Switching power source device

JP2024063487A5Active Publication Date: 2024-12-03DENSO CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
JP2022171487
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2022-10-26
Publication Date
2024-12-03
Estimated Expiration
2042-10-26

AI Technical Summary

Technical Problem

In switching power supplies using N-channel MOSFETs as high-side switches, the bootstrap capacitor cannot be reliably charged due to irregular ON/OFF timing and insufficient duty ratio, especially during input voltage drops, leading to instability in output voltage.

Method used

A switching power supply device that stabilizes boost capacitor charging by using an N-channel MOSFET as the high-side switch, with a configuration that includes an off-time generator, on-time calculation section, and high-level priority section to maintain gate voltage high and forcibly turn off the switch when necessary, ensuring consistent capacitor charging.

Benefits of technology

The device ensures stable charging of the boost capacitor even during input voltage fluctuations, maintaining output voltage stability and preventing half-on states in the high-side FET.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000000_0000_ABST
    Figure 00000000_0000_ABST
Patent Text Reader

Abstract

To provide a switching power source device capable of stably charging a boosting capacitor.SOLUTION: In a switching power source device 1, a high side switch 2 and a low side switch 3 of an N channel MOSFET generate an output voltage VOUT from an input voltage VIN. An LDO 9 generates a power source for driving the switches by charging a boosting capacitor 11. An off time generation unit 17 brings the gate voltage of the switch 2 to a high level when a divided voltage signal FB becomes lower than a target voltage VREF. A Ton calculation unit 12 has a current source circuit in which the value of a constant current is controlled in accordance with the input voltage VIN, and brings the gate voltage of the high side switch to a low level according to a comparison result of a terminal voltage of the capacitor charged with the constant current with a voltage obtained by multiplying the output voltage by α. An RS latch 14 keeps the gate voltage at a high level in a state where the off time generation unit is outputting a signal for bringing the gate voltage to the high level.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a switching power supply device that generates a transformed output voltage by switching an input voltage using a switching element. [Background technology]

[0002] In a step-down DC-DC converter, which is a type of switching power supply, when the input voltage Vin drops close to the output voltage Vout, it is desirable to drive the high-side switch with the duty ratio of the PWM signal as high as possible in order to minimize the drop in output voltage.

[0003] On the other hand, when an N-channel MOSFET is used for the high-side switch and its gate drive voltage is generated by a bootstrap circuit, the source potential of the high-side FET must be periodically lowered to a low level, in other words, the high-side FET must be turned off, in order to charge the capacitance of the bootstrap circuit. If it becomes impossible to periodically charge the bootstrap capacitance, in other words the boost capacitor, then the voltage required to drive the high-side FET cannot be obtained and it will enter a half-on state.

[0004] To address the above issues, a technology is commonly used in which, when the input voltage drops, the high-side FET operates at a constant high duty ratio to minimize the drop in output voltage while periodically charging the boost capacitor. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] Patent No. 6592374 Summary of the Invention [Problem to be solved by the invention]

[0006] In COT (Constant On Time) control, which is a control method for switching power supplies, the ON time is fixed and the OFF time is determined by feedback control to control the output voltage. Therefore, the ON / OFF timing of the switch is not determined at a constant cycle, making it difficult to stably charge the boost capacitor. In addition, when the output voltage drops, the ON time is controlled to be shorter, which creates the problem of not being able to obtain a sufficiently high duty ratio.

[0007] The present invention has been made in consideration of the above circumstances, and an object of the present invention is to provide a switching power supply device that can stably charge a boost capacitor even in a configuration that uses an N-channel MOSFET as a high-side switch. [Means for solving the problem]

[0008] According to the switching power supply device of claim 1, an input voltage is switched by a high-side switch that is at least an N-channel MOSFET to generate a transformed output voltage. A bootstrap circuit has a boost capacitor, one end of which is connected to the low potential side conduction terminal of the high-side switch, and generates a drive power supply for driving the high-side switch.

