PRESSURE REGULATION MECHANISM FOR DOWNHILL TOOLS

The pressure regulation mechanism in downhole tools addresses the challenge of regulating pressures in well liners by using flow measuring devices to manage pressure differentials, reducing the need for high-pressure-rated components and lowering costs.

FR3148620A1Pending Publication Date: 2024-11-15HALLIBURTON ENERGY SERVICES INC
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
FR2024002367
Authority / Receiving Office
FR · FR
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-05-08
Filing Date
2024-03-08
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

Existing well liner designs face challenges in regulating internal and external pressures during hydrocarbon recovery operations, leading to increased costs due to the need for high-pressure-rated components to withstand burst and collapse pressures, particularly in fracturing operations.

Method used

A pressure regulation mechanism for downhole tools, incorporating a securing mechanism with flow measuring devices and seals to isolate and control pressure differentials, using flow measuring devices to manage pressures within acceptable thresholds, reducing the need for high-pressure-rated components.

Benefits of technology

Reduces burst and collapse pressures, lowering the cost of well liner components by allowing them to be designed for lower pressure ratings, thus optimizing the design and reducing overall costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000020_0000
    Figure 00000020_0000
  • Figure 00000021_0000
    Figure 00000021_0000
  • Figure 00000022_0000
    Figure 00000022_0000
Patent Text Reader

Abstract

Systems, methods, and apparatus for regulating pressure within a well tool. Depending on certain aspects, the well tool may include a cylinder, a mounting chamber, a first flow meter, and a second flow meter installed within the cylinder. The first flow meter, having a first pressure threshold, and the second flow meter, having a second pressure threshold, may be configured to regulate internal pressure within the mounting chamber to reduce collapse pressure or pressure differential at the cylinder.The first flow measurement device can be configured to allow an external pressure greater than a first pressure threshold to enter the fixation chamber during a hydrocarbon recovery operation, and the second flow measurement device can be configured to allow the internal pressure of the chamber greater than a second pressure threshold to exit the fixation chamber after the hydrocarbon recovery operation.
Need to check novelty before this filing date? Find Prior Art

Description

Title of the invention: Pressure regulating mechanism for downhole tools Technical field

[0001] The present invention relates generally to energy services, and more particularly to a pressure regulation mechanism in downhole tools.

[0002] State of the art

[0003] A well system may use various well tools to perform hydrocarbon recovery operations. For example, a well system may use one or more well packers to perform downhole fracturing operations in one or more zones of the subterranean formation. Various pressures internal or external to the well packer during operation of the well system may result in burst pressure and collapse pressure at a cylinder of the well packer. Various well packer designs may attempt to regulate the pressures perceived by the well packer components.

[0004] Brief description of the drawings

[0005] [Fig. 1] shows a sectional view of an example of a well packing of a system of wells, depending on certain implementations.

[0006] [Fig.2] shows another sectional view of an example of a well packing of a well system comprising an insulated fixation chamber and flow measurement devices positioned within the cylinder of the fixation chamber, according to certain implementations.

[0007] [Fig.3] shows another sectional view of an example of a well packing of a well system comprising an insulated fixation chamber and flow measurement devices positioned within the cylinder of the fixation chamber, according to certain implementations.

[0008] [Fig.4] shows another sectional view of an example of a well packing of a well system comprising an insulated fixation chamber and flow measurement devices positioned within the cylinder of the fixation chamber, according to certain implementations.

[0009] [Fig.5] is a flowchart of example operations for regulating pressure in a well tool, depending on some implementations.

[0010] [Fig.6] is a diagram of an exemplary well system that includes operations fracturing, depending on certain implementations. DETAILED DESCRIPTION

[0011] The following description includes example systems, methods, techniques, and program flows that describe certain aspects of the disclosure. However, it is understood that this disclosure may be practiced without these specific details. For example, this disclosure refers to reservoir modeling in illustrative examples. Aspects of this disclosure may be applied to other types of models involving spatio-temporal data sets. In other cases, well-known instruction instances, protocols, structures, and techniques have not been presented in detail in order to avoid confusion.

[0012] [Fig. 1] shows a cross-sectional view of an exemplary well packer 100 of a well system, according to some implementations. The well packer 100 may be the only well packer in the well system or may be one of multiple well packers in the well system. For example, [Fig. 6] illustrates a well system that uses multiple well tools, such as multiple well packers, to perform fracturing operations. The well packer 100 may include a securing mechanism that includes a mandrel 101, a cylinder 102, a retainer 106, and a piston 111. The securing mechanism, which may also be referred to as an actuation mechanism, may secure the well packer 100 during oil and gas (or hydrocarbon) recovery operations, such as fracturing operations, as described in more detail herein.A clamping chamber 115 of the well packer 100 may be an internal chamber formed by the outer diameter (OD) of the mandrel 101, the inner diameter (ID) of the cylinder 102, the retainer 106, and the piston 111. In some implementations, flow metering devices (not shown) may be installed in the cylinder 102 to regulate the pressure within the clamping chamber 115, as described in more detail in Figures 2-4.

