Fixing base

The fixing foundation securely attaches tents to an artificial ground by integrating with a concrete layer and extending into a soil layer, addressing wind instability and rainwater issues.

JP2024141090APending Publication Date: 2024-10-10OHBAYASHI GUMI LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
JP2023052547
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-29
Publication Date
2024-10-10

AI Technical Summary

Technical Problem

Tents installed outdoors are easily affected by wind, necessitating secure fixation.

Method used

A fixing foundation that integrates with a concrete layer and extends into a soil layer, featuring a fixture for securing tents to an artificial ground, including a foundation part and a fixture for tent attachment.

Benefits of technology

The tent is firmly fixed to the artificial ground, enhancing stability and preventing rainwater accumulation, thereby increasing durability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024141090000001_ABST
    Figure 2024141090000001_ABST
Patent Text Reader

Abstract

To provide a fixing base capable of firmly fixing a tent to an artificial ground.SOLUTION: An artificial ground 10 has a concrete layer 24, a soil layer 25 covering the concrete layer 24 from above, and a fixing base 30 to which a tent is fixed. The fixing base 30 has a base portion 31 that is integrated with the concrete layer 24 and extends from the concrete layer 24 to a surface layer part of the soil layer 25, and an anchor 32 that is provided at the upper end of the base portion 31 and to which a tent pole 16 is fixed by a bolt 36.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a fixing base for fixing a tent to an artificial ground. [Background technology]

[0002] Conventionally, in public facilities such as hospitals, tents with roofs and walls formed by sheet materials attached to a framework are installed to secure outdoor spaces for responding to disaster victims and spaces for setting up temporary toilets in the event of a disaster, etc. One such tent is known, for example, from the tent described in Patent Document 1. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2020-41283 A Summary of the Invention [Problem to be solved by the invention]

[0004] However, the above-mentioned tents are easily affected by wind when installed outdoors, so there is a need to firmly secure the tents. [Means for solving the problem]

[0005] The fixing base that solves the above problem fixes a tent to an artificial ground having a concrete layer and a soil layer covering the concrete layer from above. The fixing base has a base part that is integrated with the concrete layer and extends from the concrete layer to the surface part of the soil layer, and a fixing device that is provided on the upper end of the base part and fixes the tent to the base. Effect of the Invention

[0006] According to the present invention, the tent can be firmly fixed to the artificial ground. [Brief description of the drawings]

[0007] [Figure 1] FIG. 2 is a perspective view showing a state in which a tent is fixed to an embodiment of a fixing base installed on an artificial ground in the first embodiment. [Diagram 2] FIG. 2 is a cross-sectional view showing a schematic configuration of the artificial ground and the fixed foundation in the first embodiment. [Diagram 3] FIG. 2 is a top view showing a fixing base in the first embodiment. [Figure 4] FIG. 11 is a cross-sectional view showing a schematic configuration of the artificial ground and the fixed base in the second embodiment. [Diagram 5] FIG. 4 is a top view showing a modified example of the fixing base of the first embodiment. [Figure 6] 1A and 1B are cross-sectional views showing modified examples of the fixing base of the first embodiment, in which (a) shows a concrete material having reinforcing bars embedded in a concrete layer, and (b) shows a concrete material having a flange embedded in a concrete layer. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0008] (Outline of the artificial ground) A first embodiment of a fixing foundation will be described with reference to Figs. 1 to 3. As shown in FIG. 1, an artificial ground 10 is provided in a location close to a building 11, such as a hospital. The artificial ground 10 has fixing bases 30 at various locations. The fixing bases 30 are used to fix a tent 15 to the artificial ground 10 in the event of a disaster or the like. The fixing bases 30 are provided at positions corresponding to the tent 15 to be set up. Specifically, the fixing bases 30 are provided at positions corresponding to the supports 16 that form the framework of the tent 15. The tent 15 is firmly fixed to the artificial ground 10 by fixing each support 16 to the fixing bases 30.

[0009] (First embodiment) 2, the artificial ground 10 has a slab 21, a waterproof layer 22 covering the slab 21 from above, and a heat insulating layer 23 covering the waterproof layer 22 from above. The artificial ground 10 also has a concrete layer 24 covering the heat insulating layer 23 from above, and a soil layer 25 covering the concrete layer 24 from above.

[0010] The concrete layer 24 is formed by pouring lightweight concrete using, for example, artificial lightweight aggregate onto the insulating layer 23. The soil layer 25 has a protective layer 26, a vegetation substrate layer 27, and a turf layer 28. The protective layer 26 protects the concrete layer 24 by covering it from above. The protective layer 26 is formed, for example, by laying a root-resistant sheet or a protective mat on the concrete layer 24. The vegetation substrate layer 27 is formed, for example, by spreading a vegetation substrate made of a mixture of a large-grained material that has strength and a small-grained material that promotes growth, and then compacting it. The turf layer 28 is formed by turf planted in the vegetation substrate layer 27. The turf layer 28 forms the surface layer of the soil layer 25.

