Management device

The management device enhances power trading by calculating and adjusting for charging and discharge patterns to ensure accurate power supply in mobility vehicles, addressing inaccuracies in predicting vehicle numbers.

JP2024140246AInactive Publication Date: 2024-10-10HONDA MOTOR CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023051296
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-28
Publication Date
2024-10-10
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing technologies for charging and supplying power in mobility vehicles with secondary batteries face inaccuracies in predicting the number of vehicles, leading to a risk of insufficient power supply.

Method used

A management device that manages power trading in a grid by calculating the required number of mobile units based on capacity history, acquiring output capability, and determining bid power amounts, adjusting for charging and discharge patterns to ensure accurate power supply.

Benefits of technology

Accurately determines the amount of bid power, preventing under or over-supply, and optimizing power distribution in the grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024140246000001_ABST
    Figure 2024140246000001_ABST
Patent Text Reader

Abstract

To provide a technology for more accurately determining a bid power amount in adjustable power.SOLUTION: A management device that manages bidding in a power trading market for power supplied to a power grid from a plurality of movable bodies having a power storage device, comprises: a required number calculation unit that calculates the required number of movable bodies required to supply a predetermined power amount according to a time period and a predetermined power amount from history of a remaining capacity of the power storage devices; a required number memory unit that stores the required number; an acquisition unit that acquires information on whether or not the movable bodies can output power to the power grid in the time period; and a bid power amount determination unit that determines a bid power amount to the power trading market based on a comparison between the number of movable bodies capable of outputting power to the power grid in the time period and the required number.SELECTED DRAWING: Figure 15
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a management device. [Background technology]

[0002] In recent years, research and development has been conducted into charging mobility vehicles equipped with secondary batteries, which contributes to energy efficiency, in order to ensure that more people have access to affordable, reliable, sustainable and advanced energy.

[0003] In this technical background, a technology has been disclosed that predicts the amount of power that can be supplied from a vehicle according to the remaining capacity at a given time and the predicted possibility of connection to an EVSE or the predicted number of connected vehicles, and further corrects the predicted value by adding a margin (see, for example, Patent Document 1). This technology discloses that the possibility of connection is determined to be possible if the vehicle's position is within a predetermined range of the EVSE. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] Patent Publication No. 2021-158835 Summary of the Invention [Problem to be solved by the invention]

[0005] In the technology for charging and supplying power to mobility vehicles equipped with secondary batteries, if a prediction of the number of vehicles turns out to be incorrect, there is a risk that the bidded electricity cannot be supplied.

[0006] In order to solve the above problem, the present application aims to achieve a technology for more accurately determining the amount of bid power in adjustable power, which will ultimately contribute to energy efficiency. [Means for solving the problem]

[0007] The management device according to the present invention employs the following configuration. (1): A management device according to one embodiment of the present invention manages bidding in an energy trading market for electricity supplied to a power grid from a plurality of mobile bodies having power storage devices, and includes a required number calculation unit that calculates the required number of mobile bodies necessary to supply a specified amount of electricity according to a time period and a specified amount of electricity from a history of remaining capacity of the power storage devices, a required number memory unit that stores the required number, an acquisition unit that acquires information regarding whether the mobile bodies are capable of outputting electricity to the power grid in a certain time period, and a bid electricity amount determination unit that determines the amount of electricity to be bid in the energy trading market based on a comparison between the number of mobile bodies capable of outputting electricity to the power grid in the time period and the required number.

[0008] (2): In the above aspect (1), when the number of mobile objects capable of outputting power falls below the required number for the first amount of power, the bid power amount determination unit searches for a second amount of power that is smaller than the first amount of power so that the number of mobile objects capable of outputting power exceeds the required number, and sets the second amount of power as the bid power amount.

[0009] (3): In the above aspect (1), the bid energy amount determination unit, when the number of mobile objects capable of outputting power exceeds the number required for the first amount of power, searches for a second amount of power greater than the first amount of power such that the number of mobile objects capable of outputting power falls below the required number, and provides a management device that sets the second largest amount of power as the bid energy amount.

[0010] (4): In the above aspect (1), the required number calculation unit calculates the required number of units for each day from the remaining capacity history of the storage device for each day, the required number memory unit stores the required number of units for a specified period, and the bid energy amount determination unit determines the bid energy amount using the maximum required number for the specified period.

[0011] (5): In any of the above aspects (1) to (3), the bid energy amount determination unit determines the bid energy amount for multiple time periods on a specific day, and determines the bid energy amount from the time period when the number of mobile objects capable of outputting power to the power grid is relatively small.

[0012] (6): In the above embodiment (1), the required number of units is corrected by multiplying the calculated required number of units and / or the bid electricity amount by a predetermined ratio and adding the result to the required number of units.

[0013] (7): In the above embodiment (1), when at least some of the multiple mobile objects are charging during the target time period for bidding, the required number of vehicles is adjusted by adding the required number of vehicles equivalent to the amount of electricity required for charging.

[0014] (8): In the above embodiment (1), both at the time of determining the bid power amount and at the time of ending the power supply, the number of mobile units that can be output is calculated based on the operation plan of the mobile units and a prediction of the charging start time and / or the time required for charging.

