Fig. 3 on the left side a side view of part of the lift system 1 according to Fig. 1 in the currently uppermost area of ​​the elevator shaft 2, and on the right side a section AA through this area. The lifting platform 17 is equipped with a lifting device 35 - as already described in connection with Fig. 3 described - equipped. In contrast to the Fig. 3 The elevator system shown is the elevator system according to Fig. 4 However, it is equipped with a rope arresting device 25.2 according to a second embodiment. In this embodiment, the rope pulley support 26 of the rope arresting device 25.2 is equipped with only four vertically arranged deflection pulleys 28.1-28.4, with the safety rope 31 being guided through these deflection pulleys and through at least one support roller 33 of a support roller arrangement 32 coupled to the lifting platform 17 in such a way that the safety rope forms four supporting rope sections 31.1-31.4 and runs along its entire length outside the clearance required for lowering a crane hook.

[0053] With the Fig. 4The illustrated rope arresting device 25.2 for the lifting platform 17 also achieves the task of ensuring that, on the one hand, during an arresting operation, the resultant of the arresting forces occurring in all load-bearing rope sections 31.1-31.4 passes through the center of gravity S of the lifting platform 17, and, on the other hand, that a sufficiently large clearance extending upwards from the center of gravity S can be realized. In detail, this task is achieved by the safety rope 31 - with reference to an imaginary reference plane extending vertically above the lifting platform through its center of gravity S - extending vertically upwards from a safety rope fixed point 29 attached to the lifting platform 17 to a vertically standing first deflection pulley 28 arranged parallel to the reference plane.1 of the rope pulley support 26, after the first deflection pulley horizontally and parallel to the reference plane to a vertically standing second deflection pulley 28.2 arranged parallel to the reference plane, after the second deflection pulley vertically downwards to a support roller arrangement 32 connected to the lifting platform 17 and having at least one vertically standing support roller 33 arranged transversely to the reference plane, after the support roller arrangement 32 vertically upwards to a vertically standing third deflection pulley 28.3 of the rope pulley support arranged parallel to the reference plane, after the third deflection pulley horizontally and parallel to the vertical reference plane to a vertically standing fourth deflection pulley 28.4 arranged parallel to the reference plane and opposite the first deflection pulley 28.1 in mirror symmetry to the reference plane, and after the fourth deflection pulley vertically downwards to the rope stop device 30 fastened to the lifting platform.

[0054] In order to achieve a sufficient cross-section of the said free space, in this embodiment - measured transversely to the said imaginary reference plane - somewhat larger dimensions of the part of the lifting platform 17 to which the safety rope fixed point 29 and the rope stop device 30 of the rope arresting device 25.2 as well as the lifting rope holder 39 and the rope pulling device 37 of the lifting device 35 are attached result.

[0055] However, with this simpler embodiment, lower manufacturing costs can be achieved if sufficient space is available to the side of the above-mentioned reference plane extending vertically through the center of gravity S of the lifting platform.

Claims

1. Method for building an elevator system (1) in an elevator shaft (2) of a building that is in its construction phase, in which method a usable lifting height of the elevator system is adapted to an increasing height of the building, - a machine platform (10) being installed in the elevator shaft (2), which platform can be raised and temporarily locked along car guide rails (6), and on which an elevator drive machine (11) having a traction sheave (12) is arranged, - an elevator car (3) and a counterweight (4) being suspended from the machine platform (10) via suspension means (15), the suspension means being guided at least over the traction sheave (12) of the elevator drive machine (11), so that the elevator car (3) and the counterweight (4) can be moved up and down in opposite directions to one another along guide rails (6, 7) in the elevator shaft (2) by the traction sheave via the suspension means (15), - a lifting platform (17) that can be raised and temporarily locked in the elevator shaft (2) being installed above the machine platform (10), by means of which lifting platform the machine platform is raised with the elevator car (3) or the counterweight (4) when the usable lifting height of the elevator car is to be adapted to a current height of the elevator shaft (2), and - before the machine platform (10) is raised, the lifting platform (17) being raised to a higher level by means of a construction crane or another lifting device, characterized in that the lifting platform (17) is equipped with a cable catching device (25.1; 25.2) which comprises a safety cable (31) which is arranged between the lifting platform (17) and a cable pulley support (26) according to the principle of a pulley block having at least two load-bearing cable portions (31.1-31.4), which is fixed above the lifting platform in the elevator shaft (2), a first load-bearing cable portion (31.1) of the safety cable (31) being fixed to the lifting platform (17) or in a stationary manner above the lifting platform, and a last load-bearing cable portion (31.4) being guided through a cable stopping apparatus (30) which is fastened to the lifting platform (17), by means of which apparatus the last load-bearing cable portion is blocked and, as a result, further lowering of the lifting platform is prevented, after the speed of the last load-bearing cable portion (31.4) relative to the cable stopping apparatus (30) has exceeded a predetermined limit.

