Plan making method, computer program, and plan making device
The planning method uses discrete penalty coefficients to simplify the objective function, enabling the creation of improved plans efficiently by focusing on significant changes and reflecting intended goals, thus overcoming the challenges of reciprocal relationships and weight adjustments in existing methods.
Patent Information
- Application Number
- JP2023045189
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-22
- Publication Date
- 2024-10-04
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing planning methods struggle to create improved plans in a short time due to reciprocal relationships between evaluation indices and the complexity of adjusting weights, making it difficult to formulate efficient plans quickly.
A planning method that utilizes discrete penalty coefficients defined by constant values for each section of the evaluation index, focusing on plans with significant changes across sections, and includes a linear sum of products of frequencies and penalty coefficients to simplify calculations and adjust the objective function more easily.
This approach allows for the creation of improved plans in a shorter time by reducing the number of adjustments needed and ensuring the plan reflects the intended goals and constraints, resulting in a realistic and efficient output.
Smart Images

Figure 2024134808000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a planning method, a computer program, and a planning device. [Background technology]
[0002] Conventionally, planning methods for formulating a plan have been known. Patent documents 1 to 4 disclose planning methods for formulating a plan in which the magnitude of an objective function expressing the purpose of the plan to be formulated is changed by using a mathematical technique. In the planning methods described in Patent documents 1 to 4, the objective function includes a plurality of evaluation indexes for evaluating the plan to be formulated, and a plurality of weights by which each of the plurality of evaluation indexes is multiplied. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2019-98350 A [Patent Document 2] JP 2019-200695 A [Patent Document 3] JP 2018-180943 A [Patent Document 4] JP 2015-90532 A Summary of the Invention [Problem to be solved by the invention]
[0004] However, even with the prior art such as Patent Documents 1 to 4, there is still room for improvement in the technology for creating an improved plan in a short time in the planning method. For example, in the planning methods described in Patent Documents 1 to 4, when a first evaluation index and a second evaluation index among multiple evaluation indexes included in the objective function have a reciprocal relationship, a small improvement in the first evaluation index may lead to a large deterioration in the second evaluation index. For this reason, although the reciprocal relationship of the weights multiplied by each of the multiple evaluation indexes is important, it is difficult to create an improved plan in a short time because there are many items to adjust the weights.
[0005] The present invention has been made to solve the above-mentioned problems, and has an object to provide a technique for creating an improved plan in a short period of time in a plan creation method. [Means for solving the problem]
[0006] The present invention has been made to solve at least part of the above-mentioned problems, and can be realized in the following forms.
[0007] (1) According to one aspect of the present invention, there is provided a planning method, comprising: an information acquiring step of acquiring planning information on a plan to be created, an index setting step of setting an evaluation index for evaluating the plan based on the planning information, a coefficient setting step of setting a penalty coefficient representing a deviation of the evaluation index from a target value, the penalty coefficient being defined by a discrete function indicating a constant value for each interval corresponding to a predetermined numerical range of the evaluation index, a function creating step of creating an objective function including the penalty coefficient by using the planning information, and a search step of searching for a plan that minimizes the objective function.
[0008] According to this configuration, the search step searches for a plan that minimizes an objective function including a penalty coefficient. The penalty coefficient represents the degree of deviation of the evaluation index from the target value, and is defined by a discrete function that indicates a constant value for each interval that indicates a predetermined numerical range of the evaluation index. As a result, when searching for a plan, attention is focused on plans in which the penalty coefficient changes when crossing an interval, and therefore the search can be performed with a clear comparison with past plans that have already been created. It is possible to output an improved plan. Furthermore, since the penalty coefficient is defined to indicate a constant value for each interval in the evaluation index, there are fewer items to be adjusted when creating the objective function compared to using an objective function that changes every time according to the value of the evaluation index. This makes it possible to easily adjust the objective function, so that an improved plan can be created in a short time. In this way, it is possible to create a plan that is an improvement over a past plan in a short time.
[0009] (2) In the plan creation method of the above aspect, the index setting step may set a plurality of the evaluation indexes, and the function creation step may create the objective function including a linear sum of the products of the frequencies of the plurality of intervals and the penalty coefficients for each of the plurality of evaluation indexes. According to this configuration, the objective function includes a linear sum of the products of the frequencies of the plurality of intervals and the penalty coefficients, and is expressed by a relatively simple configuration. This simplifies the calculations in the search for a plan, and an improved plan can be created in a shorter time.
[0010] (3) In the planning method of the above embodiment, the plan information may include information on an allowable range of the evaluation index, and the magnitude of the frequency in the interval may be limited based on at least one of an upper limit value and a lower limit value of the allowable range. According to this configuration, the frequency in the interval of the evaluation index is set based on at least one of an upper limit value and a lower limit value of the allowable range of the evaluation index. As a result, an unfeasible plan is not included in the search range of the plan, and it is possible to create a feasible plan that is an improvement over past plans and is improved in a short time. Also, for example, if the allowable range of the evaluation index reflects the planner's ideas, the plan of the search result is a plan that reflects the planner's ideas. As a result, it is possible to create an improved plan in line with the planner's ideas.
[0011] (4) In the plan creation method of the above aspect, the plan information may include priority information regarding the priority between the multiple evaluation indexes, and the magnitude relationship of the penalty coefficient between the multiple evaluation indexes may be set based on the priority information. According to this configuration, the plan information includes priority information regarding the priority between the multiple evaluation indexes. Since the penalty coefficient set for each of the multiple evaluation indexes is set based on this priority information, the plan of the search result is a plan that reflects the priority of the evaluation indexes. Therefore, it is possible to create a plan that is suited to the site where the plan is to be executed.
[0012] (5) In the plan creation method of the above aspect, the information acquisition step may acquire information on a past plan related to the plan to be created, and the coefficient setting step may set the penalty coefficient based on the information on the past plan. According to this configuration, the penalty coefficient is set based on the information on the past plan included in the plan information. This makes it possible to set a penalty coefficient that reflects problems in the past plan, and therefore makes it possible to create a plan that is reliably improved over the past plan.
[0013] (6) In the planning method of the above aspect, the plan information includes condition information on conditions that are not set as the evaluation index, and the planning method may further include a constraint setting step of setting a constraint equation based on the condition information, and the search step may search for a plan that minimizes the objective function while satisfying the constraint equation set in the constraint setting step. According to this configuration, in the constraint setting step, a constraint equation is set based on condition information on conditions that are not set as an evaluation index. Here, the constraint equation may include a variable on either the left or right side, and the other side may include only constants, only variables, or both constants and variables. In the search step, a plan that minimizes the objective function while satisfying the constraint equation is searched for, so that the plan resulting from the search may include conditions that are not included in the evaluation index. Furthermore, when feasible information is included as condition information, it is possible to set a plan that is not realistic. This makes it possible to suppress output of a poorly planned schedule as a search result, thereby enabling the creation of a realistic schedule that is an improvement over past plans.
