Energy absorbing stud
The seismic stud design with a pivot joint connection and energy-absorbing plate addresses inefficiencies in conventional studs by enhancing shear force deformation and reducing costs through standard steel usage, improving structural performance and cost-effectiveness.
Patent Information
- Application Number
- JP2024041390
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-03-17
- Filing Date
- 2024-03-15
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-03-15
AI Technical Summary
Conventional shear force-yielding seismic studs have inefficiencies due to energy-absorbing steel plates with insufficient height, requiring multiple stiffening plates and high-cost, low-yield strength materials, which affect overall rod efficiency and increase construction costs.
The design includes a boundary column vane connected to a boundary beam with an energy-absorbing plate, featuring a gap for pivot joint connections that allow horizontal and vertical force transmission, reducing the aspect ratio and enabling primarily shear force deformation, using standard steel materials.
This design enhances rod efficiency by allowing deformation mainly through shear force, reduces material costs, and prevents buckling, maintaining structural integrity during earthquakes.
Smart Images

Figure 2024133033000001_ABST
Abstract
Description
[Technical field]
[0001] TECHNICAL FIELD This disclosure relates to energy absorbing studs. [Background technology]
[0002] Taiwan is located in the Pacific Circum-Pacific earthquake belt, so in recent years, various vibration-proof and vibration-control designs have been constantly developed to ensure the safety of people's lives and property. Earthquake-resistant stud-type metal energy absorbers have a small volume and are widely used in earthquake-resistant building structures. Generally, earthquake-resistant studs are divided into two types: bending moment yielding type and shear force yielding type, and shear force yielding type earthquake-resistant studs are composed of energy-absorbing steel plates and connecting sections at both the top and bottom ends, adopting a three-stage design. Summary of the Invention [Problem to be solved by the invention]
[0003] In conventional shear-yielding earthquake-resistant studs, the height of its energy-absorbing steel plate is less than one-third of the total column height, and the deformation demand of the shear force is more than three times the floor displacement, so many stiffening plates are required to reinforce it to prevent buckling. In addition, in order to ensure the occurrence of the shear-force plastic hinge of the energy-absorbing steel plate, the upper and lower elastic parts must be very hard and occupy a certain height, which reduces the overall rod efficiency. In addition, the low-yield strength steel material required by conventional energy-absorbing steel plates is expensive and difficult to obtain, and requires special processing, which leads to increased costs. [Means for solving the problem]
[0004] One aspect of the present disclosure is an energy absorbing stud.
[0005] According to one embodiment of the present disclosure, an energy absorbing stud comprises: an intermediate section having a boundary column vane vertically connected to a boundary beam; a boundary column web plate located on a first side of the boundary column vane; and at least one boundary column having a gap extending along the horizontal direction, connected to the boundary beam together with the intermediate section by the boundary column vane, and arranged to transmit horizontal and vertical forces, the boundary column including at least one blade plate connection portion located at one end of the intermediate section; and an energy absorbing plate located on a second side of the boundary column vane opposite the boundary column web plate, arranged to develop shear force plastic behavior to absorb energy, the boundary column located on one side.
[0006] In one embodiment of the present disclosure, the width of the energy absorbing plate is less than the height of the energy absorbing plate, and the height of the energy absorbing plate is greater than half the height of the boundary post.
[0007] In one embodiment of the present disclosure, the width of the boundary post is substantially equal to or less than half the width of the energy absorbing plate.
[0008] In one embodiment of the present disclosure, there is a window between the energy absorbing plate, the sword plate connection and the boundary beam.
[0009] In one embodiment of the present disclosure, an energy absorbing stud may be located on a second side of the window with the border post vane plate and include a plate cover positioned to increase the strength of the blade plate connection.
[0010] In one embodiment of the present disclosure, the energy absorbing stud further comprises an interface plate located within the window and adjacent the plate cover and the energy absorbing plate.
[0011] In one embodiment of the present disclosure, the energy absorbing stud further comprises a first reinforcing plate located on a first surface of the energy absorbing plate and disposed along a vertical direction, and an interface plate located on an end of the energy absorbing plate, disposed along a horizontal direction, and joined to the first reinforcing plate.
[0012] In one embodiment of the present disclosure, the energy absorbing stud further comprises a second reinforcing plate located on a second surface relative to the first surface of the energy absorbing plate and disposed along a horizontal direction.
[0013] In one embodiment of the present disclosure, the energy absorbing stud further comprises a horizontal reinforcing plate located on the surface of the boundary post and arranged along the horizontal direction.
