The power conversion device enhances temperature estimation accuracy by normalizing the current change rate of switching elements, addressing inaccuracies in existing methods and preventing thermal damage.
Patent Information
- Application Number
- JP2023046550
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-23
- Publication Date
- 2024-10-04
AI Technical Summary
Existing power conversion devices face challenges in accurately estimating the temperature of switching elements like IGBTs and MOSFETs due to variations in device characteristics, which can lead to thermal runaway and device destruction, even at low output powers, and current change rate methods are inaccurate.
A power conversion device that includes a semiconductor module with a switching element, a measurement unit to measure the current change rate, a storage unit to store reference peak measurements, and a temperature estimating unit to estimate the switching element's temperature based on the peak current change rate, normalized to account for individual differences.
Improves the accuracy of temperature estimation for switching elements, preventing thermal runaway and device destruction by accurately monitoring and managing temperature levels.
Smart Images

Figure 2024135720000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a power conversion device. [Background technology]
[0002] Power conversion devices use switching elements such as insulated gate bipolar transistors (IGBTs) and metal oxide semiconductor field effect transistors (MOSFETs), which can be destroyed by thermal runaway or the like when their rated maximum temperature is exceeded.
[0003] In addition, when the life of the semiconductor chip is exhausted, the thermal connection between the semiconductor chip and the cooling means deteriorates, and the temperature of the semiconductor chip becomes higher than before the life of the semiconductor chip is exhausted. Even at low output power levels that did not exceed the rated maximum temperature before the life of the semiconductor chip is exhausted, the rated maximum temperature will be exceeded after the life of the semiconductor chip is exhausted, causing the semiconductor chip to be destroyed.
[0004] Therefore, it is necessary to detect the temperature of the switching element.
[0005] As a technique for detecting the temperature of a switching element, for example, a technique disclosed in Patent Document 1 is known in which a diode is used as a temperature detection element to detect the temperature. [Prior art documents] [Patent documents]
[0006] [Patent Document 1] JP 2005-259753 A Summary of the Invention [Problem to be solved by the invention]
[0007] However, the technique disclosed in Patent Document 1 has a problem in that it is necessary to provide a diode as a temperature detection element.
[0008] It is generally known that the current change rate (di / dt) of a switching element has temperature dependency, but the current change rate is subject to variations in device characteristics, making it difficult to detect temperature with high accuracy using the current change rate.
[0009] An object of the present invention is to provide a power conversion device that improves the accuracy of temperature estimation using the current change rate of a switching element. [Means for solving the problem]
[0010] In order to solve the above-mentioned problems, the power conversion device of the present invention is characterized in having a semiconductor module incorporating a switching element that constitutes part of a power conversion circuit, a measurement unit that measures a measurement quantity proportional to the current change rate when the switching element is turned on, a memory unit that stores in advance a reference peak measurement quantity that is the peak of the measurement quantity that serves as a reference measured at a reference temperature and a reference DC input voltage of the power conversion circuit, and a temperature estimation unit that estimates the temperature of the switching element based on the peak measurement quantity that is the peak of the measurement quantity measured during operation of the power conversion circuit and the reference peak measurement quantity. . Effect of the Invention
[0011] According to the present invention, it is possible to improve the accuracy of temperature estimation using the current change rate of a switching element.
