Method for improving existing hollow floor slab bridge

By using a breathable and liquid-tight bag to form a cylindrical partition wall in hollow deck bridges, the method addresses anchoring issues and maintains earthquake resistance while preventing weight increase.

JP2024141395AActive Publication Date: 2024-10-10PS CONSTRUCTION CO LTD +2
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
JP2023053004
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-29
Publication Date
2024-10-10
Estimated Expiration
2043-03-29

AI Technical Summary

Technical Problem

Existing methods for anchoring in hollow deck bridges face issues such as gaps between the aluminum balloon and the inner wall surface, leading to leakage of fixing material and insufficient anchoring strength, and the increased weight from filling the hollow portion with fixing material adversely affects durability and earthquake resistance.

Method used

A breathable and liquid-tight bag is inserted into the hollow portion, which expands to form a cylindrical partition wall, ensuring close contact with the inner wall and preventing leakage, while using a polyurethane foam to fill the space for anchoring without increasing weight.

Benefits of technology

The method forms a partition wall with excellent water-stopping properties, allowing secure anchoring and maintaining the bridge's earthquake resistance without significant weight increase.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024141395000001_ABST
    Figure 2024141395000001_ABST
Patent Text Reader

Abstract

To provide a method capable of preferably forming a desired partition wall in a void pipe of an existing hollow floor slab, and also to provide a method capable of fastening and fixing an anchor at an expected fastening strength in a hollow part.SOLUTION: A bag body insertion hole, an anchor insertion hole, and a fastening material injection hole are provided so as to reach a hollow part in a void pipe embedded in a hollow floor slab from an undersurface of the hollow floor slab. A bag body has air permeability and liquid-tight property and is expandable and deformable into a spherical shape. The bag body is inserted from the bag insertion hole into the hollow part so as to form a partition wall in the hollow part by injecting a liquid agent in a fluid state, which expands with the lapse of time, into the inserted bag body in order to expand and deform the bag body. An anchor is inserted from the anchor insertion hole to a position where a head part reaches the inside of the hollow part. A fastening material for fastening and fixing the anchor is injected in a space between the partition wall of the hollow part and an end face in a pipe shaft direction of the hollow part through the fastening material injection hole.SELECTED DRAWING: Figure 12
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] This invention relates to an improvement method that contributes to improving the seismic resistance and strength of existing hollow deck bridges. [Background technology]

[0002] Traditionally, hollow deck bridges that use hollow void pipe decks (hereinafter simply referred to as hollow decks) have been widely used for bridges with relatively short bridge lengths to reduce girder weight. When existing bridges that use such hollow decks do not meet the earthquake resistance standards at the time of construction, they are reinforced to make them earthquake-resistant. One reinforcement method is to fix the substructure, such as abutments and piers, to the hollow deck via a horizontal force distribution structure. The horizontal force distribution structure is intended to improve earthquake resistance by receiving the horizontal load acting on the deck and transmitting it to the substructure, thereby limiting the amount of deck movement during an earthquake.

[0003] However, since the hollow deck that constitutes the bridge girder of the hollow deck bridge has an internal hollow structure, how to firmly install the anchor connected to the horizontal force distribution structure in the hollow deck is a problem. As one of the solutions, an anchor insertion hole is provided that reaches from the lower surface side of the hollow deck to the hollow part, and an anchor is inserted through the anchor insertion hole so that a part of the anchor is located in the hollow part, while a bag such as an aluminum balloon is inserted in a contracted state into the hollow part at a position farther from the axial end of the hollow part than the anchor insertion hole, and a polyurethane foam reaction liquid is injected into the bag to expand the bag to form a partition in the hollow part, and a fluidized fixing material such as mortar is injected between the axial end of the hollow part of the void pipe and the partition so as to surround the anchor protrusion in the hollow part, and then hardened, thereby fixing and fixing the anchor to the hollow deck. Here, an aluminum balloon that has flexibility and has a flat disk shape when finally expanded is used (see Patent Document 1). [Prior art documents] [Patent documents]

[0004] [Patent Document 1] Patent No. 4519029 Summary of the Invention [Problem to be solved by the invention]

[0005] The problem here is how to form a partition wall in the hollow part. Since the final expanded shape of the aluminum balloon used in Patent Document 1 is a flat disk shape, depending on the orientation of the aluminum balloon inserted into the hollow part in the direction around the axis that is the thickness direction of the hollow deck, the aluminum balloon may not fit properly to block the entire hollow part, and a gap may be created between the inner wall surface of the hollow part and the surface of the aluminum balloon, making it impossible to stably form the desired partition wall. For example, in Patent Document 1, if there is a gap between the inner wall surface of the hollow part and the surface of the aluminum balloon, the fluidized fixing material for forming the partition wall leaks out from the gap, causing insufficient filling of the fixing material, and causing problems such as not being able to fix the anchor as expected.

