PROTECTIVE LAYER ON INFLATABLE COMPOSITE
Inflatable packers with protective materials address the issue of chemical and physical degradation from corrosive fluids, enhancing the longevity and effectiveness of seals in wellbores.
Patent Information
- Application Number
- FR2024003654
- Authority / Receiving Office
- FR · FR
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2024-03-11
- Filing Date
- 2024-04-09
- Publication Date
- 2024-11-15
AI Technical Summary
Inflatable seals used in wellbores are susceptible to chemical and physical changes due to exposure to corrosive fluids such as acids, amines, and carbon dioxide, compromising their ability to provide effective zonal isolation and sealing.
Inflatable packers are equipped with a protective material, such as metals, polymers, or ceramics, that cover the inflatable material to shield it from chemical and physical changes, maintaining the seal's integrity in wellbore environments.
The protective material extends the lifespan of inflatable seals in wellbores exposed to corrosive fluids, ensuring reliable zonal isolation and sealing performance.
Smart Images

Figure 00000020_0000 
Figure 00000021_0000 
Figure 00000022_0000
Abstract
Description
Title of the invention: PROTECTIVE LAYER ON INFLATABLE COMPOSITE CROSS-REFERENCE TO RELATED REQUESTS
[0001] The present application claims priority from U.S. Provisional Patent Application No. 63 / 501,589, filed on May 11, 2023. CONTEXT
[0002] Boreholes are generally constructed to enable the production of subsurface fluids such as hydrocarbons (e.g., oil and gas). A borehole is formed using a drill bit at the lower end of a drill string. The drill bit rotates while a force is applied through the drill string and against the rock face of the formation being drilled. After drilling to a predetermined depth, the drill string and drill bit are removed, and the borehole is lined with casing. The casing can provide a conduit to transport the subsurface fluids produced from one or more subsurface formations (e.g., reservoirs) to a surface location.Drilling well equipment, which can be placed in or connected to the wellbore, may include one or more devices that promote or hinder the production of subsurface fluids from a subsurface formation to a surface location. For example, pumps can be used to convey subsurface fluids to a surface location, while production isolation devices can prevent the production of subsurface fluids. An annular zone is thus formed between the casing and the formation penetrated by the wellbore.
[0003] A cementing operation is generally performed to displace drilling fluid and fill some or all of the hollow cylindrical annular zone between the casing and the borehole wall with cement. The combination of cement and casing strengthens the borehole and facilitates zonal isolation of fluids from certain sections of a hydrocarbon-producing formation (or "paying zones") behind the casing. The first casing train is placed from the surface to an initial drilling depth. This casing is called surface casing. In the case of offshore operations, this casing may be called lead casing. Typically, one of the main functions of the initial casing train(s) is to isolate and protect shallower aquifers containing usable water from contamination by any other borehole fluid.Consequently, these casing trains are almost always fully cemented to the surface. One or more intermediate casing trains are also inserted into the well. of drilling. These casing trains will have progressively smaller outside diameters as they progress through the borehole. In most current borehole completion work, particularly in unconventional formations where high-pressure hydraulic operations are performed downhole, these casing trains may be fully cemented. In some cases, an intermediate casing train may be a liner, which is a casing train that is not connected to the surface.
[0004] The process of drilling and then cementing progressively smaller casing trains is repeated several times until the well reaches its full depth. In some cases, the last casing train is also a liner. The last casing train, called the production casing, is also generally cemented in place. Additional tubing components may be included in the completion of a well. These include one or more production tubing columns placed within the production casing or liner. Each production tubing column extends from the surface to a designated depth near a production interval, or "paying zone." Each production tubing column may be attached to a sealing gasket. The sealing gasket serves to seal the annular space between the production tubing column(s) and the surrounding casing.
[0005] Inflatable wellbore packings are used in open-hole and cased-hole applications to support production equipment, pit liners, pit plugs, and in various other wellbore operations. Inflatable wellbore packings generally comprise an inflatable material disposed on a tubular element where the inflatable material inflates upon contact with a fluid, expanding to form an annular seal. The inflatable material used to make the wellbore packing may be sensitive to the fluids present in the wellbore. For example, in wellbores where corrosive fluids such as acids, amines, hydrogen sulfide, and carbon dioxide are present, additional considerations may be taken regarding the long-term integrity of wellbore equipment, such as inflatable wellbore packings.For example, an inflatable sealing gasket sleeve exposed to a corrosive fluid may begin to absorb the corrosive fluid into the gasket matrix, potentially causing chemical and physical changes within the gasket. Inflatable gaskets exposed to corrosive fluids can behave like a composite material with spatially varying mechanical properties. Fluids and gases within the tank can alter the volume of the inflatable gasket, potentially compromising its ability to provide zonal sealing. Brief description of the drawings
[0006] The following drawings are an illustration of certain aspects of some of the embodiments of this disclosure and shall not be used in any way to limit or define the process.
