Method and system for performing load control on the power consumption of a fleet of electric transport vehicles
Patent Information
- Application Number
- EP2022813588
- Authority / Receiving Office
- EP · EP
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2021-11-10
- Filing Date
- 2022-11-08
- Publication Date
- 2024-09-18
AI Technical Summary
Existing systems for managing electricity consumption in fleets of electric transport vehicles, such as rail transport, struggle to balance energy supply and demand dynamically, particularly during fluctuations in electricity production and consumption, leading to inefficiencies and potential imbalances in the electrical network.
A method and system that modulate the electrical consumption of air conditioning systems in electric transport vehicles by acquiring the difference between a reference frequency and the actual frequency of the electrical network's voltage, allowing for real-time adjustments in power supply and temperature settings to match energy supply and demand, thereby implementing primary and secondary load shedding.
This approach enables rapid and effective balancing of electricity supply and demand by reducing or increasing electrical consumption in electric transport vehicles, maintaining grid stability and optimizing energy usage without the need for remote server data exchange, making it suitable for both direct and alternating voltage systems.
Smart Images

Figure 1.1
Abstract
Description
[0001] DESCRIPTION
[0002] TITLE: Method and system for implementing a reduction in the electricity consumption of a fleet of electric transport vehicles
[0003] Technical field of the invention
[0004] The present invention relates to a method for carrying out a reduction in the electrical consumption of a fleet of electric transport vehicles. The present invention also relates to a system capable and configured to carry out such a method.
[0005] The invention applies in particular to fleets of rail transport vehicles, for example trains, metros, trams, trolleybuses, etc., powered by an electrical network.
[0006] State of the art
[0007] Ideally, the electrical energy produced by power generation centers should be equal to the electrical energy consumed by all electricity consumers.
[0008] To achieve this objective, energy consumption predictions are made, for example daily, particularly for large electricity consumers such as the transport sector, the steel industry, etc. Based on the predictions, the production of electrical energy by the energy production centers as well as the management of consumption deviations from the forecast consumption are planned by the electricity network management company.
[0009] Thus, the electricity network management company responsible for maintaining the balance between electricity supply and electricity demand identifies situations in which electricity consumption is not in line with electricity production. For example, the management company is able to:
[0010] - identify one or more peak periods where consumption is higher than electricity production, or a situation where electricity consumption is slightly higher than electricity production, which would result in the unnecessary start-up of an additional production unit;
[0011] - identify a situation where electricity consumption is slightly lower than electricity production, which is not acceptable in the context of optimizing electricity production.
[0012] Depending on the identified situations, the management company establishes a load shedding strategy. This strategy consists of temporarily reducing or increasing electricity consumption, according to one or more time periods ranging from a few seconds to 30 minutes, for example, in order to restore the balance between electricity production and consumption.
[0013] This strategy relies on balancing reserves capable of injecting electrical energy into the electricity grid and / or of shedding electrical energy from the grid, i.e. of withdrawing electrical energy from the grid.
[0014] These balancing reserves can be provided by balancing actors who contact the management company, such as electricity producers, electricity consumers, or any other actor capable of injecting or withdrawing electricity from the network.
[0015] Thus, in response to a load shedding order transcribing directives issued by the management company, the adjustment actors are invited to modify their electricity consumption.
[0016] Today, passenger transport, and rail transport in particular, is one of the largest consumers of electricity in France. In a passenger vehicle, such as a rail vehicle, the air conditioning system is the largest consumer of electrical energy after the vehicle's traction system.
[0017] The aim of the invention is to propose a technical solution making it possible to make a fleet of electric transport vehicles an adjustment actor, by precisely varying the electrical consumption of the fleet, in particular the air conditioning means, according to the variation in the consumption of the energy delivered by the electrical network with regard to the variation in the consumption of the electricity supplied by the electrical network. Presentation of the invention
[0018] In this regard, the present invention relates to a method for implementing a reduction, during a predefined time range, of an electrical consumption of a fleet of electric transport vehicles supplied by an electrical network, the fleet comprising at least one active electric transport vehicle in operation, and each electric transport vehicle comprising air conditioning means capable of modifying a temperature of a passenger compartment of the electric transport vehicle; the method comprising, during the predefined time range: acquiring a difference between a reference frequency and a frequency of a voltage delivered by the electrical network; modifying an electrical consumption of the air conditioning means of said at least one active vehicle as a function of said difference.
[0019] Such a method makes it possible, when an increase or a decrease in electricity consumption is actually detected, by measuring the frequency of the electricity network supplying the fleet of vehicles, to respectively reduce or increase the electricity consumption of a fleet of electric transport vehicles in order to maintain the balance between the energy supplied by the network and the energy consumed from the network.
[0020] Such a process thus allows the execution of a primary reduction in the electrical consumption of a fleet of vehicles.
[0021] Furthermore, the modification of the electrical consumption of the air conditioning means comprises sending a command to modify a consumption of the air conditioning means during the predefined time range, the modification command comprising: sending a first correction value to modify a power supply of the air conditioning means of said at least one active vehicle during a first time period; and / or sending a second correction value to modify the temperature of the passenger compartment of the active vehicle during a second time period; in which the second time period is greater than the first time period, and in which the first and / or second correction values are determined from the acquired difference.
[0022] The process thus allows a double action on the electrical consumption of air conditioning systems.
[0023] A so-called rapid action allows the consumption of air conditioning systems to be reduced or increased in a short time by modulating the power supplied to the air conditioning systems. This allows for a rapid increase or decrease in the electrical power delivered by the electricity network.
[0024] A so-called slow action makes it possible to reduce, over a longer period, the consumption of air conditioning means, by reducing or increasing the consumption of air conditioning means over a second period, in particular by modifying the temperature at which the passenger compartment of the vehicle is maintained.