[0014] (7) In the planning method of the above aspect, the plan to be created may be a production plan for producing a plurality of products, and the plurality of evaluation indexes may include the inventory quantity of each of the plurality of products and the number of setup changes of equipment capable of producing each of the plurality of products. According to this configuration, the planning method creates a production plan for producing a plurality of products. In this case, the plurality of evaluation indexes include the inventory quantity of each of the plurality of products and the number of setup changes of equipment capable of producing each of the plurality of products. As a result, in a production plan for producing a plurality of products using limited production equipment, a production plan that is improved over a past plan can be created in a short time.
[0015] (8) According to another aspect of the present invention, a computer program for planning is provided. The computer program causes a computer to realize an information acquisition function for acquiring plan information on a plan to be planned, an index setting function for setting an evaluation index for evaluating the plan based on the plan information, a coefficient setting function for setting a penalty coefficient representing the deviation of the evaluation index from a target value, the penalty coefficient being defined by a discrete function indicating a constant value for each interval corresponding to a predetermined numerical range of the evaluation index, a function creation function for creating an objective function including the penalty coefficient using the plan information, and a search function for searching for a plan that minimizes the objective function. According to this configuration, the penalty coefficient included in the objective function used when searching for a plan by the search function is defined by a discrete function indicating a constant value for each interval in the evaluation index, so that the focus is on a plan that includes a large change that crosses an interval. This makes it possible to output a plan that is clearly improved over past plans. In addition, since the penalty coefficient is a constant value for each interval in the evaluation index, the number of items to be adjusted when creating the objective function is relatively small. This allows the objective function to be easily adjusted using the coefficient setting function, making it possible to create an improved plan in a short period of time.
[0016] (9) According to yet another aspect of the present invention, a planning device is provided. The planning device includes an information acquisition unit that acquires planning information on a plan to be planned, an index setting unit that sets an evaluation index for evaluating the plan based on the planning information, a coefficient setting unit that sets a penalty coefficient that represents the deviation of the evaluation index from a target value, the penalty coefficient being defined by a discrete function that indicates a constant value for each interval corresponding to a predetermined numerical range of the evaluation index, a function creation unit that uses the planning information to create an objective function including the penalty coefficient, and a search unit that searches for a plan that minimizes the objective function. According to this configuration, the penalty coefficient included in the objective function used by the search unit when searching for a plan is defined by a discrete function that indicates a constant value for each interval in the evaluation index, so that the search unit focuses on a plan that includes a large change that crosses an interval. This makes it possible to output a plan that is clearly improved over past plans. In addition, since the penalty coefficient is a constant value for each interval in the evaluation index, the number of items to be adjusted when creating the objective function is relatively small. This allows the coefficient setting unit to easily adjust the objective function, making it possible to create an improved plan in a short period of time.
[0017] The present invention can be realized in various forms, for example, in the form of a plan made by a planning method, something obtained by the made plan, a system including a planning device, a control method for these devices and systems, a server device for distributing a computer program that controls these devices and systems, a non-transitory storage medium on which the computer program is stored, etc. [Brief description of the drawings]
[0018] [Figure 1] 1 is a schematic diagram showing a schematic configuration of a planning device according to a first embodiment. [Diagram 2] 2 is a main flowchart of a planning method according to the first embodiment. [Diagram 3] 4 is a sub-flowchart of the planning method according to the first embodiment. [Figure 4] FIG. 2 is a diagram for explaining a planning method according to the first embodiment. [Diagram 5] FIG. 13 is a diagram illustrating a planning method of a comparative example. [Figure 6] FIG. 11 is a schematic diagram showing a schematic configuration of a planning device according to a second embodiment. [Figure 7] 13 is a main flowchart of a planning method according to a second embodiment. [Figure 8] 13 is a sub-flowchart of the planning method according to the second embodiment. [Figure 9] FIG. 11 is a diagram illustrating a planning method according to a second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0019] First Embodiment FIG. 1 is a schematic diagram showing a schematic configuration of a planning device 1 of a first embodiment. The planning device 1 is a device for planning various plans so as to achieve the purpose of the plan. The planning device 1 plans, as a "plan to be planned", a production plan for producing, for example, a plurality of steel products (hereinafter simply referred to as "products") produced in a foundry, which is an improved production plan with respect to a past production plan. The planning device 1 is a computer including a read-only memory (ROM), a random access memory (RAM), a central processing unit (CPU), and the like, and includes an input unit 10, a storage unit 20, a calculation unit 30, and an output unit 40. Note that the configuration of the planning device 1 is not limited to this, and for example, the input unit 10 and the calculation unit 30 may be present in separate locations.
[0020] The input unit 10 acquires planning information related to a plan to be made. In this embodiment, the input unit 10 refers to an input device such as a keyboard (not shown) into which various information including planning information is input by the operation of a planning person (hereinafter simply referred to as "person in charge") who operates the planning device 1 to make a target plan. The planning information acquired by the planning device 1 by the input unit 10 includes a target period during which multiple products can be produced (a period during which the production plan is executed), the inventory quantity of each of the multiple products before the target period of the production plan to be made, and a period required to produce each product. The input unit 10 is not limited to an input device such as a keyboard, and may be an interface with an external recording device such as a USB memory or a flash memory in which planning information is stored. The input unit 10 corresponds to an "information acquisition unit" described in the claims.
[0021] The storage unit 20 stores the plan information input by the input unit 10, and also stores the plan output by the calculation unit 30. In this embodiment, the storage unit 20 is a general term for memory devices, and various types of storage devices such as ROM, RAM, solid state drive (SSD), hard disk, and flash memory card can be used. The storage unit 20 also stores the computer program according to this embodiment.
[0022] The calculation unit 30 is a CPU electrically connected to the storage unit 20. The calculation unit 30 executes a computer program stored in the storage unit 20, thereby functioning as an index setting unit 31, a coefficient setting unit 32, a function creation unit 33, and a search unit 34.
[0023] The index setting unit 31 sets indexes (evaluation indexes) for evaluating a plan based on the plan information. In this embodiment, the index setting unit 31 sets a plurality of evaluation indexes. The index setting unit 31 sets the inventory amount of each of a plurality of products as the evaluation index. The index setting unit 31 sets a target value for each of the set plurality of evaluation indexes based on the plan information.