2. Method according to claim 1, characterized in that the load-bearing cable portions (31.1-31.4) of the cable catching device (25.1; 25.2) are arranged in such a way that, when the cable catching device is activated, a line of action of the resultant cable forces of all load-bearing cable portions (31.1-31.4) of the cable catching device (25.1; 25.2) substantially goes through the center of gravity (S) of the lifting platform (17).

3. Method according to claim 2, characterized in that the entire safety cable (31) of the cable catching device (25.1; 25.2) is arranged in such a way that it extends completely outside of a free space that extends in the upward direction above the center of gravity (S) of the lifting platform (17), which free space allows a crane hook of the construction crane (40) to be lowered to a coupling element (42) which is attached on the lifting platform (17) above the center of gravity (S).

4. Method according to claim 3, characterized in that the free space is dimensioned such that a cylinder having a diameter of at least 0.4 m and extending upward from the center of gravity (S) of the lifting platform (17) can be arranged in the free space.

5. Method according to any of claims 1-4, characterized in that the cable pulley support (26) is fastened to a protective platform (20) which can be vertically moved and fixed in the elevator shaft (2) above the lifting platform (17).

6. Method according to claim 5, characterized in that the protective platform (20) is provided with a passage opening (21) arranged in the region of said free space, through which passage opening the crane hook is lowered to the coupling element (42) on the lifting platform (17).

7. Method according to any of claims 1-6, characterized in that the cable pulley support (26) is equipped with four vertically and four horizontally arranged deflection pulleys (27.1-27.8), the safety cable being guided through at least one load-bearing pulley (33) of a load-bearing pulley arrangement (32) which is coupled to the lifting platform (17) in such a way that the safety cable (31) forms four load-bearing cable portions (31.1-31.4) and extends completely outside of said free space.

8. Method according to any of claims 1-6, characterized in that the cable pulley support (26) is equipped with only four vertically arranged deflection pulleys (28.1-28.4), the safety cable being guided through at least one load-bearing pulley (33) of a load-bearing pulley arrangement (32) which is coupled to the lifting platform (17) in such a way that the safety cable (31) forms four load-bearing cable portions (31.1-31.4) and extends completely outside of said free space.

9. Method according to claim 8, characterized in that the safety cable (31) - in relation to a reference plane extending vertically through the center of gravity (S) of the lifting platform - is guided vertically upward from a safety cable fixed point (29) on the lifting platform (17) to a vertical first deflection pulley (27.1) which is arranged in the cable pulley support (26) perpendicularly to the reference plane, after the first deflection pulley perpendicularly to the reference plane and away therefrom to a horizontal second deflection pulley (27.2), after the second deflection pulley horizontally and in parallel with the vertical reference plane to a horizontal third deflection pulley (27.3), after the third deflection pulley perpendicularly to the reference plane and toward this to a vertical fourth deflection pulley (27.4) which is arranged perpendicularly to the reference plane, after the fourth deflection pulley vertically downward to a load-bearing pulley arrangement (32) which is connected to the lifting platform (17), which arrangement comprises at least one load-bearing pulley (33), the pulley plane of which is arranged vertically and transversely to the reference plane, after the load-bearing pulley arrangement (32) vertically upward to a vertical fifth deflection pulley (27.5) which is arranged opposite the fourth deflection pulley mirror-symmetrically to the reference plane and perpendicularly to the reference plane in the cable pulley support (26), after the fifth deflection pulley perpendicularly to the reference plane and away therefrom to a horizontal sixth deflection pulley (27.6), after the sixth deflection pulley horizontally and in parallel with the vertical reference plane to a horizontal seventh deflection pulley (27.2) which is arranged opposite the second deflection pulley (27.7) mirror-symmetrically to the reference plane, after the seventh deflection pulley perpendicularly to the reference plane and toward this to a vertical eighth deflection pulley (27.8) which is arranged perpendicularly to the reference plane, and after the eighth deflection pulley vertically downward to the cable stopping apparatus (30) attached to the lifting platform (17).

