Plate thickness control method for rolling mill
By decomposing entrance side plate thickness deviation into frequency components and compensating control delay times with optimal values, the method enhances plate thickness accuracy in rolling mills by reducing exit side deviations.
Patent Information
- Application Number
- JP2023046379
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-23
- Publication Date
- 2024-10-04
- Estimated Expiration
- 2043-03-23
AI Technical Summary
Existing plate thickness control methods in rolling mills result in significant exit side plate thickness deviation due to constant overall delay times, which compromises accuracy.
The method involves detecting entrance side plate thickness deviation, decomposing it into frequency components, calculating control delay times for each component, and compensating with optimal compensation times to minimize exit side plate thickness deviation by adjusting the timing of the rolling device control.
This approach minimizes exit side plate thickness deviation by optimizing control delay times, thereby improving overall plate thickness accuracy in rolling mills.
Smart Images

Figure 2024135601000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a method for controlling a plate thickness of a rolling mill. [Background technology]
[0002] Patent Document 1 discloses a method for controlling the thickness of a rolling mill, which calculates a roll gap ΔS between work rolls that roll a material, and outputs a command signal corresponding to the calculated roll gap ΔS to a reduction device to control the thickness of the material. In Patent Document 1, the deviation in the thickness of the entry side of the rolled material (entry thickness deviation) is resolved into frequency components, an overall delay time is calculated based on the delay time obtained for each frequency, and the timing of the command signal to be output to the reduction device is corrected based on the calculated overall delay time. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2012-135777 A Summary of the Invention [Problem to be solved by the invention]
[0004] However, in the thickness control method of Patent Document 1, the total delay time is constant, and an outlet thickness deviation (thickness deviation at the outlet of the rolled material) remains. It is desirable to reduce the remaining outlet thickness deviation and improve thickness accuracy.
[0005] An object of the present invention is to provide a method for controlling the thickness of a rolling mill capable of improving the thickness accuracy. [Means for solving the problem]
[0006] The present invention is a method for controlling a thickness of a rolling mill, which detects an entry thickness deviation of a material being rolled between a pair of rolls of a rolling mill, controls a reduction device which reduces the rolls so that a gap between the rolls becomes a roll gap calculated based on the entry thickness deviation, and corrects a timing for controlling the reduction device based on a control delay time calculated from the entry thickness deviation, characterized in that the entry thickness deviation is decomposed into a plurality of frequency components, a delay time which is the control delay time for each frequency component is calculated, an amplitude of an exit thickness deviation of the material being rolled which occurs when the delay time is compensated for with a compensation time is calculated for each frequency component, the compensation time is changed, and the compensation time at which a sum of absolute values of the amplitudes is minimized is set as an optimal compensation time, and the control delay time is compensated for with the optimal compensation time. Effect of the Invention
[0007] According to the present invention, the amplitude of the delivery thickness deviation of the rolled material, which occurs when the delay time, which is the control delay time for each frequency component, is compensated for by the compensation time, is calculated for each frequency component. Then, the compensation time is changed, and the compensation time at which the sum of the absolute values of the amplitudes of the delivery thickness deviations is minimized is set as the optimal compensation time. Then, the control delay time is compensated for by the optimal compensation time. As a result, the timing for controlling the reduction device is corrected based on the control delay time compensated for by the optimal compensation time. By compensating for the control delay time by the optimal compensation time, the amplitude of the delivery thickness deviation can be minimized. As a result, the delivery thickness deviation can be minimized. Therefore, the thickness accuracy can be improved. [Brief description of the drawings]
[0008] [Figure 1] FIG. 1 is a schematic diagram of a rolling facility. [Diagram 2] FIG. 1 is a phase diagram showing the relationship between a plurality of frequency components obtained by decomposing an inlet thickness deviation and a phase lag. [Diagram 3] FIG. 11 is a diagram showing a change in the amplitude of the delivery thickness deviation when there is no phase delay in controlling the rolling roll gap with respect to the entry thickness deviation. [Figure 4]FIG. 13 is a diagram showing a change in the amplitude of the delivery thickness deviation when the control of the rolling roll gap with respect to the entry thickness deviation is delayed by 30 degrees. [Diagram 5] FIG. 13 is a diagram showing a change in the amplitude of the delivery thickness deviation when the control of the rolling roll gap with respect to the entry thickness deviation is delayed by 90 degrees. [Figure 6] FIG. 11 is a diagram showing a change in the amplitude of the delivery-side thickness deviation when control of the rolling roll gap with respect to the entry-side thickness deviation is delayed by 180 degrees. [Figure 7] FIG. 11 is a diagram showing the relationship between the phase lag and the amplitude of the delivery thickness deviation. [Figure 8] FIG. 1 is a diagram showing the relationship between the frequency in Table 2 and the amplitude of the delivery thickness deviation for each frequency component. [Figure 9] FIG. 1 is a diagram showing the relationship between the frequency in Table 3 and the amplitude of the delivery thickness deviation for each frequency component. [Figure 10] FIG. 1 is a diagram showing the relationship between the frequency in Table 4 and the amplitude of the delivery thickness deviation for each frequency component. [Figure 11] 13 is a flowchart of an optimal compensation time calculation process. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] Hereinafter, preferred embodiments of the present invention will be described with reference to the drawings.
