A system for a utility meter
The integration of a camera system and data logging with utility meters for image capture and pulse detection addresses inaccuracies in consumption tracking, providing automatic scaling factor determination and reducing the need for manual readings, enhancing accuracy and environmental sustainability.
Patent Information
- Application Number
- GB2023007865
- Authority / Receiving Office
- GB · GB
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-25
- Publication Date
- 2024-11-27
AI Technical Summary
Utility meter systems face inaccuracies in long-term consumption tracking due to sensor placement issues, magnetic field differences, and contamination, leading to the need for manual readings, which are costly and environmentally impactful.
A system combining a camera system and data logging to capture and transmit images of utility meter registers, alongside traditional pulse detection, allowing for automatic scaling factor determination and reducing the need for manual readings by providing accurate, granular consumption data.
Enables rapid identification of issues like burst pipes and eliminates the necessity for manual meter readings, offering an environmentally friendly solution with improved accuracy and reduced environmental impact by automatically determining pulse counting accuracy and scaling factors.
Smart Images

Figure 00000000_0000_ABST
Abstract
Description
The invention relates to a system for a utility meter. Utility meters, for example for water or electricity or gas, may be mounted on a pipe or cable in a cupboard in a house or garage, or may be in a pit in the ground. A meter in a cupboard will be accessed by opening a door to the cupboard. A ground -based meter will be accessed by lifting an access cover. Utility meters for water, gas and electricity represent consumption on either mechanical counters or digital LCD displays: the register. Many, but not all, of such meters include an internal magnet as part of the mechanical mechanism whose rotation and thus consumption can be detected using a pulse module including an external magnetic field detection device such as a reed switch, resulting in a pulsed signal which can be transmitted externally. External data loggers are connected to this volt free detection signal to enable remote consumption profiling. Such loggers accumulate pulses and store counts at configurable time periods, typically every 15 minutes. This pulse count is directly proportional to resource consumption and provides an accepted method to profile consumption to aid energy optimisation and detection of undesirable excess, for example from a burst water pipe. Accumulated pulse accuracy problems can occur which may be related to sensor placement, difference in magnetic field, installation quality and contamination, resulting in poor actual long-term tracking of absolute consumption resulting in the need for a manual meter reading for the purpose of billing and to create a new consumption datum. The utility industry is typically driven by legislative requirements on manual read frequencies of between 1 and 6 months, thus pulse errors may not be evident for 2-12 months. This manual read, from a man in a van, often with an associated high environmental cost, is a disadvantage of this system. When installing the pulse module it is required to configure the scaling factor for the specific meter, that is the number of litres per pulse, in the case of a water meter, a constant that is dependent on specific meters and is often one of the ratios 1:1, 1:2, 1:5, 1:10, 1:25, 1:50, 1:100, 1:250, 1:500, and 1:1000. The consumption can only be recorded correctly with this multiplier correctly set. A known retro fit meter reading device using cameras is disclosed in WO2019 / 81877, the subject matter of which is incorporated herein by reference. According to the invention, there is provided a system for a utility meter, the system comprising: first means to detect rotation of an element of the utility meter and to create a pulse on the basis of rotation of the said element, and transmission means to transmit pulse data to an external computer; and second means comprising at least one camera directed at at least part of the alphanumerical string comprising the register of the meter, and transmission means to send data representative of the output of the or each camera to an external computer. In this way, by adding both a camera system and a data logging system to a utility meter, problems such as burst pipes can be rapidly identified through the pulse signal, but manual meter reading is unnecessary because a camera image of the utility meter register is available. The utility company is provided with the pulse data, with which it is familiar, as well as an environmentally friendly replacement for physical human visits through of the second means. The system can detect changes in stability, increasing error rate and total failure. The invention provides a non-invasive, retro fit solution. The first means may comprise a plurality of cameras each having a viewing field and including a first camera and at least a second camera, the first camera focussed on a first area of an alphanumeric string of a meter register and the said second camera focussed on a second, different area of the same alphanumeric string of the meter register, the cameras arranged so