Beam with a pretensioning element and a slip agent and awning with such a beam
The beam profile with a prestressing element and sliding element addresses the issues of weight and thermal expansion in tie beams, ensuring stability and noise reduction, enabling smooth awning operation and wrinkle-free retraction.
Patent Information
- Application Number
- EP2023176475
- Authority / Receiving Office
- EP · EP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-31
- Publication Date
- 2024-12-04
AI Technical Summary
Existing tie beams for awnings are material-intensive, leading to high weight and large external dimensions, which affects their appearance and requires a stable construction, and they experience thermal expansions causing deformations and noise due to differing component expansions.
A beam profile with a chamber containing a prestressing element and a sliding element to compensate for deflection from the beam's own weight and tensile force, while preventing direct contact to avoid friction and noise, with the sliding element allowing for thermal expansion compensation.
The solution prevents bending and noise by aligning prestressing forces transversely to the beam's longitudinal direction, maintaining stability and smooth operation, and allows for wrinkle-free retraction of the awning fabric.
Smart Images

Figure IMGAF001_ABST
Abstract
Description
FIELD OF THE INVENTION
[0001] The present invention relates to a beam for an awning for holding and tensioning an awning fabric. Furthermore, the invention relates to an awning, in particular for a patio roof or a conservatory. TECHNICAL BACKGROUND
[0002] Tension beams are commonly used for awnings, where the tension beam tensions the awning when extended. For example, awnings are installed under a roof structure, particularly to support the roof infill to protect the awning from the elements.
[0003] The awning can be made of a soft material, such as fabric or plastic. The fabric can be stored rolled up in an awning box and attached to the tension beam. The awning fabric is tensioned by moving the tension beam away from the awning box. To tension the awning or secure it to the roof structure, it can also be guided along guide rails.
[0004] The tension beam must be designed to tension the awning fabric. It must also prevent the tension beam from sagging along its length, and the tension beam must be sufficiently stable. This is usually solved by dimensioning a beam profile accordingly. However, these are correspondingly material-intensive.
[0005] Overall, conventional tension beams are heavy and have large external dimensions, which make them visually prominent. This adversely affects the appearance of the awning. Furthermore, due to their high weight, a sufficiently stable construction of the guide rails and mounting hardware is necessary to ensure secure attachment and storage of the tension beam with the awning. Likewise, the various components of the tension beam can experience varying thermal expansion rates, which can cause deformation or noise upon heating. SUMMARY OF THE INVENTION
[0006] Against this background, the present invention is based on the object of providing an improved beam and an improved awning.
[0007] According to the invention, this object is achieved by a beam having the features of patent claim 1 and / or by an awning having the features of patent claim 9.
[0008] Accordingly, it is provided: A beam, in particular a tension beam for an awning for holding and tensioning an awning fabric, comprising: a beam profile having a chamber; a prestressing element which is mounted in the chamber and applies a prestress to the beam profile; and a sliding element for mounting the prestressing element in the chamber, wherein the sliding element in the chamber is contactable with the prestressing element and is designed to compensate for different thermal expansion between the prestressing element and the beam profile.An awning, comprising a tension beam and an awning fabric, wherein the awning fabric is mounted in a wall box and the tension beam is designed in an extended state to tension the awning fabric between the wall box and the tension beam, wherein the tension beam has a beam profile and a pre-tensioning element, wherein the pre-tensioning element is designed both to compensate for deflection due to the dead weight of the tension beam profile and to compensate for bending due to tensile force of the awning fabric, wherein at least one sliding element is arranged between the pre-tensioning element and the beam profile.
[0009] The finding underlying the present invention is that the resulting forces from the tensile force through the awning fabric and from the dead weight of the tension beam are directed in different directions, in particular transversely to each other.
