Control device
The control device uses external device usage history to predict and manage vehicle power storage system trends, enhancing DR control by estimating charging and discharging tendencies and setting priorities, thus improving energy efficiency and responsiveness.
Patent Information
- Application Number
- JP2023047194
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-23
- Publication Date
- 2024-10-04
AI Technical Summary
Existing technologies struggle to accurately predict the charging and discharging trends of a vehicle's power storage system, especially when vehicle usage information is absent or insufficient, which hampers effective Demand Response (DR) control in power grids.
A control device that acquires usage history from external devices like mobile terminals, estimates charging and discharging tendencies, and selects power storage systems for DR control based on user behavior characteristics, including priority settings and notifications to enhance connectivity and responsiveness.
Enables accurate prediction and management of charging and discharging trends, improving energy efficiency and responsiveness of power storage systems to DR events, even without complete vehicle usage information.
Smart Images

Figure 2024136177000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a control device. [Background technology]
[0002] In recent years, research and development has been conducted into storage batteries that contribute to energy efficiency in order to ensure that more people have access to affordable, reliable, sustainable and advanced energy.
[0003] For example, a technique is known in which the timing for charging and discharging a storage battery of a vehicle is predicted based on the usage status and the like, and the charging and discharging of the storage battery is controlled (see, for example, Patent Document 1).
[0004] Patent Document 1 relates to a distributed energy resource management device. Patent Document 1 describes a distributed energy resource management device that includes a prediction unit that predicts the amount of power demand and the amount of power supply per unit of time of a consumer having a vehicle storage battery as a distributed energy resource, an input unit that inputs usage information including information on the time period during which the vehicle is used, and a plan creation unit that creates a charge / discharge plan for the storage battery based on the amount of power demand, the amount of power supply, and the usage information. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] Patent Publication No. 2022-050126 Summary of the Invention [Problem to be solved by the invention]
[0006] When using an on-board energy storage system for DR (Demand Response) control to adjust the supply and demand of the power grid, it is assumed that the vehicle is connected to a charging / discharging facility. However, even if an electric vehicle is parked in a garage equipped with charging / discharging facilities, the vehicle is not necessarily connected to the charging / discharging facility. Ultimately, it is up to the user to decide whether or not to connect the vehicle to the charging / discharging facility.
[0007] As in the conventional technology, if it is possible to predict that a vehicle is connected to a charging / discharging facility by monitoring the SOC installed in the vehicle or making predictions based on vehicle usage information, DR control can be performed with high accuracy. However, there are cases where there is no vehicle usage information or there is not enough usage information to make a prediction.
[0008] The present invention aims to provide a control device that can accurately predict the charging and discharging tendency of a vehicle's power storage system regardless of the presence or absence of vehicle usage information, thereby contributing to improved energy efficiency. [Means for solving the problem]
[0009] (1) The present invention is a control device that includes an acquisition unit that acquires, for each energy storage system, a usage history of an external energy storage device associated with the energy storage system mounted on each of a plurality of vehicles, and a selection unit that estimates a tendency for charging and discharging between the energy storage system and a power grid based on the usage history of the external energy storage device, and selects, from the plurality of energy storage systems, the energy storage system that will charge and discharge between the energy storage system and the power grid in accordance with the estimation result.
[0010] (2) In the control device of (1), the external power storage device may be a mobile terminal owned by a user of the vehicle.
[0011] (3) The control device according to (1) may further include a priority setting unit that sets a high priority to the power storage system corresponding to the external power storage device when the external power storage device is frequently charged.
[0012] (4) The control device of (1) may further include a notification unit that, when the external power storage device is charged frequently, sets a high frequency for notifying the power storage system corresponding to the external power storage device of information related to charging and discharging.
[0013] (5) In the control device of (1), the selection unit may reflect a degree and timing of maintaining the state of charge of the external power storage device in the selection of the power storage system.
[0014] (6) In the control device according to (1), the acquisition unit may acquire, as the usage history, information including at least a charging history at a timing when the external power storage device is charged inside the vehicle.
[0015] (7) In the control device of (6), the acquisition unit may acquire the usage history when charging by a wireless charging device in the vehicle.