[0013] The well packer 100 may also include a sealing member 126. The retaining member 106 may be positioned between the OD of the mandrel 101 and the ID of the cylinder 102, and may be movable along the OD of the mandrel 101 to secure (e.g., radially expand) the sealing member 126. For example, the retaining member 106 may compress the sealing member 126 to secure the sealing member 126. The retaining member 106 may include a recess 107 containing a seal 108, and the recess 107 and the seal 108 may extend along the OD of the mandrel 101. The retaining member 106 may also include a recess 109 containing a seal 110, and the recess 109 and the seal 110 may extend along the ID of the cylinder 102.

[0014] The piston 111 may be positioned between the OD of the mandrel 101 and the ID of the cylinder 102, and may be movable along the OD of the mandrel 101. The piston 111 may include recesses 112 and 114 which may extend along the OD of the mandrel 101 and may include a seal 120 and a seal 122, respectively. The piston 111 may also include a recess 116 and a recess 118. The recess 116 may extend along the OD of the mandrel 101 and may include a component 124 to restrict movement of the piston 111 once it has closed one or more fixation chamber ports 125. The one or more fixation chamber ports 125 may also be referred to as chamber ports or fluid ports. The fixation chamber ports 125 may allow fluid to flow from within a bore of the mandrel 101 to the fixation chamber 115.The component 124 may be any type of component that can close one or more fixation chamber ports 125, isolate the fixation chamber 115, and restrict movement of the piston 111. For example, the component 124 may be a plug, a clamping ring, or a rupture disk, among others. The recess 118 may extend along the ID of the cylinder 102 and may include a seal 119. The cylinder 102 may include a locking shoulder 129 to secure the piston 111 in place against the OD of the mandrel 101. This may ensure that the piston 111 does not move upward to close the fixation chamber ports 125 due to unexpected pressure spikes. In some implementations, the clamp chamber ports 125 may be positioned on opposite sides of the mandrel 101. In some implementations, the clamp chamber ports 125 may be positioned in recesses 127.The recesses 127 may be configured to receive the component 124, for example to secure the component 124 and the piston 111 in place, close the clamping chamber ports 125, and isolate the clamping chamber 115 from the mandrel 101.

[0015] A spring 130 may be positioned adjacent to the piston 111. The spring 130 may be compressed against a stop 132. The stop 132 may be, for example, a tubular member (e.g., a ring) positioned around the OD of the mandrel 101, which may be secured in place via a fastener 133. The fastener 133 may be, for example, a clamping ring positioned in a groove 134 that extends along the OD of the mandrel 101.

[0016] To secure or actuate the well packer securing mechanism 100, fluid 140 may pass into the securing chamber 115 from the mandrel 101 through the securing chamber ports 125. During securing or actuation, the cylinder 102 is subjected to fluid pressure (which may be referred to as securing pressure). The securing pressure may simultaneously cause the retainer 106 and the cylinder 102 to move in an axial direction (e.g., indicated by the directional arrow 104, which may be in the uphole direction) the along the mandrel 101 to secure the sealing element 126, and moving the piston 111 in an opposite direction (e.g., indicated by the directional arrow 144, which may be in the downward direction of the bore) to compress or energize the spring 130 against the stop 132.

[0017] [Fig. 2] shows another cross-sectional view of an exemplary well packer 100 of a well system including an isolated clamping chamber and flow measurement devices positioned within the cylinder of the clamping chamber, according to some implementations. After the clamping process depicted in [Fig. 1] is complete, pressure may be vented or reduced from the clamping chamber 115, through the clamping chamber ports 125, and the piston 111 may move to seal the clamping chamber port(s) 125 due to the expansion of the spring 130 and the reduction of pressure within the clamping chamber 115. The clamping chamber 115 is isolated from the mandrel 101 when the component 124 of the piston 111 closes the clamping chamber port(s) 125.

[0018] When the fluid 140 is released from the fixation chamber 115, the internal pressure of the fixation chamber 115 is reduced. The reduction in the internal pressure in the chamber causes the spring 130 to expand, which moves the piston 111 in the direction of the arrow 200. The movement of the piston 111 causes the component 124 to close the fixation chamber port(s) 125, seals the fixation chamber port(s) with the seals 120 and 122, and holds the retaining member 106 to compress the sealing member 126. In addition to closing the fixation chamber port(s) 125, the component 124 can lock the piston 111 in place. The seals 120 and 122 may provide a sealing barrier that helps isolate the clamp chamber 115 from the pressure in the mandrel 101 (which may be referred to as tubing pressure).Isolating the clamping chamber 115 from the pressure in the mandrel 101 can reduce the burst pressure at the cylinder 102.