[0007] [Fig-1] is a schematic view of a well system with one or more tools sealing (for example a sealing gasket) according to certain embodiments of the present invention.
[0008] [Fig.2] is a diagram of an enlarged view of a sealing gasket according to certain embodiments of the present invention.
[0009] [Fig.3] is a diagram showing a double-completion well with sealing gaskets according to certain embodiments of the present invention.
[0010] [Fig.4] is a longitudinal section of an area of a CO2 injection well according to certain embodiments of the present invention.
[0011] [Fig.5A] is a longitudinal section of a tube having an annular sealing gasket according to certain embodiments of the present invention.
[0012] [Fig.5B] is a longitudinal section of a tube having an annular sealing gasket according to certain embodiments of the present invention.
[0013] [Fig.6A] is a longitudinal section of a tube having an annular sealing gasket according to certain embodiments of the present invention.
[0014] [Fig.6B] is a longitudinal section of a tube having an annular sealing gasket according to certain embodiments of the present invention.
[0015] [Fig.7A] is a large-scale representation of an annular sealing gasket according to certain embodiments of the present invention.
[0016] [Fig.7B] is an enlargement of area B of the large-scale representation of an annular sealing gasket according to certain embodiments of the present invention.
[0017] [Fig.7C] is an enlargement of area C of the large-scale representation of an annular sealing gasket according to certain embodiments of the present invention. DETAILED DESCRIPTION
[0018] The present invention can generally relate to inflatable sealing gaskets and methods for deploying inflatable sealing gaskets in a borehole. More particularly, the present invention relates to inflatable sealing gaskets comprising a protective material at least partially covering an inflatable material with enhanced protection against chemical and physical changes once the inflatable sealing gasket is deployed in a borehole. The inflatable material is disposed on the element The tubular material of the wellbore packing assembly can swell upon contact with a blowing fluid or a material change fluid such as a downhole fluid (i.e., oil, gas, brine, carbon dioxide, and any combination thereof). The swelling of the inflatable material expands the protective material against the wellbore wall, forming a seal.
[0019] Fig. 1 is a schematic view of a well system 100 as an example of an environment in which one or more sealing tools, for example sealing packings 120a, 120b, can be deployed to achieve a seal along a borehole 106. The borehole 106 passes through an underground terrestrial formation 108 which comprises hydrocarbons such as oil and gas. The well system 100 may include an oil and gas drilling rig 102 disposed on the earth's surface 104 above the wellbore 106. The drilling rig 102 may include a large support structure such as a derrick 110, erected above the wellbore 106 on a foundation or support platform, such as a drilling floor 112. Even if some features of the drawing of [Fig.[l] describe an onshore oil and gas platform 102. It will be understood that embodiments of the present invention are also suitable for use in other types of drilling installations, such as offshore platforms or floating drilling rigs used for subsea wells, or in any other geographical location. For example, in a subsea context, the surface of the land 104 may be the floor of a seabed, and the floor of the drilling rig 112 may be located on the offshore platform or on the floating drilling rig on the water above the seabed. A subsea wellhead may be installed on the seabed and be accessible by a riser from the platform or vessel.
[0020] A borehole 106 can penetrate various soil layers, including the subsurface ground formation 108. The borehole 106 can be drilled according to a borehole plan to reach one or more target formations, to avoid undesirable formation features, to minimize the well's surface footprint, and to achieve any other well objective. The borehole 106 can follow a chosen path (i.e., the borehole path) from where the borehole 106 began at the earth surface 104 (i.e., the "heel") to the well end 118 (i.e., the "toe"). The initial portion of the borehole 106 is usually vertically downward, as the drill string is generally suspended vertically from the drilling rig 102.Subsequently, wellbore 106 can deviate in any direction measured by azimuth or inclination, which can result in vertical, horizontal, upward-sloping, downward-sloping, and / or curved sections. The term "top of" refers to the vertical orientation of the borehole. The term "hole" generally refers to a direction along the borehole path to the Earth's surface 104, and the term "downhole" generally refers to a direction toward the bottom at the end of the well 118, regardless of whether an element is vertically upward or vertically downward relative to a reference point. The borehole path in [Fig. 1] is simplified for ease of illustration and is not to scale. In this example, the borehole path includes an initial vertical section 105, followed by at least one deviated section 115 downstream of the vertical section 105, which transitions from the vertical section 105 to a horizontal or lateral section 107 downstream of the deviated section 115. Thus, the vertical section 105 is upstream of both the deviated section 115 and the lateral section 107.