[0024] The coefficient setting unit 32 sets a penalty coefficient for each evaluation index set by the index setting unit 31. The penalty coefficient represents the degree of deviation of the evaluation index from the target value. The coefficient setting unit 32 of this embodiment sets a penalty coefficient defined by a discrete function indicating a constant value for each interval indicating a predetermined numerical range of the evaluation index. The penalty coefficient set by the coefficient setting unit 32 is set based on priority information regarding the priorities among a plurality of evaluation indexes, which is included in the plan information.
[0025] The function creation unit 33 creates an objective function for searching for a plan. In this embodiment, the function creation unit 33 creates an objective function including a penalty coefficient set by the coefficient setting unit 32. Details of the objective function created by the function creation unit 33 will be described later.
[0026] The search unit 34 searches for a plan that is improved compared to past plans, using the objective function created by the function creation unit 33. Specifically, the search unit 34 searches for a plan that minimizes the objective function. The search unit 34 sends the plan that minimizes the objective function obtained as a search result to the storage unit 20. Note that the search unit 34 may send the plan that minimizes the objective function directly to the output unit 40 without sending it to the storage unit 20.
[0027] The output unit 40 is, for example, a display device (not shown) that displays the plan that is searched for by the search unit 34 and that minimizes the objective function to the person in charge. The output unit 40 is not limited to a display device, and may be an interface that outputs the plan that minimizes the objective function as a search result, such as an output device such as a printer, or a recording device such as a USB memory device or a flash memory. The output unit 40 may also output the plan that minimizes the objective function directly, without going through the storage unit 20.
[0028] Next, the planning method of this embodiment will be described in detail. The planning method of this embodiment is started by an operational instruction from a planner who operates the planning device 1.
[0029] FIG. 2 is a main flowchart of the planning method of the first embodiment. First, the planning device 1 acquires planning information related to the plan to be created as an "information acquisition step" (step S11). In this embodiment, a person in charge inputs planning information related to the plan to be created to the planning device 1 using the input unit 10. The planning information input to the planning device 1 includes a target period during which the plan to be created is executed, the inventory quantity of each of a plurality of products before the target period begins, the number of products to be shipped whose delivery date is a predetermined period from the start date of operation of the production equipment used to produce the products, and the allowable range of the inventory quantity of the products. The planning information input to the planning device 1 via the input unit 10 is sent to the storage unit 20 electrically connected to the input unit 10 and stored in the storage unit 20.
[0030] In this embodiment, in step S11, the planning device 1 also acquires information about past plans using the input unit 10. Here, the past plans are plans related to the plan to be created, which were created in the past by a person in charge or by the planning device, and were actually executed. The information about the past plans includes information about the results, including problems that were obtained by executing the past plans.
[0031] Next, a penalty coefficient is set (step S12). The calculation unit 30 sets the penalty coefficient based on the plan information stored in the storage unit 20 and information related to past plans.
[0032] FIG. 3 is a sub-flowchart of the planning method of the first embodiment, and is a flow chart for explaining the details of step S12 shown in FIG. 2. In step S12 for setting a penalty coefficient, first, plan information and information on past plans are read (step S121). In step S121, the calculation unit 30 reads the plan information stored in the storage unit 20. In this embodiment, the calculation unit 30 also reads information related to the past plans acquired in step S11.
[0033] Next, as an "index setting process", an evaluation index is set (step S122). In step S122, the index setting unit 31 sets an evaluation index based on the plan information read from the storage unit 20 and information related to past plans. In this embodiment, the inventory amount of each of a plurality of products is set as an evaluation index. That is, in this embodiment, the number of types of evaluation indexes set is the same as the number of types of products to be produced in the production plan to be formulated. In this embodiment, the larger the value of the evaluation index, the less desirable the product inventory amount is. Therefore, the product inventory amount as an evaluation index may be replaced with the product delivery date violation rate, the safety stock standard violation rate, the excess inventory standard violation rate, or the like.
[0034] Next, intervals are set for the evaluation indexes (step S123). In step S123, the coefficient setting unit 32 sets intervals (classes) corresponding to predetermined numerical ranges for each of the multiple evaluation indexes set in step S122.
[0035] FIG. 4 is a diagram for explaining the planning method of the first embodiment. FIG. 4 is a diagram for specifically explaining the method for setting the penalty coefficient in step S12, and is a diagram for explaining the relationship between the inventory amount of a product with product number i (i: natural number) as an evaluation index among a plurality of products and the penalty coefficient. In FIG. 4, the horizontal axis shows the inventory amount of the product with product number i, in other words, the number of orders up to the zth next day, and the vertical axis shows the penalty coefficient for the inventory amount of the product with product number i. Note that while FIG. 4 explains the product with product number i, in this embodiment in which a production plan for a plurality of products is made, the relationship between the inventory amount and the penalty coefficient shown in FIG. 4 is set for the number of types of products.
[0036] Explaining with reference to Fig. 4, in step S123, the intervals in the evaluation index are set based on the number of orders up to the zth shift (z: an integer equal to or greater than 0) from the first shift of the day for which the production plan is made. Specifically, for the inventory quantity of product with item number i, the horizontal axis in Fig. 4 shows the number of orders up to the 0th shift from the 20th shift (variables a, b, c, d, e, f, g). Among these, the inventory quantity of product number i as an evaluation index has the following "predetermined numerical ranges" set: section Sc11 where there are no orders up to shift 0, section Sc12 where there are orders up to shift 0 but not up to shift 1, section Sc13 where there are orders up to shift 1 but not up to shift 2, section Sc14 where there are orders up to shift 2 but not up to shift 3, section Sc15 where there are orders from shift 3 to shift 6, section Sc16 where there are orders up to shift 6 but not up to shift 8, section Sc17 where there are orders up to shift 8 but not up to shift 20, and section Sc18 where there are orders up to shift 20. In FIG. 4, white circles do not include the corresponding numerical value on the horizontal axis, and black circles include the corresponding numerical value on the horizontal axis. In step S123, the coefficient setting unit 32 thus determines a plurality of intervals for each of a plurality of evaluation indexes. The intervals are set seamlessly for the numerical values of the evaluation indexes. In this embodiment, the coefficient setting unit 32 thus pre-sets a threshold value that can be compromised in a certain range of intervals corresponding to a predetermined numerical range. This makes it possible to reduce the variation between evaluation indexes that satisfy the intervals desired by the person in charge and evaluation indexes that do not satisfy the intervals desired by the person in charge, even if all of the plurality of evaluation indexes do not have values desired by the person in charge. Therefore, the plan of the search results by the search unit 34 described later can be a plan that reflects the thinking of the person in charge.