[0019] In a well system having multiple well packers, such as the well system shown in [Fig. 6] which is used for fracturing operations, the attachment chambers of each of the well packers may be isolated after attaching all of the well packers at a lower pressure. For example, if the fracturing operation is conducted at 15,000 psi (or 15 ksi), the attachment chambers of each well packer may be isolated after attaching all of the well packers at a lower pressure, such as 5 ksi, so that the fracturing operation may be conducted in each zone at, for example, 15 ksi without the cylinder (such as cylinder 102) of each of the attachment chambers (such as attachment chamber 115) experiencing a burst pressure of 15 ksi during fracturing of the lower zones.Typically, when lower zones are fractured, all well linings above the lower zone experience the . high pressure, such as a burst pressure of 15 ksi, in the attachment chambers if the attachment chambers are not isolated. Therefore, the various components and elements, such as the attachment mechanism, of the well packers experience the high pressure (such as 15 ksi). Since the attachment chambers generally experience the high pressure associated with the fracturing operation (such as 15 ksi) when the attachment chambers are not isolated, the cylinder of each of the attachment chambers must generally be designed for the high pressure, which increases the cost of the well packers and results in higher attachment pressures. However, isolating the attachment chambers as described herein can reduce the burst pressure in the attachment chamber and at the cylinder.Since the burst pressure at the cylinder is reduced, the cost of cylinder design and thus the complete cost of the well packer can be reduced.

[0020] As shown in [Fig. 2], the well packer 100 may also include a flow metering device 280 and a flow metering device 282. The flow metering devices 280 and 282 may be installed in the cylinder 102. The flow metering devices 280 and 282 may be used to regulate the internal pressure of the fixation chamber 115 to reduce the collapse pressure, as described in more detail in [Fig. 3].

[0021] [Fig. 3] shows another cross-sectional view of an exemplary well packer 100 of a well system including an insulated attachment chamber and flow measurement devices positioned within the cylinder of the attachment chamber, according to some implementations. As shown in [Fig. 3], the flow measurement devices 280 and 282 may be installed within the cylinder 102 of the attachment chamber 115 of the well packer 100.

[0022] After isolating the attachment chamber 115 as described in [Fig. 2], hydrocarbon recovery operations, such as fracturing operations, may be initiated at an elevated pressure, such as 15 ksi. Generally, when the attachment chamber 115 does not include flow measurement devices and the control chamber 115 is isolated, the attachment chamber 115 of the well packer 100 that is adjacent to the zone being fractured may experience high collapse pressure at the cylinder 102 of the attachment chamber 115. For example, if the fracturing operation is conducted at 15 ksi and the attachment chamber 115 is isolated as described in [Fig. 2], the differential pressure resulting from the high external pressure and the isolated attachment chamber 115 may exert high collapse pressure at the cylinder 102 of the well packer that is adjacent to the zone being fractured.

[0023] In some implementations, for each of the well packers in the well system, flow measurement devices 280 and 282 may be installed in the cylinder 102 of the attachment chamber 115 to regulate the internal pressure of the attachment chamber 115 to reduce collapse pressure. A non-limiting example of the flow measurement devices 280 and 282 may be check valves or any other type of pressure regulating mechanism. The flow measurement device 280 may be designed and configured to allow external pressure exceeding a first pressure threshold to enter the cylinder 102 of the attachment chamber 115. A non-limiting example of the first pressure threshold may be 500 psi. However, the first pressure threshold may be any value that results in a reduced or low pressure differential between the external pressure and the internal pressure of the chamber.The flow measurement device 282 may be designed and configured to allow internal pressure exceeding a second pressure threshold to exit the cylinder 102 from the attachment chamber 115. A non-limiting example of the second pressure threshold may be 5 ksi. However, the second pressure threshold may be any value that maintains sufficient attachment pressure within the attachment chamber 115, as described in more detail below.

[0024] In the non-limiting example where the fracturing operation is performed at an elevated pressure, such as 15 ksi, the flow measurement devices 280 and 282 operate in tandem to build up an internal chamber pressure of 14.5 ksi, since the first pressure threshold allows external pressure that exceeds 500 psi to enter the cylinder 102 of the attachment chamber 115. Thus, the cylinder 102 of the attachment chamber 115 may only experience a collapse pressure (or pressure differential) of 500 psi and the mandrel 101 may only experience a burst pressure (or pressure differential) of 500 psi.As indicated herein, the values ​​described in the examples above, such as the values ​​for the high pressure fracturing operation, the first pressure threshold of the flow measurement device 280, the second pressure threshold of the flow measurement device 282, and the various burst and collapse pressures (or pressure differentials), are all non-limiting example values ​​and the values ​​may vary as needed. Further operation of the flow measurement device 282 after stopping the fracturing operation is described below in [Fig. 4].