[0012] Problems, configurations and effects other than those described above will become apparent from the following description of the embodiments. [Brief description of the drawings]
[0013] [Figure 1] 1 is a circuit diagram illustrating an overall configuration of a power conversion device according to a first embodiment. [Diagram 2] FIG. 4 is a circuit diagram for explaining an operation of storing a reference peak measurement amount in the first embodiment. [Diagram 3]5 is a waveform diagram showing an example of a current and a current change rate when a switching element is turned on. [Figure 4] 11 is a waveform diagram showing another example of the current and the current change rate when the switching element is turned on. [Diagram 5] FIG. 13 is a graph showing the current dependency of the peak current change rate. [Figure 6] FIG. 13 is a graph showing the temperature dependence of the peak current change rate. [Figure 7] FIG. 13 is a graph showing variations in temperature dependency of peak current change rate due to individual differences. [Figure 8] FIG. 13 is a graph showing variations in temperature dependence of normalized peak current change rate due to individual differences. [Figure 9] FIG. 2 is a perspective view illustrating the arrangement of a semiconductor module and a coil of a measuring unit in the power conversion device of the first embodiment, and a corresponding circuit diagram. [Figure 10] FIG. 11 is a circuit diagram for explaining the overall configuration of a power conversion device according to a second embodiment. [Figure 11] FIG. 11 is a waveform diagram showing the amount of measurement by the measurement unit of the second embodiment. [Figure 12] FIG. 11 is a waveform diagram showing a measurement amount in a comparative example. [Figure 13] FIG. 11 is a circuit diagram for explaining the overall configuration of a power conversion device according to a third embodiment. [Figure 14] FIG. 13 is a graph showing variations in temperature dependence of normalized peak current change rate due to DC input voltage. [Figure 15] FIG. 13 is a graph showing the temperature dependence of the normalized peak current change rate corrected based on the DC input voltage. [Figure 16] FIG. 13 is a waveform diagram illustrating the operation of a lifetime estimation unit in the power conversion device according to the fourth embodiment. [Figure 17] FIG. 13 is a circuit diagram for explaining the overall configuration of a power conversion device according to a fifth embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0014] Hereinafter, embodiments of the present invention will be described with reference to the drawings. In each drawing and each embodiment, the same or similar components are designated by the same reference numerals, and duplicated explanations will be omitted. EXAMPLES
[0015] FIG. 1 is a circuit diagram for explaining the overall configuration of the power conversion device according to the first embodiment.
[0016] The power conversion device 1 of the first embodiment is connected to a DC power source 2, a motor 3, and a host controller 4. The power conversion device 1 has a power conversion circuit 30, and converts DC power input from the DC power source 2 into AC power and outputs it to the motor 3. Fig. 1 shows an example in which a three-phase motor 3 is assumed as a load, but Fig. 1 shows only one of the three inputs to the motor 3.
[0017] The power conversion device 1 of the first embodiment has a semiconductor module 10 incorporating a switching element 11 that constitutes part of a power conversion circuit 30, a control unit 40, a driving unit 41, a measurement unit 50, a memory unit 60, and a temperature estimation unit 70.
[0018] The power conversion circuit 30 has a capacitor 31, a switching element 11, and a diode 12 connected in anti-parallel to the switching element 11. Fig. 1 shows an example in which an IGBT is used as the switching element 11. However, the present invention is not limited to this, and a MOSFET may be used as the switching element 11. In this case, the diode 12 may be a body diode built into the MOSFET.
[0019] An upper arm switching element 11 connected to the high potential side and a lower arm switching element 11 connected to the low potential side are connected in series to form a leg, and AC is output from a connection node between the upper arm switching element 11 and the lower arm switching element 11 to the motor 3. Although Fig. 1 shows an example in which two legs are connected in parallel, this is not limiting, and there may be one leg or three or more legs connected in parallel. Note that the remaining two legs for input to the motor 3 are not shown in Fig. 1.
[0020] The switching elements 11 are switched at predetermined timing by a control unit 40 and a drive unit 41. The control unit 40 is connected to a host controller 4.
[0021] Here, the switching element 11 and the diode 12 are built in the semiconductor module 10, and are connected by wiring having an internal inductance 13. Here, when using a semiconductor module 10 having four switching elements 11 built in, the power conversion device 1 may be configured to have three semiconductor modules 10 as a whole. Here, an example will be described assuming a semiconductor module 10 having four switching elements 11 built in, but the present invention is not limited to this.
