AI Technical Summary

Technical Problem

Multi-storey wooden buildings face challenges in vertical load transfer, rigidity, fire protection, and efficient production of wall panels, particularly when using prefabricated wall panels made of rows of wooden beams, which require manual labor and are not cost-effective for buildings taller than four storeys.

Method used

A wall structure design featuring a stud layer with closely arranged wooden beam studs and transverse chords, where the chords are significantly thinner than the studs, allowing for automated production and enhanced load capacity without compressive strength limitations, combined with fire-retardant and sound-insulating cladding for improved performance.

Benefits of technology

Enables the efficient, automated, and cost-effective production of wall panels with improved load capacity, fire protection, and sound insulation, facilitating the construction of taller wooden buildings while reducing manual labor and production costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 1.1
    Figure 1.1
Patent Text Reader

Abstract

In order for at least the support layer (4) of a solid wall panel (1) composed of barely spaced-apart, adjacent wooden beam supports (4.1 - 4.z) to be able to be produced in a highly automated manner and in a continuous method and to be independent of the compressive strength of the lintel and sill, i.e. the two chords (6a, 6b) of the support layer (4), the thickness (d) of the chords (6a, b) in the thickness direction (12) of the support layer (4) is chosen with only a fraction of the thickness (D) of the support layer (4), and both chords are arranged on the same side (4a) of the main plane of the support layer (4) in end-side chord cutouts (24a, b) in the wooden beam supports (4.1 - 4.z). Thus, during the production of the support layer (4), the supports (4.1 - 4.z) can be successively placed with the transverse chord cutouts (24a, b) downwards onto two appropriately spaced-apart, adjacent transverse chords (6a, b) and be connected thereto in a continuous process.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] Blackboard, building constructed with it and manufacturing process for the blackboard

[0002] I. Area of ​​application

[0003] The invention relates to a wall structure for multi-story buildings whose primary building material is wood, which is chosen because of its low weight, good technical insulation properties and the sustainability of its production.

[0004] II. Technical background

[0005] Different construction types are known for buildings that are primarily made of wood:

[0006] In order to reduce the need for wood - e.g. compared to log houses made of wood - and to improve the thermal insulation properties, houses in timber frame construction are known, in which the wall structure consists of frame-like supporting structures made of wood, whereby the cavities in the frame are filled with insulating material and then an inner and outer closed planking, often also made of wood or gypsum materials, is applied.

[0007] In addition, wall structures are also known, for example from DE 102011 110918 B4, in which there is a continuous, statically load-bearing wooden layer made of, for example, vertical, grown wooden beams arranged in a row, the so-called wooden posts, which can have a beam-shaped frame or sill running horizontally across all the wooden posts as the upper and lower end and which can additionally be provided with an insulating layer on the outside, with additional cladding as weather protection, fire protection and the like.

[0008] Such wall structures are also used in the form of prefabricated wall panels, which enable rapid construction progress when assembled on site.

[0009] The floor slabs are also delivered and installed as prefabricated floor slab panels, preferably made of wood materials.

[0010] However, if you want to use such a wall structure to build multi-story buildings of four to eight floors, there are a number of additional problems regarding not only vertical load transfer, but also stiffness of the panels in their main plane, sufficient fire protection,

[0011] Consideration of settlement and swelling behavior of the building material wood,

[0012] - economical and fast production of even larger quantities.

[0013] Such wall panels made of a series of wooden beams are prefabricated in the factory, but still require considerable manual production effort.

[0014] However, in order to use such wall panels on an industrial scale and to create cost-effective living space even in buildings with more than four floors, a much more highly automated and thus more cost-effective production of the wall panels is desirable. III. Description of the Invention a) Technical Problem

[0015] It is therefore the object of the invention to provide a wall structure and a method for its construction that solves the aforementioned problems in a simple manner. b) Solution to the problem

[0016] This object is achieved by the features of claims 1, 15 and 18. Advantageous embodiments emerge from the subclaims.

[0017] A generic wall panel comprises, on the one hand, a stud layer made up of closely spaced wooden beam studs and, at the end of the studs, a belt running transversely to the direction of travel, the greatest extension direction of the studs, as well as at least one planking arranged on at least one side of the stud layer, which preferably extends over the entire surface of the stud layer.

[0018] A planking, in particular by means of one or more planking panels, is understood to mean a planking that additionally stabilizes and / or stiffens the wall panel.

[0019] In addition, cladding can be implemented, in particular by means of at least one cladding panel or cladding body. In the context of this application, the material properties of the cladding are of interest, in particular its structural properties (e.g., fire-retardant or thermally insulating properties). However, the planking and cladding can also be functionally combined, in which the planking or cladding can perform additional functions such as fire protection, sound insulation, etc. in addition to the stabilizing function.

[0020] The wooden beam posts are so close to each other - or even touching each other

[0021] - arranged so that the sum of the distances between the wooden beam posts over the entire wall panel is less than 5%, better less than 3%, better less than 2%, better less than 1% of the length of the wall panel in this direction.

[0022] Preferably, all wooden beam posts are the same thickness and / or width.

[0023] Wooden beam stands of varying dimensions, particularly those of different widths, can also be used, particularly within the framework of the stand packages described later.

[0024] According to the invention, the existing problem is solved with regard to such a wall panel in that the belts are not as thick as the wooden beam posts, but are considerably thinner in the thickness direction of the post layer.

[0025] For this purpose, the wooden beam uprights have cross-belt recesses at their ends, the shape and dimension of which correspond to the cross-section of the respective belt - whereby the two belts preferably have identical cross-sections

[0026] - is adapted. Preferably, the belt recesses are open both to the end face of the wooden beam upright and / or to three adjacent longitudinal sides, thereby forming a narrower end tongue at each end of each upright.

[0027] In the direction of the chords, the transverse direction of the wooden beam uprights and also the upright layer - the chords in the thickness direction of the upright layer are both on the same side, preferably with their outer side flush with the outer side of the upright layer, whereby flush also includes deviations of up to 3 mm, better a maximum of 2 mm, better up to a maximum of 1 mm. The thickness of the transverse chords in the thickness direction of the upright layer is preferably a maximum of 40%, in particular a maximum of 35%, in particular a maximum of 30%, in particular a maximum of 25%, in particular a maximum of 20% of the thickness of the upright layer. The thickness in absolute values ​​is at least 39 mm, in particular at least 33 mm, in particular at least 27 mm, in particular at least 24 mm, in particular at least 20 mm.

[0028] The cross-section of the chord is therefore larger in the longitudinal direction of the wooden beam posts, which is also the longitudinal direction of the post layer, than in the thickness direction of the wooden beam posts, preferably at least by a factor of 6, better at least by a factor of 8, better at least by a factor of 9.