[0025] [Fig. 4] shows another cross-sectional view of an exemplary well packer 100 of a well system comprising an insulated attachment chamber and flow measurement devices positioned in the cylinder of the attachment chamber, according to some implementations.

[0026] After stopping the fracturing operation and purging or releasing the internal chamber pressure, the flow rate measuring device 282 may release internal chamber pressure that exceeds the second pressure threshold. In the non-limiting example described above, the flow rate measuring device 282 may release internal chamber pressure that exceeds 5 ksi. Thus, the flow rate measuring device 282 may maintain sufficient pressure within the attachment chamber 115 to apply a fastening load to the fastening elements in the attachment chamber 115 (such as the fastening or actuation mechanism) to supply the well packer 100 in the event of play after the fracturing operation (such as any play in the sealing element of the well packer 100).

[0027] Installing the flow measurement devices 280 and 282 in the cylinder 102 of the well packer 100 can alleviate excessive pressure differential across the cylinder 102 and other well packer components after the chamber isolation is secured. Since the differential pressure and collapse pressure at the cylinder 102 is reduced, the cost of the cylinder design and thus the overall cost of the well packer can be reduced. As described above, the pressure ratings and other characteristics of the flow measurement devices 280 and 282 can be adjusted and customized for other pressure ratings and various other designs. In some implementations, the well packer 100 can be configured as a mechanical hydraulic seal or a mechanical hydrostatic seal.It should be noted, however, that in other implementations, the well packing 100 may be another type of packing.

[0028] In some implementations, similar to the examples described above, installing the flow measurement devices 280 and 282 in highly hydrostatic tools, such as highly hydrostatic packers, can help regulate the internal pressure of the chamber. For example, a hydrostatic well packer that will be deployed to depths where the hydrostatic pressure is, for example, 30 ksi, will need to have seals and other components rated for 30 ksi. When the hydrostatic packer attachment chamber is under vacuum, the collapse pressure at the hydrostatic packer cylinder may be 30 ksi when flow measurement devices are not used. By adding the flow measurement devices 280 and 282 at the attachment chamber cylinder, the collapse pressure (or pressure differential) can be significantly reduced.For example, the first pressure threshold of the flow measurement device 280 may allow an external pressure exceeding 500 psi to enter the chamber. Thus, in this non-limiting example, the pressure differential and collapse pressure may be limited to 500 psi. Further, in another non-limiting example, the second pressure threshold of the flow measurement device . 282 may allow internal chamber pressure in excess of 15 ksi to escape from the chamber to maintain a securing pressure. When it is desired to secure the packing, rupture of the rupture disc will bring the securing chamber to the hydrostatic pressure of 30 ksi, thus producing a securing pressure differential of 15 ksi, which is normally sufficient to secure the packing. Thus, packing components may be designed simply to withstand pressures of 15 ksi (such as the pressure differential), rather than pressures of 30 ksi.As noted herein, the values ​​described in the examples above, such as the values ​​for the high pressure fracturing operation, the first pressure threshold of the flow measurement device 280, the second pressure threshold of the flow measurement device 282, and the various burst and collapse pressures (or pressure differentials), are all non-limiting example values ​​and the values ​​may vary as needed.

[0029] [Fig. 5] is a flowchart of example operations for regulating pressure in a well tool, according to some implementations. The operations may include isolating a fixation chamber of the well tool to reduce burst pressure at a cylinder of the well tool (block 510). The operations may include regulating an internal pressure of the fixation chamber using a first flow metering device and a second flow metering device installed on the cylinder of the well tool to reduce collapse pressure at the cylinder (block 520).

[0030] In some implementations, the operations may also include the first flow measurement device allowing external pressure above a first pressure threshold to enter the attachment chamber during a hydrocarbon recovery operation using the well tool, and the second flow measurement device allowing internal chamber pressure above a second pressure threshold to exit the attachment chamber after the hydrocarbon recovery operation. In some implementations, the operations may also include limiting the pressure differential between the interior of the attachment chamber and the exterior of the cylinder during the hydrocarbon recovery operation to the first pressure threshold of the first flow measurement device to reduce collapse pressure at the cylinder.In some implementations, the operations may also include maintaining the internal pressure of the chamber at the second pressure threshold of the second flow metering device after the hydrocarbon recovery operation to maintain a clamping pressure within the clamping chamber. In some implementations, the operations may further include an actuation mechanism isolating the . clamping chamber relative to a well tool mandrel by sealing a clamping chamber port to reduce burst pressure at the cylinder.