that the region consisting of said first and second areas can be captured. In this way, the cameras can be nearer to the register, and hence the system can be more compact. The space in a meter cupboard or pit can be limited. The system may include means arranged to obtain a reading of the register by stitching or juxtaposing images each captured by the respective said cameras to create the data of a complete image. The first means may take any suitable form and may comprise means to detect proximity of a rotating magnet within the utility meter and to create a pulse on the basis of rotation of the magnet. The first means may include a reed switch which is opened and closed by proximity of the magnet to create the said pulses. The system preferably includes count means to count the number of pulses received in a time period. The time period may be 600 seconds or more, and may be 1,200 seconds or less and conveniently may be about 900 seconds (15 minutes). The system may be mains powered or in a preferred embodiment may be battery powered. The system may include a wake manager. In particular where the system is battery powered this is more efficient to preserve battery life. According to another aspect of the invention there is provided a computer for a utility meter system, the computer comprising logging means to receive pulse data from a utility meter, and image means to receive image data from the same utility meter system. The computer may include means arranged to stitch or juxtapose images each captured by a plurality of cameras to create the data of a complete image. The computer suitably includes means to read the alphanumerical content of the register from the image data. The computer preferably includes analysis means to compare the pulse data with the image data, in particular to compare two register readings from the image data taken at different times to take one from the other and provide a reading for the amount of the utility used, and compare that with the counted number of pulses over the time span between the said different times. The time span may be one day. The analysis means may include means to assign a value to each pulse from the comparison and hence a scaling factor relating the time between pulses to the amount of utility used. In this way, the amount of water, electricity or gas which has passed through the meter can be known with fine granularity. By being able to allocate a value per pulse, a running total of the amount of utility used can be calculated. The computer is preferably arranged to detect changes in the scaling factor. The computer may be arranged to raise an alert if the scaling factor changes too much. In this way, the accuracy of the pulse counting can be determined automatically, without the need for multiple scheduled manual meter reads, which is the only way for existing systems to achieve the same statistic. To identify the accuracy, the analysis is carried out every day for example (for clarity of explanation, timings can vary). From this, a daily pulses per litre variable is determined which is analysed by the computer to determine the stability and therefore accuracy of this count. This information can be used to provide a confidence indicator to the pulse profile data gathered. If the scaling factor is deemed statistically stable (typically less than 1% variance) then the scaling factor can be applied to all historic pulse data taken in the time window used to calculate said variable. This will provide both accurate and absolute consumption information with a granularity of, say 900s (typically, not fixed) that is constantly adjusted based on the actual decoded register image (from the second means). According to another aspect of the invention there is provided a monitoring system for a utility meter or utility meters, the monitoring system comprising the utility meter system of the sixth paragraph above and a computer according to the eleventh paragraph above, the computer being at a distance therefrom and the computer being arranged to receive pulse data and image data from the utility meter system. Where the computer is arranged to detect changes in the scaling factor, the computer is preferably arranged to increase the time period between data acquisition from the utility meter system if the scaling factor is determined to be stable for a set period of time. Stability may be defined as less than 1% variance. In a preferred embodiment, the computer is arranged dictate the length of the time periods between data acquisition from the utility meter system to maintain a percentage error setpoint. A periodic automatic algorithm may hence be applied to change the time between optical sensor reads (such as every 24 hours). Moving the time between optical module register image read and sends from 12, to 24 and 168 hours, creates a statistical measure of pulse stability with increasing time. This metric can be used to create a meter specific profile to minimise the required optical sensor reads to maintain a percentage error setpoint. This will reduce data transfer, reducing power consumption and extending battery life. The scaling factor variable, makes it possible to automatically identify unexpected installation changes including changes in stability, increasing error rate and total failure. Existing pulse logging systems cannot determine this from pulse