[0025] The first time period can be less than 30 seconds. The second time period can be greater than 30 seconds and less than or equal to 30 minutes.
[0026] The acquisition of the difference between a reference frequency and a frequency of a voltage delivered by the electrical network may include: determining a type of a supply voltage of the fleet vehicles; if the supply voltage of the vehicles is direct, determining harmonics of the supply voltage to deduce the frequency of the voltage delivered by the electrical network; if the supply voltage of the vehicles is alternating, measuring the frequency of the supply voltage to deduce the frequency of the voltage delivered by the electrical network.
[0027] The acquisition of the difference between a reference frequency and a frequency of a voltage delivered by the electrical network may include: receiving the frequency of the voltage delivered by the electrical network.
[0028] Such a method is thus suitable for enabling load shedding to be carried out, regardless of the nature of the voltage supplied by the electric vehicle supply network. Thus, whether the voltage is direct or alternating, the method is then capable of determining the frequency of the electrical network, regardless of the nature of the supply voltage supplied to the fleet vehicles by the electrical supply network.
[0029] The reference frequency can be in the range [48 Hz;52 Hz],
[0030] The method may further comprise, during the predefined time range: periodically sending the consumption of the air conditioning means.
[0031] This method makes it possible to check that the deletion request has been executed correctly during the predefined time period. This allows, in real time, the decrease or increase in consumption of air conditioning systems to be sent to the management company, for example.
[0032] The method may further comprise: receiving geographic information defining a geographic erasure zone; determining the location of the vehicle relative to the geographic erasure zone; during the predefined time range, the method further comprising the steps of acquiring and modifying when the vehicle is located in the geographic erasure zone.
[0033] The invention further relates to a system for implementing a reduction in the electrical consumption of a fleet of electric transport vehicles powered by an electrical network, the system comprising at least one equipment for acquiring a frequency of a voltage delivered by the electrical network, the electric transport vehicles of the fleet comprising: air conditioning means capable of modifying a temperature of a passenger compartment of the electric transport vehicle; and a control unit configured to control the air conditioning means and receive a signal coming out of the acquisition equipment; in which the control unit is configured to: acquire a difference between a reference frequency and a frequency of a voltage delivered by the electrical network via the acquisition equipment; modify a consumption of the air conditioning means of said at least one active vehicle as a function of said difference.
[0034] Such a system makes it possible, in particular, to implement primary load shedding by a fleet of electric transport vehicles. Indeed, the system makes it possible to modulate, by detecting a situation of imbalance between the voltage delivered by the electricity network and the voltage consumed by the electricity network, the consumption of the air conditioning systems of the various active electric transport vehicles in the fleet.
[0035] Each vehicle in the fleet may include equipment for measuring the voltage frequency delivered by the electrical network.
[0036] This allows for rapid execution of the primary erasure, and does not require the exchange of data with a remote server.
[0037] The frequency measuring equipment may be configured to determine a type of a supply voltage of the fleet vehicles, the frequency measuring equipment comprises: a first sub-module configured to determine harmonics of the direct supply voltage to deduce therefrom the frequency of the voltage delivered by the electrical network; a second sub-module configured to measure the frequency of the alternating supply voltage to deduce therefrom the frequency of the voltage delivered by the electrical network.
[0038] The electric transport vehicles further comprise an energy management module comprising means for connection to a temperature regulation system and to a temperature sensor, the regulation system being associated with air conditioning means and being configured to maintain the temperature of a passenger compartment at a set temperature as a function of a temperature measured by the temperature sensor corresponding to the temperature of the passenger compartment, said energy management module further comprising temperature shifting means capable of shifting said temperature measured by the temperature sensor by a predetermined value, the control unit being configured to send the second correction value to the temperature shifting means to shift the measured temperature.
[0039] Such a system for implementing a load shedding makes it possible to make the implementation of the process compatible with existing vehicles, the energy management module in particular makes it possible to vary the consumption of the air conditioning means, this by deceiving the temperature sensor. This therefore makes the solution generic so that the energy management module, interfaceable with different types of vehicles, is used to reduce the energy consumption of the air conditioning means following confirmation of the load shedding request.
[0040] In the system for implementing an erasure, the vehicles may further comprise: a static contactor, configured to be actuated by the control unit, capable of modifying a supply power of the air conditioning means; the control unit being configured to send a first correction value to the static contactor to modify the supply power of the air conditioning means.
[0041] In the system for implementing a load shedding, the vehicles may further comprise: a contactor connecting the air conditioning means to the power supply network, the contactor comprising a coil by means of which the power supply of the air conditioning means to the electrical network is modulated, the control unit being configured to send a first correction value to the contactor to modify, by means of the coil, the power supply of the air conditioning means.
[0042] Other features and advantages of the invention will become apparent in the following description.
[0043] Brief description of the figures
[0044] The invention, according to an exemplary embodiment, will be well understood and its advantages will appear better on reading the detailed description which follows, given for information purposes and in no way limiting, with reference to the appended drawings in which:
[0045] [Fig. 1] Figure 1 represents an example of a timeline of erasure actions;
[0046] [Fig. 2] Figure 2 represents a method of implementing an erasure;
[0047] [Fig. 3] Figure 3 illustrates a system for implementing a reduction in consumption of a fleet of electric transport vehicles, capable of implementing the method described with reference to Figure 2;
[0048] [Fig. 4] Figure 4 illustrates a system for supervising an execution of an erasure request comprising the system illustrated in Figure 2 for implementing an erasure in response to an erasure request from a managing company; and
[0049] [Fig. 5A] and
[0050] [Fig. 5B] Figures 5A and 5B respectively represent two embodiments of a sub-module of the module for measuring the frequency of the voltage delivered by the electrical network included in the system illustrated in Figure 3.