[0021] The borehole 106 may be at least partially cased with a casing train 116 at selected locations within the borehole 106, while other parts of the borehole 106 may remain uncased. The casing train 116 may be secured in the borehole 106 using cement 106. In other embodiments, the casing train 116 may be only partially cemented in the borehole 106 or, alternatively, the casing train 116 may be entirely uncemented. The casing train 116 may be made from any material such as metals, plastics, composites, or the like, and may be expanded or unexpanded as part of an installation procedure. The production tube may be any suitable production column used in hydrocarbon production.In some examples, production tubes may be permanently arranged inside the casing train 116. The sealing gaskets 120a, 120b may be arranged on or near the production tube.
[0022] The drilling rig 102 may include a lifting device for raising and lowering the equipment of the derrick 110 onto a transport device 114. The transport device 114 may perform various functions, such as lowering and retrieving tools, conveying fluids, and supporting electrical communication, power supply, and fluid transmission during drilling operations. The transport device 114 may include any suitable equipment for mechanically conveying tools such as the sealing gaskets 120a, 120b, and any suitable gasket adjustment assembly for adjusting the sealing gaskets 120a, 120b. Such a transport device may include, for example, a tubular column made of interconnected tube segments, or a wire rope, a smooth cable, a coiled tube, or any combination thereof.In some examples, the transport device 114 can provide mechanical suspension, as well as electrical and fluidic connectivity, for bottom tools such as the sealing gaskets 120a, 120b. The transport device 114. can be used to lower one or more tools into the borehole 106, i.e., to drive / trigger them into the hole. When a drilling operation is complete, or when it becomes necessary to exchange or replace tools or components of the transport device 114, the latter can be lifted or completely removed from the borehole 106, i.e., taken out of the hole. The downhole seals 120a and 120b are examples of downhole tools that can be deployed on the transport device 114. The downhole seals 120a and 120b can be actuated at selected locations to seal a portion of the borehole 106.
[0023] One or more sealing packings or other sealing tools according to this invention can be installed for various sealing purposes. As shown in [Fig. 1], the two sealing packings 120a, 120b can represent the same sealing packing that is triggered in the borehole 106 at two different control points. For example, the location at the sealing packing 120a can represent the sealing packing as it is deployed in an operating state through the vertical section 105, and the location at the sealing packing 120b can represent the same sealing packing after it has been deployed further down in the deviated section 115 and secured. Alternatively, the sealing packings 120a, 120b can represent two different sealing packings to be deployed at different locations in the borehole 106.For example, the second sealing packing 120b may be a sealing packing that has already been deployed and fixed in the lateral section 107 of the borehole 106, and the first sealing packing 120a may be another sealing packing deployed in the vertical section 105 but which has not yet been fixed.
[0024] Various types of well packing can be used according to this invention, including, but not limited to, production well packing and maintenance well packing. Suitable types of well packing may include whether they are permanently fixed or retrievable, mechanically fixed, hydraulically fixed, and / or any combination thereof. By way of example, well packings 120a and / or 120b may be production well packings that remain in the well during well production. Alternatively, well packings 120a and / or 120b may be maintenance well packings used temporarily during well maintenance, such as cementing, acidizing, or fracturing.When secured, the sealing gasket 120 can isolate areas of the annular space between the wellbore 106 and a production casing by providing a seal between the production casing and the casing string 116. In some examples, the sealing gasket can be positioned on the production casing. Downhole fastening tools are used. can also be arranged on the transport device 114 and conveyed into the borehole 106 to actuate the sealing gaskets 120a, 120b.
[0025] Figure 2 is an enlarged view of one of the sealing elements 120 of Figure 1, which is deployed in the borehole 106 in an operating state, in which the sealing element 240 is not expanded while being triggered to the bottom of the hole before being secured. The casing 216 has a tubular shape to conform to the generally circular profile of the borehole 206, which has been drilled with a rotary drill bit. Similarly, the sealing element 220 has a generally circular outer profile to fit the generally tubular profile of the borehole 206 when triggered to the bottom of the hole, and to conform to the casing 216 when secured. The sealing element 220 includes a mandrel 222 coupled to a transport device 214 for lowering the sealing element 220 into the borehole. The chuck 222 has an internal fluid passage (“bore”) 221 for conveying fluids internally.The mandrel 222 also supports one or more other sealing components, including the sealing element 240. The mandrel 222 has a generally circular cross-sectional profile. The various other sealing components mounted radially outside the mandrel 222 may also have circular cross-sections that may vary along the axial direction of the mandrel 222. The other sealing components include, for example, a casing 224. The casing 224 comprises an upper casing portion 226 and a lower casing portion 228 spaced axially along the mandrel 222. A gland opening 230 is defined between the upper and lower casing portions 226, 228 through which the sealing element 240 can expand.The sealing element 240 is captured at opposite ends between the mandrel 222 and the respective casing parts 226, 228, the sealing element 240 extending over the gland opening 230.