only data as erratic but valid user consumption will present similar pulse profile patterns reducing the effectiveness of any applied profile algorithm. The system of the invention will provide important unique information to the meter asset owner indicating installation maintenance should be considered. Embodiments of the invention will now be described by way of example and with reference to the accompanying drawings, in which: Figure 1 is a side elevation in cross section of the device of the embodiment on a utility meter in a ground pit with an access cover; Figure 2 is a front elevation of the device of the embodiment on a utility meter in a meter cupboard on a wall, cupboard door not shown; Figure 3 is a side elevation of the cupboard of Figure 2, Figure 4 is a plan view of the device of the embodiment on a utility meter Figure 5 is a perspective view from above of the device of the embodiment; Figure 6 is an underneath perspective view of the device of the embodiment; Figure 7 is an underneath plan view of the casing and PCB of the embodiment; Figure 8 is a side elevation in cross section of the casing and PCB of the embodiment, not showing the batteries; Figure 9 is an underneath plan view of a PCB of the device of the embodiment; Figure 10 is a side elevation of the PCB of Fig 9; Figure 11 is a top plan view of the PCB of Fig 9; Figure 12 is a perspective view of the system of the embodiment; Figure 13 is a schematic view of the control unit of the system of the embodiment; and, Figure 14 is a schematic view of a pulse module of the embodiment. The camera device 4 of the embodiment of the invention comprises a prism 15 in a casing 30, and a PCB 20 carrying cameras 112. The casing 30 may be injection moulded from opaque plastics material. As shown in figures 1 to 5 , the casing 30 is generally in the form of an upturned rectangular cup with a flat top 32, sides 33, 35, 36, and rounded corners 34. Two opposite sides 36 of the casing carry two spaced ribs 38 extending into the cavity 40 of the casing 30. The ribs 38 on each side face each other. Each rib 38 includes a step 42. Between the two ribs 38 on each of the two sides 36 is provided a clip 46. Each clip 46 depends from the top 32 adjacent one of the said opposite sides 36. Each clip 46 is in the form of a tab 48 and includes an inwardly extending undercut barb 50 near the lower end thereof. The casing 30 has a window 52 in the top 32 adjacent one of the corners. To construct the device 4, the PCB 20 is clipped into the casing 30. To do this, the PCB is offered up to the casing 30 and pushed into the cavity 40 so that the upwardly facing side 60 of the PCB 20 comes to rest on the steps 42 of the ribs 38. In so doing, the clips 46 will be forced apart by the PCB 20 as it travels into the cavity 40, the clips 46 bending resiliently towards the sides 36. Once the barbs 50 pass the downwardly facing side 62 of the PCB 20, the clips 46 will snap behind the PCB 20 to hold it in place in the casing 30. The prism 15 is then injection moulded. So the casing 30 with the PCB 20 clipped into it is placed in an injection moulding machine. Clear plastics material is then injection moulded to form the prism 15. The plastics material will flow around the PCB 20 to fill the gap 70 in the cavity 40 behind the PCB 20 and will fully encapsulate the PCB 20. The mould (not shown) is shaped to form three depending feet 72, 74. There is one large foot 74 at the front side 33 of the casing 30. The foot 74 extends over most of the width of the side 33, and presents a substantially rectangular lower surface 76. The foot 74 also extends out beyond the side 33 of the casing 30 to form an upwardly facing ledge 78 along its full width adjacent the lower edge of the side 33. The other two feet 72 are generally rectangular and lie side by side behind the large foot 74. The rear sides 80 of the rear feet 72 depend from adjacent the rear side 35 of the casing 30. The rear feet 72 have an axis extending towards the large foot 74. The lower surfaces 82 of the rear feet 72 are in a common plane with the lower surface 76 of the large foot 74. The prism 15 may be made from an optically clear casting resin such as Crystalcast 1000 (trade mark). Figures 9 to 11 show the PCB 20. On its upper surface 60, the PCB 20 carries a local processing element or CPU 17, a wired communications interface 19, and a power conditioning subcircuit 108. The lower side 62 of the PCB 20 includes three cameras 112, and two infra red LEDs 114 associated with each camera 112. The cameras 112 are arranged side by side in a row and are directed down through the large foot 74 of the prism 15. A processor 17 is associated with the cameras 112 and receives images from them, which are transmitted through the wired communications interface 19 to a communications control unit 13 through wire 15. A system block diagram is shown in Figure 12 and Figure 13 and depicts a typical implementation of the system with an encapsulated battery and communications unit 13 connected by a multi core cable 15 to the camera device 4 and cable 12 to the pulse module 130 of that utility meter 5. . The cable 15 may be permanently wired or attached by means of a water and dust proof connector system 14 (as depicted in Figure 12). The cables 12, 15 will typically be in the range 0.5-2 metres in length and in this example are 0.6m