Assembly method for assembling a waterproof and thermally insulating tank wall

A temporary positioning element aids in accurately placing studs within hidden anchoring systems by creating a deformation in the strake, simplifying the assembly of waterproof and thermally insulating tank walls.

FR3140614B1Active Publication Date: 2024-10-25GAZTRANSPORT & TECHNIGAZ SA
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
FR2022010393
Authority / Receiving Office
FR · FR
Patent Type
Patents
Current Assignee / Owner
Filing Date
2022-10-11
Publication Date
2024-10-25
Estimated Expiration
2042-10-11

AI Technical Summary

Technical Problem

Existing assembly methods for waterproof and thermally insulating tank walls face difficulties in accurately positioning studs due to hidden anchoring systems, making the assembly process challenging for operators.

Method used

A temporary positioning element is used to facilitate precise placement of studs by creating a local deformation in the strake, allowing for a through hole to be made at the correct location, which is then replaced by a threaded stud during assembly.

Benefits of technology

The method enables easy and accurate positioning of studs, simplifying the assembly process by ensuring correct alignment without visible obstructions, thereby improving operational efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000024_0000
    Figure 00000024_0000
  • Figure 00000025_0000
    Figure 00000025_0000
  • Figure 00000025_0001
    Figure 00000025_0001
Patent Text Reader

Abstract

A method for assembling a sealed and thermally insulating tank wall comprises: a) assembling (2001) a secondary insulating barrier (2) on a load-bearing wall (3); b) arranging (2002) an anchoring system base (98, 398) in a recess (197, 395) formed in the secondary insulating barrier (2); c) screwing a temporary positioning element (50) into a positioning hole (40, 340); d) arranging (2004) a strake (21) above the temporary positioning element (50) such that the head (82) of the temporary positioning element (50) creates a local deformation of the strake (21); e) making (2005) a through hole (190) in the strake (21) from above the strake (21) at said local deformation; f) screwing a threaded stud (200) into the locating hole (40, 340) through the through hole (190) so as to form a primary anchoring system for one or more elements of a primary insulating barrier.Figure for abstract: Fig. 7 A.
Need to check novelty before this filing date? Find Prior Art

Description

Title of the invention: Assembly method for assembling a sealed and thermally insulating tank wall Technical field

[0001] The invention relates to the field of sealed and thermally insulating tanks with membranes. In particular, the invention relates to an assembly method for assembling a wall of such a tank. Technological background

[0002] The tanks of ships for the transport of liquefied natural gas generally comprise a double wall comprising successively, from the inside to the outside of the tank, a primary waterproof membrane, a primary thermally insulating barrier, a secondary waterproof membrane and a secondary thermally insulating barrier. The secondary insulating barrier comprises a secondary insulating block comprising a cover plate forming a support surface for the secondary waterproof membrane. The primary insulating barrier comprises primary insulating blocks. The primary insulating blocks are anchored to the secondary insulating barrier.

[0003] Document FR 2 887 010 A1 describes a sealed and thermally insulating tank wall in which an anchoring system makes it possible to anchor primary insulating blocks to secondary insulating blocks. The anchoring system comprises a plate having a bore for receiving a threaded lower part of a stud for anchoring the primary insulating blocks. When assembling the tank wall, an operator must pass the secondary membrane through the stud so that the threaded lower part of the stud can be received in the bore. However, at this point in the assembly of the tank, the bore is not visible to the operator since the secondary membrane is already arranged above it. Consequently, the operator may have difficulty positioning the stud.

[0004] Document FR 3 090 810 A1 describes another sealed and insulating tank wall in which an anchoring system makes it possible to anchor a primary insulating block to the secondary insulating block. The anchoring system comprises a base fixed to the cover plate. A movable part is retained in the base in a thickness direction of the wall and mounted movable in the base. The movable part has a tapped hole opening onto an upper surface of the movable part. The upper surface of the movable part is flush with an upper surface of the cover plate and the movable part is mounted in the base free in translation at least parallel to the longitudinal direction of the weld flange. The tapped hole of the movable part has intended to receive a threaded lower part of a stud for anchoring the primary block.

[0005] The fact that the moving part is mounted free in translation makes it possible to reduce the mechanical stresses on the waterproof membrane, for example when the tank is cooled, which causes the thermally insulating barrier to shrink and / or when the thermally insulating barrier deforms in service. However, this can also result in a certain difficulty in assembling the tank wall. Indeed, when assembling the tank wall, an operator must pass the secondary membrane through the stud so that the lower threaded part of the stud can be received in the tapped hole of the moving part. However, at this point in the assembly of the tank, the moving part is not visible to the operator since the secondary membrane is already positioned above it. Consequently, the operator cannot visually ensure correct positioning of the moving part. Summary

[0006] An object of the invention is to enable an assembly of the tank wall which is easier for the operator at the time mentioned above. An idea underlying the invention is to use a temporary positioning element during the assembly of the tank wall to satisfactorily position the stud relative to the primary anchoring system base into which it is to be screwed.

[0007] According to one embodiment, the invention provides an assembly method for assembling a sealed and thermally insulating tank wall for storing a fluid, the tank wall successively comprising, in a thickness direction, a secondary insulating barrier retained on a load-bearing wall, a secondary sealed membrane resting against the secondary insulating barrier, and a primary insulating barrier resting against the secondary sealed membrane, the secondary sealed membrane comprising metal strakes welded two by two, and the primary insulating barrier comprising juxtaposed primary insulating elements; the assembly process comprising the steps of: (a) assembling the secondary insulating barrier on the load-bearing wall, the secondary insulating barrier forming a support surface for the secondary waterproof membrane, and the secondary insulating barrier having a recess opening onto the support surface; (b) arranging an anchoring system base in the recess, said anchoring system base comprising a positioning hole having a first thread: (c) providing a temporary positioning member, the temporary positioning member comprising a rod and a head at one end of the rod, the rod having a threaded portion, and the head having a recess opposite the rod, and screwing the temporary positioning element in said positioning hole by means of the threaded portion; d) placing a said strake above the temporary positioning element such that the head creates a local deformation of the strake: e) making a through hole in the strake from above the strake at the level of said local deformation; f) removing the temporary positioning element from the positioning hole, and screwing a threaded stud into the positioning hole from above the strake through the through hole, said anchoring system base and the threaded stud forming a primary anchoring system; (g) arranging one or more primary insulating elements on said strake and fixing said one or more primary insulating elements to the secondary insulating barrier by means of the primary anchoring system.

