Method and system for charging an electrical energy store of a vehicle
Patent Information
- Application Number
- EP2022839276
- Authority / Receiving Office
- EP · EP
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2021-12-22
- Filing Date
- 2022-12-15
- Publication Date
- 2024-10-30
Smart Images

Figure 1.1
Abstract
Description
[0001] Description
[0002] Method and system for charging an electrical energy storage device of a vehicle
[0003] The invention relates to a method for charging an electrical energy storage device of a vehicle, in which a control device of the vehicle communicates with an infrastructure device. The infrastructure device informs the control device of the vehicle of the availability of a charging station. The charging station is designed to charge the electrical energy storage device of the vehicle, and the vehicle travels autonomously to the charging station. Furthermore, the invention relates to a system for charging an electrical energy storage device of a vehicle.
[0004] US 2020 / 0198489 A1 describes an automated valet parking system, i.e., a system in which a driver parks their electric vehicle in a parking zone, with the electric vehicle then automatically or autonomously driving to a charging station. After wirelessly charging the electric vehicle, the electric vehicle first drives to a free parking space and then to a pickup area, where the driver picks up the electric vehicle.
[0005] Furthermore, US 8 717 170 B1 describes a method for managing a queue of electric vehicles at a charging station.
[0006] The general problem is that, due to the increasing number of electric vehicles, more and more charging stations are needed. When electric vehicle drivers approach or drive to such charging stations and then use them to charge their electric vehicle's energy storage system, it often happens that the fully charged vehicles block the charging station after a charging session is complete. This is because the drivers or vehicle owners often do not remove the vehicles immediately after the charging session is completed.
[0007] Such problems can be addressed if the vehicle can travel to the charging station autonomously, i.e., without the intervention of the vehicle's driver, and can then also release the charging station autonomously. The object of the present invention is to create a method of the type mentioned above that ensures a particularly smooth process when using the charging station, and to provide a corresponding system for implementing the method.
[0008] This object is achieved by a method having the features of patent claim 1 and by a system having the features of patent claim 10. Advantageous embodiments with expedient further developments of the invention are specified in the dependent patent claims and in the following description.
[0009] In the method according to the invention for charging an electrical energy storage device of a vehicle, a control device of the vehicle communicates with an infrastructure device. The infrastructure device informs the control device of the vehicle of the availability of a charging station. The charging station is designed to charge the electrical energy storage device of the vehicle. Furthermore, the vehicle goes autonomously to the charging station. In the method, a control device of at least one further vehicle transmits a message to the infrastructure device according to which an electrical energy storage device of the at least one further vehicle is to be charged. The message therefore contains the content that the electrical energy storage device of the at least one further vehicle should be charged or that there is a need or desire to charge the electrical energy storage device of the at least one further vehicle.The infrastructure facility establishes a charging sequence for the vehicles' electrical energy storage devices. The vehicle and at least one other vehicle travel autonomously to the charging station one after the other according to this sequence.
[0010] This ensures a particularly smooth process when using the charging station. Because the charging sequence for the vehicles' electrical energy storage units is determined, the need to charge the electrical energy storage unit of each vehicle can be easily accommodated.
[0011] In addition, the vehicle and at least one other vehicle have the ability to travel to the charging station or approach the charging station autonomously, i.e., without the intervention of the respective vehicle's driver, and to release the charging station again autonomously after use. This prevents the charging station from being blocked by the respective vehicle for an unnecessarily long time. Because of the respective vehicle's autonomous driving capability, a driver of the vehicle is not required to release the charging station after use. This also contributes to the smooth operation of the charging station.
[0012] When determining the sequence, the infrastructure facility preferably takes into account the charge level of the respective energy storage device. This can ensure, for example, that the electrical energy storage device of the vehicle whose charge level is lower than the charge level of the electrical energy storage device of another vehicle communicating with the infrastructure facility is charged at the charging station. This is advantageous with regard to a long range of the respective vehicle after charging the electrical energy storage device.