[0009] The off-time generating unit sets the gate voltage of the high-side switch to a high level when the divided voltage signal of the output voltage falls below a target voltage. The on-time calculating unit has a current source circuit in which a value of a constant current is adjusted depending on an input voltage, and sets the gate voltage of the high-side switch to a low level according to a result of comparing a terminal voltage of a capacitor charged by the constant current with a voltage obtained by multiplying the output voltage by a gain. The high-level priority unit sets the gate voltage to a high level with priority when the off-time generating unit is outputting a signal to set the gate voltage to a high level.

[0010] With this configuration, even if the off-time generating unit's control to make the gate voltage of the high-side switch high and the on-time calculating unit's control to make the gate voltage low conflict with each other, the high-level priority unit maintains the gate voltage at a high level, so that the boost capacitor of the bootstrap circuit can be charged for a longer period of time.

[0011] According to the switching power supply device of claim 2, the low level setting unit forcibly sets the gate voltage to low level when the time during which the gate voltage shows a high level exceeds a threshold value. As a result, even if the time during which the gate voltage shows a high level becomes longer as a result of a drop in the input voltage, the low level setting unit can reliably charge the boost capacitor by turning off the high-side switch. [Brief description of the drawings]

[0012] [Figure 1] FIG. 1 is a diagram illustrating a configuration of a switching power supply device according to a first embodiment. [Diagram 2] A diagram showing the configuration of the Ton time generation circuit [Diagram 3] Circuit diagram showing the detailed configuration of the ON time counter [Figure 4] Timing chart showing the operation of the ON time counter [Diagram 5] A diagram showing a PWM signal that is output when the input voltage VIN is higher than the output voltage VOUT. [Figure 6] A diagram showing the PWM signal that is output when the input voltage VIN gradually decreases from a state where it is higher than the output voltage VOUT. [Figure 7] FIG. 7 is an enlarged view of a portion of FIG. 6. [Figure 8] FIG. 1 is a diagram showing a configuration of a switching power supply device according to a second embodiment. [Figure 9] FIG. 11 is a circuit diagram showing a detailed configuration of an ON time counter according to a third embodiment. [Figure 10] Timing chart showing the operation of the ON time counter [Figure 11]FIG. 13 is a diagram showing a configuration of a switching power supply device according to a fourth embodiment. [Figure 12] Circuit diagram showing the detailed configuration of the BT-SW voltage detection section [Figure 13] Timing chart showing the operation of the BT-SW voltage detection unit [Figure 14] A diagram showing another example of the power stage configuration. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0013] (First embodiment) A first embodiment will be described below. A switching power supply device 1 of this embodiment shown in Fig. 1 is a step-down switching power supply using COT control. A series circuit of a high-side switch 2 and a low-side switch 3, both of which are N-channel MOSFETs, is connected between a power supply VIN and ground. A series circuit of an inductor 4 and a capacitor 5 is connected between a common connection point of the switches 2 and 3 and ground.

[0014] A gate drive signal is applied to the gates of the high-side switch 2 and the low-side switch 3 via a driver 6 and an inverting driver 7, respectively. The input terminals of the drivers 6 and 7 are connected to the output terminal of an AND gate 8, and a PWM (Pulse Width Modulation) signal is input from the output terminal.

[0015] An LDO (Low Drop Out) 9 boosts an input voltage VIN to generate and supply drive power to the drivers 6 and 7. An output terminal of the LDO 9 is directly connected to a power supply terminal of the driver 7 and is also connected to a power supply terminal of the driver 6 via a diode 10. A boost capacitor 11 is connected between the cathode of the diode 10 and a common connection point of the switches 2 and 3. A source, which is a low potential side conductive terminal of the high-side switch 2, is connected to the common connection point. The LDO 9 and the boost capacitor 11 correspond to a bootstrap circuit.

[0016] The Ton calculation unit 12 receives an input voltage VIN, an output voltage VOUT, and a duty control signal D via a NOT gate 13. The Ton calculation unit 12 generates a reset signal R for an RS latch 14 based on these input signals and outputs the signal to a reset terminal R.