[0008] Thus, the temporary positioning element makes it possible to make a through hole in the strake precisely at the location where the stud must then pass through the strake to be screwed into the base of the anchoring system. These operations are thus easy to carry out for the operator, although the strake hides the base of the anchoring system from him.

[0009] It is understood that the temporary positioning element is not intended to be present in the assembled tank wall since it is replaced by the threaded stud during the implementation of the assembly method.

[0010] According to embodiments, such a method may comprise one or more of the following characteristics.

[0011] According to one embodiment, said strake comprises, at two opposite ends thereof, two edges raised towards the inside of the tank.

[0012] According to one embodiment, the assembly method comprises welding the raised edges with welding wings mechanically retained on the secondary insulating barrier.

[0013] According to one embodiment, in step d), the raised edges are each in contact with a weld wing.

[0014] According to one embodiment, the head has at least one protruding edge to create local deformation of the strake.

[0015] According to one embodiment, the head has two projecting edges to create the local deformation of the strake, the two projecting edges being arranged on either side of the rod and aligned in an alignment direction.

[0016] According to one embodiment, the temporary positioning element is screwed into said positioning hole so that said at least one protruding edge is parallel to the raised edges.

[0017] According to one embodiment, step e) comprises punching the strake by pushing in a punch right into the recess.

[0018] According to one embodiment, the rod has a bore opening into the recess of the head, the bore comprising a second thread.

[0019] According to one embodiment: - step e) comprises inserting a cutting tool into the recess and screwing the cutting tool into the bore of the rod and then actuating the cutting tool; and - step f) comprises unscrewing the temporary positioning element from the positioning hole using a tool.

[0020] According to one embodiment, the first tapping and the second tapping have opposite thread directions.

[0021] According to one embodiment, step f) comprises applying a rotation to the tool in the bore of the rod.

[0022] According to one embodiment, the first tapping is right-hand threaded, and the second tapping is left-hand threaded.

[0023] According to one embodiment, - the assembly method comprises, after step e) and before step f), a step e2) consisting of making a marking on the strake from above the strake, the marking being located at a predetermined distance from the through hole made in step e); and - in step f), the threaded stud is screwed into the positioning hole using the marking as a visual reference.

[0024] It is preferable that the marking does not affect the mechanical strength of the strake. Thus, according to one embodiment, the marking is carried out without incision or notching of the strake. For example, the marking is a felt-tip pen mark, indelible or not.

[0025] According to one embodiment, the marking is a point marking, such as a dot or a cross.

[0026] According to one embodiment, the marking is a circle or an arc of a circle.

[0027] According to one embodiment, the marking comprises a straight line segment.

[0028] According to one embodiment, in step f), the threaded stud is partially screwed into the positioning hole, then adjust the position of the threaded stud relative to the marking, and then finish screwing the threaded stud into the positioning hole.

[0029] According to one embodiment, the threaded stud comprises a collar.

[0030] According to one embodiment, in step f), the threaded stud is screwed into the hole of po positioning without the collar masking the marking. For this purpose, the predetermined distance is such that the threaded stud can be screwed in step f) into the positioning hole without the collar masking the marking. For this purpose, the predetermined distance may be such that a distance between the center of the through hole and the marking is greater than or equal to the radius of an outer contour of the collar.

[0031] According to one embodiment, the collar bears against the strake when the threaded stud has been screwed into the positioning hole. For example, a distance between the marking and the outer contour of the collar when the threaded stud has been screwed is between 0.1 mm inclusive and 4 mm inclusive.

[0032] According to one embodiment, the assembly method comprises sealingly welding the collar to the strake.

[0033] According to one embodiment, said recess is formed in a secondary insulating element of the secondary insulating barrier.

[0034] According to one embodiment, said recess is formed at a distance from the edges of said secondary insulating element.

[0035] According to one embodiment, said secondary insulating element comprises a blind hole formed in a bottom of the recess and opening into said recess.

[0036] According to one embodiment, the rod comprises a non-threaded distal portion opposite the head.

[0037] According to one embodiment, in step c), the temporary positioning element is screwed into said positioning hole by means of the threaded portion until the non-threaded distal portion is received in the blind hole.

[0038] According to one embodiment, a free end of the non-threaded distal portion is chamfered.

[0039] This chamfering tends to facilitate centering of the temporary positioning element and, where appropriate, of the moving part of the anchoring system base.

[0040] The term “secondary insulating element” designates a thermally insulating element participating in constituting the secondary insulating barrier. The secondary insulating element may in particular be a secondary insulating box, a secondary insulating block, a filling joint arranged between secondary insulating boxes or blocks, or even a bridging element joining secondary insulating blocks.

[0041] According to one embodiment, said secondary insulating element is a secondary insulating box.

[0042] According to one embodiment, the secondary insulating box comprises a bottom plate, a cover plate, and side plates connecting the cover plate to the bottom plate and holding the cover plate at a distance from the bottom plate to define an interior space of the secondary insulating box, the interior space of the secondary insulating box being filled with a thermal insulation lining, for example perlite or polyurethane foam optionally reinforced with glass fibers.

[0043] According to one embodiment, said secondary insulating element is a secondary insulating block.

[0044] According to one embodiment, said secondary insulating block comprises a block of insulating foam and a cover plate disposed over the insulating foam block, an upper surface of the cover plate forming a support surface for the secondary waterproof membrane.

[0045] According to one embodiment, the cover plate is made of plywood.

[0046] According to one embodiment, the insulating foam is a polyurethane foam, op- functionally reinforced with glass fibers, with a density between 130 kg / m3 and 200 kg / m3.

[0047] According to one embodiment, the recess extends into at least a portion of the thickness of the cover plate.

[0048] According to one embodiment, the recess opens onto the insulating foam block.

