Device for working machine with offset joint, method and device for controlling offset excavator
The method and device convert input data from offset excavators to standard kinematics for precise trajectory planning, addressing the challenge of additional kinematic degrees of freedom in offset excavators, enabling reliable and efficient leveling operations.
Patent Information
- Application Number
- EP2024164020
- Authority / Receiving Office
- EP · EP
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-03-24
- Filing Date
- 2024-03-18
- Publication Date
- 2024-09-25
AI Technical Summary
Offset excavators with additional kinematic degrees of freedom pose challenges in precise leveling due to complexities in trajectory planning and control, as existing standard excavator assistance systems are not designed to handle the extra degree of freedom effectively, leading to inefficiencies and inaccuracies in leveling operations.
A method and device that utilize a standard excavator trajectory planner to generate control data for offset excavators by converting input data from offset kinematics to standard kinematics, allowing for precise trajectory planning and execution of leveling operations, even with simultaneous movement of the offset joint, by determining target deflection angles and angular velocities for actuators.
Enables reliable, precise, and computationally efficient control of offset excavators, allowing for accurate leveling operations across various offset angles and positions, thereby improving the reliability and efficiency of leveling processes.
Smart Images

Figure IMGAF001_ABST
Abstract
Description
[0001] The present invention relates to a device for a work machine with an offset joint, to a method for controlling an offset excavator, and to a corresponding device. The present invention also relates to a computer program.
[0002] For example, excavators, regardless of size, are often used to level a given area. Assistance functions can be used to support excavator operators in this process. Offset excavators are also known, which offer an additional kinematic degree of freedom.
[0003] The object of the present invention is to provide an improved device for a work machine with an offset joint, an improved method for controlling an offset excavator, and an improved device for controlling an offset excavator. This object is achieved by a method for controlling an offset excavator and by a device for controlling an offset excavator according to the main claims.
[0004] Advantageously, according to embodiments, a trajectory planner already known for standard excavators can also be used for offset excavators. This can, for example, be applied not only to excavators with offset kinematics, but also, among other things, to excavators with a so-called fore-boom. Thus, a standard excavator trajectory planner can, in particular, also be used for an offset excavator, wherein the trajectory planning, for example for leveling, can be planned and executed reliably and precisely for all offset angles. Furthermore, the trajectory planning, in particular for leveling, can be planned and executed sufficiently reliably and precisely even with simultaneous movement of the offset joint. Thus, in the case of an excavator with an offset element or offset joint, for example, in different offset positions, can be reliably and precisely leveled using a standard excavator assistance system.a leveling process can be planned reliably and precisely.
[0005] The approach presented here creates a device for a work machine with an offset joint, wherein the device is designed to perform an assistance function for leveling an environment of the work machine.
[0006] The work machine with an offset joint can be designed as an excavator with an offset joint, which can also be referred to as an offset excavator or a shovel-type excavator, or as another type of work machine. The work machine with an offset joint can be designed as an excavator with a boom, offset joint, stick, and bucket.
[0007] The approach presented here also provides a method for controlling an offset excavator, the method comprising the following steps: Determining input data applicable to standard excavator kinematics using state data of the offset excavator applicable to offset excavator kinematics, wherein the state data represents actual deflection angles of a boom, an offset joint, a stick, and a bucket of the offset excavator, wherein the input data represents deflection angles of a model boom, a model stick, and a model bucket of a standard excavator model transferred from the offset excavator kinematics to the standard excavator kinematics; Executing a trajectory planning algorithm designed for the standard excavator kinematics using the input data to generate output data applicable to the standard excavator kinematics, wherein the output data represents planned deflection angles and additionally or alternatively planned angular velocities of the model boom, the model stick, and the model bucket of the standard excavator model;and determining control data applicable to the offset excavator kinematics for controlling the offset excavator using the output data, wherein the control data represent target deflection angles and / or target angular velocities of the boom, the offset joint, the stick, and the bucket of the offset excavator to be set by means of actuators of the offset excavator.
