A post tensioned stone assembly and method of fabrication
Patent Information
- Application Number
- GB2024014701
- Authority / Receiving Office
- GB · GB
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2024-10-07
- Publication Date
- 2024-11-20
AI Technical Summary
Existing post-tensioned stone assemblies are limited in shape and size due to fabrication techniques, which affect their structural integrity and versatility in construction applications.
A post-tensioned stone assembly comprising stone blocks with aligned apertures for tendons, sealed with flowable adhesive and non-slumping grout, allowing for tensioning and bonding without leakage, and optionally incorporating ducts for services, with fabrication methods that include angled assembly and controlled adhesive curing.
Enhances structural integrity and versatility by ensuring uniform tension distribution and adhesive bonding, enabling larger and more complex stone assemblies suitable for various construction components.
Abstract
Description
Field The present invention relates to a post tensioned stone assembly and method of fabrication. More particularly the invention relates to a post tensioned plank which may find application in a wide range of buildings or construction components such as lintels, walls and stairs. Background Pre-tensioned and post tensioned concrete structures are well known. These structures usually comprise a type of concrete in which an appropriate amount and distribution of internal stress is supplied to counteract stresses caused by external loads on the structure. In the concrete part of the structure, high-strength steel wire or alloys, also known as ‘tendons’, are provided so they generate a substantial and continuous compressive force on the concrete structure. As an initial load is applied to the structure prior to its fabrication, prestressed concrete differs from reinforced cement concrete (RCC) structures. Prestressing is a technique which helps to prevent cracks in the concrete and thereby increases the strength of a structure in which a concrete beam or post is deployed by reducing tendency of the beam or post to bend or deflect. Prestressing is a technique for achieving a lower depth, longer span, and improved strength in a structure. In structural engineering, a prestressed structure is usually a load-bearing structure whose overall integrity, stability and security depend, primarily, on the extent of the prestressing. The prestressing creates permanent stresses in the structure for the purpose of improving its performance under various operational conditions and applications. An advantage of this technique is the compressive strength of stone (or prefabricated concrete) is used optimally as the blocks are held in compression. Special alloy steels are used to form prestressing tendons which are likewise used to their optimum capability. Tension cracks are eliminated which in turn reduces the risk of steel components corroding. Shear stresses are also reduced. Post-tensioned stone assemblies are very similar to the aforementioned concrete structures in that once the stone components are in place, the tendons are tensioned, typically by way of hydraulic jacks. The force is transferred to the stone through anchorages located at ends of the tendons. The load is usually spread across surfaces of ends of components by one or more load spreading plates. However, due to the fabrication techniques that are used there are often limitations as to the shape and size of post-tensioned stone assemblies which have been produced to date. The present invention arose to provide a new type of post-tensioned stone assembly which is ideally suited for use in construction and buildings. In another aspect there is also provided a method of fabrication of post-tensioned stone plank assembly. Summary of the Invention According to a first aspect of the invention there is provided a post tensioned stone assembly comprises a plurality of stone blocks each adjacent pair of stone blocks having flat faces that abut one another; an aperture, of diameter 01, extends through each stone block, such that the apertures of adjacent stone blocks are in register one with another; a pretensioned tendon, of diameter 02, passes through the apertures of adjacent stone blocks and lies substantially on a central axis of the aperture; and a flowable adhesive surrounds the pretensioned tendon and binds its outer surface to an inner wall of the aperture. The flowable adhesive may be cementitious grout or an adhesive such as epoxy. In some embodiments a layer of non-slumping grout is applied between the blocks prior to them having rods inserted therethrough and prior to the tensioning force applied. After the non-slumping grout is applied it prevents egression of flowable adhesive from the apertures by creating a sealed volume. The non-slumping grout is applied prior to a stone block being placed on another stone block and in such a manner as to leave a gap between edges of each stone block and edges of each aperture in the stone blocks. This gap ensures that when tension is applied and the stone blocks are pressed together, the non-slumping grout is squeezed laterally but does not exude from between the stone blocks or enter any of the apertures. Optionally an insert or grommet, such as a barrel grommet or top hat grommet is placed in each aperture prior to