Power system with dual bus
The dual bus power system in electric vehicles addresses the inefficiency of auxiliary power supply units by using a controller to reconfigure switches between battery sub-packs, balancing state-of-charge and optimizing voltage delivery, thereby simplifying and reducing costs while enhancing efficiency and driving range.
Patent Information
- Application Number
- GB2020002439
- Authority / Receiving Office
- GB · GB
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-02-21
- Publication Date
- 2024-11-06
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The wide operating voltage range of battery packs in electric vehicles leads to complex, expensive, and inefficient auxiliary power supply units, as they need to step down voltage for both primary and auxiliary systems.
A power system with a dual bus configuration, comprising a primary bus and an auxiliary bus, where two battery sub-packs are connected in series and parallel configurations to provide different voltages, and switches are reconfigured by a controller to balance the state-of-charge and reduce switching frequency based on voltage and power thresholds.
This configuration simplifies and reduces the cost of auxiliary systems, maintains a balanced state-of-charge of battery sub-packs, and improves the efficiency and driving range of electric vehicles by delivering power at optimal voltages.
Smart Images

Figure 00000001_0000 
Figure 00000001_0001 
Figure 00000002_0000
Abstract
Description
Field of the Invention The invention relates to a power system having a dual bus, used by way of example in an 5 electric vehicle. Background of the Invention The operating voltage range of a battery pack can be relatively wide. By way of example, the battery pack may have an operating voltage of around 900 V when fully charged and 10 600 V when fully discharged. As well as powering primary systems, the battery pack may be required to power auxiliary systems at a much lower voltage. As a consequence of the wide operating voltage range, the auxiliary power supply unit, responsible for stepping down the voltage of the battery pack, is often complex, expensive and less efficient. 15 Summary of the Invention The present invention provides a power system comprising a first battery sub-pack, a second battery sub-pack, a primary bus, an auxiliary bus, and a plurality of switches, wherein the first battery sub-pack and the second battery sub-pack are connectable in 20 series to the primary bus to provide a first voltage at the primary bus, and the switches are configurable to selectively connect one only of the first battery sub-pack and the second battery sub-pack to the auxiliary bus to provide a second voltage at the auxiliary bus wherein: the switches comprise a first pair of switches and a second pair of switches connected in series across the primary bus, and the auxiliary bus comprises a positive rail 25 connected to a first node located between the first pair of switches, and a negative rail connected to a second node located between the second pair of switches; a node located between the first pair of switches and the second pair of switches is connected to a node located between the two sub-packs when connected in series; the power system comprises a controller for configuring the switches, the switches are configurable into a first 30 configuration in which the first battery sub-pack is connected to the auxiliary bus and a second configuration in which the second battery sub-pack is connected to the auxiliary 05 08 24 bus, and the controller repeatedly reconfigures the switches between the first configuration and the second configuration; the controller reconfigures the switches at a prescribed frequency or when a difference in the voltages of the battery sub-packs exceeds a threshold; the prescribed frequency or the threshold is defined in accordance with a 5 voltage of one or both of the battery sub-packs or in accordance with a power drawn from the power system via the auxiliary bus; and the controller reconfigures the switches at a higher prescribed frequency or a lower threshold when the voltage of the sub-packs is lower or the power drawn from the power system is higher. 10 The power system therefore comprises two voltage buses: a primary bus and an auxiliary bus. The primary bus may be used to deliver high power to primary systems. In the case of an electric vehicle, this may include the traction drive units responsible for generating motive power. The auxiliary bus may be used to deliver low power to auxiliary systems. Again, in the case of an electric vehicle, this may include a 12 V power supply unit. The 15 primary bus is held at a relatively high voltage, i.e. the sum of the voltages of the two sub-packs. This then has the advantage that a given power may be delivered to the primary systems at a lower current, which in turn reduces losses. The auxiliary bus by contrast is held at a relatively low voltage, i.e. the voltage of just one of the sub-packs. Additionally, the width of the operating voltage range of the auxiliary bus is narrower 20 than that of the primary bus. As a result, the auxiliary systems, which are typically required to operate over the full voltage range of the sub-packs, may be simpler, cheaper, smaller and / or lighter. Importantly, the power system is able to provide two different voltages on the buses simultaneously without any step-down power conversion. 