[0029] This design has a number of advantages:

[0030] On the one hand, from a production point of view - as will be explained in more detail later - two belts can be arranged parallel and at a distance from one another to produce a layer of uprights, so that the wooden beam uprights can be placed one after the other with their end tongues on and their middle sections between the belts and can be placed close to one another or in contact with one another without the wooden beam uprights being able to fall through between the belts, which also makes automated feeding, insertion and connection as well as further transport with the belts much easier.

[0031] The main advantage, however, is that the high load-bearing capacity of the timber beam studs in their longitudinal direction—the timber beam studs are cut so that the primary grain coincides with their longitudinal direction—can be utilized without being limited by the compressive strength of the chords in this direction. For spruce, for example, the elastic modulus for bending is 11,000 N / mm. 2 in the grain direction and 370 N / mm 2 across the grain and the compressive strength 21 N / mm 2 in the grain direction and 2.5 N / mm 2 across the grain.

[0032] In the case of construction with chords that have the same thickness as the wooden beam posts - the so-called sill and the frame - the compressive strength is limited to the smaller of the two compressive strengths: the compressive strength in the longitudinal direction of the wooden beam posts and the compressive strength of the chord in its transverse direction.

[0033] Nevertheless, the belts will preferably be made of wood materials, preferably laminated wood, in particular plywood, preferably veneer plywood.

[0034] This means they have a high level of dimensional stability, although they usually do not have the same compressive strength as the individual wooden beam posts in the longitudinal direction of the timber stud layer, as wood-based materials or layer-glued timber are generally made up of cross-glued layers in terms of grain to increase dimensional stability and accuracy. Thus, even if the grain direction of one layer is in the longitudinal direction of the timber stud layer, this grain direction and - with the same type of wood - the same compressive strength is only present in every second layer of this layer-glued belt.

[0035] To ensure that the compressive load acts primarily on the wooden beam uprights, the chords do not protrude beyond the ends of the wooden beam uprights in the longitudinal direction, but are flush with them or, if necessary, slightly recessed from their ends, i.e. by one to a few millimeters.

[0036] Preferably, each of the wooden beam uprights is connected to each of the chords in a force-fitting or form-fitting manner, for example, by clamping, nailing, or screwing. For manufacturing reasons, connecting elements such as staples, nails, or screws—which can be made of metal or a wood-based material—are also inserted into the end tongues of the wooden beam uprights in a first connection step from the side facing away from the chord, extending into the chord. Preferably, however, they are also inserted from the chord side in a second connection step, extending through the chords into the end tongues of the wooden beam uprights.

[0037] At least the first and last wooden beam post is fixed relative to the chords, and if not all wooden beam posts are fixed relative to the chords, then preferably at least 20%, better at least 30%, better at least 50% of all wooden beam posts of a wall panel, preferably with the fixings evenly distributed between the unfixed wooden beam posts.

[0038] Preferably, an initial fixing takes place when bringing together the belts and uprights, so that these connecting elements do not extend through the later applied sheathing panel, but additional fixing elements can be inserted from the outside of the sheathing panel into the uprights and / or into the cross belts and, if necessary, also through these up to the end tongues of the uprights.

[0039] The planking and / or cladding layers preferably consist of a fire-retardant and / or sound-insulating material, in particular primarily of gypsum or another non-combustible mineral material, for example gypsum cardboard or gypsum fiberboard, which are preferably reinforced with, in particular non-combustible, fibers.

[0040] Chipboards and oriented strand boards (OSB) or other wood-based materials can also be used, particularly for external thermal insulation or the external thermal cladding body.

[0041] Preferably, the material of the planking panels has a specific weight that is at least 50%, preferably at least 100% higher than the specific weight of the stud layer in order to achieve good sound insulation.

[0042] Preferably, the belts have positioning recesses along their direction of travel, the transverse direction of the timber stud layer, which are open towards the longitudinal direction of the timber stud layer and the two adjacent main side surfaces of the belt and have a length in the direction of extension of the belt such that a stud can be inserted therein and is thereby positioned in a specific location in the transverse direction, whereby the belts specify a positioning in the transverse direction for the timber stud layer as a whole.

[0043] If the wall in question is to have a door or window, a special door or window package, usually of the same width and of the same length, is inserted during the production of the stud layer instead of a specific number of consecutive studs, a so-called stud package, which is prefabricated apart from the production of the stud layer and, in addition to the door or window opening and any surrounding reveal timbers, the remaining elements required below and / or above it - in particular an upper lintel and / or a lower sill or, in the case of windows, a lower parapet, which can contain partial studs, in order to achieve the length design of the stud package that is replaced thereby.

[0044] The ends on both sides of such special packages can be designed in such a way that they fit into the positioning recesses of the belts, so that the belts do not have to be individually designed for this purpose, but only the door package or window package.

[0045] Or, corresponding package recesses are provided in the chords to precisely position the special package in the transverse direction of the stud layer. The package recesses, on the one hand, and the positioning recesses, on the other, then preferably have different depths measured in the longitudinal direction of the studs. Instead of a stud or a stud package made up of adjacent studs, the wooden stud layer can have an installation stud or an installation package, which - over part or the entire length of the installation package - has an installation duct for one or more cables, be it for electrical cables, water pipes, or ventilation ducts, which is open in particular to one of the main sides of the stud layer and runs in particular in the longitudinal direction.

[0046] The installation duct is lined with fire-protection-effective, particularly fire-retardant, material and is prefabricated before being installed in the stud layer. The lining can consist of adjacent panel sections of a fire-protection-effective, particularly fire-retardant, panel; however, the installation package preferably consists of fire-protection-effective, particularly fire-retardant, material over more than the depth of the installation duct, into which the installation duct is subsequently cut, in particular sawn or milled.

[0047] With regard to a building in which the walls and / or the floors have a wall panel, the existing problem is solved by designing the wall panel as described above.

[0048] Preferably, this is a building in which all load-bearing walls consist of load-bearing wall panels - as described above - i.e. the load-bearing walls, in particular exclusively, represent the load-bearing framework of the building.

[0049] If the wall panel is part of an exterior wall of the building, the wall panel is preferably installed with the flange facing the exterior of the building. If a floor slab—whether made of wood-based materials or concrete—rests on one of the end faces of a wall panel, it rests on the wall panel only in the thickness range of the upper end tabs of the timber joist studs of the stud layer.

[0050] This means that the load is only transferred to the uprights of the upright layer and not to the chord, even if it protrudes.

[0051] Remaining gaps in the connection area between a wall panel and a concrete ceiling panel are usually filled with a dense filler made of a hardenable, compressive and / or tensile-resistant material, particularly mortar or concrete, to create a force- and shear-resistant connection between the individual wall panels of the floors and the floor ceiling. The connection can also be designed to dissipate uplift forces.

