Energy operation planning device and energy operation planning method

The energy operation planning device addresses uncertainty in renewable energy predictions by selecting non-duplicative scenarios, using an estimation model and machine learning to efficiently generate power operation plans that are robust to uncertainty, thereby reducing calculation time and maintaining accuracy.

JP2024135228AActive Publication Date: 2024-10-04HITACHI LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
JP2023045808
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-22
Publication Date
2024-10-04
Estimated Expiration
2043-03-22

AI Technical Summary

Technical Problem

The challenge of creating energy operation plans is exacerbated by uncertainty in renewable energy predictions, leading to increased calculation times and potential increases in power generation costs due to the need to consider numerous uncertainty scenarios, which can result in reduced accuracy and profitability.

Method used

An energy operation planning device that includes an approximate plan creation section, an evaluation unit for scenario similarity, and a scenario selection unit to reduce the number of scenarios without affecting the plan's results, using an estimation model and machine learning to quickly generate a power operation plan.

Benefits of technology

This approach allows for economic efficiency by reducing calculation time while maintaining accuracy, ensuring the power operation plan is robust to uncertainty, thus minimizing the impact on total power generation costs and profitability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024135228000001_ABST
    Figure 2024135228000001_ABST
Patent Text Reader

Abstract

To provide an energy operation planning device capable of creating an energy operation plan by selecting a scenario, which does not exert influences on a result, without reducing simulation accuracy of uncertainty even if uncertainty scenarios are reduced.SOLUTION: A power operation planning device 1 comprises: a scenario-based plan approximation unit 31 for creating an approximation plan, in which a power operation plan is approximated, by inputting information required for creating a power operation plan to an estimation model as one or more scenarios; a similarity evaluation unit 321 for a plan result feature amount which evaluates similarity between the scenarios based on a result of the approximated plan; a scenario selection unit 322 for selecting a scenario in such a manner that the scenario does not become similar based on the evaluation of the similarity evaluation unit 321 for the plan result feature amount; and an uncertainty plan calculation unit 33 for creating the power operation plan using the selected scenario.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an energy operation planning device and an energy operation planning method. [Background technology]

[0002] In order to realize the operation of electricity, a power operation plan is created that indicates guidelines and control command values ​​for the future operation of equipment based on predicted values ​​of future conditions. An example of such a power operation plan is a generator operation plan. The generator operation plan is based on predicted values ​​of power demand at each time of the planning period, and determines the operation or stop state of the generator according to the power demand, and the generator output so that the total power generation cost is minimized after satisfying the operational constraints of each generator and the power system. In addition, when power trading in the power market is also performed, the operation plan may be determined based on predicted values ​​of the power market price so as to maximize not only the total power generation cost but also the profit including the power trading.

[0003] A method for planning the operation of such generators is disclosed, for example, in Non-Patent Document 1. Non-Patent Document 1 discloses a technology for calculating an operation plan that minimizes the total power generation cost while satisfying operational constraints for each generator and power system, such as the supply and supply balance where the demand and supply of electricity are equal, and the minimum continuous start-up time and minimum continuous stop time where a generator maintains its state for a certain period of time after starting up or stopping. In calculating this operation plan, even if there is only one generator, if the two states of starting and stopping the generator are taken into consideration for all of the time slices n of the operation plan, the calculation can be done in the order of 2 n There are an enormous number of possible combinations of operation plans, so an optimization method that can quickly determine the operation plan that minimizes the total power generation cost or maximizes profits from the enormous number of combinations of operation plans is essential.

[0004] On the other hand, for renewable energy sources such as solar power generation, whose output depends on the weather, prediction errors occur in the prediction of future power generation, which is the deviation from the actual power generation at the actual operation time. It is planned that the amount of renewable energy introduced will further increase in the future. However, the greater the amount of renewable energy introduced, the greater the impact of prediction errors. As a result, the deviation between the actual power generation and the predicted value also increases, making it difficult to meet operational constraints such as the balance between power supply and demand. In addition, due to the impact of prediction errors in renewable energy, the prediction error, which is the deviation between the predicted value of the electricity market price and the actual contract price, also increases.

[0005] If the actual operation is modified due to a prediction error of renewable energy after the operation is performed based on the operation plan, the total power generation cost may increase and profitability may deteriorate. In such an uncertain situation where the actual operation status cannot be predicted with high accuracy, planning techniques that simulate uncertainties such as the amount of power generated by renewable energy and the power market price with a huge number of prediction scenarios have been proposed in Non-Patent Documents 2 and 3. According to these techniques, an operation plan is created assuming not a single assumed scenario but also scenarios with different predicted values. Therefore, if the deviation from the actual power generation amount is small in any of the scenarios, uncertainties such as prediction errors are assumed, making it possible to suppress the impact of uncertainties on the operation plan. [Prior art documents] [Patent documents]

[0006] [Non-Patent Document 1] M. Carrion and JM Arroyo, "A computationally efficient mixed-integer linear formulation for the thermal unit commitment problem," in IEEE Transactions on Power Systems, vol. 21, no. 3, pp. 1371-1378, Aug. 2006 [Non-Patent Document 2] S. Takriti, JR Birge and E. Long, "A stochastic model for the unit commitment problem," in IEEE Transactions on Power Systems, vol. 11, no. 3, pp. 1497-1508, Aug. 1996 [Non-Patent Document 3] Yao Zhang, et al., “Chance-Constrained Two-Stage Unit Commitment under Uncertain Load and Wind Power Output Using Bilinear Benders Decomposition”, IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 32, NO. 5(2017) [Non-Patent Document 4] Yoav Goldberg, “A Primer on Neural Network Models for Natural language Processing,” Journal of Artificial Intelligence Research 57, pp.354-357(1016) Summary of the Invention [Problem to be solved by the invention]

[0007] As described above, in creating a power operation plan, in order to minimize the impact of uncertainties such as prediction errors in the predicted values ​​of future conditions, the operation plan is created in advance assuming uncertainty scenarios. In addition to the fluctuations in the amount of power generated by renewable energy as described above, for example, scenarios due to short-term weather changes such as a short period of extremely hot weather even though it is the rainy season are assumed. In addition, if the planning period is long, it will also include scenarios due to long-term factors such as a warm winter contrary to the prediction.

[0008] The greater the number of uncertainty scenarios assumed in advance, the larger the scale of calculations required to create an operational plan. In this case, there was concern that the process of creating an operational plan would require an enormous amount of calculation time, making it impossible to apply to actual operations.

[0009] For this reason, it is necessary to reduce the number of uncertainty scenarios in order to reduce the calculation time required for the process of creating an operation plan. However, simply reducing the number of uncertainty scenarios also reduces the accuracy of uncertainty simulation, and uncertainty is not fully anticipated at the time of creating the operation plan. If an unexpected uncertainty scenario occurs after the operation plan has been created, the operation plan must be revised to operate the generators. As a result, there are concerns that the total power generation cost will increase and profitability will deteriorate.