25 The power system comprises a controller for configuring the switches. Moreover, the switches are configurable into a first configuration in which the first battery sub-pack is connected to the auxiliary bus, and a second configuration in which the second battery sub-pack is connected to the auxiliary bus. The controller then repeatedly switches or reconfigures the switches between the first configuration and the second configuration. 30 This then has the advantage that the two sub-packs discharge and / or charge at a more even rate. 05 08 24 The controller reconfigures the switches at a prescribed frequency or when a difference in the voltages of the battery sub-packs exceeds a threshold. As a result, a relatively good balance in the state-of-charge of the two sub-packs may be maintained during discharging 5 and / or charging. The prescribed frequency or the threshold may be defined in accordance with a voltage of one or both of the battery sub-packs. This then has the advantage that a lower switching frequency may be used whilst also ensuring that both sub-packs reach full discharge 10 and / or full charge at the same time. In particular, a lower switching frequency or a higher threshold may be used when the voltages of the sub-packs are relatively high during discharging and / or relatively low during charging, and a higher switching frequency or a lower threshold may be used when the voltages of the sub-packs are relatively low during discharging and / or relatively high during charging. 15 The prescribed frequency or the threshold may be defined in accordance with a power drawn from the power system via the auxiliary bus. In particular, a higher frequency or a lower threshold may be used in response to a higher power draw. As a result, a good balance in the states of charge of the sub-packs may be achieved without the need to 20 continually operate at a high switching frequency. The switches comprise a first pair of switches and a second pair of switches connected in series across the primary bus, and the auxiliary bus comprises a positive rail connected to a first node located between the first pair of switches, and a negative rail connected to a 25 second node located between the second pair of switches. As a result, an auxiliary bus having a different voltage to that of the primary bus may be achieved in a cost-effective manner using a relatively simple arrangement of switches. The present invention also provides an electric vehicle comprising the power system as 30 described in any one of the preceding paragraphs. 05 08 24 The electric vehicle may comprise one or more traction drive units and one or more auxiliary systems. The traction drive units are then connected to the primary bus, and the auxiliary systems are connected to the auxiliary bus. 5 The traction drive units may additionally be connected to the auxiliary bus, and the traction drive units may comprise one or more switches for selecting either the first voltage or the second voltage. As a result, the efficiency and thus the driving range of the vehicle may be increased. 10 The traction drive units may select the first voltage or the second voltage according to a desired or commanded speed and / or torque value. For a given voltage, there is typically a single point in the torque-speed characteristic of the traction drive unit where the efficiency is greatest. Consequently, by selecting a different voltage according to a desired speed and / or torque of the traction drive unit, the efficiency of the electric vehicle, 15 and thus the driving range, may be improved. Each traction drive unit may comprise a first pair of further switches and a second pair of further switches connected in series across the primary bus. The auxiliary bus may then comprise a positive rail connected to first node located between the first pair of further 20 switches and the second pair of switches, and a negative rail connected to a second node located between the first pair of further switches and the second pair of switches. As a result, a traction drive unit having a dual bus may be achieved in a cost-effective manner using a relatively low number of switches. 