[0031] [Fig. 6] is a diagram of an exemplary well system that includes fracturing operations, according to some implementations. A well system 600 may include a wellbore 604 in a subterranean formation 606. The wellbore 604 may include a casing 602 and a number of perforations 690A-690G made in the casing 602 at different depths as part of hydraulic fracturing to provide hydraulic communication between the subterranean formation 606 and the casing 602 and to provide fracturing in different zones. The well system 600 may also include well packers 695A-695D. Each of the well packers 695A-695D may be configured to implement the features described above with reference to Figures 1-5 to regulate in a fixture chamber.In some implementations, each of the well packers 695A-695D may be configured to isolate the attachment chamber to reduce burst pressure at a cylinder of the well packer, as described above for Figures 1-5. Further, each of the well packers 695A-695D may be configured to regulate an internal pressure within the attachment chamber using a first flow metering device and a second flow metering device installed on the cylinder of the well packer to reduce collapse pressure at the cylinder, as described above for Figures 1-5.

[0032] In some implementations, the well system 600 may also include a fiber optic cable 601. The fiber optic cable 601 may be cemented in place in the annular space between the casing 602 of the wellbore 604 and the subterranean formation 606. In some implementations, the fiber optic cable 601 may be clamped outside the housing 602 during deployment and protected by centralizers and cross-coupling clamps. The fiber optic cable 601 may contain one or more optical fibers, and the optical fibers may be single-mode fibers, multi-mode fibers, or a combination of single-mode and multi-mode optical fibers.

[0033] In some implementations, the fiber optic cable 601 may be used for distributed sensing where acoustic, strain, and temperature data may be collected. The data may be collected at different locations distributed along the fiber optic cable 601. For example, the data may be collected every 1 to 3 feet along the length of the fiber optic cable 601. The fiber optic cable 601 may be enclosed in coiled tubing, a metal cable, loose fiber using coiled tubing, or gravity-deployed fiber spools that pay out the fiber as the spools are moved within the wellbore 604. The fiber optic cable 601 may also be deployed using pumped spools and / or self-propelled containers. Additional deployment options for the fiber optic cable 601 may include coiled casing and wireline-deployed spools where the fiber optic cable 601 is anchored to the toe of the wellbore 604. In such embodiments, the fiber optic cable 601 may be deployed as the wireline or coiled casing is removed from the wellbore 604. The sensor distribution shown in [Fig. 6] is exemplary only. Any suitable sensor deployment may be used. For example, the well system 600 may include fiber optic cable-deployed sensors or sensors cemented into the casing.Different types of sensor deployment can also be combined in the same well, for example by including both casing-cemented sensors and sensors in plugs, flow measurement devices, etc. in the same well system.

[0034] In some implementations, a fiber optic interrogation unit 612 may be located at the surface 611 of the well system 600. The fiber optic interrogation unit 612 may be directly coupled to the fiber optic cable 601. Alternatively, the fiber optic interrogation unit 612 may be coupled to a fiber stretching module, where the fiber stretching module is coupled to the fiber optic cable 601. The fiber optic interrogation unit 612 may receive measurement values ​​taken and / or transmitted along the fiber optic cable 601, such as acoustic, temperature, strain measurements, etc. The fiber optic interrogation unit 612 may be electrically connected to a digitizer to convert the optically transmitted measurements into digitized measurements. The 600 well system may contain multiple sensors, such as 603A-C sensors.There may be any number of sensors placed at any location in the wellbore 604. The sensors 603A-C may be pressure sensors, distributed fiber optic sensors, point temperature sensors, point acoustic sensors, interferometric sensors, or point strain sensors. The distributed fiber optic sensors may be capable of measuring distributed acoustic data, distributed temperature data, and distributed strain data. All of the sensors 603A-C may be communicatively coupled (not shown) to other components of the wellbore system 600 (e.g., the computer 610). In some implementations, the sensors 603A-C may be cemented to a casing 602.

[0035] In some implementations, a computer 610 may receive the electrically transmitted measurements from the fiber optic interrogation unit 612 using a connector 625. The computer 610 may include a signal processor to perform various processing operations on the signals captured by the fiber optic interrogation unit 612 and / or other components of the well system 600. The computer 610 may have one or more processors and a memory device for analyzing the measurements and graphically representing the analysis results on the display device 650.