[0010] (Rolling equipment configuration) The method for controlling thickness of a rolling mill according to this embodiment is carried out in a rolling facility. As shown in Fig. 1, which is a schematic diagram of the rolling facility 1, the rolling facility 1 is a facility for rolling a material W to be rolled. The material W to be rolled is an object (workpiece) to be rolled by the rolling facility 1. The material W to be rolled is in a plate shape. The material W to be rolled is, for example, a metal.
[0011] The rolling equipment 1 includes a first reel 2, a second reel 3, a direction-changing roll 4, and a multi-stage rolling mill 5.
[0012] The first reel 2 and the second reel 3 are reels on which the material W to be rolled is wound. One of the first reel 2 and the second reel 3 is an unwinding reel that unwinds the material W to be rolled. The other of the first reel 2 and the second reel 3 (the one different from the unwinding reel) is a take-up reel that winds up the material W to be rolled. The material W to be rolled may be unwound from the first reel 2, rolled in the multi-stage rolling mill 5, and taken up on the second reel 3, or may be unwound from the second reel 3, rolled in the multi-stage rolling mill 5, and taken up on the first reel 2. The above two types of unwinding and winding may be performed alternately, or only one of them may be performed.
[0013] Hereinafter, the side upstream of the multi-stage rolling mill 5 in the direction of movement of the rolled material W will be referred to as the "entrance side", and the side downstream of the multi-stage rolling mill 5 in the direction of movement of the rolled material W will be referred to as the "exit side".
[0014] The direction-changing rolls 4 change the moving direction (path direction) of the material W to be rolled. In the example shown in Fig. 1, the direction-changing rolls 4 are provided between the first reel 2 and the multi-stage rolling mill 5 (in the path of the material W to be rolled) and between the second reel 3 and the multi-stage rolling mill 5. The direction-changing rolls 4 are cylindrical or columnar members. For example, the direction-changing rolls 4 are provided with a deflector (deflector rolls).
[0015] The multi-stage rolling mill 5 is a rolling mill that rolls the material W to be rolled. The multi-stage rolling mill 5 is a rolling mill (cluster rolling mill) equipped with a large number of rolls. The multi-stage rolling mill 5 is equipped with a reduction roll 21 and a backup roll 22. The multi-stage rolling mill 5 may be equipped with an intermediate roll between the reduction roll 21 and the backup roll 22.
[0016] Each of the rolls of the multi-stage rolling mill 5 is a cylindrical or columnar member. The rolls are rotatably supported by a frame (e.g., a housing) not shown. The rolls are rotatable about central axes extending in the longitudinal direction of the rolls. Among the many rolls, one of the rolls is a drive roll. The drive roll is driven by a drive device (e.g., a drive motor not shown) that drives the roll.
[0017] In this multi-stage rolling mill 5, the material to be rolled W, the rolling roll 21, and the backup roll 22 come into contact with each other in this order. In this contact order, the side opposite the material to be rolled W is referred to as the "roll back side". Specifically, the roll back side of the rolling roll 21 is the backup roll 22 side, which is opposite the side that comes into contact with the material to be rolled W when viewed from the rolling roll 21 (using the rolling roll 21 as a reference). The number of stages (the number of rolls) of the multi-stage rolling mill 5 can be set in various ways.
[0018] The rolling rolls 21 come into contact with the material W to be rolled and sandwich the material W. The rolling rolls 21 are provided in pairs (two rolls) on both sides of the material W to be rolled in the thickness direction.
[0019] The backup rolls 22 rotatably support the rolling rolls 21 from the roll back side. When an intermediate roll is provided, the backup rolls 22 support the rolling rolls 21 from the roll back side via the intermediate roll. In this embodiment, an example of a four-high rolling mill in which one backup roll 22 is provided for one rolling roll 21 is shown, but the number of backup rolls 22 can be set in various ways, and the present invention can also be applied to, for example, a 12-high rolling mill or a 20-high rolling mill.