25 Brief Description of the Drawings In order that the invention may be more readily understood, reference will now be made by way of example only to the accompanying drawings in which: Figure 1 is a schematic diagram of an electric vehicle; 30 Figure 2 shows a traction drive unit of the electric vehicle; 05 08 24 Figure 3 is a circuit diagram of a battery pack of the electric vehicle; Figure 4 is a circuit diagram of an embodiment of the electric vehicle comprising a 5 multilevel traction drive unit; Figure 5 is a circuit diagram of an alternative embodiment of the electric vehicle comprising an alternative multilevel traction drive unit; and 10 Figure 6 is a circuit diagram of a further embodiment of the electric vehicle comprising a combination of the embodiments of Figures 3 and 5. Detailed Description of the Invention The electric vehicle 1 of Figure 1 comprise a battery pack 10 connected to a pair of 15 traction drive units 20. Each traction drive unit 20 is coupled to a pair of wheels 50 via a pair of drive shafts 60. In use, the battery pack 10 supplies electrical power to the traction drive units 20, which in turn drive the wheels 50 of the vehicle 1. As shown in Figure 2, each traction drive unit 20 comprises an electric motor 21, an 20 inverter module 22, and a gearbox 23. The electric motor 21 is a three-phase motor and comprises three phase windings 25 (see Figures 4 to 6). The inverter module 22 is coupled to the windings 25 of the motor 21 and comprises a plurality of switches SW21-SW26 and a controller 26 for controlling the switches. In use, the inverter module 22 converts the DC voltage supplied by the battery pack 1 into an AC voltage which is 25 applied to windings 25. The gearbox 23 is coupled to the motor 21 and to the drive shafts 60. Torque generated by the motor 21 is then transferred to the wheels 50 via the gearbox 23 and drive shafts 60. Referring now to Figure 3, the battery pack 10 comprises a first sub-pack 11, a second 30 sub-pack 12, a primary bus 14 having a pair of terminals 15,16, an auxiliary bus 17having 05 08 24 a pair of terminals 18,19, a first set of switches SW1-SW6, a second set of switches SW11-SW15, and a battery controller 13 for controlling the switches. Each sub-pack 11,12 comprises a plurality of cells arranged into strings connected in 5 series, with each string comprising a number of cells connected in parallel. The two subpacks have an identical arrangement of cells. In this particular embodiment, each subpack has a maximum voltage of 462 V (4.2V / cell) and a minimum voltage of 330 V (3.0V / cell). 10 The primary bus 14 is connected to and is used to supply electrical power to each of the traction drive units 20. More specifically, the primary bus 14 is connected to the inverter module 22 of each traction drive unit 20. The auxiliary bus 17 is connected to and is used to supply electrical power to auxiliary systems (not shown) of the vehicle 1. For example, the auxiliary bus 17 may be connected to a 12 V power supply unit that steps down the 15 voltage of the auxiliary bus 17 and outputs a 12 V supply. The first set of switches SW1-SW6 are used to connect the two sub-packs 11,12 to the primary bus 14. Moreover, the first set of switches SW1-SW6 can be configured into a first configuration in which the two sub-packs 11,12 are connected in series across the 20 primary bus 14 (i.e. by closing SW1, SW3 andSW5), and a second configuration in which the two sub-packs 11,12 are connected in parallel across the primary bus 14 (i.e. by closing SW1, SW2, SW4 and SW5). Switch SW6 forms part of a primary pre-charge circuit along with resistor RI. 25 When discharging the battery pack 11, the first set of switches SW1-SW6 are configured into the first configuration. As a consequence, the voltage of the primary bus 14 is between 924 V (fully charged sub-packs) and 660 V (fully discharged sub-packs). In order to charge the battery pack 10, a charge voltage is applied to the terminals 15,16 of the primary bus 14. The battery pack 2 may be charged at a high voltage (e.g. 1000 V) 30 or at a low voltage (e.g. 500 V). When charged at a high voltage, the first set of switches SW1-SW6 are again configured into the first configuration. Conversely, when charged 05 08 24 at a low voltage, the first set of switches SW1-SW6 are configured into the second configuration. The second set of switches comprises a first pair of switches SW11,SW12 and a second 5 pair of switches SW13,S14 connected in series across the primary bus 14. A node 40 located between the two pairs of switches is connected to a node 43 located between the two sub-packs 11,12 when connected in series. The positive terminal 18 of the auxiliary bus 17 is then connected via a positive rail to a node 41 located between the first pair of switches SW11,SW12, and the negative terminal 19 is connected via a negative rail to a 10 node 42 located between the second pair of switches SW13,SW14. The second set of switches further comprises switch SW15, which forms part of an auxiliary pre-charge circuit along with resistor RI 1. The second set of switches SW11-SW15 are used to connect one or both of the two sub-15 packs 11,12 to the auxiliary bus 17. When the sub-packs 11,12 are connected in series across the primary bus 14 (i.e. when the first set of switches SW1-SW6 are in the first configuration), the second set of switches are configurable into a first