[0052] In a building with a pre-described wall panel in an external wall, the external wall preferably comprises, from the inside to the outside

[0053] - a load-bearing wall in the form of one or more adjacent wall panels

[0054] - and clothing, the latter comprising

[0055] - a thermally insulating insulation body, preferably including a second water-draining layer,

[0056] - the weather-shielding exterior facade as the first water-draining layer.

[0057] This creates a weather-resistant building envelope with a long service life.

[0058] The wall panels described above – together with the floor slabs – usually form the building's load-bearing structure. The cladding comprises a prefabricated, separately handled insulating body with an insulation layer inside. This body is attached to the corresponding wall panel, preferably only from the outside, and can therefore be replaced at any time. The insulation material can be inserted into the insulating body, especially with blown-in insulation material, even after the cladding has been installed on the load-bearing wall. The exterior of the insulating body is protected by a weatherproof facade.

[0059] With regard to the method for producing wall panels as described above, at least their stud layers are manufactured according to the invention in a highly automated and very efficient continuous process by a) arranging two belts at the correct stud longitudinal spacing and with free space between them downwards, whereby the belts preferably rest with their end faces on a front stop, b) interposing a first stud by placing the end tongues of the stud on the two belts so that the end of the stud recess then rests almost or directly on the narrow longitudinal side of the belt, c) fixing this stud, in particular screwing through its end tongues, relative to the two belts in all three spatial directions, d) inserting the next stud with its middle section or - as described later - stud package between the belts behind the last stud, in particular the one already fixed to the belts,e) Fixing, in particular screwing or nailing, this additional stud through its end tongues to the two chords. f) Repeating steps d) and e) until the longitudinal spacing of the cross chords is filled with wooden beam studs along the entire length of the cross chords. This allows not only stud layers of virtually endless width – limited at most by the length of the chords – to be produced, but also allows the individual studs to be automatically fed from above and secured to the chords.

[0060] Preferably, between steps b) and c) the next stand is pushed towards the previous stand in order to keep the voids in the stand layer small.

[0061] Preferably, in step c), the fastening is carried out by inserting so-called screw nails, which can be unscrewed again due to their external thread. All other fastenings of the uprights to the cross chords and / or the planking to the uprights or cross chords are preferably carried out using clamps, i.e., the insertion of egg-shaped clamps.

[0062] In order for the feed device for the stands and / or the fixing device for fixing the stands to the belts to remain approximately, in particular exactly, in the same position, preferably after fixing each or a defined number of stands between the belts, the resulting stand layer is moved forward by the corresponding distance, namely a conveying distance in the form of a single or multiple integer of the target width of a stand, optionally plus a width allowance to compensate for material or manufacturing differences in the width of the stands.

[0063] Due to the manufacturing process, the individual posts do not all have exactly the same width, despite a defined very low moisture content, and are also not optimally straight, as they are made of natural wood.

[0064] In order to distribute the uprights evenly across the width of the wall panel and to prevent their under-dimensions from adding up compared to the conveying distance, positioning recesses with a length corresponding to at least the conveying distance or the target width of a upright can be provided in the two belts in the narrow longitudinal sides facing each other at corresponding longitudinal positions.

[0065] This of course requires two different types A and B of stands, which are of the same length, but whose belt recesses and thus also their end tongues have a different length in the longitudinal direction of the stands.

[0066] Then

[0067] - between two opposing positioning recesses, stands of type A with the shorter belt recesses and shorter end tongues are inserted,

[0068] - Away from the positioning recesses, stands of type B with the longer belt recesses and longer end tongues are inserted.

[0069] Thus, the end of the positioning recess which, in the pushing direction in which the new stand is pushed towards the already created part of the stand layer during the production of the stand layer, forms a stop for the stand inserted into the two opposing positioning recesses, and the distance from stop to stop, i.e. from the beginning of a positioning recess to the next positioning recess along the same belt, is usually always the same, and a fixed number of stands to be inserted are distributed in between.

[0070] To facilitate the insertion of the upright that is to be inserted between the two opposing positioning recesses during the construction of the upright layer, the positioning recess can be slightly longer in the direction of extension of the belts than the width of the upright to be inserted. This is because the upright is usually held by a gripper with gripping prongs on both sides when it is inserted between the belts from above. If the positioning recess is then no longer in the direction of extension of the belt than the width of the upright, when a upright is placed in such a precisely long positioning recess, the necessary distance from the last already installed upright for the gripping prong located on this side of the upright to be inserted is missing.

[0071] If, however, the positioning recess is extended in the direction of extension of the belt somewhat counter to the pushing direction - in particular at least by the thickness of a gripping prong of the gripper in this direction and / or by a maximum of 70%, in particular a maximum of 50%, in particular a maximum of 30%, in particular a maximum of 20% of the width of a stand to be inserted therein - this stand can be placed at a distance from the last mounted stand between the two opposing positioning recesses and then pushed in the pushing direction up to the end of the positioning recess in this direction, which acts as a stop,

[0072] For wall panels that are to contain a door, a window and / or electrical or plumbing installations, instead of a specific number of studs called a stud package in the application, a special package can be inserted between the belts when creating the stud layer, in particular in steps d) and e), said special package preferably having a width that is an integer multiple of the target width of the studs.

[0073] Such a special package can be

[0074] - a door package with a door opening in it,

[0075] - and / or a window package with a window opening in it,

[0076] - and / or an installation package that contains an installation channel.

[0077] An installation package is preferably created by

[0078] - non-combustible material is applied to an installation base, in particular a board-shaped one, with a width corresponding to the width of the installation package and fixed over the surface, in particular glued,

[0079] - in particular in the form of one or more layers,

[0080] - in particular in the form of plasterboard or gypsum fibreboard, - an installation channel is introduced, in particular milled, into the non-combustible material in such a way that the installation channel is completely surrounded by non-combustible material on all sides except for the outer side opposite the installation base.

[0081] After the stud layer has been produced, the planking on both sides is carried out by g) placing at least one layer of planking boards on top of the finished stud layer, h) fixing, in particular by clamping, screwing or nailing, these planking boards to the stud layer, which can also be done in a continuous process.