[0006] In addition, since aluminum balloons are made of a thin aluminum film that is difficult for air to pass through, the air cannot escape and there is a risk that the aluminum balloon will burst due to the expansion pressure of the foamed polyurethane.

[0007] Furthermore, since the final expanded shape of the aluminum balloon is a flat disk, depending on the orientation of the aluminum balloon inserted into the hollow portion in the direction around the axis that is the thickness direction of the hollow deck, a gap can appear between the inner surface of the hollow portion and the surface of the aluminum balloon, causing the fluid anchoring material to leak out from this gap, resulting in insufficient filling of the anchoring material and preventing the expected anchor fixing strength from being obtained.

[0008] Although it is possible to obtain the expected anchor strength by filling the entire hollow space of a hollow deck bridge with anchoring material, the original purpose of hollow deck bridges was to reduce the weight of the entire deck. Therefore, if the entire hollow space is filled with anchoring material, the weight of the hollow deck bridge will increase significantly, which may have a negative effect on its durability and earthquake resistance.

[0009] In consideration of the above circumstances, the present invention aims to provide a method for improving an existing hollow slab bridge, which can satisfactorily form a filling space for an anchoring material within a part of the hollow portion of a void pipe so that the anchor can be embedded in the hollow portion and fixed in place. [Means for solving the problem]

[0010] In order to solve such problems, the method for improving an existing hollow deck bridge according to the present invention includes forming a bulkhead in the hollow deck of an existing hollow deck bridge, Providing a bag insertion hole that reaches a hollow portion in a void pipe embedded in the hollow floor slab from the lower surface of the hollow floor slab; inserting a bag into the hollow portion through the bag insertion hole, the bag having air permeability and liquid tightness, and an expandable portion capable of expanding and deforming into a cylindrical shape having an axis in the longitudinal direction of the void tube; The method includes injecting a liquid agent that expands over time into the inserted bag, and expanding and deforming the bag by the expansion pressure to form a partition in the hollow portion.

[0011] According to the present invention, by using a bag body that can be expanded and deformed cylindrically in the axial direction of the void pipe as the bag body to be inserted into the hollow portion of the hollow deck, a partition wall with excellent water-stopping properties can be formed by closely contacting the surface of the bag body with the inner wall surface of the hollow portion, without being affected by the orientation around the axis that is the thickness direction of the hollow deck when the bag body is inserted.

[0012] In addition, since the bag is made of a breathable material, when a liquid agent that expands over time, such as polyurethane foam, is injected into the bag to expand and deform the bag with the expansion pressure, the air in the bag is smoothly replaced by the expanded polyurethane foam, and air is unlikely to remain in the bag. This prevents the bag from being distorted in an irregular manner due to residual gas, and a partition wall with excellent water-stopping properties can be obtained. Since a partition wall with excellent water-stopping properties is obtained in the hollow portion, an anchor can be fixed and a desired solid portion can be well formed in the hollow portion.

[0013] In addition, another method for improving an existing hollow deck bridge according to the present invention includes, when fixing an anchor to the hollow deck of an existing hollow deck bridge, Providing an anchor insertion hole, a bag insertion hole, and an anchor injection hole that reach a hollow portion in a void pipe embedded in the hollow deck from the lower surface of the hollow deck; inserting a bag having air permeability and liquid tightness, and capable of expanding and deforming into a cylindrical shape having an axis in the longitudinal direction of the void tube, into the hollow portion through the bag insertion hole; injecting a liquid agent that expands over time into the inserted bag body to expand and deform the bag body to form a partition wall in the hollow portion; Inserting the anchor through the anchor insertion hole to a position where a leading end of the anchor reaches inside the hollow portion; The method includes injecting an anchoring material into a space between the partition wall of the hollow portion and an end surface of the hollow portion in the axial direction through the anchoring material injection hole to fix the anchor.

[0014] According to the present invention, the surface of the bag body and the inner wall surface of the hollow portion are in close contact with each other to form a partition with excellent water-stopping properties, so that a space filled with fixing material for fixing and securing the anchor can be well formed within the hollow portion, thereby preventing insufficient filling of the fixing material within the hollow portion and enabling the anchor to be fixed as expected.

[0015] The liquid may be a polyurethane foam reaction liquid.