application of the non-slumping grout to prevent egress of the non-slumping grout into an aperture. These inserts or grommets may be removed prior to placement of a subsequent stone block or be dimensioned and sized to remain in situ. In some embodiments three or more apertures are provided with a pretensioned tendon positioned in each of the apertures. Preferably the two or more apertures are formed in a straight line which lies in a plane defined in the post tensioned stone assembly. The plane lies ideally on a neutral axis of the post tensioned stone assembly so that inclusion of the apertures has minimum impact on the integrity or strength of the post tensioned stone assembly when a forces is applied in an angle to the neutral axis. Offset from the apertures there are preferably ducts formed, for example by drilling, which extend from a face of an end stone block to each of the apertures. Other channels or ducts may be formed which also preferably lie on the neutral axis. These may be important when thicker assemblies are being produced and there is a requirement for channels or ducts, for example to receive services, such as hoses, conduit or cables, and for these services to be accommodated across the width of the stone assembly. In some embodiments 01 is between 1.5x 02 and 4x 02. The exact ratio depends on stone type, geometry and application. In some embodiments the assembly is a floor plank which has two apertures extending axially therethrough and which parallel one with another. A steel or steel alloy tensioning cable or tendon passes through each aperture. In some embodiments the post tensioned stone assembly comprises at least three apertures which extend axially and are parallel one with another, and at least three steel or steel alloy tensioning cables or tendons pass through each stone component. When the assembly has been constructed and tension has been applied to the cables or tendons, the flowable adhesive is introduced into the apertures. This is preferably performed when the assembly is retained at an inclined angle, which is ideally between 5° and 75°, more preferably between 10° and 50°, and most preferably between 15° and 35°. The viscosity of the flowable adhesive, at 20°C, is ideally as specified, in BS-EN 445 2007. Cementitious fluid grout that performs at a test level between 12 and 15 seconds when the test is for example in accordance with the BS-EN 445 (2007) fluidity test cone method. In some embodiments, edges of the stone floor plank may have cutaway portions in the form of slots, apertures or recesses. Optionally the force applied to the pretensioned tendon is between 50 kN and 550 kN and preferably greater than 500 kN. This force is dependent on compressive strength of the chosen stone and the geometry. This force is dependent on compressive strength of the chosen stone and the geometry of the overall assembly. According to a second aspect of the invention there is provided a method of fabricating a post tensioned stone assembly comprising the steps of: arranging a plurality of stone blocks, whose abutting faces are flat and flush with one another, on an angled support; forming at least one aperture, of diameter 01, which extends through adjacent stone blocks, such that the apertures of adjacent stone blocks are in register one with another; inserting a tendon, of diameter 02, through the apertures of adjacent stone blocks; applying a tensile force to the tendon; and flowing a flowable adhesive into a lower aperture and allowing the flowable adhesive to flow towards an upper aperture in order to bind an outer surface of the tendon to an inner wall of the aperture. The flowable adhesive is injected at the lowest point on the assembly through an injection point that can be a separate drilled port to the aperture which receives the tendon, or tendon cavity, or through a base plate into the tendon cavity as this ensures that any trapped air is vented through an upper part of the aperture. Again, in some embodiments a layer of non-slumping grout is applied between the blocks prior to them having rods inserted therethrough and prior to the tensioning force applied. After the non-slumping grout is applied it prevents egression of flowable adhesive from the apertures by creating a sealed volume. The non-slumping grout is applied prior to a stone block being placed on another stone block and in such a manner as to leave a gap between edges of each stone block and edges of each aperture in the stone blocks. This gap ensures that when tension is applied and the stone blocks are pressed together, the non-slumping grout is squeezed laterally but does not exude from between the stone blocks or enter any of the apertures. Preferably during fabrication, the stones used in the post tensioned assembly are assembled at an inclined angle to a horizontal. Optionally the method of fabrication includes the steps of introducing spacers, within apertures, for spacing the tendon substantially along a central axis of the aperture. In some variations the method includes forming three apertures through a plurality of adjacent stones and inserting a tendon in each. Tensioning the three tendons is ideally carried out at the same time, to ensure unified loading across the entire assembly. In some embodiments the assembly fabricated as a plank, in the form of an elongate rectangle, whose length is typically