[0014] In one embodiment of the present disclosure, the energy absorbing stud comprises two boundary posts, an energy absorbing plate is located between the two boundary posts, and each of the two boundary posts includes two sword plate connection portions, and an intermediate portion is located between the two sword plate connection portions.
[0015] In the above-mentioned embodiment of the present disclosure, due to the gap of the blade connection part, the blade connection part can connect the middle part of the boundary column and the boundary beam of the building at the position of this gap by means such as pivoting, and the blade plate at the gap can be used to transmit horizontal and vertical forces, so that the central energy absorbing plate only has a simple shear deformation. In addition, the energy absorbing plate is connected to the boundary beam through the boundary column, which reduces the aspect ratio of the energy absorbing plate, so that it is more guaranteed that the deformation of the energy absorbing plate is mainly shear force. In addition, the height of the energy absorbing plate can be made larger than half of the total column height, so that the ratio of the shear deformation demand of the floor and the shear deformation demand of the energy absorbing plate is close to 1, and the rod efficiency of the energy absorbing stud is greatly improved. In addition, since there is no need to use low yield strength steel, the same processing method and material as the boundary column can be adopted, and the construction cost can be reduced. [Brief description of the drawings]
[0016] Aspects of the present disclosure can be best understood from the following embodiments with reference to the accompanying figures, in which: Note that, in accordance with standard practice in the industry, various features have not been drawn to scale, and in fact may be arbitrarily increased or decreased in size for clarity of discussion. [Figure 1]FIG. 1 is a front view illustrating an energy absorbing stud according to one embodiment of the present disclosure. [Diagram 2] FIG. 2 is a front view of the energy-absorbing stud of FIG. 1 during deformation. [Diagram 3] FIG. 13 is a front view of an energy absorbing stud according to another embodiment of the present disclosure. [Figure 4] FIG. 4 is a diagram showing the shear force versus floor deformation amount during shear force deformation of the energy absorbing stud of FIG. 3. [Diagram 5] FIG. 4 is a graph showing the shear force versus floor deformation during 20 maximum shear force deformations of the energy absorbing stud of FIG. 3. [Figure 6] FIG. 13 is a rear view illustrating an energy absorbing stud according to a further embodiment of the present disclosure. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0017] The embodiments disclosed below provide numerous different embodiments, or examples, of different features for carrying out the provided objectives. In the following, specific examples of elements and configurations are described to simplify the present disclosure. Of course, these examples are only examples and are not intended to be limiting. It should be noted that the present disclosure may repeat element symbols and / or letters in each example. This repetition is used for the purpose of simplicity and clarity and does not in itself specify a relationship between each embodiment and / or configuration discussed.
[0018] Spatially relative terms such as "below," "under," "lower," "above," "top," and the like may be used for convenience of description herein to describe the relationship of one element or feature to another element or feature as shown in the drawings. The spatially relative terms are intended to cover different orientations of the device during use or operation other than the orientation shown in the drawings. The device may be oriented in other configurations (rotated 90 degrees or at other orientations) and the spatially relative description terms used herein may be interpreted correspondingly in the same manner.
[0019] FIG. 1 is a front view showing an energy absorbing stud 100 according to an embodiment of the present disclosure. Referring to FIG. 1, the energy absorbing stud 100 includes a boundary post wing plate 110, at least one boundary post 120, and an energy absorbing plate 130. The boundary post wing plate 110 is vertically connected to a boundary beam 200. The boundary post 120 includes a middle portion 124 and at least one sword plate connection portion 122. The middle portion 124 includes a boundary post web plate 129 located on a first side of the boundary post wing plate 110. The sword plate connection portion 122 is located at one end of the middle portion 124, and the sword plate connection portions 122, 126 have a gap 128 extending along the horizontal direction, and the sword plate connection portion 122 and the middle portion 124 are connected to the boundary beam 200 by the boundary post wing plate 110. The energy absorbing plate 130 is located on a second side of the boundary post wing plate 110 opposite to the boundary post web plate 129. The boundary post 120 is located on one side of the energy absorbing plate 130. In this embodiment, the energy absorbing stud 100 has two boundary posts 120, the energy absorbing plate 130 is located between the two boundary posts 120, and each of the two boundary posts 120 has two blade plate connecting parts 122, 126, and the middle part 124 is located between the two blade plate connecting parts 122, 126. Taking the blade plate connecting part 122 as an example, in the gap 128, there are only two parts, namely, the upper and lower parts of the blade plate connecting part 122, where the boundary post blade 110 and the disposable plate cover 150 are connected. With this design, the boundary post blade 110 in the gap 128 can fully utilize the ductility and elasticity of the material and play a pivotal role. In some embodiments, the materials of the energy absorbing plate 130, the boundary column 120 and the boundary column vane 110 include steel, and the materials of the energy absorbing plate 130, the boundary column 120 and the boundary column vane 110 may be the same, such as H-shaped steel or composite steel, but are not limited thereto.
