Load-bearing wall and building

The load-bearing wall system integrates wooden walls with steel frames using joining mechanisms, allowing independent installation and enhancing earthquake resistance, addressing construction clarity and structural resilience.

JP2024137548AActive Publication Date: 2024-10-07KURASAWA CONSTR CO LTD +1
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2023049106
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-25
Publication Date
2024-10-07
Estimated Expiration
2043-03-25

AI Technical Summary

Technical Problem

Conventional steel and wooden structures face challenges in earthquake resistance, leading to unclear construction responsibilities and limitations on spatial configurations, requiring collaboration between steel frame craftsmen and carpenters.

Method used

A load-bearing wall system using a rectangular frame-shaped steel frame structure with wooden load-bearing walls connected via first and second joining mechanisms, allowing for independent installation by steel frame craftsmen, enhancing earthquake resistance through tension bolts and reinforced concrete beams.

Benefits of technology

Clarifies construction responsibilities and improves earthquake resistance by transmitting earthquake forces to the steel frame structure, reducing interstory deformation and enabling easy replacement of damaged walls.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024137548000001_ABST
    Figure 2024137548000001_ABST
Patent Text Reader

Abstract

To clarify who is responsible for construction.SOLUTION: A load-bearing wall 7 is provided in a rectangular steel frame structure 2A composed of a steel beam 5, a reinforced concrete beam 6, etc., and is joined to each of the steel beam 5 and the reinforced concrete beam 6 via a first connecting mechanism 8 and a second connecting mechanism 9. The first connecting mechanism 8 includes one pull bolt 11 vertically incorporated in the load-bearing wall 7, a first wall side metal fitting 12 fixed to the load-bearing wall 7 with the one pull bolt 11, and a first frame structure side metal fitting 13 welded to the steel beam 5 or fixed to the reinforced concrete beam 6 with a first anchor bolt 17 and joined to the first wall side metal fitting 12 with a plurality of first joining bolts 16. The second connecting mechanism 9 has a second wall side metal fitting 21 fixed to the load-bearing wall 7 with a plurality of fixing bolts, and a second frame structure side metal fitting 22 welded to the steel beam 5 or fixed to the reinforced concrete beam 6 with a second anchor bolt 24 and joined to the second wall side metal fitting 21 with one second joining bolt 23.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a wooden load-bearing wall and a building joined to a steel-framed framework composed of columns and beams. [Background technology]

[0002] In conventional steel-frame construction, earthquake resistance is generally increased by using rigid-jointed beams for the columns and beams (frame structure) or by using brace structures with diagonal braces on the column and beam structures. However, rigid-jointed structures have large inter-story deformation during earthquakes, and brace structures have restrictions on floor plans.

[0003] Furthermore, traditional wooden structures were subject to restrictions on spatial configuration, such as span, height and number of floors, due to considerations of earthquake resistance and vibration environment, making them unsuitable for the construction of office buildings or apartment buildings.

[0004] In this situation, a building that adopts a wooden structure in a steel frame structure has been proposed (see, for example, Patent Document 1). Patent Document 1 discloses a building that includes a framework constructed of steel beams and columns, a seismic wall that is provided within the framework and is made of laminated and bonded wooden boards with their grain directions perpendicular to each other, and tension bolts that are arranged across the beams and the seismic wall and join the beams (steel frame) and the seismic wall, the seismic wall having an insertion hole formed in an end face of the seismic wall on the beam side and through which the tension bolt is inserted, and a recess formed in a surface of the seismic wall and connected to the insertion hole, in which a nut that is fastened to one end of the tension bolt inserted into the insertion hole is disposed. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] Patent No. 7040725 Summary of the Invention [Problem to be solved by the invention]

[0006] At a construction site, work is divided into different parts, so essentially, steel frame scaffolders work on the steel frame, and carpenters work on wooden load-bearing walls (earthquake-resistant walls), etc. However, the load-bearing walls of the building described in Patent Document 1 are directly connected to the steel frame with tension bolts and bolts, so knowledge and experience of steel frames and wooden construction are required for construction. For this reason, the steel frame scaffolders and carpenters need to work together on the construction, but if they do so, it is possible that the responsibility for the construction will become unclear.

[0007] The present invention has been made in consideration of the above-mentioned problems, and has an object to provide a load-bearing wall and a building in which responsibility for construction is clearly defined. [Means for solving the problem]

[0008] (1) The present invention relates to a rectangular wooden load-bearing wall (e.g., load-bearing wall 7 described later) that is provided in a rectangular frame-shaped steel-framed structure (e.g., load-bearing wall 2A described later) that is composed of a pair of left and right columns (e.g., a pair of left and right columns 3 and 4 described later), an upper steel-framed beam (e.g., a steel-framed beam 5 described later), and a lower reinforced concrete beam (e.g., a reinforced concrete beam 6 described later), and is joined to each of the steel-framed beam and the reinforced concrete beam via a first joint mechanism (e.g., a first joint mechanism 8 described later) on the left and right and a second joint mechanism (e.g., a second joint mechanism 9 described later) located between the first joint mechanisms on the left and right, and each of the first joint mechanisms on the left and right includes a tension bolt (e.g., a tension bolt 11 described later) vertically incorporated in the load-bearing wall and a first wall-side metal fitting (e.g., and the second joining mechanism is a load-bearing wall having a second wall-side metal fitting (for example, a second wall-side metal fitting 21 described later) fixed to the load-bearing wall with a plurality of fixing bolts, and a second frame-side metal fitting (for example, a second frame-side metal fitting 22 described later) welded to the steel-framed beam or fixed to the reinforced concrete beam with a first anchor bolt (for example, a first anchor bolt 17 described later) and joined to the first wall-side metal fitting with one second joining bolt (for example, a second joining bolt 23 described later).