[0049] According to one embodiment, the recess further extends into a portion of the thickness of the insulating foam block.

[0050] According to one embodiment, said secondary insulating block further comprises a bottom plate, the insulating foam block being arranged between the bottom plate and the cover plate.

[0051] According to one embodiment, the bottom plate is made of plywood.

[0052] According to one embodiment, the recess is formed between at least two elements secondary insulators, for example between four secondary insulating elements.

[0053] According to one embodiment, a secondary anchoring member for anchoring one or more secondary insulating elements is received in the recess.

[0054] According to one embodiment, the secondary anchoring member is mechanically linked to the load-bearing wall.

[0055] According to one embodiment, said anchoring system base comprises: - a movable part comprising a body having an upper face flush with the upper surface of the cover plate, the positioning hole passing through said body; and - a retaining part fixed to the cover plate and cooperating with the moving part so as to stop the moving part in said recess in the thickness direction, said recess and the retaining part being configured to allow movement of the movable part perpendicular to the thickness direction.

[0056] According to one embodiment, said recess and the retaining part are configured to allow movement of the moving part in a direction of movement parallel to a longitudinal direction of the strake.

[0057] According to one embodiment, the marking is a point marking, such as a dot or a cross, and an imaginary straight line passing through the center of the through hole and parallel to the direction of movement passes through the marking. According to another embodiment, the marking is a circle or an arc of a circle, and an imaginary straight line passing through the center of the through hole and parallel to the direction of movement intersects the marking. According to another embodiment, the marking comprises a straight line segment perpendicular to the direction of movement. According to another embodiment, the marking comprises two straight line segments perpendicular to the direction of movement and diametrically opposed with respect to the center of the through hole. The marking can then serve as a visual cue for positioning the stud and the moving part in a correct position allowing movement of the moving part in both directions following the direction of movement.

[0058] According to one embodiment, the cover plate has two parallel grooves for retaining weld wings on the cover plate, and the direction of movement is parallel to the grooves.

[0059] The primary insulating barrier is intended to support a primary waterproof membrane. According to one embodiment, a primary waterproof membrane rests on the primary insulating barrier.

[0060] According to one embodiment, the fluid is a liquefied gas.

[0061] According to one embodiment, the liquefied gas is LNG, namely a mixture with high methane content stored at a temperature of approximately -162°C at atmospheric pressure. Other liquefied gases may also be considered, including ethane, propane, butane, or ethylene. Liquefied gases may also be stored under pressure, for example at a relative pressure of between 2 and 20 bar, and in particular at a relative pressure of around 2 bar. The tank may be constructed using various techniques, including an integrated membrane tank or a self-supporting tank.

[0062] Such a tank may be part of a land-based storage facility, for example for storing LNG, or may be installed in a floating, coastal, or deep-water structure, including an LNG carrier, a floating storage and regasification unit (FSRU), a floating production and remote storage unit (FPSO), and others. Such a tank may also serve as a fuel tank in any type of vessel.

[0063] According to one embodiment, a ship for transporting a fluid comprises a double hull and a aforementioned tank arranged in the double hull.

[0064] According to one embodiment, the invention also provides a transfer system for a fluid, the system comprising the aforementioned ship, insulated pipes arranged to connect the tank installed in the hull of the ship to a floating or land-based storage facility and a pump for driving a flow of liquefied fluid / gas through the insulated pipes from or to the floating or land-based storage facility to or from the tank of the ship.

[0065] According to one embodiment, the invention also provides a method of loading or unloading of such a vessel, in which a liquefied fluid / gas is conveyed through insulated pipelines from or to a floating or land-based storage facility to or from the vessel's tank. Brief description of the figures

[0066] The invention will be better understood, and other aims, details, characteristics and advantages thereof will appear more clearly during the following description of several particular embodiments of the invention, given solely for illustrative and non-limiting purposes, with reference to the appended drawings.

[0067] [Fig-1] [Fig. 1] is a cutaway perspective view of a tank wall.

[0068] [Fig.2] [Fig.2] is a top view of a secondary insulating block that can be used to make the secondary insulating barrier of the tank wall of [Fig.l].

[0069] [Fig.3] [Fig.3] is a sectional view of the secondary insulating block shown in [Fig.2], in section along GG in [Fig.2].

[0070] [Fig.4] [Fig.4] is an enlargement of detail H of [Fig.3] and thus shows, in section along GG in [Fig.2], a primary anchoring system marked by IV in [Fig.l].

[0071] [Fig.5] [Fig.5] is a block diagram illustrating the steps of a method of assembling the tank wall of [Fig.l].

[0072] [Fig.6A] [Fig.6A] is a top perspective view of a temporary positioning element usable in the assembly process.

[0073] [Fig.6B] [Fig.6B] is a side view of the temporary positioning element of [Fig.6A].

[0074] [Fig.6C] [Fig.6C] is a sectional view along AA of [Fig.6B].

[0075] [Fig.7A] [Fig.7A] is a sectional view similar to [Fig.3], showing the principle of a step of the assembly process using the temporary positioning element shown in [Fig.6A], [Fig.6B] and [Fig.6C].

[0076] [Fig.7B] [Fig.7B] is a partial schematic view of the strake visible in [Fig.7A], seen from above along arrow B in [Fig.7A], showing a marking made on the strake.

[0077] [Fig.7C] [Fig.7C] is a view similar to [Fig.7B], showing a marking made on the strake according to a variant.

[0078] [Fig.7D] [Fig.7D] is a view similar to [Fig.7B], showing a marking made on the strake according to another variant.

[0079] [Fig.8] [Fig.8] is a sectional view similar to [Fig.7A], showing the same step as [Fig.7A] in another embodiment.

[0080] [Fig.9] [Fig.9] is a sectional view similar to [Fig.7A] and [Fig.8], showing the same step as [Fig.7A] and [Fig.8] in the context of yet another embodiment.