[0020] The width W1 of the energy absorbing plate 130 is smaller than the height H1 of the energy absorbing plate 130. The boundary column 120 is not in direct contact with the energy absorbing plate 130 but is in direct contact with the non-boundary beam 200. This design allows the aspect ratio of the energy absorbing plate 130 to be equivalent to the ratio of the width W1 to the height H1 (generally, the wall width in civil engineering is the length of the contact portion that applies shear force. In this disclosure, the boundary column 120 is what directly applies shear force to the energy absorbing plate 130, so the wall width is equivalent to the height H1). When the width W1 of the energy absorbing plate 130 is smaller than the height H1 of the energy absorbing plate 130 and the aspect ratio is smaller than 1, the main acting force acting on the energy absorbing plate 130 is dominated by the shear force. This design simplifies the rod mechanics of the energy absorbing plate 130, and the energy absorbing plate 130 can deform and absorb the energy during the occurrence of an earthquake with a simple shear force.
[0021] Fig. 2 is a front view of the energy absorbing stud 100 in Fig. 1 during deformation. Referring to Fig. 2, when the upper and lower boundary beams 200 of the energy absorbing stud 100 are subjected to a lateral displacement S, the blade plate connections 122, 126 are arranged to absorb the vertical force Vkp and horizontal force Hkp in the gap 128 due to the lateral displacement S, and the bending moment and axial force in the blade plate connections 122, 126. The so-called bending moment is a moment that bends the inside of the blade plate connections 122, 126 due to the horizontal force Hkp, and the so-called axial force is an axial force in the blade plate connections 122, 126 due to the vertical force Vkp, and can be divided into a pressure (compression, the arrow points toward the energy absorbing plate 130) and a tension (the arrow points away from the energy absorbing plate 130) depending on the direction of the acting force. In addition, the distortion force caused by the lateral displacement S also has a horizontal force Hkp in the horizontal direction, which forms a shear force in the energy absorbing plate 130 and forms a parallelogram deformation, thus reaching plasticity and absorbing earthquake vibration energy. During deformation, the parts where the blade plate connections 122, 126 are connected to the upper and lower boundary beams 200 respectively do not deform, but the parts between the gaps 128 of the blade plate connections 122, 126 deform, and the height H1 of the energy absorbing plate 130 is greater than half the height H2 of the boundary column 120 (see FIG. 1), thus the height H3 of the part involved in the deformation of the energy absorbing stud 100 can occupy a large proportion of the height H2 of the boundary column, for example, in the range of 80% to 95%. For small angles θ, the sine function value of angle θ can be approximated to angle θ itself (i.e.), so that the ratio of the shear deformation demand of the floor to the shear deformation demand of the energy absorbing stud 100 can be approximated to the ratio of the floor height (i.e., boundary column height H2, see FIG. 1) to the height H3 of the deformable area of the energy absorbing stud 100. Because the height H3 of the deformable area is close to the height H2 of the boundary columns, such a design makes the ratio of the shear deformation demand of the floor to the shear deformation demand of the energy absorbing stud 100 close to 1:1, that is, the ratio of the boundary column height H2 to the height H3 of the deformable area is close to 1, which greatly improves the rod efficiency of the energy absorbing stud 100.
[0022] Referring to FIG. 1, the width W2 of the boundary post 120 and half the width W1 of the energy absorbing plate 130 are substantially equal to or less than the width W2 of the boundary post 120. There is a window 140 between the energy absorbing plate 130, the blade plate connection 122 and the boundary beam 200. The upper two blade plate connection 122, the boundary beam 200 and the energy absorbing plate 130 in FIG. 1 can surround the window 140. The energy absorbing stud 100 further includes a plate cover 150. The plate cover 150 is located on the second side of the boundary post blade 110 in the window 140, and the plate cover 150 is arranged to enhance the strength of the boundary post blade 110. For example, by welding the plate cover 150 to the boundary post blade 110 of this part of the window 140, the strain strength that the boundary post blade 110 can withstand can be increased, and there is no need to increase the thickness of the entire boundary post blade 110. In some embodiments, the width of the gap 128 at the blade plate connection portion 122 is about 1 to 2 times the thickness of the boundary post blade plate 110 plus the thickness of the plate cover 150.