[0010] The idea underlying the present invention is to provide a prestressing element as reinforcement of the beam profile, which is designed to compensate for deflection due to the dead weight of the beam profile as well as to compensate for bending due to the tensile force of an awning fabric accommodated in the holder, wherein a sliding element serves to compensate for different thermal expansion between the prestressing element and the beam profile.
[0011] This advantageously prevents beam deflection if the prestressing element expands at a different rate than the beam profile. Furthermore, noise generated by the resulting tension forces can be avoided, thus preventing unpleasant cracking noises and similar effects.
[0012] According to the invention, the prestressing element can apply a prestress across the surface of the beam profile, in particular through surface contact between the prestressing element and the beam profile. In particular, the surface contact can be designed differently along the length of the beam profile, so that prestressing forces of different magnitudes arise along the length of the beam profile. The prestressing forces are aligned in particular transversely to the longitudinal direction of the prestressing element. As a result, the prestressing forces can be implemented as compressive forces of varying strengths at different contact points between the prestressing element and the beam profile. The sliding element is provided in this surface contact, so that there is no direct contact between the prestressing element and the beam profile. The prestressing element can therefore be mounted in the beam profile in a quasi-floating manner.
[0013] The sliding element can only be arranged in the area of force transmission between the prestressing element and the beam profile. This prevents frictional forces between the prestressing element and the beam profile in the event of expansion of one of the elements.
[0014] In particular, the pre-tensioning should be designed in such a way that any bending caused by the tensile force from the awning fabric's own weight can be compensated for in the extended state, so that the beam profile remains essentially deflection-free in the extended state of the awning. In addition, the sliding element can prevent deflection during heating or cooling.
[0015] Furthermore, this advantageously makes it possible to roll up the awning fabric wrinkle-free into the awning box when the awning is retracted, i.e., when the tension bar is moved toward the awning box. By preventing the tension bar from bending toward the awning box and thus preventing the awning from sagging, the awning can be rolled up virtually wrinkle-free during the retraction process.
[0016] The beam profile can have various designs, with the beam profile serving primarily for the static design of the tension beam. The beam profile has a holder for the awning fabric, which can be shaped like a hook that runs the entire length of the beam profile and into which the awning fabric is hooked.
[0017] The chamber allows a force to be exerted particularly advantageously transversely to the longitudinal direction of the beam profile. Therefore, the prestressing element is not designed as a tensioning element in the form of a steel cable that exerts the prestressing force in the longitudinal direction of the cable. Instead, the prestressing element is designed as a flat prestressing element that can generate a prestressing force on the beam element transversely to the longitudinal direction of the prestressing element through contact with the beam element.
[0018] The chamber can be inclined with respect to a horizontal and a vertical plane in the assembled state, wherein the planes run through a longitudinal direction of the beam profile. The chamber can in particular be inclined such that the chamber is aligned in the direction of a force resulting from the dead weight and the tensile force of the awning fabric. If the pre-tensioning element is now supported on the chamber, a pre-tensioning force can be transmitted to the chamber and thus to the beam element. In particular, the force is transmitted via a side surface of the chamber, on each of which a sliding element is arranged. The chamber preferably has a flat side which serves as a contact surface for transmitting the pre-tensioning force and is designed as a bearing surface for the sliding element. The flat side, in particular referred to as the second side section, is preferably aligned transversely to the direction of the pre-tensioning force.In particular, the chamber has a cross-sectional shape that has two opposite flat sides so that a preload force can be transmitted in two directions.
[0019] The awning is designed especially for a patio roof or a winter garden.
[0020] Advantageous embodiments and further developments emerge from the further subclaims and from the description with reference to the figures of the drawing.
[0021] According to an advantageous embodiment, the chamber can extend in the longitudinal direction of the beam profile, wherein the chamber has at least one pocket which is aligned in the longitudinal direction and in which the sliding element can be received. This allows the sliding element to be held in the desired position before the prestressing element is introduced. Even during force transmission between the prestressing element and the beam profile, the sliding element can be held in the desired position in order to enable the prestressing element to slide relative to the beam profile. Slipping of the sliding element can thus be prevented. The pocket is therefore designed to be open in such a way that direct contact between the sliding element and the prestressing element is still possible.