[0009] According to the present invention, in a factory where a load-bearing wall is manufactured, the first wall-side metal fitting is temporarily fixed to the load-bearing wall with a pull bolt, and the second wall-side metal fitting is temporarily fixed to the load-bearing wall with a fixing bolt, and in a factory where a steel frame is manufactured, the first frame-side metal fitting and the second frame-side metal fitting are welded to the steel frame beam, so that at the construction site, the first frame-side metal fitting is fixed to the reinforced concrete beam with the first anchor bolt, and the second frame-side metal fitting is fixed to the reinforced concrete beam with the second anchor bolt, and then the first wall-side metal fitting is joined to the first frame-side metal fitting with the first fastening bolt, and the second wall-side metal fitting is joined to the second frame-side metal fitting with the second fastening bolt, and the load-bearing wall can be installed in the steel frame. Therefore, at the construction site, a steel frame scaffolder can carry out the work alone based on his knowledge and experience of steel frames.

[0010] Furthermore, according to the present invention, as the first connecting mechanism, a first wall-side metal fitting fixed to the load-bearing wall with a tensile bolt is connected by a plurality of first connecting bolts to a first structure-side metal fitting welded to a steel beam or fixed to a reinforced concrete beam with a first anchor bolt, and as the second connecting mechanism, a second wall-side metal fitting fixed to the load-bearing wall with a fixing bolt is connected by a single second connecting bolt to a second structure-side metal fitting welded to a steel beam or fixed to a reinforced concrete beam with a second anchor bolt. Therefore, the bending of the load-bearing wall generated during an earthquake can be transmitted to the steel frame structure via the first connecting mechanism, and the shear force of the load-bearing wall generated during an earthquake can be transmitted to the steel frame structure via the second connecting mechanism, resulting in improved earthquake resistance of the building.

[0011] According to the present invention, the first wall-side metal fitting fixed to the bearing wall with tension bolts is connected by a plurality of first connecting bolts to the first frame-side metal fitting welded to the steel beam or fixed to the reinforced concrete beam with first anchor bolts, so that the bearing wall has a restoring force characteristic that follows the inter-story deformation of the steel frame as the tension bolts stretch during an earthquake and returns to its original shape after the earthquake. Therefore, according to the present invention, the inter-story deformation angle during an earthquake can be kept small while maintaining the high deformation performance of the steel frame, and as a result, deformation during an earthquake can be suppressed, which contributes to reducing damage.

[0012] Specifically, according to the present invention, in the event of a moderate earthquake, the bearing walls function to return the building to its original state, so the shaking of the building can be kept small and residual damage can be reduced. Furthermore, according to the present invention, even if the bearing walls are damaged in a major earthquake, they can be easily replaced, and by replacing them, the original earthquake resistance can be restored, making it possible to prepare for future major earthquakes.

[0013] (2) The present invention also relates to a load-bearing wall as described in (1) above, in which the second wall side metal fitting fixed to the lower part of the load-bearing wall has a relatively vertically long hole (for example, the long hole 21a described later) as a bolt hole through which the second connecting bolt is passed.

[0014] According to the present invention, the second wall side metal fitting fixed to the bottom of the load-bearing wall has a long hole that is relatively longer vertically than horizontally as a bolt hole through which the second connecting bolt is passed, so that the second wall side metal fitting can be easily joined to the second frame side metal fitting even if there is some construction error.

[0015] (3) The present invention also relates to a load-bearing wall as described in (1) above, wherein the first wall side metal fitting fixed to the underside of the load-bearing wall has a relatively horizontally long hole (for example, long hole 12a described later) as a bolt hole through which the first connecting bolt is passed.

[0016] According to the present invention, the first wall side metal fitting fixed to the bottom of the load-bearing wall has a long hole that is relatively longer horizontally than vertically as a bolt hole through which the first connecting bolt is passed, so that the first wall side metal fitting can be easily joined to the first frame side metal fitting even if there is some construction error.

[0017] (4) The present invention also relates to a load-bearing wall as described in (1) above, wherein the first joining mechanism for joining the load-bearing wall to the reinforced concrete beam has a steel plate (e.g., steel plate 19 described later) interposed between the load-bearing wall and the first wall-side metal fitting fixed to the underside of the load-bearing wall for adjusting the vertical position of the first wall-side metal fitting.

[0018] According to the present invention, the first joining mechanism, which joins a load-bearing wall to a reinforced concrete beam, has a steel plate that is interposed between the load-bearing wall and the first wall-side metal fitting fixed below the load-bearing wall and adjusts the vertical position of the first wall-side metal fitting, so that even if there is some construction error, the first wall-side metal fitting can be easily joined to the first frame-side metal fitting.

[0019] (5) The present invention also relates to a bearing wall according to the above (1), which is made of cross-laminated timber.

[0020] According to the present invention, the bearing wall is made of cross-laminated timber panels having a strength comparable to that of concrete, so that the earthquake resistance of the building can be improved.

