Work scaffolding
The work scaffold design addresses the strength issue by using a stress transmission member to support the joist member's front end via the legal frame, enhancing the scaffold's strength and enabling efficient anchor and rock bolt driving.
Patent Information
- Application Number
- JP2023051758
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-28
- Publication Date
- 2024-10-10
- Estimated Expiration
- 2043-03-28
AI Technical Summary
The existing work scaffold design, as described in Patent Document 1, faces challenges in driving anchors and rock bolts into the legal framework due to the increased distance between the work floor and the legal frame, compromising the scaffold's strength.
The work scaffold design includes a stress transmission member, such as an L-shaped member and a support member, which supports the joist member's front end via the legal frame, reducing the distance between the work floor and the legal frame, and enhances the scaffold's strength by transmitting stress effectively.
This configuration allows for easier and more effective driving of anchors and rock bolts into the legal framework, improving the scaffold's overall strength and stability.
Smart Images

Figure 2024140570000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a work scaffold, and more particularly to a work scaffold that is installed along a slope. [Background technology]
[0002] Slopes such as cuts and fills are sometimes protected using cast-in-place or precast concrete or mortar frameworks. When working on such frameworks, the work is carried out using scaffolding constructed along the existing framework.
[0003] For example, Patent Document 1 discloses a work scaffolding comprising a number of front supports, a number of rear supports that are longer than the front supports, a front joist frame erected between the front supports, a rear joist frame erected between the rear supports, a number of joist frames erected and supported between the front joist frames and the rear joist frames, and a work floor laid on the joist frames. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] Patent No. 7117708 Summary of the Invention [Problem to be solved by the invention]
[0005] However, in the work scaffold described in the above Patent Document 1, the front part of the joist frame is supported by the front joist frame installed between the front supports. Therefore, the distance between the work floor laid on the joist frame and the crest is longer than the length of the front supports. In such a case, it is very difficult to drive anchors and rock bolts into the crest using a driving machine installed on the work floor from the viewpoint of the strength of the work scaffold.
[0006] In view of the above, an object of the present invention is to provide a work scaffolding that can improve its strength. [Means for solving the problem]
[0007] The work scaffolding of the present invention is a work scaffolding installed on a concrete or mortar crest, and comprises a plurality of front supports supported by the crest, spaced apart in the direction in which the crest extends, a plurality of rear supports arranged at the same intervals as the front supports and longer than the front supports, a front beam member connecting adjacent front supports to each other, a rear beam member connecting adjacent rear supports to each other, front and rear members connecting adjacent front supports to the rear supports, a joist member whose middle part is supported by the front beam member and whose rear part is supported by the rear beam member and whose front end part is supported by the crest via a stress transfer member, and a work floor member laid on the joist member, and is characterized in that the rear supports of the work scaffolding units on the second or higher tier are supported by the joist member of a work scaffolding unit one tier lower than the work scaffolding unit in question.
[0008] According to the work scaffold of the present invention, the front end of the joist member on which the work floor member is laid is supported by the crenellation frame via the stress transmission member. Therefore, compared to the case where the work floor member is supported by the front support as in the above-mentioned Patent Document 1, the distance between the work floor member and the crenellation frame is shortened, and it is possible to improve the strength of the work scaffold.
[0009] In the work scaffolding of the present invention, it is preferable that the stress transmission member comprises an L-shaped member having one plate-shaped portion fixed to the juncture frame, and a support member fixed to the other plate-shaped portion of the L-shaped member and extending in the direction in which the juncture frame extends, and that the tip of the joist member is supported by the support member.
[0010] In this case, it is possible to easily construct a stress transmission member capable of transmitting the stress acting on the work floor member to the grating.
[0011] In addition, in the work scaffold of the present invention, for example, a clamp may be fixed to the other plate-shaped portion of the L-shaped member, and the support member may be gripped by the clamp.
[0012] In the work scaffold of the present invention, for example, the rear support may be supported by an angular member that is horizontally supported across multiple of the joists. [Brief description of the drawings]
[0013] [Figure 1] FIG. 1 is a schematic side view showing a work scaffold according to an embodiment of the present invention. [Diagram 2] FIG. 4 is a schematic enlarged side view showing the uppermost work scaffold unit. [Diagram 3] FIG. 4 is a schematic rear view showing the uppermost work scaffold unit. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0014] A working scaffold 100 according to an embodiment of the present invention will be described with reference to the drawings. Note that the drawings are for explaining the present embodiment in a schematic manner, and the dimensions are exaggerated.