[0020] The rolling equipment 1 also includes a thickness detection unit 6, a speed detection unit 7, and a screw down device 8.
[0021] The thickness detection unit 6 detects the thickness of the material W to be rolled. The thickness detection unit 6 is provided on both sides of the roll 21, on the first reel 2 side (on the first reel 2 side in the path of the material W to be rolled) and on the second reel 3 side of the roll 21. Of the two thickness detection units 6,6, the one located on the entry side functions as an entry thickness detection unit. Of the two thickness detection units 6,6, the one located on the exit side functions as an exit thickness detection unit. The entry thickness detection unit detects the thickness of the material W to be rolled before being rolled by the roll 21 (entry thickness). The exit thickness detection unit detects the thickness of the material W to be rolled after being rolled by the roll 21 (exit thickness).
[0022] The speed detection unit 7 detects the moving speed v of the material to be rolled W. A speed detection unit 7 is provided on each of the two direction changing rolls 4. The speed detection unit 7 is a device (sensor, speed detector) that detects the moving speed v. Assuming that there is no slip between the material to be rolled W and the direction changing rolls 4, the moving speed v is the peripheral speed of the outer circumferential surface of the direction changing roll 4 (the moving speed of the outer circumferential surface in the tangent direction of the outer circumferential surface).
[0023] The reduction device 8 is a device that reduces the rolling rolls 21. The reduction device 8 changes the rolling roll gap ΔS based on the plate thickness detected by the plate thickness detection unit 6. Here, the rolling roll gap ΔS is the gap between the pair of rolling rolls 21. The rolling roll gap ΔS is calculated by the following formula (1) using the deviation of the entry side plate thickness (entry side plate thickness deviation) ΔH based on the entry side plate thickness detected by the plate thickness detection unit 6. Here, m is the deformation resistance of the rolled material W, M is the mill constant, and K is the control gain in the gauge meter system. ΔS=K m / M ΔH Equation (1)
[0024] Here, the screw down device 8 has a wedge, a hydraulic cylinder, a servo valve, and a servo amplifier. The wedge moves each backup roll 22 to change the roll gap ΔS. The hydraulic cylinder moves the wedge. The servo valve operates the hydraulic cylinder. A command signal from the control unit 9 is input to the servo amplifier. Based on the command signal input to the servo valve via the servo amplifier, the servo valve is operated, thereby operating the hydraulic cylinder.
[0025] The rolling equipment 1 also includes a control unit 9. The control unit 9 is a computer that performs signal input / output, calculation (processing), information storage, and the like. For example, the functions of the control unit 9 are realized by a calculation unit executing a program stored in a storage unit of the control unit 9. The control unit 9 may be provided inside (inside the equipment) of the rolling equipment 1, or may be provided outside (for example, in a control room, etc.) of the rolling equipment 1. The control unit 9 may be a personal computer, or may be provided in a control panel.
[0026] The control unit 9 controls the operation of the rolling equipment 1. The control unit 9 controls the thickness of the material W to be rolled. The thicknesses of the material W detected by the two thickness detection units 6 are input to the control unit 9. In addition, the moving speeds v of the material W detected by the two speed detection units 7 are input to the control unit 9.
[0027] The control unit 9 detects the deviation in the entry thickness of the rolled material W (entry thickness deviation) based on the entry thickness of the rolled material W detected by the entry thickness detection unit 6. The entry thickness deviation is the difference between the actual (detected) thickness of the rolled material W and the target entry thickness.
[0028] The control unit 9 sets the control delay time. A specific method for setting the control delay time is as follows.
[0029] First, the control unit 9 breaks down the entry thickness deviation ΔH into a plurality of frequency components. The control unit 9 calculates the phase delay θd (degrees) for each of the broken down frequency components. The phase delay θd is obtained, for example, using a phase diagram as shown in FIG. 2. The phase diagram shown in FIG. 2 shows the relationship between the plurality of frequency components into which the entry thickness deviation ΔH is broken down and the phase delay θd. The memory unit of the control unit 9 stores the phase diagram as shown in FIG. 2.
[0030] The control unit 9 calculates a delay time (Td) (seconds) for each frequency component based on the calculated phase delay θd. The delay time (Td) is calculated by (θd / 360) / f, where f is the frequency. The control unit 9 then calculates a control delay time (seconds) by summing up the delay times (Td) for each frequency component.