[0013] Additionally or alternatively, when determining the sequence, the infrastructure facility can consider at least one parameter other than the state of charge of the respective energy storage device, wherein the at least one parameter indicates the urgency of charging the respective energy storage device. By taking the at least one parameter indicating the urgency of charging into account when determining the sequence, it can be ensured that circumstances relating to the respective vehicle or the driver's wishes are taken into account very comprehensively when determining the sequence. This allows the needs of users of the respective vehicle to be particularly well taken into account.
[0014] It can be provided that, for determining the order, the state of charge of the respective energy storage device and the at least one parameter indicating the urgency are taken into account differently or with equal priority, for example by a correspondingly different or similar weighting of the state of charge and the at least one parameter.
[0015] In particular, when sorting or pre-sorting vehicles, the charge level of the respective energy storage device and the parameter indicating urgency can be taken into account in the same way. This ensures that these factors are appropriately considered by the infrastructure facility when determining the order.
[0016] Furthermore, it can be provided that when determining the sequence, the infrastructure facility considers at least one parameter indicating urgency prior to the charge level of the respective energy storage device. This ensures that vehicles that are particularly urgently needed by the respective user can use the charging station with priority, even if another vehicle would be given priority when determining the sequence based solely on the charge level of the respective energy storage device. This is useful for ensuring rapid availability of vehicles urgently needed by the respective user and is particularly advantageous when there are only comparatively small differences in the charge levels of the respective energy storage devices of the vehicles.
[0017] Preferably, the at least one parameter indicating the urgency comprises a period of time during which the respective vehicle is to be parked in a parking space, from which the respective vehicle can travel to the charging station autonomously or autonomously. This is because if the duration of such a planned parking session is comparatively short, less time is available to use the charging station to charge the electrical energy storage device than in a situation in which the vehicle is to be parked in the parking space for a longer period of time. This makes it very easy to ensure that the charging station is actually used to charge the electrical energy storage device of the respective vehicle within the duration of the respective parking session. This makes the method particularly effective and efficient.
[0018] Additionally or alternatively, the at least one parameter indicating the urgency can comprise a planned end of a period during which the respective vehicle is to be parked in a parking space, from which the respective vehicle can travel to the charging station autonomously or autonomously. If the infrastructure facility takes such a planned departure time of the vehicle into account when determining the sequence, it can be reliably ensured that at the time of the planned departure, i.e., following the parking process, the electrical energy storage device of the vehicle in question is more charged than before the vehicle was parked. This is particularly advantageous with regard to the usability of the vehicle and the available range.
[0019] Additionally or alternatively, the at least one parameter indicating urgency can include a specific purpose of the respective vehicle. This ensures that vehicles used for particularly important purposes, such as emergency vehicles of the police, fire department, rescue services, or emergency medical services, or the like, are given priority over conventional vehicles with regard to charging the vehicle's respective electrical energy storage system. This increases the availability of such vehicles used for particularly important purposes.
[0020] Additionally or alternatively, the at least one parameter indicating the urgency can include a charging period for which the control device of the respective vehicle has reserved use of the charging station. This can ensure that such reservations of charging periods or charging time windows are not ignored. This is particularly advantageous with regard to user satisfaction of the respective vehicles.
[0021] After completing the charging process of the respective energy storage device, the respective vehicle can leave the charging station autonomously. This ensures that a vehicle whose electrical energy storage device is fully charged does not continue to unnecessarily block the charging station.
[0022] Additionally or alternatively, it can be provided that after the specified time period for a parking session, the respective vehicle leaves the charging station autonomously. This ensures that the vehicle is available to the user again immediately after the parking session is completed. This is also advantageous if the electrical energy storage system of the respective vehicle is not yet fully charged at the time the parking session is completed.
[0023] If the charging process is terminated because the vehicle's electrical energy storage system is fully charged, but the parking session intended for the respective vehicle has not yet expired or ended, the vehicle leaving the charging station autonomously can drive itself to a free parking space. From this parking space, the vehicle can then autonomously drive to a pick-up point where the vehicle's user can pick up the vehicle again.