[0016] The anchor can be made of mortar, which is easy to fill and has a strong fixing strength, but concrete, resin, and other materials can also be used as the anchor. In either case, the material must have the compressive strength necessary to fix and secure the anchor with sufficient strength. [Brief description of the drawings]

[0017] [Figure 1] 1 is a cross-sectional view showing an existing hollow deck which is the target of construction using a partition wall forming method according to a first embodiment of the present invention. [Diagram 2]A cross-sectional view showing a process of forming a bag insertion hole in an existing hollow deck in the partition wall forming method of the first embodiment. [Diagram 3] A cross-sectional view showing a process of inserting a bag into a hollow portion of a hollow floor slab in the partition wall forming method of the first embodiment. [Figure 4] FIG. 3 is a cross-sectional view showing a step of injecting a reactive liquid agent for polyurethane foam into a bag in the partition wall forming method of the first embodiment. [Diagram 5] 4 is a cross-sectional view showing the expansion and deformation of a bag body caused by the injection of a liquid agent into the bag body in the partition wall forming method of the first embodiment. FIG. [Figure 6] FIG. 11 is a cross-sectional view showing the process of drilling various holes in an existing hollow deck in the anchor fixing method of the second embodiment. [Figure 7] FIG. 11 is a cross-sectional view showing a process of inserting a bag body in a contracted state into a hollow portion of a hollow deck in the anchor fixing method of the second embodiment. [Figure 8] FIG. 11 is a cross-sectional view showing a process of injecting a fluid liquid agent that expands over time into a bag in the anchor fixing method according to the second embodiment. [Figure 9] FIG. 11 is a cross-sectional view showing the expansion and deformation of a bag body caused by injection of a liquid agent into the bag body in the anchor fixing method of the second embodiment. [Figure 10] FIG. 11 is a cross-sectional view showing the process of setting an anchor in the hollow portion of the hollow deck in the anchor fixing method of the second embodiment. [Figure 11] FIG. 11 is a cross-sectional view showing the process of injecting an anchoring material into the hollow portion of the hollow deck in the anchor fixing method of the second embodiment. [Figure 12] 13 is a cross-sectional view showing the state of an anchor fixed by an anchoring material in a hollow portion of a hollow deck in the anchor fixing method of the second embodiment. FIG. [Figure 13A] 1 is an enlarged plan view of a portion of an expansion portion of a bag body that satisfies the required breathability and liquid-tightness. FIG. [Figure 13B] FIG. 13B is a cross-sectional view of FIG. 13A. [Figure 14A]13 is an enlarged plan view of a portion of an expansion portion of another bag body that satisfies the required breathability and liquid-tightness. FIG. [Figure 14B] FIG. 14B is a cross-sectional view of FIG. 14A. [Figure 15] This is a cross-sectional view showing an example of the application of an anchor attached to an existing hollow deck in the axial direction of a void pipe. [Figure 16] FIG. 16 is a cross-sectional view showing an application example of the anchor in FIG. 15 in a direction perpendicular to the pipe axial direction. [Figure 17] This is a vertical cross-sectional view showing a construction method of adding cast-in-place prestressed concrete to one side of an existing hollow deck in the width direction. [Figure 18] FIG. 18 is a cross-sectional view of (D) in FIG. [Figure 19] FIG. 4 is a cross-sectional view showing a bag body having a double structure. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0018] Next, an embodiment of the present invention will be described in detail with reference to the drawings. [First embodiment] 1 to 5 are diagrams for explaining a bulkhead forming method, which is a method for improving an existing hollow deck bridge according to a first embodiment of the present invention. In these figures, reference numeral 10 denotes an existing hollow deck, and a void pipe 14 with a hollow section 12 inside is embedded in this hollow deck 10. By embedding this void pipe 14, the hollow deck 10 has an internal hollow structure, and the weight reduction improves durability and earthquake resistance. In addition, reference numeral 16 denotes the covering concrete portion between the underside of the hollow deck 10 and the underside of the void pipe 14, and reference numeral 18 denotes the asphalt pavement portion on the upper part of the hollow deck 10.

[0019] Next, a method for forming a partition wall 30 in the hollow portion 12 of the void pipe 14 in the existing hollow deck 10 will be described.

[0020] As shown in FIG. 2, a bag insertion hole 19 is drilled upward from the underside of the existing hollow deck 10 so as to penetrate through the covering concrete portion 16 and the lower side wall of the void pipe 14.