[0016] (8) In the control device of (1), the selection unit may preferentially select the power storage system that is highly likely to be connected to a charging / discharging facility.
[0017] (9) In the control device of (1), when the supply and demand state of the power grid is a power surplus, the selection unit may preferentially select the power storage system of a user that shows a tendency for a low charging rate based on the usage history.
[0018] (10) In the control device of (1), when the supply and demand state of the power grid is insufficient for power, the selection unit may preferentially select the power storage system of a user that shows a tendency for a high charging rate based on the usage history.
[0019] (11) In the control device of (1), the selection unit generates an allocation plan indicating a combination of the energy storage systems selected for the energy storage systems that charge and discharge between the energy storage systems and the power grid, and in the allocation plan, the energy storage systems may be selected using a priority set based on the charging and discharging tendency as a parameter.
[0020] (12) The present invention also provides a control device that includes an acquisition unit that acquires, for each power storage system, a usage history of an external power storage device associated with the power storage system mounted on each of a plurality of vehicles, and a demand prediction unit that acquires a demand forecast for a power grid and reflects in the demand prediction a tendency of charging and discharging between the power storage system and the power grid that is estimated based on the usage history of the external power storage device. Effect of the Invention
[0021] According to the present invention, it is possible to provide a control device that can accurately predict the tendency of charging and discharging a power storage system of a vehicle, regardless of the presence or absence of vehicle usage information, which can contribute to improving energy efficiency. [Brief description of the drawings]
[0022] [Figure 1] 1 is a schematic diagram showing a configuration of a power system to which a control device according to an embodiment of the present invention is applied; [Diagram 2] 1 is a schematic diagram showing a functional configuration of a power storage system mounted on a vehicle; [Diagram 3] 2 is a block diagram showing an example of a hardware configuration of a control device according to the present embodiment. FIG. [Figure 4] FIG. 2 is a block diagram showing an example of a functional configuration of a control device according to the present embodiment. [Diagram 5] 5 is a flowchart showing an example of a process flow of DR control by the control device of the present embodiment. [Figure 6] 1 is a graph showing changes over time in the SOC of a mobile terminal owned by user A. [Figure 7] 13 is a graph showing changes over time in the SOC of a mobile terminal owned by user B. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0023] 1 is a schematic diagram showing the configuration of a power system 1 to which a control device 10 according to an embodiment of the present invention is applied. The power system 1 includes a power generation device 2, an electric power consumer 3, a charging / discharging facility 4, a vehicle 30, a mobile terminal 40, an aggregator server 5, and the control device 10.
[0024] The power generation device 2 is connected to a power network 100 such as a power system. The power generation device 2 is, for example, a power plant operated by an electric power company. Power consumers 3 and charging / discharging equipment 4 are connected to the power network 100. Electric power generated by the power generation device 2 is supplied to the power consumers 3 and charging / discharging equipment 4 through the power network 100.
[0025] The charging / discharging equipment 4 is installed in a building 110 such as a residence or a facility. The charging / discharging equipment 4 charges and discharges a power storage system 31 mounted on a vehicle 30. The vehicle 30 is, for example, an electric vehicle. The use and type of the vehicle 30 are not particularly limited. The vehicle 30 may be a privately owned vehicle, a vehicle used by a business operator for business purposes, a shared car, etc.
[0026] When power is supplied from the power storage system 31 to the charging / discharging equipment 4, the supplied power is consumed by power loads in the building 110, or is provided to the power grid 100 via power lines installed in the building 110. When the charging / discharging equipment 4 supplies power to the power storage system 31, the charging / discharging equipment 4 supplies power transmitted from the power grid 100 to the power storage system 31, or supplies power produced by the building 110 itself by solar power generation or the like to the power storage system 31.