[0010] The present invention has been made in consideration of these circumstances, and aims to create an energy operation plan by selecting scenarios that do not affect the results even if scenarios that assume uncertainties are removed. [Means for solving the problem]

[0011] The energy management planning device of the present invention includes an approximate plan creation unit that inputs information necessary for creating an energy management plan into an estimation model as one or more scenarios and creates an approximate plan that estimates the energy management plan, an evaluation unit that evaluates the similarity between the scenarios based on the results of the approximate plan, a scenario selection unit that selects from the scenarios input into the estimation model such that the scenarios are not similar based on the similarity evaluation by the evaluation unit, and a plan creation unit that creates an energy management plan using the selected scenario. Effect of the Invention

[0012] According to the present invention, by selecting a scenario that does not affect the results even if a scenario that assumes uncertainty is removed, it is possible to create an energy operation plan that can improve economic efficiency while suppressing the effects of uncertainty in a practical calculation time, for example. Problems, configurations and effects other than those described above will become apparent from the following description of the embodiments. [Brief description of the drawings]

[0013] [Figure 1] 1 is a block diagram showing an example of a functional configuration of a power operation planning device according to a first embodiment of the present invention. [Diagram 2] FIG. 2 is a block diagram showing an example of the internal configuration of a rough planning decision variable evaluation and scenario selection unit according to the first embodiment of the present invention. [Diagram 3] 1 is a diagram illustrating an example of a configuration of a power system according to a first embodiment of the present invention, and an example of a hardware configuration of a power operation planning device according to the first embodiment. [Figure 4] 5 is a flowchart showing an example of a process in which the power operation planning device according to the first embodiment of the present invention selects an uncertainty scenario and creates a power operation plan. [Diagram 5] FIG. 2 is a diagram showing an example of a screen display of an operating cost distribution with respect to uncertainty according to the first embodiment of the present invention. [Figure 6] 1 is a graph showing a relationship between the number of scenarios according to the first embodiment of the present invention and the accuracy of planning results for a plurality of scenarios that simulate uncertainty. [Figure 7] FIG. 11 is a diagram illustrating an example of a functional configuration of a power operation planning device according to a second embodiment of the present invention. [Figure 8] FIG. 11 is a block diagram showing an example of the internal configuration of a rough planning decision variable evaluation and scenario selection unit according to a second embodiment of the present invention. [Figure 9] 10 is a flowchart showing an example of processing by a calculation unit of a power operation planning device according to a second embodiment of the present invention. [Figure 10] FIG. 11 is a conceptual diagram of a loss risk according to a second embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0014] Preferred embodiments of the present invention will now be described. Note that the following are merely examples, and the invention itself is not intended to be limited to the specific contents described below. In the following description, the same or similar elements and processes are denoted by the same reference numerals, and duplicated descriptions are omitted. In the following embodiments, only the differences from the previous embodiments are described, and duplicated descriptions are omitted. In addition, the following description of the embodiments and the configurations and processes shown in each figure are intended to provide an overview of the embodiments to the extent necessary for understanding and implementing the present invention, and are not intended to limit the implementation aspects of the present invention. In addition, each embodiment and each modified example can be combined in part or in whole within a range that is consistent with each other without departing from the spirit of the present invention.

[0015] This specification describes an energy operation planning device that supports the creation of energy operation plans by business operators who have multiple energy facilities, business operators who can adjust operation plans for energy facilities, etc. Below, an example of an electric power operation planning device for an electric power business to which the present invention is applied will be described.

[0016] [First embodiment] <Functional configuration of power operation planning device 1> First, an example of the functional configuration of the power operation planning device 1 will be described with reference to FIG. 1 and FIG. FIG. 1 is a block diagram showing an example of a functional configuration of a power operation planning device 1 according to the first embodiment. The power operation planning device 1 (an example of an energy operation planning device) includes a power generation and system information unit 2, a calculation unit 3, and a screen display and result storage unit 4, and performs processing for power operation planning.

[0017] The power generation and system information unit 2 has a function of storing information required for creating a power operation plan as a system information database DB1 and a power operation plan database DB2 shown in Fig. 3 described later. The power generation and system information unit 2 stores, for example, power generation equipment information, regular inspection information, system information, supply and demand information, adjustment capability information, renewable energy information, assumed accident information, and scenario information.

[0018] The power generation equipment information is information such as equipment constants that indicate the characteristics of each power generator. The periodic inspection information is information for stopping operation of the generator or restricting its output for the purpose of maintenance inspection. The system information is information such as the maximum transmission capacity of the interconnection lines of the power system. The supply and demand information is information such as the power demand, which is the required amount of power generation, and the probability distribution range that the demand can take, including the prediction error.

[0019] The adjustment capability information is information for adjusting fluctuations from an assumed state, such as a power operation plan. The renewable energy information is information such as the characteristics of the renewable energy, the amount of power generation, and the probability distribution range of the amount of power generation including the prediction error. The postulated accident information is information on generators and facility equipment that are unable to operate due to a malfunction and are therefore shut down. The scenario information is information on a scenario assumed by an operator, or information on a scenario statistically created from a possible probability distribution range including forecast errors in supply and demand information and renewable energy.

[0020] Next, an example of the functional configuration of the calculation unit 3 will be described. The calculation unit 3 includes a scenario-based plan estimation unit 31, an estimation plan decision variable evaluation and scenario selection unit 32, and an uncertainty plan calculation unit 33.

[0021] In the scenario-based plan approximation unit 31 (an example of an approximate plan creation unit), information required for creating a power operation plan, such as generator equipment information, supply and demand information, and scenario information, is input from the power generation and system information unit 2 to an approximate estimation model as one or more scenarios. This estimation model is a model that shows the relationship between a scenario and a plan result. For example, the estimation model is a model that simulates the relationship between information required for creating a power operation plan and a power operation plan created by strictly solving the optimization problem of equation (1) described later, and is configured by a method different from the method used for creating a power operation plan. The estimation model outputs a plan result (also called an "approximate plan") that roughly estimates a power operation plan from an input based on this simulated relationship. The estimation model is, for example, a relaxed optimization problem that relaxes the optimization problem of equation (1) for creating a power operation plan. The estimation model may be a machine learning model that learns the relationship between information required for creating a power operation plan and a power operation plan that assumes uncertainty. The relaxed optimization problem and the machine learning model will be described later in detail.

[0022] The scenario-based plan approximation unit 31 outputs the output of the estimation model as an approximate plan that is estimated assuming the uncertainty of the power operation plan. Here, the scenario-based plan approximation unit 31 inputs information required for creating a power operation plan, such as generator equipment information, supply and demand information, and scenario information, as a scenario. As a scenario, for example, in order to take into consideration the fact that the predicted value of the power demand (the power required by people) is incorrect, there are multiple scenarios in which the predicted value of the power demand is incorrect. For these scenarios, the power operation plan is, for example, a plan that determines when and how much power will be generated in order to determine the operation of the generator on that day. The plan result of this plan is information (also called the "plan result") that indicates when and how much power will be generated according to the power operation plan. In other words, the plan result is an output derived from the plan, and by showing the operator when to start or stop the generator, etc., it becomes a decision-making material for the operator to decide the operation of the generator on that day.

[0023] In addition, the plan result includes elements that the operator does not consider important at present, since the operator can adjust the plan according to future conditions. Here, if the operator assumes multiple different situations, there may be multiple scenarios, but if the difference between the scenarios is small, deleting one of the scenarios with the small difference may not change the elements that the operator considers important in the results of the power operation plan described above. For this reason, when all scenarios stored in the power generation and system information unit 2 are extracted, redundant information is included. In order to shorten the calculation time required for creating the power operation plan described later, it is necessary to extract the necessary scenarios, excluding redundant scenarios, based on the rough plan output by the scenario-based plan approximation unit 31.

[0024] Here, an example of the functional configuration of the rough plan decision variable evaluation and scenario selection unit 32 will be described with reference to FIG. FIG. 2 is a block diagram showing an example of the internal configuration of the rough planning decision variable evaluation and scenario selection unit 32.

[0025] The rough planning decision variable evaluation and scenario selection unit 32 includes a planning result feature similarity evaluation unit 321 and a scenario selection unit 322.