[0051] Detailed description
[0052] Identical elements shown in the above figures are identified by identical reference numerals. Figure 1 represents an example of a timeline of load shedding actions to restore the balance between electricity production and electricity consumption on a given electricity network.
[0053] In this example, the restoration of the balance between electricity production and consumption takes place during a failure of an electricity producer, resulting in a drop in the power produced following this interruption. The restoration of balance can take place in different circumstances, for example during consumption peaks.
[0054] Figure 1 illustrates the temporal evolution of the power produced and the network frequency, during the reestablishment of the balance between production and electricity consumption.
[0055] At time t1 when the faulty electricity producer causes a drop in the power delivered AP by the electricity network, the load shedding mechanism is triggered. The drop in power delivered causes the power produced by the electricity network to go from the value Pnom to the value Pmin.
[0056] The load shedding mechanism aims to restore the AP power decline, through balancing actors such as producers, consumers, or any other actor capable of injecting or withdrawing electrical energy from the network. The balancing actors thus provide balancing reserves, which, according to the instructions of the management company, make it possible to rebalance the power supplied by the electricity network.
[0057] The electricity injection or load shedding reserves of balancing actors are classified, according to predefined specifications, as primary, secondary or tertiary reserves. Primary and secondary reserves allow the regulation of the available electrical power of the network to compensate for decreases or increases in the electrical power supplied by the network. The tertiary reserve allows the modulation of the available electrical power of the electricity network in response to a request from the management company. In particular, to be classified according to one of the classes, the injection or load shedding reserves must meet specific conditions, linked to the injection or load shedding speed. For example, in the case of an injection in France, the reserves must meet the following conditions:
[0058] - For the primary reserve, at least partially restore the missing power in less than 30 seconds from the detection of missing power;
[0059] - For the secondary reserve, fully restore the missing power after the action of the primary reserve on the missing power, for a maximum of 15 minutes following detection of the missing power;
[0060] - For the tertiary reserve, to sustainably replace the missing power after the actions of the primary and secondary reserves, following the detection of the missing power.
[0061] In the case of load shedding, time conditions are applied to shed the additional power after the action of the primary, secondary and tertiary reserves.
[0062] Of course, the time taken for primary, secondary and tertiary reserves to replenish the missing power may vary depending on the geographical area.
[0063] Thus, as can be seen in Fig. 1, during a first phase of the load shedding mechanism, between times t1 and t2, the adjustment actor(s), providing a primary reserve, reduce their consumption in order to provide power partially compensating for the drop in AP power within a period of several seconds, for example 30 seconds from the triggering of the load shedding mechanism. Thus, at time t2, the power of the electricity network is restored to a level slightly lower than Pnom before the failure of the electricity producer.
[0064] During the second phase, between times t2 and t4, the balancing actor(s) providing secondary reserves take over in order to progressively provide, taking into account the drop in electrical power supplied to the primary reserve(s), electrical power to restore at t3 the power supplied by the electrical network to the same level Pnom as before the failure of the electricity producer. During the third phase, from t4, the balancing actor(s) providing tertiary reserves take over in order to progressively provide, depending on the drop in electrical power supplied to the secondary reserve(s), electrical power to maintain the power supplied by the electrical network at the same level Pnom as before the failure of the electricity producer.
[0065] As can be seen from the time evolution of the frequency and voltage delivered by the electrical network, the drop in power produced is characterized by a variation in the frequency of the voltage delivered.
[0066] Indeed, during nominal operation, when the power consumed and the power produced distributed by the electricity network are balanced, the frequency of the voltage delivered by the electricity network is substantially stable, and substantially equal to a reference frequency. The value of the reference frequency of the delivered voltage depends on the geographical location of the electricity network. For example, in Europe, the frequency of the voltage delivered by the network can vary between 48 and 52 Hz, so the reference frequency can be chosen within this range of values. For example, the reference frequency can be equal to 50 Hz.
[0067] Thus, a drop in the power produced leads to a drop in the frequency of the voltage supplied by the electrical network as can be seen in Figure 1.
[0068] Generally speaking, when there is an imbalance between the power produced, i.e. the power delivered by the electrical network, and the power consumed, this leads to variations in the frequency and voltage delivered by the electrical network. Thus, when the power produced is greater than the power consumed, the frequency of the voltage delivered by the electrical network increases and vice versa.
[0069] As mentioned above, a large part of the energy consumed by electric transport vehicles is used to power the air conditioning systems. The invention aims to enable, by means of a method and a system for implementing a modification of the electricity consumption of an electric transport vehicle, to make a fleet of electric vehicles an adjustment actor.
[0070] Figure 2 represents a process flowchart enabling the implementation of a reduction in the primary or secondary reserve electricity consumption of a fleet of electric transport vehicles supplied by an electrical network.
[0071] Load shedding is a variation in the electrical power consumed by balancing actors. This variation, as presented previously, is an increase or decrease in consumption.
[0072] The method is implemented for a fleet of electric transport vehicles comprising at least one active vehicle.
[0073] An active vehicle is a vehicle in operation, in which the air conditioning means are operating. It is not a vehicle that is simply switched on, or being prepared for use, but a vehicle in use in which the air conditioning means are being implemented.
[0074] In the remainder of the description, reference is made to air conditioning means configured to heat or cool a passenger compartment, i.e. capable of modifying the temperature of the passenger compartment of a vehicle. Air conditioning means may also be known as a heating, ventilation and air-conditioning system >> (known in English as the expression heating, ventilation and air-conditioning system and the acronym HVAC)
[0075] Of course, the description also applies to air conditioning means configured to heat or cool multiple passenger compartments.
[0076] The air conditioning means may include an installation for heating the passenger compartment and an installation for cooling the passenger compartment, or include a single installation for heating or cooling the passenger compartment.
[0077] The method 200 comprises a first step 210, in which a difference between a reference frequency and a frequency of a voltage delivered by the electrical network is acquired.