[0036] In some implementations, the fiber optic interrogation unit 612 may operate according to various sensing principles, including, but not limited to, amplitude-based sensing systems such as distributed temperature sensing (DTS), DAS, distributed vibration sensing (DVS), and distributed strain sensing (DSS). For example, the DTS system may be based on Raman and / or Brillouin scattering. A DAS system may be a phase detection-based system that is based on interferometric sensing using homodyne or heterodyne techniques where the system can detect changes in phase or intensity due to constructive or destructive interference. The DAS system may also be based on Rayleigh scattering and, in particular, coherent Rayleigh scattering.A DSS system may be a strain detection system using dynamic strain measurements based on interferometric sensors (e.g., the 603A-C sensors) or static strain detection measurements using Brillouin scattering. Rayleigh scattering-based DAS systems may also be used to detect dynamic strain events. Temperature effects may in some cases be subtracted from static and / or dynamic strain events, and temperature profiles may be measured using Raman-based systems and / or Brillouin-based systems capable of differentiating between strain and temperature, and / or any other optical and / or electronic temperature sensors, and / or any other optical and / or electronic temperature sensors, and / or estimated thermal events.

[0037] In some implementations, the fiber optic interrogation unit 612 may measure changes in the properties of the optical fiber between two points on the optical fiber at a given time, and these two measurement points move along the sensing optical fiber as light travels along the optical fiber. Changes in optical properties may be induced by deformations, vibrations, acoustic signals, and / or temperature resulting from fluid flow. Phase- and intensity-based interferometric sensing systems may be sensitive to temperature and mechanical vibrations, as well as those induced acoustically. The fiber optic interrogation unit 612 may capture DAS data in the time domain. One or more components of the well system 600 may convert the time-domain DAS data into frequency domain data using fast Fourier transforms (FFTs) and other transforms. For example, wavelet transforms can also be used to generate different representations of DAS data. Various frequency ranges can be used for different purposes, and low-frequency signal changes can be attributed to changes in formation deformation or fluid movement, while other frequency ranges may indicate fluid or gas movement. Various filtering techniques can be applied to generate event indicators related to fluid flow measurement.

[0038] In some implementations, the DAS measurements along the wellbore 604 may be used as an indication of fluid flow through the casing 602 in the wellbore 604. The vibrations and / or acoustic profiles may be recorded and stacked over time, where a simple approach may correlate the total energy or signal strength recorded with known flow rates. For example, the fiber optic interrogation unit 612 may measure energy and / or amplitude in multiple frequency bands where changes in the selected frequency bands may be associated with oil, water, and / or gas, thereby establishing a multi-phase production profile along the wellbore 604.

[0039] Although aspects of the disclosure are described with reference to various implementations and operations, it is understood that these aspects are illustrative and that the scope of the claims is not limited thereto. In general, the reservoir modeling techniques as described herein may be implemented with facilities compatible with any hardware system or systems. Many variations, modifications, additions, and improvements are possible.

[0040] Plural instances may be provided for the components, operations, or structures described herein as a single instance. Finally, the boundaries between different components, operations, and data stores are rather arbitrary, and particular operations are illustrated in the context of specific illustrative configurations. Other assignments of functionality are contemplated and may be within the scope of the disclosure. In general, the structures and functionality shown as separate components in the example configurations may be implemented as a combined structure or component. Likewise, the structures and functionality shown as a single component may be implemented as separate components. These and other variations, modifications, additions, and enhancements may be included within the scope of the disclosure.

[0041] As used herein, the term "or" is inclusive unless explicitly stated otherwise. Thus, the expression "at least one of A, B, or C" is satisfied by any any element of the list {A, B, C] or any combination of these, including multiples of any element. Examples of embodiments

[0042] Exemplary embodiments may include the following:

[0043] Embodiment No. 1: A well tool comprising: a cylinder; a fixation chamber formed, in part, by the cylinder; and a first flow rate measuring device and a second flow rate measuring device installed in the cylinder, the first flow rate measuring device and the second flow rate measuring device configured to regulate an internal pressure within the fixation chamber to reduce a collapse pressure at the cylinder.

[0044] Embodiment 2: The well tool of embodiment 1, wherein the first flow rate measuring device is configured to allow external pressure greater than a first pressure threshold to enter the attachment chamber during a hydrocarbon recovery operation using the well tool, and the second flow rate measuring device is configured to allow internal chamber pressure greater than a second pressure threshold to exit the attachment chamber after the hydrocarbon recovery operation.

[0045] Embodiment No. 3: The well tool of embodiment No. 2, wherein a pressure differential between the interior of the fixation chamber and the exterior of the cylinder during the hydrocarbon recovery operation is set by the first pressure threshold of the first flow measurement device in order to regulate and reduce the collapse pressure at the cylinder.

[0046] Embodiment No. 4: The well tool of embodiment No. 2, wherein the second flow measurement device maintains the internal pressure of the chamber at the second pressure threshold after the hydrocarbon recovery operation to maintain a clamping pressure inside the clamping chamber.