[0026] The plan result feature similarity evaluation unit 321 evaluates the similarity between scenarios based on the results of the rough plan created by the scenario-based plan approximation unit 31. Here, the plan result feature similarity evaluation unit 321 evaluates the similarity of the action on the energy operation plan for each scenario based on the results of the rough plan. For example, if the same plan result is estimated even with different scenarios, the plan result that is not an estimate for the scenario on which the rough plan result is based is also evaluated as similar. Here, when proceeding with operation according to the plan, the plan result includes elements that do not cause violation of operation constraints or additional costs and do not affect operation even if the contents of the plan are modified during operation. When evaluating the plan result, the similarity evaluation may be performed on only decision variables that involve violation of operation constraints or additional costs if not determined during planning, excluding elements that do not affect operation even if the operation is changed, rather than all elements of the plan result.

[0027] The scenario selection unit 322 selects scenarios from the scenarios input to the estimation model such that the scenarios are not similar based on the similarity evaluation by the similarity evaluation unit 321 of the plan result feature quantity. For example, the scenario selection unit 322 deletes similar scenarios based on the similarity evaluation by the similarity evaluation unit 321 of the plan result feature quantity and selects the remaining scenarios. At this time, in the rough planning result evaluated as similar, the scenario on which the rough planning result is based is regarded as a duplicated scenario. The scenario selection unit 322 determines one of the duplicated scenarios to be an unnecessary scenario, removes the duplicated scenario, and selects the remaining scenario. The scenarios selected by the scenario selection unit 322 are output to the uncertainty planning calculation unit 33.

[0028] Here, the scenario selection unit 322 prioritizes deletion of scenarios inputted to the scenario-based plan approximation unit 31, starting with those with small probability similarity evaluation indices, based on a probability similarity evaluation index that decreases as the occurrence probability of a scenario decreases and the similarity in the similarity evaluation with other scenarios increases, and selects the remaining scenarios. Therefore, even if the scenario selection unit 322 deletes a scenario, the occurrence probability of that scenario is low, so the impact on the results of the power operation plan created with the remaining scenarios can be kept to a minimum.

[0029] Let us return to Figure 1 to continue the explanation. The uncertainty plan calculation unit 33 (an example of a plan creation unit) calculates a power operation plan that takes uncertainty into consideration, using the scenario selected by the rough plan decision variable evaluation and scenario selection unit 32. The uncertainty plan calculation unit 33 outputs the uncertainty scenario and the power operation plan to the screen display and result storage unit 4.

[0030] The screen display and result storage unit 4 displays the uncertainty scenario and power operation plan output from the uncertainty plan calculation unit 33 on the screen of the display unit 21 shown in Fig. 3 described later. In addition, the screen display and result storage unit 4 stores the results of the power operation plan in a power operation plan database DB2 shown in Fig. 3 described later.

[0031] <Hardware configuration of power operation planning device 1> FIG. 3 is a diagram illustrating an example of a configuration of a power system 100 and an example of a hardware configuration of a power operation planning device 1 according to the first embodiment.

[0032] An example of the configuration of a power system 100 is shown in the upper part of Fig. 3. The power system 100 is a system in which a plurality of generators 130 and loads 150 are interconnected via buses (nodes) 110, transformers 120, power transmission lines 140, etc. System information indicating the configuration of the power system 100 is stored in a system information database DB1 shown in the lower part of Fig. 3.

[0033] The power operation planning device 1 acquires various information such as power generation equipment information stored in the power generation and system information unit 2 shown in Fig. 1, and multiple measurement data of the load 150, etc., from the power system 100. The power operation meter information acquired by the power operation planning device 1 from the power system 100 via the communication network 300 is stored in a power operation plan database DB2 shown in the lower part of Fig. 3.

[0034] 3, various measuring instruments are appropriately installed on the bus bar 110 for the purpose of protecting, controlling, and monitoring the power system 100. Signals detected by the measuring instruments are transmitted to the communication unit 23 of the power operation planning device 1 via a communication network 300. The dashed lines in the figure represent the generator 130 and the load 150 wirelessly transmitting the signals detected by the measuring instruments to the communication network 300.

[0035] An example of the hardware configuration of the power operation planning device 1 for the power system 100 is shown in the lower part of FIG. The power operation planning device 1 is configured as a computer system. The power operation planning device 1 includes a display unit 21, an input unit 22, a communication unit 23, a CPU 24, a memory 25, and various databases (a power system information database DB1, a power operation plan database DB2), and each unit is connected to a bus line 26.

[0036] The display unit 21 is, for example, a display device. Note that the display unit 21 may be configured to use, for example, a printer device, an audio output device, or the like instead of or together with the display device.

[0037] The input unit 22 is configured to include at least one of a keyboard, a pointing device such as a mouse, a touch panel, a voice instruction device, and the like.

[0038] The communication unit 23 includes a circuit and a communication protocol for connecting to the communication network 300. The communication unit 23 also communicates with a weather system, an electricity market system, and an aggregator that monitors and controls a plurality of distributed power sources and consumers, such as a VPP (Virtual Power Plant).

[0039] The CPU 24 executes programs in cooperation with the memory 25 to realize each part of the power operation planning device 1, instructs image data to be displayed, searches for data in various databases, etc. The CPU 24 may be configured as one or more semiconductor chips, or may be configured as a computer device such as a calculation server.

[0040] The memory 25 is configured as, for example, a random access memory (RAM) and stores computer programs, calculation result data and image data required for each process, etc. The memory 25 may be a read only memory (ROM), a hard disk drive (HDD), a solid state drive (SSD), a non-volatile memory, etc. In this case, the memory 25 is used as an example of a computer-readable non-transient storage medium that stores a program executed by the power operation planning device 1. The data stored in the memory 25 is saved in a database, sent to the display unit 21 for display, or transmitted as an operation control command to each device such as a generator via the communication network 300. Since each device is operated based on an operation control command value, the control command value needs to be a value that satisfies an operation constraint.

[0041] <Selection of uncertainty scenarios and creation of power operation plans> Next, the process of selecting an uncertainty scenario in the power operation planning device 1 and creating a power operation plan will be described with reference to FIG.

[0042] Fig. 4 is a flowchart showing an example of a process in which the power operation planning device 1 according to the first embodiment selects an uncertainty scenario and creates a power operation plan. The power operation planning device 1 has a function of inputting input information required for creating a power operation plan to an estimation model, and selecting a scenario based on an approximate plan output from the estimation model. After that, the power operation planning device 1 creates a power operation plan that takes uncertainty into consideration based on the selected scenario. The process from step S11 shown in Fig. 4 will be described below.

[0043] In step S11 in Fig. 4, the scenario-based plan approximation unit 31 shown in Fig. 1 extracts, as an initial scenario, information required for creating a power operation plan, such as power generation equipment information, supply and demand information, and scenario information, from the power generation and system information unit 2. Note that the scenario information extracted as the initial scenario includes a scenario indicating a case in which the power demand or the amount of power generation from renewable energy differs between the time of prediction and the time of operation due to a prediction error, or includes a possible probability distribution range including the prediction error.

[0044] In addition, in the process of extracting an initial scenario by the scenario-based plan approximation unit 31, a scenario desired by the operator of the power operation planning device 1, such as past power demand, may be set as the initial scenario. In addition, the operator of the power operation planning device 1 may set past time-series data with similar conditions, such as the same season or period, as the initial scenario.

[0045] Furthermore, when the scenario information is a possible probability distribution range including the prediction error, the scenario-based plan approximation unit 31 may create an uncertainty scenario indicating the prediction error based on the probability distribution. This uncertainty scenario can be created by a statistical scenario creation method such as Monte Carlo simulation based on the probability distribution range at each time. In this way, the scenario-based plan approximation unit 31 extracts information required for creating a power operation plan that takes uncertainty into account from the power generation and grid information unit 2.