[0078] To do this, the frequency of the voltage delivered by the electrical network is acquired. The acquisition of the frequency of the voltage delivered by the electrical network can be done through a measurement. Alternatively, the acquisition of the frequency of the voltage delivered by the electrical network can be the reception of a frequency of a voltage delivered by the electrical network: the measurement can be sent by a remote device for example.
[0079] The second step 215 of the method 200 aims to send a command to modify a consumption of the air conditioning means of said at least one active vehicle as a function of said difference.
[0080] As indicated with reference to Figure 1, the imbalance between the electrical power consumed and the electrical power produced supplying the electrical network is identifiable by a variation in the frequency of the voltage delivered by the electrical network.
[0081] Thus, the second step aims to detect a variation in the frequency of the voltage delivered by the electrical network compared to the reference frequency.
[0082] This detection makes it possible in particular to confirm a situation of imbalance between electrical power consumed and the electrical power produced supplying the electrical network.
[0083] As illustrated in Figure 1, a decrease in frequency below the reference frequency reflects an imbalance situation in which the electrical power consumed is greater than the electrical power produced supplying the electrical network.
[0084] An increase in frequency beyond the reference frequency then reflects a situation of imbalance in which the electrical power consumed is less than the electrical power produced supplying the electrical network.
[0085] Also, depending on the sign of the difference between the reference frequency and the frequency of a voltage delivered by the electrical network, an imbalance situation is identified: for example, the sign indicates in particular, if the electrical power consumed is lower than the electrical power produced supplying the electrical network or vice versa.
[0086] Depending on the value of the difference, the electrical consumption of the air conditioning systems of the active transport vehicles is modified. Thus, a command is sent to the air conditioning systems of the active vehicles in the fleet. This is a command to modify the consumption of the air conditioning systems, making it possible in particular to modulate the electrical power supplying the air conditioning systems.
[0087] Such an order to modify the consumption of air conditioning means makes it possible in particular to increase or reduce the consumption of air conditioning means linearly and permanently.
[0088] The change command is sent continuously and the amplitude of the change command varies according to the variation of the determined difference.
[0089] The control for modifying the consumption of air conditioning equipment thus makes it possible to modulate the power consumed by the air conditioning equipment over a predefined time range.
[0090] The command to modify the consumption of the air conditioning means may include a first and / or a second correction value.
[0091] The first correction value is a value for modifying a power supply to the air conditioning means of said at least one active vehicle during a first time period. This value may be, for example, a duty cycle making it possible to modulate the power supply to the air conditioning means, via a static contactor for example.
[0092] The second correction value is a value for modifying the temperature of the passenger compartment of the active vehicle during a second time period. This value may be, for example, a target temperature, in degrees, to which the air conditioning means must heat the passenger compartment. For example, when the air conditioning means are configured to cool the passenger compartment, increasing the target temperature to which the passenger compartment must be cooled reduces the power consumption of the air conditioning means. Similarly, when the air conditioning means are configured to heat, reducing the target temperature to which the passenger compartment must be heated reduces the power consumption of the air conditioning means.The result of the application of the correction values makes it possible to modulate the power supply to the air conditioning means during a first time period and to reduce the power supply to the air conditioning means over a second time period, which is longer, i.e. greater, than the first time period.
[0093] The action of the first correction value is a so-called "fast" action, because the modulation of the power supply to the air conditioning means occurs from the sending of the correction value over a short period. The action of the first correction value can be of the order of a few seconds, for example less than or equal to 1 second.
[0094] The action of the second correction value is called "slow" action, because the reduction of the consumption of the air conditioning means, by modifying the target temperature of the passenger compartment, allows a modification of the consumption over a longer period. The action of the second correction value can be between 30 seconds and 30 minutes.
[0095] The first and second correction values are determined from the difference between the reference frequency and the frequency of a voltage delivered by the electrical network.
[0096] For example, the first and second correction values may be proportional to the value of the difference between the reference frequency and the frequency of a voltage delivered by the acquired electrical network. In this case, the erasure may be described as primary erasure.
[0097] Alternatively, the first and second correction values may be proportional to the sum of the difference value between the reference frequency and the frequency of a voltage delivered by the electrical network and the time integral of this difference. In this case, the erasure may be described as secondary.
[0098] The first and second correction values can be expressed in KW / Hz.
[0099] In order to validate the effective reduction in the consumption of the air conditioning means, the method may include monitoring the consumption of the air conditioning means. For example, during the predefined time period during which the reduction is carried out, the method may include the periodic sending of the power consumed by the air conditioning means. This sending may be for example for the attention of the management company or an intermediary, and in real time, in order to allow the monitoring of the consumption of the air conditioning means. The sending of the consumption of the air conditioning means may be periodic.
[0100] An example of an implementation system 300 of an erasure implemented according to the method described with reference to Figure 2 is illustrated in Figure 3.
[0101] The illustrated example of the implementation system 300 is a system embedded in one or more vehicles of the fleet of electric transport vehicles.
[0102] In this example, the system 300 for implementing a load shedding comprises equipment 310 for acquiring the frequency of the voltage delivered by the electrical network 305.
[0103] The power supply of electric vehicles is carried out by the electricity network through a set of substations and the power supply network.
[0104] Power substations and the power grid are powered by the power grid. Each substation is configured to provide power to electric vehicles within a predetermined geographic area.
[0105] The supply voltage supplied to vehicles can be AC voltage or DC voltage.
[0106] In the case of alternating voltage, the frequency of the supply voltage is equal to the frequency of the voltage supplied by the electrical network. The amplitude of the alternating voltage can be between 1500V and 25000V.