[0024] In particular, if the vehicle leaves the charging station autonomously after the parking period has elapsed, the vehicle can also directly drive autonomously or independently to the pick-up point, where the user can pick up the vehicle again. Preferably, the infrastructure device transmits a message to the control device of a subsequent vehicle in the sequence, according to which the subsequent vehicle in the sequence can proceed autonomously to the charging station. This ensures that the electrical energy storage devices of the vehicles are charged successively and in sequence at the charging station. Consequently, the charging station can be used particularly efficiently.
[0025] The vehicle's energy storage unit can be charged wirelessly at the charging station. This is particularly cost-effective, as it eliminates the need for a mechanical connection between the charging station's charging plug and the vehicle's charging port.
[0026] Additionally or alternatively, it can be provided that, in order to charge the energy storage device of the respective vehicle, a charging plug of the charging station is coupled to a charging port of the respective vehicle by means of an actuating device. The actuating device can be designed in the manner of a charging robot or the like, which handles the charging plug of the charging station and mechanically couples it to the charging port of the respective vehicle. This enables particularly largely automated charging of the electrical energy storage device, even in vehicles that are not designed for wireless charging of the energy storage device. This is accompanied by a very broad usability of the charging station.
[0027] Additionally or alternatively, to charge the energy storage device of the respective vehicle, an operator can manually connect a charging plug from the charging station to a charging port on the respective vehicle. This is particularly easy to implement, especially because it eliminates the need for a charging robot or similar device. Furthermore, the operator does not need to worry about the vehicles whose energy storage devices are to be charged approaching the charging station or traveling to and leaving the charging station after charging. This is because the vehicles can preferably accomplish this autonomously.
[0028] The system according to the invention for charging an electrical energy storage device of a vehicle comprises an infrastructure device which is designed to communicate with a control device of the vehicle. The infrastructure device is further designed to inform the control device of the vehicle of the availability of a charging station, wherein the charging station is designed to charge the electrical energy storage device of the vehicle. The vehicle is designed to travel autonomously to the charging station. The infrastructure device is designed to receive a message from a control device of at least one further vehicle according to which message an electrical energy storage device of the at least one further vehicle is to be charged. Furthermore, the infrastructure device is designed to determine a charging sequence for the electrical energy storage devices of the vehicles.The vehicle and the at least one further vehicle are designed to travel to the charging station one after the other in accordance with this sequence, either autonomously or driving autonomously.
[0029] Such a system, which is designed to carry out the method according to the invention or an advantageous embodiment thereof, enables a particularly smooth process when using the charging station.
[0030] The advantages and preferred embodiments described for the method according to the invention also apply to the system according to the invention and vice versa.
[0031] The invention therefore also includes further developments of the system according to the invention that have features already described in connection with the further developments of the method according to the invention. For this reason, the corresponding further developments of the system according to the invention are not described again here.
[0032] The invention also includes combinations of the features of the described embodiments.
[0033] Exemplary embodiments of the invention are described below. Shown are:
[0034] Fig. 1 shows a schematic representation of a valet parking system with automated charging processes for electrical energy storage devices of vehicles, whereby the respective vehicle autonomously approaches a charging station and then leaves the charging station autonomously; and
[0035] Fig. 2 schematically shows one of the vehicles shown in Fig. 1.
[0036] The exemplary embodiments explained below are preferred exemplary embodiments of the invention. In the exemplary embodiments, the described components each represent individual, independently considered features of the invention, which also further develop the invention independently of one another and are thus also to be considered as components of the invention, either individually or in a combination other than that shown. Furthermore, the described exemplary embodiments can also be supplemented by further features of the invention already described.
[0037] In the figures, functionally identical elements are provided with the same reference numerals.