[0046] 4, the scenario-based plan approximation unit 31 estimates the power operation plan based on the scenario using the input information necessary for creating the power operation plan extracted in step S11 and an estimation model indicating the relationship with the result of the power operation plan. Note that when approximating the power operation plan, an estimation model may be used for each scenario to estimate the plan result according to the scenario.

[0047] As examples of this estimation model, two methods ((1) a method that utilizes a relaxed optimization problem, and (2) a method that utilizes a trained machine learning model) are assumed. These two methods are explained below. Note that estimating the plan result below means that the scenario-based plan approximation unit 31 estimates the power operation plan based on the scenario.

[0048] (1) Method using relaxation optimization problems The method of estimating planning results using a relaxed optimization problem involves approximately solving the optimization problem in a power operation plan that assumes uncertainty, as shown in the following equation (1). The objective function of the optimization problem in equation (1) is to minimize the total power generation cost of all generators for the planning period. The definitions of the variables that make up equation (1) and the constraints for equation (1) are also described below.

[0049]

number

[0050] Tend: End time of the plan Ngen: Number of generators ai,bi,ci: Power generation cost coefficients of generator i Pits: Scenario s, generator i, power output at time t uits: Discrete variable of 0, 1 indicating the start and stop of scenario s, generator i, and time t Δuits: A discrete variable of 0, 1 indicating the start of the startup of scenario s, generator i, and time t. SUCi: Start-up cost of generator i S: Number of assumed scenarios Prs: Probability of occurrence of scenario s PNLts: Penalties for violation of operational constraints

[0051] <Restrictions> Maximum generator output and minimum generator output (the output of each generator is within the range from maximum output to minimum output) · Supply and demand balance (demand share matches total power output) - Minimum continuous start time and minimum continuous stop time (restart or re-stop will occur after the minimum continuous time) - Operation and shutdown periods (shutting down or continuing operation of the generator during specified periods) Operating reserve capacity and necessary adjustment capacity (reservoir capacity to correct errors between actual operation and supply and demand plans)

[0052] Here, if the scenario-based plan estimating unit 31 tries to solve equation (1) exactly, it takes a very long calculation time. The reason for this is that it is necessary to solve equation (1) for all scenarios. Also, it is necessary to search for optimal values ​​and combinations of discrete variables from a huge number of combinations of solutions for the many discrete variables included in equation (1). Therefore, the scenario-based plan estimating unit 31 estimates the plan result by solving a relaxed optimization problem that is a simplification of equation (1). Because the difficult characteristics of equation (1) are simplified, it is possible to solve the relaxed optimization problem in a shorter time than solving the original optimization problem.

[0053] This method of solving a relaxed optimization problem involves solving a relaxed optimization problem in which all of the complex discrete characteristics of equation (1) are continuously approximated, instead of strictly solving the optimization problem regarding the power operation plan of equation (1).

[0054] The discrete variable uits, which has a huge number of combinations depending on which time t and which generator i is 1 or 0, is approximated to a continuous variable where 0 < uits_con < 1, so no discrete combinations of uits occur. Therefore, the scenario-based plan approximation unit 31 can solve the relaxed optimization problem in a short time. The approximate power operation plan obtained by solving this relaxed optimization problem is treated as a rough plan.

[0055] (2) How to utilize pre-trained machine learning models In the method of estimating the plan result using a trained machine learning model, the machine learning model is trained in advance on the relationship between the input information for creating a power operation plan and the created power operation plan. By inputting the input information into this trained machine learning model, the machine learning model estimates the plan result, i.e., creates a rough estimated power operation plan.

[0056] As a method for estimating a planning result based on machine learning, for example, there is a method that utilizes a neural network of formula (2) shown in Non-Patent Document 4. In this case, the machine learning model is expressed as the following formula (2).

[0057]

number

[0058] g (1) :Activation function W (n) :n-level weighting factor b (n) :n-level bias coefficient x: Input information y: Output information

[0059] Equation (2) simulates the relationship between input information x and the estimation target y. In equation (2), for input information x, such as a scenario, a weighted sum wx is added to a bias b (wx+b), and a nonlinear function g (n)w and b are adjusted so that the output information y to which the above has been applied becomes the power operation plan to be estimated.

[0060] When the scenario-based plan approximation unit 31 estimates a plan result from input information x, it is assumed that an example of an estimation target (plan result) corresponding to the input information x is prepared in advance, and the learning model of formula (2) is trained to adjust w. The scenario-based plan approximation unit 31 can estimate a plan result corresponding to the input x by inputting the input information x to the learned formula (2). This estimated plan result is treated as a rough plan.

[0061] As described above, the scenario-based plan approximation unit 31 can estimate the plan result obtained by approximating the power operation plan using an approximation method such as a method based on a relaxed optimization problem or a method based on machine learning. Here, these approximate plans may be displayed on a screen to notify the operator of the approximate results of the power operation plan that takes uncertainty into account. Compared to strictly solving equation (1), which is an optimization problem for the power operation plan that assumes uncertainty, the plan result can be obtained in a short time, thereby improving the efficiency of the operator's work.

[0062] When outputting the estimated plan on the screen, the scenario-based plan approximation unit 31 calculates the occurrence probability of the scenario and the operation cost index of the estimated plan for each plan estimated based on the scenario. An example of a screen display based on these occurrence probabilities and operation cost indexes is shown in FIG. 5. FIG. 5 is a graph showing the operation cost distribution with respect to the uncertainty of the power operation plan, with the horizontal axis representing operation cost and profit, and the vertical axis representing frequency. In addition, profit is shown on the right side of the horizontal axis, and loss is shown on the left side. The operation cost distribution shown in FIG. 5 is displayed on the display unit 21 shown in FIG. 3 by the screen display and result storage unit 4.

[0063] The scenario-based plan estimating unit 31 can report to the operator whether the operation costs vary due to uncertainty or whether there is a possibility of loss by showing the operation cost distribution to the operator via the screen display and result storage unit 4. For example, if the frequency of a certain scenario leans toward loss, the operator can determine, when creating a power operation plan, that there is a high possibility of loss if that scenario occurs in actual operation.

[0064] Returning to the explanation of the flowchart shown in FIG. Here, since the rough plan results estimated in step S12 are rough plan results, there will be a deviation from the plan results created by rigorously solving the optimization problem of the power operation plan of equation (1). Since these rough plan results do not provide a plan with the accuracy to actually operate the power equipment, in the subsequent steps (S13 to S15), the rough plan results are used as a basis for scenario selection. In particular, based on the rough plan results estimated in step S12, scenarios with similar and overlapping plan results are excluded. The scenario selection unit 322 selects the minimum number of scenarios required to accurately simulate uncertainty. Scenario selection based on these rough plans is shown in the following steps S13 to S15.

[0065] In step S13 in Fig. 4, the similarity evaluation unit 321 of the plan result feature quantity shown in Fig. 2 performs a similarity evaluation to determine whether the plan results are similar and overlap based on the rough plan results estimated in step S12. The similarity evaluation unit 321 of the plan result feature quantity uses the similarity evaluation criteria for determining whether the rough plan results are similar and overlapping to determine the similarity evaluation, for example, the index of formula (3) obtained by extracting the elements of each scenario s for the objective function of formula (1). In formula (3), the total power generation cost for each scenario is assumed.

