Piping and wiring inspection method
The method uses electrical continuity checks on a three-core cable to ensure accurate and efficient pre-installation inspection of refrigerant piping and control cables in air conditioning systems, addressing inaccuracies and costs of existing methods.
Patent Information
- Application Number
- JP2023054557
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-30
- Publication Date
- 2024-10-11
AI Technical Summary
Existing methods for inspecting refrigerant piping and control cables in air conditioning systems are inaccurate, time-consuming, and costly, requiring operation of the units and installation of additional sensors, and cannot be performed before indoor units are installed.
A method involving electrical continuity checks using a three-core cable with a tester to verify the installation of refrigerant piping and control cables before indoor units are installed, utilizing a connecting means to ensure accurate and efficient inspection without additional sensors.
This method significantly reduces work burden, cost, and time while improving accuracy by allowing pre-installation inspection, eliminating external factor influence, and ensuring correct installation of refrigerant piping and control cables.
Smart Images

Figure 00000000_0000_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a piping and wiring inspection method for inspecting whether piping and wiring are correctly installed when constructing an air conditioning system. [Background technology]
[0002] Conventionally, air conditioning systems (so-called air conditioners) have been used to appropriately adjust the temperature and humidity of the air in the rooms of buildings such as buildings, as well as the speed and volume of circulating air. Among these, direct expansion air conditioning systems using a refrigeration cycle are equipped with an outdoor unit, an indoor unit, refrigerant piping consisting of gas pipes and liquid pipes connecting the two devices, and a control signal cable (for example, a three-core cable, also known as a crossover wire, hereinafter referred to as the control cable).
[0003] When constructing an air conditioning system, first, a worker lays out refrigerant piping and control cables from the outdoor unit side where the outdoor unit is planned to be installed to the indoor unit side where the indoor unit is planned to be installed. After that, the refrigerant piping and control cables are connected on the outdoor unit side and the indoor unit side, respectively, as components that connect the outdoor unit and the indoor unit.
[0004] Incidentally, when constructing an air conditioning system in a large facility such as an office building or a commercial facility, since there are many rooms, a large number of indoor units are also installed. In addition, as the size of the rooms becomes larger, multiple indoor units may be installed in one room, resulting in an even larger number (for example, several to several hundred units).
[0005] In some cases, one indoor unit is installed for one outdoor unit, and in other cases, multiple indoor units are installed for one outdoor unit. In the latter case, the refrigerant piping and control cable are branched off to each room at the middle of the piping and wiring.
[0006] In either case, an indoor unit is required for each room (of course, there are cases where multiple indoor units are installed in one room). Therefore, when installing the refrigerant piping and control cables, concerns such as incorrect piping and wiring may arise. Therefore, when constructing an air conditioning system, it is necessary to inspect whether the installation has been performed correctly in a position where both the indoor unit and the outdoor unit are not visible at some point before completion (for example, when the installation of the refrigerant piping and control cables is completed, or immediately after the refrigerant piping and control cables are connected to the outdoor unit).
[0007] One example of such an inspection is a method of judging whether the refrigerant pipes and control cables are correctly installed by detecting temperature changes in the refrigerant pipes (see, for example, Patent Document 1, etc.).There is also a method of judging whether the refrigerant pipes and control cables are correctly installed by detecting pressure in the refrigerant pipes (see, for example, Patent Document 2, etc.). [Prior art documents] [Patent documents]
[0008] [Patent Document 1] Japanese Patent Application Publication No. 11-325538 [Patent Document 2] JP 2002-213800 A Summary of the Invention [Problem to be solved by the invention]
[0009] However, the inspection method of detecting temperature changes in refrigerant piping in Patent Document 1 has problems such as the fact that it takes time for the temperature in the piping to actually change, and the temperature may be affected by external factors, resulting in a lack of accuracy.
[0010] Furthermore, in the inspection method of detecting the pressure inside the refrigerant pipes of Patent Document 2, it is necessary to separately install a pressure detection means, which poses problems in terms of cost and work efficiency.
[0011] In both Patent Documents 1 and 2, there is a problem in that inspection is only possible after operating either the outdoor unit or the indoor unit, that is, after actually wiring and connecting the control cables and the like.
[0012] The present invention has been made to solve the problems exemplified above, and an object of the present invention is to provide a piping and wiring inspection method that is highly accurate while suppressing increases in costs and work time. Another object of the present invention is to provide a piping and wiring inspection method that can perform inspection before actually installing an indoor unit indoors, before connecting a control cable to the indoor unit wiring, and before connecting a refrigerant piping to the indoor unit. [Means for solving the problem]
[0013] The following describes each of the means suitable for achieving the above objects. Note that, as necessary, the specific effects of the corresponding means will be added.