[0026] To achieve high expansion of the element and a high-pressure sealing system with minimal hydraulic adjustment force, the sealing element can be deployed outward by expanding it on a double-support and piston arrangement. A pair of opposing supports 236, 238 is arranged radially between an outside diameter (OD) of the mandrel 222 and the casing 224. The supports 236, 238 are axially movable toward each other to selectively engage the sealing element 240 in order to push the sealing element 240 outward through the gland opening 230 into a tight fit with an inside diameter (ID) of the tubing 216.
[0027] During the lifetime of an oil and gas well, the production of reservoir fluids depletes the reservoir, leaving behind a usable volume to store carbon dioxide, i.e., a carbon dioxide injection zone. The carbon dioxide injection zone may include underground formations where hydrocarbons have been produced and depleted. These depleted wells can be used to store carbon dioxide (CO2) by injecting carbon dioxide into the injection zone to convert the depleted well into a carbon capture and storage underground storage (CCUS) well. As noted above, inflatable well seals are used in the construction of the wellbore, and therefore, when a depleted well is converted into a CCUS well, the inflatable well seals may be exposed to carbon dioxide. In some embodiments, the differential pressure across the inflatable well seal is reduced by placing a fluid over the seal.For example, the inflatable sealing gaskets of the present invention can be exposed to carbon dioxide and water or to a harmless fluid when the harmless fluid is injected into the upper stratum above the carbon dioxide injection layer and its rock cover to reduce the upward leakage rates of carbon dioxide during and after its injection.
[0028] Let us now turn to [Fig. 3], which illustrates a cased borehole 302 penetrating an underground formation. The formation comprises numerous layers or zones, although only three layers are shown in [Fig. 3]. Layer 0 is overlain by the nearly impermeable layer 1. Above layer 1 is a permeable layer, layer 2. Layer 2, in turn, is overlain by another nearly impermeable layer of shale or shale sand, for example. As shown in [Fig. 3], the borehole 302 includes a double completion system. The coaxial tubes 330a, 330b are provided with respective sealing gaskets 306a, 306b so that tube 330a is in fluidic communication with layer 2 of the formation via the casing perforations 350a, and tube 330b is in communication with layer 0 of the formation via the casing perforations 350b.Pressure sensors 360a, 360b are supplied together with tubes 330a and 330b. Supercritical carbon dioxide is injected by suitable means, for example a pressure-controlled pump 370b, into layer 0 via tube 330b (displacing the brine in this layer). In some embodiments, a compatible fluid such as water (e.g., brine) is injected by suitable means, for example a pressure-controlled pump 370a, into layer 2 via tube 330a at a pressure at least equal to that of layer 0 corrected for the gravitational head of the respective fluids. The pressure of the pumps 370a, 370b is preferably controlled by a control device 380 which receives information from the pressure sensors 360a, 360b and causes the pumps 370a, 370b to pump the [equivalent fluid]. supercritical carbon dioxide and brine in layers 0 and 2 of the formation as described in more detail below in order to properly trap the carbon dioxide in layer 0. Therefore, the inflatable sealing gaskets 306b according to the present invention are simultaneously exposed to supercritical carbon dioxide and brine.
[0029] However, carbon dioxide is a corrosive fluid that can alter the properties of an inflatable well seal. Furthermore, the operating conditions under which carbon dioxide (CO2) is introduced into the wellbore, such as temperature, pressure, and the state of the CO2 (gaseous CO2, liquid (supercritical) CO2, or CO2 dissolved in water (carbonic), can each affect the degree of carbonation of the inflatable well seal. The inflatable well seal according to the present invention, comprising the protective material at least partially covering the inflatable material, can be used in any type of wellbore, including wellbore environments containing carbon dioxide, where the inflatable well seal according to the present invention can have a longer service life compared to conventional inflatable well seals.The inflatable sealing packing according to the present invention can be used in wellbores where corrosive fluids are present, including, but not limited to, acids, amines, and hydrogen sulfide, where the inflatable sealing packing, comprising the protective material at least partially covering the inflatable material, can have a longer service life compared to conventional inflatable sealing packings. Therefore, the inflatable sealing packing according to the present invention can be used for CO2 injection wells, secondary oil recovery, enhanced oil recovery, or any other wellbore treatment, for example.