[0022] The measuring unit 50 measures a measurement quantity proportional to a current change rate when the switching element 11 is turned on. Specifically, the measuring unit 50 measures a voltage applied to a mutual inductance loop 52 coupled with the internal inductance 13 of the semiconductor module 10. The measuring unit 50 has, for example, a coil 51 forming a mutual inductance coupled with the internal inductance 13. The measuring unit 50 has a mutual inductance loop 52 in which a plurality of coils 51 are connected to each other in a loop shape. Furthermore, the measuring unit 50 has an amplifier 53 that measures a voltage applied to the mutual inductance loop 52. Here, when a current Ic flows inside the semiconductor module 10, a voltage proportional to a current change rate dIc / dt of the current Ic is applied to the mutual inductance loop 52. The applied voltage is detected by the amplifier 53, so that the above-mentioned measurement quantity can be measured. Furthermore, when the mutual inductance is M, there is the relationship voltage V = M (dIc / dt), so this formula can be used to divide the voltage V by the mutual inductance M to convert it to the current change rate, which can then be used as the measurement quantity.
[0023] FIG. 2 is a circuit diagram for explaining the operation of storing the reference peak measurement amount in the first embodiment.
[0024] The storage unit 60 stores in advance a reference peak measurement quantity, which is a peak of a measurement quantity that serves as a reference and is measured at a reference temperature and a reference DC input voltage of the power conversion circuit 30 .
[0025] At the time when the reference peak measurement amount is measured and stored in advance, the semiconductor module 10 incorporating the switching element 11 is already assembled as the power conversion device 1, and is in the same state as in FIG. 1. This allows the reference peak measurement amount to include variations due to individual differences in the power conversion device 1. The DC power source 2 is not shown. At the time when the reference peak measurement amount is measured, the power conversion circuit 30 is not continuously operating, so the junction temperature of the switching element 11 is the outside air temperature. With the outside air temperature as the reference temperature and a reference DC input voltage input to the power conversion circuit 30, the control unit 40 and the drive unit 41 control the switching of the switching element 11 at a predetermined timing to pass several current pulses to the motor 3, and the peak of the measurement amount measured by the measurement unit 50 at that time is stored in the memory unit 60 as the reference peak measurement amount.
[0026] Next, returning to FIG. 1, the operation of estimating the temperature of the switching element 11 during the operation of the power conversion circuit 30 will be described.
[0027] During normal operation of the power conversion device 1, i.e., when the control unit 40 and the drive unit 41 are controlling the switching of the switching element 11 at a predetermined timing to operate the power conversion circuit 30, the measurement unit 50 measures the measurement quantity as described above and outputs it to the temperature estimation unit 70.
[0028] The temperature estimator 70 estimates the temperature of the switching element 11 based on a peak measurement amount, which is the peak of a measurement amount measured during operation of the power conversion circuit 30, and a reference peak measurement amount.
[0029] Here, the principle by which the temperature estimator 70 can estimate the temperature of the switching element 11 based on the peak measurement amount and the reference peak measurement amount will be described.
[0030] Fig. 3 is a waveform diagram showing an example of the current and the current change rate when the switching element is turned on. Fig. 4 is a waveform diagram showing another example of the current and the current change rate when the switching element is turned on. In Fig. 3 and Fig. 4, the horizontal axis is time t [μs], the vertical axis on the left is current Ic [A], and the vertical axis on the right is current change rate dIc / dt [A / ns].
[0031] 3 and 4 show graphs of the waveforms of both the current Ic measured when the switching element 11 is turned on under the conditions of a temperature of 25° C., a DC input voltage of 1500 V, and a load current of 200 A in FIG. 3 and 800 A in FIG. 4. The current change rate dIc / dt was calculated from the current Ic. In both FIG. 3 and FIG. 4, the current Ic at the time of turning on rises from 0 A, reaches a peak value, then decreases and approaches a constant value. The approaching current value corresponds to the current flowing through the load such as the motor 3. The current change rate dIc / dt also reaches a peak value once, and in FIG. 4, it maintains an almost constant value while the current Ic is rising, and then decreases to 0 A / ns in both FIG. 3 and FIG. 4. Here, the peak current change rate, which is the peak value of the current change rate dIc / dt, is 7.5 A / ns for both the load currents of 200 A and 800 A.