[0082] The planking of the second side of the stud layer is then carried out by i) turning the stud layer, which has already been planked on the top side, 180° around the conveying direction, so that the attached planking panels are at the bottom and the belts are at the top. If necessary, additional fixing is required, in particular by clamping, nailing, or screwing the belts opposite the end tongues. k) Repeating steps g) and h) on the side of the stud layer that is now on top. c) Examples of implementation

[0083] Embodiments of the invention are described in more detail below by way of example. They show:

[0084] Figure 1a: a stud layer of a wall panel in the partially finished

[0085] Condition in plan view of one of its main surfaces,

[0086] Figure 1b: a first section through the stud layer at point B -

[0087] B in Figure 1a, Figure 1c: a second section through the stud layer at point C -

[0088] C in Figure 1a,

[0089] Figure 1 d: a cross-section through the already nailed stud layer,

[0090] Figure 1e: a cross-section through a one-sided planked

[0091] Stand layer,

[0092] Figure 1f: a cross-section through a hull already planked on both sides

[0093] Stand layer,

[0094] Figure 1g: a cross-section through two superimposed wall panels with a floor slab in between, with insulation and weather protection layer on the outside,

[0095] Figure 2a: a stud layer of a wall panel with

[0096] Window in partially finished state in plan view of one of its main surfaces,

[0097] Figure 2b: a stud layer of a wall panel with a door and windows as well as an installation duct, in the finished state in the view according to Figure 2a and Figure 1a from the inside of the room,

[0098] Figure 2c: the stand layer of Figure 2b, but without the smaller

[0099] Window, in perspective view,

[0100] Figure 3: the stud layer of Figure 2c in perspective view, already planked on both sides,

[0101] Figure 4a - d: the manufacturing process of an installation stand viewed in the direction of the installation channel, Figure 5a, b: the beginning of the production process of the stand layer in different manufacturing stages in a top view,

[0102] Figure 6a, b: the beginning of the production process in the manufacturing stages according to Figure 5a, b in side view,

[0103] Figure 7a - c: the storage and assembly process of a stand in detail.

[0104] Figures 1a - f show the basic structure of the support layer 4 of a wall panel 1 according to the invention:

[0105] This consists of wooden beam uprights 4.1, 4.2 etc. arranged in a row in the width direction 11 of the wall panel 1, which preferably all have an identical cross-section, in particular identical width, and an identical length in their direction of extension 4', the upright direction 4', which is thus simultaneously the height direction 10 of the wall panel 1.

[0106] The width direction 11 and the height direction 10 of the wall panel 1 span its main plane.

[0107] The wooden beam uprights 4.1, 4.2 etc. each have a recess in the form of a shoulder, the belt recess 24a, b, in the end areas of their upright direction 4' on the same side 4a of their circumference, so that when the uprights 4 are placed next to one another, a board-shaped belt 6a, 6b can be inserted into these belt recesses 24a, b which are aligned over the entire width of the wall panel 1 in the width direction 11 and whose cross-section fits into it, and can be connected to each individual upright 4.1, 4.2.

[0108] In the case of the vertically standing uprights 4.1, 4.2 etc. made of solid wood - when the wall panel 1 is mounted vertically - they are cut in such a way that the grain direction 9 lies essentially in the upright direction 4' of the wooden beam uprights 4.1, 4.2 etc., because in the direction of the grain direction 9 solid wood has the smallest dimensional changes in the future and the highest static load capacity.

[0109] The flanges 6a, 6b can also be made of sawn timber, but are usually glued together from layers 8 lying parallel to the main plane of the upright layer - as can best be seen in the enlargement of Figure 1c - whereby the grain in the individual layers 8 runs crosswise to the adjacent layer 8, i.e. in every second layer 8 the grain can also lie in the upright direction 4', so that the end grain proportion in the top and bottom sides is relatively high and thus offers a high resistance to dimensional changes in the vertical direction 20 - see Figure 1g.

[0110] Since the belts 6a, 6b can fulfil these functions better the more layers 8 they consist of glued together, they are preferably made of layers of veneer, i.e. as laminated veneer lumber, and not just as plywood.

[0111] In order to avoid dimensional inaccuracies with regard to the cross-section, especially the width B, of the uprights over the width of the up to 12 m long upright layer 4, according to Figure 1a in the mutually facing narrow sides of the two chords 6a, b at corresponding positions in the width direction 11 at defined intervals, for example for every fifth upright 4.5, 4.10 etc. - thus in particular from the beginning to the beginning of two consecutive recesses e.g. 23a a distance of e.g.at least 5 times the nominal width B of a stand 4 - positioning recesses 23a, b are provided, which - in the plan view of Figure 1a - pass through from one main side to the other main side of the cross chords 6a, b and have a length corresponding to at least the nominal width B of a wooden beam stand, and on a stand which is to be inserted between two such opposing positioning recesses 23a, 23b, less long end tongues 25a, b are provided in the end area in the stand direction 4', so that such a stand inserted between the two chords can only be pushed back and forth in the width direction 11, i.e. in the direction of extension of the chords 6a, b, within the positioning recesses 23a, b in which it lies.

[0112] In order to facilitate the insertion of a stand, for example 4.5, between two opposing positioning recesses 23a, b, the positioning recess 23a, 23b can - as described above - be somewhat longer in the width direction 11 than the desired width B of the belt 4.10 to be placed therein, as shown in Figure 1a at the bottom right of the positioning recess 23b, which is then pushed after insertion in the pushing direction, there to the left, up to the end of the positioning recess 23a, b acting as a stop and is fixed in this position relative to the belts 6a, b.

[0113] The position of the end of the positioning recess located in the pushing direction of the uprights defines the position in the width direction 11 of the wooden uprights 4.5, 4.10, etc. inserted into these positioning recesses 23a, b, and in between them are - in this case four - wooden beam uprights 4.6 - 4.9, which fill this intermediate space, whereby they can contact each other or, due to manufacturing inaccuracies, can occupy very small distances from each other in the width direction 11.

[0114] Thus, in the positioning recesses 23, there are located stands 4.5 of a type 4A according to Figure 1c, whose positioning recesses 24a, b and thus also their end tongues 25a, b are shorter in the stand direction 4' than in the type 4B according to Figure 1b, which are provided in the sections between the positioning recesses 23.

[0115] The end view in Figure 1d also shows the connection between the individual uprights 4.1 etc. and the chords 6a, 6b. This connection is achieved by nailing with nails 13, which are driven from the side 4b facing away from the chords, the side facing upwards during manufacture, through the end tongues 25a, b into the opposite chord 6a, 6b of each upright as an initial fixation. Screw nails are usually driven for this purpose; these nails have a thread on their outside and can be unscrewed again.

[0116] In order to complete the stud layer 4 to form a finished wall panel 1, possibly after additional stapling, firstly, as shown in Figure 1e, on one side, preferably again on the side 4b which is still on top, in one or more layers of planking boards 5, usually made of a non-combustible material such as plasterboard or gypsum fibreboard, are applied, in particular over the entire surface, to the stud layer 4 and - here preferably by means of staples 13 which reach approximately to the middle of the thickness D of the stud layer 4 - nailed or stapled to the studs in their middle area as well as through the belts 6a, 6b through their end tongues 25a, b.

[0117] The planking 5 serves a dual purpose: firstly, fire retardancy, in that the planking 5 is made of fire-protection-effective, in particular non-combustible, material, for example primarily of gypsum or another stone powder material or calcium silicate; secondly, the planking 5 is also intended to improve the load transfer of the stud layer 4 in its main plane.