[0008] The control method can be implemented to control the operation of the offset excavator or at least one maneuver of the offset excavator. The offset excavator can also be referred to as an excavator with an offset joint, as a work machine with an offset joint, as an excavator with offset kinematics, or as an enveloping circle excavator. The offset excavator can be designed as an excavator with a boom, offset joint, stick, and bucket. Controlling an offset excavator can be achieved by controlling actuators of the offset excavator. The actuators of the offset excavator to be controlled here can include hydraulic cylinders. The standard excavator kinematics can, for example, have three kinematic degrees of freedom. The offset excavator kinematics can, for example, have four kinematic degrees of freedom. In other words, the offset excavator kinematics can have at least one more kinematic degree of freedom than the standard excavator kinematics.The standard excavator model can also be referred to as a hypothetical or model standard excavator, or as a model of a standard excavator. The standard excavator model can be defined by model data. A standard excavator can be implemented as an excavator with a boom, stick, and bucket. The trajectory planning algorithm can also be referred to as an optimization algorithm or an optimizer.
[0009] The method can also include a step of outputting the control data to the actuators of the offset excavator via an output interface in order to control the actuators using the control data to set the target deflection angles and, additionally or alternatively, the target angular velocities of the boom, offset joint, stick, and bucket of the offset excavator. Such an embodiment offers the advantage that the offset excavator can be controlled reliably, precisely, and with low computational effort. For example, the control data can be output directly to the actuators or indirectly to the actuators via a control unit, whereby the control data is used by the control unit to control the actuators.
[0010] Furthermore, the method can include a step of reading the status data via an input interface from the actuators and, additionally or alternatively, from at least one detection device of the offset excavator for detecting the actual deflection angle. Such an embodiment offers the advantage of obtaining a reliable data basis regarding the actual configuration of the offset excavator.
[0011] In particular, in the execution step, the trajectory planning algorithm can plan a trajectory of a bucket tip of the model bucket defined by the initial data. In the determination step, control data for implementing the trajectory of a bucket tip of the offset excavator's bucket can then be determined. Such an embodiment offers the advantage that a precisely defined maneuver of the offset excavator can be carried out reliably and accurately.
[0012] According to one embodiment, in the step of execution, the trajectory planning algorithm can plan a grading process defined by the initial data for grading the area surrounding the offset excavator. The algorithm can be configured to plan the grading process. Such an embodiment offers the advantage of providing a reliable and efficient grading assistant for offset excavators or excavators with offset kinematics. Thus, a grading assistant designed for an offset excavator or excavator with offset kinematics can be easily implemented. This can also, in particular, cause the bucket tip of the offset excavator to follow a predetermined trajectory, thus allowing a level surface to be removed.
[0013] In addition, a currently constant actual deflection angle of the offset joint can be used in the determination step. Identical angular velocities can be used for the offset excavator kinematics and the standard excavator kinematics. This embodiment offers the advantage of enabling a reliable and accurate transfer of values between the two kinematics.
[0014] In the determination step, differential angles between the actual deflection angles and the deflection angles transferred from the offset excavator kinematics to the standard excavator kinematics can also be used. In this case, further differential angles between the planned deflection angles and the target deflection angles can be used in the determination step. The differential angles and the further differential angles can be identical. Such an embodiment offers the advantage of enabling simple and reliable use of a conventional trajectory planning algorithm for offset excavators.
[0015] The method mentioned herein can be implemented, for example, in software or hardware or in a mixed form of software and hardware, for example in a control unit or a device.
[0016] The approach presented here further provides a device configured to perform, control, or implement the steps of a variant of a method presented here in corresponding devices. This embodiment of the invention in the form of a device also allows the problem underlying the invention to be solved quickly and efficiently. The device can be configured to perform an assistance function for leveling the surroundings of the work machine.