[0021] (6) The present invention also relates to a rectangular wooden load-bearing wall (e.g., load-bearing wall 7) that is provided in a rectangular steel frame structure (e.g., load-bearing wall 2B) that is composed of a pair of left and right columns (e.g., a pair of left and right columns 3 and 4 described later) and a pair of upper and lower steel beams (e.g., a pair of upper and lower steel beams 5 and 27 described later), and that is connected to each of the pair of upper and lower steel beams via left and right first joint mechanisms (e.g., first joint mechanism 8 described later) and a second joint mechanism (e.g., second joint mechanism 9 described later) located between the left and right first joint mechanisms, and each of the left and right first joint mechanisms is connected to the load-bearing wall via a tension bolt (e.g., tension bolt 11 described later) that is vertically incorporated into the load-bearing wall. and a first wall-side hardware (e.g., first wall-side hardware 12 described later) fixed to the load-bearing wall with the one tension bolt, and a first frame-side hardware (e.g., first frame-side hardware 13 described later) welded to the steel-framed beam and joined to the first wall-side hardware with the plurality of first connecting bolts (e.g., first connecting bolt 16 described later), and the second connecting mechanism is a load-bearing wall having a second wall-side hardware (e.g., second wall-side hardware 21 described later) fixed to the load-bearing wall with a plurality of fixing bolts, and a second frame-side hardware (e.g., second frame-side hardware 22 described later) welded to the steel-framed beam and joined to the second wall-side hardware with one second connecting bolt (e.g., second connecting bolt 23 described later).

[0022] According to the present invention, in a factory where the bearing walls are manufactured, the first wall-side metal fittings are temporarily fixed to the bearing walls with pull bolts, and the second wall-side metal fittings are temporarily fixed to the bearing walls with fixing bolts, and in a factory where the steel frame is manufactured, the first frame-side metal fittings and the second frame-side metal fittings are welded to each of a pair of upper and lower steel frame beams, so that at the construction site, the bearing walls can be installed within the steel frame by simply joining the first wall-side metal fittings to the first frame-side metal fittings with the first fastening bolts, and joining the second wall-side metal fittings to the second frame-side metal fittings with the second fastening bolts. Therefore, at the construction site, a steel frame scaffolder can carry out the work alone, based on his knowledge and experience of steel frames.

[0023] Furthermore, according to the present invention, as the first connecting mechanism, a first wall side metal fitting fixed to the load-bearing wall with a tensile bolt is connected to a first structural side metal fitting welded to a steel frame beam with multiple first connecting bolts, and as the second connecting mechanism, a second wall side metal fitting fixed to the load-bearing wall with a fixing bolt is connected to a second structural side metal fitting welded to a steel frame beam with one second connecting bolt. Therefore, the bending of the load-bearing wall generated during an earthquake can be transmitted to the steel frame structure via the first connecting mechanism, and the shear force of the load-bearing wall generated during an earthquake can be transmitted to the steel frame structure via the second connecting mechanism, resulting in improved earthquake resistance of the building.

[0024] According to the present invention, the first wall-side metal fastened to the bearing wall by tension bolts is connected to the first frame-side metal welded to the steel beam by a plurality of first connecting bolts as the first connecting mechanism, so that the bearing wall has a restoring force characteristic that follows the inter-story deformation of the steel frame as the tension bolts stretch during an earthquake and returns to its original shape after the earthquake. Therefore, according to the present invention, the inter-story deformation angle during an earthquake can be kept small while maintaining the high deformation performance of the steel frame, and as a result, deformation during an earthquake can be suppressed, which contributes to reducing damage.

[0025] Specifically, according to the present invention, in the event of a moderate earthquake, the bearing walls function to return the building to its original state, so the shaking of the building can be kept small and residual damage can be reduced. Furthermore, according to the present invention, even if the bearing walls are damaged in a major earthquake, they can be easily replaced, and by replacing them, the original earthquake resistance can be restored, making it possible to prepare for future major earthquakes.

[0026] (7) The present invention also relates to a load-bearing wall as described in (6) above, in which the second wall side metal fitting fixed to the lower part of the load-bearing wall has a relatively vertically long hole (for example, the long hole 21a described later) as a bolt hole through which the second connecting bolt is passed.

[0027] According to the present invention, the second wall side metal fitting fixed to the bottom of the load-bearing wall has a long hole that is relatively longer vertically than horizontally as a bolt hole through which the second connecting bolt is passed, so that the second wall side metal fitting can be easily joined to the second frame side metal fitting even if there is some construction error.

[0028] (8) The present invention also relates to a load-bearing wall as described in (6) above, wherein the first wall side metal fitting fixed to the underside of the load-bearing wall has a relatively horizontally long hole (for example, long hole 12a described later) as a bolt hole through which the first connecting bolt is passed.

[0029] According to the present invention, the first wall side metal fitting fixed to the bottom of the load-bearing wall has a long hole that is relatively longer horizontally than vertically as a bolt hole through which the first connecting bolt is passed, so that the first wall side metal fitting can be easily joined to the first frame side metal fitting even if there is some construction error.

[0030] (9) The present invention also relates to a load-bearing wall as described in (6) above, in which a first joining mechanism for joining the load-bearing wall to the lower of the pair of upper and lower steel beams has a steel plate (e.g., steel plate 19 described below) interposed between the load-bearing wall and the first wall-side metal fitting fixed to the underside of the load-bearing wall for adjusting the vertical position of the first wall-side metal fitting.

[0031] According to the present invention, the first joining mechanism, which joins a load-bearing wall to the lower of a pair of upper and lower steel beams, has a steel plate that is interposed between the load-bearing wall and the first wall-side metal fitting fixed to the lower part of the load-bearing wall and adjusts the vertical position of the first wall-side metal fitting, so that even if there is some construction error, the first wall-side metal fitting can be easily joined to the first frame-side metal fitting.

[0032] (10) The present invention also relates to a load-bearing wall according to the above (6), which is made of cross-laminated timber.