[0031] The control unit 9 controls the reduction device 8. The control unit 9 controls the reduction device 8 so that the gap between the rolls 21 becomes the roll gap ΔS calculated based on the entry thickness deviation ΔH. Here, the control unit 9 corrects the timing of controlling the reduction device 8 based on the control delay time calculated from the entry thickness deviation ΔH. For example, since the reduction device 8 has a delay element, the thickness accuracy can be improved by advancing the timing of controlling the reduction device 8 by the delay amount, i.e., the control delay time. Note that there may be cases where the thickness accuracy can be improved by delaying the timing of controlling the reduction device 8 by the control delay time.
[0032] Here, the phase diagram shown in Fig. 2 was obtained as follows. The plate thickness control system is roughly divided into a detection system including the plate thickness detection unit 6, a calculation system including the control unit 9, and a hydraulic system including the screw down device 8. Therefore, assuming that the maximum frequency when the inlet plate thickness deviation ΔH is resolved into a plurality of frequency components is 30 Hz, examples of the phase lag of the detection system (detection phase lag), the phase lag of the calculation system (calculation phase lag), and the phase lag of the hydraulic system (hydraulic system phase lag) were calculated in the frequency range of 0.01 Hz to 30 Hz. The results are shown in Table 1.
[0033] [Table 1]
[0034] In this embodiment, the detection phase lag is approximated by a first-order lag system. The transfer function of the first-order lag system is given by 1 / (Ts+1), where s is the Laplace operator and T is the time constant (seconds). The time constant T is determined by the performance of the sensor. The phase lag of the first-order lag system is given by -atan(wT), where w is the angular frequency, and w=2πf (f is the frequency).
[0035] The time constant is usually 0.005 seconds to 0.1 seconds, but in Table 1, the detected phase lag was calculated with the time constant T set to 0.01 (seconds). When the frequency is in the range of 0.01 Hz to 30 Hz, the detected phase lag varies in the range of 0 degrees to -62.1 degrees. The fact that the detected phase lag is a negative value indicates that the phase is lagging rather than leading.
[0036] In this embodiment, the calculation phase delay is a constant. In Table 1, the calculation period is usually 0.001 seconds to 0.01 seconds, but in this embodiment, the calculation period (seconds) is set to 0.0050. This calculation period (seconds) is a fixed value determined by the calculation processing capacity of the control unit 9.
[0037] The calculation period of 0.0050 seconds was converted to a calculated phase lag (degrees). For example, a frequency of 10 Hz is 1 / 10 seconds when converted to a period. Since it takes 1 / 10 seconds to complete one cycle at 360 degrees, when 0.0050 seconds is converted to a calculated phase lag, the calculated phase lag = -0.005 / (1 / 10) x 360 = -18.0 (degrees). As shown above, the calculated phase lag for frequencies from 0.01 Hz to 30 Hz was calculated. The calculated phase lag varies in the range of 0 degrees to -54.0 degrees.
[0038] In this embodiment, the hydraulic system phase delay is approximated by a second-order delay system. The hydraulic system phase delay may be approximated by a first-order delay system. The transfer function of the second-order delay system is wn 2 / (s 2 +2ζwns+wn 2 ) where wn is the natural frequency (Hz), s is the Laplace operator, and ζ is the damping coefficient. The hydraulic phase lag is given by -atan(2ζu / (1-u 2 ) where u=w / wn. The natural frequency wn is given by 2π·fn, where fn is the 90-degree lag frequency (Hz).
[0039] The hydraulic system phase lag was calculated with the 90-degree lag frequency fn being normally 1 Hz to 50 Hz, but 50 Hz in this embodiment, and the damping coefficient ζ being normally 0.5 to 1.5, but 1.0 in this embodiment. Here, the 90-degree lag frequency fn and the damping coefficient ζ are determined by the mechanical structure of the screw down device 8. Therefore, the natural frequency wn is determined by the mechanical structure of the screw down device 8. When the frequency is in the range of 0.01 Hz to 30 Hz, the hydraulic system phase lag changes in the range of 0 degrees to -61.9 degrees. There is no phase lead in the hydraulic system phase lag, and the phase lag occurs.
[0040] As described above, by approximating the detected phase lag with a first-order lag system, the calculated phase lag as a constant, and approximating the hydraulic system phase lag with a second-order lag system, the detected phase lag, the calculated phase lag, and the hydraulic system phase lag can each be accurately determined.