[0037] In step S123, the coefficient setting unit 32 may set the numerical range of the section manually by the person in charge, or may set the numerical range of the section with restrictions such as the person in charge's wishes or minimum standards. In addition, the coefficient setting unit 32 may set the numerical range of the section by using information on past plans as teacher data. The intervals may be set using techniques similar to machine learning.
[0038] Next, as a "coefficient setting step", a penalty coefficient is set for each section (step S124). In step S124, the coefficient setting unit 32 sets a penalty coefficient for each of the multiple sections set in step S123. The setting of the penalty coefficient in step S124 will be described with reference to FIG. 4.
[0039] In the relationship between the inventory amount of product with item number i and the penalty coefficient shown in FIG. 4, in step S124, a penalty coefficient is set for each of the multiple intervals Sc11 to Sc18 set in step S123. The penalty coefficient indicates the weight of the evaluation index in each interval, and in this embodiment, it is a numerical representation of the degree of undesirability for each interval. In this embodiment, the penalty coefficient for the same interval for one evaluation index is constant. As a result, in the plan search by the search unit 34 described later, multiple similar plans that remain in the same interval are eliminated, and a combination of intervals with a smaller penalty coefficient is focused on as an improved plan, so that a plan that is more in line with the thinking of the person in charge can be created.
[0040] A first example of a method for setting the penalty coefficient will be described with reference to FIG. 4. For example, in the section Sc11, there is no inventory corresponding to the number of orders up to the 0th shift, i.e., the number of orders that are currently required, so the product is out of stock. Therefore, the penalty coefficient is set to 50, which is the largest penalty coefficient in FIG. 4, and this is the section in which the objective function is increased. Also, for example, in a production site, if the goal (target value) is to maintain the inventory quantity from the 3rd shift to the 6th shift, the penalty coefficient is set to 0 in the section Sc15, and the objective function is minimized. This makes it effective to search for a plan using the objective function by applying the criteria actually used in the production site. Also, when the inventory amount is less than the target value, multiple sections Sc12, Sc13, and Sc14 can be set to reflect the compromise line at the production site in the objective function, so that a plan that is more suited to the actual situation at the production site can be created.
[0041] As a second example of a method for setting the penalty coefficient, the penalty coefficient may be set using information about past plans stored in the storage unit 20 together with the plan information. The information about past plans includes results obtained by already executing the past plans, and includes problems and items that contributed to improvements. Thus, when setting the penalty coefficient, the search unit 34 can search for plans that are improved over past plans by taking into account the results of the past plans.
[0042] In this embodiment, the penalty coefficient is determined for each of a plurality of intervals in this manner. Note that the inventory quantity of the product with item number i and the numerical values of the penalty coefficient shown in FIG. 4 are merely examples and are not limited to these numerical values. That is, the variables a, b, c, d, e, f, and g, which respectively indicate the inventory quantity of the product shown on the horizontal axis, and the variables A, B, C, D, E, F, and G, which respectively indicate the penalty coefficient shown on the vertical axis, can be made different depending on the type of evaluation index. Also, the number of variables a, b, c, d, e, f, and g, and the variables A, B, C, D, E, F, and G can be increased or decreased depending on the type of evaluation index.
[0043] 2, after step S12, a decision variable is defined (step S13). In step S13, the coefficient setting unit 32 defines a variable δ, which indicates whether the value of the evaluation index falls within the interval set in step S123, as a decision variable. In this embodiment, the decision variable δ corresponds to the inventory amount of each of the multiple products.
[0044] Next, in the "function creation step", an objective function is created (step S14). In step S14, the function creation unit 33 creates an objective function including the penalty function set in step S12. In this embodiment, the objective function is expressed by the following formula (1) using the relationship between the product inventory amount and the penalty coefficient shown in FIG.
number
[0045] The "frequency" included in formula (1) will be explained with reference to FIG. 4. In FIG. 4, first, calculate how many shifts in the future the inventory quantity in the first shift of the day for which the production plan is made corresponds to. For example, if the inventory quantity of product number i falls in the section Sc11 (less than 0 shifts in the future), δ a,i In this case, δ=0 for each of the other sections Sc12 to Sc18. If the inventory of product number i is sufficient for orders up to the first shift but not enough for orders up to the second shift (section Sc13), δ c,i = 1. In this case, the other sections Sc11, Sc1 2, Sc14 to Sc18 have δ=0. In this way, for one evaluation index, there exists a section whose frequency is always 1. Therefore, the objective function shown in formula (1) can be said to be a linear sum of (penalty coefficient)×(frequency of section) for multiple products. In this embodiment, the value P zaiko By minimizing can be output.
[0046] The frequency is also limited by the allowable range of product inventory contained in the planning information. Specifically, there is an upper limit to the amount of inventory that can be stored at the production site. Therefore, for example, in the case of the inventory amount of product with product number i shown in FIG. 4, if it is assumed that an inventory amount greater than the next 8 shifts cannot be stored at the production site, the frequency of sections Sc17 and Sc18 will always be 0. It is also possible to reflect the thinking of the person in charge in the allowable range of the evaluation index. In this way, in the planning method of this embodiment, the frequency is limited based on the allowable range of the evaluation index.
[0047] Next, in the "search step", a plan that minimizes the objective function is searched for (step S15). In step S15, the search unit 34 searches for a plan that minimizes the objective function. In step S15, a plan that minimizes the objective function may be searched for using a so-called mathematical programming solver, a genetic algorithm, or other methods called meta-heuristics. The plan that minimizes the objective function is stored in the storage unit 20.
[0048] Finally, the drawn up plan is output (step S16). The output unit 40 outputs the plan candidates stored in the storage unit 20 to the person in charge as plans to be drawn up. The person in charge checks the plan output from the output unit 40 and uses it as an actual production plan.
[0049] Fig. 5 is a diagram for explaining a planning method of a comparative example. In Fig. 5, the horizontal axis indicates the number of days indicating the deviation from the desired shipping date of the product, and the vertical axis indicates the weight for controlling the deviation from the desired delivery date of the product. The relationship between the number of days and the weight shown in Fig. 5 is the same as the relationship between the evaluation index and the penalty coefficient shown in Fig. 4.
[0050] In the relationship between the number of days and the weighting for a product shown in FIG. 5, the desired shipping date is t days. Furthermore, FIG. 5 shows deviations from the desired shipping date, such as (t-α) days α days before t days, (t-β) days β days before t days, (t+α) days α days after t days, and (t+β) days β days after t days. In the comparative example shown in FIG. 5, a composite function based on a quadratic function is used for weighting in the relationship between the number of days and the weighting. Specifically, the weighting W is expressed by formula (2) when the product shipping date is between (t-α) days and (t+α) days.
number
number
number
[0051] In the comparative example shown in FIG. 5, multiple variables are included, such as the letters α, β, and γ in formulas (2) to (4). The magnitudes of these variables need to be adjusted according to their relationships with other evaluation indexes, and the adjustments are time-consuming. Therefore, a relatively long time is required to create an improved plan.