[0033] According to the present invention, the bearing wall is made of cross-laminated timber panels having a strength comparable to that of concrete, so that the earthquake resistance of the building can be improved.

[0034] (11) The present invention also relates to a building comprising a bearing wall according to any one of (1) to (10) above.

[0035] According to the present invention, in a factory where a load-bearing wall is manufactured, the first wall-side metal fitting is temporarily fixed to the load-bearing wall with a pull bolt, and the second wall-side metal fitting is temporarily fixed to the load-bearing wall with a fixing bolt, and in a factory where a steel frame is manufactured, the first frame-side metal fitting and the second frame-side metal fitting are welded to the steel frame beam. Then, at the construction site, if there is a reinforced concrete beam below, the first frame-side metal fitting is fixed to the reinforced concrete beam with the first anchor bolt, and the second frame-side metal fitting is fixed to the reinforced concrete beam with the second anchor bolt, and if there is a steel frame beam below, the first wall-side metal fitting is connected to the first frame-side metal fitting with the first fastening bolt, and the second wall-side metal fitting is connected to the second frame-side metal fitting with the second fastening bolt, so that the load-bearing wall can be installed in the steel frame. Therefore, at the construction site, a steel frame scaffolder can carry out the work alone based on his knowledge and experience of steel frames.

[0036] Furthermore, according to the present invention, as the first connecting mechanism, a first wall-side metal fitting fixed to the load-bearing wall with a tensile bolt is connected by a plurality of first connecting bolts to a first structure-side metal fitting welded to a steel beam or fixed to a reinforced concrete beam with a first anchor bolt, and as the second connecting mechanism, a second wall-side metal fitting fixed to the load-bearing wall with a fixing bolt is connected by a single second connecting bolt to a second structure-side metal fitting welded to a steel beam or fixed to a reinforced concrete beam with a second anchor bolt. Therefore, the bending of the load-bearing wall generated during an earthquake can be transmitted to the steel frame structure via the first connecting mechanism, and the shear force of the load-bearing wall generated during an earthquake can be transmitted to the steel frame structure via the second connecting mechanism, resulting in improved earthquake resistance of the building.

[0037] According to the present invention, the first wall-side metal fitting fixed to the bearing wall with tension bolts is connected by a plurality of first connecting bolts to the first frame-side metal fitting welded to the steel beam or fixed to the reinforced concrete beam with first anchor bolts, so that the bearing wall has a restoring force characteristic that follows the inter-story deformation of the steel frame as the tension bolts stretch during an earthquake and returns to its original shape after the earthquake. Therefore, according to the present invention, the inter-story deformation angle during an earthquake can be kept small while maintaining the high deformation performance of the steel frame, and as a result, deformation during an earthquake can be suppressed, which contributes to reducing damage.

[0038] Specifically, according to the present invention, in a moderate earthquake, the bearing walls work to return the building to its original state, so the shaking of the building can be kept small and residual damage can be reduced. Furthermore, according to the present invention, even if the bearing walls are damaged in a major earthquake, they can be easily replaced, and by replacing them, the original earthquake resistance can be restored, making it possible to prepare for future major earthquakes. Effect of the Invention

[0039] According to the bearing walls described in (1) to (10) above and the building described in (11) above, it is possible to clarify who is responsible for the construction. [Brief description of the drawings]

[0040] [Figure 1] FIG. 1 is a front view showing a frame and a bearing wall on the first floor of a building according to a first embodiment of the present invention. [Diagram 2] FIG. 2 is a cross-sectional view taken along the direction of arrows II-II in FIG. [Diagram 3] FIG. 3 is a cross-sectional view taken along the line III-III of FIG. [Figure 4] A front view showing the first wall-side metal fitting fixed to the bottom of a load-bearing wall via a steel plate. [Diagram 5] A front view showing the second wall side metal fitting fixed to the lower part of the load-bearing wall. [Figure 6] FIG. 11 is a front view showing the frame and bearing walls of the second and higher floors of a building according to a second embodiment of the present invention. [Figure 7] FIG. 7 is a cross-sectional view taken along the direction of arrows VII-VII in FIG. 6. [Figure 8] 8 is a cross-sectional view taken along the line VIII-VIII of FIG. 6. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0041] Hereinafter, with reference to the drawings, a detailed description will be given of the frames 2A (see Figures 1 to 3), 2B (see Figures 6 to 8) and load-bearing walls 7 (see Figures 1 to 8) of a building 1 (see Figures 1 to 3 and Figures 6 to 8) according to an embodiment of the present invention.

[0042] [First embodiment] First, the configuration of a frame 2A and a bearing wall 7 on the first floor of a building 1 according to the first embodiment will be described with reference to Figs. 1 to 5. Fig. 1 is a front view showing a frame 2A and a bearing wall 7 on the first floor of a building 1. Fig. 2 is a cross-sectional view taken along the direction of arrows II-II in Fig. 1. Fig. 3 is a cross-sectional view taken along the direction of arrows III-III in Fig. 1. Fig. 4 is a front view showing a first wall-side metal fitting 12 fixed to the lower part of the bearing wall 7 via a steel plate 19. Fig. 5 is a front view showing a second wall-side metal fitting 21 fixed to the lower part of the bearing wall 7.