[0017] A series circuit of resistor elements 15a and 15b is connected to the capacitor 5. A common connection point of the resistor elements 15a and 15b is connected to a non-inverting input terminal of a comparator 16. A reference voltage or target voltage VREF is applied to an inverting input terminal of the comparator 16, and an output terminal of the comparator 16 is connected to a set terminal S of the RS latch 14. The resistor element 15 and the comparator 16 configure an off-time generating unit 17.

[0018] The RS latch 14 generates the above-mentioned duty control signal D from its output terminal Q and outputs it to one of the input terminals of the AND gate 8. The input terminal of the ON time counter 18 is connected to the common connection point of the switches 2 and 3, and the output terminal is connected to the other input terminal of the AND gate 8. The RS latch 14 is a latch that prioritizes the set signal and sets the output terminal Q to a high level when a set signal and a reset signal are input simultaneously, and corresponds to a high level priority section.

[0019] 2, the Ton calculation unit 12 is composed of a series circuit of a current source circuit 21 and a capacitor 22 connected between a power source VIN and ground, and a comparison circuit (comparator 24) having an inverting input terminal to which the α-fold value of the output voltage VOUT is input and a non-inverting input terminal connected to a common connection point of the current source circuit 21 and the capacitor 22, and also connected to ground via a switch circuit 23. The current source circuit 21 supplies a constant current I (=G×VIN) proportional to the input voltage VIN.

[0020] The switch circuit 23 is turned on by a signal DB which is an inversion of the duty control signal D. The off-time generating unit 17 compares the voltage FB, which is the divided output voltage VOUT, with a reference voltage VREF, and sets the RS flip-flop 14 according to the result, thereby setting the duty control signal D to a high level. Ton is the time during which the signal D maintains a high level, and is determined by the constant current charging of the capacitor 22. If the capacitance of the capacitor 22 is C, then Ton = (VOUT × C) / (G × VIN) In other words, the time Ton is inversely proportional to the input voltage VIN.

[0021] The ON time counter 18, which corresponds to a low level setting unit, is a counter that counts the time during which the high-side switch 2 maintains an ON state. As shown in Fig. 3, the ON time counter 18 includes eight D flip-flops 25a to 25h connected in series, a buffer 26, a selector 27, and a NOT gate 28. The inverted output terminal of each D flip-flop 25 is connected to the corresponding input terminal D.

[0022] A clock signal CLK is input from the CLK generating circuit 19 to the clock terminal of the first-stage D flip-flop 25a and the "1" side of the selector 27. If the voltage at the common connection point of the switches 2 and 3 is SW, the voltage SW is input to the "0" side of the selector 27 via a buffer 26. The output terminal of the selector 27 is connected to the negative logic reset terminal R of each D flip-flop 25. The "1,0" switching control of the selector 27 is performed by the non-inverted output of the final-stage D flip-flop 25h. In addition, the non-inverted output terminal of the D flip-flop 25h is given to the input terminal of the AND gate 8 via a NOT gate 28.

[0023] 4, the output signal MAXon of the NOT gate 28 remains at a high level until the pulse count of the clock signal CLK reaches 8. When the pulse count reaches 8, the signal MAXon goes to a low level for a half period of the clock signal CLK.

[0024] Next, the operation of this embodiment will be described. As shown in Fig. 5, when the voltage FB falls below the reference voltage VREF, the RS latch 14 is set and the PWM signal rises. At the same time, the switch circuit 23 of the Ton calculation unit 12 is turned off and the capacitor 22 is charged with the constant current I. When the terminal voltage of the capacitor 22 reaches a value α times the output voltage VOUT, the output signal of the comparator 24 changes from low level to high level and the RS latch 14 is reset. The time from when the RS latch 14 is set to when it is reset is the time Ton. This is the normal COT control.