[0118] For this purpose, the planking 5 has the fiber portion, preferably again made of a non-combustible or poorly combustible material, for example mineral materials, which are arranged in irregular directions and thus give the planking 5 a high resistance to forces in its main plane, i.e. to shear forces.

[0119] A non-combustible or low-combustibility material can also be achieved by coating or impregnating a combustible material with a fire-retardant material such as calcium silicate or water glass. The connection between the individual studs is also improved indirectly by nailing them to the sheathing boards.

[0120] The stud layer 4 should also be covered on its vertical narrow sides with such fire protection-effective, in particular fire-retardant, cladding 5 in order to prevent the penetration of fire and smoke into the structure.

[0121] Subsequently - after turning the stud layer 4 planked on one side so that the flanges 6a, b are now on top - planking is usually also carried out on the upper side 4a facing away from the flanges 6a, b, whereby in this case the nails or staples 13 do not reach the flanges or even penetrate them when nailing.

[0122] Figure 1g shows the further layers with which a wall panel 1 can be covered externally when it forms an external wall 50 of a building 100, namely

[0123] - a thermal insulation body 14

[0124] - a weather protection layer 15, wherein when used as an external wall 50, the wall panel 1 is preferably mounted with its side 4a and thus the belts 6a, b facing the outside of the building 100.

[0125] The outer cladding is preferably attached to the wall panels from the outside after the building 100 has been constructed and can be removed and replaced at any time.

[0126] This is facilitated by the fact that the thermal insulation in the form of a substantially closed, independently handleable, box-shaped insulating body 14, inside which the insulating material 14a is located, can be fixed to the wall panel 1 from the outside. The box-shaped insulating body 14, whose insulating body walls are held at a distance by vertically extending ribs 17, can be attached to the wall panel 1 already filled with insulating material 14a, or blown-in insulation material is used, which enables the empty insulating body 14 to be attached to the wall panel 1 with subsequent filling of the cavity of the insulating body 14 via a relatively small blowing opening.

[0127] A horizontal batten 26 is applied to this, followed by a vertical batten 26—or vice versa—and the weather protection layer 15 as the outermost layer. Thus, the intersecting battens 26 generally provide an air gap 16 between the outer surface of the insulation body 14 and the weather protection layer 15 for rear ventilation.

[0128] Figures 2b and 2c show, in plan view of the main plane and in perspective, a stud layer 4 of a wall panel 1, in which a door opening T and a window opening F as well as an installation duct 21 - the latter on the inside of the room - are integrated, as is an additional small window opening in Figure 2c.

[0129] Figure 2a shows in detail how such a window opening F or door opening T is provided in the stud layer 4:

[0130] For this purpose, instead of a defined number of consecutive, continuous, i.e. normal, uprights at a defined position in the width direction 11 of the wall panel 1, for example, a prefabricated window package 4PF or door package 4PT is placed between the two belts 6a, b, which contains a window opening F or door opening T for inserting a window whose width is less than the width of the window package 4PF.

[0131] The 4PF window package therefore has a width that is preferably an integer multiple of the nominal width B of a stud. Above and below the window opening F, a top chord 4PFa or 4PTa runs transversely to the stud direction 4', i.e., usually horizontally when the wall panel is installed, as a lintel, and a bottom chord 4PFb serves as a parapet for a window opening, or 4PTb as a threshold for a door opening, at least across the entire width of the window opening F or door opening T.

[0132] The lintel preferably extends across the entire width of the 4PF or 4PF package. Below the lintel, on both sides of the opening, there is at least one shorter stud than the normal length studs on which the lintel rests to transfer the load.

[0133] Depending on the distance of the lintel, parapet or sill to the adjacent chord 6a, 6b in the direction of the upright 4', partial uprights can in turn be connected to this upper chord or lower chord, to which the upper chord or lower chord are firmly connected, and in whose end tongues in particular the chord recesses 24a, 24b are incorporated to accommodate the chords 6a, 6b which continue to run across the entire width of the wall panel 1 and thus also across the window opening F and the window package 4PF.

[0134] Since the upper edge of a window opening F as well as a door opening T is usually only a short distance from the upper chord 6a, partial studs are generally no longer used there, but the upper chord 4PFa extends as a lintel from the opening to the upper end of the stud layer 4. Preferably, the width of the upper chord 4PFa also extends over the entire width of the corresponding window package 4PF or door package 4PT.

[0135] The lower chord 4PFb - as a parapet for the window and as a sill for the door - usually only extends across the width of the opening in the width direction and is connected at its ends to the partial studs that extend from the lower chord 6b to the lintel. For the exact positioning of the window opening F in the width direction 11, the chords 6a, 6b have a package recess 27 analogous to the positioning recesses 23a, b in the facing narrow sides, but with a multiple of the length of the package recesses 23a, b - namely the width of the window package 4PF - and with a different depth in the stud direction 4', usually with a greater depth b than the depth a of the positioning recesses 23a, b.

[0136] The prefabricated window package 4PF is therefore - if the production of the upright layer is started at one end of the chords 6a, 6b, for example with the upright 4.1 - at the corresponding position and is then inserted between the package recesses 27.

[0137] In order not to be tied to the grid dimension of the integer width B of a post with the width of a window package 4PF or a door package 4PT and thus the window opening F or door opening T located therein, a special post 4* can also be used within such a package - as shown in Figure 2b for the smaller window - which in particular limits the opening, for example F, on one side or on each side - which has a width that deviates from the target width B, for example 1.5 times or 2 times.

[0138] Such a special stand 4* can have a recess in the area of ​​the opening, for example F, whereby the width of the opening, for example F, becomes independent of the grid dimension based on the width B of a normal stand.

[0139] Furthermore, in Figures 2b, 2c, on the main side 4b of the stud layer 4 facing away from the chords, there is an installation duct 21 through which, in this case, an electrical cable can be led up from the floor in the stud layer 4, as shown up to an installation opening 21a provided in the paneling 5 at the upper end of the installation duct 21, e.g. for a light switch at the upper end of the installation duct 21, which is then laid on the stud layer 4 according to Figures 2b, c and thus covers the installation duct 21, as can be seen in Figure 3a. Alternatively, the installation duct 21 can also extend over the entire length of the stud or installation package in which it is located.

[0140] Depending on the depth and width, other pipes such as a water pipe can also be laid in such an installation channel 21, which is achieved according to Figures 4a - 4d:

[0141] For this purpose, instead of the width B of one or more normal studs of type 4A or 4B - in the case of an installation duct 21 for only one electrical cable, usually only one stud - is replaced by an installation package 4Plnst - which accordingly can only have the width of a single stud or, if necessary, an integer multiple of the nominal width B of a stud - and which is prefabricated externally:

[0142] In the thickness direction 12, the installation package 4P Inst consists of a, usually board-shaped, installation base 7 made of a wood material - be it solid wood or a laminated wood panel - whose extension in the width direction 11 preferably has a multiple of the required width of the installation package 4Plnst.