[0081] [Fig.10] [Fig.10] is a schematic cutaway representation of a LNG carrier tank and a loading / unloading terminal for this tank. Description of the embodiments

[0082] In [Fig.l], the multi-layer structure of a sealed and thermally insulating tank 1 for storing a liquefied fluid, such as liquefied natural gas (LNG) is shown. The tank 1 has a generally polyhedral shape and comprises several walls. The wall of the tank 1 successively comprises, in the direction of the thickness, from the outside to the inside of the tank 1, a secondary thermally insulating barrier 2 retained on a supporting structure 3, a secondary sealed membrane 4 resting against the secondary thermally insulating barrier 2, a primary thermally insulating barrier 5 resting against the secondary sealed membrane 4 and a primary sealed membrane 6 intended to be in contact with the liquefied natural gas contained in the tank 1.

[0083] The supporting structure 3 of the tank 1 may in particular be formed by the hull or the double hull of a ship. The supporting structure comprises a plurality of supporting walls 3 defining the general shape of the tank 1, usually a polyhedral shape.

[0084] The secondary thermally insulating barrier 2 comprises a plurality of secondary insulating blocks 7 which are retained on the load-bearing wall 3. The secondary insulating blocks 7 have a generally parallelepiped shape and are arranged in parallel rows. Three rows are indicated by the letters A, B and C.

[0085] The secondary insulating blocks 7 are for example retained on the load-bearing wall 3 by means of secondary anchoring members 88. Mastic beads (not shown) are interposed between the secondary insulating blocks 7 and the load-bearing wall 3 to compensate for the deviations of the load-bearing wall 3 relative to a flat reference surface. Kraft paper can be inserted between the mastic beads and the load-bearing wall 3 if desired to prevent adhesion of the mastic beads to the load-bearing wall 3. The secondary anchoring members 88 can be in various numbers, for example ranging from 2 to 6 per secondary insulating block 7, and placed for example at the corners of four secondary insulating blocks 7 and / or in the gap between two secondary insulating blocks 7. The secondary anchoring members 88 can be made in various ways according to requirements.

[0086] Alternatively, the aforementioned kraft paper is omitted and the secondary insulating blocks 7 are retained on the load-bearing wall 3 by the adhesion of the mastic beads.

[0087] [Fig.2] and [Fig.3] show in more detail one of the secondary insulating blocks 7. The secondary insulating block 7 comprises an insulating foam block 11 and a plate cover plate 10 arranged on the insulating foam block 11. The foam of the insulating foam block 11 may be an expanded polyurethane foam, optionally reinforced with glass fibers. The cover plate 10 may be made of plywood. A bottom plate 12 may be arranged under the insulating foam block 11, so that the insulating foam block 11 is sandwiched between the cover plate 10 and the bottom plate 12. The bottom plate 12 may be made of plywood.

[0088] With reference to [Fig.2], the cover plate 10 has two grooves 20, each of the grooves 20 extending in the thickness of the cover plate 10. The two grooves 20 are parallel to each other and thus extend in a direction marked by the arrow 1000 in the drawings.

[0089] Returning to [Fig.l], it can be seen that the secondary waterproof membrane 4 comprises a continuous layer of metal strakes 21 with raised edges 32 towards the inside of the tank. The strakes 21 are welded two by two, by their raised edges 32, on the two faces of a welding wing 35 (see [Fig.7A]). The welding wings 35 have a cross-section in the shape of a right angle. The raised edges 32 of the strakes 21 are welded to one arm of the right angle, while the other arm is engaged in a groove 20 (see [Fig.7A]). The distance between two grooves 20 corresponds to the width of a strake 21, while the distance between a free edge of a secondary insulating block 7 and an adjacent groove 20 corresponds to the width of a strake 21, so that a strake 21 forms the junction between two adjacent insulating blocks 7. Thus, the secondary waterproof membrane 4 is retained on the secondary thermally insulating barrier 2.The weld wings 35 and the grooves 20 form sliding joints allowing the strakes 21 to contract and deform relative to the secondary insulating blocks 7.

[0090] The strakes 21 are, for example, made of Invar®: that is to say an alloy of iron and nickel whose coefficient of expansion is typically between 1.2.10 6 and 2.10 6 KA. It is also possible to use alloys of iron and manganese whose coefficient of expansion is typically of the order of 7 to 9 106 KA.

[0091] With reference to [Fig.l], the primary thermally insulating barrier 5 comprises a plurality of primary insulating blocks 22 superimposed astride two rows of secondary insulating blocks 7. The primary insulating blocks 22 are anchored to the secondary insulating blocks 7 by means of primary anchoring systems 97. The primary anchoring systems 97 are separated and offset from the secondary anchoring members 88. The primary insulating blocks 22 have a generally parallelepiped shape and are arranged in parallel rows. In addition, they have dimensions identical to those of the secondary insulating blocks 7 except for their thickness in the direction of thickness of the tank wall 1 which is likely to be different, and in particular smaller.

[0092] [Fig. 1] also shows that the primary waterproof membrane 6 comprises a continuous sheet of rectangular sheets 33 which have two series of mutually perpendicular corrugations. The first series of corrugations 55 extends perpendicular to the rows of insulating blocks A, B, C and therefore perpendicular to the raised edges 32 of the strakes 21 and has a regular spacing 57. The second series of corrugations 56 extends parallel to the rows of insulating blocks A, B, C and therefore parallel to the raised edges 32 of the strakes 21 and has a regular spacing 58. Preferably, the first series of corrugations 55 is higher than the second series of corrugations 56.

[0093] According to other embodiments, the primary waterproof membrane 6 has a structure similar to that of the secondary waterproof membrane 4, that is to say that it is made up of an assembly of strakes with raised edges.

[0094] The primary anchoring system 97 will now be described with reference to [Fig. 2], [Fig. 3] and [Fig. 4]. The primary anchoring system 97 comprises an anchoring system base 98 (hereinafter referred to as "the base 98" for convenience) and a stud 200.