[0043] As shown in Figs. 1 to 3, the first floor frame 2A of the building 1 is a rectangular steel frame structure consisting of a pair of left and right columns 3, 4, an upper steel beam 5, and a lower reinforced concrete beam 6. This frame 2A is earthquake-resistant by utilizing a rectangular wooden load-bearing wall 7. The load-bearing wall 7 is preferably made of cross-laminated timber (CLT), but may be made of laminated timber or plywood instead of cross-laminated timber, as long as it is made of wood. This load-bearing wall 7 is provided in the frame 2A and is connected to each of the steel beams 5 and the reinforced concrete beams 6 via first joint mechanisms 8 on the left and right, and second joint mechanisms 9 located between the first joint mechanisms 8 on the left and right.

[0044] Each of the left and right first joint mechanisms 8 shown in Figures 1 and 2 has one tension bolt 11, a first wall-side metal fitting 12, a first frame-side metal fitting 13, a metal plate 14, a nut 15, and a plurality of first joint bolts 16. Each of the left and right first joint mechanisms 8 that join the bearing wall 7 to the reinforced concrete beam 6 further has a first anchor bolt 17 and a nut 18. Furthermore, each of the left and right first joint mechanisms 8 that join the bearing wall 7 to the reinforced concrete beam 6 further has a steel plate 19 (see Figure 4) when it is necessary to adjust the height position of the first wall-side metal fitting 12.

[0045] One tension bolt 11 is vertically incorporated into the bearing wall 7 and fixes the first wall-side metal fitting 12 to the bearing wall 7. This tension bolt 11 is passed vertically from the upper end or lower end of the bearing wall 7 where the first wall-side metal fitting 12 is provided, through a tension bolt hole (not shown) formed vertically in the bearing wall 7, so that the tip of the tension bolt 11 reaches a through hole 7a formed in the bearing wall 7 and is fastened by a nut 15 via a metal plate 14 provided in the through hole 7a. The through hole 7a is a substantially cubic cavity that penetrates the bearing wall 7 from the front surface to the back surface, and the tip of the tension bolt 11, the metal plate 14, and the nut 15 are arranged in the through hole 7a.

[0046] The first wall-side metal fitting 12 is fixed to the upper or lower end of the bearing wall 7 with one tension bolt 11, and is joined to the first frame-side metal fitting 13 with multiple first connecting bolts 16. As shown in Fig. 4, the first wall-side metal fitting 12 fixed to the lower part of the bearing wall 7 has a long hole 12a that is relatively longer horizontally than vertically as a bolt hole through which the first connecting bolt 16 (see Figs. 1 and 2) is passed.

[0047] 1 and 2, in each of the first joint mechanisms 8 on the left and right sides that join the bearing wall 7 to the steel beam 5, the first frame side metal member 13 is welded to the steel beam 5 and joined to the first wall side metal member 12 with a plurality of first joining bolts 16.

[0048] In each of the left and right first connecting mechanisms 8 that connect the load-bearing wall 7 to the reinforced concrete beam 6, the first structural side metal fitting 13 is fixed to the reinforced concrete beam 6 by a first anchor bolt 17 and is connected to the first wall side metal fitting 12 by multiple first connecting bolts 16.

[0049] The metal plate 14 is provided on the upper or lower surface of the through hole 7a formed in the bearing wall 7, and is interposed between the nut 15 tightening the tension bolt 11 and the upper or lower surface of the through hole 7a. This metal plate 14 functions as a washer.

[0050] The nut 15 is provided in a through hole 7a formed in the bearing wall 7, and the first wall side metal fitting 12 is fixed to the bearing wall 7 by tightening the tension bolt 11.

[0051] A plurality of first fastening bolts 16 join the first wall side metal fitting 12 and the first frame side metal fitting 13 together.

[0052] The first anchor bolt 17 is embedded vertically in the reinforced concrete beam 6, and the tip of the first anchor bolt 17 protrudes vertically from the reinforced concrete beam 6. The first anchor bolt 17 fixes the first frame side hardware 13 to the reinforced concrete beam 6 by tightening a nut 18.

[0053] The nut 18 tightens the first anchor bolt 17 to fix the first frame side metal fitting 13 to the reinforced concrete beam 6 .

[0054] 4, the steel plate 19 is interposed between the bearing wall 7 and the first wall-side metal fitting 12 fixed below the bearing wall 7, and adjusts the height position of the first wall-side metal fitting 12. However, the steel plate 19 is not an essential component, and its presence or absence and its thickness are determined depending on the situation.

[0055] 1 and 3, the second joint mechanism 9 has a second wall-side metal fitting 21, a second frame-side metal fitting 22, a plurality of fixing bolts (not shown), and one second joint bolt 23. The second joint mechanism 9 that joins the bearing wall 7 to the reinforced concrete beam 6 further has a second anchor bolt 24 and a nut 25.

[0056] The second wall-side metal fitting 21 is fixed to the upper or lower end of the bearing wall 7 with a plurality of fixing bolts (not shown), and is joined to the second frame-side metal fitting 22 with second connecting bolts 23. As shown in Fig. 5, the second wall-side metal fitting 21 fixed to the lower part of the bearing wall 7 has a long hole 21a that is relatively longer vertically than horizontally as a bolt hole through which the second connecting bolt 23 (see Figs. 1 and 3) is passed.

[0057] 1 and 3, in the second joint mechanism 9 that joins the bearing wall 7 to the steel beam 5, the second frame side metal fitting 22 is welded to the steel beam 5 and joined to the second wall side metal fitting 21 by one second joining bolt 23.

[0058] In the second connecting mechanism 8 that connects the load-bearing wall 7 to the reinforced concrete beam 6, the second structural side metal fitting 22 is fixed to the reinforced concrete beam 6 with a second anchor bolt 24 and is connected to the second wall side metal fitting 21 with one second connecting bolt 23.