[0011] (Fixed foundation) The fixing base 30 has a base portion 31 and an anchor 32 embedded in the base portion 31 . The foundation portion 31 is integrated with the concrete layer 24. The foundation portion 31 is formed in a quadrangular prism shape extending upward from the upper surface of the concrete layer 24. The foundation portion 31 has an exposed surface 33 that is exposed at the surface portion of the soil layer 25.

[0012] The exposed surface 33 has a fixing surface 34 and a sloped surface 35 . The fixing surface 34 is formed in a rectangular shape in the center of the exposed surface 33 when viewed from above the fixing base 30 (see FIG. 3). The fixing surface 34 is a surface to which the support pole 16 of the tent 15 is fixed. The support pole 16 has a support pole body 17 and a base plate 18 joined to the lower end of the support pole body 17. The support pole 16 is fixed to the fixing surface 34 by fastening a bolt 36 to an anchor 32 through a fastening hole formed in the base plate 18.

[0013] The inclined surface 35 is provided around the fixed surface 34. The inclined surface 35 forms a downward gradient on the exposed surface 33 from the outer periphery of the fixed surface 34 to the outside. With this configuration, rainwater can be guided to the soil layer 25, and thus rainwater is prevented from accumulating on the exposed surface 33. Such a foundation portion 31 can be integrated with the concrete layer 24 by installing a formwork for the foundation portion 31 and then pouring concrete to form the concrete layer 24.

[0014] 3, the anchors 32 are embedded in the foundation 31 so as to be located at each corner of the fixing surface 34. The anchors 32 may be embedded in the foundation 31 by being placed at a predetermined position before pouring the concrete that forms the foundation 31, or by being driven into the foundation 31 after the foundation 31 is formed. When the fixing foundation 30 is not in use, the anchors 32 may have bolts 36 or caps attached to them in order to prevent foreign matter from entering the inside.

[0015] The operation and effects of the first embodiment will be described. (1-1) The fixing foundation 30 of the artificial ground 10 has a foundation part 31 formed of concrete which is integrated with the concrete layer 24 and has a fixing surface 34 on the surface portion of the soil layer 25, and a fixing device formed of an anchor 32 which is embedded in the foundation part 31 and to which a bolt 36 is fastened for fixing the support pole 16 of the tent 15 to the fixing surface 34. As a result, after placing the support pole 16 of the tent 15 on the fixing surface 34, the support pole 16 of the tent 15 can be firmly fixed to the artificial ground 10 simply by fastening the bolt 36 to the anchor 32.

[0016] (1-2) In the fixing base 30, the exposed surface 33 of the base portion 31 has a sloped surface 35 that forms a downward slope from the outer periphery of the fixing surface 34 toward the outside. This makes it possible to guide rainwater that falls on the exposed surface 33 to the soil layer 25. As a result, the durability of the fixing base 30 can be improved.

[0017] Second embodiment A second embodiment of the fixing base will be described. In the second embodiment, the parts different from the first embodiment will be described in detail, and the parts similar to those in the first embodiment will be denoted by the same reference numerals and the detailed description thereof will be omitted.

[0018] As shown in Fig. 4, the tension net 19 attached to the tent 15 is fixed to the fixing base 50. The base portion 51 of the fixing base 50 has a base plate 52 and a base rod 53. The base plate 52 is fixed to the concrete layer 24 with anchor bolts 54 and nuts 55, and is thereby integrated with the concrete layer 24. The base rod 53 extends upward from the center of the base plate 52. The base rod 53 is joined to the base plate 52 by a joining method such as welding. An engaging member 65 is connected to the upper end of the base rod 53 via a high nut 56 that is long in the vertical direction.

[0019] The foundation portion 51 also has a protective tube 58 and a stopper plate 59. The protective tube 58 is joined to the foundation plate 52 by a joining method such as welding. The protective tube 58 extends upward from the foundation plate 52 to the surface portion of the soil layer 25. The foundation rod 53 and the engaging member 65 are disposed inside the protective tube 58. At the lower end of the protective tube 58, at the front side and the back side in the plane of FIG. 4, drainage holes 60 are formed to allow rainwater that has entered the protective tube 58 to escape to the soil layer 25.

[0020] The anti-slip plate 59 is joined to the inside of the protective tube 58 so as to face the base plate 52. The anti-slip plate 59 has a through hole through which the high nut 56 or the engaging device 65 passes. The anti-slip plate 59 suppresses misalignment of the engaging device 65 in the horizontal direction. The anti-slip plate 59 also has drainage holes 62 formed at the ends on the left and right sides of the paper in FIG.

[0021] The engaging device 65 is a fastener with which the tension net 19 of the tent 15 is engaged, thereby fixing the tent 15 to the artificial ground 10. The engaging device 65 is, for example, an eye bolt connected to the high nut 56.

[0022] The fixing base 50 has a cap 66. The cap 66 closes the upper end opening of the protective tube 58 to prevent foreign matter from entering the protective tube 58 when the fixing base 50 is not in use.