10. Method according to claim 8, characterized in that the safety cable (31) - with reference to a reference plane extending vertically above the lifting platform (17) through its center of gravity (S) - is guided vertically upward from a safety cable fixed point (29) on the lifting platform (17) to a vertical first deflection pulley (28.1) of the cable pulley support (26), which pulley is arranged in parallel with the reference plane, after the first deflection pulley horizontally and in parallel with the reference plane to a vertical second deflection pulley (28.2) which is arranged in parallel with the reference plane, after the second deflection pulley vertically downward to a load-bearing pulley arrangement (32) which is connected to the lifting platform, the pulley arrangement having at least one vertical load-bearing pulley (33) which is arranged transversely to the reference plane, after the load-bearing pulley arrangement (32) vertically upward to a vertical third deflection pulley (28.3) of the cable pulley support (26), which third deflection pulley is arranged mirror-symmetrically opposite to the reference plane relative to the second deflection pulley and in parallel with the reference plane, after the third deflection pulley horizontally and in parallel with the vertical reference plane to a vertical fourth deflection pulley (28.4) which is arranged in parallel with the reference plane and mirror-symmetrically to the reference plane opposite the first deflection pulley, and after the fourth deflection pulley vertically downward to the cable stopping apparatus (30) which is attached to the lifting platform (17).

11. Method according to any of claims 1-10, characterized in that the lifting platform (17) is equipped with a lifting device (35), in which a lifting cable (38) is guided upward within said free space above the lifting platform (17) from a lifting cable holder (39) on the lifting platform (17) to a lifting cable deflection pulley (36.1) of a lifting cable deflection apparatus (36) which is temporarily fixed in the free space and from a lifting cable deflection pulley (36.1) downward to a cable pulling apparatus (37) which is arranged on the lifting platform (17).

12. Method according to claim 11, characterized in that the lifting cable deflection apparatus (36) comprising at least one lifting cable deflection pulley (36.1) is arranged in the region of said free space on the protective platform (20) for raising the lifting platform (17) by means of the lifting device (35), and in that for raising the lifting platform (17), the lifting cable deflection apparatus (36) is removed from the region of the free space by means of the construction crane (40).

13. Elevator system (1) in an elevator shaft (2) of a building that is in its construction phase, in which elevator system a usable lifting height of the elevator system can be adapted to an increasing height of the building, the elevator system (1) comprising - a machine platform (10) which is installed in the elevator shaft (2) and can be raised and temporarily locked along car guide rails (6), an elevator drive machine (11) having a traction sheave (12) being arranged on the machine platform (10) - an elevator car (3) and a counterweight (4), which are suspended from the machine platform (10) via suspension means (15), the suspension means (15) being guided at least over the traction sheave (12) of the elevator drive machine (11), so that the elevator car (3) and the counterweight (4) can be moved up and down in opposite directions to one another along guide rails (6, 7) in the elevator shaft (2) by the traction sheave (12) via the suspension means (15), - a lifting platform (17) which is installed above the machine platform (10) in the elevator shaft (2), which lifting platform can be raised and temporarily locked, the machine platform (10) being able to be raised by means of the lifting platform (17) with the elevator car (3) or the counterweight (4) when the usable lifting height of the elevator car (3) is to be adapted to a current height of the elevator shaft (2), and the lifting platform (17) being designed in such a way that it can be raised to a higher level by means of a construction crane or another lifting device before the machine platform (10) is raised, characterized in that the lifting platform (17) is equipped with a cable catching device (25.1; 25.2) which comprises a safety cable (31) which is arranged between the lifting platform (17) and a cable pulley support (26), according to the principle of a pulley block having at least two load-bearing cable portions (31.1-31.4), which is fixed above the lifting platform in the elevator shaft (2), a first load-bearing cable portion (31.1) of the safety cable (31) being fixed to the lifting platform (17) or in a stationary manner above the lifting platform and a last load-bearing cable portion (31.4) being guided through a cable stopping apparatus (30) which is fastened to the lifting platform (17), by means of which apparatus the last load-bearing cable portion is blocked and, as a result, further lowering of the lifting platform can be prevented after the speed of the last load-bearing cable portion (31.4) relative to the cable stopping apparatus (30) has exceeded a predetermined limit.

Citation Information

Patent Citations

  • Elevator arrangement and method

    WO2010100319A1

  • Fall prevention device for a platform

    EP3019428A1

  • Fall protection device for a platform

    EP3019428B1

  • Method for erecting an elevator system, and elevator system which can be adapted to an increasing building height

    EP3390263A1

  • Method for constructing a lift facility

    EP3390263B1