[0021] Next, as shown in Fig. 3, a bag 30 having an expansion part 30a that is breathable and liquid-tight and can be expanded and deformed into a cylindrical shape having an axis in the longitudinal direction of the void pipe 14 is inserted in a contracted state from the lower opening of the bag insertion hole 19 to a depth such that the expansion part 30a is located at approximately the middle height within the hollow part 12 of the void pipe 14. Here, the bag 30 is made of a material that is breathable to a degree that it allows air to pass through and liquid-tight to a degree that it does not allow the liquid agent to pass through, and is capable of being expanded and deformed into a cylindrical shape having an axis in the longitudinal direction of the void pipe 14 by the internal pressure when the liquid agent 31 expands within the bag 30 as shown in Fig. 4.

[0022] Next, as shown in FIG. 4, a liquid 31 that expands over time, such as a reactive liquid of polyurethane foam, is injected into the bag 30 through the lower opening of the bag insertion hole 19 using a liquid injection tube 31a, and is expanded in the bag 30. As a result, as shown in FIG. 5, the bag 30 is expanded and deformed under the expansion pressure. Here, by using a cylindrical bag 30 having an axis in the length direction of the void tube 14, when a necessary and sufficient amount of liquid 31 is injected into the bag 30, the expansion part 30a of the bag 30 expands and deforms according to the internal shape of the void tube 14. As a result, the surface of the bag 30 and the inner wall surface of the hollow part 12 come into close contact with each other over a certain range of the length L of the void tube 14, forming a partition wall with excellent water-stopping properties.

[0023] After expanding and deforming the bag body 30 in this manner, the liquid agent injection pipe 31a is removed. Alternatively, the portion protruding from the lower surface of the existing hollow deck 10 may be cut off without removing the liquid agent injection pipe 31a.

[0024] As described above, in this embodiment, the bag 30 having the expansion part 30a capable of expanding and deforming into a cylindrical shape having an axis in the longitudinal direction of the void pipe 14 is inserted into the hollow part 12, and the liquid agent 31 that expands over time is injected into the bag 30, so that the bag 30 is expanded and deformed into a cylindrical shape by the expansion pressure. At this time, even if the bag 30 is set in an orientation having an angle with respect to the axial direction of the void pipe 14, the orientation of the bag 30 is automatically corrected so that the axis of the bag 30 is aligned with the longitudinal direction of the void pipe 14 due to the internal shape of the void pipe 14 and the force of the bag 30 trying to expand and deform into a cylindrical shape when it is subjected to the expansion pressure. This makes it possible to more reliably form a partition wall with excellent water-stopping properties in which the surface of the expansion part 30a of the bag 30 and the inner wall surface of the hollow part 12 are in close contact with each other over a certain length L of the void pipe 14.

[0025] In addition, since the bag body 30 is made of a material that satisfies the degree of breathability that allows air to flow in and out, air is pushed out of the bag body 30 as the liquid agent 31 expands. This prevents irregular expansion and deformation of the bag body 30 due to residual air in the bag body 30, and therefore makes it possible to more reliably obtain a partition wall with excellent water-stopping properties.

[0026] Furthermore, the partition wall formed in the existing hollow deck 10 can be used, for example, as a partition wall forming part of a space for embedding a fixing material such as mortar to fix steel materials such as anchors in a part of the hollow portion 12 of the void pipe 14, as described in the second embodiment below.

[0027] [Second embodiment] Next, a description will be given of an anchor fixing method, which is a method for improving an existing hollow deck bridge according to a second embodiment of the present invention. The anchor fixing method of this embodiment is a method that makes it possible to obtain the expected anchor fixing strength by fixing an anchor 32 to a fixing material 38 filled in the space (fixing material filling space 34) between the partition wall formed by the partition wall formation method of the first embodiment shown in Figures 1 to 5 and the axial end 33 of the hollow portion 12 of the void pipe 14.

[0028] 6 to 12 are diagrams for explaining the details of the anchor fixing method of the second embodiment. In these diagrams, the same parts as those in Figs. 1 to 5 used in the explanation of the partition wall forming method of the first embodiment are given the same reference numerals.

[0029] As shown in Figure 6, the bag insertion hole 19, anchor insertion hole 20, fixing material injection hole 22, and filling confirmation hole 24 are drilled upward from the underside of the existing hollow deck 10, penetrating the covering concrete portion 16 and the lower side wall of the void pipe 14. Here, the diameter of the anchor insertion hole 20 is about 75 mm, and the diameters of the other holes, i.e., the fixing material injection hole 22, bag insertion hole 19, and filling confirmation hole 24, may be about 30 and 50 mm, respectively.