[0015] (9) In the above embodiment (8), when the amount of power to be bid is determined, the charging start time and / or the time required for charging is predicted based on one or more operation plans of the mobile object within a unit period.

[0016] (10) In the above embodiment (8) or (9), when the power supply is to be terminated, the charging start time and / or the time required for charging are predicted based only on the most recent operation plan of the mobile object.

[0017] (11): In the aspect of (10) above, a management device is provided that, when power supply is terminated, if the difference between the SOC of the mobile object and the amount of power required for the most recent operation plan of the mobile object is equal to or greater than a certain value, does not charge the mobile object. Effect of the Invention

[0018] According to aspects (1) to (11), a technique for more accurately determining the amount of bid power in adjustable power can be achieved. [Brief description of the drawings]

[0019] [Figure 1] 1 is a diagram illustrating an example of the configuration of a management system including a management device according to an embodiment; [Diagram 2]FIG. 2 is a functional block diagram showing a functional configuration of a management device. [Diagram 3] 13 is a flowchart showing a flow of a time-based total number process executed by the management device. [Figure 4] 10 is a flowchart showing the flow of a bid energy amount determination process executed by a management device. [Diagram 5] FIG. 11 is a diagram illustrating a processing example of a vehicle exclusion process. [Figure 6] FIG. 11 is a diagram illustrating a processing example of a first DR possible time determination process. [Figure 7] FIG. 13 is a diagram showing an example of charging. [Figure 8] FIG. 11 is a diagram illustrating a processing example of a second DR possible time determination process. [Figure 9] FIG. 13 is a diagram illustrating an example of a total number calculation process. [Figure 10] FIG. 11 illustrates an example of replacement processing; [Figure 11] FIG. 11 is a diagram illustrating an example of a statistical amount calculation process. [Figure 12] FIG. 13 is a diagram illustrating a processing example of a required number calculation process. [Figure 13] FIG. 13 is a diagram illustrating an example of data stored in a required number storage process. [Figure 14] FIG. 11 illustrates an example of an extraction process. [Figure 15] FIG. 11 illustrates an example of an allocation process; [Figure 16] FIG. 13 is a diagram showing a case where the SOC is insufficient. [Figure 17] FIG. 13 is a diagram illustrating recovery charging being performed after participation in DR. [Figure 18] 10 is a flowchart showing a process for determining whether or not to plan recovery charging. [Figure 19] FIG. 13 is a diagram showing the influence of recovery charging. [Figure 20] FIG. 13 is a diagram showing an example of prediction for the frames from 15:00 to 18:00. [Figure 21] FIG. 13 illustrates a graph of group total recovery charge output. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0020] Hereinafter, an embodiment of a management device of the present invention will be described with reference to the drawings.

[0021] 1 is a diagram showing an example of a configuration of a management system 1 including a management device 100 according to an embodiment of the present invention. The management system 1 includes the management device 100, one or more vehicles 200_1-200_n (n is an integer equal to or greater than 1), and one or more customer terminals 400_1-400_m (m is an integer equal to or greater than 1). Hereinafter, when there is no particular distinction between the vehicles 200_1-200_n, any one of the vehicles will be referred to as vehicle 200. When there is no particular distinction between the customer terminals 400_1-400_m, any one of the vehicles will be referred to as customer terminal 400.

[0022] The network 500 is composed of a local area network (LAN), a wide area network (WAN), and a mobile phone line. The management device 100 and the customer terminal 400 can communicate with each other at least via a mobile phone line. The management device 100 and the vehicle 200 can communicate with each other via a LAN or a WAN.

[0023] The management device 100 manages bidding in an energy trading market for electricity supplied to an energy grid from multiple mobile objects (hereinafter also referred to as "vehicles") having power storage devices (hereinafter also referred to as "batteries"). The vehicle 200 is a vehicle that can participate in DR (Demand Response). The customer terminal 400 is a terminal of the vehicle used by the vehicle 200. The customer terminal 400 is, for example, a smartphone or a feature phone. In this embodiment, a smartphone will be used as the customer terminal 400.

[0024] FIG. 2 is a functional block diagram showing the functional configuration of the management device 100. The management device 100 includes a CPU (Central Processing Unit), a memory, an auxiliary storage device, and the like, which are connected by a bus, and functions as a device including a communication unit 110, a required number storage unit 141, and a control unit 120 by executing a management program. All or part of the functions of the communication unit 110, the required number storage unit 141, and the control unit 120 may be realized using hardware such as an ASIC (Application Specific Integrated Circuit), a PLD (Programmable Logic Device), or an FPGA (Field Programmable Gate Array). The management program may be recorded in a computer-readable recording medium. The computer-readable recording medium is, for example, a portable medium such as a flexible disk, a magneto-optical disk, a ROM, or a CD-ROM, or a storage device such as a hard disk built into a computer system. The management program may be transmitted via an electric communication line.

[0025] The communication unit 110 is a network interface and communicates with the vehicle 200 and the customer terminal 400 via the network 500.

