AI Technical Summary

Technical Problem

In cement clinker production plants, especially those operating in recirculation or oxy-fuel processes, atmospheric air ingress contaminates the system due to incomplete sealing of transport and dosing devices, leading to significant nitrogen contamination in the exhaust gas, which hampers carbon dioxide enrichment and increases compression work.

Method used

A conveyor device equipped with a gas supply system that uses recirculation gas to displace atmospheric air during bulk material transfer, featuring a tapered feed device and adjustable speed control to maintain a bulk material cone as a seal, ensuring minimal nitrogen ingress and maximizing CO2 enrichment.

Benefits of technology

Effectively prevents atmospheric air penetration, maintaining high CO2 concentrations and reducing nitrogen levels in the exhaust gas, thereby optimizing the carbon dioxide enrichment process and minimizing compression work.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 1.1
    Figure 1.1
Patent Text Reader

Abstract

The invention relates to a conveyor device (100) for conveying bulk material (10) for a system (20) for producing cement clinker, wherein the system (20) for producing cement clinker operates in the recirculation process and / or in the oxy-fuel process, and wherein the conveyor device (100) has a connection (110) to the system (20) for producing cement clinker, in which bulk material (10) to be transported is transferred into the system (20) for producing cement clinker. According to the invention, the connection (110) between the conveyor device (100) and the system (20) for producing cement clinker has a gas supply (120) for supplying the connection (110) with recirculation gas. This design allows for a separation between atmospheric air and recirculation gas in the system for producing cement clinker.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] Conveying device for a cement production plant

[0002] The invention relates to a conveying device for conveying bulk material for a plant for producing cement clinker, wherein the plant for producing cement clinker operates in the recirculation process and / or in the oxy-fuel process, and wherein the conveying device has a connection to the plant for producing cement clinker, in which bulk material to be transported is transferred into the plant for producing cement clinker.

[0003] To produce cement clinker, calcareous rock is first ground together with silicate-containing rock to form raw meal and then subjected to heat treatment in a cement clinker production plant in an entrained-flow reactor in an atmosphere of nitrogen-rich combustion air. During the heat treatment, carbon dioxide (CO2) is formally extracted from the calcareous rock from the carbonate (CO2) contained in the lime. 2-). This heat treatment produces carbon dioxide (CO2) from two sources: the combustion of fuels, whether renewable or fossil, and the expulsion of carbon dioxide (CO2) from the lime (CaCO3). In order to reduce carbon dioxide emissions into the atmosphere, the first plants have been operated nitrogen-free or at least with low nitrogen levels, using carbon dioxide (CO2) as the carrier gas. This changes the solid chemistry and the heat balance of the plant. The aim of the nitrogen-free or low-nitrogen, but carbon dioxide-rich production of cement clinker is to inject the carbon dioxide into underground caverns. The low nitrogen content of the carbon dioxide-rich exhaust gas to be injected saves considerable compression work. To provide exhaust gas that is as highly enriched in CO2 as possible from a cement clinker production plant, the plant can be operated using an oxyfuel process.The carbon dioxide-enriched exhaust gas from this plant is largely recirculated and enriched with the oxygen necessary for the combustion processes. The objective is to produce a gas mixture consisting, as far as possible, exclusively of CO2 and water vapor, and in particular to minimize nitrogen, which is considered a contaminant. In this sense, the ingress of atmospheric air from the surrounding area into the plant, which operates under negative pressure, is harmful. The typical proportion of infiltrated air in the exhaust gas of a clinker kiln line downstream of the heat exchanger is between 15% in a properly installed new plant and up to 30% in an older plant.A significant portion of atmospheric air enters the kiln system via the flour feed, because, on the one hand, the transport and dosing devices used there can only be incompletely sealed against the atmospheric ambient air and, on the other hand, even within fine bulk material flows, there is a high pore volume fraction that is filled with atmospheric air.

[0004] The invention is therefore based on the object of preventing the penetration of false air through the raw meal feed.

[0005] The object of the invention is achieved by a conveying device having the features of claim 1. Further advantageous embodiments are specified in the subclaims to claim 1.

[0006] According to the concept of the invention, it is provided that the connection between the conveying device and the plant for the production of cement clinker has a gas supply for supplying the connection with recirculation gas. This gas supply displaces any atmospheric air during the transfer of the bulk material to be conveyed into the plant for the production of cement clinker. In an embodiment of the invention, it can be provided that the conveying device is a bucket elevator which has a feed device at the outlet, wherein the feed device has a cross-section that is tapered compared to the mean cross-sectional area at the transition to the plant for the production of cement clinker, on which cone of bulk material forms during the conveyance of the bulk material and empties into the transition.The bulk material cone on the tapered cross-section leads to gas separation between the atmospheric ambient air and the recirculation gas in the cement clinker production plant. If the cement clinker production plant is operated under negative pressure, the atmospheric pressure pushes the bulk material through the tapered cross-section of the feed device, causing the bulk material to pass through the narrower cross-section as if by suction.

[0007] In order to drive atmospheric air trapped in the pores of the bulk material, the gas supply can be arranged in such a way that the recirculation gas flows into the bulk material cone and drives the trapped atmospheric air out of the bulk material.

[0008] In order to maintain the bulk material cone as a seal, it can be provided that the conveying device has a control device which controls the speed of the bucket elevator depending on the height of the bulk material cone, whereby the speed of the bucket elevator decreases with increasing height of the bulk material cone and conversely the speed of the bucket elevator increases with decreasing height of the bulk material cone.

[0009] In order to adjust the flow rate of the bulk material in the transition to the plant for the production of cement clinker, it can be provided that the cross-sectional area of ​​the tapered cross-section can be adjusted from the outside by at least one sliding plate.