[0038] A method for charging an electrical energy storage device 10 of a vehicle 12 will be explained with reference to Fig. 1. The vehicle 12 can accordingly be designed, for example, as an electric vehicle or a hybrid vehicle. In such a vehicle 12, the electrical energy storage device 10 supplies at least one electric drive motor (not shown) of the vehicle 12 with electrical energy, which is designed to propel the vehicle 12 or at least to assist the propulsion of the vehicle 12.
[0039] If a driver of such a vehicle 12 approaches a freely accessible charging station or charging column, it may happen that the driver leaves the vehicle 12 at the charging column after completing the charging process, even if the electrical energy storage device 10 of the vehicle 12 is fully charged. This is disadvantageous because users of other vehicles with electrical energy storage devices cannot use the charging column because the charging column is blocked. This situation is avoided here.
[0040] This is because vehicle 12 is configured to perform an automated parking process and an automated charging process. Automated parking of vehicles is also referred to as automated valet parking. Just as with non-autonomous vehicles, the vehicle can be handed over to a "valet" (valet = attendant, operator), who then takes care of parking the vehicle, such a process can also be performed automatically.
[0041] Such a situation of charging, particularly automated charging, in an automated valet parking facility is schematically illustrated in Fig. 1. The automated valet parking facility can be carried out in a parking area 14 shown schematically in Fig. 1 and / or in a parking garage or the like.
[0042] A control device 16 of the vehicle 12 (see Fig. 2) can communicate with an infrastructure device 18 when carrying out the method. A corresponding, bidirectionally usable communication path 20 is schematically indicated in Fig. 1. In particular, this communication path 20 can be used according to an infrastructure-to-vehicle standard (infrastructure-to-vehicle) or I2V standard, i.e., according to a vehicle-to-X communication standard.
[0043] The infrastructure facility 18 can, as shown here by way of example, be associated with a charging station 22, which is designed to charge the electrical energy storage device 10 of the vehicle 12. However, the infrastructure facility 18 can also be designed as a separate unit from the charging station 22. Furthermore, the charging station 22 can be designed as the infrastructure facility 18, or in other words, the infrastructure facility 18 can be provided by the charging station 22.
[0044] In the method, a driver (not shown) can, for example, first drive the vehicle 12 to a transfer station 24, which, according to Fig. 1, can have a plurality of parking spaces 26. When the vehicle 12 is located at the transfer station 24 or similar transfer point, the control device 16 of the vehicle 12 can, in particular at the request of the driver of the vehicle 12, transmit a message to the infrastructure device 18, according to which the driver of the vehicle 12 wishes to park the vehicle 12 in the parking area 14. Furthermore, the message can contain the content that the electrical energy storage device 10 of the vehicle 12 is to be charged. In this way, the infrastructure device 18 can be granted approval for automated valet parking and the preferably automated charging of the electrical energy storage device 10 of the vehicle 12.
[0045] After receiving a message 28 transmitted to the control device 16 from the infrastructure device 18, an autonomous driving device (not shown) of the vehicle 12 can set the vehicle 12 in motion and ensure that the vehicle 12 travels autonomously to the charging station 22. The message 28 transmitted to the control device 16 of the vehicle 12 can indicate that the charging station 22 is available, i.e., that the charging station 22 can be used to charge the electrical energy storage device 10 of the vehicle 12.
[0046] In the present case, the situation should be considered that, in addition to the vehicle 12 or first vehicle 12, at least one further vehicle 30 also intends to use the charging station 22. Accordingly, a control device 32 of the further vehicle 30 can transmit a message 34 to the infrastructure device 18, which contains the content that an electrical energy storage device 40 of the further vehicle 30 is to be charged or is to be charged. Consequently, the vehicle 12 or first vehicle 12 and the further vehicle 30 or second vehicle 30 compete for a charging space 42 at the charging station 22.
[0047] From Fig. 1 it can also be seen that, in an analogous manner, other vehicles 36 located on the parking area 14 can also compete with the vehicle 12 or first vehicle 12 and the further vehicle 30 or second vehicle 30 for a parking space at the charging station 22 or at one of the further charging stations 38 shown in Fig. 1. These other vehicles 36 can thus also be referred to as further vehicles 30, 36 in relation to the vehicle 12 or first vehicle 12.