configuration in which the first sub-pack 11 only is connected across the auxiliary bus 17 (i.e. by closing SW11, SW13 and SW15), and a second configuration in which the second sub-pack 12 20 only is connected across the auxiliary bus 17 (i.e. by closing SW2, SW4 and SW5). When the sub-packs 11,12 are connected in parallel across the primary bus 14 (i.e. when the first set of switches SW1-SW6 are in the second configuration), the second set of switches are configurable into a third configuration in which the first sub-pack 11 and the second sub-pack 12 are connected in parallel across the auxiliary bus 17 (i.e. by closing SW11, 25 SW14 and SW15). Accordingly, when the two sub-packs 11,12 are connected in series, the first and second configurations are used to connect one only of the sub-packs 11,12 to the auxiliary bus 17. And when the two sub-packs 11,12 are connected in parallel, the third configuration is used to connect both sub-packs 11,12 to the auxiliary bus 17. 30 During discharge of the battery pack 11, the controller 13 configures the second set of switches SW11-SW15 into the first configuration or the second configuration such that 05 08 24 only one of the sub-packs 11,12 is connected to the auxiliary bus 17 at any one time. As a result, the voltage of the auxiliary bus 19 is between 462 V (fully charged sub-pack) and 330 V (fully discharged sub-pack). The voltage of the auxiliary bus 19 is therefore half that of the primary bus 14. Moreover, the size or width of the operating voltage range 5 of the auxiliary bus 17, which in this instance is 132 V (i.e. 462 V - 330 V), is also half of that of the primary bus 14. This then has the significant advantages for the auxiliary systems of the vehicle 1. In particular, the auxiliary systems may be rated for a lower maximum voltage and a narrower voltage range. As a result, the complexity, cost, size and / or mass of one or more of the auxiliary systems may be reduced. 10 If the second set of switches SW11-SW15 were to remain indefinitely in, say, the first configuration, the first sub-pack 11 would discharge quicker than the second sub-pack 12. As a result, the first sub-pack 11 would reach a state of full discharge before the second sub-pack 12, which is undesirable. Accordingly, during discharge of the battery pack 10, 15 the controller 13 repeatedly switches or reconfigures the second set of switches SW11- SW15 between the first configuration and the second configuration. As a result, the two sub-packs 11,12 discharge at a more even rate. The controller 13 may switch between the first and second configuration at a prescribed 20 frequency. The prescribed frequency may be set such that, when the power demanded by the auxiliary systems is at a maximum, a relatively good balance in the state-of-charge of the two sub-packs 11,12 is nevertheless maintained. If the prescribed frequency is fixed at this value, a potential disadvantage arises when the power demanded by the auxiliary systems is relatively low. In this instance, switching between the two configurations 25 would occur at a higher frequency then that required to maintain a good balance in the states of charge. Accordingly, the prescribed frequency may be defined according to the power drawn by the auxiliary systems. In particular, a higher prescribed frequency may be used in response to a higher power draw. Rather than switching at a prescribed frequency, the controller 13 may instead switch between the two configurations whenever 30 a difference in the voltages of the two sub-packs 11,12 exceeds a threshold. This then has the advantage that, irrespective of the power drawn by the auxiliary systems, 05 08 24 switching between the two configurations occurs at the lowest possible frequency that ensures a good balance in the states of charge. It is desirable to minimise the switching frequency whilst also ensuring that both sub-5 packs 11,12 reach a state of full discharge at the same time. A lower switching frequency may therefore be used when the voltages of the sub-packs 11,12 are relatively high, and a higher switching frequency may be used when the voltages of the sub-packs 11,12 are relatively low. Accordingly, the controller 13 may define the prescribed frequency or the difference threshold according to the voltage of one or both of the sub-packs 11,12. More 10 particularly, as the voltage(s) decreases, the controller 13 would use a higher prescribed frequency or a lower difference threshold. When charging the battery pack 10 at a high voltage (i.e. when the sub-packs 11,12 are connected in series), the controller 13 again configures the second set of switches SW11-15 SW15 in the manner described above. That is to say that the controller 13 repeatedly switches or reconfigures the second set of switches SW11-SW15 between the first configuration and the second configuration. As a consequence, the voltage of the auxiliary bus 17 continues to be held at a voltage of between 426 V (fully charged subpacks) and 330 V (fully discharged