[0022] According to an advantageous embodiment, the chamber can have two opposing pockets, each of which can accommodate a sliding element. This allows the prestressing element to be mounted on two opposite sides, where it can transmit forces to the beam profile, via the sliding element. In particular, the force is transmitted via a side surface of the chamber, on each of which a sliding element is arranged. The pockets are therefore preferably provided on these side surfaces. The pockets are designed to be open in such a way that direct contact between each sliding element and the prestressing element is still possible.
[0023] The prestressing element can advantageously be designed as a flat steel rail. In particular, a force can be transmitted to the chamber, in particular via the sliding element, via a short side edge of the cross-section of the flat steel rail. This is achieved in particular by the flat steel rail being rigid in the direction of the prestressing force, so that the prestressing force can be transmitted via the short side edge. The prestressing force is built up via a long side edge of the cross-section, with the long side running in particular parallel to the direction of the prestressing force. The short side edge of the flat steel rail can be in contact with the flat side of the chamber in order to transmit the prestressing force.
[0024] According to a particularly preferred embodiment, the chamber can have a rectangular cross-section, with the at least one pocket being formed on a short side of the rectangular shape. The pocket can therefore be formed as a partial region of the chamber, with the partial region maintaining an open connection to the chamber, so that direct contact between the sliding element and the preloading element remains possible.
[0025] According to an advantageous embodiment, the at least one pocket can be formed by at least one projection, which projection allows the sliding element to be held in the pocket. This allows the sliding element to abut against the projection as a kind of stop and thus be held in position. For example, two projections can be provided, with one projection projecting on each side of the chamber.
[0026] According to a further development, the sliding element can have a length that is adaptable to the length of the beam profile. Thus, the beam profile and the sliding element can have the same length. For example, the sliding element can also be pre-assembled or attached to the pre-tensioning element or to the beam profile.
[0027] According to one embodiment, the sliding element can be used to create a floating bearing between the prestressing element and the beam profile. This prevents frictional forces between the beam profile and the prestressing element, thus preventing noise generation. Furthermore, deflection due to differential thermal expansion can be prevented, as free movement of the prestressing element along the beam profile is enabled.
[0028] According to one embodiment, the beam profile can be an extruded profile, and the chamber and the pockets or projections can be formed as part of the extruded profile. This allows a one-piece beam profile to be produced that already includes the chamber.
[0029] According to one embodiment, direct contact between the prestressing element and the beam profile can be prevented by the sliding element, so that noise generation due to contact of the prestressing element with the beam profile can be prevented.
[0030] In an advantageous embodiment of the awning, the pre-tensioning element, by being supported on the beam profile, can exert a resulting pre-tensioning force on the beam profile, counter to its own weight and counter to the tensile force. The pre-tensioning force is oriented substantially transversely to a longitudinal direction of the beam profile, and the pre-tensioning element is mounted in the beam profile in a floating manner in the longitudinal direction by the sliding element. The same advantages apply to the awning as described for the beam.
[0031] The above embodiments and further developments can be combined with one another as desired, where appropriate. Further possible embodiments, further developments, and implementations of the invention also include combinations of features of the invention not explicitly mentioned above or described below with regard to the exemplary embodiments. In particular, those skilled in the art will also add individual aspects as improvements or additions to the respective basic form of the present invention. TABLE OF CONTENTS OF THE DRAWING
[0032] The present invention will be explained in more detail below with reference to the exemplary embodiments shown in the schematic figures of the drawing. In the drawings: Fig. 1 shows an embodiment of an awning; Fig. 2 shows a sectional view through a beam profile with a pre-tensioning element; Fig. 3 shows a sectional view through a beam profile with a pre-tensioning element; Fig. 4 shows a side view of a pre-tensioning element; Fig. 5 shows a side view of different tension beams in different states of deformation; Fig. 6 shows a pre-tensioning element with an auxiliary tool; Fig. 7 shows a pre-tensioning element with an auxiliary tool; Fig. 8 shows a pre-tensioning element with an auxiliary tool; Fig. 9 shows a sectional view through a beam profile with a pre-tensioning element and sliding elements.