[0048] The other vehicles 36 shown in Fig. 1 have, in a manner analogous to the first vehicle 12 and the second vehicle 30, a respective electrical energy storage device 40 and a respective control device 32 which, as explained for the control device 16 of the first vehicle 12, is designed to communicate with the infrastructure device 18.
[0049] In the present case, the infrastructure facility 18 ensures an orderly charging of the energy storage devices 10, 40 of the respective vehicles 12, 30, 36. The infrastructure facility 18 establishes a sequence according to which or in accordance with which the vehicles 12, 30, 36, in the present case the vehicle 12 and the at least one further vehicle 30, 36, each travel autonomously to the charging station 22 (or one of the other charging stations 38) one after the other.
[0050] The sequence determined by the infrastructure facility 18 can, for example, be recorded in a list, which can be stored in a data storage device (not shown) of the infrastructure facility 18. The vehicles 12, 30, 36 can thus be entered into such a list according to the temporal sequence to be observed for charging the respective electrical energy storage device 10, 40 and thus pre-sorted.
[0051] To determine the sequence, the vehicles 12, 30, 36 can report the respective charge level of the respective electrical energy storage device 10, 40 to the infrastructure facility 18 upon entering the parking garage or onto the parking area or upon reaching the parking area 14 shown as an example in Fig. 1. Preferably, the control device 16, 32 of the respective vehicles 12, 30, 36 additionally transmits parameters different from the charge level of the respective energy storage device 10, 40 to the infrastructure facility 18, wherein these parameters indicate the urgency of charging the respective energy storage device 10, 40.
[0052] Consequently, when creating the list or when determining the order, the infrastructure device 18 can take into account both the state of charge of the respective energy storage device 10, 40 and at least one further parameter indicating the urgency of charging the respective energy storage device 10, 40.
[0053] The infrastructure device 18 can take into account a variety of circumstances as parameters indicating the urgency of charging the respective energy storage device 10, 40, which are different from the state of charge of the respective energy storage device 10, 40.
[0054] For example, the parking duration of the respective vehicle 12, 30, 36 can be taken into account when determining the order. Accordingly, the parameter indicating the urgency can include a period of time during which the respective vehicle 12, 30, 36 is to be parked in the parking space 14.
[0055] Furthermore, a departure time preset in the respective vehicle 12, 30, 36 can be taken into account for determining the sequence of the infrastructure facility 18. Thus, the parameter indicating the urgency can also include a planned end of the period during which the respective vehicle 12, 30, 36 is to be parked in the parking area 14.
[0056] Furthermore, it can be considered whether one of the vehicles 12, 30, 36 is an emergency vehicle or something similar whose availability is of particularly high importance. Consequently, the parameter indicating the urgency can also include the intended use of the respective vehicle 12, 30, 36.
[0057] Additionally or alternatively, it can be taken into account whether the control device 16, 32 of one of the vehicles 12, 30, 36 has reserved a specific charging period or charging slot, i.e., a time window or a period of time, defined in particular by a start time and an end time, during which the charging station 22 is to be used to charge the respective electrical energy storage device 10, 40 of the respective vehicle 12, 30, 36. However, the infrastructure device 18 can also take into account other or further parameters indicating the urgency of charging the respective electrical energy storage device 10, 40 when determining the sequence.
[0058] Preferably, the vehicles 12, 30, 36 each receive the message 28 that the loading location 42 has become available, according to the order determined by the infrastructure facility 18, for example, according to their position on the list. Furthermore, the message 28 can contain a precise route to the respective loading location 42.
[0059] The autonomous driving device of the respective vehicle 12, 30, 36, i.e. according to Fig. 1, for example, the autonomous driving device of the first vehicle 12, then follows the predetermined route autonomously to the respective charging point 42. In Fig. 1, an arrow 44 illustrates that the vehicle 12 or first vehicle 12 travels autonomously along this route to the charging point 42 which the further vehicle 30 or second vehicle 30 has previously vacated at the charging station 22.