sub-packs). The controller 13 may use a prescribed 20 frequency or a difference threshold, as described above, in order to control the switching. Should the controller 13 use a prescribed frequency or a difference threshold that depends on the voltage of one or both of the sub-packs 11,12, the controller 13 would in this instance use a higher prescribed frequency or a lower difference threshold as the voltage(s) increases. This is in contrast to the situation described above for discharging, 25 in which the controller 13 uses a higher prescribed frequency or a lower difference threshold as the voltage(s) decreases. When charging the battery pack 10 at a low voltage (i.e. when the sub-packs 11,12 are connected in parallel), the controller 13 configures the second set of switches SW11-30 SW15 into the third configuration. As a consequence, the auxiliary bus 17 is held at the 05 08 24 same voltage as that of the primary bus 14. The auxiliary bus 17 is therefore held at the charge voltage of 500 V. The battery pack 10 comprises two voltage buses: a primary bus 14 for delivering high 5 power to the primary systems of the vehicle 1, including the traction drive units 20; and an auxiliary bus 17 for delivering low power to the auxiliary systems of the vehicle 1. The primary bus 14 is held at a relatively high voltage (e.g. between 660 V and 924 V). As a result, a given power may be delivered to the primary systems at a lower current. This then has the advantage that losses may be reduced, and electrical components of the 10 primary systems, such as the switches SW21-SW26 of the inverter module 22 of the traction drive units 20, may be rated for lower current. The auxiliary bus 17 by contrast is held at a relatively low voltage. Moreover, the width of the operating voltage range is narrower than that of the primary voltage bus. As a result, the auxiliary systems, which are typically required to operate over the full voltage range of the battery pack, may be 15 simpler, cheaper, smaller and / or lighter. Importantly, the battery pack 10 is able to provide two different voltages on the buses 14,17 simultaneously without any step-down power conversion. In the embodiment described above and illustrated in Figure 3, the battery pack 10 20 comprises an auxiliary pre-charge circuit SW15, RI 1. Conceivably, if the controller 13 were to switch or reconfigure the second set of switches SW11-SW14 between the first configuration and the second configuration at a sufficiently high frequency or if the controller 13 used a different threshold that was sufficiently small, the pre-charge circuit may be omitted. Pre-charge would then be required only on initial power up of the electric 25 vehicle 1. However, this could be handled by momentarily operating the switches SW11- SW14 in linear mode. Each of the first set of switches SW1-SW6 is a contactor. By contrast, each of the second set of switches SW11-SW15 is a power device (i.e. a semiconductor switch). Contactors 30 have the advantage that they are simple, robust, cheap and easy to control. However, contactors have a relatively limited number of open-and-close cycles, and have a 05 08 24 relatively slow response time. As such, contactors are unsuitable for the second set of switches SW11-SW15. Contactors also suffer from the problem that they may open inadvertently in response to vibration or a mechanical impulse, such as that which may arise when the vehicle 1 hits apothole. Accordingly, whilst the first set of switches SW1- 5 SW6 are contactors, one or more of the switches may alternatively be a power device. Although more expensive and their control is more complex, power devices are not susceptible to opening in response to vibration or a mechanical impulse, and they are generally more compact and lighter than contactors. 10 In the embodiment described above, the auxiliary bus 17 and the second set of switches SW11-SW15 form part of the battery pack 10. However, it will be appreciated, particularly when viewing Figure 3, that the auxiliary bus 17 and the second set of switches SW11-SW15 may be located outside of the battery pack 10 and may form a separate stage of the power system of the vehicle 1. The battery pack 10 would then 15 comprise a midpoint terminal 42, such as that shown in Figure 5, in order to provide a connection between the midpoint node 40 of the second set of switches SW11-SW15 and the midpoint node of the two sub-packs 11,12. Accordingly, in a more general sense, the vehicle 1 may be said to comprise a power system having a first sub-pack 11, a second sub-pack 12, a primary bus 14, an auxiliary bus 15, and a plurality of switches SW11- 20 SW14. The first sub-pack 11 and the second sub-pack 12 are then connectable in series to the primary bus 14 to provide a first voltage at the primary bus 14. And the switches SW11-SW14 are configurable to selectively connect one only of the first sub-pack 11 and the second sub-pack 12 to the auxiliary bus 17 to provide a second voltage at the auxiliary bus 17. 