[0143] On this installation base 7, several layers of a non-combustible material, in particular plasterboard or gypsum fiberboard, are applied and connected to each other and to the installation base 7, generally not by nailing or stapling, but by gluing, for example, until the overall structure has the thickness D of the stud layer and thus of a single stud.

[0144] Strips with the required width of the installation package, here the width B of a single upright according to Figure 4b, are then cut from such a layered structure, for example using a circular saw 28 as shown in Figure 4a. The installation channel 21 to be produced in the longitudinal direction 4' of the installation package 4Plnst is achieved as shown in Figure 4c by moving a cylindrical milling cutter 29, for example, along the upright direction 4', i.e., the longitudinal direction 10, over the desired length.

[0145] The installation package 4Plnst thus completed according to Figure 4d is installed as a special package between the chords 6a, b during the production of the stud layer 4 instead of the corresponding number of normal studs.

[0146] Alternatively, the groove can also be inserted after the installation package 4Plnst in the stud layer 4,

[0147] Thus, the cross-section of the installation duct 21 is surrounded on three sides by non-combustible material, and for the fourth side of the cross-section this is achieved by the subsequently applied planking of the finished stud layer 4 with, for example, plasterboard.

[0148] The belts with their recesses are designed to enable the production of the upright layer 4, preferably including the planking 5, in a continuous process that is as automated as possible, which results in significant cost advantages:

[0149] As can be seen in the top view of Figure 5a, there are therefore belt supports 18 arranged at a distance equal to the length of the uprights 2 in the conveying direction 11, the width direction of the wall panel to be produced, here in the form of roller tracks 18 made up of a plurality of rotatable, optionally also controlled drivable, transport rollers 30 arranged horizontally one behind the other.

[0150] A belt 6a, b is placed on each roller conveyor 18 with positioning recesses 23a, 23b facing each other, whereby the correct distance in the stud direction 4' is ensured by belt guides 32a, b provided on both sides, i.e. on the respective outer side of the belt 6a, 6, for the belts as a stop in the height direction of the wall panel 1 to be produced. The production of a stud layer 4 begins when the two belts 6a, 6b are placed on their respective belt supports 18a, 18b and pushed or driven forward in the conveying direction 11 up to activated end stops 31 present at analogous positions in the conveying direction 11 in the path of movement of the cross belts 6a, 6b and - usually manually - brought outwards into contact with their belt guides 32a, 32b according to Figure 5a and Figure 6a.

[0151] Then, from above, the first wooden beam upright 4.1 is placed, in particular directly, on the end stops 31, 31 onto the beginning of the two chords 6a, 6b - preferably automatically - with its chord recesses 24a, b between the chords 6a, 6b pointing downwards, so that it rests only with each of its end tongues 25a, 25b on the front end of one of the two transverse chords 6a, b and is then nailed from above by means of nails 13 through these end tongues 25a, 25b to the chord 6a, b below - preferably automatically.

[0152] Preferably, there is a supply of studs of type 4A, for example, above the area in front of the end stops 31, from which - preferably automatically - the first stud 4.1 and subsequently the further studs 4. ff are placed and nailed to them.

[0153] At the position of a specific, e.g. the fifth, stand 4.5, the two transverse belts 6a, 6b - as can be seen in Figure 5a - each have a positioning recess 23a, b facing each other and extending through the entire thickness of the belt, so that at this position in the height direction 10 the clear distance between the belts 6a, 6b is greater.

[0154] Accordingly, for insertion at this, for example, fifth position, a type 4B stand is required, of which a supply is also available, for example, above the area in front of the end stops 31, and whose end tongues 25a, b are somewhat shorter, corresponding to the depth of the positioning recesses 23a, b. This is inserted as stand 4.5 between the positioning recesses 23a, b.

[0155] In principle, it does not matter at which positions positioning recesses 23a, b are provided for a stand of type 4B, provided that the distance in the conveying direction 11 between the positioning recesses 23a, b of a belt preferably corresponds to a multiple of the nominal width B, possibly plus a surcharge for manufacturing inaccuracies.

[0156] As soon as the first stand 4.1 is placed and mounted, i.e. nailed, the stops 31 are deactivated, i.e. removed from the path of movement of the cross belts 6a, b and the mounted stands, for example moved downwards between the transport rollers 30.

[0157] The entire started stand layer 4 can then be moved forward in the transport direction 11 by the desired width B of a stand.

[0158] Theoretically, this is possible by controlled driving of the transport rollers 30. However, since slippage can occur in this case, the first mounted stand 4.1 and / or the front end of the two cross belts 6a, b are preferably gripped, preferably clamped, by one or, better, two grippers 2 spaced apart from one another in the vertical direction 10, which are preferably mounted on a common gripper arm 3.

[0159] By moving the grippers 2, in particular the gripper arm 3, forward in the transport direction 11 by, for example, a desired width B of a stand or the width of a special package to be inserted, a further stand 4.2ff or a special package can be placed one after the other on the belts 6a, b and connected to them until the stand layer 4 is completed.

[0160] In this way, automatic support devices 33a, b for the stands and automatic nailing devices 34 can essentially remain at their longitudinal position in the conveying direction 11 and do not have to be designed to be movable in the conveying direction 11.

[0161] If the laying device - as shown in Figure 7a in the same viewing direction as Figures 6a, b - for laying the individual stands is a gripper 33, for example at the front end of a robot arm, the robot arm will generally hold the stand 4x clamped between two gripper prongs 33a, b, which engage the side surfaces of the stand 4x pointing in and against the transport direction 11.

[0162] Then there is the problem that a gripping tine 33b would collide with the stand 4x when lowering it directly behind the previously mounted stand - or with the longitudinal stop 31 in the case of the first stand.

[0163] Therefore, the stand 4x to be mounted can be placed on a stand support 35 which is height-adjustable, for example, by means of an adjusting cylinder 36, at a placement height such that, on the one hand, the gripping tine 33b does not yet collide with the adjacent, previously mounted stand and, on the other hand, the stand 4x is preferably not yet immersed with its middle part between the two belts 6a, b.

[0164] After removing the gripper 33, the stand 4x is pressed downwards from above by means of a pressing device 38 according to Figure 7c until the end tongues 25 a, b rest on the belts 6a, b, for which, of course, the stand support 35 must also be lowered further.