[0026] 2 controls the operation of each part of the management device 100. The control unit 120 is executed by a device including a processor such as a CPU and a RAM. The control unit 120 executes a management program to function as a required number calculation unit 121, an acquisition unit 122, and a bid energy amount determination unit 123.

[0027] The required number calculation unit 121 calculates the number of mobile objects required to supply a predetermined amount of power according to a time period and a predetermined amount of power from a history of the remaining capacity (hereinafter also referred to as "SOC") of the power storage device. The acquisition unit 122 acquires information on whether or not the mobile objects can output to the power grid in a certain time period. The bid power amount determination unit 123 determines the amount of power to be bid to the power trading market based on a comparison between the number of mobile objects that can output to the power grid in the above-mentioned time period and the required number. In this manner, in this embodiment, an embodiment in which the bid power amount, which is one of adjustable power, is determined will be described, but it is not limited to the bid power amount and may be applied to other purposes. The required number storage unit 141 is configured using a storage device such as a magnetic hard disk device or a semiconductor storage device. The required number storage unit 141 stores the calculated required number.

[0028] Next, a description will be given with reference to a flowchart of the flow of processing executed by the management device 100. After describing the flow of processing with reference to the flowchart, the details of each process in the flowchart will be described.

[0029] 3 is a flowchart showing the flow of the time-based total number process executed by the management device 100. This flowchart is executed by the acquisition unit 122. The management device 100 executes a vehicle exclusion process to exclude vehicles that cannot participate in DR (step S101). For vehicles that have not been excluded by the vehicle exclusion process, the management device 100 executes a first DR available time determination process (step S102), a second DR available time determination process (step S103), and a third DR available time determination process (step S104). Based on these processes, the management device 100 executes a total number calculation process to calculate the total number of vehicles that can participate in DR for each hour (step S105).

[0030] 4 is a flowchart showing the flow of the bid energy amount determination process executed by the management device 100. The management device 100 executes a replacement process to replace each vehicle SOC with the upper limit discharge amount discharged at DR (step S201). The management device 100 executes a statistics calculation process to calculate the average SOC and standard deviation (step S202). The management device 100 executes a required number calculation process to calculate the number of vehicles required to supply the supplyable amount from the average SOC and standard deviation (step S203). The management device 100 executes a required number storage process to store the calculated required number for one month in the required number storage unit 141 (step S204).

[0031] The management device 100 executes an extraction process to extract a required number of vehicles for supplying a target supply amount (step S205). The management device 100 executes an allocation process to allocate the required number of vehicles (step S206). The management device 100 executes an achievement determination process to determine whether the allocation has been achieved (step S207). The management device 100 determines whether the allocation has been achieved (step S208). If the allocation has not been achieved (step S208: NO), the process proceeds to step S205. If the allocation has been achieved (step S208: YES), the management device 100 determines the achieved available supply amount as the bid amount of power (step S209) and ends the process. In the process shown in FIG. 4, steps S201 to S204 are executed by the required number calculation unit 121. Steps S205 to S209 are executed by the bid amount of power determination unit 123.

[0032] The details of each process in the above-described flowchart will be described. FIG. 5 is a diagram showing an example of the vehicle exclusion process (step S101). FIG. 5 shows a vehicle state and a participating vehicle list. In FIG. 5, the vehicle ID is information for uniquely identifying a vehicle. The vehicle state is information indicating whether or not participation is possible. In this way, in step S101, the management device 100 creates a participating vehicle list that excludes vehicles whose vehicle state is "not allowed to participate."

[0033] FIG. 6 is a diagram showing a processing example of the DR possible time first determination process (step S102). FIG. 6 shows an input screen of a smartphone and at-home time information. As shown in FIG. 6, a user of a vehicle can input a time period during which the vehicle is used, that is, an operation plan, using a smartphone. When the vehicle is being used, DR participation is not possible, so the time period during which the vehicle is used is set as DR participation not possible. In this embodiment, in the at-home time information, whether or not participation is possible every 30 minutes is stored as "0" or "1" in "at home". "0" indicates that participation is not possible, and "1" indicates that participation is possible. In addition, "time" indicates the time at which a 30-minute period starts from the relevant time. Therefore, for example, the time "17:30" indicates a period from 17:30 to 18:00. Note that, although "at home" is used as an example in this embodiment, it is not limited to home, as long as it is a facility to which the vehicle can supply power.

[0034] For example, as shown in FIG. 6, when the user inputs that the vehicle will be used from 8:55 to 12:00, the management device 100 sets "at home" corresponding to the time of 8:30 to 11:30 to 0. In this way, in step S102, the management device 100 updates the at-home time information according to the time period in which the vehicle is used. In this way, when the bid energy amount is determined, the charging start time and / or the time required for charging are predicted from one or more operation plans within a unit period (e.g., 30 minutes) of the mobile object. This makes it possible to improve the accuracy of the calculation of the number of mobile objects by calculating the number of mobile objects that can be output from each operation plan in an overall sense.