[0032] Fig. 5 is a diagram showing the current dependency of the peak current change rate, in which the horizontal axis represents the load current [A] and the vertical axis represents the peak current change rate (peak dIc / dt) [A / ns].
[0033] Fig. 5 is a graph showing the peak current change rate when the load current and the junction temperature Tj of the switching element 11 are changed under the condition that the DC input voltage is 1500V. Fig. 5 shows graphs for junction temperatures Tj = 25°C, 75°C, 100°C, 125°C, and 150°C, in that order from the top. As shown in Fig. 5, it can be seen that the peak current change rate has no current dependency or has only a small current dependency. In this way, since the peak current change rate hardly changes even if the output current (corresponding to the load current) of the power conversion device 1 differs, it is possible to estimate the temperature of the switching element 11 based on the peak current change rate.
[0034] Fig. 6 is a diagram showing the temperature dependency of the peak current change rate, in which the horizontal axis represents the junction temperature Tj [°C] and the vertical axis represents the peak current change rate (peak dIc / dt) [A / ns].
[0035] As shown in Fig. 6, when the junction temperature Tj increases, the peak current change rate decreases. Therefore, for example, when the peak current change rate becomes 5.3 A / ns or less, it can be determined that the junction temperature Tj is 125°C or more. However, since the graph in Fig. 6 has variations due to individual differences, this only applies when the semiconductor module 10 incorporating the switching element 11 used in the measurement is assembled into the power conversion device 1 used in the measurement. This does not apply to different manufacturing lots or different configurations of the power conversion device 1, even for the same device.
[0036] 7 is a diagram showing the variation in temperature dependency of the peak current change rate due to individual differences, in which the horizontal axis represents the junction temperature Tj [°C] and the vertical axis represents the peak current change rate (peak dIc / dt) [A / ns].
[0037] FIG. 7 shows a graph of the temperature dependency of the peak current change rate when the power conversion device 1 is configured using semiconductor modules 10 from a different manufacturing lot from that shown in FIG. 6, overlaid on FIG. 6. All the semiconductor modules 10 shared the same tendency that the peak current change rate decreases as the junction temperature Tj increases. However, the peak current change rate at or above 125°C varies from 4.5 A / ns to 5.7 A / ns. Taking the variation into consideration, if it is determined that the junction temperature Tj may be 125°C or higher when the peak current change rate becomes 5.7 A / ns or lower, the switching element 11 exhibiting the characteristics of the smallest peak current change rate may be determined to be 125°C even though the actual temperature is about 70°C.
[0038] Therefore, in order to solve the problem of variation due to individual differences, the peak current change rate is standardized.
[0039] Fig. 8 is a diagram showing the variation in temperature dependency of the normalized peak current change rate due to individual differences. In Fig. 8, the horizontal axis represents the junction temperature Tj [°C], and the vertical axis represents the normalized peak current change rate (peak dIc / dt) [%].
[0040] FIG. 8 shows a graph of peak current change rates normalized by dividing each peak current change rate in FIG. 7 by each peak current change rate when the junction temperature Tj is 25° C. Therefore, the normalized peak current change rate is 100% when the junction temperature Tj is 25° C. As shown in FIG. 8, it can be seen that the normalized peak current change rate has small variations due to individual differences. Therefore, in the example of FIG. 8, when the normalized peak current change rate becomes 70% or less, it can be determined that the junction temperature Tj is 125° C. or more. In this way, by estimating the temperature of the switching element 11 based on the normalized peak current change rate, the influence of variations due to individual differences can be suppressed, and the accuracy of temperature estimation can be improved.