long. There are no restrictions on utility meter type or the resource it measures requiring only that the register 100 is always active. The entire system is totally water and dust proof and suitable for use in harsh metering environments. The communications and control unit 13 consists of a single PCB 136 with integrated batteries 138, low power processor 140, non-volatile storage, radio communications interface (WIFI / 2G / 4G / NBIoT) 142, pulse input signal conditioning 144 and optical sensor interface 145, wake manager 150 and comms manager 152. The PCB 136 is placed into a hollow injection moulded case 146, the connectors 12, 15 are attached and wired to the PCB 136. The sub assembly is then encapsulated with a two-part potting compound 148 (Two-component polyurethane system, Resin RL420LV, Hardener HL420LV) that is highly water and chemical resistant. Once this has cured, a front lid 150 is secured creating a fully sealed communication and power module 13. The communications and control unit 13 includes an antenna 16 upstanding on the top of the case 146. A pulse module 130 is provided. The pulse module 130 includes a reed switch 132 to detect a rotating magnet in the register mechanism and thereby result in pulses on the cable 12. The other end of the cable 12 is connected to the pulse data acquisition unit 144 of the control and communications unit 13. The camera device 4 consists of multiple image sensors (micro-cameras 112) placed on a PCB 20 to ensure each camera 112 captures overlapping portions of the register 100. This multi camera approach allows the camera device 4 to be miniaturised, effectively reducing the distance from the cameras 112 to the meter surface 102. This is critically important over a single camera solution to ensure the camera device 4 will fit in the often space constrained environments meters are located in as well as reducing optical distortions. In use, a utility meter 5 will be located in a ground pit 2 as shown in Fig 1, or in a wall mounted cupboard 8, as shown in Fig 2. In the ground pit 2 situation, a pit 2 in the ground 3 creates a chamber in the ground closed by an access cover 1. A utility meter 5, usually a water meter, is found on a pipe at the bottom of the pit 2. In the case of a wall mounted cupboard 8, a cupboard 8 is mounted on a wall 6 and the cupboard 8 has a door 7. Inside the cupboard 8 is a cable or pipe and on the cable or pipe is a utility meter 9. The utility meter 5, 9 has a register 100 consisting of a row or string of numbers. This may be an LCD or LED display, or a mechanical display, such as a serial arrangement of adjacent rings which turn to display different numbers on their outer periphery, as shown in Fig 4. The device 4 of the invention can be mounted on the utility meter 5, 9. The register display 100 will be behind a transparent cover 102 in the form of a layer of glass or transparent plastic. As shown, the device 4 is mounted offset from the register display 100. This means that the register display 100 can still be read by a user looking at the display 100. To attach the device 4, the surface of the transparent cover 102 adjacent the register display 100 is first cleaned to remove any dirt or grease. A UV curable adhesive, such as LOCTITE AA 3491 (trade mark), is then applied to the lower surface 76 of the large foot 74, and the device 10 is placed on the transparent cover 102. The position of the device 4 is then adjusted, so that the cameras 112 are aligned with the register display 100. The UV adhesive is then cured by shining UV light through the ledge 78 down to the lower surface 76 of the large foot 74. Encapsulation of the PCB 20 in the prism 15 material provides a completely waterproof solution. The separation of the cameras 112, their position, relative to optics and surface attached to the meter surface 102 is fixed geometry. This creates an effective working distance from the camera device 4 to the register 100 below the meter surface of 5-15mm. This will result in two to three digits within the field of view of each image sensor 112. With an image sensor separation distance of typically 8-10mm, at least one digit overlap in each captured image will ensure minimal distortion when the multiple images are recombined. In the event the utility meter 5, 9 has larger digits, or the digits are closer than 5mm from the under the meter surface 102, bonding a clear acrylic adaptor plate (not shown) to the meter surface 102 will optically reduce the digit size that the image sensor 112 can see. The adaptor plates will be of different thickness and interactively selected at installation to achieve the entire register 100 within the field of view of all the image sensors 112. The adaptor plate will first be bonded to the meter surface 102 and the camera device 4 then bonded to the adaptor plate. To acquire a pulse signal from the meter 5, 9, the dedicated, meter manufacturer approved pulse module 130 attachment is required. The pulse module 130 includes a reed switch 132 to detect a rotating magnet in the register mechanism and thereby result in pulses on the cable 12. The output from the pulse module 130 is a volt free contact. To interface this signal to the pulse capturing circuitry at the remote computer 120 a simple protection and filtering circuit is implemented, with the actual pulse logging against time carried out by the