[0014] Means 1. Outdoor unit and An indoor unit; A refrigerant pipe having a conductive gas pipe and a conductive liquid pipe; When constructing an air conditioning system having a three-core cable having a first electric wire, a second electric wire, and a third electric wire, At least in a state where the indoor unit has not been installed or where piping and wiring connections to the indoor unit have not been installed, One end of the refrigerant pipe and one end of the three-core cable are disposed on the outdoor unit side, After arranging the other end of the refrigerant piping and the other end of the three-core cable on the indoor unit side, A piping and wiring inspection method for inspecting whether the refrigerant piping and the three-core cable are correctly installed, comprising: The other end of the gas pipe and the other end of the liquid pipe of the refrigerant piping are connected to each other in advance by a connecting means made of a conductor, a wiring continuity confirmation process for electrically connecting the first electric wire and the second electric wire of the three-core cable on the indoor unit side, and then confirming electrical continuity by contacting test pins of a tester with each of the first electric wire and the second electric wire of the three-core cable on the outdoor unit side; a refrigerant piping continuity confirmation step of electrically connecting the third electric wire of the three-core cable to the gas pipe, the liquid pipe, or the connecting means on the indoor unit side, and then confirming electrical continuity by contacting the test pin of the tester with the third electric wire of the three-core cable and the gas pipe or the liquid pipe of the refrigerant piping on the outdoor unit side, respectively.
[0015] According to the means 1, it is possible to check whether the first and second electric wires of the three-core cable are properly arranged by checking the electrical continuity once with a tester through the wiring continuity checking process. Also, it is possible to check whether the third electric wire of the three-core cable and the refrigerant piping having a gas pipe and a liquid pipe are properly arranged by checking the electrical continuity twice with a tester after connecting the other ends of the gas pipe and the liquid pipe with a connecting means (on the indoor unit side), in other words, by checking the electrical continuity a minimum number of times, it is possible to check whether the three electric wires of the three-core cable and the refrigerant piping having a gas pipe and a liquid pipe are properly arranged. Therefore, the workload of the worker in carrying out the inspection can be significantly reduced, and the work cost can be reduced, and the work time can be dramatically shortened. Also, since there is no need to install a sensor or the like for measuring temperature and pressure separately, it is possible to reduce costs and improve work efficiency in this respect as well.
[0016] Furthermore, since the test can be performed simply by checking electrical continuity, it is possible to prevent external factors such as the outside temperature from affecting the test results, thereby improving the accuracy of the test.
[0017] Furthermore, inspection can be performed before the indoor unit is actually installed indoors, before the control cable is connected to the indoor unit wiring, and before the refrigerant piping is connected to the indoor unit.
[0018] Means 2. The gas pipe and the liquid pipe are each made of copper pipe, The piping and wiring inspection method according to Means 1, characterized in that the connecting means is also made of a copper pipe.
[0019] According to Means 2, when the other ends of the gas pipe and the liquid pipe of the refrigerant piping are connected to each other with a connecting means made of a conductor, it is possible to easily and reliably connect them by welding or the like while maintaining the tubular (cylindrical) state. Furthermore, even after the connecting means is cut off after the inspection is completed, the cross-sectional shape of each pipe is easily maintained, which makes it easier to perform flaring, for example, and improves the workability when connecting to the indoor unit.
[0020] Means 3. A piping and wiring inspection method according to Means 1 or 2, characterized in that the diameter of the gas pipe is equal to or larger than the diameter of the liquid pipe and is equal to or smaller than twice the diameter of the liquid pipe.
[0021] According to Means 3, the diameters of the gas pipe and the liquid pipe are not so different that it may be difficult to distinguish between the pipes. In this regard, as described above, the other ends of the gas pipe and the liquid pipe of the refrigerant piping are connected to each other by the connecting means. Therefore, in the refrigerant piping continuity checking process, accurate checking can be performed regardless of whether the test pin is brought into contact with the gas pipe or the liquid pipe on the outdoor unit side. [Brief description of the drawings]
[0022] [Figure 1] FIG. 1 is a schematic diagram showing a schematic configuration of an air conditioning system. [Diagram 2] FIG. 2 is a schematic diagram showing a state in which a refrigerant pipe and a three-core cable are arranged. [Diagram 3] FIG. 3 is a partially enlarged perspective view showing an overview of a portion K in FIG. 2. [Figure 4]FIG. 13 is a schematic diagram showing a state immediately before wiring continuity check is performed. [Diagram 5] FIG. 13 is a schematic diagram showing a mode of wiring continuity check. [Figure 6] FIG. 4 is a schematic diagram showing a mode of checking continuity of refrigerant piping. [Figure 7] FIG. 11 is a perspective view showing a mode of checking refrigerant piping continuity in another embodiment. [Figure 8] FIG. 13 is a schematic diagram showing the state of the confirmation tag when attachment is completed. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0023] Hereinafter, an embodiment will be described with reference to the drawings. Note that the dimensions and scales in the drawings are simplified for convenience and do not necessarily correspond to the actual dimensions and scales.
[0024] As shown in Fig. 1, the air conditioning system 1 includes an outdoor unit 2 installed on the rooftop of a building, and an indoor unit 3 installed inside the building. For convenience, the air conditioning system 1 in this embodiment is configured such that one indoor unit 3 is installed for one outdoor unit 2.