[0030] The inflatable sealing gaskets according to the present invention comprise a protective material at least partially covering an inflatable material with enhanced protection against chemical and physical changes once the inflatable sealing gasket is deployed in a borehole. The protective material can be any material capable of protecting the inflatable material, including metals, polymers, ceramics, composites, and any combination thereof. The protective metal can be any pure metal or any alloy capable of providing enhanced protection against the downhole environment, including any ferrous alloy, for example. The protective metal can be, for example, in the form of a metal flap that moves during the expansion of the inflatable material. Protective polymer can be any polymer material capable of providing enhanced protection against the downhole environment, including any elastomer, thermoset and thermoplastic such as styrene butadiene, natural rubber, ethylene-propylene monomer rubber, ethylene-propylene-diene monomer rubber, ethylene-vinyl acetate rubber, hydrogenated acrylonitrile butadiene rubber, acrylonitrile butadiene rubber, isoprene rubber, chloroprene rubber, polynorbomene, EPDM, nitrile rubber, HMBR, acrylonitrile, hydrogenated nitrile, chloroprene, ethylene-vinyl acetate rubber, silicone, ethylene-propylene-diene monomer, butyl, chlorosulfonated polyethylene, polyurethane, ACM, BIMS and any combination thereof.The protective ceramic can be any ceramic material capable of providing enhanced protection against the downhole environment, including any conventional or technical ceramic. The protective composite can be any composite material capable of providing enhanced protection against the downhole environment, including a metal matrix composite, a polymer matrix composite, or a ceramic matrix composite.
[0031] The protective material may be inflatable or non-inflatable in the presence of a material-changing fluid such as petroleum, gas, brine, carbon dioxide, acid, cement, and any combination thereof. Non-inflatable protective materials include metals and polymers such as Teflon and hydrogenated nitrile butadiene rubber (HNBR), for example. Inflatable protective materials include polymers such as ethylene propylene diene monomer rubber (EPDM), for example.
[0032] The protective material can be bonded to the inflatable material to form a single structure. In embodiments, the bond is formed by a suitable process including, but not limited to, a mechanical process such as clamping the protective material and the inflatable material against each other, shrink-fitting the protective material against the inflatable material, thermal bonding of the protective material and the inflatable material, for example by bringing the protective material and the inflatable material into contact and heating them together, and / or a chemical process including the use of a polymerizing additive to form a polymer bond (for example vulcanization) or the use of an adhesive.
[0033] We refer to [Fig. 4] which illustrates a longitudinal section through an area of a borehole. As shown in [Fig. 4], an annular sealing gasket 420 is disposed on the outside of a pipe 440; said sealing gasket expands by swelling upon exposure to and absorption of a fluid. The annular sealing gasket 420 swells upon contact with an inflating fluid 410. The blowing fluid 410 can be introduced into the wellbore after the annular packing is introduced, or the blowing fluid may be present in the wellbore when the annular packing 420 is introduced. The annular packing may be made of materials that swell in different types of blowing fluids, such as a petroleum-based fluid, a water-based fluid, or it may be a hybrid pack that swells in both petroleum-based and water-based fluids. The annular packing 420 thus seals the annular space 450 to the wellbore wall 460. The wellbore may be an open-hole well or a cased well, where the production tubing 440 is drawn into an open hole or the production tubing 440 is drawn into casing, respectively.Thus, the annular space 450 is formed by the outer surface of the production tube 440 and the wellbore wall 460, or by the outer surface of the production tube 440 and the inner surface of the casing, respectively. As shown in [Fig. 4], the swelling fluid 410 flows through the annular packing 420 before the latter is expanded and sealed against the wellbore wall 460. An annular packing 430 is shown to be expanded and sealed against the wellbore wall 460 so that well fluid 470 cannot bypass the packing element in the annular space 450.