micro controller device 140 within the control and communications unit 13. Two options are implemented depending on the colour of register digits and associated background. Visible spectrum surface mount LED(s) 114 without filtering and Infra-red surface mount LED(s) 114 with associated filters in front of the image sensors 112. This results in maximum digit contrast. The processing element 140 will have three main modes of operation: • Device interactive Installation and alignment mode for optical sensor module 4. • Deep sleep, ultra-low power mode between wake and communication cycles. • Pulse and Image capture, store and timestamp Most of time is spent in an ultra-low power mode to preserve system power as it is powered from a battery 138 with limited capacity. Interactive installation requires images to be captured and streamed back from the multiple image sensors 112 to a handheld device (not shown) for display. This is achieved by the processor 140 requesting images from the optical sensor module device 4 via a TTL interface. The images are received and prepared for optimised sending over a low bandwidth, low power, wireless interface, typically not not limited to, WIFI or Bluetooth, to the hand-held display. To capture the pulse inputs, a processor 140 with hardware ultra-low power counting capability should be used, with hardware programmable filtering capability to reduce false transition detection. The processor will wake every 900s (not limited to this time period) and record the number of pulses that have occurred and the EPOC time. This read and store function must be executed fast and efficiently to minimise time not in the ultra-low power mode. To manage the communications to a remote computer 120, which may be a host or server, high level communications protocols will be required. These specific, contradictory requirements, focus the optimal implementation to a multi-processor solution, one to handle the ultra-low power wake up, pulse counting management and one to deal with optical sensor interfacing, uploading the logged and stored pulse and image data. The wake manager firmware 150 will be responsible for all system low power management including waking up the different resources as needed to achieve the accurate period between pulse logging, the periodic register image acquisition and periodic image sending. It will also be responsible to make sure no resource exceeds time allocated for specific tasks to preserve battery life. All wake operations are based on the accurately maintained system time, adjusted each communications cycle. At a predefined time, the processor 140 will wake from ultra-low power mode and initiate communications over the wired 3V TTL RS232 interface to the optical sensor module 4. This is under control of the wake manager 150. The module cameras 112 are selected sequentially and resulting image sent to the communications and control unit 13 and stored for sending when required by the comms manager 152. Pulse data acquisition must be in ultra-low power hardware, either external to the processor 140 as discrete logic / CPLD / FPGA 144 or internal to the processor 140 as a dedicated low power counter. The preferred implementation is using the internal capability of an ultra-low power processor 140 with a flexible hardware pulse counting peripheral 144. This peripheral 144 will continue to maintain a pulse count even when the processor 140 is in deep sleep, low power mode. To accurately count pulses from the connected pulse module 130, basic input signal conditioning is required before it can be presented to the processor 140. This consists of a simple current limit and clamping circuit with simple first order PC low pass filtering. Communications from the system to the outside world is required at installation for optical sensor alignment, and when the pulse and or image data is scheduled for an upload to a remote computer, host, or server 120. All communications will be wireless, radio based, for convenience and to support many devices to one host computer. Radio protocol standards used will be, but not limited to, bluetooth, WIFI, 2G, 4G and NBIoT. This firmware module will maintain to an accuracy of typically 1 second per day, the current EPOC time (number of seconds elapsed since Jan 1st 1970). The time is adjusted during each communications cycle to achieve better than a 10s drift under any normal operating conditions. This accurate time-base is used for all events controlled by the wake manager 150 to ensure the system follows a use profile as requested by the remote computer 120. All meter consumption metrics are also timestamped with this system time and provided to the remote host computer 120 during a data upload cycle. Internal non-volatile storage is implemented large enough to store more than 365 days of 15-minute pulse data with corresponding daily images. The data upload period is configurable by the computer 120 with a typical profile sending pulse data every 24 hours and image data every 7 days. Data is sent from the communications and control unit 13 via one of the communication protocols to a remote computer 120. The computer will be capable of both accepting inbound data from devices and also return device specific configurations relating to measurement and uploading timings. The computer 120 will employ software to recombine images to create a