[0047] Embodiment No. 5: The well tool of embodiment No. 1, wherein the first flow rate measuring device is a first check valve and the second flow rate measuring device is a second check valve.

[0048] Embodiment No. 6: The well tool of embodiment No. 1, wherein the well tool is a well packer, the well packer being configured as a mechanical hydraulic packer or a mechanical hydrostatic packer.

[0049] Embodiment No. 7: The well tool of embodiment No. 1, further comprising: an actuating mechanism configured to isolate the fixation chamber to reduce burst pressure at the cylinder.

[0050] Embodiment No. 8: The well tool of embodiment No. 7, further comprising: a mandrel; and a fixation chamber port between the fixation chamber and the mandrel, wherein the actuating mechanism is configured to isolate the chuck clamping chamber by sealing the clamping chamber orifice to reduce burst pressure at the cylinder.

[0051] Embodiment No. 9: The well tool of embodiment No. 1, wherein the well tool is a well packer configured for use in a fracturing operation for hydrocarbon recovery.

[0052] Embodiment No. 10: A method of regulating pressure in a well tool, comprising: isolating a fixation chamber of the well tool to reduce burst pressure at a cylinder of the well tool; and regulating an internal pressure within the fixation chamber using a first flow measurement device and a second flow measurement device installed in the cylinder of the well tool to reduce burst pressure at the cylinder.

[0053] Embodiment No. 11: The method of embodiment No. 10, wherein the regulation of the internal pressure of the chamber comprises the first flow measurement device allowing an external pressure greater than a first pressure threshold to enter the fixation chamber during a hydrocarbon recovery operation using the well tool, and the second flow measurement device allowing the internal pressure of the chamber greater than a second pressure threshold to exit the fixation chamber after the hydrocarbon recovery operation.

[0054] Embodiment No. 12: The method of Embodiment No. 11, wherein regulating the internal pressure of the chamber comprises limiting the pressure differential between the interior of the fixation chamber and the exterior of the cylinder during the hydrocarbon recovery operation to the first pressure threshold of the first flow measurement device in order to reduce the collapse pressure at the cylinder.

[0055] Embodiment No. 13: The method of embodiment No. 11, wherein regulating the internal pressure of the chamber comprises maintaining the internal pressure of the chamber at the second pressure threshold of the second flow measurement device after the hydrocarbon recovery operation in order to maintain a clamping pressure inside the clamping chamber.

[0056] Embodiment No. 14: The method of Embodiment No. 10, wherein isolating the attachment chamber from the well tool comprises an actuating mechanism isolating the attachment chamber from a mandrel of the well tool by sealing a attachment chamber port to reduce burst pressure at the cylinder.

[0057] Embodiment No. 15: A well system for hydrocarbon recovery, comprising: a well casing; and one or more well liners, wherein each of the wellhead(s) includes: a cylinder; a fixture chamber formed, in part, by the cylinder; and a first flow metering device and a second flow metering device installed in the cylinder, the first flow metering device and the second flow metering device configured to regulate an internal pressure within the fixture chamber to reduce a collapse pressure at the cylinder.

[0058] Embodiment #16: The well system of embodiment #15, wherein the first flow rate measuring device is configured to allow external pressure greater than a first pressure threshold to enter the attachment chamber during a hydrocarbon recovery operation using the one or more well spools, and the second flow rate measuring device is configured to allow internal chamber pressure greater than a second pressure threshold to exit the attachment chamber after the hydrocarbon recovery operation.

[0059] Embodiment No. 17: The well system of embodiment No. 16, wherein a pressure differential between the interior of the fixation chamber and the exterior of the cylinder during the hydrocarbon recovery operation is set by the first pressure threshold of the first flow measurement device in order to regulate and reduce the collapse pressure at the cylinder.

[0060] Embodiment No. 18: The well system of embodiment No. 16, wherein the second flow measurement device maintains the internal pressure of the chamber at the second pressure threshold after the hydrocarbon recovery operation to maintain a clamping pressure within the clamping chamber.

[0061] Embodiment No. 19: The well system of embodiment No. 15, wherein the first flow rate measuring device is a first check valve and the second flow rate measuring device is a second check valve.

[0062] Embodiment #20: The well system of embodiment #15, wherein each of the one or more well liners further comprises: a mandrel; a fixation chamber port between the fixation chamber and the mandrel; and an actuating mechanism configured to isolate the fixation chamber from the mandrel by sealing the fixation chamber port to reduce burst pressure at the cylinder.

Claims

Claims

1. A well tool, comprising: a cylinder (102); a fixation chamber (115) formed, in part, by the cylinder; and a first flow rate measuring device (280) and a second flow rate measuring device (282) installed in the cylinder, the first flow rate measuring device and the second flow rate measuring device configured to regulate an internal pressure within the fixation chamber to reduce a collapse pressure at the cylinder.