[0052] In addition, when a quadratic-based composite function is used for weighting, as in the objective function of the comparative example, even a slight change in the value of the evaluation index also changes the weight, and the value of the objective function may change significantly. For this reason, it is easy to be mistaken that a small improvement in the evaluation index will have a large effect, and in reality, it may not lead to a large improvement. Furthermore, there is a risk that a small improvement in a specific evaluation index and a large deterioration in another evaluation index will be traded off. For this reason, when a function such as that shown in FIG. 5 is used for weighting, it is difficult to create a plan with clear improvements.
[0053] According to the planning method of this embodiment described above, in step S15, a plan that minimizes the objective function including the penalty coefficient is searched for. The penalty coefficient represents the deviation of the evaluation index from the target value, and is defined by a discrete function that indicates a constant value for each interval that indicates a predetermined numerical range of the evaluation index. This makes it possible to automatically search for a plan. Since the method does not stop at a slight improvement in the same interval in the evaluation index of the plan drawn up by the method, but focuses on a plan in which the penalty coefficient changes across intervals, it is possible to output a plan that is clearly improved compared to past plans that have already been created. Furthermore, since the penalty coefficient is defined to indicate a constant value for each interval in the evaluation index, there are fewer items to be adjusted when creating the objective function compared to using an objective function that changes every time according to the value of the evaluation index. This makes it possible to easily adjust the objective function, so that an improved plan can be drawn up in a short time. In this way, it is possible to draw up a plan that is improved compared to past plans in a short time.
[0054] According to the planning method of the present embodiment, the objective function includes a linear sum of the products of the frequencies of each of a plurality of intervals and the penalty coefficient as shown in formula (1), and is expressed by a relatively simple configuration. This simplifies the calculations in the plan search, and allows a plan that is an improvement over past plans to be created in an even shorter time.
[0055] Furthermore, according to the planning method of this embodiment, the frequency of an evaluation index in an interval is limited based on the upper limit of the allowable range of the evaluation index, such as the amount of inventory that can be stored at the production site. This prevents unfeasible plans from being included in the search range of the plan, making it possible to create a feasible plan that is an improvement on past plans in a short period of time. Furthermore, if the allowable range of the evaluation index is reflected in the person in charge, the plan that is the search result will be a plan that reflects the person in charge's thinking. This makes it possible to create an improved plan in line with the person in charge's thinking.
[0056] Furthermore, according to the plan creation method of the present embodiment, the penalty coefficient is set based on information about past plans included in the plan information, which makes it possible to set a penalty coefficient that reflects problems in the past plans, thereby making it possible to create a plan that is reliably an improvement over the past plans.
[0057] Furthermore, according to the computer program of this embodiment, since the penalty coefficient indicates a constant value for each interval, a plan including a large change across intervals is output as a search result. This makes it possible to output a plan that is clearly improved over past plans. Furthermore, since the number of items to be adjusted when minimizing the objective function is relatively small, a plan that is improved over past plans can be created in a short time.
[0058] Furthermore, according to the planning device 1 of this embodiment, when the search unit 34 searches for a plan, it focuses on a plan that includes a large change across a section, in which the penalty coefficient changes. This allows the planning device 1 to output a plan that is clearly improved over a past plan. Furthermore, due to the characteristics of the penalty coefficient, the number of items to be adjusted when creating an objective function is relatively small, so that the coefficient setting unit 32 can easily adjust the objective function. This allows the planning device 1 to create a plan that is improved over a past plan in a short period of time.
[0059] <Second embodiment> 6 is a schematic diagram showing a schematic configuration of a planning device according to a second embodiment. The planning device according to the second embodiment is different from the planning device according to the first embodiment (FIG. 1) in that the calculation unit further includes a constraint setting unit.
[0060] The planning device 2 of this embodiment includes an input unit 10, a storage unit 20, a calculation unit 50, and an output unit 40. The calculation unit 50 executes a computer program stored in the storage unit 20 to function as an index setting unit 31, a coefficient setting unit 32, a function creation unit 33, a search unit 34, and a constraint setting unit 51.
[0061] The constraint setting unit 51 sets a constraint equation that constrains the range of the plan search in the search unit 34. In this embodiment, the plan information acquired by the planning device 2 includes condition information related to the production plan of the product in addition to the inventory quantity of each of the multiple products before the target period begins. Here, the condition information refers to information on conditions related to the production plan that are not set as an evaluation index, such as the production conditions of the product. The constraint setting unit 51 creates a constraint equation based on the condition information. The constraint equation only needs to include a variable on either the left side or the right side, and the other side may include only a constant, only a variable, or both a constant and a variable. The search unit 34 of this embodiment searches for a plan that satisfies the constraint equation created by the constraint setting unit 51 and minimizes the objective function. The function of the constraint setting unit 51 will be described in detail later.
[0062] Next, the planning method of this embodiment will be described in detail. The planning method of this embodiment is started by an operational instruction from a planner who operates the planning device 2.
[0063] FIG. 7 is a main flowchart of the planning method of the second embodiment. FIG. 8 is a sub-flowchart of the planning method of the second embodiment, which is a flowchart for explaining the details of step S22 shown in FIG. 7. In the planning method of this embodiment, first, as an "information acquisition step", planning information on the plan to be created is acquired (step S21). The planning information input to the planning device 2 in step S21 includes the target period during which the plan to be created is executed, the inventory number of each of the multiple products before the target period begins, the number of available production facilities, the upper limit of the possible production time, and the like, as well as the above-mentioned condition information and priority information. Here, the priority information is information on the priority among multiple evaluation indexes, and is used when setting a penalty coefficient in step S224 described later. In this embodiment, as in the first embodiment, information on past plans is also acquired using the input unit 10.
[0064] Next, a penalty coefficient is set (step S22). The calculation unit 50 sets the penalty coefficient based on the plan information and information on past plans stored in the storage unit 20. In step S22, first, similarly to step S121 of the plan formulation method of the first embodiment, the plan information and information on past plans are read (step S221).
[0065] Next, as an "index setting process", an evaluation index is set (step S222). The index setting unit 31 sets the evaluation index based on the planning information read from the storage unit 20 and information related to past planning. In this embodiment, the inventory amount of each of the multiple products and the number of setup changes of the production equipment that produces each of the multiple products are set as the evaluation index. On the other hand, the production conditions included as condition information in the planning information are not set as the evaluation index.