[0017] For this purpose, the device can have at least one computing unit for processing signals or data, at least one memory unit for storing signals or data, at least one interface to a sensor or an actuator for reading sensor signals from the sensor or for outputting data or control signals to the actuator, and / or at least one communication interface for reading or outputting data embedded in a communication protocol. The computing unit can be, for example, a signal processor, a microcontroller, or the like, wherein the memory unit can be a flash memory, an EEPROM, or a magnetic storage unit.The communication interface can be designed to read in or output data wirelessly and / or wired, wherein a communication interface that can read in or output wired data can read this data, for example, electrically or optically from a corresponding data transmission line or output it to a corresponding data transmission line.
[0018] In this case, a device can be understood as an electrical device that processes sensor signals and outputs control and / or data signals depending on them. The device can have an interface, which can be implemented in hardware and / or software. In a hardware implementation, the interfaces can, for example, be part of a so-called system ASIC, which contains a wide variety of functions of the device. However, it is also possible for the interfaces to be separate integrated circuits or to consist at least partially of discrete components. In a software implementation, the interfaces can be software modules that are present, for example, on a microcontroller alongside other software modules.
[0019] Also advantageous is a computer program product or computer program with program code that can be stored on a machine-readable carrier or storage medium such as a semiconductor memory, a hard disk memory or an optical memory and is used to carry out, implement and / or control the steps of the method according to one of the embodiments described above, in particular when the program product or program is executed on a computer or a device.
[0020] The invention is explained in more detail below with reference to the accompanying drawings. They show: Fig. 1 shows a schematic representation of an offset excavator with an exemplary embodiment of a device; Fig. 2 shows a schematic representation of an offset excavator; Fig. 3 shows a schematic representation of an offset excavator; Fig. 4 shows a schematic representation of an offset excavator; Fig. 5 shows a schematic representation of an offset excavator; Fig. 6 shows a schematic representation of an offset excavator; and Fig. 7 shows a flowchart of an exemplary embodiment of a method for controlling an offset excavator.
[0021] Identical or similar elements may be provided with identical or similar reference numerals in the following figures. Furthermore, the figures of the drawings, their description, and the claims contain numerous features in combination. A person skilled in the art will appreciate that these features can also be considered individually or combined to form further combinations not explicitly described here.
[0022] Before describing the embodiments in more detail below, we will first briefly discuss the background, fundamentals and advantages of the embodiments.
[0023] Excavators, regardless of size, can often be used to level a given area. For this purpose, assistance functions can be used, for example, to support excavator personnel in this process. In a standard excavator or classic excavator for which such assistance functions are currently available, the boom, arm and bucket are controlled simultaneously in order to achieve a defined guidance of the bucket tip. The kinematics of an offset excavator or excavator with an offset are as follows: An offset joint is installed between the boom and the stick joint, which enables parallel displacement of the stick to the right or left as seen from the excavator cab. By operating the offset joint, the height and depth of the bucket tip can also change, which can be taken into account when creating a subgrade, according to exemplary embodiments.With the same deflection angles or the same cylinder deflection of the boom, stick and bucket, not only can a parallel displacement of the stick and bucket occur through the offset joint and the bucket position is shifted in the y-direction, but a displacement in the x-direction and in the z-direction, i.e. the height of the bucket above the ground, can also occur. In order to travel over a level surface, e.g. a horizontal plane, with the bucket tip, it is necessary to determine the exact angular velocities for the boom, stick and bucket. Since this problem cannot be solved unambiguously kinematically, an optimizer or algorithm for trajectory planning is used. This algorithm attempts to solve the kinematic problem by taking various boundary conditions, e.g. end stops of the hydraulic cylinders, into account. This can then be determined which speeds the boom, stick and bucket should have in order to level the desired level.The optimization problem for a standard excavator thus has three known degrees of freedom. However, an excavator with offset kinematics has an additional kinematic degree of freedom compared to a standard excavator. According to exemplary embodiments, this additional degree of freedom can be prevented from complicating the optimizer's solution finding process. This allows, among other things, calculation times, deviations, and instabilities to be kept to a minimum.