[0066]

number

[0067] In addition to the above elements of each scenario s, the similarity evaluation unit 321 of the plan result feature may also use specific elements as evaluation indexes. For example, in the plan result, there are elements that can be adjusted according to the situation even if any of the scenarios actually occurs, such as the generator output, because the output can be adjusted in a short time. In contrast to these elements that can be adjusted according to the situation, there are also elements that cannot be adjusted according to the situation after the plan is created due to constraints on the generator operation, such as slow adjustment, or the policy or system of the power generation operation. Since elements that cannot be adjusted according to the situation are more important to the operator than elements that can be adjusted according to the situation, these elements that cannot be adjusted according to the situation after the plan is created due to constraints on the generator operation, the system of the power generation operation, etc. may also be used as evaluation indexes.

[0068] Here, the plan result feature similarity evaluation unit 321 treats elements that cannot be adjusted according to the situation after the power operation plan is created as evaluation indices and as decision variables determined by the power operation plan. These decision variables are elements whose values ​​determined in the power operation plan cannot be changed when the power operation plan is being operated. A specific example of a decision variable is the start and stop of generators, which cannot be adjusted according to the situation even if the prediction error changes immediately before operation on the day after the power operation plan is created the day before the day of operation. Other decision variables include the buying and selling volume in the power market, which is agreed on the day before and cannot be adjusted on the day of operation. Start and stop u its In this case, when the power operation planning device 1 makes a power operation plan on the day before the actual operation date, the variables for several hours immediately prior to operation become the decision variables in formula (1). The reason for this is that, assuming that a power operation plan for a generator has been made, the generator is already operating as planned, and if a generator scheduled to be operated soon is about to be operated, it is not possible to change the plan, such as starting up a generator different from the plan. Note that the "plan result feature quantity" in the plan result feature similarity evaluation unit 321 refers to the decision variables.

[0069] In addition, if the fuel purchase amount of fuel required for power generation, which is purchased before operation, is used as the decision variable, a variable that influences the decision variable, such as the fuel consumption in each scenario, may be used as the evaluation index instead of the decision variable. Here, in formula (1), in order to evaluate the plan results according to each scenario, the decision variables are also defined for each scenario. However, after the power operation plan is created, the decision variables are elements that cannot be adjusted according to the occurrence status of each scenario. For this reason, when creating the power operation plan assuming uncertainty in step S16 described later, the decision variables are assumed to be equal between each scenario.

[0070] The plan result feature similarity evaluation unit 321 evaluates the similarity and overlap of the plan results based on the evaluation index of each scenario s in the objective function in the plan results estimated for each scenario and the decision variables determined from the results of the power operation plan. At this time, the evaluation method of the following formula (4) is used.

[0071]

number

[0072] s: Similarity and scenarios to be evaluated (scenario to be deleted) s': Comparison with scenario s Prs: Probability of occurrence of scenario s ys: A vector of normalized evaluation indices (for each scenario s, the evaluation indices in the objective function, decision variables, etc. are normalized by their respective indices to form a single vector)

[0073] The similarity evaluation unit 321 of the planned result feature uses formula (4) to evaluate the scenario s to be evaluated based on the closeness of the scenario s' to the scenario s' whose occurrence probability Prs of the scenario s is small or whose distance (|||| Euclidean norm) of the evaluation index y is the closest. Here, the evaluation value in formula (4) is the probability similarity evaluation index.

[0074] Probability of occurrence of scenario s Pr sWhen is small, it is considered that the possibility of it actually occurring is low. Even if such a scenario s is deleted, the impact on the plan result is small. Furthermore, when the distance between scenario s and the closest scenario s' is small, it means that there is a scenario that will result in a similar plan result. Therefore, the similarity evaluation unit 321 of the plan result feature calculates the similarity evaluation index of formula (4) for each scenario as a similarity evaluation of the plan result according to the scenario. The similarity evaluation index calculated for each scenario is used as the similarity evaluation value.

[0075] In step S14 of Fig. 4, the scenario selection unit 322 selects a scenario based on the similarity evaluation value calculated in step S13. The scenario selection unit 322 deletes the scenario that is evaluated as a duplicate because it has the smallest similarity evaluation value, and excludes it from scenario s or scenario s'. Note that the occurrence probability of a scenario deleted by the scenario selection unit 322 is added to the occurrence probability of the most similar scenario in equation (4).

[0076] Here, the number of scenarios and the accuracy of the uncertainty simulated by multiple scenarios will be described with reference to Fig. 6. Fig. 6 is a graph showing the relationship between the number of scenarios and the accuracy of the planning results for multiple scenarios that simulate uncertainty. The horizontal axis of the graph shown in Fig. 6 represents the number of scenarios, and the vertical axis represents the deterioration of the accuracy of the planning results according to the number of scenarios. Here, the deterioration of the planning results is evaluated, for example, by the expected value of the total power generation cost of formula (1) calculated based on the approximate planning results of all scenarios, and is the amount of change in the expected value that changes from all scenarios according to the decrease in the number of scenarios.

[0077] The initial state corresponds to the number of scenarios A0 at the right end of the horizontal axis in the graph shown in Fig. 6. Since the number of scenarios A0 is the initial state with the largest number of scenarios, there is little deterioration in the accuracy of the planning results. However, when overlapping scenarios are deleted by the processing in step S14 in Fig. 4, the accuracy of the planning results gradually deteriorates, as indicated by the white arrow in the figure.

[0078] The scenario selection unit 322 evaluates the deterioration of the accuracy of the plan result due to the scenario exclusion as shown in FIG. 6 each time it excludes a scenario evaluated to have a high similarity based on the similarity evaluation index of the formula (4). As long as the deterioration of accuracy is within the threshold a%, the scenario is excluded, and the remaining scenario is selected. In the above, the deterioration of the accuracy of the plan result is evaluated by the expected value cost calculated based on the scenario and the rough plan result, but the expected value of the probability similarity evaluation index shown in the similarity evaluation with other scenarios by the similarity evaluation unit 321 of the plan result feature quantity may be used as the evaluation value instead of the expected value cost. In addition, multiple elements may be treated as one vector, as in ys of the formula (4), and the evaluation may be performed by the expected value of the distance (||·|| Euclidean norm) between each scenario. In this way, it is possible to guarantee the accuracy of the results of the power operation plan created assuming uncertainty by excluding overlapping scenarios while keeping the deterioration of the plan result within the threshold.

[0079] In step S15 in Fig. 4, the scenario selection unit 322 evaluates whether the accuracy of the planning result shown in step S14 is maintained within a threshold value a %. If the error indicating the deterioration of the accuracy of the planning result is within a % of the specified error shown in Fig. 6, the scenario selection unit 322 evaluates that it is within the threshold value (YES in S15). In this case, since there is no problem with the accuracy of the planning result, the scenario selection unit 322 returns to step S13 again and repeats deleting scenarios with overlapping planning results. When the processes from steps S13 to S15 are repeated, the accuracy deteriorates from the initial state each time the number of scenarios is reduced, as shown in Fig. 6.

[0080] If the error indicating the deterioration of the accuracy of the planning result exceeds a% of the specified error, the scenario selection unit 322 evaluates that it is not within the threshold (NO in S15). In this case, since there is a problem with the accuracy of the planning result, the scenario selection unit 322 stops the scenario deletion process. After that, the scenario selection unit 322 outputs the remaining scenarios that have not been deleted to the uncertainty planning calculation unit 33.

[0081] 4, the uncertainty plan calculation unit 33 creates a power operation plan that takes uncertainty into consideration. Here, the uncertainty plan calculation unit 33 creates a power operation plan by solving an optimization problem that takes uncertainty into consideration using equation (1) for scenarios in which the plan results selected in step S15 do not overlap.

[0082] Unlike the approximate planning result in step S12, the uncertainty planning calculation unit 33 solves the characteristic of equation (1) without approximating it. In this case, the uncertainty planning calculation unit 33 applies a commercial optimization solver to solve the optimization problem of equation (1) to obtain an exact solution. After that, the uncertainty planning calculation unit 33 outputs the created power operation plan to the screen display and result storage unit 4.