[0034] Figure 5A is a longitudinal section of a tube with an annular sealing gasket. As shown in Figure 5A, the sealing gasket assembly 500 is located outside the tube 502. The sealing gasket assembly 500 comprises a sealing gasket element 504, a protective element 506, and an end ring 508. The sealing gasket element 504 may be made of a material that will swell upon contact with a swelling fluid. For example, the sealing gasket element 504 may comprise a material that swells with oil or water.In some embodiments, the sealing element may comprise materials such as styrene-butadiene, natural rubber, ethylene-propylene monomer rubber, ethylene-propylene-diene monomer rubber (EPDM), ethylene-vinyl acetate rubber, hydrogenated acrylonitrile-butadiene rubber, acrylonitrile-butadiene rubber, isoprene rubber, chloroprene rubber, polynorbornene, and combinations thereof. The protective element 506 may be made of a material that does not swell in a swelling fluid. Alternatively, the protective element 506 may have relatively less swelling when in contact with a swelling fluid than the material of the sealing element 504. For example, the protective element 506 may comprise a polymer material such as EPDM rubber, nitrile rubber, and combinations thereof. The protective element 506 may also... This includes, but is not limited to, acrylonitrile, hydrogenated nitrile, chloroprene, ethylene-vinyl acetate rubber, silicone, ethylene-propylene-diene monomer, butyl, chlorosulfonated polyethylene, polyurethane, ACM, BIMS, and combinations thereof. The 506 protective element may have less propensity to swell in the swelling fluid than the 504 sealing element. For example, the 506 protective element may be less diffusive against swelling in fluids such as hydrocarbons, and may exhibit less expansion when exposed to swelling fluids than the 504 sealing element. The term "swellable" is used here to indicate an increase in the volume of a material.Typically, this increase in volume is due to the incorporation of molecular components of a fluid into the inflatable material itself, but other inflation mechanisms or techniques can be used if desired. The inflatable material can inflate upon contact with an activating agent, such as an inorganic or organic fluid. In one embodiment, an inflatable material can be one that inflates upon contact with and / or absorption of a hydrocarbon, such as petroleum. In another embodiment, an inflatable material can be one that inflates upon contact with and / or absorption of an aqueous fluid.
[0035] In [Fig. 5A], the protective element 506 is shown as wrapping around the tube 502 and the butt end ring 508 where the sealing element 504 and the protective element 506 come into contact with the end ring 508. [Fig. 5B] shows an alternative configuration of the protective element 506, in which only the protective element 506 butts up against and comes into contact with the end ring 508. The end ring 508 can be fixed to the tube 502 to provide a base against which the butt seal element 504 and / or the protective element 506 can expand.
[0036] The protective element 506 and the sealing element 504 may be any suitable elastomeric sleeve, ring, or strip for creating a fluid-tight seal between the tube 502 and an outer tube, casing, or borehole in which the tube 502 is disposed. The sealing assembly 500 may be made of any material and have any shape and size. In some embodiments, the sealing assembly 500 may be designed for the anticipated conditions at each selected interval in which the insulating sealing assembly 500 is used, taking into account expected temperatures and pressures, for example. In some embodiments, only a portion of the sealing assembly 500, such as the sealing element 504, may comprise an inflatable material.
[0037] The sealing element 504 offers several advantages. For example, by layering a relatively less swollen or non-swollen material on top of a relatively more swollen material, the differential swelling of the sealing element 504 causes the protective element 506 to be pushed against the borehole wall, whether it be the casing or the inside diameter of the open borehole, creating a seal between the less swollen material and the borehole wall. This seal then provides further protection for the sealing element 504 against subsequent exposure to fluids. In the example of the CO2 storage wells in [Fig. 3], a sealing assembly 500 can be placed in a borehole, and a swelling fluid is then brought into contact with the sealing element 504, causing the protective element 506 to seal against the borehole wall.The sealing element 504 containing the more swollen material will be protected from further CO2 injection by the seal provided by the protective element 506 containing the less swollen material.
[0038] [Fig. 6A] is a longitudinal section of a casing 602 with an annular sealing gasket 600. As shown in [Fig. 6A], the annular sealing gasket 600 is disposed on the casing 602 between the end rings 604. [Fig. 6B] is a detailed view of [Fig. 6A] showing the protective element 606 disposed between the end ring 604 and the sealing gasket element 608. When the annular sealing gasket 600 and the sealing gasket element 608 expand, the protective element 606 is pushed against the borehole (not shown) and provides a seal against the borehole. The protective element 606 will be exposed to downhole fluid such as oil, gas, brine, carbon dioxide, any wellbore fluid treatment, or any combination thereof.The exposed protective element 606 will protect the sealing element 608 and the annular sealing element 600 in general from these wellbore fluids.