between 1 m and 25 m, more preferably between 5 m and 20 m, most more preferably between 10 m and 15 m. Optionally a breathable plug is inserted into at least one of the apertures in the post tensioned stone assembly, after the flowable adhesive is introduced. An advantage of using the breathable plug is that it allows the flowable adhesive to cure in a controlled manner. In some embodiments the stone assembly is a floor plank. Alternatively, the stone assembly may be used as part of a floor or walkway or balcony. A method of fabricating a post tensioned stone floor plank includes inclining the plurality of stone blocks as they are supported on an angled support. Ideally the stone blocks are supported on the support at angle between 15° and 45°, more preferably between 20° and 40°, and most preferably between 25° and 35°.an angle of incline between 5° and 30°. The combination of angle of incline of the angled support, viscosity of flowable adhesive and rate of introduction of the flowable adhesive, ensure that no air bubbles are formed or trapped within the aperture. This avoids any discontinuities being formed which might weaken the bond between the inner walls of stone blocks and the pretensioned tendon that could compromise the integrity of the assembly. In some embodiments the post tensioned stone floor assembly or plank has at least one cutaway portion formed or cut along at least one of its edges. In some embodiments the method includes placing spacers, around a tendon for spacing the tendon substantially along a central axis of the aperture. In some embodiments the method of fabricating a post tensioned stone assembly comprises arranging rows of post tensioned stone floor planks in a parallel configuration so as to define an array of stone blocks. A preferred embodiment of the invention will be described by way of example of an assembly which is a stone plank and with reference to the Figures in which: Brief Description of the Drawings Figures 1 Ato 1K show stages of production of one example of a post tensioned stone assembly comprising a plurality of stone blocks arranged on an inclined support to form a stone plank; Figures 2A to 2H show further stages, in diagrammatical form, of production of the plank; Figures 3Ato 3D show examples of finished versions of the plank; Figure 4A shows an alternative embodiment of a post tensioned stone assembly in the form of a wall in which the supports shown in Figures 1A to 1K have been extended to define an array and leave apertures in the wall or floor plank; Figures 5A an overall view of seven stone planks, with offset stone blocks, arranged in an array to form a walkway or floor; 5B a plan view of the walkway or floor in Figure 5A and shows in hidden detail tendons extending through adjacent offset stone block; 5C is a detailed view of a plan view of the walkway or floor in Figure 5A and shows in hidden detail tendons anchors along edges of the further examples of a stone assembly in which portions have been removed from the flooring; Figures 6A is an overall view of seven stone planks, arranged in an array to form a walkway or floor, with apertures cut between post tensioned tendons; and Figure 6B is a plan view of the walkway or floor in Figure 6A. Detailed Description of Preferred Embodiments Referring to Figures 1Ato 1K there are shown a support frame or rig 10 which is used to construct a post tensioned stone assembly, in the form of a plank 100 (Figure 2A). Plank 100 which comprises a plurality of stone blocks 20, 22, 24, 26 (Figure 2B). The support frame 10 comprises rigid steel uprights 12 and base struts 14 to provide a stable and strong supporting surface 16 on which a first stone block 20 is placed. Supporting surface 16 is inclined to the horizontal at an angle between 5° and 75° more preferably between 10° and 50°, and most preferably between 15° and 35°. Stone block 20 is shown in detail in Figure 1E. Figure 1C shows a side elevation of the arrangement of the support frame 10 in which like parts bear the same reference numerals. A neoprene gasket 200, shown in Figure 1J is preferably placed between the first block of stone 20 and the second block of stone 22 to prevent debris or high points on the block becoming points of stress during compression. Referring to Figures 2E and 2F a steel end plate 77 is sufficiently thick to distribute evenly the compressive force throughout the end face of stone block 20 which defines one end of the assembly. Figure 1D shows a detailed view of a second stone block 22 being placed on the first stone block 20. Figure 1B shows apertures 30, 32 and 34, formed for example by drilling through stone block 20. The drilled apertures 30, 32 and 34 are parallel one to another and pass through the stone block 20 and align with similar sized and positioned apertures in a second stone block 22 so that all three apertures are collinear when second stone block 22 is placed adjacent stone block 20 on the support frame part of frame 12. Figure 1F is a plan view which shows figure 1G and 1H show in detail and Figure 1 J. Referring to Figure 2D there is shown a layer of compressive cementitious adhesive product 99, such as non-slumping grout 99 is applied prior to a stone block being placed on another stone block and in such a manner as to leave a gap between edges of each stone block and edges of each aperture in the stone blocks. The