Operation amount indication information generation method, learned model generation method, operation amount indication information generation device, and program
By employing time-series data and machine learning to generate operation amount instruction information using S-shaped functions, the method automates heavy equipment operations on work boats, addressing the inefficiencies and skill shortages in civil engineering tasks.
Patent Information
- Application Number
- JP2023047163
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-23
- Publication Date
- 2024-10-04
AI Technical Summary
The operation of heavy equipment in civil engineering work, such as cranes on work boats, relies heavily on operator skill and experience, leading to inefficiencies and a shortage of skilled operators due to aging, making automation of these operations necessary for improved labor productivity.
A method using time-series data and S-shaped or inverted S-shaped functions, represented by sigmoid, tanh, or exponential functions, to generate operation amount instruction information for heavy machinery, incorporating environmental information and machine learning to automate operations like dredging and rubble mound compaction.
Enables autonomous operation of heavy equipment on work boats, improving efficiency and reducing reliance on skilled operators by generating precise operation instructions suitable for various work environments.
Smart Images

Figure 2024136158000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a technique for carrying out civil engineering work using heavy machinery on a work boat. [Background technology]
[0002] Civil engineering works such as dredging using a work boat and weight compaction of riprap mounds require various operations such as raising and lowering the bucket and rotating the crane. For example, in grab dredging, a typical dredging work in port construction, an operator uses a crane on a work boat to raise and lower the dredging bucket, move it horizontally, and open and close it to perform dredging. Similarly, for riprap to be dumped on the seabed to build a mound, an operator must grab the stone with the bucket, raise and lower it, move it horizontally, and dump it, and for weight compaction, an operator must raise and lower it, drop it, and move it horizontally.
[0003] Furthermore, as a technology for grasping the operation of a work machine, Patent Document 1 describes a method for calculating, in a time-division manner, a feature vector whose feature values are information about the machine that changes over time as it operates, classifying a plurality of feature vectors into a plurality of clusters and assigning identification IDs to create a classification model, and generating output information for grasping a specified operation based on the classification model. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2022-83497 A Summary of the Invention [Problem to be solved by the invention]
[0005] Incidentally, the operation of construction machinery (hereinafter also referred to as heavy machinery) such as cranes used on work ships performing civil engineering work such as riprap, dredging, and riprap mound compaction is largely based on experience, and the efficiency of the work varies greatly depending on the skill of the operator, so a skilled operator with a wealth of experience and skill is required. However, due to the retirement of skilled operators due to aging, it is becoming increasingly difficult to secure operators with such experience and skill. In addition, even for young operators, the opportunity to acquire experience and skills from such skilled operators is decreasing due to the decrease in the number of skilled operators. Therefore, in recent years, there has been a demand for technology to automate the operation of heavy machinery in order to improve labor productivity, etc. The technology described in Patent Document 1 can perform loading and unloading work in a short time, but it was not possible to automate civil engineering work using heavy machinery such as cranes.
[0006] One aspect of the present invention has been made in consideration of the above problems, and aims to provide a technology for generating operation amount instruction information for heavy machinery used in dredging work and riprap mound compaction work, and for automatically operating the heavy machinery based on the information. [Means for solving the problem]
[0007] In order to solve the above problems, one embodiment of the present invention provides a method for generating operation amount instruction information, which includes a first step in which an information processing device executes an S-shaped or inverted S-shaped function that represents the relationship between time and the operation amount for each operation content, identified using time series data that represents the operation content of an operator performed on heavy equipment on a work ship performing civil engineering work, and that includes at least one of a sigmoid function, a tanh function, and an exponential function, to generate operation amount instruction information for operating the heavy equipment on the work ship.
[0008] According to the above configuration, it is possible to generate operation amount instruction information for causing heavy machinery on a work ship performing civil engineering work to operate autonomously in accordance with the operation content.
[0009] In the above-mentioned method for generating manipulated variable information, the information processing device may further execute a second step of determining parameters included in the function.
[0010] According to the above configuration, the information processing device can generate the manipulated variable indication information by using a simple function expressed by parameters determined by the information processing device, without performing complex calculations.
[0011] In the above-mentioned operation amount instruction information generating method, the information processing device may further execute a third step of acquiring environmental information representing the working environment of the civil engineering work, and in the second step, parameters of the function used to generate the operation amount instruction information may be determined by inputting the environmental information acquired in the third step into a trained model that has been machine-learned to determine the correlation between (i) environmental information representing the working environment of civil engineering work performed in the past, and (ii) parameters that define an S-shaped or inverted S-shaped function that represents the relationship between the amount of operation and time for each operation content performed on heavy equipment on a work ship that performed civil engineering work in the past.
[0012] According to the above configuration, parameters of an S-shaped or inverse S-shaped function are determined using a trained model that has been machine-learned, and operation amount instruction information is generated using the determined parameters, thereby making it possible to generate operation amount instruction information that is more suitable for the civil engineering work.
[0013] In the above-described method for generating manipulated variable indication information, the machine learning method may be any one of linear regression, decision tree method, support vector machine, and neural network.
[0014] According to the above configuration, by determining function parameters using a trained model that has been machine-learned using either linear regression, a decision tree method, a support vector machine, or a neural network, it is possible to generate operation amount instruction information that is more suitable for civil engineering work.
[0015] In the above-mentioned operation amount instruction information generating method, in the first step, operation amount instruction information for each operation may be generated using a function corresponding to each of a plurality of operations of the heavy equipment in the civil engineering work. According to the above-mentioned configuration, it is possible to generate operation amount instruction information suitable for each of a plurality of operations of the heavy equipment performing the civil engineering work.
[0016] In the above-mentioned method for generating operation amount instruction information, the operation amount instruction information may be information for controlling at least one of the operation contents of the heavy machine, that is, lifting and lowering of a dredging bucket or a weight for compacting a riprap mound, opening and closing of the bucket, raising and lowering of the weight or a crane suspending the bucket, and turning of the crane. According to the above-mentioned configuration, it is possible to generate operation amount instruction information for controlling a dredging bucket or a weight.
[0017] In the above-mentioned operation amount instruction information generating method, the function may be a function expressing a relationship between time and information indicating at least one of the height of the bucket or the weight, the opening degree of the bucket, the elevation of the crane, and the swing angle of the crane. According to the above-mentioned configuration, it is possible to generate operation amount instruction information that specifies at least one of the height of the dredging bucket or weight, the opening degree of the bucket, and the swing angle of the crane.