[0039] Figure 7A is a large-scale representation of an annular sealing gasket according to certain embodiments of the present invention. Area B represents a contact area between the sealing gasket element 504 (with reference to Figure 5), the protective element 506, the end ring 508, and the tube assembly 502. Area C represents a contact area between the sealing gasket element 504 (with reference to Figure 5) and the protective element 506 between two sealing gasket assemblies 500. Figure 7B is an enlargement of area B of the large-scale representation of an annular sealing gasket according to certain embodiments of the present invention. In [Fig.7B], the protective element 730 overlaps the sealing element 740 and the tube assembly 710 while being in adjacent contact with the end piece 720. As shown in [Fig.7B], a step in the sealing trim element 740 increases the surface area. of contact between the sealing element 740 and the protective element 730. The increased contact area optimizes the sealing capacity with the protective element 730, improves its swelling capacity, and optimizes the sealing capacity of the protective element 730 against the borehole wall (not shown) because the swelling of the sealing element 740 pushes the protective element against the borehole. Therefore, the step in the sealing element 740 increases the contact area between the protective element 730 and the borehole wall. The improved seal between the protective element 730 and the borehole wall further prevents the sealing element 740 from being exposed to downhole fluids. Figure 7C is an enlargement of area C of the full-scale representation of an annular sealing element according to certain embodiments of the present invention.As shown in [Fig.7C], the sealing element 750 is in contact with the tube assembly 710.
[0040] Therefore, the present invention may relate to wellbore packing assemblies and methods of using such wellbore packing assemblies that include a protective material, an inflatable material, and a tubular element. The methods and systems may exhibit any of the various features described herein, including one or more of the following.
[0041] Statement 1. Method comprising: inserting into a borehole a sealing assembly comprising: a protective material, an inflatable material and a tubular element; wherein the inflatable material is disposed on the tubular element, wherein the protective material is disposed on the inflatable material and at least partially covers a portion of the inflatable material; bringing the inflatable material into contact with an inflation fluid; inflating the inflatable material to expand the protective material against a wall of the borehole; and forming a seal between the protective material and the wall of the borehole.
[0042] Statement 2. A method according to statement 1, wherein the borehole penetrates an underground formation comprising a carbon dioxide injection zone and wherein the joint isolates the carbon dioxide injection zone.
[0043] Statement 3. Method according to statement 1 or statement 2, wherein the protective material is disposed between a nozzle and the inflatable material and the nozzle extends over the protective material.
[0044] Statement 4. A method according to any one of the preceding statements 1 to 3, further comprising protecting the inflatable material against a material change fluid by preventing the material change fluid from flowing through the seal.
[0045] Statement 5. A method according to any one of the preceding statements 1 to 4, wherein the inflatable material is protected from a material change selected from the group consisting of hardening, softening, embrittlement, change of volume and combinations thereof.
[0046] Statement 6. A method according to any one of the preceding statements 1 to 5, in which the protective material and the inflatable material are pressed tightly together.
[0047] Statement 7. A method according to any one of the preceding statements 1 to 6, wherein the protective material is bonded to the inflatable material by vulcanization.
[0048] Statement 8. A method according to any one of the preceding statements 1 to 7, wherein the protective material is bonded to the inflatable material by at least one chemical selected from a polymerization additive, an adhesive and combinations thereof.
[0049] Statement 9. A method according to any one of the preceding statements 1 to 8, wherein the protective material comprises hydrogenated nitrile-butadiene rubber.
[0050] Statement 10. A method according to any one of the preceding statements 1 to 9, wherein the inflatable material comprises an ethylene-propylene-diene monomer.
[0051] Statement 11. A method according to any one of the preceding statements 1 to 10, wherein the protective material is an inflatable material.
[0052] Statement 12. Wellbore sealing assembly, comprising a protective material, an inflatable material and a tubular element; wherein the inflatable material is disposed on the tubular element, wherein the protective material is disposed on the inflatable material and wherein the protective material covers at least a part of the inflatable material.
[0053] Statement 13. System according to statement 12, in which the protective material is disposed between a nozzle and the inflatable material.
[0054] Statement 14. System according to statement 12 or according to statement 13, in which the protective material is disposed between a nozzle and the inflatable material and the nozzle extends over the protective material.
[0055] Statement 15. System according to any one of the preceding statements 12 to 14, in which the protective material and the inflatable material are pressed tightly against each other.
[0056] Statement 16. System according to any one of the preceding statements 12 to 15, wherein the protective material is bonded to the inflatable material by vulcanization.
[0057] Statement 17. System according to any one of the preceding statements 12 to 16, wherein the protective material is bonded to the inflatable material by a chemical additive.
[0058] Statement 18. System according to any one of the preceding statements 12 to 17, wherein the protective material comprises hydrogenated nitrile-butadiene rubber.
[0059] Statement 19. System according to any one of the preceding statements 12 to 18, wherein the inflatable material comprises ethylene-propylene-diene monomer rubber.