[0060] For example, the additional vehicle 30 can release the charging station 42 after the electrical energy storage device 40 of the additional vehicle 30 has been charged, in particular fully charged. Therefore, the electrical energy storage device 10 of the first vehicle 12 is subsequently charged at the charging station 42 by the charging station 22.
[0061] If the electrical energy storage device 10 of the vehicle 12 can be charged wirelessly at the charging station 22, a charging plug 46 of the charging station 22 does not need to be mechanically coupled to a charging port 48 (see Fig. 2) of the vehicle 12.
[0062] However, it may additionally or alternatively be provided that the charging plug 46 of the charging station 22 is manually coupled to the charging port 48 of the respective vehicle 12, 30, 36 by an operator (not shown).
[0063] Furthermore, the respective charging station 22, 38 can have a charging robot or similar actuating device 50, or such an actuating device 50 can be assigned to the respective charging station 22, 38 or to a plurality of charging stations 22, 38. For reasons of clarity, the actuating device 50 is only schematically indicated in Fig. 1 for some of the charging stations 22, 38. The mechanical coupling of the charging plug 46 to the charging port 48 of the respective vehicle 12, 30, 36 can also be carried out automatically using such an actuating device 50.
[0064] A locking device (not shown in detail here) of the charging port 48 can be released, for example, by the control device 16 of the vehicle 12 when the vehicle 12 has approached the charging column or charging station 22 and is located, for example, at the charging station 22 on the charging bay 42. Thereafter, i.e., after such a locking device has been released or unlocked, the charging plug 46 can be coupled to the charging port 48. As already mentioned above, such coupling does not need to be performed if the vehicle 12 is designed for wireless charging of its electrical energy storage device 10.
[0065] The charging process is then started. Once the charging process is complete, the respective vehicle 12, 30, 36 can drive autonomously to another free parking space or parking area 52 in the parking area 14 until the parking process intended for the respective vehicle 12, 30, 36 is completed. This route, which may be driven autonomously by the additional vehicle 30, is illustrated in Fig. 1 by another arrow 54.
[0066] Furthermore, it is possible for the respective vehicle 12, 30, 36 to travel autonomously to a pick-up point 56 after the end of the charging process, where the driver of the respective vehicle 12, 30, 36 can pick up the vehicle 12, 30, 36 again. The corresponding autonomous route, for example, of the vehicle 30 to the pick-up point 56 is illustrated in Fig. 1 by a further arrow 58.
[0067] The respective vehicle 12, 30, 36 can also drive autonomously to the pick-up point 56 even without the charging process being completed, for example when the respective electrical energy storage device 10, 40 is not yet fully charged, where the driver can pick up or receive the respective vehicle 12, 30, 36 again.
[0068] As soon as, for example, the additional vehicle 30 has vacated the charging bay 42 at the charging station 22, i.e., has left the charging station 22 autonomously, the infrastructure device 18 can send the message 28 to the next vehicle 12 in the list or to the next vehicle 12 in the order such that, for example, the electrical energy storage device 10 of this vehicle 12 can be charged at the charging station 22. Accordingly, the next vehicle, i.e., the first vehicle 12 according to Fig. 1, can move up, and the electrical energy storage device 10 of this vehicle 12 can be charged at the charging station 22.
[0069] Overall, the examples show how the method described here or a corresponding system can improve automated charging in valet parking using infrastructure-to-vehicle technology or l2V technology.