[0027] FIG. 2 is a schematic diagram showing a functional configuration of the power storage system 31 mounted on the vehicle 30. As shown in FIG. 2, the power storage system 31 includes a system control unit 32, a battery 33, an electric device 34, and a non-contact charging device 35. The system control unit 32 is configured to be able to communicate with external devices such as the control device 10. The system control unit 32 is a control device such as an ECU (Electronic Control Unit) that controls charging and discharging of the battery 33 and the operation of the electric device 34. The battery 33 is a battery that supplies power for driving the vehicle 30. The electric device 34 operates to charge and discharge the battery 33. The electric device 34 includes electric components such as a relay, a switch, and a DC-DC converter, and communication devices such as a TCU (Telematics Control Unit). The non-contact charging device 35 uses the power of the battery 33 or the power of an auxiliary battery such as a lead storage battery to supply power to the mobile terminal 40 in a non-contact manner. However, in this embodiment, the non-contact charging device is not limited to the non-contact charging device 35, and a normal plug-connected charging device may be used instead of the non-contact charging device 35.
[0028] Returning to FIG. 1 , the mobile terminal 40 will be described. The mobile terminal 40 is a computer associated with the vehicle 30 or the vehicle's power storage system 31. The mobile terminal 40 is, for example, a portable computer such as a smartphone or a tablet. The mobile terminal 40 is configured to be able to communicate with the control device 10 via a communication network 101. The mobile terminal 40 transmits a usage history including information regarding charging of the mobile terminal 40 itself to the control device 10 via the communication network 101. This usage history may include information regarding attributes such as gender and employee status.
[0029] The information on charging is data on the past usage history such as the full charge maintenance rate of the mobile terminal 40, the change in the charging state over time, and the timing of charging. The mobile terminal 40 transmits the information on charging to the control device 10 by communication using a communication cable or wirelessly. The mobile terminal 40 may transmit the information on charging to the system control unit 32 at the timing of power supply by the non-contact charging device 35, and the system control unit 32 may transmit the information on charging to the control device 10 via the communication network 101. Furthermore, the mobile terminal 40 may transmit the information on charging to the control device 10 via the communication network 101 by a dedicated program (app) installed in the mobile terminal 40. The information on charging may be transmitted at the timing of charging, periodically, or based on a request from the control device 10. In this way, various methods can be adopted as a method for transmitting the information on charging.
[0030] The aggregator server 5 is a server used by an electricity aggregator that trades electricity in the electricity market. The aggregator server 5 is configured to be able to communicate with the control device 10 via a communication network 101. The aggregator server 5 transmits information on electricity supply and demand via the communication network 101 to the control device 10 that performs DR (Demand Response) control for adjusting supply and demand in the electricity grid 100. The information on electricity supply and demand is, for example, information including an adjustment power amount based on the electricity demand amount and a target period.
[0031] The control device 10 is a power resource management device that determines a combination of a plurality of power consumers 3 and vehicles 30 to which a DR request is to be assigned. The control device 10 acquires information on power supply and demand received from the aggregator server 5. The control device 10 may acquire information on power supply and demand from power generation devices 2 and power consumers 3 other than the aggregator server 5. Note that the building 110 in which the charging / discharging facility 4 is installed may be included in the power consumers 3.
[0032] The control device 10 executes DR control to provide a necessary amount of power to the power grid 100 and consume power from the power grid 100 based on information on power supply and demand. In DR control, a process is performed to balance the amount of power generated by the power generation device 2 and the amount of power demand. On the demand side, when the amount of power demand is greater than the amount of power generated, adjustment is made to decrease the amount of power demand, and when the amount of power demand is less than the amount of power generated, adjustment is made to increase the amount of power demand. For example, the control device 10 controls the charging and discharging of the battery 33 for the charging and discharging equipment 4 and the power storage system 31 (battery 33) based on information on power supply and demand from the aggregator server 5, thereby adjusting the power of the power grid 100.
[0033] Next, a hardware configuration of the control device 10 will be described with reference to Fig. 3. Fig. 3 is a block diagram showing an example of a hardware configuration of the control device 10 of this embodiment. As shown in Fig. 3, the control device 10 is a computer including a processor 11, a ROM (read-only memory) 12, a RAM (random-access memory) 13, an auxiliary storage device 14, and a communication I / F (interface) 15, and each part is connected by a bus or the like.
[0034] The processor 11 is a central part of a computer that performs various calculations and processes such as calculations and controls required for the operation of the control device 10. The processor 11 is, for example, a central processing unit (CPU), a micro processing unit (MPU), a system on a chip (SoC), a digital signal processor (DSP), a graphics processing unit (GPU), an application specific integrated circuit (ASIC), a programmable logic device (PLD), or a field-programmable gate array (FPGA). Alternatively, the processor 11 is a combination of two or more of these. The processor 11 may also be a combination of these with a hardware accelerator or the like.