[0033] The accompanying drawing figures are intended to provide a further understanding of embodiments of the invention. They illustrate embodiments and, in conjunction with the description, serve to explain principles and concepts of the invention. Other embodiments and many of the noted advantages will become apparent upon review of the drawings. Elements of the drawings are not necessarily shown to scale relative to one another.
[0034] In the figures of the drawing, identical, functionally identical and acting elements, features and components are provided with the same reference symbols, unless otherwise stated. DESCRIPTION OF EMBODIMENTS
[0035] Fig. 1shows an embodiment of an awning 2. The awning 2 has an awning fabric 3 that can be stretched between a tension beam 1 and a wall box 11. This creates different tensile forces 1 from the awning fabric 3. The tensile forces M1 are greatest in the middle area of the tension beam 1, so that in this area the tension beam 1 is deflected the most by the awning fabric 3 in the plane E1 and against the direction R1. Furthermore, the tension beam 1 has a dead weight E, so that the tension beam 1 experiences deflection in the plane E2 in the direction R2. This deflection in the different planes E1, E2 or directions R1, R2 can be prevented with the proposed devices and methods. The tension beam 1 is also guided in guide rails 14, so that the awning fabric 3 can be extended and retracted over a desired distance.
[0036] Fig. 2shows a sectional view through a beam profile 4 with a prestressing element 5. The beam profile 4 has a receptacle 13 for fastening the awning fabric 3. A chamber 6 is integrated into the beam profile 4, which is inclined at an angle of incidence 12. The angle of incidence 12 is aligned with respect to the horizontal plane, wherein the horizontal plane E1 runs in the direction R1. The chamber 6 is formed over almost the entire height of the beam profile 4 and, in particular, has a rectangular cross-section. The chamber 6 has two side surfaces 7a, 7b, which are arranged opposite one another in the chamber 6. A prestressing element 5, which is arranged in the chamber 6, is supported against these side surfaces 7a, 7b. As a result, a prestressing force can be transmitted from the prestressing element 5 via the side surfaces 7a, 7b to the beam element 4. The prestressing force is directed in the direction of the chamber 6, i.e.in the direction that describes the angle of attack 12. This allows a resulting counterforce to be built up that is directed against the counterweight E of the tension beam 1 and against the tensile force M1 from the awning fabric 3.
[0037] Fig. 3 shows a further sectional view through a beam profile 4 with a prestressing element 5. Here, the prestressing forces V1, V2 are shown. These are formed from a contact between the prestressing element 5 and the chamber 6, in particular a contact between the short side edge of the prestressing element 6 and second side sections 16 of the chamber 6. On each of the first side sections 15 of the chamber 6, a bulge 9 is formed, so that a mounting opening 10 results in the chamber 6. Through this mounting opening 10, an auxiliary tool (shown in Fig. 6 ) to retract the preloading element 5 into the chamber 6.
[0038] Fig. 4shows a side view of a prestressing element 5. In this side view, the arched shape or curvature can be seen. While the cross-section of the prestressing element 5 can have a constant cross-sectional shape over its entire length, i.e. in the longitudinal direction 8, the prestressing element 5 itself is curved. This means that a camber is formed. The camber can be described by a partial circle shape, which depends on a radius r. In this embodiment, a camber d is greatest in the central region of the prestressing element 5. The camber d can, for example, be 0.5 mm to 40 mm. The camber d can also be 0.5 mm to 30 mm, in particular 1 mm to 30 mm. In a preferred embodiment, the camber d can be 0.5 mm or 2 mm. The values depend on the length of the prestressing element 5.The prestressing element 5 can, for example, have a length of 3 m to 10 m, in particular 5 m to 7 m, in particular 6 m.