[0018] In the above-mentioned method for generating operation amount instruction information, the environmental information may include information indicating at least one of the planar positions of the work vessel and the civil engineering work site, water depth, tide level, ground conditions, excavation depth, rubble mound height, external force conditions, bucket capacity, weight of deadweight, specifications of the work vessel, and rolling characteristics of the work vessel. According to the above-mentioned configuration, it is possible to generate operation amount instruction information more suitable for the work environment.
[0019] In the above-mentioned method for generating operation amount instruction information, the information processing device may further execute a fourth step of causing heavy equipment on the work boat to perform civil engineering work using the operation amount instruction information generated in the first step. According to the above-mentioned configuration, it is possible to cause the heavy equipment on the work boat to perform civil engineering work without an operator operating the heavy equipment on the work boat.
[0020] In addition, the trained model generation method of the present invention includes a step in which an information processing device executes a step of generating a trained model by machine learning the correlation between (i) environmental information representing the working environment of civil engineering work previously performed by heavy equipment on a work ship as an input variable, and (ii) parameters that define an S-shaped or inverted S-shaped function representing the relationship between the operation amount and time for each operation content performed on the heavy equipment on a work ship that performed the civil engineering work as an output variable, the function including at least one of a sigmoid function, a tanh function, and an exponential function.
[0021] By using the trained model generated by the above configuration, it is possible to generate operation amount instruction information for operating heavy machinery on a work vessel by inputting environmental information.
[0022] In addition, the operation amount instruction information generating device of the present invention includes a generation unit that generates operation amount instruction information for operating the heavy equipment on a work ship using an S-shaped or inverted S-shaped function that represents the relationship between time and the operation amount for each operation content, identified using time series data that represents the operation content performed by an operator on heavy equipment on a work ship performing civil engineering work, and that includes at least one of a sigmoid function, a tanh function, and an exponential function.
[0023] According to the above configuration, it is possible to generate operation amount instruction information for autonomously operating heavy machinery on a work vessel performing civil engineering work.
[0024] Further, a program according to the present invention is a program for causing a computer to function as the operation amount indication information generating device, and is a program for causing a computer to function as the generating unit.
[0025] According to the above configuration, it is possible to generate operation amount instruction information for autonomously operating heavy machinery on a work vessel performing civil engineering work.
[0026] The operation amount indication information generating device according to each aspect of the present invention may be realized by a computer. In this case, the control program of the operation amount indication information generating device, which causes a computer to operate as each part (software element) of the operation amount indication information generating device, and the computer-readable recording medium on which the control program is recorded, also fall within the scope of the present invention. Effect of the Invention
[0027] According to one aspect of the present invention, it is possible to generate operation amount instruction information for autonomously operating heavy machinery on a work vessel performing civil engineering work. [Brief description of the drawings]
[0028] [Figure 1] FIG. 1 is a diagram showing an example of a heavy machine for performing dredging work according to a first embodiment. [Diagram 2] FIG. 2 is a diagram showing an example of a heavy machine performing weight compaction work on a rubble mound according to the first embodiment. [Diagram 3] 1 is a block diagram showing a functional configuration of an information processing device according to a first embodiment. [Figure 4] FIG. 2 is a diagram showing an example of a flow of a dredging operation according to the first embodiment. [Diagram 5] FIG. 2 is a diagram showing an example of a flow of weight compaction work for a rubble mound in the first embodiment. [Figure 6] FIG. 13 is a diagram showing an example of a change in bucket height over time during dredging work. [Figure 7] FIG. 11 is a diagram showing an example of a change over time in the rotation angle of a crane during dredging operation. [Figure 8] FIG. 11 is a diagram showing an example of a change in bucket opening degree over time during dredging work. [Figure 9] FIG. 13 is a diagram showing an example of a change over time in the hoisting angle of a crane during dredging operations. [Figure 10] FIG. 13 is a diagram showing an example of the change in the height of a weight over time during weight compaction work on a rubble mound. [Figure 11]4 is a flowchart showing an example of the flow of a manipulation amount indication information generating method according to the first embodiment. [Figure 12] FIG. 11 is a block diagram showing a functional configuration of an information processing device according to a second embodiment. [Figure 13] 10 is a flowchart showing an example of the flow of a manipulation amount indication information generating method according to the second embodiment. FIG. [Figure 14] FIG. 11 is a flow diagram showing an example of the flow of a trained model generation method according to the second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0029] [Embodiment 1] <1. Overview of the method for generating operation amount instruction information> First, an overview of the operation amount instruction information generating method according to this embodiment will be described. The operation amount instruction information generating method according to this embodiment is a method for generating operation amount instruction information for making heavy machinery on a work ship perform civil engineering work. One example of the heavy machinery on a work ship is heavy machinery that performs civil engineering work such as leveling, riprap, and dredging. The operation amount instruction information is information for operating work tools such as weights, buckets, and clamshells in civil engineering work.
[0030] The work boat is, for example, a crane ship, and is equipped, for example, with a crane on the deck of a barge and with the following devices (1) to (3) suspended from a pair of lifting wires paid out from the tip of the crane's jib. (1) A device for shaping the top and slope of an underwater mound using a weighted body (2) A device that uses a bucket or clamshell to dredge sediment from the bottom of a body of water. (3) A device that dumps crushed stone from a ship's hold onto the bottom of the water using a bucket or clamshell.
[0031] Here, a specific example of heavy equipment on a work ship will be described with reference to Figs. 1 and 2. Fig. 1 is a diagram showing an example of heavy equipment performing dredging work. In Fig. 1, a crane ship W1 anchored at the water surface S is a work ship equipped with heavy equipment performing grab dredging, and the heavy equipment on the crane ship W1 is a crane C12 equipped with a bucket B11 for dredging. The crane C12 has a rotating part rotatably installed on a barge and a jib rotatably supported on the rotating part, and the bucket B11 is suspended from the tip of a hoisting wire that is reeled out from the tip of the jib. The operator of the crane C12 performs dredging work while adjusting the height of the bucket (the position in the Z-axis direction in the figure), the rotating angle of the crane, the opening degree of the bucket, and the like.
[0032] FIG. 2 is a diagram showing an example of a heavy machine performing weight compaction work on a rubble mound. In FIG. 2, the heavy machine on the crane ship W2 anchored at the water surface S is a crane C22 equipped with a weight B21. The crane C22 has a swivel section rotatably installed on a barge and a jib rotatably supported on the swivel section, and the weight B21 is suspended from the tip of a hoisting wire that is let out from the tip of the jib. In the weight compaction work on the rubble mound, the lower surface of the weight B21 supported by a pair of hoisting wires that are let out from the tip of the jib of the crane ship W2 is lowered toward the top surface of the bottom mound by letting out the hoisting wire, thereby compacting the top surface of the mound. The operator of the crane C22 performs the weight compaction work on the rubble mound while adjusting the height of the weight B21 (the position in the Z-axis direction in the figure), the swivel angle of the crane C22, and the like.