[0035] The processor 11 controls each unit to realize various functions of the control device 10 based on programs such as firmware, system software, and application software stored in the ROM 12 or the auxiliary storage device 14. The processor 11 also executes processes described below based on the programs. Note that a part or all of the programs may be incorporated in the circuitry of the processor 11.
[0036] ROM 12 and RAM 13 are main storage devices of a computer with processor 11 at its core. ROM 12 is a non-volatile memory used exclusively for reading data. ROM 12 stores, for example, firmware among the above programs. ROM 12 also stores data used by processor 11 when performing various processes. RAM 13 is a memory used for reading and writing data. RAM 13 is used as a work area or the like for storing data temporarily used by processor 11 when performing various processes. RAM 13 is typically a volatile memory.
[0037] The auxiliary storage device 14 is, for example, an EEPROM (electric erasable programmable read-only memory), a HDD (hard disk drive), or a flash memory. The auxiliary storage device 14 stores, for example, system software and application software among the above programs. The auxiliary storage device 14 also stores data used by the processor 11 in performing various processes, data generated by the processes in the processor 11, various setting values, and the like. The communication I / F 15 is an interface for communicating with an external device.
[0038] In the present embodiment, the control device 10 is implemented by a single computer, but is not limited to this configuration. The control device 10 may be implemented by multiple computers. At least some of the functions of the control device 10 may be implemented by one or more servers such as a cloud server. In addition, a large-scale distributed ledger mechanism may be used as appropriate.
[0039] Next, the control function of the control device 10 realized by the hardware configuration of the control device 10 will be described. Fig. 4 is a block diagram showing an example of the functional configuration of the control device 10 of this embodiment. Fig. 5 is a flowchart showing an example of the process flow of DR control by the control device 10 of this embodiment. Note that the functional blocks of Fig. 4 and the flowchart of Fig. 5 are merely examples, and the order and configuration of the processes can be changed as appropriate.
[0040] 4, the control device 10 includes an acquisition unit 21, a priority setting unit 22, a notification unit 23, a demand forecasting unit 24, a selection unit 25, and a DR control execution unit 26 as functional units operating in the processor 11. The configuration of each functional unit will be described below with reference to FIG. 5.
[0041] In step S11, the acquisition unit 21 acquires information indicating the usage history of the user's mobile terminal 40 in order to acquire the user's behavioral characteristics regarding charging. The information indicating the usage history acquired by the acquisition unit 21 is managed (stored) separately for each user. For example, when using a mobile terminal 40 such as a smartphone, behavioral characteristics regarding charging vary from person to person, such as some people tend to charge frequently, some people charge when the SOC (State Of Charge) drops to a certain level, and some people do not charge until the capacity is almost zero or close to zero.
[0042] The information indicating the usage history is, for example, information indicating a time change in SOC indicating the charging state of mobile terminal 40. In the following explanation, when it is necessary to distinguish between user A and user B, the mobile terminal 40 owned by user A will be referred to as mobile terminal 40a, the vehicle 30 as vehicle 30a, and the charging / discharging facility 4 as charging / discharging facility 4a, and the mobile terminal 40 owned by user B will be referred to as mobile terminal 40b, the vehicle 30 as vehicle 30b, and the charging / discharging facility 4 as charging / discharging facility 4b.
[0043] Information showing different usage histories for each user will be described with reference to Fig. 6 and Fig. 7. Fig. 6 is a graph showing the change over time of the SOC of a mobile terminal 40a owned by a user A. Fig. 7 is a graph showing the change over time of the SOC of a mobile terminal 40b owned by a user B. In Fig. 6 and Fig. 7, the arrows indicate a plug-in that electrically connects the battery 33 of the power storage system 31 of the vehicle 30 to the charging / discharging equipment 4 to start charging.
[0044] Comparing Figures 6 and 7, User A periodically charges as time passes, and has a high plug-in rate, aiming to always fully charge. On the other hand, User B does not charge until the SOC drops to a certain level, and there are also periods of non-charging standby. User B's behavioral characteristics are that he plugs in and charges when the SOC reaches a threshold.