[0035] When a user uses a vehicle, the power of the storage battery of the vehicle is naturally consumed, so the vehicle must have a reasonable SOC at the start of use. Therefore, when the vehicle is used after participating in DR, it may be necessary to charge the vehicle before use. FIG. 7 is a diagram showing an example of charging. It shows that the vehicle is charged before going out on the day of DR. When charging, the vehicle cannot participate in DR during that time period.

[0036] FIG. 8 is a diagram showing a processing example of the second DR possible time determination process (step S103). FIG. 8 shows an input screen of a smartphone and at-home time information. As shown in FIG. 8, when the user inputs that the vehicle will be used from 9:00 to 12:00, the vehicle status corresponding to the time of 9:30 to 11:30 is set to 0 in the above-mentioned step S102. In addition, in step S103, the management device 100 considers the charging time to be 3 hours and sets the vehicle status corresponding to 6:00 to 8:30 to 0. In this way, in step S102, the management device 100 updates the at-home time information of the charging time period according to the time period during which the vehicle is used. Note that the charging time may be estimated by predicting the SOC at the time when the use of the vehicle is started and estimating according to the predicted SOC.

[0037] Next, the third DR possible time determination process (step S104) will be described. In the third DR possible time determination process, the management device 100 calculates the recovery charge time when the vehicle consumes power by participating in DR, and sets "at home" in the at-home time information corresponding to the calculated recovery charge period to 0.

[0038] FIG. 9 is a diagram showing an example of the total number calculation process (step S105). FIG. 9 shows the at-home time information for each vehicle (EV A, ..., EV X) and the total number of vehicles that can participate. The management device 100 can calculate the number of vehicles that can participate for each time period by adding the at-home time information for each vehicle for each time period. The total number of vehicles that can participate indicates the number of vehicles that can participate for each time period. The total number of vehicles that can participate is stored in a storage device such as a RAM or a hard disk.

[0039] Next, the bid energy amount determination process shown in Fig. 4 will be described. Fig. 10 is a diagram showing an example of the replacement process (step S201). In the replacement process, Fig. 10 for one day shows the original SOC, the SOC after replacement taking into consideration the lower limit, and the SOC after replacement taking into consideration the upper limit. Fig. 10 also shows an example in which the SOC of vehicles with vehicle IDs AAA, BBB, ..., ZZZ is targeted. Also, an example is shown in which the lower limit SOC is set to 15% and the maximum supply amount per vehicle when participating in DR is set to the upper limit SOC, which is set to 60%.

[0040] The management device 100 subtracts the lower limit SOC of 15% from the original SOC. As a result, for example, the SOC of a vehicle with a vehicle ID of AAA becomes 50-15, or 35%,. Next, in order to set the upper limit to 60%, the management device 100 sets all SOCs exceeding 60% after the replacement taking into consideration the lower limit to 60%. For example, the SOC of a vehicle with an ID of BBB exceeds 60% after the replacement taking into consideration the lower limit, so the SOC after the replacement taking into consideration the lower limit becomes 60%. In this way, in step S201, the management device 100 executes a replacement process in which each vehicle SOC is replaced with the upper limit discharge amount to be discharged at the DR.

[0041] FIG. 11 is a diagram showing an example of the statistical calculation process (step S202). FIG. 11 shows the SOCs of three vehicles (EV A, EV B, EV xx) from 0:00 to 24:00 on the day before the DR participation date, and their average value and standard deviation. For example, the SOC of EV A is shown as a straight line for a period of several hours from 0:00 and for several hours before 24:00. A time period without a straight line indicates a time period during which the vehicle cannot participate in the DR, such as when the vehicle is out. The average value indicates the average value of the SOC of each vehicle, and the standard deviation indicates the standard deviation of the SOC of each vehicle. The average value and standard deviation shown in FIG. 11 are calculated from the SOC of each vehicle in block units (e.g., 3-hour units). The average value and standard deviation are calculated every time a day ends, and are stored for a predetermined period, for example, 30 days. In this way, the management device 100 executes a statistical calculation process to calculate the average value and standard deviation in step S202.

[0042] Fig. 12 is a diagram showing an example of the required number calculation process (step S203). In the required number calculation process, the required number of units is calculated for each available supply amount value. Fig. 12 is a diagram showing a graph showing, for each available supply amount value a to d (kw), the number of units required for each time period to achieve that available supply amount value. The horizontal axis shows time, and the vertical axis shows the required number of units.

[0043] The method for calculating the required number of units is to calculate the relationship between the "number of units" and the "distribution of the average SOC of that number of units" from the above average value and standard deviation. Here, the calculation is made using the central limit theorem, which states that the average SOC when a certain number of n units are extracted will be normally distributed.

[0044] Specifically, n is the number of required units, Pt is the target value of the probability of successful resource provision for the management system 1, SOCt is the sample average of the time when n units are extracted, and SOCp is the average SOC when n units are extracted that satisfies Pt% inclusion. Regarding the average SOC obtained with a probability P of Pt% or more when n units are extracted, P(SOCt <SOCp)=1-Pt Standardize the P(Z<(SOCp-AVE_SOC) / (σ / (√n))=1-Pt Here, AVE_SOC is the average value, and σ is the standard deviation at time.