[0165] Before being pressed between the straps 6a, b, the stand 4x can, as shown in Figure 7b, be pushed—preferably still at the storage height—by means of a slider 37 with minimal resistance in the transport direction 11 or pushing direction 11 against a stand stop 39 or the last previously mounted stand. However, while the stand is being pushed downward until its end tongues rest on the straps 6a, b, the slider 37 does not press against the stand, but is preferably moved slightly backwards at a distance from it.

[0166] The stand stop 39 for the stand 4x held by the gripper 33 serves in particular in the vertical direction as a stop for the gripping tine 33b and in the transport direction 11 in particular as a stop for the held stand 4x.

[0167] Preferably, this stand stop 39 is arranged above the activated front stop 31 and / or the last mounted stand.

[0168] Preferably, this stand stop 39 is arranged with its contact surface facing opposite to the transport direction 11 slightly in front of the front stop 31 in the transport direction 11.

[0169] LIST OF REFERENCE SYMBOLS

[0170] 1 blackboard

[0171] 2 grippers

[0172] 3 gripper arm

[0173] 4th stand layer

[0174] 4' stand direction

[0175] 4a, b page

[0176] 4.1 , 4.2 Wooden beam stands

[0177] 4A, B type of wooden beam stands

[0178] 4P stand package

[0179] 4PT door package

[0180] 4PF window package

[0181] 4PFa upper chord

[0182] 4PFb lower chord

[0183] 4Plnst installation package

[0184] 5 planking plate, planking

[0185] 5* Installation planking

[0186] 6a, b belt

[0187] 7 Installation basis

[0188] 8 layer

[0189] 9 Grain direction

[0190] 10 Height direction board

[0191] 11 Transverse direction, width direction, conveying direction

[0192] 12 Thickness direction

[0193] 13 Screw, nail, staple

[0194] 14 insulating bodies

[0195] 14a Insulating wall

[0196] 15 Weather protection layer

[0197] 16 Air gap

[0198] 17 rib

[0199] 18a, b Belt support 19 horizontal direction

[0200] 20 vertical direction

[0201] 21 Installation channel

[0202] 21a Installation breakthrough

[0203] 22 Installation recess

[0204] 23 Positioning recess

[0205] 24a, b Cross belt recess

[0206] 25a, b end tongue

[0207] 26 battens

[0208] 27 Package recess

[0209] 28 saw blade

[0210] 29 cutters

[0211] 30 transport roller

[0212] 31 Forehead stop

[0213] 32a, b Belt guide, side stop

[0214] 33 Laying device, gripper

[0215] 33a, b gripping tine

[0216] 34 Nail device

[0217] 35 height-adjustable stand support

[0218] 36 actuating cylinders

[0219] 37 sliders

[0220] 38 Press-in device

[0221] 39 Storage stop

[0222] 50 exterior wall

[0223] 60 floor ceiling

[0224] 100 buildings a depth 23 b depth 27

[0225] B Target width of stand d Thickness of belt

[0226] D Thickness of stand and stand layer

[0227] F Window opening

[0228] T Door opening

Claims

REQUIREMENTS 1. Blackboard (1) with - comprising a stator layer (4) - arranged close together, especially touching each other Wooden beam stand (4.1, 4.2), - which are connected to each other at the upper and lower ends by a strap (6a, b) running perpendicular to their stand direction (4'). - and one or more plankings (5) extending in particular over the entire wall panel (1) on at least one side of the stud layer (4), characterized in that - the belts (6a, b) have a lesser thickness (d) than the stator layer (4) in the thickness direction (12) and both are arranged only on one side (4a) of the stator layer (4) in the thickness direction (12) and - with their cross-section in end-side belt recesses (24) of the wooden beam uprights (4.1 -4.z) adjacent to remaining end tongues (25a, b).

2. Wall panel according to claim 1, characterized in that - the thickness (d) of the belts (6a, b) is a maximum of 40%, in particular a maximum of 35%, in particular a maximum of 30%, in particular a maximum of 25%, in particular a maximum of 20% of the thickness (D) of the stand layer (4) and / or. - the thickness (d) of the straps (6a, b) is a maximum of 39 mm, in particular a maximum of 33 mm, in particular a maximum of 27 mm, in particular a maximum of 24 mm, in particular a maximum of 20 mm and / or 34 the thickness (d) of the end tongues (25a, b) is at least 61 mm, in particular at least 67 mm, in particular at least 73 mm, in particular at least 78 mm, in particular at least 83 mm.

3. Wall panel according to one of the preceding claims, characterized in that - positioning recesses (23) with the width (b) of a wooden beam stand (4.1) are provided along the straps (6a, b) at defined intervals and at corresponding positions and opposite each other, between which stands are located whose strap recess (24a, b) and end tab (25a, b) is then shorter than for stands away from the positioning recesses (23).

4. Wall panel according to one of the preceding claims, characterized in that - the straps (6a, b) do not protrude beyond the ends of the wooden beam uprights (4.1 - 4z) in the longitudinal direction (10), in particular they are flush with these, and if necessary, they are set back from these. (Material:) 5. Wall panel according to one of the preceding claims, characterized in that - the wooden beam uprights (4.1 - 4z) made of grown wood consist with grain direction (9) primarily in the longitudinal direction (10) of the wooden beam uprights (4.1 -4z), - the cross chords (6a, b) consist of laminated wood, in particular plywood, in particular veneer plywood, with in particular at least five layers (8) and preferably intersecting grain direction with respect to the individual layers (8).

6. Wall panel according to one of the preceding claims, characterized in that 35 - the sheathing panel (5) consists of fire-resistant, in particular fire-retardant, material, - especially a plasterboard panel, - preferably a gypsum fiberboard stabilized with, in particular non-combustible, fibers. (Connection:) 7. Wall panel according to one of the preceding claims, characterized in that - each wooden beam stand (4.1 - 4z) is connected to each of the straps (6a, b) by means of two screws (13) or nails (13) or clamps (13), in particular - the screws (13) or nails (13), in particular screw nails, or staples are inserted from the side (4b) facing away from the belt (6a, b) through the stud layer (4) into the belt (6a, b), and / or - the screws (13) or nails (13) or clamps are inserted through the sheathing plate (5) and, if applicable, the strap (6a, b) into the wooden beam posts (4.1 - 4z).

8. Wall panel according to one of the preceding claims, characterized in that - in the case of several sheathing or cladding panels (5), these abut each other in the transverse direction (11) to the longitudinal direction (10) of the wooden beam studs (4.1 - 4z) on one of the wooden beam studs (4.1 - 4z). (Special packages:) 9. Wall panel according to one of the preceding claims, characterized in that Instead of a stand package (4P) consisting of one or more adjacent wooden beam stands (4.1 - 4p), a special package may be available, in particular - a door package (4PT) containing a door opening (T), possibly framed by jamb timbers, or - a window package (4PF) containing a window opening (F), possibly framed by jamb timbers, or - an installation package (4Plnst) which contains an installation channel (21) wherein the special package in particular has a width (B) of a single or an integer multiple of the width (b) of a wooden beam stand (4.1).