[0015] The work scaffolding 100 is constructed along a slope on which a concrete or mortar crest A is installed. The crest A is made of cast-in-place or precast concrete, and has a lattice-like protruding portion in which a protruding portion extending left-right (the direction in which the crest A extends, the horizontal direction toward the crest A) intersects with a protruding portion extending vertically (up-down). Here, through-holes B are formed in at least a part of the intersecting portion of the protruding portion, and anchors or rock bolts C are driven into the ground through these through-holes B by a driving machine arranged on the work scaffolding 100.
[0016] The work scaffold 100 is in the form of a staircase with multiple steps, three steps in this case, and each step is made up of similarly constructed work scaffold units 10A to 10C. The work scaffold 100 is constructed step by step starting from the lower step work scaffold unit 10C.
[0017] Each work scaffold unit 10 comprises a front support 11, a rear support 12, a front beam member 13, a rear beam member 14, front and rear members 15, a joist member 16, a work floor member 17, and the like.
[0018] The front columns 11 are made of, for example, round steel pipes, and are supported at intervals in the left-right direction by the crest frame A. Here, the front columns 11 are installed upright on a horizontal plane formed in the crest frame A via jack bases 11a.
[0019] The rear support columns 12 are made of, for example, round steel pipes, and are the same in number as the front support columns 11 but longer than the front support columns 11. The rear support columns 12 are provided at the same interval as the front support columns 11 in the left-right direction.
[0020] Each rear support pillar 12 of the lowest work scaffold unit 10C is installed upright on the ground D behind the crane frame A via a jack base 12a.
[0021] Each rear support 12 of the work scaffold units 10A, 10B other than the lowest one is supported by the joist member 16 of the work scaffold unit 10B, 10C one level below. These rear supports 12 are supported by one or more, here two, square steel pipes, which are supported horizontally across a plurality of, here three, joist members 16. The rear supports 12 are provided upright on the square members 18 by fitting the openings of the clamps from above the two adjacent square members 18 using a jack base 12a having a U-shaped clamp at the bottom that opens downward. The rear supports 12 support the joist member 16 forward of the position supported by the front supports 11 of the work scaffold units 10B, 10C one level below.
[0022] The front beam member 13 is made of, for example, a round steel pipe, and connects the front columns 11 adjacent in the left-right direction. Here, the front beam member 13 connects the upper parts and middle parts of the front columns 11. The rear beam member 14 connects the rear columns 12 adjacent in the left-right direction. The rear beam member 14 is made of, for example, a truss structure combining round steel pipes, and connects the upper parts of the rear columns 12 adjacent in the left-right direction. The rear beam member 14 is also made of, for example, a round steel pipe, and connects the middle parts of the rear columns 12 adjacent in the left-right direction.
[0023] The front-rear member 15 is made of, for example, a round steel pipe, and connects the front support 11 and the rear support 12 located in the front-rear direction. Here, the front-rear member 15 connects the upper parts and the middle parts of the front support 11 and the rear support 12. The front-rear member 15 also connects the upper part of the front support 11 and the middle part of the rear support 12 located in the front-rear direction.
[0024] The front beam member 13, the rear beam member 14 and the front / rear members 15 may be connected to the front support column 11 or the rear support column 12 in the same manner as described in the above-mentioned Patent Document 1, for example, but the connection method is not limited to this.
[0025] The middle part of the joist member 16 is supported by the front beam member 13, and the rear part is supported by the rear beam member 14. Furthermore, the joist member 16 extends forward from the front support 11, and the front end part is supported by the crest frame A via a stress transfer member 20. The front end part of the joist member 16 and the crest frame A are adjacent to each other, but are not in contact with each other.
[0026] The stress transmission member 20 is made up of an L-shaped member 21, a catch clamp 22 fixed to the L-shaped member 21, and a support member 23 held by the catch clamp 22.
[0027] The L-shaped member 21 is formed from a steel material such as an L-shaped steel with an L-shaped cross section extending in the left-right direction. One plate-shaped portion 21a of the L-shaped member 21 is fixed to the upper surface of the legal frame A by an anchor 24. A catch clamp 22 is fixed to the other plate-shaped portion 21b of the L-shaped member 21. The catch clamp 22 grips a support member 23 made of, for example, a round steel pipe, which extends in the left-right direction.