[0023] The energy absorbing stud 100 further includes a first reinforcing plate 170 and an interface plate 160. The first reinforcing plate 170 is located on the first surface 132 of the energy absorbing plate 130 and is arranged along the vertical direction. The interface plate 160 is located in the window 140 and at the end of the energy absorbing plate 130, and the interface plate 160 is adjacent to the plate cover 150 and the energy absorbing plate 130. The interface plate 160 is arranged along the horizontal direction and is joined to the first reinforcing plate 170. In this embodiment, the number of the first reinforcing plate 170 is shown as one, but more first reinforcing plates 170 can be added as needed. An embodiment of adding the first reinforcing plate 170 will be described later and in FIG. 3. The role of the first reinforcing plate 170 and the interface plate 160 is to delay the buckling of the energy absorbing plate 130, so that the energy absorbing plate 130 can withstand a larger lateral displacement and delay irrecoverable deformation.
[0024] In this embodiment, the energy absorbing stud 100 further includes a horizontal reinforcing plate 174. The horizontal reinforcing plate 174 is located on the surface of the boundary column web plate 129 and arranged along the horizontal direction. It should be noted that the horizontal reinforcing plate 174 is not only arranged on one surface of the boundary column web plate 129, but also on the back surface of the boundary column 120 in FIG. 1, as will be described in FIG. 6. In some embodiments, the material of the first reinforcing plate 170 and the horizontal reinforcing plate 174 includes steel, and the thickness of the first reinforcing plate 170 and the horizontal reinforcing plate 174 is in the range of 1.0 cm to 2.5 cm, for example, about 2 cm.
[0025] 3 is a front view of an energy absorbing stud 100a according to another embodiment of the present disclosure. Referring to FIG. 3, the energy absorbing stud 100a includes a boundary post wing plate 110, at least one boundary post 120, an energy absorbing plate 130, and a first reinforcing plate 170a. The difference between this embodiment and the embodiment of FIG. 1 is that the energy absorbing stud 100a has three first reinforcing plates 170a. In this way, the additional first reinforcing plates 170a allow the energy absorbing stud 100a to withstand a larger strain force and a larger lateral displacement than the embodiment of FIG. 1.
[0026] FIG. 4 is a diagram showing the shear force vs. floor deformation during shear force deformation of the energy absorbing stud 100a of FIG. 3. In FIG. 4, even if the lateral displacement reaches 5% (i.e., lateral displacement of 5 cm occurs for each meter in the vertical direction) in the primary deformation cycle, the force-displacement relationship curve is a gentle curve, which shows that the energy absorbing stud 100a of FIG. 3 does not buckle. FIG. 5 is a diagram showing the shear force vs. floor deformation during 20 maximum shear force deformations of the energy absorbing stud 100a of FIG. 3. In FIG. 5, even if the lateral displacement cycle of FIG. 4 is repeated 20 times, the overlap of the force-displacement relationship curve is still very high, which shows that the energy absorbing stud 100a of FIG. 3 does not experience the phenomenon of structural deterioration due to metal fatigue during these 20 cycles.
[0027] FIG. 6 is a rear view of an energy absorbing stud 100b according to a further embodiment of the present disclosure. Referring to FIG. 6, the energy absorbing stud 100b includes a boundary post wing plate 110, at least one boundary post 120, and an energy absorbing plate 130. The difference between the embodiment of FIG. 6 and the embodiment of FIG. 3 is that the energy absorbing stud 100b of FIG. 6 further includes a second reinforcing plate 172. The second reinforcing plate 172 is located on the second surface 134 of the energy absorbing plate 130 opposite to the first surface 132, and the second reinforcing plate 172 is arranged along the horizontal direction. By adding the second reinforcing plate 172, the structure of the energy absorbing plate 130 of the energy absorbing stud 100b is further strengthened. In some embodiments, the material of the second reinforcing plate 172 includes steel, and the thickness of the second reinforcing plate 172 is in the range of about 1.0 cm to 2.5 cm, for example, 2 cm.