[0095] The base 98 comprises a movable part 110 and a retaining part 120. The retaining part 120 is arranged in a counterbore 198 and is fixed to the cover plate 10, for example by fixing screws 121 (not visible in [Fig.4] but the positions of which are marked in the top view of [Fig.2]) and / or by gluing. The moving part 110 is arranged in a housing 199. The moving part 110 comprises a body 111 of which an upper surface 111A is flush with the surface of the cover plate 10. The retaining part 120 cooperates with the moving part 110 so as to stop the moving part 110 in the thickness direction of the tank wall 1, while allowing movement of the moving part 110 perpendicular to the thickness direction of the tank wall 1. More particularly, movement of the moving part 110 is possible at least in a direction of movement 1001 (see [Fig. 2] and [Fig.4]) which is parallel to the direction 1000 in which the grooves 20 extend.

[0096] The retaining part 120 and the moving part 110 may each have various geometries as long as the above-described movement of the moving part 110 is permitted.

[0097] The body 111 has a positioning hole 40, which passes through the body 111 and which will be described in more detail later.

[0098] The housing 199 opens into the counterbore 198. In the following, the assembly consisting of the counterbore 198 and the housing 199 will be referred to as “the recess 197”.

[0099] An assembly method 2000 is now described for assembling the tank wall 1.

[0100] In a first step 2001 (see [Fig.5]) of the assembly method 2000, the secondary insulating barrier 2 is assembled on the load-bearing wall 3, here by juxtaposing secondary insulating blocks 7, in parallel rows as described above with reference to [Fig.l]. The secondary insulating barrier 2 thus comprises recesses 197, at a rate of one recess 197 per secondary insulating block 7.

[0101] In a step 2002, a base 98 is placed in the recess 197. This can be done after assembling the secondary insulating barrier 2. Alternatively, the base 98 may have been placed in the recess 197 of each secondary insulating block 7 before assembling the secondary insulating barrier 2 on the load-bearing wall 3. In particular, it is possible to prefabricate the secondary insulating blocks 7 with the base 98 already placed in the recess 197.

[0102] Then, in a step 2003, a temporary positioning element 50 is provided.

[0103] The temporary positioning element 50 is shown in [Fig.6A], [Fig.6B] and [Fig.6C]. It comprises a rod 60 and a head 82 at one end of the rod 60. The rod 60 has a threaded portion 62 and an unthreaded distal portion 63. The unthreaded distal portion 63 is at the end of the rod 60 which is opposite the head 82; thus, the threaded portion 62 is between the end of the rod 60 which carries the head 82 and the unthreaded distal portion 63. The threaded portion 62 is intended to cooperate with a corresponding tapping which the positioning hole 40 comprises.

[0104] Still during step 2003, the temporary positioning element 50 is screwed into the positioning hole 40 by means of the threaded portion 62. The non-threaded distal portion 63 is then received in a blind hole 196 (see [Fig.4]) which is formed in a bottom of the recess 197 and opens into the recess 197. Preferably, a free end 64 of the non-threaded distal portion 63 is chamfered (see [Fig.6B] and [Fig.6C]). This chamfering tends to facilitate centering of the temporary positioning element 50 and the moving part 110.

[0105] As shown in [Fig.4], the recess 197 is made in the thickness of the cover plate 10 such that the housing 199 opens onto the insulating foam block 11, while the blind hole 196 is made in the insulating foam block 11. Alternatively, the housing 199 may not open onto the insulating foam block 11. In this case, the blind hole 196 may only be made in the cover plate 10. Alternatively, the recess 197 may be made in the thickness of the cover plate 10 and in a portion of the thickness of the insulating foam block 11.

[0106] At the end of step 2003, the moving part 110 is held in place by the temporary positioning element 50, and the head 82 of the temporary positioning element 50 projects relative to the moving part 110, above the surface 111A.

[0107] In a step 2004, a strake 21 is placed above the temporary positioning element 50. For this, as shown schematically in the [Fig.7A], a welding wing 35 can be inserted into each of the two grooves 20 which are located on either side of the recess 197, and the strake 21 can be placed so that the raised edge 32 of the corresponding strake 21 bears against the welding wing 35.

[0108] As can be seen in [Fig.7A], given that the head 82 of the temporary positioning element 50 projects and that the strake 21 has a small thickness, the head 82 creates a local deformation of the strake 21. In other words, the presence of the head 82 locally deforms the strake 21 relative to the normal plane shape of the latter.

[0109] The head 82 has two projecting edges 89 (see [Fig.6A]), the two projecting edges 89 being on either side of the rod 60 and aligned in an alignment direction 999. In this case, before arranging the strake 21, the alignment direction 999 may be parallel or approximately parallel (for example to within ±10°) to the direction 1000 of the grooves 20. This result may be obtained by judgment when screwing the temporary positioning element 50 in step 2003. It is understood that in this way, the projecting edges 89 impose that a direction of greater slope of the local deformation of the strake 21 is perpendicular or approximately perpendicular to the direction 1000 of the grooves 20.

[0110] In a step 2005, a through hole 190 (not shown in [Fig.7A] but shown in [Fig.7B]) is made in the strake 21 at the local deformation created in step 2004. To make this through hole 190, the head 82 of the temporary positioning element 50 has a recess 83 (see [Fig.6A], [Fig.6C] and [Fig.7A]). It is understood that the presence of the recess 83 makes it possible to make the through hole 190 in the strake 21 in various ways, since the recess 83 allows a perforation tool to pass through the strake 21, which passage would not be possible if the head 82 were full.

[0111] The through hole 190 can be made in step 2005 in various ways. In a particular example, the through hole 190 is made in the following way: - firstly, the strake 21 is punched by driving a punch (not shown) perpendicular to the strake 21 into the recess 83; in [Fig.7A], the arrow 899 represents the movement of the punch; - then in a second step, through the hole made by the punch, a cutting tool (not shown) is inserted into the recess 83 and the cutting tool is screwed into a bore 84 (see [Fig.6A] and [Fig.6C]) that the temporary positioning element 50 has; then the cutting tool is actuated, the actuation of the cutting tool making the through hole 190 to the desired dimensions. The cutting tool makes the through hole 190 by local shearing of the strake 21 using the bore 84 as a retaining means.

[0112] Advantageously, the bore 84 is tapped and the insertion of the cutting tool is carried out by screwing using the tapping of the bore 84. In [Fig.7A], the arrow 949 represents the direction of screwing of the cutting tool.