[0033] The operation amount instruction information generating method according to the present embodiment generates operation amount instruction information for autonomously operating the heavy equipment without the operator operating the heavy equipment. In the operation amount instruction information generating method according to the present embodiment, an information processing device executes a first step of generating operation amount instruction information for operating the heavy equipment on the work ship using a function specified using time series data representing the operation content of a skilled operator performed on the heavy equipment on the work ship performing civil engineering work. Here, the function used to generate the operation amount instruction information is an S-shaped or inverse S-shaped function representing the relationship between time and the operation amount for each operation content, and includes at least one of a sigmoid function, a tanh function, and an exponential function. Note that a skilled operator means an operator with long experience and high proficiency. According to the present embodiment, civil engineering work using heavy equipment on the work ship can be automated using a simple function without performing complex calculations.
[0034] <2. Configuration of information processing device> 3 is a block diagram showing a functional configuration of an information processing device 10 that executes the operation amount indication information generating method according to this embodiment. The information processing device 10 is an example of an operation amount indication information generating device according to this specification. The information processing device 10 includes a control unit 11, a storage unit 12, a communication IF 13, and an input / output IF 14. The control unit 11 includes a parameter determination unit 112, a generation unit 113, and an output unit 114.
[0035] The parameter determination unit 112 determines parameters to be included in a function used to generate operation amount instruction information, based on environmental information indicating the work environment obtained when civil engineering work was performed. Here, the above function is, for example, a function that expresses the relationship between time and information indicating at least one of the height of the bucket or weight, the opening degree of the bucket, the elevation of the crane that suspends the weight or bucket, and the slewing angle of the crane. However, the function is not limited to the above example, and may be another function that expresses the change over time in the operating amount of the work tool or heavy machine that performs civil engineering work.
[0036] The generating unit 113 generates operation amount instruction information for autonomously operating the heavy machinery on the work ship, using a function defined by the parameters determined by the parameter determining unit 112. Here, the operation amount instruction information is, for example, information for controlling at least one of the operations by the heavy machinery, such as raising and lowering a dredging bucket or a weight for compacting a riprap mound, opening and closing the bucket, raising and lowering a crane that suspends the weight or bucket, and swinging the crane.
[0037] The output unit 114 outputs the operation amount instruction information generated by the generation unit 113. As an example, the output unit 114 outputs the operation amount instruction information to an output device connected to the input / output IF 14, such as a display (not shown). The output unit 114 may also output the operation amount instruction information to another device connected to the communication IF 13, such as a portable terminal, or may output the operation amount instruction information by writing it in a predetermined storage area of the storage unit 12.
[0038] Furthermore, the output unit 114 may control the rotation of the crane on the work ship, the raising and lowering of the weight or bucket, and the opening and closing of the bucket, by outputting the operation amount instruction information generated by the generation unit 113 to a crane control device that controls the operation of the weight or bucket via the communication IF 13. In other words, the output unit 114 may cause the heavy machinery on the work ship to perform civil engineering work, using the operation amount instruction information generated by the generation unit 113.
[0039] The storage unit 12 stores various data necessary for the processing executed by the information processing device 10. The storage unit 12 particularly stores a work log WL and a parameter P. The work log WL is data showing the history of past civil engineering work, and includes time-series data showing the operation contents performed in the past on the heavy equipment on the work ship, and environmental information showing the work environment obtained when the civil engineering work was performed. The parameter P is a parameter included in an S-shaped or inverse S-shaped function used when the information processing device 10 generates the operation amount instruction information. The function including the parameter P includes at least one of a sigmoid function, a tanh function, and an exponential function. The storage unit 12 may be external to the information processing device 10 and connected via a communication IF 13.
[0040] The communication IF 13 is an interface for communicating with other computers. The communication IF 13 may include an interface for communicating with other computers without going through another network, such as a Bluetooth (registered trademark) interface. The communication IF 13 may also include an interface for communicating with other computers via a LAN (Local Area Network), such as a Wi-Fi (registered trademark) interface. An input device and / or an output device, which are computer-readable recording media, are connected to the input / output IF 14. Examples of the input / output IF 14 include optical disks and magnetic disks, such as USB and CD-ROM (Compact Disc ROM).
[0041] <3. Dredging work flow> Here, dredging work and weight compaction work of a rubble mound will be described as concrete examples of civil engineering work performed by heavy machinery on a work vessel. In dredging work, the lifting and lowering, horizontal movement, opening and closing, etc. of a bucket are controlled by the operator.
[0042] Fig. 4 is a diagram showing an example of the flow of dredging work. In dredging work, a series of actions is repeated: the bucket of a heavy machine is lowered from the water surface S toward the bottom of the water, excavation is performed, and the bucket is turned to release soil. In the example of Fig. 4, the dredging work includes a bucket lowering step S1, an excavation step S2, a bucket raising step S3, a bucket turning step S4, a soil releasing step S5 onto a soil transport barge, and a bucket turning step S6.
[0043] In the bucket lowering step S1, the bucket is lowered toward the seabed in an open state. In the excavation step S2, the bucket opening degree is controlled to excavate the seabed surface. In the bucket raising step S3, the bucket is raised above the water surface S in a closed state. In the bucket rotating step S4, the bucket is rotated in a closed state. In the soil discharging step S5 onto the soil ship, the bucket is lowered, opened to discharge soil, and raised in an open state. In the bucket rotating step S6, the bucket B11 is rotated in an open state. Thus, in the grab dredging operation, the bucket is lowered (open state), closed, raised (closed state), rotated (closed state), lowered (closed state), opened, raised (open state), and rotated (open state) in this order. The dredging operation is performed by repeatedly executing these steps.
[0044] The lifting, swinging, and opening / closing operations of the bucket may be performed in parallel. For example, the bucket lifting step S3 and the bucket swinging step S4 may be performed in parallel, or the bucket swinging step S6 and the bucket lowering step S1 may be performed in parallel.
[0045] <4. Flow of work for compacting rubble mounds with weights> Figure 5 is a diagram showing an example of the flow of weight compaction work on a riprap mound. In weight compaction work on a riprap mound, the lifting and lowering, horizontal movement, falling (compaction), etc. of the weight are controlled by the operation of an operator. In the example of Figure 5, the weight compaction work on a riprap mound includes a rotation process S21, a lowering process S22, a lifting process S23, a compaction process S24, and a lifting and moving process S25.