[0041] Using the above principle, the temperature of the switching element 11 may be estimated based on the peak current change rate and the reference peak current change rate used for normalization (here, the peak current change rate when the junction temperature Tj is 25° C.), but it is difficult to directly measure the peak current change rate. Therefore, it is desirable to use a measurement quantity proportional to the current change rate as in this embodiment, taking advantage of the fact that the above principle also holds true for a measurement quantity proportional to the current change rate.
[0042] Specifically, a voltage proportional to the current change rate is applied to the amplifier 53 of the measuring unit 50 shown in Fig. 1, and the amplifier 53 measures this voltage as a measurement quantity. The temperature estimating unit 70 has a comparison calculator 71 and a calculator 72. The comparison calculator 71 divides the peak measurement quantity measured during the operation of the power conversion circuit 30 by a reference peak measurement quantity measured in advance at a reference temperature and a reference DC input voltage and stored in the storage unit 60 to calculate a ratio between the peak measurement quantity and the reference peak measurement quantity, i.e., a normalized peak measurement quantity, and the calculator 72 estimates the temperature of the switching element 11 based on this. For example, the calculator 72 converts the normalized peak measurement quantity into the junction temperature of the switching element 11 based on a lookup table storing the characteristics as shown in Fig. 8 or a relational expression describing the characteristics as shown in Fig. 8, and outputs the normalized peak measurement quantity to the control unit 40. However, this is not limited to the above, and when the normalized peak measurement amount becomes equal to or less than a predetermined threshold value, such as 70%, it may be determined that the junction temperature Tj is equal to or higher than 125° C., and output this to the control unit 40.
[0043] When the control unit 40 determines that the estimated temperature is higher than, for example, a preset operating temperature, the control unit 40 suppresses the temperature rise by performing control to mitigate high temperature operation, such as by lowering the switching frequency of the switching element 11.
[0044] In the above description, an example has been shown in which the temperature estimator 70 estimates the temperature of the switching element 11 based on the ratio between the peak measurement amount and the reference peak measurement amount, but the present invention is not limited to this, and the temperature of the switching element 11 may be estimated based on the difference between the peak measurement amount and the reference peak measurement amount. This is because, when the reference temperature is set to 25°C in Fig. 7, for example, the difference between the peak measurement amount at 125°C and the reference peak measurement amount at 25°C is close to each other in all curves. However, the influence of variation due to individual differences is greater than when the ratio is used, so it is more desirable to use the ratio rather than the difference.
[0045] 1, the storage unit 60 and the temperature estimation unit 70 may be configured as circuits separate from the control unit 40, or, for example, the control unit 40 may have the functions of both the storage unit 60 and the temperature estimation unit 70. In this case, the control unit 40 may be configured as, for example, a microcomputer, the storage unit 60 may be realized as a memory, and the temperature estimation unit 70 may be realized by executing a program in the microcomputer.
[0046] FIG. 9 is a diagram in which a perspective view for explaining the arrangement of the semiconductor module and the coil of the measuring unit in the power conversion device of the first embodiment and a corresponding circuit diagram are arranged side by side.
[0047] The semiconductor module 10 has a switching element 11, a diode 12, an internal inductance 13, a case 14, a high potential side terminal 15, a low potential side terminal 16, an AC terminal 17, and an auxiliary terminal 18. Note that the switching element 11, the diode 12, and the internal inductance 13 are built into the case 14 and are therefore not shown in the perspective view.
[0048] The measuring unit 50 is attached externally to the semiconductor module 10, and the coil 51 of the measuring unit 50 is a coupling coil having mutual inductance with the current loop from the high potential side terminal 15 to the low potential side terminal 16 of the semiconductor module 10, and is disposed in the vicinity of the high potential side terminal 15 and the low potential side terminal 16. The coil 51 is connected by wiring to form a mutual inductance loop 52, which is connected to a detection terminal 54 of an amplifier 53. The amplifier 53 is not shown. In this embodiment, since the peak current change rate is several A / ns, the mutual inductance of the mutual inductance loop 52 is set to, for example, 2 nH.