[0023] The operation and effects of the second embodiment will be described. (2-1) The fixing base 50 has a base part 51 integrated with the concrete layer 24, and engaging members 65 connected to base rods 53 constituting the base part 51 and to which the tension net 19 of the tent 15 is fixed. This enables the tent 15 to be firmly fixed to the artificial ground 10.

[0024] (2-2) The fixing base 50 has a protective tube 58 that is integrated with the base plate 52 and has the base rod 53 and the engaging device 65 disposed inside. This makes it possible to protect the base rod 53 and the engaging device 65 from the soil layer 25.

[0025] (2-3) The base portion 51 is provided with a stopper plate 59 that prevents the engaging device 65 from shifting out of position. This allows the stopper plate 59 to bear part of the load when the tension net 19 is pulled. As a result, the moment acting on the base end of the base rod 53 can be reduced.

[0026] (2-4) The protective tube 58 has a drainage hole 60, and the stopper plate 59 has a drainage hole 62. This allows rainwater that has infiltrated into the protective tube 58 to escape into the soil layer 25. As a result, corrosion of the foundation 51 caused by rainwater can be suppressed.

[0027] The first and second embodiments can be modified as follows: The first and second embodiments and the following modifications can be combined with each other to the extent that they are not technically inconsistent.

[0028] In the first embodiment, the foundation portion 31 is formed in a quadrangular prism shape. However, the foundation portion 31 is not limited thereto, and may be formed in a cylindrical shape or a polygonal prism shape as long as the foundation portion 31 is formed integrally with the concrete layer 24.

[0029] In the first embodiment, as shown in Fig. 5, the fixing base 30 may be configured such that one base portion 31 has multiple fixing surfaces 34. With this configuration, when adjacent tents 15 are connected, both tents 15 can be firmly fixed to the artificial ground 10.

[0030] In the first embodiment, the foundation portion 31 is integrated with the concrete layer 24 by installing the formwork for the foundation portion 31 and then pouring the concrete that forms the concrete layer 24. However, as shown in Fig. 6(a), the foundation 31 can be integrated with the concrete layer 24 by installing a concrete block 70 that will become the foundation 31 and then pouring concrete to form the concrete layer 24. The concrete block 70 may be provided with reinforcing bars 71 that are embedded in the concrete layer 24. Also, as shown in Fig. 6(b), the concrete block 70 may have a protruding portion 72 that is embedded in the concrete layer 24.

[0031] In the second embodiment, the engaging member 65 may be fixed to the base rod 53 by, for example, welding. In the first and second embodiments, the anchoring base may be integral with the slab 21 . [Explanation of symbols]

[0032] 10...artificial ground, 11...building, 15...tent, 16...support, 17...support body, 18...base plate, 19...tension net, 21...slab, 22...waterproof layer, 23...insulating layer, 24...concrete layer, 25...soil layer, 26...protective layer, 27...vegetation base layer, 28...turf layer, 30...fixing base, 31...base part, 32...anchor, 33...exposed surface, 34...fixing surface, 35...sloping surface, 36...bolt, 50...fixing base, 51...base part, 52...base plate, 53...foundation rod, 54...anchor bolt, 55...nut, 56...high nut, 58...protective tube, 59...anti-slip plate, 60,62...drain hole, 65...engagement device, 66...cap, 70...concrete block, 71...reinforcing bar, 72...protrusion.

Claims

1. A fixing base for fixing a tent to an artificial ground having a concrete layer and a soil layer covering the concrete layer from above, a foundation portion integrated with the concrete layer and extending from the concrete layer to a surface portion of the soil layer; A fastener provided on an upper end of the base portion to which the tent is fixed. Fixed foundation.

2. The foundation portion is made of concrete having an exposed surface at the upper end portion on the surface portion of the soil layer, The fasteners are anchors that are embedded in the foundation and receive bolts that secure the tent poles to the exposed surface. The anchoring base according to claim 1.

3. The exposed surface has a fixing surface to which the support is fixed and a sloped surface that forms a downward slope from the outer periphery of the fixing surface toward the outside. The anchoring base according to claim 2.

4. The foundation portion includes a foundation plate fastened to the concrete layer and a foundation rod extending upward from the foundation plate, The fixing device is an engagement device that is connected to the upper end of the foundation rod and engages with the tent netting. The anchoring base according to claim 1.

5. The foundation portion has a protective cylinder joined to the foundation plate and having the foundation rod and the engaging member disposed therein. The anchoring base according to claim 4.

6. The base portion has a stopper plate joined to the inside of the protective tube so as to face the base plate and suppress the positional displacement of the fastener. The anchoring base according to claim 5.

Citation Information

Patent Citations

  • Steel frame column base

    JP1997317004A

  • Building erection structure

    JP1999166240A

  • Installation foundation and construction method thereof

    JP2011247072A

  • Frame structure

    JP2017203287A

  • Pole and installation method of pole body

    JP2023048688A