[0066] Next, intervals are determined for the evaluation indexes (step S223). In step S223, the coefficient setting unit 32 sets intervals (classes) corresponding to a predetermined numerical range for each of the multiple evaluation indexes set in step S222.
[0067] FIG. 9 is a diagram for explaining the planning method of the second embodiment. FIG. 9 is a diagram for specifically explaining the method for setting the penalty coefficient for the number of setup changes of the production equipment in step S22, and is a diagram for explaining the relationship between the number of setup changes of the production equipment M(i) that manufactures a product with product number i as an evaluation index and the penalty coefficient. In FIG. 9, the horizontal axis shows the number of setup changes of the production equipment M(i), and the vertical axis shows the penalty coefficient for the number of setup changes of the production equipment M(i). Note that FIG. 9 explains one production equipment M(i), but when making a production plan for multiple products, multiple production equipment may be used to correspond to all the types of products to be manufactured. Specifically, For example, two production equipments are used to produce 0 types of products. In such a case, the relationship between the number of changeovers of the production equipment and the penalty coefficient shown in FIG. 9 is set for each of the multiple production equipments (two production equipments in this specific example).
[0068] Explaining with reference to Fig. 9, in step S223, the intervals in the evaluation index are determined based on the number of setup changes per day for the production equipment M(i). Specifically, as the "predetermined numerical range", an interval Sc21 for one setup change, an interval Sc22 for two setup changes, an interval Sc23 for three setup changes, and an interval Sc24 for four or more setup changes are set. In Fig. 9, a white circle does not include the corresponding numerical value on the horizontal axis, and a black circle includes the corresponding numerical value on the horizontal axis.
[0069] Next, as a "coefficient setting step", a penalty coefficient is set for each section based on the priority information (step S224). In step S224, the coefficient setting unit 32 sets a penalty coefficient for each of the multiple sections set in step S223. The setting of the penalty coefficient in step S224 will be described with reference to FIG. 9.
[0070] In the relationship between the number of setup changes and the penalty coefficient of the production equipment M(i) shown in FIG. 9, a penalty coefficient is set for each of a plurality of sections Sc121 to Sc24, similar to the relationship between the inventory amount of the product and the penalty coefficient in the first embodiment. In this embodiment, in creating the objective function, the relationship between the inventory amount of the product and the penalty coefficient (see FIG. 4) and the number of setup changes of the production equipment and the penalty coefficient (see FIG. 9) are used in combination, so that the magnitude relationship between the penalty coefficient for the inventory amount of the product and the penalty coefficient for the number of setup changes of the production equipment is determined using priority information included in the plan information. Note that the numerical values of the number of setup changes and the penalty coefficient of the production equipment M(i) shown in FIG. 9 are only examples, and are not limited to these numerical values. That is, the variables q, r, s each indicating the number of setup changes shown on the horizontal axis, and the variables Q, R, S, T each indicating the penalty coefficient shown on the vertical axis, can be made different depending on the type of evaluation index. Also, the number of variables q, r, s and variables Q, R, S, T can be increased or decreased depending on the type of evaluation index.
[0071] Here, the relationship between the product inventory and the penalty coefficient (FIG. 4) and the relationship between the number of setup changes of the production equipment and the penalty coefficient (FIG. 9) in this embodiment will be described using specific examples. As a first specific example, assume that the penalty coefficient when the product inventory is out of stock is 50 (corresponding to the variable G in the section Sc11 shown in FIG. 4). Here, if it is considered that the occurrence of setup changes of the production equipment four times has the same impact on the production site as the case where the product inventory is out of stock, the penalty coefficient in the section Sc24 in FIG. 9 when the number of setup changes of the production equipment occurs four times is also set to 50. In this embodiment, in this way, in the comparison between multiple evaluation indexes, the magnitude relationship of the penalty coefficient is set using priority information that takes into account the magnitude of the impact on the production site, and the value of the objective function is set to a plan that is in line with the production site where the plan is executed. As a result, it is possible to create an improved plan reliably by minimizing the objective function.
[0072] As a second specific example, assume that the number of orders for product i in one month is 3,000 units, which can be produced if the production equipment M(i) is occupied for two days. Meanwhile, assume that the frequency of orders for product i is every day in one month (20 working days), and the number of orders per order is 150 units. In this case, when the relationship between the product inventory amount and the penalty coefficient shown in Figure 4 is applied, the penalty coefficient increases when the inventory amount for the next six shifts (for example, 450 units) is exceeded (the penalty coefficient in section Sc16 relative to the penalty coefficient in section Sc15). To avoid such a situation, the optimal plan for product i would be to change the setup of production equipment M(i) and temporarily halt production of product i every time the inventory amount reaches 450 units. However, The optimal plan for the production site would be to limit the number of setup changes to one and complete the production of 3,000 units at one time, while simultaneously limiting the number of setup changes to one. Therefore, by appropriately setting the penalty coefficient for the inventory level of product i in accordance with the variables related to the excess inventory level of product i (variables e, f, and g shown in Figure 4), it is possible to search for the optimal plan for the production site.
[0073] For example, the variable e shown in FIG. 4 is set to the larger of "the number of orders for the next six shifts" or "the amount that can be produced if the production equipment M(i) is occupied for two days." In this way, in the second specific example mentioned above where the number of orders per time is 150 units, the variable e becomes "the amount that can be produced if the production equipment M(i) is occupied for two days." Also, if the number of orders per day exceeds 1,500 units, the variable e becomes "the number of orders for the next six shifts." By setting the variables in this way, it is possible to prevent overproduction of product i, thereby realizing appropriate inventory management that is in line with the situation at the production site.
[0074] 7, after step S22, decision variables are defined (step S23) in the same manner as step S13 in the planning method of the first embodiment. In this embodiment, the decision variables δ correspond to the inventory amounts of the multiple products and the number of changeovers of the production equipment corresponding to each of the multiple products.
[0075] Next, as a "function creation step", an objective function is created (step S24). In step S24, the function creation unit 33 creates an objective function using both the relationship between the product inventory amount and the penalty coefficient, and the relationship between the number of changeovers of the production equipment and the penalty coefficient. The objective function regarding the number of changeovers of the production equipment is expressed by the following formula (5) using the relationship between the number of changeovers of the production equipment and the penalty coefficient shown in Figure 9.
number
[0076] In this embodiment, the inventory amount of each of the multiple products and the number of changeovers of the production equipment that produces each of the multiple products are set as the evaluation indexes. Therefore, the objective function of the entire production plan for the multiple products is a combination of the objective function for the inventory amount of the products shown in formula (1) and the objective function for the number of changeovers of the production equipment shown in formula (5).