complete picture of the whole register from the partial images from the cameras 112. Uniquely to this system, and unlike other systems using pulse cables, fully automatic 5 determination of meter / pulse module scaling factor is possible. This is achieved using the following the method in table 2 below, assuming for clarity parameters for pulse logging on a water meter are every 900s and register image read and send is configured for daily at 3pm. Step Method Variable Unit 1 Initiate optical module register read at 3pm Day 1 NA NA 2 Upload optical and pulse data, remote computer determines register reading readl litres 3 Initiate optical module register read at 3pm Day 2 NA NA 4 Upload optical and pulse data, remote computer determines register reading read2 litres 5 Remote computer determines consumed units between read times as actualConsumed = read2-readl actualConsumed litres 6 Remote computer calculates pulse count occurring between readl and read2 pulseCounted counts 7 Remote computer calculates meter and pulse module combined actual scaling factor as: scalingFactor= pulseCounted / actualConsumed scalingFactor Pulses per litre Table 2: Process to auto determine pulse module scaling / multiplying factor With this parameter known, accurate absolute consumption information can easily be 10 determined from the recorded 900s pulse data counts. This eliminates errors relating to conventional pulse module integration with conventional dataloggers, e.g. if the scaling factor is set to 2.5 instead of 10 then all consumption recorded and reported will be 4 times with the error not picked up until the next scheduled manual meter reading. Unique to this device, accuracy of the pulse counting can be determined automatically, without the need for multiple scheduled manual meter reads, the only way for existing systems to achieve the same statistic. To identify the accuracy, the method in table 2 is applied every day (for clarity of explanation, timings can vary). From this method, a daily pulses per litre variable is determined which is analysed by the computer to determine the stability and therefore accuracy of this count. This information can be used to provide a confidence indicator to the pulse profile data gathered. A periodic automatic algorithm is applied to change the time between optical sensor reads (shown in table 2 for clarity as 24 hours). Moving the time between optical module register image read and sends from 12, 24 and 168 hours, creates a statistical measure of pulse stability with increasing time. This metric can be used to create a meter specific profile to minimise the required optical sensor reads to maintain a percentage error setpoint. This will reduce data transfer, reducing power consumption and extending battery life. If the scalingFactor (determined using table 2) is deemed statistically stable (typically less than 1% variance) then the scalingFactor can be applied to all historic pulse data taken in the time window used to calculate said variable. This will provide both accurate and absolute consumption information with a granularity of 900s (typically not fixed) that is constantly adjusted based on the actual decoded register image (from the optical module). The scalingFactor variable (determined by applying method in table 2), makes it possible to automatically identify unexpected installation changes including changes in stability, increasing error rate and total failure. Existing pulse logging systems cannot determine this from pulse only data as erratic but valid user consumption will present similar pulse profile patterns reducing the effectiveness of any applied profile algorithm. The system presented in this embodiment will provide important unique information to the meter asset owner indicating installation maintenance should be considered. Particular advantages of the invention are: 1. Automatic pulse cable drift compensation / correction. 2. Automatic identification of pulse count scaling multiplier. 3. Automatic characterisation of pulse counting accuracy. 4. Automatic detection of faulty pulse sensor cable or meter pulse output. 5. Totally non-invasive, retro fit solution. As an alternative to UV curable adhesive, a two component epoxy clear adhesive could be used, such as Loctite EA 9455. As a further alternative, an optically clear double sided adhesive tape could be used. As an alternative to injection moulding, casting may be used, in particular, vacuum casting. In another embodiment, the LEDs 114 alongside the cameras 112 may not be infra red but may be another wavelength of optical radiation including visible, or may be multispectral. In another embodiment, there may be only one battery 116. The encapsulating compound 148 need not be Two-component polyurethane system, Resin RL420LV, Hardener HL420LV, but instead may be any other weather resistant encapsulant. In a variant, the interconnecting cables 12,15 may not be two separate cables but may be realised as a single cable from the communications unit 13 that is split into two. In the embodiment, the communications and control unit 13 includes an antenna 16 upstanding on the top of the case 146, but in a variant the antenna 16 could instead be at the end of a cable from the communications and control unit 13, the cable being up to 5m long, to enable optimal RF placement of the antenna 16 for data transmission.