[0045] Find z that is 1-Pt from the standard normal distribution table, (SOCp-AVE_SOC) / (σ / (√n)=z…(Formula 1) It is also possible to directly determine z without determining Pt.

[0046] Next, the number of vehicles required to output only at the supply output KWt (kw) is defined as n. Also, EVSE is the available amount of EVSE to be supplied, and DRt is the DR participation time per vehicle. n=(KWt / EVSE)×((EVSE×DRt) / (SOCp×efEVSE))…(Formula 2) The first term on the right side of this equation (KWt / EVSE) indicates the required number of chargers, and the second term (EVSE×DRt) / (SOCp×efEVSE) indicates the multiplier required when taking SOC into account.

[0047] Equation 1 and Equation 2 are simultaneously used to calculate n. Specifically, for example, SOCp is calculated in Equation 1, and the calculated SOCp is substituted into Equation 2 to obtain the following equation. √n=(-b±√(b×b-4×c)) / 2…(Formula 3) Here, b and c are as follows. b=(z×σ) / AVE_SOC c=-(KWt×DRt) / (AVE_SOC×efEVSE) By squaring both sides of equation 3, we get n.

[0048] From the above, the required number n is calculated by substituting the average value obtained in the statistical calculation process into AVE_SOC, the standard deviation obtained in the statistical calculation process into σ, and the available supply amount value into KWt. In the case of Fig. 12, the required numbers are shown when a, b, c, and d are substituted for KWt. In this way, the management device 100 executes the required number calculation process to calculate the number of vehicles required to supply the available supply amount from the average SOC and standard deviation.

[0049] 13 is a diagram showing an example of data stored in the required number of vehicles storage process (step S204). In the process described in FIG. 12, the required number of vehicles is obtained on a daily basis, and the required number of vehicles is stored for a predetermined period (for example, 30 days). FIG. 13 is a graph showing the number of units required for each supplyable amount value a to d (kW) for each time period. The horizontal axis shows the date, and the vertical axis shows the required number of units. In FIG. 13, as an example, the transition of the number of units in the time period from 12:00 to 12:30 and the time period from 9:00 to 9:30 is shown. The circled area in the graph shows the maximum number of units. The data shown in this graph is stored in the required number storage unit 141. In this way, the management device 100 executes the required number storage process to store the calculated required number of units for one month in the required number storage unit 141.

[0050] Fig. 14 is a diagram showing an example of the extraction process (step S205). Fig. 14 shows the graph explained in Fig. 13, a graph showing the maximum value for each time period, and a graph showing the number of vehicles after multiplication by the variation coefficient. The horizontal axis of the graph showing the maximum value for each time period and the graph showing the number of vehicles after multiplication by the variation coefficient indicates time, and the vertical axis indicates the required number of vehicles.

[0051] The management device 100 calculates the maximum number of units in the graph described in FIG. 13, and obtains it as the maximum value for each time period. Then, the required number of units is obtained by multiplying the obtained maximum number by the variation coefficient. The variation coefficient is set to a larger number just to be safe, and a value obtained empirically may be used. In this way, the management device 100 executes an extraction process to extract the required number of units to supply the target supply amount. Then, the required number of units is corrected by multiplying the calculated required number by a predetermined ratio and adding the result to the required number of units. Alternatively, the bid amount of power is calculated, and the bid amount of power is corrected by multiplying the calculated bid amount of power by a predetermined ratio and adding the result to the bid amount of power. As a result, when the required number of units and the bid amount of power are low, bidding can be performed with a small margin, and when they are high, power can be supplied with a sufficient margin even if the calculation error of the required number becomes large. As a result, the calculation accuracy of the required number can be improved.

[0052] The required number calculation unit 121 calculates the required number of units for each day from the remaining capacity history of the power storage device for each day, the required number storage unit 141 stores the required number of units for a predetermined period (30 days), and the bid power amount determination unit 123 determines the bid power amount using the maximum required number of units for the predetermined period. As a result, by determining the bid amount for the number of DR participating units using the maximum past required number of units, it is possible to reliably secure the target available supply amount of power after bidding.

[0053] FIG. 15 is a diagram showing an example of the allocation process (step S206). FIG. 15 shows a graph showing the number of vehicles that can participate and a graph showing the number of vehicles required. The graph showing the number of vehicles that can participate is the graph obtained by the total number per hour process in FIG. 3 (see FIG. 9). The graph showing the number of vehicles required is the graph described in FIG. 14. The graph showing the number of vehicles required may also be a graph showing the number of vehicles required to achieve the supply amount that was available on the previous day, for example.

[0054] The management device 100 allocates vehicles according to the required number. At this time, the management device 100 allocates in the order of the slots (time slots) with the fewest number of vehicles that can participate in the graph showing the number of vehicles that can participate. In FIG. 15, the numbers written under the horizontal axis of the graph showing the number of vehicles that can participate indicate the order in the example of FIG. 15. For example, if the time slot is 30 minutes (corresponding to "DR_time" in the figure), 48 allocations will be made from No. 1 to No. 48 in 24 hours / 30 minutes. In this way, the bid energy amount determination unit 123 determines the bid energy amount for multiple time slots on a specific day (a day participating in DR), and determines the bid energy amount from the time slot in which the number of mobile objects that can output to the power grid is relatively small. Note that the allocation may be made in chronological order, taking into consideration that vehicles that can participate in the time slot in which the number of mobile objects that can output to the power grid is relatively small will remain. In this way, the bid energy amount is determined preferentially from the time slot in which the number of vehicles participating in DR is small (i.e., it is difficult to secure the required number of vehicles), thereby increasing the probability of agreement.