[0041] The detected phase lag, calculated phase lag, and hydraulic system phase lag obtained as described above were added up for each frequency component to obtain the phase lag θd for each frequency component. The phase lag θd is -0.08 to -177.98 degrees. Since the value of the phase lag θd is negative, the phase is delayed.
[0042] The phase diagram shown in Fig. 2 was obtained from the relationship between the multiple frequency components and the phase delay θd obtained in Table 1. It can be seen that the phase delay θd changes in a beautiful manner close to a straight line. Note that the phase diagram of this embodiment is not limited to that shown in Fig. 2.
[0043] The control unit 9 calculates the delay time (Td) (seconds) for each frequency component based on the phase delay θd calculated as described above. As described above, by calculating the detection phase delay, which is the phase delay of the detection system, the calculation phase delay, which is one layer delay of the calculation system, and the hydraulic system phase delay, which is the phase lag of the hydraulic system, respectively, the delay time (Td) for each frequency component can be calculated with high accuracy.
[0044] Here, it will be explained that the larger the phase lag θd, the larger the outlet thickness deviation (the deviation of the thickness of the rolled material W at the outlet). The outlet thickness deviation is the value obtained by subtracting the rolling roll gap ΔS from the inlet thickness deviation ΔH.
[0045] The change in the amplitude of the exit thickness deviation is shown in Figures 3 to 6. Here, we assume that the entry thickness deviation ΔH is a sine wave with an amplitude of ±1. Entry thickness deviation ΔH = 1·sin(wt) = sin(wt). Here, w is the angular frequency and t is the time (seconds). The rolling roll gap ΔS is also considered as a sine wave with an amplitude of ±1. Roll gap ΔS = sin(wt-θd). θd is the phase lag. Exit thickness deviation = sin(wt)-sin(wt-θd) = 2sin(θd / 2)·cos(wt+θd / 2). The amplitude of the exit thickness deviation is 2sin(θd / 2).
[0046] Figure 3 shows the change in the amplitude of the exit thickness deviation when there is no phase delay θd in the control of the roll gap ΔS relative to the entry thickness deviation ΔH. At this time, the roll gap ΔS = sin(wt). In this case, the exit thickness deviation becomes 0. This is the optimal state.
[0047] Figure 4 shows the change in the amplitude of the delivery thickness deviation when the control of the rolling roll gap ΔS relative to the entry thickness deviation ΔH is delayed by 30 degrees. When the phase delay θd is 30 degrees, the amplitude of the delivery thickness deviation is 2sin(30 / 2)=0.52. In other words, the delivery thickness deviation with an amplitude of ±0.52 remains.
[0048] Figure 5 shows the change in the amplitude of the delivery thickness deviation when the control of the rolling roll gap ΔS relative to the entry thickness deviation ΔH is delayed by 90 degrees. When the phase delay θd is 90 degrees, the amplitude of the delivery thickness deviation is 2sin(90 / 2)=1.41. In other words, the delivery thickness deviation with an amplitude of ±1.41 remains.
[0049] Figure 6 shows the change in the amplitude of the exit thickness deviation when the control of the rolling roll gap ΔS relative to the entry thickness deviation ΔH is delayed by 180 degrees. When the phase lag θd is 180 degrees, the amplitude of the exit thickness deviation is 2sin(180 / 2)=2. In other words, an exit thickness deviation with an amplitude of ±2 remains. The state in which the phase lag θd is 180 degrees is a resonance state, which is the worst state in which the amplitude of the exit thickness deviation becomes the largest.
[0050] The relationship between the phase lag θd and the amplitude of the delivery thickness deviation is shown in Fig. 7. When the phase lag θd is in the range of less than 60 degrees, the amplitude of the delivery thickness deviation is improved, but when the phase lag θd is 60 degrees or more, the amplitude of the delivery thickness deviation increases.
[0051] Therefore, the control unit 9 compensates for the control delay time with a compensation time (Tc) (seconds) so that the phase delay θd (amplitude of the delivery thickness deviation) becomes small. The control unit 9 temporarily sets the compensation time (Tc). Then, the control unit 9 calculates the amplitude of the delivery thickness deviation of the rolled material W, which occurs when the delay time (Td) is compensated for with the compensation time (Tc), for each frequency component.
[0052] The control unit 9 changes the compensation time (Tc) and sets the compensation time at which the sum of the absolute values of the amplitudes calculated for each frequency component is minimized as the optimum compensation time (Tc).
[0053] First, Table 2 shows the amplitude of the delivery thickness deviation for each frequency component when the compensation time (Tc) is provisionally set to 0.0214 seconds.