[0107] In the case of direct voltage, the direct voltage is obtained, at the substations, by rectifying and filtering the alternating voltage supplied by the electrical network. The amplitude of direct voltage can be between 600 V and 5000 V, for example, be equal to 1500 V. The power supply of the vehicles can be done via a pantograph when the power supply network is a catenary. Alternatively, the power supply of the vehicles can be done via a collector when the power supply network is a third power rail.
[0108] The acquisition equipment 310 may comprise a measurement module capable of periodically or continuously measuring the frequency of the voltage delivered by the electrical network supplying the fleet of electric transport vehicles. The measurement module may be arranged so as to allow the measurement of the frequency of the voltage delivered by the electrical network 305 at a contact point.
[0109] This contact point can be at the vehicle's pantograph or at a collector.
[0110] The point of contact can also be at a power substation or at any point in the power network.
[0111] Since the supply voltage delivered by the substations can be a direct or alternating voltage, the measuring module can comprise at least two sub-modules:
[0112] - A first sub-module, configured to measure the frequency of the alternating voltage supplying electric vehicles which is the frequency of the electrical voltage delivered by the electrical network.
[0113] - A second sub-module, configured to determine harmonics of the DC supply voltage to deduce the frequency of the voltage delivered by the electrical network. Examples are illustrated in more detail in Figures 5A and 5B.
[0114] For example, the measuring module can be placed in each vehicle, to measure the voltage delivered by the third rail or by the catenary, respectively at the collector or pantograph level.
[0115] For example, the measurement module may be arranged at a substation or any other point in the power supply network where the voltage and frequency can be measured. In this case, the acquisition equipment 310 may comprise one or more communication modules, capable of sending and / or receiving measurements of the frequency of the voltage delivered by the electrical network 305.
[0116] In other words, the frequency measured by the measuring module at a substation or any other point in the power supply network is sent via a communication module to the vehicles, also including a communication module.
[0117] Such communication modules can, for example, enable data transmission via a wireless network, or can be a radio module compatible with WiFi, 5G or 4G networks, for example.
[0118] The system for implementing an erasure 300 comprises air conditioning means 325 capable of modifying the temperature of the passenger compartment of the vehicle in which the system for implementing an erasure 300 is installed.
[0119] These air conditioning means, being capable of both increasing or reducing the temperature of the passenger compartment of a vehicle, may thus comprise heating means 325b and a compressor 325a. The heating means 325b are configured to heat the air to increase the temperature of the passenger compartment. The compressor 325a is configured to cool the air and reduce the temperature of the passenger compartment.
[0120] The erasure implementation system 300 further comprises a control unit 315 configured to receive an outgoing signal from the acquisition equipment 310 and to control, according to the outgoing signal from the acquisition equipment 310, the air conditioning means 325.
[0121] The control unit 315 is configured to activate the erasure according to the measured value of the frequency of the voltage delivered by the electrical network by the acquisition equipment.
[0122] The control unit 315 is thus configured to acquire the difference between the reference frequency and the frequency of the voltage delivered by the electrical network via the acquisition equipment 310.
[0123] Also, the control unit 315 is configured to send a command to modify a consumption of the air conditioning means of said at least one active vehicle as a function of said difference. For this, the control unit 315 is connected on the one hand to a static contactor 345 and on the other hand to an energy management module 330.
[0124] The control module of the static contactor 320 and the static contactor 345, which may be a high-speed static contactor, make it possible to modulate the power supply 340 of the air conditioning means. An example of a high-speed static contactor 345 may be, for example, a transistor.
[0125] The 330 energy management module is a module for reducing the electrical consumption of air conditioning systems.
[0126] The energy management module 330 can be used to modulate the electrical power consumed by the air conditioning means, i.e. to increase or reduce the electrical power consumed by the air conditioning means as a function of the frequency of the voltage delivered by the electrical network. The energy management module can, for example, act by:
[0127] - Changing the power source of the air conditioning systems, for example in a fleet vehicle. Modules may in particular allow the air conditioning systems to be powered for a predetermined period by batteries on board the vehicle;
[0128] - Modifying the operation of the air conditioning means, for example to modify the target temperature, i.e. the actual temperature of the passenger compartment.
[0129] An example of a generic energy management module 330 that can be associated with any air conditioning system present in a transport vehicle is also disclosed in French patent application FR 3 011 912.
[0130] The proposed energy management module 330, also called EcoPark, comprises means for connection to a temperature control system 335a associated with air conditioning means 325 and a temperature sensor 335b.
[0131] The control system 335a is configured to maintain the temperature of a passenger compartment at a set temperature based on a temperature measured by the temperature sensor 335b corresponding to the temperature of the passenger compartment. In other words, the control system 335a makes it possible to control the air conditioning means 325 in order to maintain a target temperature in the passenger compartment of the vehicle.
[0132] The energy management module 330 further comprises temperature shift means. These shift means make it possible to modify the temperature measured by the temperature sensor 335b by a predetermined value: these shift means thus make it possible to deceive the temperature sensor 335b.
[0133] The energy manager module 330 can be configured according to a first and second mode of operation, when the fleet vehicles reduce their consumption and when the fleet vehicles increase their consumption.
[0134] In the first operating mode, with a view to reducing electrical consumption, the shift means of the energy management module 330 are configured to increase the temperature measured by the temperature sensor 335b when the air conditioning means 325 are configured to heat and to decrease the temperature measured by the temperature sensor 335b when the air conditioning means 325 are configured to cool.
[0135] In the second operating mode, the shift means of the energy manager module 330 are configured to increase the temperature measured by the temperature sensor 335b when the air conditioning means 325 are configured to cool and to decrease the temperature measured by the temperature sensor 335b when the air conditioning means 325 are configured to heat.
[0136] Thus, the regulation system 335a maintains the temperature of the passenger compartment at the set temperature as a function of the temperature measured by the temperature sensor 335b which has been shifted, i.e. increased or decreased by a predetermined value.