[0046] In the rotation process S21, the crane is rotated and the weight is set at the target position in the horizontal direction and at a specified height from the water surface. In the lowering process S22, the weight is lowered and allowed to hit the bottom to check the depth. In the ascent process S23, the weight is raised and raised again to the target height. In the compaction process S24, the weight is dropped from a specified height to strike the top surface, and the impact energy is used to compact the top surface of the riprap mound. After the compaction process S24 and the ascent process S23 have been performed a specified number of times, in the raising and moving process S25, the weight is raised and the crane is rotated to set it at the next compaction position.
[0047] <5. Specific function expressions> Next, specific examples of functional expressions representing operation details for each of the dredging work and the riprap mound weight compaction work will be described. As an example, the operation amount instruction information is expressed by the following sigmoid function.
number
[0048] (5-1. In case of dredging work) As described above, dredging work is performed in a cycle of excavating the seabed, lifting the bucket, rotating the bucket, discharging soil onto the soil barge, rotating the bucket, lowering the bucket, excavating the seabed, etc. In this case, (i) the bucket height, (ii) the crane's rotation angle, (iii) the bucket opening and closing degree, and (iv) the crane's elevation are each expressed by a sigmoid function.
[0049] (5-1-1. Bucket height) FIG. 6 is a diagram showing an example of a change in bucket height over time during dredging work. In the example of FIG. 6, the horizontal axis indicates elapsed time (seconds), and the vertical axis indicates bucket height (m). In the example of FIG. 6, the dredging work is divided into five steps, namely (a) excavation step S2, (b) bucket raising step S3, (c) soil releasing step S5_1, (d) soil releasing step S5_2, and (e) bucket lowering step S1, for the bucket height, and a sigmoid function is determined for each operation. In the example of FIG. 6, the soil releasing step S5 (see FIG. 4) is divided into soil releasing step S5_1 and soil releasing step S5_2. A specific example of the sigmoid function for each operation (a) to (e) will be described.
[0050] (a) Excavation process S2 First, the height H (m) of the bucket in the excavation process S2 is expressed by the following function, for example.
number
[0051] (b) Bucket rising process S3 Moreover, the height H(m) of the bucket in the bucket raising step S3 is expressed by the following function, for example.
number
[0052] (c) Soil release process onto a soil transport ship S5_1 Moreover, the height H(m) of the bucket in the soil releasing process S5_1 onto the soil barge is expressed by the following function, for example.
number
[0053] (d) Soil release process S5_2 Moreover, the height H(m) of the bucket in the soil releasing process S5_2 is expressed by the following function, for example.
number
[0054] (e) Bucket lowering process S1 Moreover, the height H (m) of the bucket from the altitude reference plane in the bucket lowering process S1 is expressed by the following function, for example.
number
[0055] Although a specific example of the function representing the bucket height has been described, the function representing the bucket height is not limited to the above example and may be another function. For example, in the bucket lowering process S1, considering the difference in resistance value between air and water, the parameters may be different between the air portion and the underwater portion, and the bucket height may be expressed by different functions. The same is true for the bucket ascent process S3, where the parameters may be different between the air portion and the underwater portion, and the bucket height may be expressed by different functions.
[0056] (5-1-2. Crane rotation angle) Next, a specific example of a function representing the crane's swing angle will be described. Fig. 7 is a diagram showing an example of the change over time in the swing angle of the crane during dredging work. In the example of Fig. 7, the horizontal axis indicates elapsed time (seconds) and the vertical axis indicates the swing angle (°). In the example of Fig. 7, functions are determined for the swing angle of the crane at each of (f) swing process S4 (when releasing soil onto the soil transport barge) and (g) swing process S6 (when lowering the bucket).
[0057] (f) Turning process S4 First, the rotation angle θ (°) of the crane in the rotation process S4 is expressed by the following function, for example.
number
[0058] (g) Turning process S6 Moreover, the rotation angle θ (°) of the crane in the rotation process S6 is expressed by the following function, for example.
number
[0059] (5-1-3. Bucket opening) Next, a specific example of a function representing the bucket opening degree will be described. FIG. 8 is a diagram showing an example of a change in the bucket opening degree over time in dredging work. In the example of FIG. 8, the horizontal axis indicates elapsed time (seconds), and the vertical axis indicates the opening degree (%). The dredging bucket is closed (closing step S31) in the excavation step S2 to the bucket raising step S3 shown in FIG. 4 described above, and then opens to release soil in the soil releasing step S5 (opening step S32), opens again (opening step S33) in the bucket lowering step S1, and closes again (closing step S31) in the excavation step S2. In the example of FIG. 8, a function is determined for the bucket opening degree for each of (h) the closing step S31 (excavation step S2 to the bucket raising step S3), (i) the opening step S32 (soil releasing step S5), and (j) the opening step S33 (bucket lowering step S1).
[0060] (h) Closing process S31 First, the opening degree R (%) of the bucket in the closing step S31 is expressed by the following function, for example.
number
[0061] (i) Opening process S32 Moreover, the bucket opening rate R (%) in the opening step S32 (the step S5 of releasing soil onto the soil barge) is expressed by the following function, for example.
number
[0062] Here, R 1 is the opening degree (%) at the end of the closing process S31, and M 2 is the maximum opening degree (%) when releasing soil to the soil transport ship. 2 is a parameter related to the opening speed (m / s), and t c2 is a parameter related to the start time (s) of the shedding process S32. 1 =0.0, M 2 =15, c 2 = 3.0, t c2 Each of these parameters is obtained by functional approximation of the actual operation contents by a skilled operator. Parameter M 2 , c 2 , and t c2 are parameters that are set separately, and if each parameter can be set appropriately, the change in mouth opening degree R over time can be appropriately expressed.
[0063] (j) Opening process S33 Moreover, the bucket opening rate R (%) in the opening step S33 is expressed by the following function, for example.
number
[0064] (5-1-2. Crane hoisting angle) Next, a specific example of a function that represents the hoisting angle of a crane that suspends a weight or bucket will be described. Fig. 9 is a diagram showing an example of the change over time in the hoisting angle of a crane during dredging work. In the example of Fig. 9, the horizontal axis represents elapsed time (seconds) and the vertical axis represents the hoisting angle (°). In the example of Fig. 9, functions are determined for the hoisting angle of the crane at each of (k) the lowering process S4' (when releasing soil onto the soil transport barge) and (l) the raising process S6' (when lowering the bucket).