[0077] Next, as a "constraint setting step", a constraint equation is created (step S25). In step S25, the constraint setting unit 51 creates a constraint equation based on condition information such as a production condition included in the plan information. The conditions that the plan must satisfy are created as constraint expressions. An example of a production condition is the upper limit of the number of setup changes of the production equipment per day. In this case, the upper limit of the number of setup changes of the production equipment is created as a constraint expression expressed as a constant, and is combined with the objective function created in step S24. In this way, adding an upper limit value related to the production conditions can prevent unrealistic plans from being created.
[0078] Next, in the "search step", a plan that minimizes the objective function while satisfying the constraint equations is searched for (step S26). In step S26, the search unit 34 searches for a plan that minimizes the objective function, on the premise that the constraint equations created in step S25 are satisfied. In step S26, a plan that minimizes the objective function may be searched for using a mathematical programming solver or a genetic algorithm, similar to step S15 of the planning method of the first embodiment. Finally, the created plan is output (step S27), similar to step S16 of the planning method of the first embodiment.
[0079] According to the planning method of the present embodiment described above, the penalty coefficient included in the objective function is defined by a discrete function indicating a constant value for each interval indicating a predetermined numerical range in the evaluation index. As a result, when searching for a plan, attention is focused on plans of significant improvement in which the penalty coefficient changes across intervals, rather than remaining on a slight improvement. Therefore, a plan that is clearly improved compared to a past plan that has already been created can be output. In addition, since the number of items to be adjusted when creating the objective function is relatively small, the objective function can be easily adjusted. As a result, an improved plan can be created in a short time. In this way, an improved plan can be created compared to a past plan in a short time.
[0080] According to the planning method of the present embodiment, the plan information includes priority information regarding the priority among a plurality of evaluation indexes. The penalty coefficients set for each of the plurality of evaluation indexes are set based on this priority information, so that the plan of the search result is a plan that reflects the priority of the evaluation indexes. Therefore, a plan that is suited to the site where the plan is to be executed can be created.
[0081] Furthermore, according to the planning method of this embodiment, in step S25, a constraint equation is created based on condition information related to conditions that are not set as evaluation indexes. In step S26, a plan that minimizes the objective function while satisfying the constraint equation is searched for, so that the plan of the search result can be a plan that includes conditions such as production conditions that are not included in the evaluation index. In addition, it is possible to prevent unrealistic plans from being output as search results. This makes it possible to create a realistic plan that improves the degree of improvement over past plans.
[0082] According to the planning method of the present embodiment, in order to create a production plan for producing a plurality of products, the plurality of evaluation indexes include the inventory quantity of each of the plurality of products and the number of setup changes of the equipment capable of producing each of the plurality of products. As a result, in a production plan for producing a plurality of products using limited production equipment, a production plan that is improved over past plans can be created in a short time.
[0083] <Modifications of this embodiment> The present invention is not limited to the above-described embodiment, and can be embodied in various forms without departing from the spirit and scope of the invention. For example, the following modifications are also possible.
[0084] [Variation 1] In the above embodiment, the planning method is a production plan for producing a plurality of steel products, and a production plan that is an improvement over a past production plan is created. The plan made by the method is not limited to a production plan for steel products, but may be a production plan for industrial products such as automobiles, or an agricultural product such as agricultural produce. Also, the plan is not limited to a production plan, and may be a plan for achieving various goals.
[0085] [Variation 2] In the above embodiment, the frequency of the evaluation index in the interval is limited based on the upper limit of the allowable range of the evaluation index, such as the amount of inventory that can be stored at the production site. The limit may be based on the lower limit of the allowable range, or there may be no limit based on the upper and lower limits. By limiting the frequency of the evaluation index in the interval based on at least one of the upper and lower limits of the allowable range, it is possible to eliminate unrealizable plans from the search range of the plan, and therefore it is possible to create a feasible plan in a short time.
[0086] [Variation 3] In the above embodiment, the magnitude relationship of the penalty coefficients between the multiple evaluation indexes is set using priority information that takes into account the magnitude of the impact on the production site. However, the method of setting the magnitude relationship of the penalty coefficients between the multiple evaluation indexes is not limited to this. For example, the setting may be based on the experience and knowledge of the person in charge.
[0087] [Variation 4] In the above embodiment, the penalty coefficient is set based on information about past plans, but the type of evaluation index and the width of the interval may also be set based on information about past plans. In addition, at least one of the type of evaluation index, the width of the interval, and the penalty coefficient may be set manually by a person in charge, or using a technology similar to machine learning that uses information about past plans as training data.
[0088] [Variation 5] In the second embodiment, the conditions to be satisfied by the plan are created as constraint expressions based on condition information such as production conditions included in the plan information, and in step S26, a plan that minimizes the objective function is searched for on the premise that the constraint expressions are satisfied. However, the conditions used in the constraint expressions are not limited to production conditions. For example, the constraint expressions may be created based on values that are contrary to the thinking of the person in charge. For example, if it is known in advance that the number of setup changes of the production equipment needs to be limited to two or less in a certain period of time, the space for searching plans can be narrowed by including a limit on the number of setup changes of the production equipment in the constraint expressions, so that the search for plans can be performed in an even shorter time. In addition, after the plan is output, for example, the person in charge does not need to make any adjustments, and the time required for planning can be further shortened.
[0089] [Variation 6] In the above-described embodiment, the planning device includes an input unit, a storage unit, a calculation unit, and an output unit. However, the configuration of the planning device is not limited to this. In addition, the calculation unit functions as an index setting unit, a coefficient setting unit, a function creation unit, and a search unit in the first embodiment, and functions as an index setting unit, a coefficient setting unit, a function creation unit, a constraint setting unit, and a search unit in the second embodiment. The configuration of the functions included in the calculation unit is not limited to this.
[0090] Although the present aspect has been described above based on the embodiment and modified examples, the above-mentioned embodiment of the aspect is intended to facilitate understanding of the present aspect and does not limit the present aspect. The present aspect may be modified or improved without departing from the spirit and scope of the claims, and equivalents are included in the present aspect. Furthermore, if a technical feature is not described as essential in this specification, it may be deleted as appropriate.