[0055] In FIG. 15, the first and second allocations are shown. In the first allocation, a resource pattern at time x is shown. In this resource pattern, a vehicle ID (EV ID in the figure), a total DR possible time, and DR possible time information are shown for each vehicle. The total DR possible time indicates the time during which DR can be participated. The DR possible time information indicates whether or not DR can be participated at the corresponding time. "0" indicates that participation is not possible, and "1" indicates that participation is possible. The management device 100 allocates the required number of vehicles that can participate in DR with the resource pattern. The resource pattern at the second time y is also allocated in the same way, but the total DR possible time of the vehicles already allocated at the first time is the time that is subtracted by the time allocated at the first time. For example, the total DR time of a vehicle with EV ID 201 is 9 hours at the first time, but at time y, 3 hours are subtracted to make it 6 hours. Thereafter, if the block is 3 hours, allocation is performed up to the 8th time.

[0056] In this allocation process, if the allocation is achieved, "1" is returned as the allocation achievement information, and if the allocation is not achieved, "0" is returned as the allocation achievement information. When the allocation process ends, the management device 100 executes achievement determination processing (step S207). Steps S205 to S208, including this step S207, form a loop process. The mth loop process in this loop process is referred to as the "mth loop".

[0057] If the allocation process returns "1" in the first loop, there is a possibility that the available supply amount can be increased. On the other hand, if the allocation process returns "0" in the first loop, the available supply amount must be decreased.

[0058] Therefore, in the first loop, if the allocation achievement information is "0", the management device 100 reduces the supplyable amount by a predetermined amount, makes a negative judgment in step S208, proceeds to step S205, and performs the second loop processing. Then, in the m (m≧2)th loop processing, if the allocation achievement information is "0", the supplyable amount is further reduced by a predetermined amount and the m+1th loop processing is performed. In the m (m≧2)th loop processing, if the allocation achievement information is "1", it is judged that the allocation has been achieved, and in step S209, the achieved supplyable amount is determined.

[0059] On the other hand, in the achievement determination process, if the allocation achievement information is "1" in the first loop, the management device 100 increases the supplyable amount by a predetermined amount, makes a negative determination in step S208, proceeds to step S205, and performs the second loop process. Then, if the allocation achievement information is "1" in the m (m≧2)th loop process, the supplyable amount is further increased by a predetermined amount and the m+1th loop process is performed. If the allocation achievement information is "0" in the m (m≧2)th loop process, it is determined that the allocation has been achieved in the m-1th time, and the achieved supplyable amount is determined in step S209.

[0060] In this way, when the number of mobile objects capable of outputting power falls below the required number for the first amount of power (available supply amount), the bid power amount determination unit 123 searches for a second amount of power (amount of power obtained by subtracting a predetermined amount from the first amount of power) smaller than the first amount of power such that the number of mobile objects capable of outputting power exceeds the required number, and sets the second amount of power as the bid power amount. This makes it possible to avoid an event in which the bidded power cannot be supplied, while bidding for the maximum target available supply amount that ensures the required number of objects, and to supply a larger amount of power to the power grid.

[0061] Furthermore, when the number of mobile objects capable of outputting power exceeds the number required for the first amount of power (available supply amount), the bid power amount determination unit 123 searches for a second amount of power (amount of power increased by a predetermined amount from the first amount of power) that is greater than the first amount of power and that reduces the number of mobile objects capable of outputting power below the required number, and sets the second largest amount of power after the second amount of power as the bid power amount. This makes it possible to bid the maximum target available supply amount that ensures the required number of objects, and to supply a larger amount of power to the power grid.

[0062] As described above, according to the present embodiment, the amount of bid power in adjustable power can be determined more accurately, thereby preventing an event in which the bidded power cannot be supplied.

[0063] Next, in the above-mentioned embodiment, a form of charging after participating in DR will be described. When the use of the vehicle is scheduled after participating in DR, it is considered that the SOC will be insufficient. FIG. 16 is a diagram showing a case where the SOC is insufficient. As shown in FIG. 16, it is considered that the SOC will be insufficient while the vehicle is out because the vehicle participates in DR. In that case, recovery charging is required before going out, and a charging plan for that needs to be formulated. Therefore, the management device 100 judges whether or not to formulate a charging plan, and formulates recovery charging according to the judgment result.

[0064] Therefore, as shown in Fig. 17, recovery charging is performed after participating in DR. Fig. 18 is a flowchart showing the flow of the determination process for whether or not to plan recovery charging. In Fig. 18, the management device 100 determines whether or not the vehicle ID of the vehicle to be determined is on the list of vehicles participating in DR (step S301). If the vehicle ID of the vehicle to be determined is not on the list of vehicles participating in DR (step S301: NO), the management device 100 ends the process without formulating recovery charging (step S305).