[0065] (k) Laying down process S4' First, the hoisting angle θ′ (°) of the crane in the lowering step S4′ is expressed by the following function, for example.
number
[0066] (l) Raising process S6' Moreover, the hoisting angle θ′ (°) of the crane in the raising step S6′ is expressed, for example, by the following function.
number
[0067] (5-1-4. Parameters to be determined) In the above function representation, D 1a , D 1b , ~D 5 , t 1 ~t 5 , a 1 ~a 5 , K 1 ~K 2 , K 1 '~K 2 ',t b1 ~t b2, t b1 '~t b2 ',b 1 ~b 2 , b 1 '~b 2 ', M 1 ~M 3 , t c1 ~t c3 , c 1 ~c 3 By setting each parameter, it is possible to generate operation amount instruction information for autonomously operating the work vessel according to the rules defined by the functions. Each parameter can be obtained, for example, by performing function approximation on time-series data representing the operation contents of an operator skilled in operating heavy machinery.
[0068] (5-1-5. When performing multiple actions in parallel) As described above, the crane hoisting operation, the bucket height operation, the crane slewing operation, and / or the bucket opening and closing operation may be performed in parallel. For example, in the example of Figs. 6 to 8, the bucket lifting and lowering operation, the crane slewing operation, and the bucket opening operation are performed in parallel between 65 and 80 seconds in order to release soil to the soil transport barge. At each time, each operation is operated so as to match the operation value shown in the graph (or so as to reduce the difference). As a result of adding up each operation, multiple operations performed in parallel, such as the crane slewing while lowering the bucket, can be expressed by a function. Note that the crane hoisting operation mainly occurs at the start of work for the day, but is not an operation that occurs all the time, so this function is used as necessary.
[0069] (5-2. In the case of weight compaction work on rubble mounds) Next, we will explain the functions that represent the operation contents in the weight compaction work of the rubble mound. The operation of raising and lowering the weight and the operation of the crane turning in the weight compaction work of the rubble mound can be expressed by functions in the same way as the operation in the dredging work described above. In addition, the release of the weight (controlled drop) can also be expressed by a function.
[0070] (5-2-1. Height of weight) Fig. 10 is a diagram showing an example of the change in the height of the weight over time in weight compaction work for a rubble mound. In the example of Fig. 10, the horizontal axis indicates the elapsed time (seconds) and the vertical axis indicates the height of the weight. In the example of Fig. 10, the height H (m) of the weight in the compaction process S24 in which the weight is dropped in a controlled manner is expressed by a sigmoid function. The height H (m) of the weight in the lowering process S22 is expressed by the following function, for example.
number
[0071] <6. Flow of the method for generating operation amount instruction information> 11 is a flow diagram showing an example of the flow of a method for generating operation amount instruction information executed by the information processing device 10. In step M11, the information processing device 10 determines whether to start civil engineering work using heavy machinery on a work ship. For example, the information processing device 10 determines that work will be started when an operator inputs operation amount instruction information to the effect that work will be started. If civil engineering work is to be started (step M11; YES), the information processing device 10 proceeds to processing of step M12. On the other hand, if civil engineering work is not to be started (step M11; NO), the information processing device 10 waits until work is started.
[0072] In step M12, the parameter determination unit 112 determines a parameter P for expressing the operation instruction content for the heavy machinery by functional approximation, based on the environmental information representing the working environment during the past work stored in the memory unit 12. Step M12 is an example of the second step according to the present specification. For example, in the case of dredging work, the parameter determination unit 112 determines the following parameters (a) to (k) for each process shown in Figs. 6 and 7. (a) Parameters of the function representing the bucket height in the excavation process S2 (b) Parameter of the function representing the bucket height in the rising process S3 (c) Parameter of the function representing the bucket height in the soil discharge process S5_1 (d) Parameter of the function representing the bucket height in the soil discharge process S5_2 (e) Parameter of the function representing the height of the bucket in the descending process S1 (f) Parameter of the function representing the rotation angle of the crane in the rotation process S4 (g) Parameter of the function representing the rotation angle of the crane in the rotation process S6 (h) Parameter of a function representing the opening degree of the bucket in the closing process S31 (j) A parameter of a function representing the opening degree of the bucket in the opening step S32 (k) A parameter of a function representing the opening degree of the bucket in the opening step S33
[0073] Furthermore, for example, in the case of weight compaction work on a rubble mound, the parameter determination unit 112 determines the parameter of a function that represents the height of the weight. However, the parameter P determined by the parameter determination unit 112 is not limited to the above-mentioned example, and the parameter determination unit 112 may determine the parameter of another function that represents the operating amount of a work tool used in civil engineering work.
[0074] At this time, the parameter determination unit 112 determines the parameter P using a trained model by a learning method such as linear regression, decision tree method, support vector machine, neural network, etc. In this case, as an example, the trained model is constructed by learning the correlation between input and output using environmental information representing the working environment of civil engineering work performed by the heavy equipment in the past as input data (input variables) and parameters used when approximating the relationship between the operation amount and time for each operation content performed on the heavy equipment with an S-shaped or inverse S-shaped function as output data (output variables). However, the method of determining the parameter P is not limited to the above example, and the parameter determination unit 112 may determine the parameter P by other methods.
[0075] In step M13, the generation unit 113 generates operation amount instruction information for operating the heavy machinery on the work boat, using a function determined by the parameter P determined in step M12. Step M13 is an example of the first step according to the present specification.
[0076] At this time, the generating unit 113 generates operation amount instruction information for each operation by using a function corresponding to each of a plurality of operations of the heavy equipment in the civil engineering work. For example, in step M13, the generating unit 113 calculates three pieces of operation amount instruction information, (i) the height H of the bucket, (ii) the swing angle θ of the crane, and (iii) the opening degree R of the bucket, by using different functions. The lifting and lowering of the bucket is controlled based on the calculated height H of the bucket. Also, the swing of the crane is controlled based on the calculated swing angle θ of the crane. Also, the opening and closing of the bucket is controlled based on the calculated opening degree R of the bucket. In this way, the operation instruction information generated by the generating unit 113 includes the height H of the bucket, the swing angle θ of the crane, the opening degree R of the bucket, and the like. Also, the operation instruction information generated by the generating unit 113 includes the operation instruction timing designated by the parameter P determined by the parameter determining unit 112.
[0077] In step M14, the output unit 114 outputs the operation amount instruction information generated in step M13. Step M14 is an example of a fourth step according to the present specification. As an example, the output unit 114 outputs the operation amount instruction information generated in step M13 to a control device that controls the heavy equipment, thereby causing the heavy equipment on the work ship to perform civil engineering work. At this time, the lifting and lowering of the bucket, the rotation of the crane, and the opening and closing of the bucket may be controlled in sequence or in parallel.