[0024] Fig. 1 shows a schematic representation of an offset excavator 100 with an exemplary embodiment of a device 110. The offset excavator 100 can also be referred to as an excavator with an offset joint, as a work machine with an offset joint, as an excavator with offset kinematics, or as an enveloping circle excavator. The device 110 or device 110 for controlling or control device 110 is designed to control the offset excavator 100. In other words, the device 110 for controlling is designed to control an operation of the offset excavator 100 or at least a maneuver of the offset excavator, for example a grading process. According to one exemplary embodiment, the device 110 is designed to perform an assistance function for grading an area surrounding the offset excavator 100.
[0025] A plurality of actuators 102 of the offset excavator 100 are shown, including, merely by way of example, a detection device 104 and the control device 110. The actuators 102 are configured to adjust the deflection angles of a boom, an offset joint, a stick, and a bucket of the offset excavator 100. The detection device 104 is configured to detect the set deflection angles. The actuators 102 and / or the detection device 104 are configured to provide status data 105 representing the actual deflection angles of the boom, the offset joint, the stick, and the bucket of the offset excavator 100.
[0026] The device 110 for controlling comprises a determination device 113, an execution device 115, and a determination device 117. In addition, the device 110 according to the embodiment shown here comprises an input interface 111 and an output interface 119.
[0027] The control device 110 is designed to read the status data 105 via the input interface 111 from the actuators 102 and / or from the at least one detection device 104.
[0028] The determination device 113 of the apparatus 110 is configured to determine input data 114 applicable to a standard excavator kinematics using the state data 105 of the offset excavator 100 applicable to an offset excavator kinematics. The input data 114 represent deflection angles of a model boom, a model stick, and a model bucket of a standard excavator model or a model or hypothetical standard excavator, transferred from the offset excavator kinematics to the standard excavator kinematics. The determination device 113 is also configured to provide the input data 114 to the execution device 115.
[0029] The execution device 115 is configured to execute a trajectory planning algorithm designed for the standard excavator kinematics using the input data 114 in order to generate output data 116 applicable to the standard excavator kinematics. The output data 116 represents planned deflection angles and / or angular velocities of the model boom, the model stick, and the model bucket of the standard excavator model. In other words, the execution device 115 is configured to convert the input data 114 into the output data 116 using the trajectory planning algorithm designed for the standard excavator kinematics. Furthermore, the execution device 115 is configured to provide the output data 116 to the determination device 117.
[0030] The determination device 117 is configured to use the output data 116 to determine control data 125 applicable to the offset excavator kinematics for controlling the offset excavator 100. The control data 125 thus determined represent target deflection angles and / or target angular velocities of the boom, the offset joint, the stick, and the bucket of the offset excavator 100, which are to be set by means of actuators 102 of the offset excavator 100.
[0031] The control device 110 is also configured to output the control data 125 to the actuators 102 via the output interface 119 in order to control the actuators 102 using the control data 125 to set the desired deflection angles and / or desired angular velocities of the boom, the offset joint, the stick, and the bucket of the offset excavator 100.
[0032] According to one embodiment, the execution device 115 is configured to use the trajectory planning algorithm to plan a trajectory of a bucket tip of the model bucket of the standard excavator model, defined by the output data 125. Additionally or alternatively, the execution device 115 is configured to use the trajectory planning algorithm to plan a grading process, defined by the output data 125, for grading an area surrounding the offset excavator 100.
[0033] According to one exemplary embodiment, the determination device 113 is configured to use a currently constant actual deflection angle of the offset joint. Identical angular velocities are used for the offset excavator kinematics and the standard excavator kinematics. Additionally or alternatively, the determination device 113 is configured to use differential angles between the actual deflection angles and the deflection angles transferred from the offset excavator kinematics to the standard excavator kinematics, with the determination device 117 being configured to use further differential angles between the planned deflection angles and the target deflection angles. The differential angles and the further differential angles are identical.