[0028] As described above, due to the gap at the blade plate connection, the blade plate can connect the middle part of the boundary column and the boundary beam of the building at the position of this gap by means such as pivoting, and the blade plate connection at the gap can transmit horizontal and vertical forces, so that the central energy absorbing plate only has a simple shear deformation. In addition, the energy absorbing plate is connected to the boundary beam through the boundary column, which reduces the aspect ratio of the energy absorbing plate, so that it is more guaranteed that the deformation of the energy absorbing plate is mainly shear force. In addition, the height of the energy absorbing plate can be made larger than half of the total column height, so that the ratio of the shear deformation demand of the floor and the shear deformation demand of the energy absorbing plate is close to 1, and the rod efficiency of the energy absorbing stud is greatly improved. In addition, since there is no need to use low yield strength steel, the same processing method and material as the boundary column can be adopted, and the construction cost can be reduced.
[0029] The foregoing outlines features of several embodiments so that those skilled in the art may better understand aspects of the present disclosure. Those skilled in the art should appreciate that the present disclosure may be readily used as a basis for designing or modifying other processes and structures to achieve the same purposes and / or advantages as the embodiments described herein. Those skilled in the art should further recognize that such equivalent structures do not depart from the spirit or scope of the present disclosure, and that various modifications, substitutions and alterations may be made herein without departing from the spirit or scope of the present disclosure. [Explanation of symbols]
[0030] 100, 100a, 100b: Energy absorbing studs 110: Boundary column wing plate 120: Boundary pillar 122, 126: Blade connection part 124: Middle section 128: Gap 129: Boundary column web 130: Energy absorbing plate 132: First Surface 134: Second Surface 140: Window 150: Board cover 160: Boundary plate 170, 170a: First reinforcing plate 172: Second reinforcement plate 174:Horizontal reinforcing plate 200: Boundary beam H1, H2, H3: Height W1, W2: Width Vkp: Vertical force Hkp:Horizontal force S: Lateral displacement θ: Angle
Claims
1. 1. An energy absorbing stud comprising: A boundary column blade connected perpendicularly to the boundary beam; At least one boundary post located on one side of the energy absorbing plate, the boundary post having a boundary post web plate located on a first side of the boundary post vane, the boundary post having a gap extending along the horizontal direction and connected to the boundary beam by the boundary post vane together with the intermediate part, the boundary post having at least one blade plate connection part located on one end of the intermediate part, the boundary post being arranged to transmit horizontal and vertical forces; an energy absorbing plate located on a second side of the boundary column vane plate opposite the boundary column web plate, arranged to form a uniform shear force deformation, and having the boundary column located on one side.
2. 2. The energy absorbing stud of claim 1, wherein a width of said energy absorbing plate is less than a height of said energy absorbing plate, and said height of said energy absorbing plate is greater than half a height of said boundary post.
3. 3. The energy absorbing stud of claim 2, wherein a width of said boundary post and half of said width of said energy absorbing plate are substantially the same as or less than said width.
4. 2. The energy absorbing stud of claim 1, wherein there is a window between the energy absorbing plate, the sword plate connection and the boundary beam.
5. 5. The energy absorbing stud of claim 4, further comprising a plate cover located on the second side of the window with the boundary post vane plate and positioned to enhance strength of the blade plate connection.
6. 6. The energy absorbing stud of claim 5, further comprising an interface plate located within said window and adjacent said plate cover and said energy absorbing plate.
7. A first reinforcing plate is located on a first surface of the energy absorbing plate and is arranged along a vertical direction; 2. The energy absorbing stud of claim 1, further comprising an interface plate located at an end of the energy absorbing plate, disposed horizontally along the edge and joined to the first reinforcing plate.
8. 8. The energy absorbing stud of claim 7, further comprising a second reinforcing plate located on a second surface of the energy absorbing plate opposite the first surface and disposed along a horizontal direction.
9. The energy absorbing stud according to claim 1 , further comprising a horizontal reinforcing plate located on a surface of the boundary column web plate and arranged along the horizontal direction.
10. 2. The energy absorbing stud of claim 1, comprising two said boundary posts, said energy absorbing plate being between the two said boundary posts, and each of the two said boundary posts includes two said sword plate connection portions, and said intermediate portion is located between the two said sword plate connection portions.
Citation Information
Patent Citations
Steel Panel Damper
CN108005245A
Vibration control steel sheet unit and vibration control wall
JP1998147999A
Vibration control device
JP2018066140A
Elongate member reinforcement
US20150075099A1