[0078] The output unit 114 may also output the operation amount instruction information to an output device connected to the input / output IF 14 or the communication IF 13. Here, the output device includes, for example, a display, a projector, a printing device, a portable terminal, and / or a speaker. As an example, the output unit 114 may display the calculation results of (i) the height H of the bucket, (ii) the rotation angle θ of the crane, and (iii) the opening degree R of the bucket side by side on a display device, or may give voice instructions from a speaker. This display allows the operator to understand the operation amount to be performed at each time. As described above, the lifting and lowering of the bucket, the rotation of the crane, and the opening and closing of the bucket are not limited to being operated individually, but may be operated in parallel.
[0079] In step M15, the information processing device 10 determines whether to end the work. For example, the information processing device 10 may determine that the work is to be ended when the condition of the seabed, which is the target of the civil engineering work, satisfies a predetermined condition. In addition, the number of times to perform the excavation process S2, which is the main process, in the civil engineering work, may be set at the beginning. Other processes, such as the bucket lowering process S1, the bucket raising process S3, and the bucket rotating process S4, are linked to the set number of times of the excavation process S2 and are performed the required number of times. If the civil engineering work is to be ended (step M15; YES), the information processing device 10 ends the processing. On the other hand, if the civil engineering work is to be continued (step M15; NO), the information processing device 10 returns to the processing of step M12.
[0080] In this way, when one cycle (steps M12 to M14) of civil engineering work is completed and the next civil engineering work is started, the parameter determination unit 112 again determines the parameters of each function (parameters related to maximum excavation depth, excavation speed, excavation start time, etc.) in step M12.
[0081] <7. Effects of information processing devices> As described above, according to this embodiment, the information processing device 10 generates operation amount instruction information for operating heavy equipment on a work ship using an S-shaped or inverse S-shaped function including at least one of a sigmoid function, a tanh function, and an exponential function, which is a function identified using time-series data representing the operation content of an operator performed on heavy equipment on a work ship performing civil engineering work. Since the sigmoid function, the tanh function, and the exponential function are not complicated functions, according to this embodiment, heavy equipment on a work ship performing civil engineering work can be operated autonomously using a simple function without performing complicated calculations.
[0082] Furthermore, the information processing device 10 according to this embodiment generates operation amount instruction information for each operation by using a function corresponding to each of the multiple operations of the heavy equipment in the civil engineering work. As a result, according to this embodiment, it is possible to generate operation amount instruction information suitable for each of the multiple operations of the heavy equipment performing civil engineering work.
[0083] In the present embodiment, the operation amount instruction information is information for controlling at least one of the operation contents of the heavy machine, that is, raising and lowering the dredging bucket or the weight for compacting the riprap mound, opening and closing the bucket, raising and lowering the weight or the crane suspending the bucket, and turning the crane. Therefore, according to the present embodiment, the operation amount instruction information for controlling the dredging bucket or the weight can be generated.
[0084] In this embodiment, the function represents the relationship between time and information indicating at least one of the height of the bucket or weight, the opening degree of the bucket, the elevation of the weight or the crane that suspends the bucket, and the slewing angle of the crane. Therefore, according to this embodiment, it is possible to generate operation amount instruction information that specifies at least one of the height of the dredging bucket or weight, the opening degree of the bucket, and the slewing angle of the crane.
[0085] Furthermore, the information processing device 10 according to the present embodiment causes the heavy machinery on the work ship to perform civil engineering work using the generated operation amount instruction information. This allows the heavy machinery on the work ship to perform civil engineering work without the operator having to operate the heavy machinery on the work ship.
[0086] [Embodiment 2] Other embodiments of the present invention will be described below. For ease of explanation, the same reference numerals are given to members having the same functions as those described in the above embodiment, and the description thereof will not be repeated.
[0087] <1. Configuration of the operation amount indication information generating device> 12 is a block diagram showing a functional configuration of an information processing device 10B according to the present embodiment. The information processing device 10B is an example of a manipulated variable instruction information generating device according to the present specification, and is also an example of a trained model generating device that executes the trained model generating method according to the present specification.
[0088] The information processing device 10B executes two phases, an estimation phase and a learning phase. The estimation phase is a phase for generating manipulated variable instruction information. The learning phase is a phase for constructing, by machine learning, a trained model LM1 used for determining a parameter P of a function used for generating the manipulated variable instruction information.
[0089] The information processing device 10B includes a control unit 11B, a storage unit 12B, a communication IF 13, and an input / output IF 14. The control unit 11B includes an estimation phase execution unit 110 and a learning phase execution unit 150. The estimation phase execution unit 110 executes a phase for generating operation amount instruction information. The learning phase execution unit 150 constructs a trained model LM1 used for determining parameters of a function by machine learning.
[0090] The estimation phase execution unit 110 includes an environment information acquisition unit 111B, a parameter determination unit 112B, a generation unit 113, and an output unit 114. Note that components having the same functions as those in the information processing device 10 will be described using the same reference numerals. The learning phase execution unit 150 includes a training data generation unit 151 and a model generation unit 152.
[0091] The environmental information acquisition unit 111B acquires environmental information that indicates the working environment of the civil engineering work. Here, the environmental information includes, for example, information indicating at least one of the planar positions of the work boat and the target location of the civil engineering work, the water depth, the tide level, the ground conditions, the excavation depth, the rubble mound height, the external force conditions, the bucket capacity, the weight of the weighted plumbing, the specifications of the work boat, and the rolling characteristics of the work boat. The planar positions of the work boat and the target location are information regarding the planar position coordinates and the bow angle of the boat and the target location of the work. The water depth is the water depth of the sea or river that is the target water area of the civil engineering work. The tide level is the height of the sea level measured from the reference surface. The ground conditions are information regarding the soil quality such as sand or clay. The excavation depth is the depth of excavation performed by heavy machinery on the work boat. The rubble mound height is the height of the rubble mound. The external force conditions are the external forces acting on the work boat due to waves, tides, wind, and the like. The bucket capacity is the capacity of the bucket, and the weight of the weighted plumbing is the weight of the weighted plumbing. The specifications of the work boat include the size, weight, shape, type, etc. of the work boat. The motion characteristics of the work boat include, for example, the amplitude, period, phase difference, etc. of the motion.
[0092] The environmental information acquisition unit 111B may acquire environmental information input by an input device connected to the input / output IF 14, or may acquire environmental information by receiving environmental information transmitted by another device connected via the communication IF 13. Here, the input device is a device operated by an operator, and includes, for example, a touch panel, a keyboard, a mouse, a scanner, and / or a microphone. The input device may also be a measuring device attached to a predetermined position of the work boat to measure the motion of the work boat.
[0093] Furthermore, with regard to items that change with the tides (water depth), the environmental information acquisition unit 111B may calculate the tide level from the tide table data for the target location and the time of work implementation, and include the calculation result in the environmental information.