10. Wall panel according to one of the preceding claims, characterized in that - within such a special package, in particular a door package (4PT) or window package (4PF), a special stand (4*) may also be used which has a width that deviates from the nominal width (B), for example 1.5 times or 2 times, - which in particular limits the opening, e.g. (F), on one side. (Installation package:) 11. Wall panel according to one of the preceding claims, characterized in that the installation package (4Plnst) has in cross-section to its longitudinal direction (10) an installation base (7), an installation, in particular extending in the longitudinal direction (10), Channel (21), which on all sides except those with the outside of the The installation package (4Plnst) has an aligned outer surface enclosed in non-combustible material.

12. Wall panel according to claim 11, characterized in that - the installation base (7) is made of a wood-based material, but not of natural wood, - in particular made of laminated wood, in particular plywood, in particular veneer plywood, with in particular at least two layers (8) and preferably intersecting grain direction with respect to the individual layers (8).

13. Wall panel according to one of the preceding claims, characterized in that - either the installation base (7) on the one hand and the enclosure made of non-combustible material on the other hand extend over the entire width of the installation package (4Plnst), - or the enclosure made of non-combustible material is at least partially arranged in an installation recess (22) in the installation base (7) running in the direction of the installation channel (21).

14. Wall panel according to one of the preceding claims, characterized in that - the enclosure of the installation duct (21) consists of one or more layers of plasterboard and / or gypsum fiberboard, - in the case of multiple layers, these are in particular parallel to the main plane (4") of the stator layer (4), - the installation channel (21) is incorporated into the layer structure, for example by milling. 38 15. Building (100) from - floor-to-ceiling wall panels (1), in particular made of wall panels (1) according to one of the preceding claims, characterized in that - in the case of a wall panel (1) as an outer wall (50), the wall panel (1) with the straps (6a, b) running horizontally is arranged on the outside of the building (100), - in the case of a wall panel (1) as an outer wall (50), the floor slab (60) only rests on the wall panel (1) of the outer wall (50) in the thickness area of ​​the upper ends (define) of the wooden beam studs (4.1 - 4z).

16. Building according to claim 15, characterized in that the free space remaining between superimposed wall panels (1) and a floor slab in between is densely filled with a hardenable, pressure-resistant filling material, in particular mortar or concrete.

17. Building according to claim 16 or 15, wherein an outer wall (50) comprises at least from the outside to the inside - a weather protection layer (15), - an insulating body (14) with thermal insulating material (14a), - the wall panel (1 ) as a load-bearing layer, characterized in that - the insulating body (14) is designed as a prefabricated, essentially closed on all sides, separately manageable component that can be attached to the corresponding wall panel, preferably only from the outside, with insulating material (14a) inside and can therefore be replaced at any time, - the insertion of the insulating material (14a) into the insulating body (14) can, especially in the case of blown-in insulating material, also take place after the insulating body (14) has been mounted on the wall panel (1). 39 18. Method for producing at least the upright layers (4) of wall panels (1), in particular according to one of claims 1-15, in a continuous process, characterized in that the upright layer (4) is produced by: a) arranging two straps (6a, b) at the correct longitudinal distance between the uprights and with a downward clearance between them, with their end faces in a defined position, in particular against an end stop (31); b) inserting a first upright (4.1) by placing the end tongues (25a, b) of the upright (4.1) onto the two straps (6a, b) so that the straps lie in the strap recesses (24a, b); c) fixing, in particular by screwing, clamping or nailing, this upright through its end tongues (25a, b) opposite the two transverse straps (6a, b); d) inserting the next upright (4.2) or special package (4P) between the straps (6a, b) behind the last stand, in particular already fixed to the straps (6a, b) (4.1), e) Fixing, in particular screwing or nailing or clamping, this stand through its end tongues opposite the two straps (6a, b), f) Repeating steps d) and e), until the longitudinal spacing of the cross straps (6a, b) is filled with wooden beam stands (4.1 - 4.z) along the entire length of the cross straps (6a, b).

19. Method according to claim 18, characterized in that - between steps b) and c) the next stand (4.2) is pushed towards, in particular until contact is made with, the previous stand (4.1). (Moving forward in sections:) 40 20. Method according to one of the preceding method claims, characterized in that after fixing each or a defined number of uprights (4.1 , 4.2 , 4.3) between the belts (6a, b) the resulting upright layer (4) and / or the at least one end stop (31) - is moved forward either by the width of a wooden beam stand or a special package, - especially after deactivating the forehead stop (31).

21. Method according to one of the preceding method claims, characterized in that, for moving the resulting layer of uprights forward, the first wooden beam upright (4.1) with the straps (6a, b) attached to it is grasped by a gripper and moved forward in a defined stepwise manner in the transport direction (10). (Positioning recess:) 22. Proceedings under any of the preceding procedural claims, wherein - the two straps (6a, b) have positioning recesses (23) at corresponding longitudinal positions in their narrow longitudinal sides facing each other, with a length corresponding to at least the width (b) of a stand (4.1), characterized in that - in the areas away from the positioning recesses (23) stands of type A having long end tongues (25a, b) are inserted, - between two opposing positioning recesses (23) stands of type B, which in contrast have shorter end tongues (25a, b), are inserted. (Inserting packages:) 23. A method according to one of the preceding method claims, characterized in that 41 In steps d) and e) instead of a single stand (4.2) a stand package (4P) with a width an integer multiple of the width (b) of a single stand is inserted. (Create installation package:) 24. Method according to one of the preceding method claims, characterized in that an installation package (4Plnst) is produced by - non-combustible material is applied and bonded to an installation base (7), which in particular has a width corresponding to the width of the installation package (4Plnst), - especially in the form of one or more layers (8), - especially gypsum board or gypsum fiberboard, - an installation channel (21) is introduced into the non-combustible layer structure, in particular milled into it, such that the installation channel (21) is completely surrounded on all sides except for the outer side opposite the installation base (7) by non-combustible material.

25. A method according to one of the preceding method claims, characterized in that - the non-combustible material is placed in an installation recess (22) of the installation base (7). - in particular until this installation recess (22) is completely filled with the non-combustible material. (Planking or cladding:) 26. Method according to one of the preceding method claims, characterized in that after completion of the stud layer (4) its sheathing is carried out by 42 g) Place at least one layer of sheathing panels (5) on the top of the completed stud layer (4), h) Fix, in particular by screwing, nailing or clamping, these sheathing panels (5) to the stud layer (4), i) Turn the stud layer (4) over so that the sheathing panels (5) attached to it face downwards and the straps (6a, b) face upwards, k) Repeat steps g) and h) on the now top side of the stud layer (4). 43