[0049] As described above, according to the power conversion device 1 of this embodiment, the accuracy of temperature estimation using the current change rate of the switching element 11 can be improved. EXAMPLES
[0050] FIG. 10 is a circuit diagram illustrating the overall configuration of the power conversion device according to the second embodiment.
[0051] The second embodiment is a modification of the first embodiment, and differs from the first embodiment in that the measurement unit 50 includes a low-pass filter 55.
[0052] The low-pass filter 55 is composed of, for example, a resistor and a capacitor, and has a cutoff frequency set to, for example, 50 MHz. The signal measured by the amplifier 53 is input to the temperature estimation unit 70 or the storage unit 60 after high-frequency components of 50 MHz or higher are removed.
[0053] Fig. 11 is a waveform diagram showing the amount measured by the measurement unit of Example 2. Fig. 12 is a waveform diagram showing the amount measured in the comparative example. In Fig. 11 and Fig. 12, the horizontal axis is time t [μs], and the vertical axis is the amount measured [V].
[0054] Since the power conversion device 1 has a densely packed structure and handles high voltages and high currents, high frequency noise is superimposed due to the influence of parasitic capacitance and parasitic inductance present in the semiconductor modules 10 and wiring. Without the low pass filter 55, there is a lot of noise in the measured amount, as shown in Fig. 12. In contrast, when the low pass filter 55 is added, the noise in the measured amount is reduced, as shown in Fig. 11, and the S / N ratio is significantly improved. The cutoff frequency is preferably, for example, 10 MHz to 100 MHz.
[0055] 10 shows an example in which low-pass filter 55 is configured with a resistor and a capacitor, but the present invention is not limited to this, and the measurement amount may be smoothed by signal processing with a width of 20 ns or more instead of providing low-pass filter 55. The smoothing width is preferably, for example, 10 ns to 100 ns. EXAMPLES
[0056] FIG. 13 is a circuit diagram illustrating the overall configuration of the power conversion device according to the third embodiment.
[0057] The third embodiment is a modification of the second embodiment, and differs from the second embodiment in that the temperature estimation unit 70 also uses information on the DC input voltage of the power conversion circuit 30. The difference between the third embodiment and the first embodiment may be applied to the first embodiment.
[0058] The power conversion device 1 of this embodiment has a resistor 80, which divides the input voltage from the DC power supply 2 and inputs it to the temperature estimation unit 70. The input voltage from the DC power supply 2 is a high voltage and cannot be directly input to the temperature estimation unit 70. Therefore, the resistor 80 divides the voltage and converts it into a low voltage, thereby converting it into a voltage value that can be input to the temperature estimation unit 70.
[0059] The temperature estimator 70 estimates the temperature of the switching element 11 based on the peak measurement amount, the reference peak measurement amount, and the DC input voltage of the power conversion circuit 30.
[0060] 14 is a diagram showing the variation in temperature dependency of the normalized peak current change rate due to the DC input voltage, in which the horizontal and vertical axes are the same as those in FIG.
[0061] In Fig. 8, we have shown that the standardized peak current change rate can reduce the variation due to individual differences, but if the DC input voltage deviates by ±300V, the standardized peak current change rate will also have a different temperature dependency. In Fig. 14, the peak current change rates for a DC input voltage of 1800V and 1200V are standardized using the peak current change rate when the temperature is 25°C and the DC input voltage is 1500V, and are superimposed on the graph for a DC input voltage of 1500V in Fig. 8. As can be seen from Fig. 14, if the standardized peak current change rate is standardized by the peak current change rate measured with a reference DC input voltage different from the DC input voltage used for measurement, there is a problem that the characteristics will deviate and the accuracy of the temperature estimation will decrease.
[0062] 15 is a diagram in which the temperature dependency of the normalized peak current change rate is corrected based on the DC input voltage. In FIG. 15, the horizontal axis and the vertical axis are the same as those in FIG.