[0045] In order to perform DR control, it is necessary for the charging / discharging facility 4 and the power storage system 31 of the vehicle 30 to be electrically connected. If the above-mentioned behavioral characteristics of the mobile terminal 40 are applied to the power storage system 31 of the vehicle 30, it is more likely that the power storage system 31 (battery 33) of the vehicle 30a of user A, which has a higher plug-in probability than user B, is connected to the charging / discharging facility 4a.
[0046] The following describes the room for increasing (increasing power demand) and decreasing (decreasing power demand) the DR when the charging / discharging facility 4 and the power storage system 31 of the vehicle 30 are electrically connected. User A tends to have a higher SOC at plug-in than user B. Therefore, from the perspective of the room for increasing the DR, the power storage system 31 of the vehicle 30b of user B, which has a low SOC, is more likely to be able to absorb a larger amount of power from the power grid 100 by charging and increase the demand, compared to the power storage system 31 of the vehicle 30a of user A. On the other hand, from the perspective of the room for decreasing the DR, the power storage system 31 of the vehicle 30a of user A, which has a high SOC, is more likely to be able to provide a larger amount of power to the power grid 100 by discharging, compared to the power storage system 31 of the vehicle 30b of user B.
[0047] Returning to Fig. 5, the process of step S12 executed after the acquisition process of step S11 will be described. In step S12, the priority setting unit 22 sets the priority of the power storage system 31 of the vehicle 30 of the user to be subject to DR control based on the behavioral characteristics of the user. For example, the priority setting unit 22 sets high the priority of the power storage system 31 of the vehicle 30a of user A who shows a behavioral characteristic of high frequency of charging the mobile terminal 40a. A user who is set high in priority is given preferential treatment (reward) in terms of points, money, services, etc. After the process of step S12, the process proceeds to step S13.
[0048] In step S13, the notification unit 23 sets the notification frequency based on the behavioral characteristics of the user. For example, the notification unit 23 sets the notification frequency relatively high for the user B who shows a behavioral characteristic of charging the mobile terminal 40b infrequently. After the process of step S13, the process proceeds to step S14.
[0049] In step S14, the demand forecasting unit 24 obtains a demand forecast for electricity based on various environmental information. The various environmental information includes, for example, weather information, season, temperature, past performance, information on the supply and demand of electricity within the area of the power grid 100, and the like. The demand forecasting unit 24 of this embodiment performs demand forecasting by reflecting the charging and discharging timing of the power storage system 31 estimated based on the user's behavioral characteristics in addition to the various environmental information. The usage history of the user's mobile terminal 40 functions as a parameter for calculating the demand forecast. After the process of step S14, the process proceeds to step S15.
[0050] In step S15, the selector 25 executes a selection process for selecting, from the plurality of power storage systems 31, a power storage system 31 that transmits and receives power to and from the power grid 100. An example of the selection process of this embodiment will be described below.
[0051] In the selection process, the selection unit 25 estimates a tendency of charging and discharging the power storage system 31 of the vehicle 30 based on information indicating the usage history of the mobile terminal 40 of the user acquired by the acquisition unit 21. For example, the selection unit 25 estimates the charging and discharging timing of the power storage system 31 of the vehicle 30a based on the behavioral characteristics of the user A, and estimates the charging and discharging timing of the power storage system 31 of the vehicle 30b based on the behavioral characteristics of the user B. This charging and discharging timing is performed for each registered user.
[0052] Next, the selection unit 25 selects the power storage system 31 to be the target of DR control based on the estimated charging and discharging tendency. When the supply and demand state is a power surplus, the power storage system 31 that is likely to have a low SOC, such as the power storage system 31 of user B, is preferentially set as the target of DR control, and the power storage system 31 is charged to absorb power. When the supply and demand state is a power shortage, the power storage system 31 that is likely to have a high SOC, such as the power storage system 31 of user A, is preferentially set as the target of DR control, and the power storage system 31 is discharged to transmit power to the power grid 100.