Claims
1. A system for a utility meter, the system comprising: first means to detect rotation of an element of the utility meter and to create a pulse on the basis of rotation of the said element, and transmission means to transmit pulse data to an external computer; and second means comprising at least one camera directed at at least part of the alphanumerical string comprising the register of the meter, and transmission means to send data representative of the output of the or each camera to an external computer.
2. A system as claimed in claim 1, wherein the second means comprises a plurality of cameras each having a viewing field and including a first camera and at least a second camera, the first camera focussed on a first area of an alphanumeric string of a meter register and the said second camera focussed on a second, different area of the same alphanumeric string of the meter register, the cameras arranged so that the region consisting of said first and second areas can be captured.
3. A system as claimed in claim 2, wherein the system includes means arranged to obtain a reading of the register by stitching or juxtaposing images each captured by the respective said cameras to create the data of a complete image.
4. A system as claimed in claim 1, 2 or 3, wherein the first means comprises first means to detect proximity of a rotating magnet within the utility meter and to create a pulse on the basis of rotation of the magnet.
5. A system as claimed in claim 4, wherein the first means includes a reed switch which is opened and closed by proximity of the magnet to create the said pulses.
6. A system as claimed in any preceding claim, wherein the system includes count means to count and store the number of pulses received in a time period.
7. A system as claimed in claim 6, wherein the time period is 600 seconds or more (10 minutes).
8. A system as claimed in claim 6 or claim 7, wherein the time period is 1,200 seconds or more (20 minutes).
9. A system as claimed in claim 6, 7 or 8, wherein the time period is about 900 seconds (15 minutes).
10. A system as claimed in any preceding claim, wherein the system includes a wake manager.
11. A system as claimed in any preceding claim, wherein the system is battery powered.
12. A computer for a utility meter system, the computer comprising logging means to receive pulse data from a utility meter system, and image means to receive image data from the same utility meter system.
13. A computer as claimed in claim 12, wherein the computer includes means arranged to stitch or juxtapose images each captured by a plurality of cameras to create the data of a complete image.
14. A computer as claimed in 12 or claim 13, wherein the computer includes means to read the alphanumerical content of the register from the image data.
15. A computer as claimed in claim 14, wherein the computer includes analysis means to compare the pulse data with the image data, in particular to compare two register readings from the image data taken at different times to take one from the other and provide a reading for the amount of the utility used, and compare that with the counted number of pulses over the time span between the said different times.
16. A computer as claimed in claim 15, wherein the time span is one day.
17. A computer as claimed in claim 15 or 16, wherein the analysis means includes means to assign a value to each pulse from the comparison and hence a scaling factor relating the time between pulses to the amount of utility used.
18. A computer as claimed in claim 17, wherein the computer is arranged to detect changes in the scaling factor.
19. A computer as claimed in claim 18, wherein the computer is arranged to raise an alert if the scaling factor changes too much.
20. A monitoring system for a utility meter or utility meters, the monitoring system comprising the utility meter system of any of claims 1 to 11 and a computer as claimed in any of claims 12 to 19, the computer being at a distance therefrom and the computer being arranged to receive pulse data and image data from the utility meter system.5 21. A monitoring system as claimed in claim 20, wherein the computer is a computer asclaimed in claim 18 or claim 19, and wherein the computer is arranged to increase the time period between data acquisition from the utility meter system if the scaling factor is determined to be stable for a set period of time.
22. A monitoring system as claimed in claim 21, wherein stability is defined as less than 1% 10 variance.
23. A monitoring system as claimed in claim 21 or claim 22, wherein the computer is arranged dictate the length of the time periods between data acquisition from the utility meter system to maintain a percentage error setpoint.
Citation Information
Patent Citations
Method for reading and verifying data of domestic gauge
CN109813385A
Intelligent water meter and system combining camera recognition and pulse metering
CN113029304A
Meter attachment support system, meter attachment support device and program
JP2017020927A
Remote data acquisition and processing system
US6208266B1
Radio frequency device within an energy sensor system
US7412338B2