[0059] One second fastening bolt 23 joins the second wall side metal fitting 21 and the second frame side metal fitting 22 together.

[0060] The second anchor bolt 24 is embedded vertically in the reinforced concrete beam 6, and the tip of the second anchor bolt 24 protrudes vertically from the reinforced concrete beam 6. The second anchor bolt 24 fixes the second frame side metal fitting 22 to the reinforced concrete beam 6 by tightening a nut 25.

[0061] The nut 25 tightens the second anchor bolt 24 to fix the second frame side metal fitting 22 to the reinforced concrete beam 6.

[0062] In this way, with the building 1 and the load-bearing wall 7, in the factory where the load-bearing wall 7 is manufactured, the first wall-side hardware 12 is temporarily fixed to the load-bearing wall 7 with a pull bolt 11, and the second wall-side hardware 21 is temporarily fixed to the load-bearing wall 7 with a fixing bolt (not shown). Also, in the factory where the steel frame is manufactured, the first frame-side hardware 13 and the second frame-side hardware 22 are welded to the steel-framed beam 5. Then, at the construction site, the first frame-side hardware 13 is fixed to the reinforced concrete beam 6 with the first anchor bolt 17, and the second frame-side hardware 22 is fixed to the reinforced concrete beam 6 with the second anchor bolt 24, and then the first wall-side hardware 12 is joined to the first frame-side hardware 13 with the first connecting bolt 16, and the second wall-side hardware 21 is joined to the second frame-side hardware 22 with the second connecting bolt 23; this allows the load-bearing wall 7 to be installed within the steel-framed frame 2A. Therefore, at the construction site, a steel scaffolder can carry out the work independently based on his knowledge and experience of steel frames. This makes it possible to clearly define who is responsible for the work.

[0063] In addition, according to the building 1 and the load-bearing wall 7, as the first connecting mechanism 8, the first wall-side metal fitting 12 fixed to the load-bearing wall 7 with a tension bolt 11 is connected with a plurality of first connecting bolts 16 to the first frame-side metal fitting 13 welded to the steel-framed beam 5 or fixed to the reinforced concrete beam 6 with a first anchor bolt 17, and as the second connecting mechanism 9, the second wall-side metal fitting 21 fixed to the load-bearing wall 7 with a fixing bolt (not shown) is connected with one second connecting bolt 23 to the second frame-side metal fitting 22 welded to the steel-framed beam 5 or fixed to the reinforced concrete beam 6 with a second anchor bolt 24. Therefore, the bending of the load-bearing wall 7 generated during an earthquake can be transmitted to the steel-framed frame 2A via the first connecting mechanism 8, and the shear force of the load-bearing wall 7 generated during an earthquake can be transmitted to the steel-framed frame 2A via the second connecting mechanism 9, and as a result, the earthquake resistance of the building 1 can be improved.

[0064] Furthermore, in the building 1 and the bearing wall 7, the first wall-side metal fitting 12 fixed to the bearing wall 7 by the tension bolt 11 is connected by a plurality of first connecting bolts 16 to the first frame-side metal fitting 13 welded to the steel-framed beam 5 or fixed to the reinforced concrete beam 6 by the first anchor bolt 17, so that the bearing wall 7 has a restoring force characteristic that follows the inter-story deformation of the steel-framed frame 2A as the tension bolt 11 extends during an earthquake and returns to its original shape after the earthquake. Therefore, the building 1 and the bearing wall 7 can keep the inter-story deformation angle during an earthquake small while maintaining the high deformation performance of the steel-framed frame 2A, and as a result, deformation during an earthquake can be suppressed, contributing to reducing damage.

[0065] Specifically, in a moderate earthquake, the building 1 and the bearing wall 7 function to return the building 1 to its original state, so that the shaking of the building 1 can be kept small and residual damage can also be reduced. Furthermore, even if the building 1 and the bearing wall 7 are damaged in a major earthquake, they can be easily replaced, and by replacing them, the original earthquake resistance can be restored, making it possible to prepare for future major earthquakes.

[0066] Furthermore, according to the load-bearing wall 7, the second wall side metal fitting 21 fixed to the lower part of the load-bearing wall 7 has a long hole 21a that is relatively longer vertically than horizontally as a bolt hole through which the second connecting bolt 23 is passed, so that the second wall side metal fitting 21 can be easily joined to the second frame side metal fitting 22 even if there is some construction error.

[0067] Furthermore, according to the load-bearing wall 7, the first wall-side metal fitting 12 fixed to the lower part of the load-bearing wall 7 has a long hole 12a that is relatively longer horizontally than vertically as a bolt hole through which the first connecting bolt 16 is passed, so that the first wall-side metal fitting 12 can be easily joined to the first frame-side metal fitting 13 even if there is some construction error.

[0068] Furthermore, according to the load-bearing wall 7, when the first joining mechanism 8, which joins the load-bearing wall 7 to the reinforced concrete beam 6, has a steel plate 19 interposed between the load-bearing wall 7 and the first wall-side metal fitting 12 fixed below the load-bearing wall 7, which adjusts the vertical position of the first wall-side metal fitting 12, the first wall-side metal fitting 12 can be easily joined to the first frame-side metal fitting 13 even when there is some construction error.

[0069] Furthermore, when the bearing wall 7 is made of cross-laminated timber panels having a strength comparable to that of concrete, the earthquake resistance of the building 1 can be improved.