[0030] Next, as shown in Fig. 7, a bag 30 having an expansion part 30a, which is breathable and liquid-tight and can be expanded and deformed into a cylindrical shape having an axis in the longitudinal direction of the void tube 14, and a mouth part 30b is inserted in a contracted state from the lower opening of the bag insertion hole 19 to a depth such that the expansion part 30a is located at approximately the middle height in the hollow part 12 of the void tube 14. Here, as described in the first embodiment, the bag 30 is made of a material that satisfies, for example, breathability to allow air to enter and exit, and liquid-tightness to prevent the passage of the liquid agent 31 that expands over time, and a material that has an expansion part 30a that can be expanded and deformed into a cylindrical shape having an axis in the longitudinal direction of the void tube 14 due to the internal pressure when the liquid agent 31 expands in the bag 30, as shown in Fig. 8, is used.

[0031] Next, as shown in FIG. 8, a liquid 31 that expands over time, such as a reactive liquid of polyurethane foam, is injected into the bag 30 through the opening at the lower side of the bag insertion hole 19 via the mouth 30b using the liquid injection tube 31a, and is expanded in the bag 30. As a result, as shown in FIG. 9, the expansion section 30a of the bag 30 is expanded and deformed by the expansion pressure. Here, the bag 30 is made of a cylindrical material having an axis in the length direction of the void tube 14, and when a necessary and sufficient amount of the liquid 31 is injected into the bag 30, the bag 30 expands and deforms according to the internal shape of the void tube 14. As a result, the surface of the bag 30 and the inner wall surface of the hollow section 12 come into close contact with each other over a certain range of the length L of the void tube 14, forming a partition wall with excellent water-stopping properties.

[0032] After expanding and deforming the bag body 30 in this manner, the liquid agent injection pipe 31a is removed. Alternatively, the portion protruding from the lower surface of the existing hollow deck 10 may be cut off without removing the liquid agent injection pipe 31a.

[0033] 10, an anchor 32 made of a deformed steel bar or the like is inserted from the lower opening of the anchor insertion hole 20 so that its upper end protrudes vertically into the hollow portion 12. At this time, the anchor 32 is located in the fixing material filled space 34 between the bag body 30, which has expanded and deformed to become a partition wall within the hollow portion 12, and the axial end 33 of the hollow portion 12 of the void pipe 14.

[0034] Next, as shown in Fig. 11, an anchoring material injection pipe 36 is inserted from the lower opening of the anchoring material injection hole 22, and an anchoring material 38 such as mortar in a fluid state is injected into the anchoring material filling space 34 until the anchoring material filling space 34 is almost filled. In order to check the filling state of the anchoring material 38 in the anchoring material filling space 34, a confirmation pipe 40 with both ends open is inserted from below into the filling confirmation hole 24 before the anchoring material 38 is injected. At this time, the upper end opening of the confirmation pipe 40 is adjusted to a position close to the uppermost surface 42 of the hollow portion 12. Just before the anchoring material 38 is completely filled into the anchoring material filling space 34, the anchoring material 38 in a fluid state flows into the upper end opening of the confirmation pipe 40, so that the filling state of the anchoring material 38 can be checked by checking that the anchoring material 38 in a fluid state leaks out from the lower end opening of the confirmation pipe 40. After the filling (approximate filling) of the fixing material 38 in the fixing material filling space 34 is completed, the portions of the fixing material injection pipe 36 and the confirmation pipe 40 protruding from the underside of the existing hollow deck slab 10 are cut off, as shown in Figure 12.

[0035] When the fixing material 38 has hardened, the anchor 32 is fixed to the hardened fixing material 38.

[0036] As described above, in this embodiment, the bag 30 having the expansion part 30a capable of expanding and deforming into a cylindrical shape having an axis in the longitudinal direction of the void pipe 14 is inserted into the hollow part 12, and the liquid agent 31 that expands over time is injected into the bag 30, so that the bag 30 is expanded and deformed into a cylindrical shape by the expansion pressure. At this time, even if the bag 30 is set in an orientation having an angle with respect to the axial direction of the void pipe 14, the orientation of the bag 30 is automatically corrected so that the axis of the bag 30 is aligned with the longitudinal direction of the void pipe 14 due to the internal shape of the void pipe 14 and the force with which the bag 30 tries to expand and deform into a cylindrical shape when it receives the expansion pressure. As a result, the surface of the expansion part 30a of the bag 30 and the inner wall surface of the hollow part 12 can more reliably form a partition with excellent water-stopping properties in which the surface of the expansion part 30a of the bag 30 and the inner wall surface of the hollow part 12 are in close contact with each other over a certain length L of the void pipe 14, so that the fixing material 38 can be confined in the fixing material filling space 34 around the anchor 32, and the anchor can be fixed as expected.