[0137] This increase or decrease amplifies at each instant the difference between the set temperature and the temperature used as a reference for the regulation system, i.e. the temperature measured by the offset temperature sensor. Thus, the regulation system 335a modulates air conditioning means to heat or cool the passenger compartment until the temperature measured by the offset temperature sensor 335b decreases or increases respectively to a value close to the set temperature.
[0138] Therefore, the consumption of electrical energy is changed.
[0139] Thus, the control unit 315 is configured to determine a reduction to be carried out, expressed in KW / Hz, according to the difference between the reference frequency and the frequency of the voltage delivered by the electrical network. Then, from the determined reduction, the control unit 315 is configured to determine a first and second correction value to be provided respectively to the control module 320 of the static contactor 345 and to the energy management module 330 to reduce the consumption of the air conditioning means.
[0140] The first correction value supplied to the control module of the static contactor 320 makes it possible to modify the power supply to the air conditioning means 325, in a rapid time.
[0141] This first correction value may be, for example, a modification of the duty cycle p, applied to the transistor 345 connecting the power supply network (the power supply 340) to the air conditioning means 325. This duty cycle, representing the ratio between the switching on and the non-switching on of the transistor 345, makes it possible to modify the power supply of the air conditioning means 325, by reducing or increasing it according to the duty cycle value.
[0142] In particular, when the air conditioning means 325 are configured to heat the passenger compartment of the vehicle, the heating power supply is modulated. When the air conditioning means 325 are configured to cool the passenger compartment of the vehicle, the compressor power supply is modulated.
[0143] Changing the duty cycle can increase or reduce the consumption of the air conditioning means 325 depending on the value used. The smaller the duty cycle, the lower the power consumption of the air conditioning means 325. Conversely, the larger the duty cycle, the higher the power consumption of the air conditioning means 325.
[0144] The second correction value provided to the energy management module makes it possible, in particular, to modify the consumption of air conditioning systems.
[0145] This may be a corrected target temperature, or a command relating to the power source of the air conditioning means 325.
[0146] For example, in the case of an EcoPark energy manager module, the second correction value may be the predetermined value, in degrees Celsius, used by the offset means to modify the temperature measured by the temperature sensor.
[0147] The control unit 315 can thus be configured to send the second correction value to the temperature offset means to offset the measured temperature.
[0148] The modification of the energy consumed by the air conditioning means via the action of the energy management module is made over a longer period than the action of the contactor 342.
[0149] Some or all of the vehicles in a fleet may be equipped with a system for implementing a load shedding operation as described.
[0150] Alternatively, the modulation of the power supply to the air conditioning means 325 can be done at the level of a contactor 342, connecting the air conditioning means 325 to the power supply network 340.
[0151] This contactor 342, which may be an electromechanical controllable switch, which may be controlled using a duty cycle. The actuation (indicated in dotted lines by the arrow 342a via a control module 320 of the contactor 340) of the contactor 342 may be carried out periodically, with periods of the order of 3 minutes for example.
[0152] The modulation of the power supply to the air conditioning means can be carried out at the level of this contactor 342, by modifying the control duty cycle. The modulation of the power supply to the air conditioning means can for example be carried out by modifying the duty cycle controlling a coil of the contactor 342, by delaying or advancing the control of the coil.
[0153] In this case, the first correction value can be the duty cycle allowing the power supply to the air conditioning means to be modulated via contactor 342.
[0154] Figure 4 illustrates an environment 400 in which an exemplary erasure implementation system as illustrated in Figure 3 is employed.
[0155] A fleet 420 of electric transport vehicles is illustrated. The vehicles in the fleet 420 are each equipped with a load shedding implementation system 425. For clarity, only one of the load shedding implementation systems 425 is shown.
[0156] In this fleet of 420 vehicles, only vehicles 420a and 420b are active and therefore can implement a deletion.
[0157] The 420d vehicle, being prepared for entry into service, is not active and cannot implement a deletion through its 425 deletion implementation system. The same applies to the 420c vehicle, which is inactive.
[0158] The vehicles of the fleet 420 are powered by a power supply substation 410. At this substation 410 is arranged a module for measuring the frequency of the electrical network 415, connected to a communication module 430.
[0159] The communication module 430 is capable of transmitting frequencies measured by the measurement module 415 to the communication module 435 of the erasure implementation system 425 on board the vehicles of the fleet 420.
[0160] The communication module 435 may also be capable of exchanging data with a server 415, as shown in the figure.
[0161] The system for implementing a deletion 425, also a control unit 440, which according to the frequency measurements received, modifies the consumption of the air conditioning means 460, by means of an energy management module associated with a temperature sensor 425 and the air conditioning means regulation system 455, and by means of a high-speed static contactor.
[0162] The control unit 440 then determines correction values for each of the active vehicles, making it possible to vary the consumption of a vehicle in Kilowatts (kW), over a given time slot.
[0163] It may be envisaged, in one embodiment, that each active vehicle regularly sends measurements of the electrical consumption of the air conditioning means 460 to the server 415. Thus, the server may be configured to transmit these measurements to a management company 405, which can then quantify the primary erasure carried out by the fleet 420 of vehicles.
[0164] Alternatively, the first and second correction values may be defined relative to geographic information 470.
[0165] Indeed, consumption peaks and troughs can be observed in specific geographical areas. In this case, it appears interesting to reduce electricity consumption in the affected geographical areas, rather than reducing electricity consumption in other geographical areas, more or less distant.
[0166] The 405 management company can provide information relating to geographical locations where the adjustment actors must modify their electricity consumption.
[0167] For example, the managing company 405 can provide such geographical indications in real time. Alternatively, the managing company can provide, in anticipation, this geographical information the day before, based for example on weather forecasts and electricity consumption predictions.