non-slumping grout 99 is combed on an end face 23 of the first stone block 20. Stone block 22 is then stuck to the face of the first stone block 20, as shown in Figure 1D with the non-slumping grout in order to adhere blocks 20 and 22 one to another. To prevent the non-slumping grout 99 from flowing into the apertures 30, 32 and 34 as it is being applied, through the blocks, an insert or grommet (not shown), such as a barrel grommet or top hat grommet is placed in each aperture 30, 32, 34 prior to application of the non-slumping grout 99 to prevent egress of the non-slumping grout into the apertures. These inserts or grommets may be removed prior to placement of a subsequent stone block or be dimensioned and sized to remain in situ between adjacent stone blocks. A breathable plug (not shown) is inserted into the apertures in the post tensioned stone assembly, after the flowable adhesive is introduced. An advantage of this is that the flowable adhesive is able to cure in a controlled manner. Once applied, the next stone block 24 is placed in position against a layer of nonslumping grout 99 on upward facing face of the next stone block 22, with apertures 30, 32, 34 in register with the ones in the stone block 20 below and the process is repeated to achieve a stone plank as shown in Figure 1B. When the non-slumping grout 99 is applied, these layers bind adjacent stones and form an impervious barrier which prevents the non-slumping grout 99 egressing from the apertures 30, 32 and 34 as the non-slumping grout 99 is applied to each stone face. Thus, the method of fabricating a post tensioned stone assembly includes arranging stone blocks with their flat abutting faces flush with one another, on an angled support and ensuring that apertures which extends through adjacent stone blocks are in register one with another. This is repeated with stone block 24, 26, 28 etc until the required number of stone blocks are grouted together on the frame 12. The stone blocks 20 to 28, forming the assembly 100, are thus bonded together as indicated in Figures 1G and 1H. As the stone blocks 20, 22, 24 adhere together, an incompressible barrier is created. This is important because tendons 51, 53 and 55 are then inserted in the apertures 30, 32 and 34 respectively and held in place by anchors 50, 52 and 54 respectively. Referring to Figures 3A, 3B, 3C and 3D shows various views of the of the plank 100 in a bonded state prior to insertion of tendons in apertures 30, 32 and 34. Posttensioning cables or tendons 50, 52 and 54 are then placed through the apertures 30, 32 and 34 respectively as shown in Figures 2Aand 2C. Figures 2E and 2F show in diagrammatical form, the next stage of production of the plank 100. Figure 2E shows a side elevation view and Figure 2F and shows in detail the base of and how anchoring is achieved with a lower edge of the stone block in contact with RSJ 84. Figure 2F shows in detail a lower end of the plank 100 with anchor 54 gripping the lower end of tendon 55. A similar anchor is placed around the tendon at an upper face of the plank 100. Figure 3A shows how the bonded stone blocks are laid adjacent one another such that their edges that rest on the gantry 12 are flat and side 40 are aligned. This is also shown in Figure 2B. Referring again to Figures 2B to 2F, the tendons 51, 53 and 55 are typically steel tensioning bars to which a tension force is applied by a hydraulic pulling machine or jack (not shown). The tension force applied to each steel tendon 51, 53 and 55 is typically in excess of 400 kN and preferably in excess of 500 kN. Aflowable adhesive, such as a cementitious grout or an epoxy resin, is then introduced into each of the three apertures 30, 32, 34 under pressure. The bonded stone blocks 20 to 28 that are held together by the applied non-slumping grout, ensure the flowable adhesive does not leak out between the stone blocks 20 to 28 and flows up each channel defined by the apertures 30, 32, 34 in each adjacent stone block. The flowable adhesive is pumped into the apertures 30, 32 and 34, via tube 74 as shown in Figure 1F from a lower end of the assembly so that air is pushed upwards and exhausts from upper ends of the apertures 30, 32 and 34. The flowable adhesive is then allowed to cure. The flowable adhesive is injected into the cavity in each aperture around the steel tendons 51, 53 and 55 to fill the cavity defined by each aperture 30, 32 and 34 from the lower end towards the upper end of the assembly. Tension is then applied to the tendons 51,53 and 55 using hydraulic jacks (not shown). Anchors 60, 62 and 64 are then used to anchor each of the tendons 51, 53 and 55 respectively. Figure 2D shows how the tendons 51,53 and 55 are anchored. The tension is applied to the stone assembly and then the flowable adhesive in injected. The assembly remains in place until the flowable adhesive has reached a desired level of cure to enable the assembly to be lifted off the support rig. When the flowable adhesive has cured and hardened the tensioning equipment is removed and the cured cementitious grout retains the tension in the tensioning bars and thereby clamps the stone blocks 20 to 28 together. Tensioning equipment (not shown) in place as tension is applied to each of the tendons 51,53 and 55. Figure 4A shows an alternative embodiment of a post tensioned stone assembly in the form of a wall in which