[0028] The support member 23 and the lower portion of the front support 11 are connected by a reinforcing member 25 made of, for example, a round steel pipe. This connection method may be the same as the connection method using the front and rear members 15 described above.
[0029] The front portions of the plurality of joists 16 are placed on the support members 23. As a result, the joists 16 are supported on the crest A via the L-shaped members 21, the catch clamps 22 and the support members 23, i.e., the stress transmission members 20. Therefore, the stress acting on the joists 16 from above is transmitted to the crest A via the stress transmission members 20.
[0030] The work floor member 17 is laid across the upper surfaces of the plurality of joist members 16. The work floor member 17 may be a metal plate such as punched metal, or a wooden board such as a cedar board. In the topmost work scaffold unit 10A, the work floor member 17 is laid across the upper surfaces of all the joist members 16. However, in the work scaffold units 10B and 10C other than the topmost one, the work floor member 17 is laid only on the upper surfaces of the joist members 16 located rearward of the joist members 16 supported by the rear support 12.
[0031] Furthermore, the work scaffold units 10A to 10C may be provided with handrails, baseboards, etc. These may be configured in the same manner as in Patent Document 1, for example.
[0032] According to the above-mentioned working scaffold 100, the front end of the joist member 16 on which the working floor member 17 is laid is supported by the crenellation frame A via the stress transmission member 20. Therefore, compared to the case where the front part is supported by the front support as in the above-mentioned Patent Document 1, the distance between the working floor member 17 and the crenellation frame A is shortened, so it is possible to improve the strength of the working scaffold 100. This also makes it possible to drive anchors and rock bolts into the crenellation frame A using a driving machine arranged near the front end of the working floor member 17 of the uppermost working scaffold unit 10A.
[0033] The present invention is not limited to the work scaffold 100 specifically described in the above embodiment, and can be modified as appropriate within the scope of the claims. [Explanation of symbols]
[0034] 10...work scaffold unit, 10A...topmost work scaffold unit, 10B...middle work scaffold unit, 10C...bottom work scaffold unit, 11...front support, 11a...jack base, 12...rear support, 12a...jack base, 13...front beam member, 14...rear beam member, 15...front and rear members, 16...joist member, 17...work floor member, 18...angle-shaped member, 20...stress transfer member, 21...L-shaped member, 21a...one plate-shaped portion, 21b...other plate-shaped portion, 22...catch clamp, 23...support member, 24...anchor, 25...reinforcing member, 100...work scaffold, A...frame, B...through hole, C...anchor, rock bolt, D...ground.
Claims
1. A work scaffold installed on a concrete or mortar frame, A plurality of front supports provided at intervals in the extension direction of the frame and supported by the frame; A plurality of rear support columns are provided at the same intervals as the front support columns and are longer than the front support columns; a front beam member connecting adjacent front columns; a rear beam member connecting adjacent rear columns; A front-rear member that connects the adjacent front support pillars and the adjacent rear support pillars; A joist member having a middle portion supported by the front beam member, a rear portion supported by the rear beam member, and a front end portion supported by the jug via a stress transfer member; A work scaffold unit having a plurality of stages, each of which includes a work floor member laid on the joist member, A work scaffold characterized in that the rear support pillar of the work scaffold unit on the second or higher level is supported by the joist member of the work scaffold unit one level lower than the work scaffold unit.
2. The stress transfer member includes an L-shaped member having one plate-shaped portion fixed to the frame, and a support member fixed to the other plate-shaped portion of the L-shaped member and extending in the extension direction of the frame, The work scaffold according to claim 1, wherein the tip of the joist member is supported by the support member.
3. 3. The work scaffold according to claim 2, wherein a clamp is fixed to the other plate-shaped portion of the L-shaped member, and the support member is gripped by the clamp.
4. 4. The work scaffold according to claim 1, wherein the rear support is supported by an angular member that is horizontally supported across a plurality of the joists.
Citation Information
Patent Citations
Scaffold structure in slope construction
JP2003313871A
Scaffold joint device for wall work
JP2009263865A
Scaffolding apparatus in slope frame work
JP2013113003A
Work platform for slope face work and assembly method thereof
JP2019094693A
Support device
JP2021088922A