[0083] In step S17 of Figure 4, the screen display and result storage unit 4 displays the scenarios that were deleted in steps S13 to S15 due to overlapping plan results, the scenarios that do not overlap with the selected plan results, and the power operation plan results created in step S16 on the screen of the display unit 21 shown in Figure 3, and stores them in the power operation plan database DB2 shown in Figure 3.

[0084] <Advantages of the First Embodiment> In the power operation planning device 1 according to the first embodiment described above, when creating a power operation plan assuming uncertainties such as prediction errors, the relationship between a huge number of scenarios simulating uncertainties and the plan results created based on the scenarios is evaluated in advance. Based on this evaluation, scenarios whose effects on the plan results overlap are eliminated, and the remaining scenarios are selected. The power operation planning device 1 creates a power operation plan that takes uncertainty into consideration for the selected scenario. In this way, the power operation planning device 1 deletes only scenarios whose plan results overlap, that is, whose effects on the plan overlap, and selects scenarios that affect the plan results. In addition, even when deleting overlapping scenarios, the accuracy of the plan results is guaranteed by an evaluation of the accuracy, so that the accuracy of the simulation of uncertainties is not degraded even if the number of scenarios is reduced, and the effect of shortening the calculation time required to create a power operation plan can be obtained.

[0085] Here, when the power operation planning device 1 evaluates the effect of a scenario on a planned result, an estimation model is constructed that indicates the relationship between the scenario and the planned result. As the estimation model, a plan result according to a scenario is estimated using a method of solving an approximate relaxation problem of the optimization problem used in creating a power generation plan, or a method of utilizing a machine learning model that has learned the relationship between the scenario and the planned result in advance. Therefore, it is possible to estimate the planned result faster than when the power operation planning device 1 creates a power generation plan by a method of strictly solving an optimization problem related to the power generation plan, and to evaluate the similarity of the scenario based on the estimated planned result.

[0086] Furthermore, the power operation planning device 1 sets elements in the approximate plan results output from the estimation model that are restricted in their modification during plan operation after the plan is created due to equipment or operational regulations as decision variables in the plan. These decision variables and the objective function values ​​of the plan are evaluated, and scenarios with a low probability of occurrence and a high degree of overlap are deleted while evaluating the impact before and after deletion. In this way, the power operation planning device 1 deletes only scenarios whose plan results overlap, so that the calculation time for creating a power operation plan that takes uncertainty into account can be increased while ensuring optimal accuracy of elements to be determined in the plan.

[0087] In the conventional technology, when creating a plan assuming uncertainty, the impact of the scenario on the plan result was not taken into consideration. Therefore, reducing the number of scenarios of uncertainty assumed in the plan reduced the optimal accuracy of the plan result and the decision variables in the plan. On the other hand, increasing the number of scenarios increased the calculation time for creating the plan. In contrast, the power operation planning device 1 according to the first embodiment creates a power operation plan by carefully selecting scenarios while evaluating the impact on the plan result based on the approximate plan result and decision variables estimated by the estimation model. As a result, it becomes possible to achieve both improved optimality and calculation speed, which was not possible with the conventional technology.

[0088] In the above-described embodiment, electricity is used as an example of energy, and the present invention is applied to the power operation planning device 1. However, gas, wind power, hydraulic power, biomass, etc. may be used as examples of energy instead of electricity, and the present invention may be applied to operation plans for these energies.

[0089] [Second embodiment] Next, a configuration example and a processing example of a power operation planning device 1A according to a second embodiment of the present invention will be described with reference to Fig. 7 to Fig. 10. Note that descriptions overlapping with the contents described in the first embodiment will be omitted.

[0090] <Functional configuration of power operation planning device 1A> FIG. 7 is a diagram illustrating an example of a functional configuration of a power operation planning device 1A according to the second embodiment.

[0091] The calculation unit 3A of the power operation planning device 1A is equipped with a scenario-based plan estimation unit 31, an estimation plan decision variable evaluation and scenario selection unit 32A, and an uncertainty plan calculation unit 33, which are provided in the power operation planning device 1 of the first embodiment, as well as a non-selected scenario impact evaluation unit 34.

[0092] The unselected scenario impact assessment unit 34 receives as input the plan results (power operation plan that takes uncertainty into consideration) calculated by the uncertainty plan calculation unit 33, and evaluates a situation in which the scenario selection unit 322 did not select a scenario. The unselected scenario impact assessment unit 34 outputs an evaluation value that evaluates the plan results for scenarios that were not anticipated when the plan was created by the uncertainty plan calculation unit 33. A scenario that was not anticipated when the plan was created is a scenario that was not selected by the scenario selection unit 322.

[0093] The rough estimate plan decision variable evaluation and scenario selection unit 32A selects a scenario again based on the evaluation value input from the non-selected scenario impact evaluation unit 34. For example, the rough estimate plan decision variable evaluation and scenario selection unit 32A creates a power operation plan by fixing decision variables for a scenario not selected by the scenario selection unit 322, and then, when the non-selected scenario impact evaluation unit 34 evaluates that a scenario not selected by the scenario selection unit 322 will have an impact on the operation cost, adds the scenario not selected by the scenario selection unit 322 to the scenario selected by the scenario selection unit 322. The uncertainty plan calculation unit 33 calculates an uncertain power operation plan by adding the scenario not selected by the scenario selection unit 322.

[0094] FIG. 8 is a block diagram showing an example of a functional configuration of the rough plan decision variable evaluation and scenario selection unit 32A.

[0095] The rough plan decision variable evaluation and scenario selection unit 32A includes a risk scenario selection unit 323 in addition to the plan result feature similarity evaluation unit 321 and the scenario selection unit 322 according to the first embodiment. In addition, an evaluation value is input to the risk scenario selection unit 323 from the non-selected scenario impact evaluation unit 34.

[0096] The risk scenario selection unit 323 receives the evaluation values ​​of the plan results of the scenarios selected by the scenario selection unit 322 and the scenarios that were not anticipated when the plan was created and that were evaluated by the unselected scenario impact evaluation unit 34. Based on the scenarios selected by the scenario selection unit 322 and the rough estimate plans of the scenarios, the risk scenario selection unit 323 selects only scenarios that affect a statistical risk evaluation index based on the operating cost distribution, and selects this scenario as a risk scenario. At this time, the risk scenario selection unit 323 selects a scenario that falls within a specific distribution area of ​​the operating cost distribution calculated based on the rough estimate plan for each scenario, as a risk scenario. The specific distribution area is, for example, an area that falls within a loss risk 50 shown in FIG. 10, which will be described later. The risk scenario selection unit 323 may also extract a scenario that falls within a statistical evaluation index from the operating cost distribution, and select this scenario as a risk scenario. To these risk scenarios, the non-selected scenario impact assessment unit 34 evaluates scenarios that were not anticipated when the plan was created and determines that they will have an impact on operating costs based on the evaluation values ​​of the plan results, and outputs the results to the uncertainty plan calculation unit 33.

[0097] 7, the uncertainty plan calculation unit 33 creates a power operation plan that takes uncertainty into consideration, based on the scenario that affects the statistical risk assessment index, selected by the risk scenario selection unit 323. The created power operation plan is stored in the power operation plan database DB2 shown in FIG. 3, and is output to the screen display and result storage unit 4.

[0098] The screen display and result storage unit 4 displays the uncertainty scenarios and power operation plans output from the uncertainty plan calculation unit 33 and the risk scenario selection unit 323 on a screen, and stores the plan results in the power operation plan database DB2.