[0065] If the vehicle ID of the vehicle to be judged is on the list of vehicles participating in DR (step S301: YES), the management device 100 judges whether or not there is a charging plan between after DR participation and going out (step S302). If there is a charging plan (step S302: NO), the management device 100 ends the process without formulating a recovery charge (step S305). If there is no charging plan (step S302: YES), the management device 100 judges whether or not the current SOC is insufficient for the planned outing (step S303). If the current SOC is not insufficient for the planned outing (step S303: NO), the management device 100 ends the process without formulating a recovery charge (step S305). If the current SOC is insufficient for the planned outing (step S303: YES), the management device 100 formulates a recovery charge (step S304) and ends the process.

[0066] In this way, when the power supply ends, the charging start time and / or the time required for charging is predicted based only on the most recent operation plan of the mobile object. This makes it possible to avoid power shortages for the most recent operation plan and to further improve the accuracy of calculating the optimal charging power. Furthermore, when the power supply ends, if the difference between the SOC of the mobile object and the amount of power required for the most recent operation plan of the mobile object (for example, a difference that does not cause a SOC shortage when the mobile object goes out) is equal to or greater than a certain level, the mobile object is not charged. This makes it possible to reduce battery deterioration by avoiding unnecessary charging.

[0067] In relation to this recovery charging, a description will be given of the formulation of a charging plan that allows a DR participating vehicle to secure an SOC for driving on a DR participation day. For example, a charging plan is formulated that allows a DR participating vehicle to secure an SOC for driving on a DR participation day, triggered by the end of the DR period.

[0068] The start condition of the process to be formulated may be, for example, when the time matches the end date and time of the contract information minus the set value. The set value is a certain time before the next time slot, taking into account the calculation time of the FB control in the next time slot, when the target vehicle has contracted to participate in DR for a consecutive time slot (reference value: 15 minutes).

[0069] The management device 100 outputs the vehicle ID of a vehicle that will participate or has participated in DR during the contract period. The management device 100 uses the vehicle ID to obtain the following information (departure time, charging mode).

[0070] The departure time and / or plan input information input from the customer terminal 400 is referenced to obtain the earliest departure time that is later than the current time. Note that, if the obtained charging gun engagement status indicates that the charging gun is not engaged, the creation of the charging plan is canceled.

[0071] As shown in Fig. 19, although it has been decided that the vehicle will participate in DR in multiple time periods, due to the establishment of the above-mentioned recovery charging, unscheduled charging may occur during the time period in which the vehicle was scheduled to participate. In such cases, the supply amount and the charging amount are offset, so it is necessary to compensate so that the amount of supply is the amount that was originally supposed to be supplied.

[0072] When compensation is required, the management device 100 first calculates the recovery charging time and the charger output that overlap with the scheduled DR participation time. In the following explanation, one time period is expressed as a "frame", and each frame is referred to as the 1st frame, 2nd frame, and so on, starting from midnight.

[0073] For the kth frame prediction, the recovery time and charger output of the following vehicles are obtained. A: Vehicles allocated based on DR allocation on the day before the forecast target date. B: If k>1, assigned vehicles from DR1 to (k-1)th frame. However, if the same vehicle (same vehicle ID) is present in A and B, they will be treated as such from now on. Also, even if the recovery charging times overlap, it is assumed that one vehicle will be charging.

[0074] The management device 100 then extracts the recovery charge time that overlaps with the DR time of the kth frame from the recovery charge time. This will be explained using FIG. 20. FIG. 20 is a diagram showing an example of a prediction for the frame from 15:00 to 18:00. As shown in the recovery charge time on the left side of FIG. 20, the recovery charge time of the vehicle with vehicle ID yyy is 14:00 to 15:30 and 17:30 to 19:00. Therefore, the overlapping times of the recovery charge time of the vehicle with vehicle ID yyy are 15:00 to 15:30 and 17:30 to 18:00, as shown in the display on the right side.

[0075] Next, the management device 100 calculates the average recovery charge output and the maximum output (group) during the DR scheduled time. The management device 100 calculates the average recovery charge output A by the following formula. A = (Σa(i) × b(i)) / c Here, Σ indicates the sum for i. a(i) indicates the recovery charge time (hours). b(i) indicates the grid side charge output (kW). c indicates the DR participation time per vehicle. Next, the management device 100 calculates the maximum output averaged over x minutes using the following formula. B = max(Σd(j,i)×b(i)) / x Here, max is for j, and Σ indicates the sum for i. x indicates the time of one frame in the time period in which DR will be participated. Each frame in the time period in which DR will be participated is assigned as x(1), x(2) ..., x(j), ..., and the recovery charge time (min) in frame j is d(j, i).

[0076] Next, when calculating the average output of the recovery charge and calculating the required number of units in terms of kWh (case a), the required number of units is obtained as follows. That is, the required number of units when providing e (kW) is obtained as the required number corresponding to the minimum amount of provision that is equal to or greater than (e+A) (kW).