the planks, shown in Figures 1A to 1K, have been extended to define an array of vertically arranged planks with gaps or spacings between adjacent planks or columns to provide lighting and / or ventilation. Such a wall, with slats or gaps may be used for example around a courtyard or atrium which when surrounded by two, three or four similar walls creates a shaded environment in which air currents provide natural convective cooling. Referring to Figure 5A there is shown an overall view of seven stone planks 100-106, with offset stone blocks, arranged in an array to form a walkway or floor panel 200. Figure 5B is a plan view of the walkway or floor 200 and shows the position of tendons 300, 302, 304 and 306 in hidden detail. The tendons 300, 302, 304 and 306 extend through adjacent offset stone blocks 20A, 22A and 24A which are staggered with respect to another row of offset stone blocks 20B, 22B and 24B. These offset stone blocks 20B, 22B and 24B in turn are sandwiched by another set of offset stone blocks 20C, 22C and 24C. Figure 5C is a detailed view of a plan view of the walkway or floor shown in Figure 5A and shows in hidden detail pegs 80A, 80B, 80C and 80D which lock edges of the offset stone blocks 20B, 22B and 24B with stone blocks 20C, 22C and 24C. These floors are fabricated using the same techniques described above however apertures formed in them. Figure 6A shows an overall view of seven stone planks, arranged in an array to form a walkway with lenticular apertures 400 removed between post tensioned tendons. Figure 6B shows the lenticular apertures 400 from above. The invention has been described by way of examples only and it will be appreciated that variation may be made to the aforementioned embodiments without departing from the scope of protection as defined by the claims.
Claims
1. A post tensioned stone assembly suitable for use in construction and buildings, comprises a plurality of stone blocks each adjacent pair of stone blocks having flat faces that abut one another; a circular aperture, of diameter 01, extends through each stone block, such that the apertures of adjacent stone blocks are in register one with another; a pretensioned tendon, of diameter 02, passes through the apertures of adjacent stone blocks and lies substantially on a central axis of the aperture; and a flowable adhesive surrounds the pretensioned tendon and binds its outer surface to an inner wall of the aperture.
2. A post tensioned stone assembly according to claim 1 wherein a grout is applied to opposing surfaces of adjacent stone blocks.
3. A post tensioned stone assembly according to claim 1 or 2 wherein two apertures extend axially through each stone block and are parallel one with another.
4. A post tensioned stone assembly according to any preceding claim wherein three apertures extend axially are and parallel one with another.
5. A post tensioned stone assembly according to any preceding claim wherein edges of the stone assembly have cutaway portions lenticular shaped.
6. A post tensioned stone assembly according to any preceding claim wherein the force applied to the pretensioned tendon is in excess of 50kN.
7. A floor or a wall comprising a plurality of post tensioned stone assemblies according to any preceding claim which are connected together by way of tensioned tendons.
8. A floor or a wall according to claim 7 in which a portion of at least one stone assembly has been removed to reveal a gap or space.
9. A method of fabricating a post tensioned stone assembly comprising the steps of arranging a plurality of stone blocks, whose abutting faces are flat and flush with one another, on an angled support;forming at least one aperture, of diameter 01, which extends through the stone blocks, such that the apertures of adjacent stone blocks are in register one with another;inserting a tendon, of diameter 02, through the apertures of adjacent stone blocks; applying a tensile force to the tendon; andflowing a flowable adhesive into a lower aperture and allowing the flowable adhesive to flow towards an upper aperture in order to bind an outer surface of the tendon to an inner wall of the aperture.
10. A method of fabricating a post tensioned stone assembly according to claim 9 including the step of applying a layer of non-slumping grout to opposing surfaces of adjacent stone blocks.11 .A method of fabricating a post tensioned stone assembly according to claim 9 or 10 including the step of introducing spacers for spacing the tendon substantially on a central axis of the aperture.
12. A method of fabricating a post tensioned stone assembly according to any of claims 9 to 11 wherein each block of the plurality of blocks comprises three apertures into which three tendons are inserted.
13. A method of fabricating a post tensioned stone assembly according to claim 12 wherein the tendons are tensioned substantially simultaneously.
14. A method of fabricating a post tensioned stone assembly according to any of claims 9 to 13 includes the step of inserting a breathable plug in an aperture opening.
15. A method of fabricating a post tensioned stone assembly according to any of claims 9 to 14 wherein the stone blocks are supported at an angle of incline between 10° and 70°, more preferably between 15° and 40°, and most preferably between 10° and 35°.
16. An assembly fabricated according to the method of any of claims 9 to 15.s