25 In addition to supplying power to the auxiliary systems of the vehicle 1, the auxiliary bus 17 may be used to supply power to one or more of the primary systems. In particular, the auxiliary bus 17 may be used to supply power at a lower voltage to the traction drive units 20. 30 05 08 24 For a given voltage applied to the windings 25 of the motor 21, there is typically a single point in the torque-speed characteristic of the motor 21 where the efficiency of the motor 21 is greatest. Consequently, by selectively applying different voltages to the windings 25 according to a desired speed and / or torque of the motor 21, the efficiency of the motor 5 21 may be improved. As a result, the driving range of the vehicle 1 may be increased. By way of example only, the higher voltage of the primary bus 14 (e.g. 924 V) may be applied to the motor 21 when operating at high torque conditions (e.g. when accelerating), and the lower voltage of the auxiliary bus 17 (e.g. 462 V) may be applied to the motor 21 when operating at low torque conditions (e.g. when coasting). 10 Figure 4 shows an alternative embodiment of the electric vehicle 1. The inverter module 22 continues to comprise a pair of terminals 27,28 connected to the primary bus 14, a link capacitor C926 connected across the primary bus 14, a set of switches SW21-SW26 coupled to the windings 25 of the motor 21, and an inverter controller 26 for controlling 15 the switches SW21-SW26. In this alternative embodiment, the inverter module 22 additionally comprises a second set of terminals 30,31 connected to the auxiliary bus 17, a second link capacitor C462 connected across the auxiliary bus 17, and a second set of switches SW31-SW34 for selectively coupling the first set of switches SW21-SW26 to one of the primary bus 14 and the auxiliary bus 17. In particular, the second set of 20 switches SW31-SW34 are configurable into a first configuration (i.e. SW31,SW34 are closed and SW32,SW33 are open) in which the first set of switches SW21-SW6 are connected to the primary bus 14, and a second configuration (i.e. SW32,SW33 are closed and SW31,SW34 are open), in which the first set of switches SW21-SW26 are connected to the auxiliary bus 17. The controller 26 then configures the second set of switches 25 SW31-SW34 into the first configuration or the second configuration as required. By way of example only, the controller 26 may execute a vector control algorithm to generate a voltage vector, which is then used to determine the configuration of the second set of switches SW31-SW34. For example, if the amplitude of the voltage vector is greater than a threshold, the controller 26 may configure the second set of switches SW31-SW34 into 30 the first configuration such that the voltage of the primary bus 14 is applied to the windings 25. Conversely, if the amplitude of the voltage vector is less than the threshold, 05 08 24 the controller 26 may configure the second set of switches SW31-SW34 into the second configuration such that the voltage of the auxiliary bus 17 is applied to the windings 25. The provision of a traction drive unit 20 having a dual bus may be achieved without the 5 need for the auxiliary bus 17, as will now be described with reference to Figure 5. Figure 5 illustrates a further embodiment of the electric vehicle 1. In this further embodiment, the battery pack 10 no longer comprises an auxiliary bus 17 or the second set of switches SW11-SW15. Instead, the battery pack 10 comprises an additional 10 terminal 44 and a further switch SW7. The additional terminal 42 is connected via switch SW7 to the node 41 located between the two sub-packs 11,12 when connected in series. For the purposes of the present discussion, this additional terminal 42 will be referred to as the midpoint terminal, since it is connected to the midpoint between the two sub-packs 11,12. Switch SW7 forms part of the first set of switches SW1-SW6 and is provided only 15 to ensure that the midpoint terminal 42 can by isolated from the first sub-pack 11 when the battery pack 10 is powered off. The inverter module 22 again comprise a pair of terminals 27,28 connected to the primary bus 14, a first set of switches SW21-SW26 coupled to the windings 25 of the motor 21, 20 and an inverter controller 26 for controlling the switches SW21-SW26. In this further embodiment, the inverter module 22 additionally comprises a single mid-point terminal 32, a second set of switches SW31-SW34, and a pair of link capacitors C462-1, C462-2. The second set of switches comprises a first pair of switches SW31,SW32 and a second 25 pair of switches SW33,S34 connected in series across the primary bus 14. A node 33 located between the two pairs of switches is connected to the midpoint terminal 32 via a midpoint rail. The first set of switches SW21-SW26 may be said to be connected between a positive or upper rail and a negative or lower rail. The positive rail is then connected to a node 34 located between the first pair of switches SW31 ,SW32, and the negative rail 30 is connected to a node 35 located between the second pair of switches SW33,SW34. 