[0070] The aim of the building 1 and the load-bearing wall 7 is to standardize the design and construction so that they can be used by many designers and builders. The key to construction is that the connections are made to accommodate different forces (bending moment, shear force) and different structural types (concrete, steel frame, wood), and are standardized by fastening metal plates to metal plates with bolts (HTB: high tension bolts). This allows steel frame scaffolders to assemble using the same procedures they are accustomed to using on a daily basis, making construction quick and inexpensive.

[0071] [Second embodiment] Next, the configuration of a frame 2B and a bearing wall 7 on the second or higher floor of a building 1 according to a second embodiment will be described with reference to Figs. 6 to 8. Fig. 6 is a front view showing a frame 2B and a bearing wall 7 on the second or higher floor of a building 1. Fig. 7 is a cross-sectional view taken along the line VII-VII in Fig. 6. Fig. 8 is a cross-sectional view taken along the line VIII-VIII in Fig. 6.

[0072] Here, only the characteristic parts of the frame 2B and the load-bearing walls 7 of the building 1 in the second embodiment will be described, and explanations of the configuration, action, and effects similar to those of the frame 2A and the load-bearing walls 7 of the building 1 in the first embodiment will be omitted as appropriate.

[0073] As shown in Figures 6 to 8, the frame 2B for the second and higher floors of the building 1 is a rectangular steel frame structure made up of a pair of left and right columns 3, 4 and a pair of upper and lower steel beams 5, 27. The bearing walls 7 are provided within the frame 2B and are joined to each of the pair of upper and lower steel beams 5, 27 via first joint mechanisms 8 on the left and right, and second joint mechanisms 9 located between the first joint mechanisms 8 on the left and right.

[0074] As shown in Fig. 4, each of the left and right first joining mechanisms 8 that join the bearing wall 7 to the steel beams 27 (see Figs. 6 and 7) below has a steel plate 19 when it is necessary to adjust the height position of the first wall-side metal fitting 12. The first wall-side metal fitting 12 fixed to the lower part of the bearing wall 7 has a long hole 12a that is relatively longer horizontally than vertically as a bolt hole through which the first joining bolt 16 (see Figs. 6 and 7) is passed.

[0075] As shown in Figure 5, the second wall side metal fitting 21 fixed to the lower part of the load-bearing wall 7 has a long hole 21a that is relatively longer vertically than horizontally as a bolt hole through which the second connecting bolt 23 (see Figures 6 and 8) is passed.

[0076] 6 and 7, the first frame-side metal fitting 13 is welded to the steel-framed beams 5, 27, and is joined to the first wall-side metal fitting 12 with a plurality of first joining bolts 16.

[0077] 6 and 8, the second frame side metal fitting 22 is welded to the steel beams 5, 27, and is joined to the second wall side metal fitting 21 by one second joining bolt 23.

[0078] In this way, according to the building 1 and the load-bearing wall 7, the first wall-side metal fitting 12 is temporarily fixed to the load-bearing wall 7 with the pull bolt 11 in the factory where the load-bearing wall 7 is manufactured, and the second wall-side metal fitting 21 is temporarily fixed to the load-bearing wall 7 with a fixing bolt (not shown). Also, in the factory where the steel frame is manufactured, the first frame-side metal fitting 13 and the second frame-side metal fitting 22 are welded to the steel-framed beams 5, 27. At the construction site, the first wall-side metal fitting 12 is joined to the first frame-side metal fitting 13 with the first fastening bolt 16, and the second wall-side metal fitting 21 is joined to the second frame-side metal fitting 22 with the second fastening bolt 23, so that the load-bearing wall 7 can be installed in the steel-framed frame 2B. Therefore, a steel scaffolder can carry out the work alone based on his knowledge and experience of steel frames. This makes it possible to clarify the responsibility for the work.

[0079] In addition, according to the building 1 and the load-bearing wall 7, as the first connecting mechanism 8, the first wall side hardware 12 fixed to the load-bearing wall 7 with a tension bolt 11 is connected to the first frame side hardware 13 welded to the steel frame beams 5, 27 with a plurality of first connecting bolts 16, and as the second connecting mechanism 9, the second wall side hardware 21 fixed to the load-bearing wall 7 with a fixing bolt (not shown) is connected to the second frame side hardware 22 welded to the steel frame beams 5, 27 with one second connecting bolt 23. Therefore, the bending of the load-bearing wall 7 generated during an earthquake can be transmitted to the steel frame structure 2B via the first connecting mechanism 8, and the shear force of the load-bearing wall 7 generated during an earthquake can be transmitted to the steel frame structure 2B via the second connecting mechanism 9, and as a result, the earthquake resistance of the building 1 can be improved.

[0080] Furthermore, in the building 1 and the bearing wall 7, the first connecting mechanism 8 is formed by connecting the first wall-side metal fitting 12 fixed to the bearing wall 7 by tension bolts 11 with a plurality of first connecting bolts 16 to the first frame-side metal fitting 13 welded to the steel-framed beams 5, 27, so that the bearing wall 7 has a restoring force characteristic that follows the inter-story deformation of the steel-framed frame 2B as the tension bolts 11 extend during an earthquake and returns to its original shape after the earthquake. Therefore, the building 1 and the bearing wall 7 can keep the inter-story deformation angle during an earthquake small while maintaining the high deformation performance of the steel-framed frame 2B, and as a result, deformation during an earthquake can be suppressed, contributing to reducing damage.

[0081] Specifically, in a moderate earthquake, the building 1 and the bearing wall 7 function to return the building 1 to its original state, so that the shaking of the building 1 can be kept small and residual damage can also be reduced. Furthermore, even if the building 1 and the bearing wall 7 are damaged in a major earthquake, they can be easily replaced, and by replacing them, the original earthquake resistance can be restored, making it possible to prepare for future major earthquakes.