[0010] To remove atmospheric air from the bulk material during transport, a gas supply can be provided to supply the freeboard space of the individual buckets with recirculation gas. Due to its higher density than atmospheric air in the freeboard space, the CO2-rich recirculation gas then settles on the bulk material during transport of the bulk material in the respective bucket, displacing the existing atmospheric air from the pores of the bulk material.

[0011] The invention is explained in more detail with reference to the following figures.

[0012] It shows:

[0013] Fig. 1 shows a first embodiment of the conveying device according to the invention.

[0014] Figure 1 shows a sketch of a first embodiment of the conveying device 100 according to the invention. This first embodiment of the conveying device 100 is a bucket elevator, which is sketched vertically interrupted in this illustration. At the lower part of the bucket elevator as conveying device 100 there is a bulk material feed 105 for feeding bulk material, in this case raw meal, which is fed onto the bucket elevator as conveying device 100 in an atmospheric air environment. The bucket elevator as conveying device 100 can be enclosed or can convey openly. Two deflection rollers 14 and 14' drive a chain hoist 13 on which individual conveyor buckets 12 are arranged and transport the raw meal as bulk material 10 upwards in portions.Having reached the upper deflection roller 14', each bucket 12 of the bucket elevator as conveying device 100 discharges the raw meal as bulk material 10 into the outlet of the bucket elevator as conveying device 100, where the outlet 130 has a connection 110 to a plant 20 for producing cement clinker. On the plant 20 side, the connection 110 consists of a feed device 140. The buckets 12 of the bucket elevator as conveying device 100 empty into this feed device 140. The bulk material 10 poured into it forms a bulk material cone 11 in the feed device 140. This bulk material cone 11 made up of bulk material 10 empties through the transition 150 into the plant 20 for producing cement clinker. According to the concept of the invention, it is provided that recirculation gas from the system 20 is fed into the area of ​​the connection 110 in order to displace the atmospheric air entrained with the bulk material 10.It can be provided that the gas supply 120 displaces the atmospheric air in the region of the connection 110, or it can be provided that the gas supply 120 is offset somewhat further downwards so that the gas supply 120 opens into the bulk material cone 11 and there expels atmospheric air from the pores of the bulk material 10. In order to form a bulk material cone 11, the cross-section of the feed device 140 is tapered so that at the base of the feed device 140 there is a smaller tapered cross-section VQ than the mean cross-section MQ of the feed device. The bulk material 10 is emptied through the smaller, tapered cross-section VQ into the system 20. In order to adjust the size of the cross-section at the base of the feed device 140, a sliding plate 170 can be provided, with which the cross-section can be adjusted.A control device 160 can be provided which controls the speed and thus the transport capacity of the bucket elevator as the conveying device 100, wherein the control device reduces the speed of the bucket elevator as the height of the bulk material cone 11 increases and increases it as the height of the bulk material cone 11 decreases. The aim of this control is to maintain the bulk material cone 11 upright and stable, which serves as a gas seal between the atmospheric air of the bucket elevator and the recirculation gas of the system 20. To prevent the ingress of atmospheric air into the pores of the bulk material cone 11, the gas supply 120 can also introduce the recirculation gas from the system 20 into the bulk material cone 11. To free the bulk material 10 of atmospheric air during the transport process, a gas supply 120' can be provided to supply the freeboard space of the individual buckets 12 with recirculation gas. LIST OF REFERENCE SYMBOLS.

[0015] Bulk material 120' gas supply

[0016] Bulk material cone 130 outlet

[0017] Cup 140 feeder

[0018] Chain hoist 150 transition

[0019] Deflection pulley 160 Control device ' Deflection pulley 170 Sliding plate

[0020] System 0 Conveyor MQ average cross-sectional area5 Bulk material feed VQ tapered cross-section0 Connection 0 Gas supply

Claims

7 PATENT CLAIMS Conveying device (100) for conveying bulk material (10) for a plant (20) for the production of cement clinker, wherein the plant (20) for the production of cement clinker operates in the recirculation process and / or in the oxy-fuel process, and wherein the conveying device (100) has a connection (110) with the plant (20) for the production of cement clinker, in which bulk material (10) to be conveyed passes into the plant (20) for the production of cement clinker, characterized in that the connection (110) between the conveying device (100) and the plant (20) for the production of cement clinker has a gas supply (120) for supplying the connection (110) with recirculation gas. 8 Conveying device according to claim 1, characterized in that the conveying device (100) is a bucket elevator which has a feed device (140) at the outlet (130), wherein the feed device (140) has a cross-section (VQ) that is tapered relative to the mean cross-sectional area (MQ) at the transition (150) to the system (20) for the production of cement clinker, on which a bulk material cone (11) forms during the conveying of the bulk material (10), which empties into the transition (150). Conveying device according to claim 2, characterized in that the gas supply (120) is arranged such that the recirculation gas flows into the bulk material cone (11) and there drives the trapped atmospheric air out of the bulk material (10). Conveying device according to one of claims 2 or 3, characterized in that the conveying device (100) has a control device (160) which regulates the speed of the bucket elevator depending on the bulk material cone height, 9 wherein the speed of the bucket elevator decreases with increasing height of the bulk material cone and conversely increases with decreasing height of the bulk material cone. Conveying device according to one of claims 2 to 4, characterized in that the cross-sectional area of ​​the tapered cross-section (VQ) is adjustable from the outside by means of at least one sliding plate (170). Conveying device according to one of claims 1 to 5, characterized in that a gas supply (120') supplies the freeboard space of the individual buckets (12) with recirculation gas.