[0077] On the other hand, as shown in Figure 21, there is a limit to the discharge output, and it may not be possible to output even if the battery capacity is sufficient. In such a case, when the group total recovery charge output (kW), which is the sum of the recovery charge outputs of multiple vehicles, is at its maximum, the discharge output must be maximized. When calculating the maximum recovery charge output in this way and calculating the number of vehicles required from a kW perspective (case b), the required number of vehicles is obtained as follows. In other words, the number of vehicles required to instantaneously supply (e+B) (kW) is calculated as follows using the grid side discharge output (EVSE supplyable amount) f (kW / vehicle).

[0078] Required number (units) = (e+B) / f The larger of the required number of units obtained in case a and the required number of units calculated in case b shall be the required number of units at the time of delivery e.

[0079] In this way, when at least some of the multiple mobile objects are charging during the target time period for bidding, the required number of vehicles is corrected by adding the required number of vehicles equivalent to the amount of power required for the charging. This improves the accuracy of calculation of the required number of vehicles by taking into account the reduction in the amount of power supply due to charging.

[0080] As described in Fig. 7, the number of mobile units that can be output is calculated based on the prediction of the charging start time and / or the time required for charging from the operation plan of the mobile units before the bid amount of power is determined. Therefore, both when the bid amount of power is determined and when the power supply ends, the number of mobile units that can be output is calculated based on the prediction of the charging start time and / or the time required for charging from the operation plan of the mobile units. This allows the accuracy of the calculation to be improved by calculating the number of mobile units that can be output based on the latest situation at multiple time periods.

[0081] The above describes the form for carrying out the present invention using an embodiment, but the present invention is not limited to such an embodiment, and various modifications and substitutions can be made within the scope that does not deviate from the gist of the present invention. [Explanation of symbols]

[0082] 100 Management device 110 Communications Department 120 Control section 121 Required number calculation section 122 Acquisition Department 123 Bidding Power Quantity Determination Department 141 Required number of units memory unit 200 vehicles 400 Customer terminals 500 Network

Claims

1. A management device for managing bidding in an energy trading market for electricity supplied to an energy grid from a plurality of mobile objects each having an energy storage device, comprising: a required number calculation unit that calculates a required number of the mobile objects required to supply a predetermined amount of power according to a time period and a predetermined amount of power from a history of remaining capacity of the power storage device; a required number storage unit for storing the required number; an acquisition unit that acquires information regarding whether the mobile object is capable of outputting power to a power grid in a certain time period; a bid energy amount determination unit that determines an amount of energy to be bid to the energy trading market based on a comparison between the number of mobile objects that can output to the power grid during the time period and the required number of mobile objects; A management device comprising:

2. The bid energy amount determination unit When the number of moving objects capable of outputting power falls below the number required for the first amount of power, A second amount of power smaller than the first amount of power is searched for so that the number of the mobile units capable of outputting power exceeds the required number, and the second amount of power is set as a bid amount of power. The management device according to claim 1 .

3. The bid energy amount determination unit When the number of moving objects capable of outputting power exceeds the number of moving objects required for the first amount of power, A second amount of power larger than the first amount of power such that the number of mobile units capable of outputting power falls below the required number is searched for, and the second largest amount of power is set as the bid amount of power. The management device according to claim 1 .

4. the required number calculation unit calculates the required number of vehicles per day from a history of remaining capacity of the power storage device per day; The required number storage unit stores the required number of vehicles for a predetermined period of time, The bid energy amount determination unit determines the bid energy amount using the maximum value of the required number in the predetermined period. The management device according to claim 1 .

5. The bid energy amount determination unit A method for determining a bid amount of energy for a plurality of time periods on a specific day, The amount of bid energy is determined based on the time when the number of mobile devices capable of outputting power to the power grid is relatively small. The management device according to any one of claims 1 to 3.

6. 2. The management device according to claim 1, wherein the required number of units is corrected by multiplying the calculated required number of units and / or the bid amount of power by a predetermined ratio and adding the result to the required number of units.

7. The management device according to claim 1, wherein when at least some of the multiple mobile objects are charging during the target time period for bidding, the required number of vehicles is corrected by adding the required number of vehicles equivalent to the amount of electricity required for charging.

8. The management device according to claim 1 calculates the number of mobile units that can be output based on the operation plan of the mobile units and a prediction of the charging start time and / or the time required for charging, both at the time of determining the bid power amount and at the time of ending the power supply.

9. 9. The management device according to claim 8, wherein when the amount of power to be bid is determined, a charging start time and / or a time required for charging is predicted based on one or more operation plans for the mobile object within a unit period.

10. 10. The management device according to claim 8, wherein, at the end of power supply, a charging start time and / or a time required for charging is predicted based only on an operation plan of the mobile object in the immediate future.

11. The management device according to claim 10 , wherein when the power supply is terminated, if a difference between an SOC of the mobile body and an amount of power required for a most recent operation plan of the mobile body is equal to or greater than a certain value, charging of the mobile body is not performed.

Citation Information

Patent Citations

  • Bidding management device

    JP2021158835A