[0091] <Application example 1> 1. A planning method comprising the steps of: An information acquisition step of acquiring plan information related to a plan to be created; an index setting step of setting an evaluation index for evaluating a plan based on the plan information; a coefficient setting step of setting a penalty coefficient representing the degree of deviation of the evaluation index from a target value, the penalty coefficient being defined by a discrete function indicating a constant value for each interval corresponding to a predetermined numerical range of the evaluation index; a function creation step of creating an objective function including the penalty coefficient by using the planning information; A search step of searching for a plan that minimizes the objective function. How to plan. <Application example 2> The planning method according to Application Example 1, In the index setting step, a plurality of evaluation indexes are set, In the function creation step, the objective function is created, the objective function including a linear sum of a product of a frequency of each of the plurality of intervals and the penalty coefficient for each of the plurality of evaluation indexes. How to plan. <Application example 3> The planning method according to Application Example 1 or Application Example 2, The plan information includes information regarding an allowable range of the evaluation index, The magnitude of the frequency in the interval is limited based on at least one of an upper limit value and a lower limit value of the tolerance range. How to plan. <Application Example 4> The planning method according to any one of Application Examples 1 to 3, The plan information includes priority information regarding priorities among the plurality of evaluation indexes, The magnitude relationship of the penalty coefficients among the plurality of evaluation indexes is set based on the priority information. How to plan. <Application example 5> The planning method according to any one of Application Examples 1 to 4, In the information acquisition step, information regarding past plans related to the plan to be created is acquired, In the coefficient setting step, the penalty coefficient is set based on information regarding the past plan. How to plan. <Application Example 6> The planning method according to any one of Application Examples 1 to 5, the plan information includes condition information regarding a condition that is not set as the evaluation index, The planning method further comprises: a constraint setting step of setting a constraint equation based on the condition information; In the search step, a plan is searched for that minimizes the objective function while satisfying the constraint equation set in the constraint setting step. How to plan. <Application Example 7> The planning method according to any one of Application Examples 1 to 6, The plan to be created is a production plan for producing a plurality of products, The evaluation indexes include an inventory quantity of each of the plurality of products and a number of changeovers of equipment capable of producing each of the plurality of products. How to plan. <Application Example 8> A computer program for creating a plan, comprising: an information acquisition function for acquiring plan information relating to a plan to be formulated; An index setting function that sets an evaluation index for evaluating a plan based on the plan information; a coefficient setting function for setting a penalty coefficient representing the degree of deviation of the evaluation index from a target value, the penalty coefficient being defined by a discrete function indicating a constant value for each interval corresponding to a predetermined numerical range of the evaluation index; a function creation function that creates an objective function including the penalty coefficient by using the plan information; A search function that searches for a plan that minimizes the objective function; A computer program that enables a computer to realize the above. <Application Example 9> A planning device comprising: An information acquisition unit that acquires plan information related to a plan to be created; an index setting unit that sets an evaluation index for evaluating a plan based on the plan information; a coefficient setting unit that sets a penalty coefficient representing a deviation of the evaluation index from a target value, the penalty coefficient being defined by a discrete function indicating a constant value for each interval corresponding to a predetermined numerical range of the evaluation index; a function creation unit that creates an objective function including the penalty coefficient by using the plan information; A search unit that searches for a plan that minimizes the objective function. Planning device. [Explanation of symbols]
[0092] 1,2...Planning device 10...Input section 31...Indicator setting section 32...Coefficient setting section 33...Function creation section 34…Exploration Department
Claims
1. 1. A planning method comprising the steps of: An information acquisition step of acquiring plan information related to a plan to be created; an index setting step of setting an evaluation index for evaluating a plan based on the plan information; a coefficient setting step of setting a penalty coefficient representing the degree of deviation of the evaluation index from a target value, the penalty coefficient being defined by a discrete function indicating a constant value for each interval corresponding to a predetermined numerical range of the evaluation index; a function creation step of creating an objective function including the penalty coefficient by using the planning information; A search step of searching for a plan that minimizes the objective function. How to plan.
2. 2. The planning method according to claim 1, In the index setting step, a plurality of evaluation indexes are set, In the function creation step, the objective function is created, the objective function including a linear sum of a product of a frequency of each of the plurality of intervals and the penalty coefficient for each of the plurality of evaluation indexes. How to plan.
3. 3. The planning method according to claim 2, further comprising: The plan information includes information regarding an allowable range of the evaluation index, The magnitude of the frequency in the interval is limited based on at least one of an upper limit value and a lower limit value of the tolerance range. How to plan.
4. The planning method according to claim 2 or 3, The plan information includes priority information regarding priorities among the plurality of evaluation indexes, The magnitude relationship of the penalty coefficients among the plurality of evaluation indexes is set based on the priority information. How to plan.
5. The planning method according to claim 1 or 2, In the information acquisition step, information regarding past plans related to the plan to be created is acquired, In the coefficient setting step, the penalty coefficient is set based on information regarding the past plan. How to plan.
6. The planning method according to claim 1 or 2, the plan information includes condition information regarding a condition that is not set as the evaluation index, The planning method further comprises: a constraint setting step of setting a constraint equation based on the condition information; In the search step, a plan is searched for that minimizes the objective function while satisfying the constraint equation set in the constraint setting step. How to plan.
7. The planning method according to claim 1 or 2, The plan to be created is a production plan for producing a plurality of products, The evaluation indexes include the number of stocks of the products and the number of products The number of equipment changeovers that can produce each of these products, including How to plan.
8. A computer program for creating a plan, comprising: an information acquisition function for acquiring plan information relating to a plan to be formulated; An index setting function that sets an evaluation index for evaluating a plan based on the plan information; a coefficient setting function for setting a penalty coefficient representing the degree of deviation of the evaluation index from a target value, the penalty coefficient being defined by a discrete function indicating a constant value for each interval corresponding to a predetermined numerical range of the evaluation index; a function creation function that creates an objective function including the penalty coefficient by using the plan information; A search function that searches for a plan that minimizes the objective function; A computer program that enables a computer to realize the above.
9. A planning device comprising: An information acquisition unit that acquires plan information related to a plan to be created; an index setting unit that sets an evaluation index for evaluating a plan based on the plan information; a coefficient setting unit that sets a penalty coefficient representing a deviation of the evaluation index from a target value, the penalty coefficient being defined by a discrete function indicating a constant value for each interval corresponding to a predetermined numerical range of the evaluation index; a function creation unit that creates an objective function including the penalty coefficient by using the plan information; A search unit that searches for a plan that minimizes the objective function. Planning device.
Citation Information
Patent Citations
Cast plan planning device, method, and program
JP2015090532A
Plan creation apparatus, plan creation method, and program
JP2018180943A
Plan creation device, plan creation method, and program
JP2019098350A
Plan creation device, plan creation method, and program
JP2019200695A
Cited By
Electric aircraft reachable domain evaluation method and system based on quasi-static electric quantity discretization
CN120372800A