[0037] In addition, since the bag body 30 is made of a material that is breathable to the extent that air can flow in and out and is liquid-tight to the extent that it does not allow passage of the liquid agent 31 that expands over time, such as a polyurethane foam reactive liquid agent, air is pushed out of the bag body 30 as the liquid agent 31 expands. This prevents irregular expansion and deformation of the bag body 30 due to residual air in the bag body 30, thereby providing a partition with excellent water-stopping properties, and allows the fixing material 38 to be confined in the fixing material filled space 34 around the anchor 32, allowing the anchor to be fixed as expected.

[0038] Next, an example of the bag body 30 that satisfies the required breathability and liquid-tightness will be described. FIG. 13A is a plan view of an expanded portion 30a of the bag body 30 that satisfies the required breathability and liquid-tightness, and FIG. 13B is a cross-sectional view thereof. As shown in these figures, a plurality of holes 41 are provided in the upper portion of the expanded portion 30a of the bag body 30. These holes 41 may be provided at approximately equal intervals in the expanded portion 30a of the bag body 30. A mesh body 42 is attached to the front side or back side of the expanded portion 30a of the bag body 30, so that the required breathability and liquid-tightness of the expanded portion 30a of the bag body 30, that is, the property of allowing air to pass but not allowing a fluid liquid agent 31 such as a polyurethane foam reactive liquid agent to pass through, is ensured. The mesh body 42 may be attached to the expanded portion 30a of the bag body 30 by, for example, sewing. It goes without saying that the mesh size of the mesh body 42 is smaller than the size of the holes 41.

[0039] FIG. 14A is a plan view of an expanded portion 50a of another bag body 50 that satisfies the required breathability and liquid-tightness, and FIG. 14B is a cross-sectional view thereof. As shown in these figures, on the front side of the expansion portion 50a of this bag body 50, pocket portions 62 are attached by sewing or the like to each of a plurality of holes 61 provided in the upper part of the expansion portion 50a. The pocket portions 62 are configured to cover the holes 61 from the front side with a gap G, and to allow air to pass through the gap G at a position shifted from the hole portion 61 within the plane of the expansion portion 50a. The size of the gap G is set to a size that allows air to pass through but does not allow polyurethane foam to pass through, thereby ensuring the required breathability and liquid-tightness of the expansion portion 60a of the bag body 60, that is, the property of allowing air to pass through but not allowing a fluidized liquid agent 31 such as a reactive liquid agent of polyurethane foam to pass through.

[0040] Although the configurations of the two types of bags 30 and 50 have been described above, the present invention is not limited to using these bags, and any bag that satisfies the required breathability and liquid-tightness may be used, and the material of the bag itself may be selected to satisfy the required breathability and liquid-tightness. For example, a nonwoven fabric that satisfies the required breathability and liquid-tightness may be used.

[0041] The anchors 32 fixed and held in place in the existing hollow deck 10 can be used for reinforcing bridges that use the existing hollow deck 10, preventing the deck from falling, and for a variety of other purposes.

[0042] 15 and 16 are diagrams showing an example of application of the anchor 32 attached to the existing hollow deck 10, in which the anchor 32 is used to connect with a horizontal force distribution structure, with Fig. 15 being a cross-sectional view of this application example in the axial direction of the void pipe 14, and Fig. 16 being a cross-sectional view in a direction perpendicular to the axial direction. The horizontal force distribution structure 50 is composed of a steel bracket 52 attached to both sides of the axial direction of the void pipe 14 of a substructure 51 such as an abutment or pier, and a connection part 53 between the anchor 32 attached to the existing hollow deck 10 and the steel bracket 52, and receives the horizontal load acting on the existing hollow deck 10 and transmits it to the substructure 50, thereby limiting the movement of the existing hollow deck 10 and improving earthquake resistance.

[0043] As another example of application of the anchor 32, a mounting part can be fixed to the bottom of the anchor 32 and this mounting part can be connected to a mounting fixture fixed to the lower structure with a chain or cable, thereby applying the anchor 32 to a structure that prevents the hollow deck from falling. Furthermore, the anchor 32 can be used to connect to an elastic bearing structure that receives horizontal loads and absorbs and damps seismic energy based on its own horizontal elastic shear deformation.

[0044] The anchors 32 fixed to the existing hollow deck 10 are not limited to the above uses, but can also be used for a variety of other purposes.