[0054] [Table 2]
[0055] Table 2 shows the delay time (Td) (seconds) when the frequency is 0.01 Hz. The period is the inverse of the frequency, which is 100 seconds. Also, it takes 100 seconds to complete one cycle of 360 degrees. Therefore, the delay time (Td) when the frequency is 0.01 Hz is Td = (0.077 / 360) x 100 = 0.0214 seconds.
[0056] Next, the compensation time (Tc) was set. Ideally, Td+Tc=0. Therefore, based on the delay time (Td) when the frequency was 0.01Hz, the compensation time (Tc) was set to 0.0214 seconds.
[0057] As shown in Table 2, the value of Td+Tc is 0 when the frequency is 0.01 Hz, but the value increases as the frequency increases. θcd (degrees) is the angle conversion of Td+Tc. θcd is calculated as 360·(Td+Tc)·f.
[0058] The amplitude of the delivery thickness deviation for each frequency component was calculated as follows. When the phase is shifted by θ, the subtraction of sin(wt) and sin(wt-θ) is sin(wt)-sin(wt-θ)=2sin(θ / 2)·cos(wt+θ / 2). Therefore, the maximum amplitude Δhmax is 2sin(θ / 2). The maximum amplitude Δhmax was calculated by substituting θcd for 2sin(θ / 2).
[0059] Figure 8 shows the relationship between the frequency in Table 2 and the amplitude of the delivery thickness deviation for each frequency component. It can be seen that the maximum amplitude Δhmax increases as the frequency value increases. As the maximum amplitudes Δhmax are all positive, it can be seen that the phase is advanced too much. The sum of the absolute values of the maximum amplitudes Δhmax of the delivery thickness deviation for each frequency component shown in Table 2 is 4.167, which is large. For a frequency of 0.01 Hz, the maximum amplitude Δhmax is 0, so Tc = 0.0214 seconds is optimal, but in the frequency range of 0 to 30 Hz, Tc = 0.0214 seconds is not optimal.
[0060] Next, Table 3 shows the amplitude of the delivery thickness deviation for each frequency component when the compensation time (Tc) (seconds) is set to 0.0165 seconds.
[0061] [Table 3]
[0062] In Table 3, the delay time (Td) was calculated when the frequency was 30 Hz. Since the delay time (Td) when the frequency was 30 Hz was -0.0165 seconds, the compensation time (Tc) was set to 0.0165 seconds so that Td + Tc = 0 when the frequency was 30 Hz. Then, in the same manner as in Table 2, the amplitude of the delivery thickness deviation was calculated.
[0063] The relationship between the frequency in Table 3 and the amplitude of the delivery thickness deviation for each frequency component is shown in Figure 9. The sum of the absolute values of the maximum amplitude Δhmax of the delivery thickness deviation for each frequency component shown in Table 3 is 1.933. In the entire frequency range from 0 to 30 Hz, the maximum amplitude Δhmax is a negative value. This shows that the phase is too delayed.
[0064] Next, Table 4 shows the amplitude of the delivery thickness deviation for each frequency component when the compensation time (Tc) (seconds) is set to 0.0173 seconds.
[0065] [Table 4]
[0066] In Table 4, the compensation time (Tc) (seconds) was determined by trial and error so that the sum of the absolute values of the amplitude of the delivery thickness deviation for each frequency component would be minimized. The compensation time (Tc) when the sum of the absolute values of the amplitude for each frequency was the minimum of 1.493 was 0.0173 seconds.
[0067] The relationship between the frequency in Table 4 and the amplitude of the delivery thickness deviation for each frequency component is shown in Fig. 10. When the frequency is around 0 to 20 Hz, the maximum amplitude Δhmax is a negative value, but when the frequency exceeds 20 Hz, the maximum amplitude Δhmax becomes a positive value. In other words, it can be seen that the phase lags and leads.
[0068] From the above, in this embodiment, the optimum compensation time (Tc) is set to 0.0173 seconds.
[0069] The control unit 9 compensates for the control delay time with the optimal compensation time. The timing for controlling the screw down device 8 is corrected based on the control delay time compensated for with the optimal compensation time. By compensating for the control delay time with the optimal compensation time, the amplitude of the delivery thickness deviation can be minimized. This makes it possible to minimize the delivery thickness deviation. Therefore, the thickness accuracy can be improved.
[0070] (Activation) The rolling equipment 1 is configured to operate as follows. A method for controlling the thickness of a rolling mill is performed as follows.