[0168] The provision of geographic information may be made via communication modules (not shown) present in the server 415 and / or at the level of the managing company 405. The server then sends this data to the vehicles of the fleet 420, which receive this data via communication modules (which may be for example the same as the communication module 435 or another separate communication module). For example, when determining the correction values, only the active vehicles located within a radius of 10 km around the geographic area provided by the managing company implement primary erasure.
[0169] The vehicles in the fleet may, for example, include a module enabling the geolocation of the vehicles, such as a GPS chip, connected to the control unit 440. The geographic information provided may, for example, be a set of GPS coordinates, defining a geographic area.
[0170] Thus, the control unit 440 can be configured to compare a geolocation of a vehicle with the provided geographical information defining a geographical erasure zone. When the control unit 440 determines that the vehicle is in the geographical zone, the determination of the correction values is made to maximize the erasure at this location. Otherwise, when the vehicle is outside the geographical zone provided by the managing company, a lower or zero correction value is determined, i.e. the vehicle then performs a primary and / or secondary erasure of lesser magnitude or even zero erasure.
[0171] Figures 5A and 5B illustrate an example of a sub-module of the measurement module, capable of determining the frequency of the voltage delivered by the electrical network included in the system of Figure 3.
[0172] As mentioned, the voltage delivered to the electric transport vehicle, via the pantograph or the third rail for example, can be an alternating voltage or a direct voltage.
[0173] In the case where the supply voltage delivered to the electric transport vehicle is an alternating voltage, the frequency is measured by known means, such as a frequency meter or any other known assembly making it possible to obtain the frequency of the alternating voltage delivered.
[0174] In the case where the supply voltage delivered to the electric transport vehicle is a direct voltage, i.e. resulting from the rectification and filtering of an alternating voltage supplied by the electrical network, the frequency of the alternating voltage delivered by the electrical network before being rectified is found. Indeed, when the alternating voltage supplied by the electrical network is rectified and filtered, for example at a substation, the direct voltage obtained at the output contains a frequency linked to the rectification, this frequency being proportional to the frequency of the alternating voltage supplied by the network.
[0175] For example, in the case of a three-phase AC voltage supplied by the network with a frequency of 50 Hz, at the output of a three-phase rectifier, the frequency at the output of the rectifier is six times the frequency of the AC voltage supplied by the electrical network, i.e. 300 Hz. Thus, in this example, the DC output voltage includes rectification harmonics of the frequency of 300 Hz. To smooth the voltage, a band-pass filter is arranged in series after the rectifier. Consequently, only a low amplitude of the DC output voltage remains, which includes rectification harmonics.
[0176] The sub-module illustrated in Figures 5A and 5B is a sub-module capable of determining the frequency of the voltage delivered by the electrical network when the supply voltage of the electric vehicles in the fleet is a direct voltage.
[0177] The illustrated assembly allows, from the frequency of the direct supply voltage, i.e. on the determined rectification harmonic, to determine the frequency of the alternating voltage supplied by the electrical network.
[0178] The sub-module includes a 500a voltage and frequency sensor and a 500b processing module.
[0179] The 500a probe is directly connected to the high voltage line 505, and allows the extraction of the part of the output DC voltage which includes rectification harmonics.
[0180] An exemplary probe structure 500a is illustrated in Figure 5A.
[0181] The probe 500a comprises a capacitor 510, which may preferably be a Y-type safety capacitor, suitable for high voltages, for example 15 kV.
[0182] The capacitor 510 is followed by a double transient voltage suppression diode 515, allowing the assembly to be protected from overvoltages. The capacitor in combination with an assembly 520 based on an operational amplifier, allows in particular to extract, and therefore to obtain at the output Vs, a part of the voltage including the rectification harmonics.
[0183] Thus, the reading of the frequency of the voltage delivered by the high voltage electrical network 505 is carried out by looking for the rectification harmonic at the output (Vs) of this assembly.
[0184] Thus, knowing the type of rectifier used, for example three-phase or six-phase or twelve-phase, it is possible from the rectification harmonic to find the frequency of the alternating voltage delivered by the electrical network.
[0185] Alternatively, it is possible to deduce the type of rectifier used by analyzing the frequencies of the supply voltage. For example, if the supply voltage only includes a frequency of 600 Hz, and no frequency of 300 Hz, it can be deduced that a 6-phase rectifier is used.
[0186] For this purpose, the 500b digital assembly is used, mounted in series with the 500a probe.
[0187] The voltage Vs obtained at the output of the probe 500a is filtered by a low-pass filter 530, making it possible to remove high frequencies from the signal. Preferably, all frequencies above 1000 Hz are removed from the signal.
[0188] A 545 sampling module samples the signal in order to digitize it. Sampling can be carried out at a sampling rate of around 10 kHz.
[0189] The harmonic frequencies contained in the digital signal at the output of the sampling module 545 are then determined by a module 550. For this, the module 550 can implement a digital Fourier transform (known in English by the acronym FFT for Fast Fourier Transform), in order to determine the harmonic components of the signal at the output of the sampling module 545.
[0190] Subsequently, according to the harmonics determined using the 550 module, the frequency of the electrical network is extracted using the 555 module. This 555 module can for example implement a phase-locked loop (known in English by the acronym PLL for phase-locked loop), to determine the main frequency of the determined harmonics.
[0191] The difference 565 with the reference frequency 550 can then be calculated as shown in Figure 5B.
[0192] The advantage of such an assembly, particularly the 500a at the sensor level, is that it ensures a double level of failure.
[0193] Indeed, when a failure occurs at the 515 capacitor, the assembly operates in open circuit. Also, when a failure occurs at the 515 double diode, the assembly operates in short circuit.
[0194] Although described through a certain number of detailed exemplary embodiments, the proposed device and method include various variants, modifications and improvements which will be obvious to those skilled in the art, it being understood that these various variants, modifications and improvements are part of the scope of the invention, as defined by the following claims.