[0070] List of reference symbols
[0071] Energy storage
[0072] vehicle
[0073] storage area
[0074] Control device
[0075] Infrastructure facility
[0076] Communication path
[0077] Charging station
[0078] transfer station
[0079] Parking space
[0080] News
[0081] vehicle
[0082] Control device
[0083] News
[0084] vehicle
[0085] Charging station
[0086] Energy storage
[0087] Loading area
[0088] Arrow
[0089] Charging plug
[0090] Charging port
[0091] Actuating device
[0092] parking
[0093] Arrow
[0094] Transfer point
Claims
Claims: A method for charging an electrical energy storage device (10) of a vehicle (12), wherein a control device (16) of the vehicle (12) communicates with an infrastructure device (18), the infrastructure device (18) informing the control device (16) of the availability of a charging station (22) configured for charging the electrical energy storage device (10) of the vehicle (12), and wherein the vehicle (12) autonomously goes to the charging station (22), characterized in that a control device (32) of at least one further vehicle (30, 36) transmits a message (34) to the infrastructure device (18) according to which an electrical energy storage device (40) of the at least one further vehicle (30, 36) is to be charged, the infrastructure device (18) determining a sequence for charging the electrical energy storage devices (40) of the vehicles (12, 30, 36).and wherein the vehicle (12) and the at least one other vehicle (30, 36) each proceed autonomously to the charging station (22) in sequential order. Method according to claim 1, characterized in that the infrastructure (18) takes into account a state of charge of the respective energy storage device (10, 40) when determining the order. Method according to any of the preceding claims, characterized in that the infrastructure (18) takes into account at least one parameter other than a state of charge of the respective energy storage device (10, 40) when determining the order, which indicates an urgency for charging the respective energy storage device (10, 40). Method according to claim 3, characterized in that the infrastructure (18) takes into account at least one parameter other than a state of charge of the respective energy storage device (10, 40) when determining the order. A parameter indicating urgency is given priority over the state of charge of the respective energy storage device (10, 40). A method according to claim 3 or 4, characterized in that the at least one parameter indicating urgency comprises a duration and / or a planned end to a duration during which the respective vehicle (12, 30, 36) is to be parked on a parking area (14) from which the respective vehicle (12, 30, 36) can autonomously proceed to the charging station (22). A method according to any one of claims 3 to 5, characterized in that the at least one parameter indicating urgency comprises an intended use of the respective vehicle (12, 30, 36).A method according to any one of claims 3 to 6, characterized in that the at least one parameter indicating urgency comprises a charging period for which the control unit (16, 32) of the respective vehicle (12, 30, 36) has reserved the use of the charging station (22). A method according to any one of the preceding claims, characterized in that after completion of a charging process of the respective energy storage device (10, 40) and / or after the expiry of a time period provided for a parking process of the respective vehicle (12, 30, 36), the respective vehicle (12, 30, 36) autonomously leaves the charging station (22), wherein the infrastructure device (18) transmits a message (28) to the control unit (16) of a subsequent vehicle (12) in sequence, according to which the subsequent vehicle (12) can autonomously proceed to the charging station (22).Method according to one of the preceding claims, characterized in that the energy storage device (10, 40) of the respective vehicle (12, 30, 36) is wirelessly charged at the charging station (22) and / or a charging plug (46) of the charging station (22) is used to charge the energy storage device (10, 40) of the respective vehicle (12, 30, 36) by means of a. - 18 - The system is coupled to a charging port (48) of the respective vehicle (12, 30, 36) by an operating device (50) and / or manually by an operator. It comprises a system for charging an electrical energy storage device (10) of a vehicle (12), with an infrastructure device (18) configured to communicate with a control device (16) of the vehicle (12), wherein the infrastructure device (18) is configured to inform the control device (16) of the vehicle (12) of the availability of a charging station (22) configured to charge the electrical energy storage device (10) of the vehicle (12), wherein the vehicle (12) is configured to autonomously proceed to the charging station (22), characterized in that the infrastructure device (18) is configured to receive a message from a control device (32) of at least one other vehicle (30, 36).according to which an electrical energy storage device (40) of at least one other vehicle (30, 36) is to be charged, wherein the infrastructure device (18) is configured to determine a sequence for charging the electrical energy storage devices (10, 40) of the vehicles (12, 30, 36), and wherein the vehicle (12) and the at least one other vehicle (30, 36) are configured to proceed autonomously to the charging station (22) one after the other in accordance with this sequence.