[0113] The bore 84 opens into the recess 83 and extends through the rod 60. Preferably, the bore 84 is not blind, that is to say, the bore 84 also opens into the free end of the non-threaded distal portion 63. This makes it possible to simplify the manufacture of the temporary positioning element 50.

[0114] Returning to [Fig. 4], a stud 200 is described which is intended to be screwed into the positioning hole 40 in place of the temporary positioning element 50. The stud 200 has a collar 202 and, under the collar 202, a threaded lower part 201 which allows the stud 200 to be screwed into the positioning hole 40. The stud 200 also has a threaded upper part 209 which allows the primary insulating blocks 22 to be retained as will be described later.Above the collar 202 and below the threaded upper part 209, the stud 200 has, from bottom to top, a section 203 of diameter greater than that of the part 209, a section 204 of diameter equal to or slightly less than that of the section 203, and having at least one flat making it possible to provide a grip for a key or another tool to screw the stud 200 into the positioning hole 40, and an unthreaded section 206 of diameter substantially equal to that of the threaded upper part 209.

[0115] [Fig.7B] is a partial view, in the direction of arrow B in [Fig.7A], of the strake 21 at the end of step 2005. The strake 21 has been pierced by the through hole 190, and the through hole 190 is thus shown in solid lines. Also indicated in [Fig.7B] are the outline of the head 82 of the temporary positioning element 50 and the outline of the moving part 110, in dotted lines because these elements are not visible through the strake 21.

[0116] In a step 2006, a marking 195 is produced (see [Fig.7B]) on the strake 21. The marking 195 is produced at a predetermined distance ô from the through hole 19O. The marking 195 and the predetermined distance ô will be detailed later.

[0117] Since the strake 21 has a small thickness, it is preferable that the marking 195 does not affect the mechanical strength of the strake 21, and is therefore produced without incision or notching of the strake 21. For example, the marking 195 is produced with a felt-tip pen, indelible or not.

[0118] In a step 2007, the temporary positioning element 50 is removed from the positioning hole 40. More specifically, the temporary positioning element 50 is unscrewed through the through hole 190.

[0119] Particularly advantageously, the tapping of the bore 84 has a thread direction opposite to the thread direction of the tapping of the positioning hole 50. This makes it possible to use a threaded tool, more specifically the cutting tool used in step 2005 or another tool, to unscrew the temporary positioning element 50, simply by turning this tool in an unscrewing direction 948 (see [Fig.7A]) opposite to the screwing direction 949. For example, the tapping of the bore 84 is left-hand threaded, while the tapping of the positioning hole 40 is right-hand threaded; the reverse is of course also possible.

[0120] Still during step 2007, instead of the temporary positioning element 50, the threaded part 201 of the stud 200 is screwed into the positioning hole 40, from above the strake 21, through the through hole 190.

[0121] The predetermined distance δ is chosen such that the stud 200 can be screwed into the positioning hole 40 through the through hole 190 without the collar 202 masking the marking 195. For this purpose, the predetermined distance δ may be such that a distance between the center of the through hole 190 and the marking 195 is greater than or equal to the radius of the collar 202.

[0122] Considering [Fig.2], [Fig.4] and [Fig.7B], and remembering that the moving part 110 is movable in the direction 1001 shown in these figures, it is understood that the marking 195 makes it possible to visually transfer onto the strake 21 a position of the moving part 110, even if the moving part 110 is hidden by the strake 21. Indeed, as long as the temporary positioning element 50 remains screwed into the positioning hole 40 at the end of step 2003, the temporary positioning element 50 and the moving part 110 remain integral. The position of the temporary positioning element 50 thus materializes the position of the moving part 110, the latter having been able to be adjusted manually before screwing the temporary positioning element 50 in step 2003, since then the strake 21 does not yet mask the moving part 110.

[0123] Still considering [Fig.2], [Fig.4] and [Fig.7B], it is understood that since the predetermined distance δ is chosen such that the stud 200 can be screwed into the positioning hole through the through hole 190 without the collar 202 masking the marking 195, if the collar 202 masks the marking 195, then the positioning of the stud 200 and the moving part 110 is incorrect and must be corrected. The marking 195 can thus serve as a visual reference for correctly positioning the moving part 110 and the stud 200 before finishing screwing the stud 200 in step 2007. More specifically, the stud 200 can be partially screwed, then the positioning of the stud 200 can be adjusted relative to the marking 195, then the stud 200 can be finished screwing, the collar 202 pressing against the strake 21 when the stud 200 has been finished screwing.

[0124] In one example, a distance between the marking 195 and the outer contour of the collar 202 when the stud 200 has been screwed in is between 0.1 mm inclusive and 4 mm inclusive.

[0125] It should be noted that the marking 195 can be achieved in different ways. As re shown in [Fig.7B], the marking 195 may be a point marking, such as a dot or a cross. Preferably in this case, as shown in [Fig.7B], the marking 195 is positioned such that an imaginary straight line 198D passing through the center 199 of the through hole 190 and parallel to the direction 1001 also passes through the marking 195. It is understood that in this case, the marking 195 can serve as a visual cue for positioning the stud 200 and the moving part 110 in a correct position allowing movement of the moving part 110 in both directions along the direction 1001.

[0126] Alternatively, as shown in [Fig.7C], the marking 195 may be a circle drawn at the distance δ from the through hole 190 around the through hole 190. The marking 195 intersects the imaginary line 198D. It is understood that in this case also, the marking 195 may serve as a visual reference for positioning the stud 200 and the moving part 110 in a correct position allowing movement of the moving part 110 in both directions along the direction 1001. Alternatively, in a manner not shown, the marking 195 may be an arc of a circle, preferably intersecting the imaginary line 198D, or two arcs of a circle, preferably each intersecting the imaginary line 198D.

[0127] Alternatively, as shown in [Fig.7D], the marking 195 may be a straight line segment drawn at the distance δ from the through hole 190 and perpendicular to the direction 1001. It is understood that in this case also, the marking 195 may serve as a visual marker for positioning the stud 200 and the moving part 110 in a correct position allowing movement of the moving part 110 in both directions along the direction 1001. Optionally, as shown in [Fig.7D], the marking 195 may be two straight line segments diametrically opposed relative to the center 199 of the through hole 190, each drawn at the distance δ from the through hole 190 and perpendicular to the direction 1001.