[0195] Furthermore, different aspects and features described above may be implemented together, or separately, or substituted for each other, and all different combinations and subcombinations of the aspects and features are within the scope of the invention.
[0196] Further, some systems and equipment described above may not incorporate all of the modules and functions described for the preferred embodiments.
Claims
29 DEMANDS 1. Method for implementing a reduction, during a predefined time period, of the electrical consumption of a fleet (420) of electric transport vehicles supplied by an electrical network, the fleet (420) comprising at least one active electric transport vehicle (420a, 420b) in operation, and each electric transport vehicle (420a, 420b, 420c, 420d) comprising air conditioning means (460) capable of modifying the temperature of a passenger compartment of the electric transport vehicle; the method comprising, during the predefined time period: acquiring a difference between a reference frequency and a frequency of a voltage supplied by the electrical network; modifying the electrical consumption of the air conditioning means (460) of said at least one active vehicle (420a, 420b) as a function of said difference;wherein the modification of the electrical consumption of the air conditioning means (460) includes sending a command to modify the consumption of the air conditioning means (460) during the predefined time range, the modification command comprising: sending a first correction value to modify the supply power of the air conditioning means (460) of said at least one active vehicle (420a, 420b) during a first time period; and / or sending a second correction value to modify the temperature of the passenger compartment of the active vehicle (420a, 420b) during a second time period; wherein the second time period is greater than the first time period, and wherein the first and / or second correction values are determined from the acquired difference.
2. Method of implementing an erasure according to claim 1, wherein the first time period is less than 30 seconds; the second time period is greater than 30 seconds and less than or equal to 30 minutes. 30 3. Method of implementing a load shedding according to any one of claims 1 or 2, wherein the acquisition of the difference between a reference frequency and a frequency of a voltage supplied by the electrical network comprises: determining a type of supply voltage for the fleet vehicles (420); if the supply voltage of the vehicles is direct current, determining harmonics of the supply voltage to deduce the frequency of the voltage supplied by the electrical network; if the supply voltage of the vehicles is alternating current, measuring the frequency of the supply voltage to deduce the frequency of the voltage supplied by the electrical network.
4. Method of implementing a load shedding according to one of claims 1 or 2, wherein the acquisition of the difference between a reference frequency and a frequency of a voltage delivered by the electrical network comprises: receiving the frequency of the voltage delivered by the electrical network.
5. Method of implementing erasure according to any one of claims 1 to 4, wherein the reference frequency is within the range [48 Hz; 52 Hz], 6. A method for implementing load shedding according to any one of claims 1 to 5, wherein, during the predefined time range: periodically send the consumption of the air conditioning equipment (460).
7. A method for implementing a data erasure according to any one of claims 1 to 6, comprising: receiving geographic information defining a geographic erasure zone; determining the location of the active vehicle (420a, 420b) relative to the geographic erasure zone; during the predefined time period, the method further comprising the acquisition and modification steps when the active vehicle is located in the erasure geographic area.
8. System for implementing a load shedding of electrical consumption of a fleet of electric transport vehicles supplied by an electrical network, the system comprising at least one acquisition device (310) of a frequency of a voltage supplied by the electrical network, the electric transport vehicles (420a, 420b, 420c, 420d) of the fleet (420) comprising: air conditioning means (325, 460) capable of modifying a temperature of a passenger compartment of the electric transport vehicle (420a, 420b, 420c, 420d); and a control unit (315, 440) configured to control the air conditioning means (325, 460) and receive a signal output from the acquisition device (310); in which the control unit (315, 440) is configured to: acquire a difference between a reference frequency and a frequency of a voltage delivered by the electrical network through the acquisition equipment of the equipment (310);modify the consumption of the air conditioning means (325, 460) of said at least one active vehicle (420a, 420b) according to said difference.; 9. System for implementing a load shedding according to claim 8, wherein the fleet vehicles each include a measuring device (415) for the voltage frequency delivered by the electrical network.
10. System for implementing a load shedding according to claim 9, wherein the frequency measuring equipment (410) is configured to determine a type of supply voltage for the vehicles (420a, 420b, 420c, 420d) of the fleet (420), the frequency measuring equipment includes: a first sub-module configured to determine harmonics of the DC supply voltage to deduce the frequency of the voltage delivered by the electrical network; a second sub-module configured to measure the frequency of the AC supply voltage in order to deduce the frequency of the voltage delivered by the electrical network.
11. System for implementing a load shedding according to any one of claims 8 to 10, wherein the electric transport vehicles further comprise an energy management module (445) having means for connection to a temperature control system (455) and to a temperature sensor (425), the control system (455) being associated with air conditioning means and being configured to maintain the temperature of a passenger compartment at a setpoint temperature based on a temperature measured by the temperature sensor (425) corresponding to the temperature of the passenger compartment, said energy management module (445) further comprising temperature shift means capable of shifting said temperature measured by the temperature sensor by a predetermined value, the control unit (315, 440) being configured to send the second correction value to the temperature shift means to shift the measured temperature.
12. System for implementing a clearing according to any one of claims 8 to 11, wherein the vehicles further comprise: a static contactor (345), configured to be actuated by the control unit (315, 440), capable of modifying a supply power of the air conditioning means (325, 460); the control unit (315, 440) being configured to send a first correction value to the static contactor (345) to modify the supply power of the air conditioning means (325, 460).
13. System for implementing a load shedding according to any one of claims 8 to 11, wherein the vehicles further comprise: a contactor (342) connecting the air conditioning means to the power supply network (340), the contactor (342) comprising a coil through which the power supplying the air conditioning means (325, 460) to the electrical network is modulated, 33 the control unit (315, 440) being configured to send a first correction value to the contactor (342) to modify, via the coil, the supply power of the air conditioning means (325, 460).