[0094] The parameter determination unit 112B inputs the environmental information acquired by the environmental information acquisition unit 111B into the trained model LM1 to determine parameters P of a function used to generate the operation amount instruction information, and writes the determined parameters P into the storage unit 12B. The trained model LM1 will be described later.
[0095] The training data generation unit 151 generates training data to be used for machine learning of the trained model LM1. Here, the training data includes one or more sets of (i) environmental information representing the working environment of civil engineering work previously performed by heavy equipment on a work ship, and (ii) parameters Pt that define an S-shaped or inverse S-shaped function representing the relationship between the amount of operation for each operation performed on the heavy equipment on the work ship that performed the civil engineering work and time, the function including at least one of a sigmoid function, a tanh function, and an exponential function.
[0096] Here, the environmental information included in the training data is environmental information that represents the environment when civil engineering work was actually performed in the past, which is recorded in the work log WL. Also, the parameters Pt included in the training data are parameters obtained by functional approximation of the change over time in the operation content of the heavy machinery when civil engineering work was actually performed in the past.
[0097] The parameter Pt in the training data generating unit 151 is generally an appropriate parameter when approximating the time series data included in the work log WL with a function, and is determined by trial and error consideration while widely changing the parameter. However, it is not limited to this method.
[0098] The model generation unit 152 generates a trained model LM1 by machine learning using the training data generated by the training data generation unit 151.
[0099] The trained model LM1 is a trained model used by the parameter determination unit 112B when generating the parameter P. The trained model LM1 is generated by machine learning using the above-mentioned training data. In other words, the trained model LM1 is a trained model that machine-learns the correlation between (i) environmental information that represents the working environment of civil engineering work previously performed by heavy equipment on a work ship, and (ii) a parameter Pt that defines an S-shaped or inverse S-shaped function that represents the relationship between the amount of operation for each operation performed on the heavy equipment on the work ship that performed the civil engineering work and time, and that includes at least one of a sigmoid function, a tanh function, and an exponential function. The environmental information is an example of an input variable related to this specification, and the parameter Pt is an example of an output variable related to this specification.
[0100] As the machine learning method of the trained model LM1, for example, any of linear regression, nonlinear regression, decision tree method, support vector machine, and neural network is used. As the neural network, for example, a convolutional neural network or a recurrent neural network method may be used. However, the machine learning method of the trained model LM1 is not limited to the above examples, and other methods may be used.
[0101] The input data of the trained model LM1 includes the environmental information acquired by the environmental information acquisition unit 111B, that is, the environmental information representing the work environment of the civil engineering work to be performed. The output data of the trained model LM1 includes the parameter P.
[0102] The storage unit 12B stores various data necessary for the processing executed by the information processing device 10B. The storage unit 12 particularly stores the work log WL, the parameters P, the training data TD, and the learned model LM1. The learned model LM1 being stored in the storage unit 12B means that the parameters defining the learned model LM1 are stored in the storage unit 12B. The manner in which the learned model LM1 is stored in the storage unit 12B is merely an example, and the learned model LM1 may be stored in a storage device other than the storage unit 12B (e.g., a storage device of an external server, etc.) and exist independently of the storage unit 12B.
[0103] <2. Flow of the method for generating operation amount instruction information> 13 is a flow diagram showing an example of the flow of a manipulation amount instruction information generating method executed by the information processing device 10B. In step M21, the information processing device 10B determines whether to start civil engineering work using heavy machinery on a work ship. For example, the information processing device 10B determines that work will be started when an operator inputs manipulation amount instruction information to the effect that work will be started. If civil engineering work is to be started (step M21; YES), the information processing device 10B proceeds to the processing of step M22. On the other hand, if civil engineering work is not to be started (step M21; NO), the information processing device 10B waits until work is started.
[0104] In step M22, the environmental information acquisition unit 111B acquires environmental information that represents the work environment of the civil engineering work. Step M22 is an example of a third step according to this specification.
[0105] In step M23, the parameter determination unit 112B inputs the environmental information acquired in step M22 to the trained model LM1, thereby determining the parameter P of the function used to generate the above-mentioned manipulated variable instruction information.
[0106] In step M24, the generation unit 113 generates operation amount instruction information for operating the heavy machinery on the work boat, using a function determined by the parameter P determined in step M23. The content of the processing in step M24 is similar to the content of the processing in step M13 in the above-mentioned first embodiment.
[0107] In step M25, the output unit 114 outputs the operation amount instruction information generated in step M24. As an example, the output unit 114 outputs the operation amount instruction information generated in step M24 to a control device that controls the heavy machinery, thereby causing the heavy machinery on the work ship to perform civil engineering work.
[0108] <3. Flow of trained model generation method> Next, a method for generating the trained model LM1 will be described with reference to the drawings. Fig. 14 is a flow diagram showing an example of the flow of the trained model generation method executed by the information processing device 10B. In step M31, the training data generation unit 151 refers to the work log WL to generate training data including one or more sets of (i) environmental information representing the work environment of civil engineering work previously performed by the work vessel, and (ii) parameters Pt that define the function.
[0109] In step M32, the model generation unit 152 generates a trained model LM1 by machine learning the correlation between (i) environmental information representing the working environment of civil engineering work previously performed by the work vessel and (ii) the parameter Pt. As an example, the model generation unit 152 generates the trained model LM1 by a training method of a convolutional neural network. However, the training method of the trained model LM1 is not limited to the above example, and other training methods may be used.
[0110] <4. Effects of information processing devices> As described above, according to this embodiment, the information processing device 10B according to this embodiment generates a trained model LM1 by machine learning the correlation between (i) environmental information representing the working environment of civil engineering work previously performed by heavy equipment on a work ship, and (ii) parameters Pt that define an S-shaped or inverse S-shaped function representing the relationship between the amount of operation for each operation performed on the heavy equipment on the work ship that performed the civil engineering work and time, the function including at least one of a sigmoid function, a tanh function, and an exponential function. By using the trained model LM1 that has been generated, it is possible to generate operation amount instruction information for operating the heavy equipment on the work ship.
[0111] In addition, the parameter P optimal for generating the operation amount instruction information is considered to differ depending on the planar position of the work ship and the civil engineering work target location, the water depth, the ground conditions (soil quality such as sand or clay), the dredging depth, the external force conditions (waves, currents, wind), the type of dredger used, and the like. The information processing device 10B according to this embodiment uses the parameter Pt obtained by functionally approximating the operation contents of a skilled operator performed in the past as an input variable, and uses environmental information as an output variable to link the two and perform machine learning to construct a trained model LM1 by machine learning. By determining the parameter P using the trained model LM1 trained in this way, it is possible to realize high-quality and highly efficient (fast construction speed) civil engineering work.