[0034] Fig. 2 shows a schematic representation of an offset excavator 100. The offset excavator 100 corresponds to or is similar to the offset excavator from Fig. 1 . In Fig. 2 The offset excavator 100 is shown in a side view. In the illustration of Fig. 2 a boom 201, an offset joint 203, a stick 207 and a bucket 209 of the offset excavator 100 together with the associated actuators 102 are shown. The actuators 102 are designed as hydraulic cylinders. Thus, a first of the actuators 102 is designed to move the boom 201 or to adjust a deflection angle of the boom 201. A second of the actuators 102, which is hidden in the illustration by the offset joint 203, is designed to move the offset joint 203 or to adjust a deflection angle of the offset joint 203. A third of the actuators 102 is designed to move the stick 207 or to adjust a deflection angle of the
[0035] arm 207. A fourth of the actuators 102 is designed to move the bucket 209 or to adjust a deflection angle of the bucket 209.
[0036] Fig. 3 shows a schematic representation of an offset excavator 100. The offset excavator 100 corresponds to or is similar to the offset excavator from one of the figures described above, in particular Fig. 2 . In Fig. 3 The offset excavator 100 is shown in a top view. Furthermore, an x-axis and a y-axis are shown. The first of the actuators 102, which is designed to move the boom 201 or to adjust a deflection angle of the boom 201, is hidden in the figure by the boom 201. In contrast, the second of the actuators 102, which is designed to move the offset joint 203 or to adjust a deflection angle of the offset joint 203, is explicitly shown. In the illustration of Fig. 3 Two different deflection angles of the offset joint 203 are illustrated. In particular, an adjustment of the deflection angle of the offset joint 203 is shown, as symbolically represented by a curved arrow. This adjustment results in a parallel displacement of the arm 207 and the bucket 209, which also results in a displacement of the latter along the x-axis, as illustrated by another arrow.
[0037] Fig. 4 shows a schematic representation of an offset excavator 100. The offset excavator 100 corresponds to or is similar to the offset excavator from one of the figures described above, in particular Fig. 2 and / or Fig. 3 . The representation in Fig. 4 This is similar to the illustration in Fig. 2 . The offset excavator 100 shows the boom 201, the offset joint 203, the stick 207, and the bucket 209. Furthermore, various deflection angles are shown in connection with the device for controlling the offset excavator 100, and in particular in connection with the device's determination device. Shown here are an actual deflection angle or deflection angle q 1,OFF of the boom 201 of the offset excavator, a deflection angle q 1,STD of the model boom of the standard excavator model transferred from the offset excavator kinematics to the standard excavator kinematics, an actual deflection angle or deflection angle q 7,OFF of the stick 207 of the offset excavator, and a deflection angle q 7,STD of the model stick of the standard excavator model transferred from the offset excavator kinematics to the standard excavator kinematics.
[0038] Fig. 5 shows a schematic representation of an offset excavator 100. The offset excavator 100 corresponds to or is similar to the offset excavator from one of the figures described above, in particular Fig. 2 bis Fig. 4 . The representation in Fig. 5 This is similar to the illustration in Fig. 2 . The offset excavator 100 shows the boom 201, the offset joint 203, the stick 207 and the bucket 209. The illustration in Fig. 5 corresponds to the Fig. 3 deflection of the offset joint 203 shown above.
[0039] Fig. 6 shows a schematic representation of an offset excavator 100. The offset excavator 100 and the representation in Fig. 6 corresponds to the offset excavator and the illustration from Fig. 5 except that the representation in Fig. 6 with the Fig. 3 corresponds to the deflection of the offset joint 203 shown below.
[0040] Fig. 7 shows a flowchart of an embodiment of a method 700 for controlling an offset excavator. The method 700 can be implemented to control the offset excavator from one of the figures described above or to control an operation thereof or at least a maneuver thereof. The method 700 for controlling is implemented using and / or by means of the device from Fig. 1 or a similar device.