[0025] 6 and 7, when the input voltage VIN gradually decreases from a state where it is higher than the output voltage VOUT, the on-time of the high-side switch 2 gradually increases so that the output voltage VOUT does not decrease accordingly. When the input voltage VIN becomes lower than the output voltage VOUT, the on-time increases, and there is a risk that the charge stored in the boost capacitor 11 will be depleted.

[0026] Therefore, in this embodiment, the ON time counter 18 monitors the voltage SW to measure the time during which the high-side switch 2 maintains the ON state, and when that time reaches a time corresponding to the threshold clock pulse number "8", the signal MAXon is set to low level to forcibly turn off the high-side switch 2 via the AND gate 8. At this timing, the boost capacitor 11 is charged.

[0027] As described above, according to this embodiment, the switching power supply device 1 generates a stepped-down output voltage VOUT by switching the input voltage VIN using the high-side switch 2 and the low-side switch 3, which are N-channel MOSFETs. The LDO 9 generates a drive power supply for driving the switches 2 and 3 by charging the boost capacitor 11.

[0028] When the voltage division signal FB falls below the target voltage VREF, the off-time generation unit 17 sets the gate voltage of the high-side switch 2 to a high level. The Ton calculation unit 12 has a current source circuit 21 in which the value of the constant current I is adjusted depending on the input voltage VIN, and sets the gate voltage of the high-side switch 2 to a low level according to the result of comparing the terminal voltage of the capacitor 22 charged by the constant current I with a voltage obtained by multiplying the output voltage by α. The RS latch 14 preferentially sets the gate voltage to a high level when the off-time generation unit 17 is outputting a signal to set the gate voltage to a high level.

[0029] With this configuration, even if the control by the off-time generating unit 17 to set the gate voltage of the high-side switch 2 to a high level conflicts with the control by the Ton calculating unit 12 to set the gate voltage to a low level, the gate voltage is maintained at a high level by the RS latch 14. Therefore, the boost capacitor 11 can be charged for a longer period of time even under COT control.

[0030] Then, when the time during which the gate voltage of the high-side switch 2 shows a high level exceeds a threshold, the ON time counter 18 forcibly sets the gate voltage to a low level. As a result, even if the time during which the gate voltage shows a high level becomes longer as a result of a drop in the input voltage VIN, the Ton calculation unit 12 turns off the high-side switch 2, so that the boost capacitor 11 can be reliably charged.

[0031] Second embodiment Hereinafter, the same parts as those in the first embodiment will be denoted by the same reference numerals and explanations will be omitted, and only the different parts will be explained. As shown in Fig. 8, the switching power supply device 1A of the second embodiment differs only in that the input terminal of the ON time counter 18 is connected to the gate of the high-side switch 2 instead of the common connection point of the switches 2 and 3.

[0032] Third embodiment 9, the third embodiment uses an ON time counter 30 instead of the ON time counter 18. The ON time counter 30 has a similar configuration to the Ton calculation unit 12, and is composed of a series circuit of a current source circuit 31 and a capacitor 32 connected between a power supply VDD and ground, and a comparator 34 having a reference voltage input to a non-inverting input terminal and an inverting input terminal connected to a common connection point of the current source circuit 31 and the capacitor 32, and also connected to ground via a switch circuit 33. The ON / OFF of the switch circuit 33 is controlled by a NOT gate 13, similar to the Ton calculation unit 12.

[0033] 10, the ON time counter 30 operates such that the comparator 34 compares the terminal voltage Vcount of the capacitor 32 with a reference voltage, and when the former level exceeds the latter level, the signal MAXon goes low, thereby turning off the high-side switch 2 and charging the boost capacitor 11.

[0034] (Fourth embodiment) 11, a switching power supply device 41 of the fourth embodiment uses a BT-SW voltage detection unit 42 instead of the ON time counter 18. The BT-SW voltage detection unit 42 is connected between the cathode BT of the diode 10 and the source SW of the high-side switch 2. The driving power for the inverting driver 7 is also supplied from the cathode of the diode 10.