[0039] Fig. 5shows a side view of different tension beams 1 in different states of deformation. In the top illustration, the tension beam 1 is shown with an upward deflection, which is exerted by the prestressing force V2. This is the case if the tension beam 1 were viewed without its own weight. If the dead weight E is applied, the tension beam 1 is present without excess camber, as shown in the second illustration. Consequently, the prestressing can prevent deflection due to a dead weight E. The third illustration, seen from above, shows a tension beam 1 which, due to a prestressing V1, experiences a deflection in the direction of plane E1, which represents the plane of the awning fabric 3. If the awning is now extended, the tensile force M1 from the awning fabric 3 acts on the tension beam 1.However, due to the preload V1, deflection of the tension beam 1 can be prevented, so that the tension beam 1 is present without deformation. A spring force F is shown at the outer ends of the tension beam, which describes the force when the awning is extended along the guide rails 14, see . Figure 1 .
[0040] Fig. 6 shows a preload element 5 with an auxiliary tool 21, wherein the auxiliary tool 21 is inserted into the preload element 5 to grip it. The auxiliary tool 21 comprises a shaft 25 with a head region 22. The head region can be coupled to the preload element 5. This can be achieved by forming a projection 24 on the head region 22, which is inserted into an undercut 23 of the preload element 5.
[0041] Fig. 7shows a pre-tensioning element 5 with an auxiliary tool 21, wherein the auxiliary tool 21 is coupled to the pre-tensioning element 5. To grip the pre-tensioning element 5 with the auxiliary tool 21, the auxiliary tool 21, in particular the shaft 25, is rotated by 90° so that the projection 24 engages with the undercut 23. If the auxiliary tool 21 is now moved counter to the longitudinal direction 8 of the pre-tensioning element 5, the pre-tensioning element 5 can be drawn or pressed into the chamber 6 of the beam profile 4. For this purpose, the pre-tensioning element 5 has rounded corner regions to facilitate threading into the chamber 6. Furthermore, the projection 24 has rounded corner regions to facilitate threading of the auxiliary tool 21 into the undercut 23.
[0042] Fig. 8shows a further representation of the pre-tensioning element 5 with the auxiliary tool 21, wherein in the representation (a) there is no anchoring yet, and in the representation (b) by rotation of the auxiliary tool 21 there is an anchoring of the auxiliary tool 21 with the pre-tensioning element 5. By the Figures 6 to 8 The assembly method can be described with which a prestressing element 5, which for example has a shape as in Figure 4 can be drawn into a chamber 6, which, for example, as shown in the Figures 2 and 3 is formed.
[0043] Fig. 9shows a sectional view through a beam profile 4 with a prestressing element 5 and sliding elements 17. The sliding elements 17 serve to mount the prestressing element 5 in the chamber 6, wherein each of the sliding elements 17 in the chamber 6 is in contact with the prestressing element 5. This makes it possible to compensate for different thermal expansion between the prestressing element 5 and the beam profile 4. The chamber 6 can, in particular in the two second side sections 16, each have a pocket 18 into which a sliding element 17 can be inserted. The pocket 18 can be formed by a projection 19 which projects from the chamber 6 on an inner side. The projection 19 can simultaneously serve to mount the prestressing element 5 at a distance from the two first side sections 15.For this purpose, further projections 20 can be provided on the first side sections 15 of the chamber 6 in order to hold the prestressing element 5 centrally in the chamber 6 over the entire length of the chamber 6. The projections 20 can further ensure that only prestressing forces V1, V2 are transmitted to the second side sections 16, and the prestressing element 5 does not warp in the chamber 6.