[0045] The above-mentioned second embodiment is a method of fixing an anchor 32 to an anchor 38 filled in the space (anchor filling space 34) between the partition wall formed in the existing hollow deck 10 by the partition wall formation method of the above-mentioned first embodiment and the axial end 33 of the hollow section 12 of the void pipe 14. However, in order to enable the addition of cast-in-place prestressed concrete for widening the existing hollow deck 10, the anchor 38 can be embedded and hardened in a partial range in the axial direction of the hollow section 12 of the void pipe 14, and the anchor can also be used to increase the compressive strength of the existing hollow deck 10 in the width direction so that it can withstand prestress.

[0046] Next, an example of using the partition wall for the above purpose will be described. 17(A) to (D) are longitudinal cross-sectional views showing a construction method for adding cast-in-place prestressed concrete 10' to one side of an existing hollow deck 10 in the width direction, and FIG. 18 is a transverse cross-sectional view of FIG. 17(D).

[0047] In improving such an existing hollow deck 10, first, as shown in FIG. 18, a partition wall 50 (see FIG. 18) is formed by the partition wall forming method of the first embodiment at the portion where the PC steel is arranged in the axial direction of each void pipe 14 to form an anchoring material filling space (reference numeral 34 in FIG. 10) between the end face of the void pipe 14 in the axial direction. In this example, the formation position of each partition wall 50 is selected so that, for example, two PC steel pieces are arranged in one anchoring material filling space. Next, as shown in FIG. 17(B) and FIG. 18, an anchoring material 38 such as mortar is filled in the anchoring material filling space and hardened. After that, a through hole 44 is formed by horizontal core boring or the like at the position where the PC steel is arranged.

[0048] Next, as shown in (C), (D) and FIG. 18, the cast-in-place prestressed concrete 10' is added to one side of the existing hollow deck 10 in the width direction. When adding the cast-in-place prestressed concrete 10', first, a formwork and reinforcing bars for forming the cast-in-place prestressed concrete 10' are arranged, and an additional sheath 44' is arranged in the formwork so as to correspond to the position of the hole drilled in the existing hollow deck 10. After this, concrete is poured into the formwork. After the concrete strength is developed, the PC steel 46 is inserted into the through hole 44 drilled in the existing hollow deck 10 and the additional sheath 44', and the PC steel 46 is tensioned to introduce prestress. Then, grout (not shown) is injected into the through hole 44 and the gap between the sheath 44' and the PC steel 46. With the above, the addition of the cast-in-place prestressed concrete 10' to the existing hollow deck 10 is completed. Here, by embedding the anchoring material 38 in the anchoring material filling space within the void pipe 14, sufficient compressive strength in the width direction of the existing hollow deck 10 against prestress is ensured, and sufficient durability can be obtained.

[0049] If the through hole 44 is formed at the PC steel position by horizontal core boring or the like before forming the partition wall 50, the amount of drilling required can be reduced; however, in this case, it is necessary to insert a sheath into the through hole 44 in advance to prevent the through hole from becoming blocked when the partition wall 50 is formed.

[0050] The partition wall forming method of the present technology can thus effectively form the partition walls 50 required to add cast-in-place prestressed concrete 10' to the existing hollow floor slab 10.

[0051] The anchors 32 fixed to the existing hollow deck 10 are not limited to the above uses, but can also be used for a variety of other purposes.

[0052] (Regarding double / multiple bags) When forming the partition wall, the possibility that the bag will burst from the seam due to the expansion pressure caused by the foaming of polyurethane foam cannot be denied. This is because the expansion rate of polyurethane foam varies greatly depending on the temperature of the outside air at the time of filling and other conditions. Since polyurethane foam is liquid before foaming, the amount of expansion cannot be known until it is filled, so it is easy to fill it with more than necessary. It is desirable to take measures to ensure the formation of the partition wall even if the bag bursts from the seam. Therefore, a measure to make the bag have a double or multiple structure can be considered. Figure 19 is a diagram showing a bag 30' with a double structure. A polyurethane foam liquid agent 31 is injected into the inner bag 301. The outer bag 302 contains the entire inner bag 301, and the polyurethane foam liquid agent 31 is not injected into it. An appropriate amount of gas such as air is trapped in the outer bag 302 in advance so that a small gap is created between the inner surface of the outer bag 302 and the outer surface of the inner bag 301 due to the foaming of polyurethane foam. As a result, even if the inner bag 301 bursts due to the expansion pressure caused by the foaming of the polyurethane foam, the outer bag 302 prevents the polyurethane foam from leaking into the void pipe, thereby ensuring the formation of the partition wall.