[0053] Further, the selection unit 25 generates an allocation plan of the target power storage systems 31 to be subjected to DR control based on the demand forecast by the demand forecast unit 24, information on power supply and demand acquired from the aggregator server 5, or both. The allocation plan specifies the number of power storage systems 31 and the target power storage systems 31 of the users. As described above, the power storage systems 31 of the users set in the allocation plan change depending on whether the power supply and demand state is a power surplus or a power shortage. For example, the selection unit 25 creates an allocation plan that preferentially combines the power storage systems 31 that are likely to be connected to the charging and discharging equipment 4 (high DR certainty) or that are set to a high priority from among the selected target power storage systems 31. In this way, the usage history of the user's mobile terminal 40 functions as a parameter for generating the allocation plan.
[0054] The process of step S16 executed after the selection process of step S15 will be described. In step S16, the notification unit 23 notifies the power storage system 31 of the vehicle 30 selected as the target of DR control by the selection unit 25 of a charge / discharge request. The notification unit 23 may notify the system control unit 32 of the power storage system 31, or may notify the mobile terminal 40 of the user. After the process of step S16, the process proceeds to step S17.
[0055] In step S17, the DR control execution unit 26 executes charging / discharging for the target power storage system 31 that has responded to the notification from the notification unit 23. Alternatively, the DR control execution unit 26 executes DR if the participation conditions such as plug-in are met, without responding to each participation request for each DR event with regard to whether or not participation is possible, for example. A series of processes from step S11 to step S17 executes DR control that reflects the behavioral characteristics of the user of the control device 10. As a result, a plurality of batteries 33 mounted on a plurality of vehicles 30 provide power resources to the power grid 100.
[0056] As described above, the control device 10 of this embodiment includes an acquisition unit 21 that acquires, for each power storage system 31, a usage history of a mobile terminal 40 as an external power storage device associated with the power storage system 31 mounted on each of a plurality of vehicles 30, and a selection unit 25 that estimates a tendency for charging and discharging between the power storage system 31 and the power network 100 based on the usage history of the mobile terminal 40, and selects, from the plurality of power storage systems 31, a power storage system 31 that charges and discharges between the power storage system 31 and the power network 100 in accordance with the estimation result.
[0057] This makes it possible to obtain a behavioral characteristic of the user regarding charging from the usage history of another device (external power storage device) different from the power storage system 31 of the vehicle 30, and to predict the tendency of charging and discharging of the power storage system 31 of the vehicle 30 by using this behavioral characteristic. Therefore, even if there is insufficient vehicle usage information for predicting the tendency of charging and discharging of the power storage system 31, it is possible to grasp the tendency of charging and discharging of the power storage system 31, and to accurately select the power storage system 31 to be the target of DR control.
[0058] In this embodiment, the external power storage device is a mobile terminal 40 owned by the user of the vehicle 30.
[0059] This makes it possible to easily and accurately acquire the user's behavioral characteristics regarding charging from a mobile terminal 40, such as a smartphone or tablet, that the user regularly uses.
[0060] Moreover, the control device 10 of the present embodiment further includes a priority setting unit 22 that sets a high priority to the power storage system 31 corresponding to the mobile terminal 40 when the charging frequency of the mobile terminal 40 is high.
[0061] This allows users who are highly likely to be connected to the charging / discharging facility 4 and the power storage system 31 and who have a high contribution to DR control to be managed by distinguishing them based on priority. Therefore, it is possible to preferentially select the power storage system 31 of a user with a high priority, or to give points, services, etc. to the user with a high priority.
[0062] Moreover, the control device 10 of this embodiment further includes a notification unit 23 that, when the charging frequency of the mobile terminal 40 is low, sets the frequency of notifying the power storage system 31 corresponding to the mobile terminal 40 of information related to charging and discharging to be high.
[0063] This makes it easier for users who are unlikely to have their charging / discharging equipment 4 and the power storage system 31 connected to each other to recognize information related to charging / discharging, such as a request for charging / discharging and the start of DR control, thereby increasing the probability of connecting the charging / discharging equipment 4 and the power storage system 31. This increases the responsiveness of the power storage system 31, thereby making it possible to further improve the effectiveness of DR control.
[0064] Furthermore, in this embodiment, the selection unit 25 reflects the degree and timing of maintaining the charged state of the mobile terminal 40 in the selection of the power storage system.