05 08 24 The two link capacitors C462-1, C462-2 are connected in series across the primary bus 14. Moreover, a first link capacitor C462-1 is connected in parallel with the first pair of switches SW31 ,SW32 between the positive rail of the primary bus 14 and the midpoint rail, and the second link capacitor C462-2 is connected in parallel with the second pair of 5 switches SW33,SW34 between the midpoint rail and the negative rail of the primary bus 14. The second set of switches SW31-SW34 of the inverter module 22 are similar to the second set of switches SW11-SW14 of the battery pack 10 of Figures 3 and 4, both in 10 terms of their arrangement and their operation, as will now be described. The second set of switches SW31-SW34 are used to connect one or both of the two subpacks 11,12 to the first set of switches SW21-SW26. Let us assume that the two subpacks 11,12 are connected in series across the primary bus 14 (i.e. SW1, SW3, SW5 are 15 closed), and that the midpoint terminal 42 is connected to the midpoint between the two sub-packs (i.e. SW7 is closed). The second set of switches SW31-SW34 are then configurable into a first configuration in which the first sub-pack 11 only is connected to the first set of switches SW21-SW26 (i.e. by closing SW31 and SW33), a second configuration in which the second sub-pack 12 only is connected to the first set of 20 switches SW21-SW26 (i.e. by closing SW32 and SW34), and a third configuration in which both sub-packs 11,12 are connected in series to the first set of switches SW21-SW26 (i.e. by closing SW31 and SW34). The first and second configurations are therefore used to connect one only of the sub-packs 11,12 to the first set of switches SW21-SW26, and the third configuration is used to connect both sub-packs 11,12 to the 25 first set of switches SW21-SW26. The inverter controller 26 configures the second set of switches SW31-SW34 such that either a first voltage or a second voltage is supplied to the first set of switches SW21-SW26. As a result, either the first voltage or the second voltage is applied to the windings 30 25 of the motor 21 by the first set of switches SW21-SW26. The first voltage corresponds to the combined or series voltage of the two sub-packs 11,12, whereas the second voltage 05 08 24 corresponds to the voltage of just one of the sub-packs 11,12. The second voltage is there half that of the first voltage. In this particular embodiment, the first voltage is between 924 V (fully charged sub-packs) and 660 V (fully discharged sub-packs), and the second voltage is between 462 V (fully charged sub-pack) and 330 V (fully discharged sub-5 pack). If the second set of switches SW31-SW34 were to remain indefinitely in, say, the first configuration, the first sub-pack 11 would discharge quicker than the second sub-pack 12. As a result, the first sub-pack 11 would reach a state of full discharge before the second 10 sub-pack 12, which is undesirable. The inverter controller 26 therefore repeatedly switches or reconfigures the second set of switches SW31-SW34 between the first configuration and the second configuration. As a result, the two sub-packs 11,12 discharge at a more even rate. 15 As noted above in connection with the second set of switches SW11 -SW15 of the battery pack 10, the inverter controller 26 may switch between the first and second configuration at a prescribed frequency. The prescribed frequency may be fixed or it may be defined according to the power drawn by the motor 21, a desired speed / or torque of the motor 21, or by some other parameter. For example, the controller 26 may execute a vector control 20 algorithm to generate a voltage vector. The voltage vector may then be used to determine whether the first voltage or the second voltage should be applied to the windings 25. Additionally, the voltage vector may be used to define the frequency at which the second set of switches SW31-SW34 are switched between the first configuration and the second configuration. Rather than switching at a prescribed frequency, the controller 26 may 25 instead switch between the two configurations whenever a difference in the voltages of the two sub-packs 11,12 exceeds a threshold. Again, as noted above in connection with the battery pack of Figure 3, the controller 26 may define the prescribed frequency or the difference threshold according to the voltage of one or both of the sub-packs 11,12. In particular, as the voltage(s) of the sub-pack(s) decreases, the controller 26 may use a 30 higher prescribed frequency or a lower difference threshold. 