[0128] In any event, at the end of step 2007, the stud 200 is in place in the positioning hole 40 and the primary anchoring system 97 is thus assembled.

[0129] In a step 2008, the secondary waterproof membrane 4 is welded in order to ensure the sealing of the secondary waterproof membrane 4. For this, the collar 202 is sealed to the strake 21, and the raised edges 32 of the strake 21 are welded to the welding wings 35, according to known techniques.

[0130] In a step 2009, one or more primary insulating blocks 22 are placed on the strake 21 and said primary insulating block(s) 22 are fixed by means of the primary anchoring system 97. For example, this fixing can be carried out by means of a flat washer, one (or more) Belleville washer(s) located at the section 206 and a nut screwed onto the threaded upper part 209.

[0131] Although steps 2001 to 2009 have been described above in the context of a single block secondary insulating barrier 7, it is understood that these steps can be repeated as many times as there are primary anchoring systems 97 and secondary insulating blocks 7 to be installed to assemble the tank wall 1. It is also understood that the secondary insulating barrier 2 can comprise secondary elements different from the secondary insulating blocks 7 described above, in particular in certain particular zones such as in the vicinity of the edges of the tank.

[0132] Then, in a step 2010, the construction of the tank wall 1 can be completed, in particular by assembling the primary waterproof membrane 6 on the primary insulating barrier 5.

[0133] In [Fig. 8], an alternative embodiment is shown. This alternative embodiment is different from what has been described previously only in that the temporary positioning element 50 does not have the non-threaded distal portion 63 and the secondary insulating block 7 does not have the blind hole 196. The temporary positioning element 50 and the steps of the method 2000 are otherwise identical to what has been described previously, and these are therefore not described again for the sake of brevity.

[0134] It is also understood that the method 2000 is applicable to other types of secondary insulating elements to constitute the secondary insulating barrier 2 than the secondary insulating blocks 7.

[0135] Furthermore, the method 2000 is applicable when the recess for receiving the base 98 of the primary anchoring system 97 is formed in the secondary insulating barrier 4 elsewhere than at the center of a secondary insulating block 7. For example, the base 98 can be received in a recess formed in a corner area of ​​one or more adjacent secondary insulating elements, or in a recess formed between several adjacent secondary insulating elements.

[0136] Furthermore, the method 2000 is applicable to other primary anchoring systems comprising a base received in a recess and a stud intended to be screwed into the base, in particular to primary anchoring systems where the base is a simple plate.

[0137] For example, [Fig. 9] schematically shows an alternative embodiment where the base 398 of a primary anchoring system 397 is a plate provided with a threaded hole 340. The threaded hole 340 is sized to receive the threaded portion 201 of the stud 201 (not shown in [Fig. 9]) and the rod 60 of the positioning element 50. The base 398 is received in a recess 395 formed in the secondary insulating barrier 2, between the outer edges of two or more adjacent secondary insulating elements 607 constituting the secondary insulating barrier 2. In a manner not shown in [Fig. 9], the recess 395 can further receive a secondary anchoring member for anchoring one or more of the secondary insulating elements 607 and / or receive a seal made of thermally insulating material.

[0138] The temporary positioning element 50 is identical to what was previously described and is therefore not described again for the sake of brevity.

[0139] The steps of the method 2000 are identical to what was described previously, and are therefore not described again for the sake of brevity. It is specified, however, that since the base 398 is a plate, the step 2006 consisting of making a marking on the strake 21 can be omitted, since then the marking is not necessary to report a position of a moving part relative to the base 398.

[0140] With reference to [Fig. 10], a cutaway view of an LNG carrier ship 70 shows a sealed and thermally insulating tank 71 of generally prismatic shape mounted in the double hull 72 of the ship 70. The wall of the tank 71 comprises a primary sealed membrane intended to be in contact with the LNG contained in the tank, a secondary sealed membrane arranged between the primary sealed membrane and the double hull 72 of the ship, and two thermally insulating barriers arranged respectively between the primary sealed membrane and the secondary sealed membrane and between the secondary sealed membrane and the double hull 72.

[0141] In a manner known per se, loading / unloading pipelines 73 arranged on the upper deck of the ship can be connected, by means of appropriate connectors, to a maritime or port terminal to transfer a cargo of LNG from or to the tank 71.

[0142] [Fig. 10] shows an example of a marine terminal comprising a loading and unloading station 75, an underwater pipeline 76 and an onshore installation 77. The loading and unloading station 75 is a fixed offshore installation comprising a mobile arm 74 and a tower 78 which supports the mobile arm 74. The mobile arm 74 carries a bundle of insulated flexible pipes 79 which can be connected to the loading / unloading pipelines 73. The orientable mobile arm 74 adapts to all sizes of LNG carriers. A connecting pipe, not shown, extends inside the tower 78. The loading and unloading station 75 allows the loading and unloading of the LNG carrier 70 from or to the onshore installation 77. The latter comprises liquefied gas storage tanks 80 and connecting pipes 81 connected by the underwater pipe 76 to the loading or unloading station 75.The subsea pipeline 76 allows the transfer of liquefied gas between the loading or unloading station 75 and the onshore installation 77 over a long distance, for example 5 km, which makes it possible to keep the LNG carrier 70 at a great distance from the coast during loading and unloading operations.

[0143] To generate the pressure necessary for the transfer of the liquefied gas, pumps on board the ship 70 and / or pumps equipping the onshore installation 77 and / or pumps equipping the loading and unloading station 75 are used.

[0144] Although the invention has been described in connection with several embodiments by particular, it is quite obvious that it is in no way limited thereto and that it includes all the technical equivalents of the means described as well as their combinations if these fall within the scope of the invention.

[0145] The use of the verb “comprise”, “comprise” or “include” and its conjugated forms does not exclude the presence of other elements or other steps than those stated in a claim.