[0044] Although the present invention has been fully described above using preferred embodiments, it is not limited thereto, but can be modified in a variety of ways. In particular, the chamber 6 can be oriented at an angle of incidence 12 in the beam profile 4 that differs from the illustrations. List of reference symbols
[0045] 1 Tension beam 2 Awning 3 Awning fabric 4 Beam profile 5 Pre-tensioning element 6 Chamber 7 Side surface 8 Longitudinal direction 9 Curvature 10 Auxiliary installation opening 11 Wall box 12 Angle of attack 13 Mounting 14 Guide rails 15 First side sections 16 Second side sections 17 Sliding element 18 Pocket 19 Projection 20 Projection 21 Auxiliary tool 22 Head area 23 Undercut 24 Projection 25 Shaft R1Spatial direction R2Spatial direction R3Longitudinal direction E1horizontal plane E2vertical plane V1Pre-tension force V2Pre-tension force M1Tensile force of awning fabric EEtight weight of tension beam FFeel force rRadius dCamber
Claims
1. Beam, in particular tension beam (1) for an awning (2) for holding and tensioning an awning fabric (3), with: a beam profile (4) which has a chamber (6); a prestressing element (5) which is mounted in the chamber and applies a prestress to the beam profile; and a sliding element (17) for mounting the prestressing element (5) in the chamber, wherein the sliding element (17) in the chamber (6) is contactable with the prestressing element (5) and is designed to compensate for different thermal expansion between the prestressing element (5) and the beam profile (4).
2. Beam according to claim 1, characterized by that the chamber (6) extends in the longitudinal direction (R3) of the beam profile (4), wherein the chamber (6) has at least one pocket (18) which is aligned in the longitudinal direction (R3) and in which the sliding element (17) can be received.
3. Beam according to claim 1, characterized by thatthe chamber (6) has two opposite pockets (18), in each of which a sliding element (17) can be received.
4. Beam according to claim 2 or 3, characterized by that the chamber (6) has a rectangular shape in cross-section, wherein the at least one pocket (18) is formed on a short side of the rectangular shape.
5. Beam according to one of claims 2 to 4, characterized by that the at least one pocket (18) is formed by at least one projection (19), wherein the sliding element (17) can be held in the pocket (18) by the projection (19).
6. Beam according to one of the preceding claims, characterized by that the sliding element (17) has a length that can be adapted to a length of the beam profile (4).
7. Beam according to claim 6, characterized by that by means of the sliding element (17) a floating bearing can be formed between the prestressing element (5) and the beam profile (4).
8. Beam according to one of claims 6 or 7, characterized by that direct contact between the prestressing element (5) and the beam profile (4) can be prevented by the sliding element (17), so that noise development due to contact of the prestressing element (5) with the beam profile (4) can be prevented.
9. Awning (2) comprising a tension beam (1) and an awning fabric (3), wherein the awning fabric (3) is mounted in a wall box (11) and the tension beam (1), in an extended state, is designed to tension the awning fabric (3) between the wall box (11) and the tension beam (3), wherein the tension beam (3) has a beam profile (4) and a pre-tensioning element (5), wherein the pre-tensioning element (5) is designed both to compensate for deflection due to the dead weight (E) of the tension beam profile (4) and to compensate for bending due to tensile force (M1) of the awning fabric (3), wherein at least one sliding element (17) according to one of the preceding claims is arranged between the pre-tensioning element (5) and the beam profile (4).
10. Awning (2) according to claim 9, characterized by thatthe prestressing element (5) applies a resulting prestressing force (V1, V2) to the beam profile (4) by being supported on the beam profile (4) against its own weight (E) and against the tensile force (M1), wherein the prestressing force (V1, V2) is oriented substantially transversely to a longitudinal direction (R3) of the beam profile (4), and wherein the prestressing element (5) is mounted in the beam profile (4) in a floating manner in the longitudinal direction (R3) by the sliding element (17).
Citation Information
Patent Citations
Articulated awning with push rod
EP3508664A1
Improvements in or relating to awnings, sun blinds and the like
GB643624A