05 08 24 With the embodiments shown in Figures 4 and 5, a cost-effective multilevel inverter module 22 is provided. Multilevel inverters are known, but they typically comprises a large number of switches and the required control is relatively complex. By contrast, with the embodiments shown in Figures 4 and 5, a multilevel inverter can be achieved 5 with the addition of just four switches, namely SW31-SW34. Moreover, control of the switches SW31-SW34 is relatively straightforward. By way of example, if all switches SW21-SW26 and SW31-SW34 of the inverter module 22 were opened, current in the windings 25 would still have a return path to the link capacitors (C926 of Figure 4, and C462-1 and C462-2 of Figure 5) via the body diodes of switches SW31 and SW34. By 10 contrast, with existing multilevel inverters, the switches must be carefully controlled and / or additional diodes must be provided in order to provide the necessary paths back to the link capacitors. 15 In the embodiment of Figure 5, the battery pack 10 comprises sub-packs 11,12 having the same number and configuration of cells. As a result, the two sub-packs 11,12 have the same nominal voltage and capacity. Conceivably, however, the battery pack 10 may comprise sub-packs 11,12 having different nominal voltages. The inverter module 22 would then be capable of supplying the electric motor 21 with three voltage levels rather 20 than two. In particular, when the second set of switches SW31-SW34 are in the first configuration, the inverter module 22 would supply the voltage of the first sub-pack 11. When the second set of switches SW31-SW34 are in the second configuration, the inverter module 22 would supply the voltage of the second sub-pack 12. And when the second set of switches SW31-SW34 are in the third configuration, the inverter module 22 25 would supply the sum of the voltages of the first and second sub-packs 11,12. It will be appreciated that when operating in this mode, the inverter controller 26 would not repeatedly switch or reconfigure the switches SW31-SW34 between the first configuration and the second configuration. 30 In the embodiment of Figure 5, a multilevel inverter module 22 is achieved without the need for the auxiliary bus 14 of the battery pack 10 of Figure 3. However, the two embodiments of Figures 3 and 5 are not mutually exclusive, and the vehicle 1 may comprise the combination of the two embodiments, as illustrated in Figure 6. In comparing the embodiments of Figures 4 and 6, the embodiment of Figure 6 has at least two advantages over that of Figure 4. First, the total capacitance requirement of the 5 inverter module 22 is smaller, and thus the size and cost of the capacitors are reduced. Second, the second set of switches SW11-SW15 of the battery pack 10 are not required to carry the relatively high currents drawn by the traction drive unit 20. As a result, cheaper switches rated for lower current may be used for the second set of switches SW11-SW15 of the battery pack 10. 10 08 24
Claims
1. A power system comprising a first battery sub-pack, a second battery sub-pack, a primary bus, an auxiliary bus, and a plurality of switches, wherein the first battery sub-5 pack and the second battery sub-pack are connectable in series to the primary bus to provide a first voltage at the primary bus, and the switches are configurable to selectively connect one only of the first battery sub-pack and the second battery sub-pack to the auxiliary bus to provide a second voltage at the auxiliary bus,wherein:10 the switches comprise a first pair of switches and a second pair of switchesconnected in series across the primary bus, and the auxiliary bus comprises a positive rail connected to a first node located between the first pair of switches, and a negative rail connected to a second node located between the second pair of switches;a node located between the first pair of switches and the second pair of switches15 is connected to a node located between the two sub-packs when connected in series;the power system comprises a controller for configuring the switches, the switches are configurable into a first configuration in which the first battery sub-pack is connected to the auxiliary bus and a second configuration in which the second battery sub-pack is connected to the auxiliary bus, and the controller repeatedly reconfigures the switches20 between the first configuration and the second configuration;the controller reconfigures the switches at a prescribed frequency or when a difference in the voltages of the battery sub-packs exceeds a threshold;the prescribed frequency or the threshold is defined in accordance with a voltage of one or both of the battery sub-packs or in accordance with a power drawn from the25 power system via the auxiliary bus; andthe controller reconfigures the switches at a higher prescribed frequency or a lower threshold when the voltage of the sub-packs is lower or the power drawn from the power system is higher.
Citation Information
Patent Citations
Battery system for a motor vehicle with two voltage circuits
DE102014006772A1
Electrical on-board system of a motor vehicle with two subnetworks operating at different voltages
DE102018207263A1
Power system for automobiles
US20030057776A1
Charging-rate equalizing apparatus and battery system
US20140001848A1
Battery control
US20150214757A1