[0146] In the claims, any reference sign in parentheses cannot be interpreted as a limitation of the claim.

Claims

Claims

1. Assembly method (2000) for assembling a sealed and thermally insulating tank wall for storing a fluid, the tank wall (1) successively comprising, in a thickness direction, a secondary insulating barrier (2) retained on a load-bearing wall (3), a secondary sealed membrane (4) resting against the secondary insulating barrier (2), and a primary insulating barrier (5) resting against the secondary sealed membrane (4), the secondary sealed membrane (4) comprising metal strakes (21) welded two by two, and the primary insulating barrier (5) comprising juxtaposed primary insulating elements (22); the assembly method (2000) comprising the steps of: a) assembling (2001) the secondary insulating barrier (2) on the load-bearing wall (3), the secondary insulating barrier (2) forming a support surface for the secondary waterproof membrane (4), and the secondary insulating barrier (2) having a recess (197, 395) opening onto the support surface; b) arranging (2002) an anchoring system base (98, 398) in the recess (197, 395), said anchoring system base (98, 398) comprising a positioning hole (40, 340) having a first thread; c) providing (2003) a temporary positioning member (50), the temporary positioning member (50) comprising a rod (60) and a head (82) at one end of the rod (60), the rod (60) having a threaded portion (62), and the head (82) having a recess (83) opposite the rod (60), and screwing the temporary positioning member (50) into said positioning hole (40, 340) by means of the threaded portion (62); d) arranging (2004) a said strake (21) above the temporary positioning element (50) such that the head (82) creates a local deformation of the strake (21); e) making (2005) a through hole (190) in the strake (21) from above the strake (21) at the level of said local deformation; f) removing (2007) the temporary positioning element (50) from the positioning hole (40, 340), and screwing a threaded stud (200) into the positioning hole (40, 340) from above the strake (21) through the through hole (190), said anchoring system base (98, 398) and the threaded stud (200) forming a primary anchoring system (97, 397); g) arranging (2009) one or more primary insulating elements (22) on said strake (21) and fixing said one or more primary insulating elements (22) to the secondary insulating barrier (2) by means of the primary anchoring system (97, 397).

2. An assembly method (2000) according to claim 1, wherein said strake (21) comprises, at two opposite ends thereof, two raised edges (32) towards the inside of the tank, and the assembly method (2000) comprises welding (2008) the raised edges (32) with welding wings (35) mechanically retained on the secondary insulating barrier (2).

3. Assembly method (2000) according to any one of claims 1 to 2, wherein the head (82) has at least one projecting edge (89) to create the local deformation of the strake (21).

4. An assembly method (2000) according to claim 2 and claim 3 taken in combination, wherein the temporary positioning element (50) is screwed into said positioning hole (40, 340) such that said at least one projecting edge (89) is parallel to the raised edges (32).

5. An assembly method (2000) according to any one of claims 1 to 4, wherein step e) comprises punching the strake (21) by driving a punch into the recess (83).

6. An assembly method (2000) according to any one of claims 1 to 5, wherein the rod (60) has a bore (84) opening into the recess (83) of the head (82), the bore comprising a second thread, and wherein: - step e) comprises inserting a cutting tool into the recess (83) and screwing the cutting tool into the bore (84) of the rod (60) then actuating the cutting tool; and - step f) comprises unscrewing the temporary positioning element (50) from the positioning hole (40) by means of a tool.

7. The assembly method (2000) of claim 6, wherein the first tapping and the second tapping have opposite thread directions, and step f) comprises applying rotation to the tool in the bore (84) of the rod (60).

8. An assembly method (2000) according to any one of claims 1 to 7, wherein: - the assembly method (2000) comprises, after step e) and before step f), a step e2) consisting of making (2006) a marking (195) on the strake (21) from above the strake (21), the marking (195) being located at a predetermined distance (ô) from the through hole (190); and - in step f), the threaded stud (200) is screwed into the positioning hole (40, 340) using the marking (195) as a visual reference.

9. An assembly method (2000) according to claim 8, wherein in step f), the threaded stud (200) is partially screwed into the positioning hole (40, 340), then the position of the threaded stud (200) is adjusted relative to the marking (195), then the threaded stud (200) is finished being screwed into the positioning hole (40, 340).

10. An assembly method (2000) according to claim 8 or 9, wherein the threaded stud (200) comprises a collar (202), and in step f), the threaded stud (200) is screwed into the positioning hole (40, 340) without the collar (202) masking the marking (195).

11. An assembly method (2000) according to any one of claims 1 to 10, wherein said recess (197) is formed in a secondary insulating element (7) of the secondary insulating barrier (2).

12. An assembly method (2000) according to claim 11, wherein said recess (197) is formed at a distance from the edges of said secondary insulating element (7).

13. An assembly method (2000) according to claim 12, wherein said secondary insulating element (7) comprises a blind hole (196) formed in a bottom of the recess (197) and opening into said recess (197), the rod (60) comprises an unthreaded distal portion (63) opposite the head (82), and in step c), the temporary positioning element (50) is screwed into said positioning hole (40, 340) by means of the threaded portion (62) until the unthreaded distal portion (63) is received in the blind hole (196).

14. An assembly method (2000) according to claim 13, wherein a free end (64) of the non-threaded distal portion (63) is chamfered.

15. An assembly method (2000) according to any one of claims 11 to 14, wherein said secondary insulating member (7) is a secondary insulating block comprising an insulating foam block (11) and a cover plate (10) disposed on the insulating foam block (11), an upper surface of the cover plate (10) forming a support surface for the secondary waterproof membrane (4), and in wherein the recess (197) extends into at least a portion of the thickness of the cover plate (10).

16. The assembly method (2000) of claim 15, wherein said anchoring system base (98) comprises: - a movable part (110) comprising a body (111) having an upper face (11 IA) flush with the upper surface of the cover plate (10), the positioning hole (40) passing through said body (111); and - a retaining part (120) fixed to the cover plate (10) and cooperating with the movable part (110) so as to stop the movable part (110) in said recess (197) in the thickness direction, said recess (197) and the retaining part (120) being configured to allow movement of the movable part (110) perpendicular to the thickness direction.