[0065] This makes it possible to obtain more detailed behavioral characteristics relating to charging, such as the ratio of the charging and discharging charge rate and the timing of charging, and therefore makes it possible to more accurately predict the tendency of charging and discharging of the electricity storage system 31.
[0066] Further, in this embodiment, the acquisition unit 21 acquires information including at least a charging history at the timing when the mobile terminal 40 is charged inside the vehicle 30 as a usage history.
[0067] This makes it possible to reliably and easily acquire the user's behavioral characteristics regarding charging at the timing when the mobile terminal 40 is charged in the vehicle 30. Furthermore, by determining that the user is aboard the vehicle 30, the control device 10 can send the user a notification requesting charging / discharging at the timing when the user gets off the vehicle 30. Getting off the vehicle is a good timing to connect the charging / discharging equipment 4 and the power storage system 31 of the vehicle 30, and it is also possible to effectively encourage the user to charge / discharge.
[0068] In this embodiment, the acquisition unit 21 acquires the usage history when charging is performed by the wireless charging device 35 in the vehicle 30.
[0069] This allows for more time to acquire the usage history by using contactless power supply that is easy for users to use, and enables more accurate estimation of the charging and discharging tendency of the power storage system 31. By acquiring the usage history of drivers who are likely to perform charging operations of the power storage system 31, the charging and discharging tendency of the power storage system 31 can be predicted more accurately.
[0070] Moreover, in this embodiment, the selection unit 25 preferentially selects the electricity storage system 31 that is highly likely to be connected to the charging / discharging facility 4.
[0071] As a result, since there is a high probability that the power storage system 31 selected by the selection unit 25 is connected to the charging / discharging equipment 4, more effective DR control can be realized.
[0072] Furthermore, in this embodiment, when the supply and demand state of the power network 100 is a power surplus, the selector 25 preferentially selects the power storage system 31 of a user that shows a tendency for the charging rate to be low based on the usage history.
[0073] As a result, the power storage system 31 that can consume (charge) more power because the charging rate is low is selected as the target of DR control, so that the margin during DR control can be increased and more stable supply and demand adjustment can be performed.
[0074] Furthermore, in this embodiment, when the supply and demand state of the power network 100 is a power shortage, the selector 25 preferentially selects the power storage system 31 of a user that shows a tendency for a high charging rate based on the usage history.
[0075] As a result, the power storage system 31 that can provide (discharge) more power because of its high charging rate is selected as a target for DR control when power is insufficient, so that more stable supply and demand adjustment can be performed.
[0076] Further, in this embodiment, the selection unit 25 generates an allocation plan indicating a combination of the energy storage systems 31 selected for charging / discharging between the energy storage systems 31 and the power grid 100, and in the allocation plan, the energy storage systems are selected using a priority set based on the charging / discharging tendency as a parameter.
[0077] This makes it possible to accurately select a combination of power storage systems 31 to be selected from a plurality of power storage systems 31 present within the area of the power network 100 by utilizing the behavioral characteristics of the user regarding charging.
[0078] In addition, the control device 10 of this embodiment is equipped with an acquisition unit 21 that acquires, for each power storage system 31, a usage history of a mobile terminal 40 as an external power storage device associated with the power storage system 31 mounted on each of the multiple vehicles 30, and a demand prediction unit 24 that acquires a demand forecast for the power network and reflects in the demand prediction a tendency of charging and discharging between the power storage system 31 and the power network 100 estimated based on the usage history of the mobile terminal 40.
[0079] This makes it possible to obtain a behavioral characteristic of the user regarding charging from the usage history of another device (external power storage device) different from the power storage system 31 of the vehicle 30, and to predict the tendency of charging and discharging the power storage system 31 of the vehicle 30 by using this behavioral characteristic. Therefore, even if there is insufficient vehicle usage information for predicting the tendency of charging and discharging the power storage system 31, it is possible to grasp the tendency of charging and discharging the power storage system 31, and to accurately predict the power demand within the area of the power network 100.