[0063] In order to solve the above problem, the temperature estimation unit 70 corrects the peak current change rate normalized based on the DC input voltage. Specifically, the voltage dependency of the peak current change rate, which indicates the characteristic of the change in the peak current change rate when the DC input voltage is changed as a device characteristic at a reference temperature (for example, a graph or look-up table in which the horizontal axis is the DC input voltage and the vertical axis is the peak current change rate), is measured in advance. Then, if the peak current change rate is a times when the DC input voltage is 1800V compared to when the reference DC input voltage is 1500V, for example, the normalized peak current change rate can be multiplied by 1 / a to correct it to a uniform voltage dependency as shown in FIG. 15. Note that the correction method is not limited to this, and for example, the graph in FIG. 14 may be shifted up or down based on the DC input voltage and the voltage dependency of the peak current change rate to be corrected as shown in FIG. 15.
[0064] As described above, by using information on the DC input voltage as well, the accuracy of temperature estimation can be improved even if the DC input voltage deviates from the reference DC input voltage. EXAMPLES
[0065] The fourth embodiment is a modification of the first embodiment, and differs from the first embodiment in that it includes a life estimation unit (not shown). The differences from the fourth embodiment may be applied to the other embodiments.
[0066] Fig. 16 is a waveform diagram for explaining the operation of the life estimation unit in the power conversion device of Example 4. In Fig. 16, the horizontal axis is time t [ms], the vertical axis in the first row is the current I15 [A] flowing through the high potential side terminal 15, the vertical axis in the second row is the current I16 [A] flowing through the low potential side terminal 16, the vertical axis in the third row is the normalized current change rate (dIc / dt) [%] at the beginning of use, and the vertical axis in the fourth row is the normalized current change rate (dIc / dt) [%] just before the end of life.
[0067] 16 shows an example in which the motor 3 is driven by PWM control in the power conversion device 1. The current I15 flowing through the high potential side terminal 15 in the first graph and the current I16 flowing through the low potential side terminal 16 in the second graph are intermittent sine waves caused by PWM control, and the current value changes with each switching.
[0068] As shown in the third graph, the peak of the normalized current change rate (dIc / dt) at the beginning of use of the semiconductor module 10 is indicated by the triangle symbol and is a nearly constant value of about 80%. Note that the normalization of the current change rate is done by normalizing it with the peak current change rate at the reference temperature, as explained in FIG. 8.
[0069] As shown in the fourth graph, the peak of the normalized current change rate (dIc / dt) just before the end of the life of the semiconductor module 10 is indicated by a triangle symbol, and has dropped to about 65%. It is estimated that the temperature of the switching element 11, which was initially about 100°C, has risen to about 150°C. The rated maximum junction temperature of the switching element 11 in this embodiment is 150°C, and if the temperature rises further, there is a risk of the device being destroyed. Therefore, if such a symptom is detected during actual operation, the switching element 11 should be stopped preventatively before it is fatally destroyed.
[0070] Therefore, the power conversion device 1 of this embodiment has a life estimation unit that estimates the deterioration of the semiconductor module 10 based on the peak measurement amount and the reference peak measurement amount. For example, the life estimation unit determines that the semiconductor module 10 is deteriorated when the ratio between the peak measurement amount and the reference peak measurement amount is equal to or less than a predetermined threshold. However, this is not limited to this, and as described in the first embodiment, a difference may be used instead of the ratio. Furthermore, the life estimation unit may perform correction based on the DC input voltage of the power conversion circuit 30, as described in the third embodiment and FIG. 15.
[0071] The result of the determination by the life estimation unit is sent to the control unit 40. When it is determined that the power conversion device 1 has deteriorated, the control unit 40 takes measures such as stopping the operation of the power conversion device 1 or notifying the upper controller 4 of the deterioration.
[0072] For example, the temperature estimation unit 70 or the control unit 40 may also function as the life estimation unit.
[0073] As described above, by determining the deterioration using the life estimation unit, it is possible to take preventive measures before the switching element 11 is fatally damaged. EXAMPLES
[0074] FIG. 17 is a circuit diagram illustrating the overall configuration of the fifth embodiment and the configuration of a power conversion device.