2. The well tool of claim 1, wherein the first flow rate measuring device is configured to allow external pressure greater than a first pressure threshold to enter the attachment chamber during a hydrocarbon recovery operation using the well tool, and the second flow rate measuring device is configured to allow internal pressure of the chamber greater than a second pressure threshold to exit the attachment chamber after the hydrocarbon recovery operation.

3. The well tool of claim 2, wherein a pressure differential between the interior of the fixation chamber and the exterior of the cylinder during the hydrocarbon recovery operation is set by the first pressure threshold of the first flow measurement device to regulate and reduce the collapse pressure at the cylinder.

4. The well tool of claim 2, wherein the second flow measurement device maintains the internal pressure of the chamber at the second pressure threshold after the hydrocarbon recovery operation to maintain a clamping pressure within the clamping chamber.

5. The well tool according to one of claims 1 to 4, wherein the first flow measuring device is a first check valve and the second flow measuring device is a second check valve.

6. The well tool of claim 5, further comprising: a mandrel (101); a clamp chamber port (125) between the clamp chamber and the mandrel; and an actuating mechanism configured to isolate the clamp chamber from the mandrel by sealing the clamp chamber port to reduce burst pressure at the cylinder.

7. The well tool of one of claims 1 to 6, wherein the well tool is a well packer (100) configured as a mechanical hydraulic packer or a mechanical hydrostatic packer and configured for use in a fracturing operation for hydrocarbon recovery.

8. A method of regulating pressure in a well tool, comprising: isolating a fixture chamber (115) of the well tool to reduce burst pressure at a cylinder (102) of the well tool; and regulating an internal pressure of the fixture chamber using a first flow rate measuring device (280) and a second flow rate measuring device (282) installed on the cylinder of the well tool to reduce collapse pressure at the cylinder.

9. The method of claim 8, wherein regulating the internal pressure of the chamber comprises the first flow measurement device allowing an external pressure greater than a first pressure threshold to enter the fixation chamber during a hydrocarbon recovery operation using the well tool, and the second flow measurement device allowing the internal pressure of the chamber greater than a second pressure threshold to exit the fixation chamber after the hydrocarbon recovery operation.

10. The method of claim 9, wherein regulating the internal pressure of the chamber comprises limiting the pressure differential between the interior of the fixation chamber and the exterior of the cylinder during the hydrocarbon recovery operation to the first pressure threshold of the first flow measurement device in order to reduce the collapse pressure at the cylinder.

11. The method of claim 9, wherein regulating the internal pressure of the chamber comprises maintaining the internal pressure of the chamber at the second pressure threshold. of the second flow measuring device after the hydrocarbon recovery operation in order to maintain a fixing pressure inside the fixing chamber.

12. The method of one of claims 8 to 11, wherein isolating the attachment chamber from the well tool comprises an actuating mechanism isolating the attachment chamber from a mandrel (101) of the well tool by sealing a attachment chamber port (125) to reduce burst pressure at the cylinder.

13. A well system for hydrocarbon recovery, comprising: a well casing; and one or more well liners (100), wherein each of the one or more well liners comprises: a cylinder (102); a fixture chamber (115) formed, in part, by the cylinder; and a first flow measurement device (280) and a second flow measurement device (282) installed in the cylinder, the first flow measurement device and the second flow measurement device configured to regulate an internal pressure within the fixture chamber to reduce a collapse pressure at the cylinder.

14. The well system of claim 13, wherein: the first flow measurement device is configured to allow external pressure above a first pressure threshold to enter the attachment chamber during a hydrocarbon recovery operation using the at least one well packer and, optionally, wherein a pressure differential between the interior of the attachment chamber and the exterior of the cylinder during the hydrocarbon recovery operation is set by the first pressure threshold of the first flow measurement device to regulate and reduce collapse pressure at the cylinder, and the second flow measurement device is configured to allow internal chamber pressure above a second pressure threshold to exit the attachment chamber after the hydrocarbon recovery operation and, optionally,wherein the second flow measuring device maintains the pressure, internal chamber at the second pressure threshold after the hydrocarbon recovery operation to maintain a fixing pressure inside the fixing chamber.

15. The well system of one of claims 13 to 14, wherein the first flow measurement device is a first check valve and the second flow measurement device is a second check valve, and wherein each of the at least one well packer further comprises: a mandrel (101); a fixation chamber port (125) between the fixation chamber and the mandrel; and an actuating mechanism configured to isolate the fixation chamber from the mandrel by sealing the fixation chamber port to reduce burst pressure at the cylinder.