[0099] <Hardware configuration of power operation planning device 1A> Since it is similar to the first embodiment, a detailed description will be omitted.

[0100] <Processing of the Calculation Unit of the Power Operation Planning Device 1A> Fig. 9 is a flowchart showing an example of processing by the calculation unit 3A of the power operation planning device 1A according to the second embodiment. The function of the power operation plan and the impact evaluation of the non-selected scenario performed by the calculation unit 3A will be described using the flowchart in Fig. 9.

[0101] The processing from steps S11 to S15 is the same as the processing according to the first embodiment shown in FIG.

[0102] In step S15, the scenario selection unit 322 evaluates whether the accuracy of the plan result is maintained within the threshold range. If the accuracy of the plan result is not within the threshold (NO in S15), the risk scenario selection unit 323 selects a risk scenario (S15B-1). Here, the risk scenario selection unit 323 evaluates the scenario selected by the scenario selection unit 322 and its approximate plan result (rough plan) using CVaR (Conditional Value at Risk), which is a statistical risk evaluation index and indicates loss risk. The risk scenario selection unit 323 selects only scenarios that correspond to loss risk as risk scenarios. Here, a method for selecting a scenario according to risk will be described with reference to FIG. 10.

[0103] Figure 10 is a conceptual diagram of loss risk. Figure 10 is the same as the screen display example of the operating cost distribution against uncertainty shown in Figure 5. Here, we will explain how to select a scenario according to risk based on the conceptual diagram of loss risk.

[0104] When simulating the uncertainty of the power operation plan with multiple scenarios, the operation cost and profit are expressed by the above formula (3) based on the rough plan of each scenario shown in the first embodiment. In addition, each scenario has a frequency (occurrence probability Prs). The horizontal axis of FIG. 10 shows the operation cost or profit when a certain scenario occurs, and the vertical axis shows the frequency at which the operation cost or profit occurs. Based on the frequency and operation cost for each scenario, it is expressed by a histogram or a probability density function.

[0105] Some managers have a desire to avoid situations where operating costs result in losses rather than situations where they result in profits. In this case, the manager may have a desire to evaluate only risk scenarios that correspond to loss risk 50 in Fig. 10. The above-mentioned CVaR is used as an index for evaluating such loss risk 50.

[0106] The risk scenario selection unit 323 evaluates the loss risk using CVaR, and selects a scenario that corresponds to a loss risk of 50, which corresponds to the CVaR in the operating cost distribution in Fig. 10. Since the risk scenario selection unit 323 evaluates scenarios that correspond to the loss risk and can delete scenarios that do not correspond to the loss risk, it is possible to reduce the number of scenarios required for evaluation and reduce the calculation time required for the uncertainty plan calculation unit 33 to create a plan.

[0107] In addition, the uncertainty plan calculation unit 33 targets only scenarios that correspond to loss risks, thereby reducing loss risks and creating a power operation plan that takes uncertainty into consideration. The uncertainty plan calculation unit 33 can minimize costs by targeting scenario s that corresponds to loss risks in the objective function of formula (1).

[0108] In the above-mentioned processing of the risk scenario selection unit 322, a scenario corresponding to a risk that the operator wants to evaluate is selected in advance, and as an example of the selection, an example of selecting a scenario corresponding to a loss risk has been described. However, the risk scenario selection unit 323 may select a scenario in an area specified by the operator in the operation cost distribution as the risk scenario. For example, the power operation planning device 1A creates a histogram based on the scenario and the estimated approximate planning result. The operator specifies a distribution area that is to be evaluated for this histogram. The scenario in this specified distribution area is selected as the risk scenario.

[0109] In step S16 of FIG. 9, the uncertainty plan calculation unit 33 creates a power operation plan that takes uncertainty into consideration, based on the risk scenario selected in step S15B-1.

[0110] In step S16B-1 of Fig. 9, the non-selected scenario impact assessment unit 34 evaluates the impact when the equipment is operated according to the power operation plan created in step S16. Since a scenario other than the selected scenario may occur during operation in particular, the non-selected scenario impact assessment unit 34 evaluates the impact when a scenario other than the selected scenario occurs. In other words, the non-selected scenario impact assessment unit 34 evaluates the impact when a scenario other than the risk scenario selected by the risk scenario selection unit 323 in step S15B-1 or the scenario selected by the scenario selection unit 322 in step S14 occurs during operation.

[0111] As described above, the scenario selection unit 322 and the risk scenario selection unit 323 select a scenario based on the approximate plan result estimated by the scenario-based plan approximation unit 31. For this reason, if the estimation accuracy of the approximate plan is low, a scenario that will affect the plan result may not be extracted in the scenario selection by the risk scenario selection unit 323. Therefore, in order to avoid insufficient extraction of important scenarios that will affect the plan result, the non-selected scenario impact evaluation unit 34 evaluates the impact when scenarios other than those extracted by the scenario selection unit 322 and the risk scenario selection unit 323 are applied to the plan result. Furthermore, the non-selected scenario impact evaluation unit 34 evaluates whether the operating cost shown in formula (3) will be excessive due to a constraint violation or the like.

[0112] In particular, it may become clear that the above-mentioned unselected scenario will actually occur just before operation after the plan is created. For this reason, when evaluating the unselected scenario, the uncertainty plan calculation unit 33 fixes the variables (decision variables defined in the first embodiment) that cannot be changed during operation after the plan is created to the values ​​at the time of planning. Then, the uncertainty plan calculation unit 33 re-creates the power operation plan using the remaining variables, targeting the scenarios not selected by the scenario selection unit 322. Based on the results of this re-planning, it is assumed that the unselected scenario will occur during operation, and the impact is evaluated.

[0113] Compared to when creating a power operation plan according to the first embodiment, in a power operation plan recreated after fixing decision variables to assume post-plan operation, the decision variables cannot be changed, so there are fewer adjustment factors. For this reason, depending on the scenario that occurs, there is a possibility that the operational constraints will be violated and the operational cost of formula (3) will become excessive. The unselected scenario impact evaluation unit 34 evaluates whether the scenarios not selected by the scenario selection unit 322 will cause the operational cost of formula (3) to become excessive due to violation of the operational constraints, and outputs an evaluation value.

[0114] 9, the non-selected scenario impact assessment unit 34 determines whether the impact of the non-selected scenario is within a threshold. Here, it evaluates whether the assessment value in step S16B-1, which assumes a scenario other than the selected scenario occurs during operation, becomes excessively large due to a constraint violation.

[0115] If the impact of the non-selected scenario exceeds the threshold (NO in S16B-2), the non-selected scenario impact assessment unit 34 extracts scenarios whose operating costs are equal to or greater than a preset threshold. In this case, the scenarios that are equal to or greater than the threshold are scenarios other than the risk scenarios selected in S15B-1. Then, the process returns to step S15B-1 and continues.

[0116] That is, the risk scenario selection unit 323 adds scenarios that are determined to cause constraint violations in step S16B-2 based on evaluation by the non-selected scenario impact assessment unit 34 assuming operation to the scenarios selected in step S15B-1, and outputs the resulting plan to the uncertainty plan calculation unit 33. The uncertainty plan calculation unit 33 again creates a power operation plan that takes uncertainty into account in step S16, and the non-selected scenario impact assessment unit 34 evaluates the impact of the non-selected scenarios. This process is repeated until there are no more constraint violations in step S16B-2.

[0117] Here, if the impact of the non-selected scenario is within the threshold value (YES in S16B-2), the uncertainty plan calculation unit 33 outputs the power operation plan that takes uncertainty into consideration, created in step S16, to the screen display and result storage unit 4. In addition, the results of the scenario selection in step S14, the results of the risk scenario selection in step S15B-1, and the scenarios added in the impact evaluation of the non-selected scenarios in step S16B-1 are also output in the same manner.