[0080] The above-mentioned series of processes can be executed by hardware or software. In other words, the above-mentioned functional configuration is merely an example and is not particularly limited. That is, it is sufficient that the computer has a function capable of executing the above-mentioned series of processes as a whole, and the type of functional block used to realize this function is not particularly limited to the above-mentioned example. In addition, the location of the functional block is not particularly limited and may be arbitrary. For example, one functional block may be configured as a single piece of hardware, may be configured as a single piece of software, or may be configured as a combination of these. When the series of processes are executed by software, a program constituting the software is installed in a computer or the like from a network or a recording medium. The computer may be a computer built into dedicated hardware. In addition, the computer may be a computer capable of executing various functions by installing various programs, such as a server, a general-purpose smartphone, or a personal computer.
[0081] A recording medium containing such a program may be constituted not only by a removable medium (not shown) that is distributed separately from the device main body in order to provide the program to a user, but also by a recording medium provided to a user in a state where the medium is pre-installed in the device main body. Since the program can be distributed via a network, the recording medium may be mounted on or accessible to a computer that is connected to or can be connected to the network. In addition, the steps of describing the program recorded on the recording medium include not only processes that are performed chronologically according to the order, but also processes that are not necessarily processed chronologically but are executed in parallel or individually. [Explanation of symbols]
[0082] 10 Control device 21 Acquisition Department 22 Priority setting section 23 Notification Department 24 Demand Forecasting Department 25 Selection section 30 Vehicles 31 Energy Storage System 40 Mobile terminal (external power storage device)
Claims
1. an acquisition unit that acquires, for each of a plurality of power storage systems mounted on each of the plurality of vehicles, a usage history of an external power storage device associated with the power storage system; a selection unit that estimates a tendency of charging and discharging between the power storage system and a power grid based on the usage history of the external power storage device, and selects the power storage system that will charge and discharge between the power storage system and the power grid from among the plurality of power storage systems in accordance with a result of the estimation.
2. The control device according to claim 1 , wherein the external power storage device is a mobile terminal owned by a user of the vehicle.
3. The control device according to claim 1 , further comprising a priority setting unit that sets a high priority to the power storage system corresponding to the external power storage device when the external power storage device is charged frequently.
4. The control device according to claim 1 , further comprising a notification unit that sets a frequency of notifying the power storage system corresponding to the external power storage device of information related to charging and discharging to be high when the external power storage device is charged at a low frequency.
5. The control device according to claim 1 , wherein the selection unit reflects a degree and timing of maintaining the state of charge of the external power storage device in the selection of the power storage system.
6. The control device according to claim 1 , wherein the acquisition unit acquires, as the usage history, information including at least a charging history at a timing when the external power storage device is charged inside the vehicle.
7. The control device according to claim 6 , wherein the acquisition unit acquires the usage history during charging by a wireless charging device in the vehicle.
8. The control device according to claim 1 , wherein the selection unit preferentially selects the power storage system that is highly likely to be connected to a charging / discharging facility.
9. The control device according to claim 1 , wherein the selection unit, when a supply-demand state of the power grid is a power surplus, preferentially selects the power storage system of a user that shows a tendency for a low charging rate based on the usage history.
10. The control device according to claim 1 , wherein the selection unit, when the supply and demand state of the power grid is insufficient, preferentially selects the power storage system of a user that shows a tendency for a high charging rate based on the usage history.
11. The selection unit generates an allocation plan indicating a combination of the power storage systems selected for charging / discharging between the power storage systems and the power grid; The control device according to claim 1 , wherein in the allocation plan, the power storage systems are selected using a priority level set based on the charging / discharging tendency as a parameter.
12. an acquisition unit that acquires, for each of a plurality of power storage systems mounted on each of the plurality of vehicles, a usage history of an external power storage device associated with the power storage system; a demand prediction unit that acquires a demand forecast for a power grid, and reflects in the demand forecast a tendency of charging and discharging between the power storage system and the power grid that is estimated based on the usage history of the external power storage device.
Citation Information
Patent Citations
Control apparatus and program
JP2020115707A
Charge / discharge management device and vehicle
JP2021040373A
Distributed energy resource management device, distributed energy resource management method, and distributed energy resource management program
JP2022050126A
State prediction system, state prediction method, and program
JP2022101729A
Method and system for charging a fleet of batteries
US20120133337A1