[0041] The control method 700 comprises a determining step 713, an executing step 715, and a determining step 717. In the determining step 713, input data applicable to a standard excavator kinematics are first determined using status data of the offset excavator applicable to an offset excavator kinematics. The status data represent actual deflection angles of a boom, an offset joint, a stick, and a bucket of the offset excavator. The input data represent deflection angles of a model boom, a model stick, and a model bucket of a standard excavator model transferred from the offset excavator kinematics to the standard excavator kinematics. Subsequently, in the executing step 715, a trajectory planning algorithm designed for the standard excavator kinematics is executed using the input data in order to generate output data applicable to the standard excavator kinematics.The output data represents planned deflection angles and / or angular velocities of the model boom, the model stick, and the model bucket of the standard excavator model. In particular, in step 715 of execution, the trajectory planning algorithm plans a grading operation defined by the output data for grading an area surrounding the offset excavator. Subsequently, in step 717 of determination, control data applicable to the offset excavator kinematics for controlling the offset excavator are determined using the output data. The control data represents target deflection angles and / or target angular velocities of the boom, the offset joint, the stick, and the bucket of the offset excavator, which are to be set using actuators of the offset excavator.
[0042] According to one embodiment, the control method 700 also includes a reading step 711 and / or an output step 719. In the reading step 711, the status data is read in via an input interface from the actuators and / or from at least one detection device of the offset excavator to detect the actual deflection angles. In the output step 719, the control data is output to the actuators of the offset excavator via an output interface in order to control the actuators using the control data to set the target deflection angles and / or target angular velocities of the boom, the offset joint, the stick, and the bucket of the offset excavator.
[0043] With reference to the figures described above, a system structure of the offset excavator 100 and a function of the device 110 for controlling an offset excavator 100 are summarized again and, in other words, briefly explained below.
[0044] The kinematics of an offset excavator or offset excavator 100 have the following features: An offset joint 203 is installed between the boom 201 and the arm joint or arm 207, which enables parallel displacement of the arm or arm 207 to the right or left as seen from the cab. However, by operating the offset joint 203, i.e., by changing the deflection angle of the offset joint 203, the height and depth of the bucket tip of the bucket 209 also change, which should be taken into account when creating a subgrade. The parallel displacement of the arm 207 and the bucket 209 by the offset joint 203 means that with the same cylinder deflection of the boom 201, arm 207 and bucket 209, not only a parallel displacement takes place and the bucket position is shifted in the y-direction, but also a displacement in the x-direction and in the z-direction, ie the height of the bucket above the ground, takes place.
[0045] The determining device 113 of the device 110 for controlling is designed and / or the step 713 of determining from the method 700 for controlling is executable to perform a first kinematic conversion from the offset excavator kinematics to the standard excavator kinematics or, more precisely, a kinematic conversion of measured boom, stick and bucket angles from offset excavator kinematics to the standard excavator kinematics.
[0046] The execution device 115 of the device 110 for controlling is designed and / or the step 715 of executing from the method 700 for controlling is feasible, for example, to use a trajectory planner for the bucket tip based on the standard excavator kinematics.
[0047] The formation device 117 of the device 110 for controlling is designed and / or the step 717 of determining from the method 700 for controlling is executable to perform a second kinematic conversion from the standard excavator kinematics to the offset excavator kinematics or, more precisely, a kinematic conversion of boom, stick and bucket angles and speeds from the standard excavator kinematics to the offset excavator kinematics.
[0048] Thus, according to exemplary embodiments, only two kinematic conversions are performed in order to be able to use a trajectory planner for standard excavators. The determination device 113 and / or the determination step 713 particularly recalculate the deflection angle q 1,STD of the model boom of the standard excavator model, also referred to as q boom,SB, and the deflection angle q 7,STD of the model stick of the standard excavator model, also referred to as q stick,SB, in order to be able to use existing trajectory planners for standard excavators. Assuming that the offset angle is constant for the moment, the angular velocities in both kinematics are identical, whereby the relationships q boom,SB = q boom,OF , q stick,SB = q stick,OF and q bucket,SB = q bucket,OF apply, where SB stands for standard excavators and OF stands for offset excavators. The difference angles between kinematics are the same before and after the trajectory planner.With this information, the planned angles from the trajectory planner can also be recalculated from the standard excavator kinematics to the offset excavator kinematics. Bezugszeichenliste
[0049] 100 Offset excavator or work machine with offset joint 102 Actuators 104 Detection device 105 Status data 110 Device 111 Input interface 113 Determination device 114 Input data 115 Execution device 116 Output data 117 Determination device 119 Output interface 125 Control data 201 Boom 203 Offset joint 207 Stick 209 Bucket q 1,OFF Deflection angle of the boom of the offset excavator q 1,STD Deflection angle of the model boom of the standard excavator model q 7,OFF Deflection angle of the stick of the offset excavator q 7,STD Deflection angle of the model stick of the standard excavator model 700 Method for controlling 711 Step of reading 713 Step of determining 715Step of execution 717Step of determination 719Step of output
Claims
1. Device (110) for a work machine (100) with an offset joint (203), wherein the device (110) is designed to perform an assistance function for leveling an environment of the work machine (100).