[0035] 12, the BT-SW voltage detection unit 42 includes a series circuit of resistor elements 43a and 43b connected between the terminals BT and SW, an N-channel MOSFET 44 and a series circuit of resistor elements 45a and 45b, and a buffer 46. The gate of the FET 44 is connected to the common connection point of the resistor elements 43a and 43b. The input terminal of the NOT gate 46 is connected to the common connection point of the resistor elements 45a and 45b. The output terminal of the NOT gate 46 is connected to the input terminal of the AND gate 8.

[0036] 13, in the BT-SW voltage detection unit 42, if the BT-SW voltage is high and the gate voltage of the FET 44 exceeds the threshold, the FET 44 is ON, and the signal BT-POR output via the buffer 46 indicates a high level. When the BT-SW voltage decreases and the gate voltage of the FET 44 falls below the threshold, the FET 44 turns OFF. This changes the signal BT-POR to a low level.

[0037] (Other embodiments) FIG. 14 shows another example of the configuration of the power stage that performs switching, in which a diode 47 is arranged instead of the low-side switch 3. The count number of the Ton time calculation unit 18 is not limited to "8". Although the present disclosure has been described based on the embodiment, it is understood that the present disclosure is not limited to the embodiment or structure. The present disclosure also includes various modifications and modifications within the equivalent range. In addition, various combinations and forms, and other combinations and forms including only one element, more than one element, or less than one element, are also within the scope and concept of the present disclosure. [Explanation of symbols]

[0038] In the drawing, 1 is a switching power supply device, 2 is a high-side switch, 3 is a low-side switch, 8 is an AND gate, 9 is an LDO, 11 is a boost capacitor, 12 is a Ton calculation unit, 14 is an RS latch, 17 is an off-time generation unit, 18 is an on-time counter, 21 is a current source circuit, 23 is a switch circuit, and 24 is a comparator.

Claims

1. A high-side switch (2) which is at least an N-channel MOSFET is used to switch an input voltage to generate a transformed output voltage. a bootstrap circuit (9) having a boost capacitor (11) whose one end is connected to a low potential side conduction terminal of the high side switch and which generates a drive power supply for driving the high side switch; an off-time generating unit (17) that sets a gate voltage of the high-side switch to a high level when the divided voltage signal of the output voltage falls below a target voltage; an on-time calculation unit (12) that has a current source circuit (21) in which a value of a constant current is adjusted depending on the input voltage, and that sets a gate voltage of the high-side switch to a low level depending on a result of comparing a terminal voltage of a capacitor (22) that is charged by the constant current with a voltage obtained by multiplying the output voltage by a gain; a high level priority unit (14) that prioritizes setting the gate voltage to a high level when the off-time generation unit is outputting a signal that sets the gate voltage to a high level; a low level setting section (18, 30, 42) that forcibly sets the gate voltage to a low level when the time during which the gate voltage shows a high level exceeds a threshold.

2. 2. The switching power supply device according to claim 1, wherein the low level setting section (18) includes a counter that measures the time during which the gate voltage indicates a high level.

3. The low level setting unit (30) includes a ramp signal generating unit that generates a ramp signal by combining a current source (31), a capacitor (32) that is charged by the current of the current source, and a discharging switching element (33) that discharges the capacitor during a period in which the gate voltage indicates a low level; 2. The switching power supply according to claim 1, further comprising a comparison circuit (34) for comparing the ramp signal with a reference voltage.

4. 2. The switching power supply device according to claim 1, wherein the low level setting unit (42) includes a voltage detection unit (43) that detects a terminal voltage of the boost capacitor, and when the terminal voltage falls below a threshold value, the gate voltage is forcibly set to a low level.

5. The on-time calculation unit (12) includes a ramp signal generation unit that generates a ramp signal by combining the current source circuit and a discharging switching element (23) that discharges the capacitor during a period in which the gate voltage indicates a low level; 5. The switching power supply device according to claim 1, further comprising a comparison circuit (24) for comparing the output voltage with the ramp wave signal.