[0118] 9, the screen display and result storage unit 4 stores the power operation plan that takes uncertainty into consideration in the power operation plan database DB2 and displays it on the screen. At this time, the power operation plan database DB2 stores the results of the scenario selection in step S14, the results of the selection of risk scenarios in step S15B-1, and the scenarios added in the impact assessment of non-selected scenarios in step S16B-1, and displays the selection results on the screen.

[0119] The power generation and grid information unit 2 may be configured in a storage device or a cloud server outside the power operation planning device 1. In this case, the calculation unit 3 of the power operation planning device 1 acquires necessary information from the storage device or the cloud server as appropriate when executing processing. The uncertainty plan calculated by the calculation unit 3 may be stored in the storage device or the cloud server.

[0120] <Effects of the second embodiment> In the power operation planning device 1A according to the second embodiment described above, in addition to the scenario selection according to the first embodiment, an operation cost distribution (profit) is created that is indicated by the occurrence frequency of the scenario and the operation cost assuming that scenario, based on the plan result estimated according to the scenario. The power operation planning device 1A selects a scenario that falls within a specific region within the distribution designated by the operator from this operation cost distribution, such as the risk of profit or loss, and creates a power operation plan that takes uncertainty into consideration. Therefore, the power operation planning device 1A has the effect of reducing the number of scenarios outside the specific region, while preferentially improving risks that the operator considers important and wants to evaluate when creating a power operation plan, and speeding up the calculation time for creating the plan.

[0121] Here, scenario selection is performed based on the estimation of the plan result according to the scenario as shown in the first embodiment. If the estimation accuracy of the estimated plan result is low, the overlap of the plan results cannot be evaluated correctly, and scenarios that affect the plan result may not be sufficiently extracted in the scenario selection. Therefore, in order to avoid insufficient extraction of important scenarios, the power operation planning device 1A evaluates the occurrence of a scenario that was not selected during the actual operation of a power operation plan that takes into account uncertainty created based on a selected scenario.

[0122] Since there are decision variables that cannot be adjusted immediately before operation after the creation of this plan, in the evaluation assuming operation, these decision variables are set to the values ​​at the time of planning, and adjustment factors are limited.By adding scenarios in which costs become excessive due to constraint violations in the evaluation assuming operation to the newly selected scenarios, it is possible to correct the aforementioned insufficient scenario extraction, which has the effect of increasing the accuracy of the simulation of uncertainty.

[0123] It should be noted that the present invention is not limited to the above-described embodiments, and various other applications and modifications are possible without departing from the gist of the present invention as set forth in the claims. For example, the above-mentioned embodiments have described the configuration of the device and system in detail and specifically in order to explain the present invention in an easily understandable manner, and are not necessarily limited to those having all of the configurations described. In addition, it is possible to replace a part of the configuration of the embodiment described here with the configuration of another embodiment, and it is also possible to add the configuration of another embodiment to the configuration of one embodiment. In addition, it is also possible to add, delete, or replace a part of the configuration of each embodiment with another configuration. In addition, the control lines and information lines shown are those that are considered necessary for the explanation, and not all control lines and information lines in the product are necessarily shown. In reality, it can be considered that almost all components are connected to each other. [Explanation of symbols]

[0124] 1, 1A... power operation planning device, 2... power generation and system information section, 3... calculation section, 4... screen display and result storage section, 31... scenario-based plan estimation section, 32... rough plan decision variable evaluation and scenario selection section, 33... uncertainty plan calculation section, 34... non-selected scenario impact evaluation section, 321... plan result feature similarity evaluation section, 322... scenario selection section, 323... risk scenario selection section, DB1... system information database, DB2... power operation plan database

Claims

1. an approximate plan creation unit that inputs information required for creating an energy operation plan into an estimation model as one or more scenarios and creates an approximate plan that approximates the energy operation plan; an evaluation unit that evaluates a similarity between the scenarios based on a result of the rough planning; a scenario selection unit that selects a scenario from the scenarios input to the estimation model such that the scenarios are not similar to each other based on an evaluation of similarity by the evaluation unit; A plan creation unit that creates the energy operation plan using the selected scenario. Energy operation planning device.

2. The evaluation unit evaluates a similarity of an effect on the energy operation plan for each of the scenarios based on a result of the rough estimation plan, The scenario selection unit deletes the similar scenarios based on the similarity evaluation by the evaluation unit and selects the remaining scenarios. The energy operation planning device according to claim 1 .

3. The rough plan creation unit creates an operation cost distribution including the occurrence probability of the scenario and the operation cost of the rough plan based on the rough plan. The energy operation planning device according to claim 2 .

4. a risk scenario selection unit that selects, as a risk scenario, a scenario that affects a statistical risk assessment index based on the operating cost distribution, based on the scenario selected by the scenario selection unit and the rough estimate plan. The energy operation planning device according to claim 3 .

5. The estimation model is a model that simulates the relationship between information necessary for creating the energy management plan and the rough estimate plan that is roughly estimated assuming uncertainty, and is configured by a method different from the method used to create the energy management plan. The energy operation planning device according to any one of claims 1 to 4.

6. The evaluation unit evaluates the similarity of the overlapping scenarios by using a decision variable, which is an element whose value determined in the energy management plan created by the plan creation unit cannot be changed, during operation of the energy management plan created by the plan creation unit. The energy operation planning device according to claim 2 .

7. a non-selected scenario impact assessment unit that assesses a situation in which the scenario selection unit does not select the scenario, The plan creation unit creates the energy operation plan by fixing the decision variables for the scenarios not selected by the scenario selection unit, and then, when the unselected scenario impact assessment unit evaluates that the scenarios not selected by the scenario selection unit will have an impact on operation costs, adds the scenarios not selected by the scenario selection unit to the scenarios selected by the scenario selection unit. The energy operation planning device according to claim 6.

8. The scenario selection unit, based on a probability similarity evaluation index that has a smaller probability of occurrence of the scenario inputted to the rough plan creation unit and has a smaller value as the similarity between the scenario and other scenarios increases in similarity evaluation, prioritizes removing scenarios with smaller probability similarity evaluation indexes and extracts remaining scenarios. The energy operation planning device according to claim 2 .

9. The scenario selection unit, when deleting the scenario and extracting the remaining scenario, selects the scenario in which the expected value of the operation cost of the energy operation plan based on the scenario and its estimated plan, or the change in the probability similarity evaluation index indicated by the evaluation unit in the similarity evaluation with other scenarios, before and after the deletion of the scenario, is within a threshold value. The energy operation planning device according to claim 8.

10. A display unit for displaying the operating cost distribution is provided. The energy operation planning device according to claim 3 .

11. The estimation model is a relaxed optimization problem obtained by relaxing the optimization problem for creating the energy management plan. The energy operation planning device according to claim 5 .

12. The estimation model is a machine learning model that learns the relationship between information necessary for creating the energy operation plan and the rough estimation plan. The energy operation planning device according to claim 5 .

13. A step of inputting information required for creating an energy operation plan into an estimation model as one or more scenarios and creating an approximate plan that approximates the energy operation plan; Evaluating the similarity between the scenarios based on the results of the rough planning; selecting a scenario from among the scenarios input to the estimation model such that the scenarios are not similar based on the similarity evaluation; and creating the energy operation plan using the selected scenario. Energy operation planning method.

Citation Information

Patent Citations

  • Prediction device, prediction system, prediction method and program

    JP2018173837A

  • Power supply-demand planning device

    JP2021083235A

  • Systems and Methods for Computer Implemented Energy Management

    US20140365023A1