[0053] We have explained above the embodiment of the method for improving an existing hollow deck bridge according to the present invention, but the existing hollow deck that is the subject of the invention may be any deck having a hollow portion, such as a PC hollow deck, an RC hollow deck, or a box-shaped hollow deck. [Explanation of symbols]

[0054] 10 Existing hollow deck 12 Hollow part 14 Void tube 18 Bag insertion hole 20 Anchor insertion hole 22 Fixing agent injection hole 30 Bag body 31 Liquid 32 Anchor 34 Fixing material filling space 38 Fixing agent

Claims

1. When forming a bulkhead in the hollow deck of an existing hollow deck bridge, Providing a bag insertion hole that reaches a hollow portion in a void pipe embedded in the hollow floor slab from the lower surface of the hollow floor slab; inserting a bag into the hollow portion through the bag insertion hole, the bag having air permeability and liquid tightness, and an expandable portion capable of expanding and deforming into a cylindrical shape having an axis in the longitudinal direction of the void tube; a liquid agent that expands over time is injected into the inserted bag body, and the bag body is expanded and deformed to form a partition wall in the hollow portion; Methods for improving existing hollow deck bridges, including:

2. The method for improving an existing hollow deck bridge according to claim 1, The liquid is a reaction liquid for polyurethane foam. Methods for improving existing hollow deck bridges.

3. A method for improving an existing hollow deck bridge according to claim 1 or 2, The bag body is A plurality of holes provided in an upper portion of the extension portion; a mesh body attached to the front or back surface of the bag body so as to overlap the plurality of holes, The mesh size of the mesh body is smaller than the size of the hole Methods for improving existing hollow deck bridges.

4. A method for improving an existing hollow deck bridge according to claim 1 or 2, The bag body is A plurality of holes provided in an upper portion of the extension portion; and a pocket portion provided corresponding to each of the holes, The pocket portion is configured to cover the corresponding hole portion from the front side of the bag body with a gap, and to allow air to circulate through the gap at a position shifted from the hole portion within the surface of the bag body, and the size of the gap is smaller than the size of the hole portion. Methods for improving existing hollow deck bridges.

5. A method for improving an existing hollow deck bridge according to claim 1 or 2, The bag body is made of nonwoven fabric. Methods for improving existing hollow deck bridges.

6. A method for improving an existing hollow deck bridge according to claim 1 or 2, The bag body has a double or multiple structure. Methods for improving existing hollow deck bridges.

7. When fixing anchors to the hollow deck of an existing hollow deck bridge, Providing an anchor insertion hole, a bag insertion hole, and an anchor injection hole that reach a hollow portion in a void pipe embedded in the hollow deck from the lower surface of the hollow deck; inserting a bag into the hollow portion through the bag insertion hole, the bag having air permeability and liquid tightness, and capable of expanding and deforming into a cylindrical shape having an axis in the longitudinal direction of the void tube; injecting a liquid agent that expands over time into the inserted bag body to expand and deform the bag body to form a partition wall in the hollow portion; Inserting the anchor through the anchor insertion hole to a position where a leading end of the anchor reaches inside the hollow portion; and injecting a fixing material into a space between the partition wall of the hollow portion and an end surface of the hollow portion in the tube axis direction through the fixing material injection hole to fix the anchor. Methods for improving existing hollow deck bridges.

8. The method for improving an existing hollow deck bridge according to claim 7, The liquid is a reaction liquid for polyurethane foam. Methods for improving existing hollow deck bridges.

9. The method for improving an existing hollow deck bridge according to claim 7 or 8, The bag body is A plurality of holes provided in an upper portion of the bag body; a mesh body attached to the front or back surface of the bag body so as to overlap the plurality of holes, The mesh size of the mesh body is smaller than the size of the hole Methods for improving existing hollow deck bridges.

10. The method for improving an existing hollow deck bridge according to claim 7 or 8, The bag body is A plurality of holes provided in an upper portion of the bag body; and a pocket portion provided corresponding to each of the holes, The pocket portion is configured to cover the corresponding hole portion from the front side of the bag body with a gap, and to allow air to circulate through the gap at a position shifted from the hole portion within the surface of the bag body, and the size of the gap is smaller than the size of the hole portion. Methods for improving existing hollow deck bridges.

11. The method for improving an existing hollow deck bridge according to claim 7 or 8, The bag body is made of nonwoven fabric. Methods for improving existing hollow deck bridges.

12. The method for improving an existing hollow deck bridge according to claim 7 or 8, The bag body has a double or multiple structure. Methods for improving existing hollow deck bridges.

Citation Information

Patent Citations

  • Method for repairing concrete structure

    JP2005146569A

  • Anchor anchoring method for PC hollow slab bridges

    JP4519029B2