[0071] A driving device (not shown) drives the driving roll, thereby driving the reduction roll 21. The material W to be rolled is transported between the first reel 2 and the second reel 3, and is rolled by the multi-stage rolling mill 5. At this time, the control unit 9 controls the rolling of the material W to be rolled by the multi-stage rolling mill 5. Specifically, the control unit 9 controls the thickness of the material W to be rolled. The control unit 9 controls the reduction device 8 so that the gap between the rolling rolls 21 becomes the rolling roll gap ΔS calculated based on the entry thickness deviation ΔH. The control unit 9 corrects the timing of controlling the reduction device 8 based on the control delay time calculated from the entry thickness deviation ΔH.
[0072] Here, the control unit 9 calculates an optimal compensation time (Tc) and compensates for the control delay time with the optimal compensation time. Hereinafter, the optimal compensation time calculation process will be described with reference to Fig. 11 which is a flowchart.
[0073] First, the control unit 9 reads in a phase diagram registered in the storage unit of the control unit 9 (step S1). In this embodiment, the phase diagram shown in FIG.
[0074] Next, the control unit 9 detects the entry thickness deviation ΔH (step S2). Specifically, based on the entry thickness of the rolled material W detected by the entry thickness detection unit 6, the control unit 9 detects the deviation of the entry thickness of the rolled material W (entry thickness deviation).
[0075] Next, the control unit 9 sets the maximum frequency fmax (Hz) of the entry thickness deviation ΔH (step S3). Specifically, the entry thickness deviation ΔH is decomposed into a plurality of frequency components to obtain the maximum frequency fmax (Hz), which is then set. The maximum frequency fmax (Hz) may be set by an operator. In this case, a frequency that is not likely to be higher than this frequency is set as the maximum frequency fmax (Hz).
[0076] The control unit 9 sets a value as close to zero as possible as the minimum frequency fmin (Hz) of the inlet thickness deviation ΔH. Although it is desirable for the minimum frequency fmin (Hz) to be zero, this is because calculations cannot be performed at zero. The frequency pitch between the minimum frequency fmin and the maximum frequency fmax is set appropriately. For example, the pitch is set to 5 Hz. It is not necessary for the pitch to be constant.
[0077] Next, the control unit 9 obtains the delay time (Td) (seconds) for each frequency component of the inlet thickness deviation ΔH (step S4). The control unit 9 converts the phase delay θd for each frequency component obtained from the phase diagram into the delay time (Td) (seconds).
[0078] Next, the control unit 9 calculates the control delay time (seconds) (step S5). Specifically, the control delay time is calculated by summing up the delay times (Td) for the respective frequency components.
[0079] Next, the control unit 9 provisionally sets the compensation time (Tc) (seconds) (step S6). For example, based on the minimum delay time (Td) of −0.0165 seconds in Tables 2 to 4, the compensation time (Tc) is provisionally set to 0.0165 seconds.
[0080] Next, the control unit 9 changes the compensation time (Tc) in small increments from 0.0165 seconds (step S7) and determines whether the amplitude of the delivery thickness deviation has become minimum (step S8). In step S8, if it is determined that the amplitude of the delivery thickness deviation has not become minimum (S8: NO), the control unit 9 returns to step S7. On the other hand, in step S8, if it is determined that the amplitude of the delivery thickness deviation has become minimum (S8: YES), the control unit 9 sets the compensation time (Tc) at which the amplitude of the delivery thickness deviation is minimum as the optimal compensation time (Tc) (step S9). In this embodiment, as shown in Table 4, the optimal compensation time (Tc) is 0.0173 seconds.
[0081] Next, the control unit 9 judges whether or not to continue the calculation (step S10). If it is judged in step S10 that the calculation is to be continued (S10: YES), the control unit 9 returns to step S2. On the other hand, if it is judged in step S10 that the calculation is not to be continued (S10: NO), the control unit 9 ends this flow.
[0082] (effect) As described above, according to the method for controlling the thickness of the rolling mill according to the present embodiment, the amplitude of the delivery thickness deviation of the rolled material W, which occurs when the delay time (Td), which is the control delay time for each frequency component, is compensated for by the compensation time (Tc), is calculated for each frequency component. Then, the compensation time (Tc) is changed, and the compensation time at which the sum of the absolute values of the amplitudes of the delivery thickness deviations is minimized is set as the optimal compensation time (Tc). Then, the control delay time is compensated for by the optimal compensation time (Tc). As a result, the timing for controlling the screw down device 8 is corrected based on the control delay time compensated for by the optimal compensation time (Tc). By compensating for the control delay time with the optimal compensation time (Tc), the amplitude of the delivery thickness deviation can be minimized. As a result, the delivery thickness deviation can be minimized. Therefore, the thickness accuracy can be improved.