2. Method (700) for controlling an offset excavator (100), the method (700) comprising the following steps: determining (713) input data (114) applicable to a standard excavator kinematics using state data (105) of the offset excavator (100) applicable to an offset excavator kinematics, the state data (105) comprising actual deflection angle (q 1,OFF , q 7,OFF ) of a boom (201), an offset joint (203), a stick (207) and a bucket (209) of the offset excavator (100), wherein the input data (114) represent deflection angles (q 1,STD , q 7,STD) of a model boom, a model stick, and a model bucket of a standard excavator model; executing (715) a trajectory planning algorithm designed for the standard excavator kinematics using the input data (114) to generate output data (116) applicable to the standard excavator kinematics, wherein the output data (116) represent planned deflection angles and / or angular velocities of the model boom, the model stick, and the model bucket of the standard excavator model; and determining (717) control data (125) applicable to the offset excavator kinematics for controlling the offset excavator (100) using the output data (116), wherein the control data (125) represent target deflection angles and / or target angular velocities of the boom (201), the offset joint (203), the stick (207) and the bucket (209) of the offset excavator (100) to be set by means of actuators (102) of the offset excavator (100).
3. Method (700) according to claim 2, comprising a step (719) of outputting the control data (125) via an output interface (119) to the actuators (102) of the offset excavator (100) in order to control the actuators (102) using the control data (125) in order to set the desired deflection angles and / or desired angular velocities of the boom (201), the offset joint (207), the stick (207) and the bucket (209) of the offset excavator (100).
4. Method (700) according to one of claims 2 to 3, comprising a step (711) of reading in the status data (105) via an input interface (111) from the actuators (102) and / or from at least one detection device (104) of the offset excavator (100) for detecting the actual deflection angles.
5. The method (700) according to any one of claims 2 to 4, wherein in the step (715) of execution by the trajectory planning algorithm, a trajectory of a bucket tip of the model bucket defined by the output data (116) is planned.
6. The method (700) according to any one of claims 2 to 5, wherein in the step (715) of execution by the trajectory planning algorithm, a grading operation defined by the output data (116) for grading an environment of the offset excavator (100) is planned.
7. The method (700) according to any one of claims 2 to 6, wherein in the determining step (713) a currently constant actual deflection angle of the offset joint (203) is used, wherein identical angular velocities are used for the offset excavator kinematics and for the standard excavator kinematics.
8. The method (700) according to any one of claims 2 to 7, wherein in the step (713) of determining, difference angles between the actual deflection angles and the deflection angles transferred from the offset excavator kinematics to the standard excavator kinematics are used, wherein in the step (717) of determining, further difference angles between the planned deflection angles and the target deflection angles are used, wherein the difference angles and the further difference angles are identical.
9. Device (110) which is configured to carry out and / or control the steps of the method (700) according to one of claims 2 to 8 in corresponding units (113, 115, 117).
10. Computer program configured to execute and / or control the steps of the method (700) according to one of claims 2 to 8.
11. A machine-readable storage medium on which the computer program according to claim 10 is stored.
Citation Information
Patent Citations
Excavator Leveling Control Methods and Systems
CN113338371B
Flat ground control method and device and excavator
CN114411840A
Multi-purpose apparatus for hydraulic excavators and cranes
DE3602213A1
control device for a backhoe
DE4110959A1
Device for hydraulic excavators and cranes
EP0299104A1