[0060] Statement 20. System according to any one of the preceding statements 16 to 19, wherein the protective material is an inflatable material.
[0061] It should be understood that compositions and processes are described as "comprising", "containing" or "including" various components or steps, and compositions and processes may also "essentially consist" or "be made up of" the various components and steps.
[0062] For the sake of brevity, only certain ranges are explicitly described here. However, ranges from any lower limit can be combined with any upper limit to indicate a range not explicitly stated; similarly, ranges from any lower limit can be combined with any other lower limit to indicate a range not explicitly stated; likewise, ranges from any upper limit can be combined with any other upper limit to indicate a range not explicitly stated. Furthermore, whenever a numeric range with a lower and upper limit is described, any number and any included range within the range are specifically described.In particular, each range of values (of the form, "from about a to about b", or, equivalently, "approximately from a to b" or, equivalently, "approximately a-b") should be understood here as presenting every number and every range lying within the widest range of values, even if they are not explicitly stated. Thus, each individual point or value can constitute its own lower or upper bound combined with any other individual point or value or with any other lower or upper bound, to cite a range not explicitly stated.
[0063] Consequently, the present invention is well suited to achieve the aforementioned purposes and obtain the advantages inherent in the present invention. The particular examples described above are given by way of illustration only, since the present invention can be modified and implemented in different but equivalent ways that are obvious to a person skilled in the art who benefits from the teachings of the present invention. Although individual examples are described, the invention covers all possible combinations of all the examples. Furthermore, there are no limitations relating to the manufacturing or design details illustrated herein, except those described in the claims below. Likewise, the terms in the claims have their ordinary and usual meanings, unless otherwise clearly and explicitly defined by the patent holder.It is therefore evident that the particular illustrative examples described above may be changed or modified, and that all such variations are considered to be included within the scope and spirit of the present invention. In case of conflict in the uses of a word or term in this description and in a [reference to a specific document or document]. Several patents or other documents may be incorporated here for reference; definitions consistent with this description should be adopted.
Claims
Claims
1. A method of deploying an inflatable packer assembly in a wellbore (106), comprising: inserting into a wellbore a packer assembly (500), comprising: a protective material (506); an inflatable material (504); and a tubular member (508); wherein the inflatable material is disposed on the tubular member, wherein the protective material is disposed on the inflatable material and at least partially covers a portion of the inflatable material; contacting the inflatable material with a swelling fluid (410); inflating the inflatable material to expand the protective material against a wall of the wellbore (460); and forming a seal between the protective material and the wall of the wellbore.
2. The method of claim 1, wherein the wellbore penetrates a subterranean formation comprising a carbon dioxide injection zone and wherein the seal isolates the carbon dioxide injection zone.
3. The method of claim 1, wherein the protective material is disposed between a tip and the inflatable material and the tip extends over the protective material.
4. The method of claim 1, further comprising protecting the swellable material from a material change fluid by preventing the material change fluid from flowing through the seal, wherein the swellable material is protected from a material change selected from the group consisting of hardening, softening, embrittlement, volume change, and combinations thereof.
5. The method of claim 1, wherein the protective material and the inflatable material are pressed together.
6. A method according to claim 1, wherein the protective material is either bonded to the swellable material by vulcanization or the protective material is bonded to the swellable material by at least one product chemical selected from a polymerization additive, an adhesive and their combinations.
7. The method of claim 1, wherein the protective material comprises hydrogenated nitrile butadiene rubber.
8. The method of claim 1, wherein the swellable material comprises ethylene-propylene-diene monomer rubber.
9. The method of claim 1, wherein the protective material is a swellable material.
10. A wellbore seal assembly (500), comprising: a protective material (506); an inflatable material (504); and a tubular member (508); wherein the inflatable material is disposed on the tubular member, wherein the protective material is disposed on the inflatable material, and wherein the protective material covers at least a portion of the inflatable material.
11. A wellbore seal assembly according to claim 10, wherein the protective material is disposed between a tip and the inflatable material and the tip extends over the protective material.
12. A wellbore seal assembly according to claim 10, wherein the protective material and the swellable material are clamped against each other.
13. A wellbore seal assembly according to claim 10, wherein the protective material is either bonded to the swellable material by vulcanization, or the protective material is bonded to the swellable material by a chemical additive.
14. The wellbore seal assembly of claim 10, wherein the protective material comprises hydrogenated nitrile butadiene rubber, and wherein the swellable material comprises ethylene propylene diene monomer rubber.
15. A wellbore seal assembly according to claim 10, wherein the protective material is a swellable material.