[0083] Further, the phase lag θd includes a detection phase lag that occurs when detecting the entry thickness deviation ΔH, a calculation phase lag that occurs when calculating the rolling roll gap ΔS, and a hydraulic system phase lag that occurs due to the operation of the reduction device 8. The thickness control system is roughly divided into a detection system that detects the entry thickness deviation ΔH, a calculation system that calculates the rolling roll gap ΔS, and a hydraulic system including the reduction device 8. Thus, by respectively determining the detection phase lag, which is the phase lag of the detection system, the calculation phase lag, which is one layer lag of the calculation system, and the hydraulic system phase lag, which is the phase lag of the hydraulic system, the delay time (Td) for each frequency component can be calculated with high accuracy.
[0084] In the above embodiment, the phase lag is divided into three parts: the detected phase lag, the calculated phase lag, and the hydraulic system phase lag. However, since the calculated phase lag is a constant, it may be calculated by including it in the detected phase lag or the hydraulic system phase lag.
[0085] Moreover, the detected phase lag is approximated by a first-order lag system, the calculated phase lag is set to a constant, and the hydraulic system phase lag is approximated by a second-order lag system. In the first-order lag system, the time constant T is determined by the performance of the sensor. The calculation period (seconds) when calculating the rolling roll gap ΔS is determined by the calculation processing capacity. In the second-order lag system, the natural frequency wn and the damping coefficient ζ are determined by the mechanical structure of the reduction device 8. Therefore, by approximating the detected phase lag by a first-order lag system, the calculated phase lag is set to a constant, and the hydraulic system phase lag by a second-order lag system, the detected phase lag, the calculated phase lag, and the hydraulic system phase lag can each be calculated with high accuracy.
[0086] In the above embodiment, the detected phase lag is approximated by a first-order lag system, the calculated phase lag is a constant, and the hydraulic system phase lag is approximated by a second-order lag system, but other phase lag models may be applied.
[0087] Although the embodiments of the present invention have been described above, they are merely illustrative examples and do not limit the present invention, and the specific configurations and the like can be appropriately modified in design. Furthermore, the actions and effects described in the embodiments of the invention are merely a list of the most preferable actions and effects resulting from the present invention, and the actions and effects of the present invention are not limited to those described in the embodiments of the present invention. [Explanation of symbols]
[0088] 1. Rolling equipment 2 Reel 1 3. Second Reel 4-way change roll 5 Multi-stage rolling mill 6 Plate thickness detection section 7 Speed detection section 8. Rolling device 9. Control Unit 21 Rolling Mill 22 Backup Roll
Claims
1. A method for controlling a thickness of a rolling mill, comprising: detecting an entry thickness deviation of a rolled material rolled by a pair of rolling rolls of a rolling mill; controlling a reduction device that reduces the rolling rolls so that a gap between the rolling rolls becomes a rolling roll gap calculated based on the entry thickness deviation; and correcting a timing for controlling the reduction device based on a control delay time calculated from the entry thickness deviation, The inlet thickness deviation is decomposed into a plurality of frequency components, and a delay time which is the control delay time for each frequency component is calculated, The amplitude of the delivery thickness deviation of the rolled material that occurs when the delay time is compensated for by the compensation time is calculated for each frequency component, changing the compensation time and setting the compensation time at which the sum of the absolute values of the amplitudes is minimized as an optimal compensation time; A method for controlling a thickness of a rolling mill, comprising the steps of: compensating for the control delay time by the optimal compensation time.
2. Calculating the delay time based on the phase delay for each of the frequency components; 2. The method for controlling a thickness of a rolling mill according to claim 1, wherein the phase lag includes a detection phase lag generated when detecting the entry-side thickness deviation, a calculation phase lag generated when calculating the rolling roll gap, and a hydraulic system phase lag generated by operation of the reduction device.
3. The detected phase delay is approximated by a first-order delay system; The calculated phase delay is a constant, 3. The method for controlling a thickness of a rolling mill according to claim 2, wherein the hydraulic system phase lag is approximated by a second-order lag system.
Citation Information
Patent Citations
Rolling mill AGC control system
CN101716606A
Side guide apparatus in front of coil winding machine
JP1979009141A
Method of suppressing influence of roll eccentricity
JP1996057511A
Rolling control device, rolling control method and rolling control program
JP2015166093A
Reduction control device and reduction control method
JP2017024052A