[0082] The present invention is not limited to the above-described embodiment, and various modifications are possible without departing from the spirit and technical concept of the present invention. In other words, the position, size, length, number, shape, material, etc. of each component may be changed as appropriate.

[0083] For example, in the above embodiment, an example has been described in which the second wall side hardware 21 fixed to the lower part of the load-bearing wall 7 has a long hole 21a that is relatively longer vertically than horizontally as a bolt hole through which the second connecting bolt 23 is passed. However, the present invention is not limited to this, and the long hole may be provided in the second wall side hardware 21 fixed to the upper part of the load-bearing wall 7, the second structural side hardware 22 welded to the steel beams 5, 27, or the second structural side hardware 22 fixed to the reinforced concrete beam 6.

[0084] In addition, in the above embodiment, an example has been described in which the first wall side hardware 12 fixed to the bottom of the load-bearing wall 7 has a long hole 12a that is relatively longer horizontally than vertically as a bolt hole through which the first connecting bolt 16 is passed. However, the present invention is not limited to this, and the long hole may be provided in the first wall side hardware 12 fixed to the top of the load-bearing wall 7, the first structural frame side hardware 13 welded to the steel beams 5, 27, or the first structural frame side hardware 13 fixed to the reinforced concrete beam 6. [Explanation of symbols]

[0085] 1. Building 2A,2B frame 3,4 Pillars 5 Steel beams 6 Reinforced concrete beams 7 Load-bearing wall 7a Through hole 8 First joining mechanism 9 Second joining mechanism 11 Pull bolt 12 First wall side metal fitting 12a long hole 13 First frame side hardware 14 Metal plate 15 Nut 16 First connecting bolt 17 First anchor bolt 18 Nut 19 Steel plate 21 Second wall side metal fitting 21a long hole 22 Second frame side hardware 23 Second connecting bolt 24 Second anchor bolt 25 Nut 27 Steel beam

Claims

1. A rectangular wooden load-bearing wall is provided within a rectangular steel frame structure consisting of a pair of left and right columns, an upper steel beam, and a lower reinforced concrete beam, and is joined to each of the steel beams and the reinforced concrete beams via first joint mechanisms on the left and right and a second joint mechanism located between the first joint mechanisms on the left and right, The left and right first joining mechanisms each include A tension bolt vertically installed in the bearing wall; A first wall side metal fitting fixed to the bearing wall by the one tension bolt; a first frame side metal fitting that is welded to the steel frame beam or fixed to the reinforced concrete beam with a first anchor bolt and joined to the first wall side metal fitting with a plurality of first joining bolts; The second joining mechanism is A second wall side metal fitting fixed to the bearing wall by a plurality of fixing bolts; A second frame side metal fitting is welded to the steel beam or fixed to the reinforced concrete beam with a second anchor bolt, and is joined to the second wall side metal fitting with one second fastening bolt. Load-bearing wall.

2. The second wall-side metal fitting fixed to the lower portion of the bearing wall has a relatively vertically long hole as a bolt hole through which the second fastening bolt is passed. A load-bearing wall according to claim 1.

3. The first wall-side metal fitting fixed to the lower part of the bearing wall has a relatively horizontally long hole as a bolt hole through which the first fastening bolt is passed. A load-bearing wall according to claim 1.

4. The first joining mechanism for joining the bearing wall to the reinforced concrete beam has a steel plate that is interposed between the bearing wall and the first wall-side metal fitting fixed to the lower part of the bearing wall and adjusts the position of the first wall-side metal fitting in the height direction. A load-bearing wall according to claim 1.

5. Cross-laminated board A load-bearing wall according to claim 1.

6. A rectangular wooden load-bearing wall is provided in a rectangular steel frame structure composed of a pair of left and right columns and a pair of upper and lower steel beams, and is joined to each of the pair of upper and lower steel beams via left and right first joint mechanisms and a second joint mechanism located between the left and right first joint mechanisms, The left and right first joining mechanisms each include A tension bolt vertically installed in the bearing wall; A first wall side metal fitting fixed to the bearing wall by the one tension bolt; A first frame side metal fitting is welded to the steel beam and joined to the first wall side metal fitting by a plurality of first fastening bolts, The second joining mechanism is A second wall side metal fitting fixed to the bearing wall by a plurality of fixing bolts; A second frame side metal fitting is welded to the steel beam and joined to the second wall side metal fitting by one second fastening bolt. Load-bearing wall.

7. The second wall-side metal fitting fixed to the lower portion of the bearing wall has a relatively vertically long hole as a bolt hole through which the second fastening bolt is passed. A load-bearing wall according to claim 6.

8. The first wall-side metal fitting fixed to the lower part of the bearing wall has a relatively horizontally long hole as a bolt hole through which the first fastening bolt is passed. A load-bearing wall according to claim 6.

9. The first joining mechanism that joins the bearing wall to the lower steel beam of the pair of upper and lower steel beams has a steel plate that is interposed between the bearing wall and the first wall-side metal fitting fixed to the lower part of the bearing wall and adjusts the position of the first wall-side metal fitting in the height direction. A load-bearing wall according to claim 6.

10. Cross-laminated board A load-bearing wall according to claim 6.

11. The bearing wall according to any one of claims 1 to 10 is provided. building.

Citation Information

Patent Citations

  • Woody earthquake-proof wall

    JP2018188845A

  • Building

    JP2019065685A

  • Construction method of ligneous earthquake resisting wall and ligneous earthquake resisting wall

    JP2022144037A

  • building

    JP7040725B2