[0075] Example 5 is a modification of Example 1, and differs from Example 1 in that the measurement unit 50 performs measurement without using the mutual inductance loop 52. The difference from Example 5 may be applied to other examples.
[0076] The measuring unit 50 of this embodiment measures the voltage applied to the internal inductance 13 of the semiconductor module 10 as a measurement amount proportional to the rate of change of current when the switching element 11 is turned on. In Fig. 17, a wire 56 is connected to the internal inductance 13 connected to the emitter of the switching element 11 of the lower arm on the right side, and the voltage is measured by an amplifier 53. Note that, since the potentials are different, it is not possible to measure all the internal inductances 13 simultaneously. Although this method can estimate the temperature using the rate of change of current, the method using the mutual inductance loop 52 as in the first embodiment can estimate the temperature more accurately.
[0077] Although the embodiments of the present invention have been described above, the present invention is not limited to the configurations described in the embodiments, and various modifications are possible within the scope of the technical concept of the present invention. In addition, some or all of the configurations described in each embodiment may be combined and applied. [Explanation of symbols]
[0078] 1 Power conversion device 2 DC power supply 3 Motor 4 Upper controller 10 Semiconductor Module 11 Switching elements 12 Diodes 13 Internal inductance 14 cases 15 High potential terminal 16 Low potential terminal 17 AC terminal 18 Auxiliary terminal 30 Power Conversion Circuit 31 Capacitor 40 Control section 41 Drive unit 50 Measuring part 51 Coil 52 Mutual inductance loop 53 Amplifier 54 Detection terminal 55 Low-pass filter 56 Wiring 60 Storage section 70 Temperature estimation section 71 Comparison Operator 72 Arithmetic unit 80 Resistance IC current dIc / dt Current change rate Tj junction temperature
Claims
1. A semiconductor module incorporating a switching element that constitutes a part of a power conversion circuit; a measurement unit for measuring a measurement quantity proportional to a current change rate when the switching element is turned on; a storage unit that stores a reference peak measurement quantity, which is a peak of the measurement quantity that serves as a reference and is measured at a reference temperature and a reference DC input voltage of the power conversion circuit in advance; A power conversion device comprising: a temperature estimation unit that estimates a temperature of the switching element based on a peak measurement quantity, which is a peak of the measurement quantity measured during operation of the power conversion circuit, and the reference peak measurement quantity.
2. In claim 1, The power conversion device, wherein the temperature estimator estimates a temperature of the switching element based on a ratio between the peak measurement amount and the reference peak measurement amount.
3. In claim 1, The power conversion device, wherein the temperature estimator estimates a temperature of the switching element based on a difference between the peak measurement amount and the reference peak measurement amount.
4. In claim 1, The power conversion device, wherein the measurement unit measures a voltage applied to a mutual inductance loop coupled with an internal inductance of the semiconductor module.
5. In claim 1, The power conversion device, wherein the measurement unit has a low-pass filter with a cutoff frequency of 10 MHz to 100 MHz.
6. In claim 1, A power conversion device, wherein the peak measurement amount is a peak after the measurement amount is smoothed in a width of 10 ns to 100 ns.
7. In claim 1, The power conversion device, wherein the temperature estimator estimates a temperature of the switching element based on the peak measurement amount, the reference peak measurement amount, and a DC input voltage of the power conversion circuit.
8. In claim 1, a lifetime estimation unit that estimates deterioration of the semiconductor module based on the peak measurement amount and the reference peak measurement amount.
9. In claim 8, The power conversion device, wherein the life estimation unit determines that the semiconductor module is deteriorated when a ratio between the peak measurement amount and the reference peak measurement amount is equal to or smaller than a predetermined threshold value.
10. In claim 1, The power conversion device, wherein the measurement unit measures a voltage applied to an internal inductance of the semiconductor module.
Citation Information
Patent Citations