[0112] In this embodiment, the environmental information representing the work environment includes at least one of the following information: horizontal positions of the work vessel and the civil engineering work site, water depth, tide level, ground conditions, excavation depth, rubble mound height, external force conditions, bucket capacity, weight of deadweight, specifications of the work vessel, and rolling characteristics of the work vessel. Therefore, according to this embodiment, it is possible to generate operation amount instruction information that is more suitable for these work environments.
[0113] [Additional Note 1] The functions of the information processing devices 10 and 10B according to the above-mentioned first and second embodiments may be realized by a single device, or may be realized by a system in which a plurality of devices cooperate with each other. For example, a first device implementing the estimation phase executing unit 110 and a second device implementing the learning phase executing unit 150 may be configured as separate devices, and the above-mentioned information processing device 10B may be realized by the cooperation of the first device and the second device.
[0114] [Additional Note 2] In the above embodiment, parameters may be different between air and water, and different functions may be used. For example, each parameter (t 5 etc.), and each parameter (t 2 etc.) may be set separately for the air function and the water function.
[0115] [Additional Note 3] In the above embodiment, there are cases where the docking position of the soil transport ship changes. For such cases, data is collected and the collected work log WL is used to determine the parameter P, so that operation amount instruction information suitable for the docking position can be generated.
[0116] [Software implementation example] The functions of the information processing devices 10, 10B (hereinafter referred to as the "devices") can be realized by a program for causing a computer to function as the device, and a program for causing a computer to function as each control block of the device (particularly each part included in the control units 11, 11B).
[0117] In this case, the device includes a computer having at least one control device (e.g., a processor) and at least one storage device (e.g., a memory) as hardware for executing the program. The control device and storage device execute the program to realize each function described in each of the above embodiments.
[0118] The program may be non-transitory and may be recorded in one or more computer-readable recording media. The recording media may or may not be included in the device. In the latter case, the program may be provided to the device via any wired or wireless transmission medium.
[0119] In addition, some or all of the functions of each of the control blocks can be realized by a logic circuit. For example, an integrated circuit in which a logic circuit that functions as each of the control blocks is formed is also included in the scope of the present invention. In addition, the functions of each of the control blocks can be realized by, for example, a quantum computer.
[0120] Furthermore, each process described in each of the above embodiments may be executed by AI (Artificial Intelligence). In this case, the AI may be operated by the control device or another device (for example, an edge computer or a cloud server).
[0121] The present invention is not limited to the above-described embodiments, and various modifications are possible within the scope of the claims. Embodiments obtained by appropriately combining the technical means disclosed in different embodiments are also included in the technical scope of the present invention. [Explanation of symbols]
[0122] 10, 10B Information processing device 11, 11B Control section 12, 12B storage section 110 Estimation Phase Execution Unit 111B Environmental Information Acquisition Department 112, 112B Parameter determination section 113 Generation part 114 Output section 150 Learning Phase Execution Unit 151 Training Data Generation Unit 152 Model Generation Unit
Claims
1. a first step of generating operation amount instruction information for operating the heavy equipment on the work ship using an S-shaped or inverse S-shaped function that represents the relationship between time and the operation amount for each operation content, the relationship being specified using time-series data that represents the operation content of an operator performed on the heavy equipment on the work ship performing civil engineering work, the function including at least one of a sigmoid function, a tanh function, and an exponential function; The operation amount indication information generating method is executed by an information processing device.
2. A second step of determining the parameters included in said function; The operation amount indication information generating method according to claim 1 , further comprising the step of:
3. a third step of acquiring environmental information representing a work environment of the civil engineering work, In the second step, the environmental information acquired in the third step is input to a trained model that has been machine-learned to determine the correlation between (i) environmental information representing the working environment of past civil engineering work, and (ii) parameters that define an S-shaped or inverse S-shaped function that represents the relationship between the amount of operation and time for each operation performed on heavy machinery on a work ship that performed past civil engineering work, thereby determining parameters of the function used to generate the operation amount instruction information. The operation amount indication information generating method according to claim 2 .
4. The method for generating operation amount indication information according to claim 3 , wherein the machine learning method is any one of linear regression, decision tree method, support vector machine, and neural network.
5. In the first step, operation amount instruction information for each of a plurality of operations of the heavy equipment in the civil engineering work is generated using a function corresponding to each of the operations. The operation amount indication information generating method according to claim 1 or 2.
6. The operation amount instruction information is information for controlling at least one of the operation contents of the heavy machinery, namely, raising and lowering a dredging bucket or a weight for compacting a riprap mound, opening and closing the bucket, raising and lowering a crane that suspends the weight or the bucket, and turning the crane. The operation amount indication information generating method according to claim 3 .
7. The function is a function expressing a relationship between information indicating at least one of a height of the bucket or the weight, an opening degree of the bucket, a hoisting of the crane, and a rotation angle of the crane, and a time. The operation amount indication information generating method according to claim 6 .
8. The environmental information includes information indicating at least one of the planar positions of the work vessel and the civil engineering work site, water depth, tide level, ground conditions, excavation depth, rubble mound height, external force conditions, bucket capacity, weight of weight, specifications of the work vessel, and motion characteristics of the work vessel. The operation amount indication information generating method according to claim 3 .
9. a fourth step of causing heavy machinery on the work ship to perform civil engineering work using the operation amount instruction information generated in the first step; The operation amount indication information generating method according to claim 1 or 2, further comprising the information processing device executing the following:
10. (i) environmental information representing the working environment of civil engineering work previously performed by heavy machinery on a work vessel as an input variable; (ii) generating a trained model by machine learning the correlation between the amount of operation for each operation content performed on the heavy machinery on the work vessel that performed the civil engineering work as an output variable and a parameter that defines an S-shaped or inverse S-shaped function that represents the relationship between time and the amount of operation for each operation content performed on the heavy machinery on the work vessel that performed the civil engineering work, and a function including at least one of a sigmoid function, a tanh function, and an exponential function; The trained model generation method is executed by an information processing device.
11. a generation unit which generates operation amount instruction information for operating the heavy equipment on the work ship using an S-shaped or inverse S-shaped function which represents the relationship between time and the operation amount for each operation content, the relationship being specified using time-series data which represents the operation content of an operator performed on the heavy equipment on the work ship performing civil engineering work, and which includes at least one of a sigmoid function, a tanh function, and an exponential function; An operation amount indicating information generating device comprising:
12. A program for causing a computer to function as the operation amount indication information generating device according to claim 11, the program causing a computer to function as the generating unit.
Citation Information
Patent Citations
Action grasping system
JP2022083497A