[0025] Between the outdoor unit 2 and the indoor unit 3, a refrigerant pipe 6 having a conductive gas pipe 4 and a conductive liquid pipe 5, and a three-core cable 7 are arranged. The outer diameter of the gas pipe 4 will of course differ depending on the cooling load and cooling capacity, but it is, for example, about 15.9 mm, and the outer diameter of the liquid pipe 5 is, for example, about 9.5 mm. In addition, the gas pipe 4 and the liquid pipe 5 are each covered with a covering 8 made of sponge rubber, and are then wound together with adhesive tape 9.
[0026] As shown in Figs. 2 and 3, the three-core cable 7 includes a first electric wire 11, a second electric wire 12, and a third electric wire 13. The electric wires 11 to 13 are made of copper conductors and are covered with insulators 14 of different colors (e.g., red, white, and black). The three-core cable 7 is a control signal cable connected between the indoor unit 3 and the outdoor unit 2 to send the operation state of the indoor unit 3 as a signal to the indoor unit 3 and to control changes in the operation capacity and on / off of the compressor on the outdoor unit 2 side. The power line (power cable) of the indoor unit 3 and the power line of the outdoor unit 2 are sent from power panels located nearby, respectively, and are not usually wired between the indoor unit 3 and the outdoor unit 2.
[0027] Next, the inspection procedure will be specifically described. Note that the inspection is performed after the refrigerant piping 6 and the three-core cable 7 are installed and before the outdoor unit 2 and the indoor unit 3 are installed, in other words, in the state shown in FIG.
[0028] Incidentally, as will be described in modified example (a) below, only the outdoor unit 2 may be installed. This state of construction is often seen in new building construction where the developer is the client, but when the entire building is completed, the tenant's construction work is often carried out at different times while the indoor ceiling and partitions of the tenant on the indoor side are not yet decided. In such cases, the piping and wiring inspection is carried out before the indoor unit 3 is installed or before the piping and wiring connection to the indoor unit 3 is installed.
[0029] Prior to the inspection, as shown in FIG. 4, the ends of a copper pipe 21 (approximately U-shaped) serving as a connecting means are connected to the ends of the gas pipe 4 and the liquid pipe 5 on the indoor unit 3 side by welding.
[0030] Then, one worker (not shown) is stationed on each side of the outdoor unit 2 and the indoor unit 3. Both workers are provided with a means of communication (e.g., a mobile phone or a walkie-talkie) that enables them to communicate with each other. In addition, the worker on the outdoor unit 2 side is provided with a tester (electrical tester) 23 equipped with a test pin 22, as shown in Figs. 5 and 6.
[0031] Once the worker's placement is complete, first, a wiring continuity check is performed to confirm electrical continuity of the three-core cable 7. That is, as shown in FIG. 5, the worker on the indoor unit 3 side entangles the first electric wire 11 and the second electric wire 12 of the three-core cable 7 to electrically connect them. In this embodiment, any two of the three electric wires that are determined in advance are selected as the first electric wire 11 and the second electric wire 12. Thereafter, the worker on the indoor unit 3 side informs the worker on the outdoor unit 2 side by a communication means that the connection is complete. Next, the worker on the outdoor unit 2 side checks electrical continuity by contacting the test pin 22 of the tester 23 with the first electric wire 11 and the second electric wire 12 of the three-core cable 7. If the continuity is confirmed, it can be confirmed that the arrangement of the first electric wire 11 and the second electric wire 12 is appropriate.
[0032] If the continuity cannot be confirmed in a case where there are many indoor units 3 for a large room and multiple three-core cables 7 are connected in parallel, the first electric wire 11 and the second electric wire 12 of the other three-core cables 7 are entangled and electrically connected. Similarly, the fact that the connection is complete is communicated by communication means. Next, the worker on the outdoor unit 2 side checks the electrical continuity by contacting the test pin 22 of the tester 23 with the first electric wire 11 and the second electric wire 12 of the three-core cable 7. If the continuity is confirmed by this, it is confirmed that the arrangement of the first electric wire 11 and the second electric wire 12 is appropriate. After the confirmation, the system name on the outdoor unit 2 side may be communicated to the three-core cable 7 on the indoor unit 3 side, and a tag may be attached to acknowledge the completion of the confirmation.
[0033] After the wiring continuity check is completed, the refrigerant piping continuity check is performed to check the electrical continuity of the refrigerant piping 6. That is, as shown in FIG. 6, the worker on the indoor unit 3 side electrically connects the third electric wire (the remaining electric wire) 13 of the three-core cable 7 and the copper pipe 21 (which may be the gas pipe 4 or the liquid pipe 5) of the refrigerant piping 6 by intertwining them with each other. After that, the worker on the indoor unit 3 side informs the worker on the outdoor unit 2 side by communication means that the connection is complete. Next, the worker on the outdoor unit 2 side checks the electrical continuity by contacting the test pin 22 of the tester 23 with the third electric wire 13 of the three-core cable 7 and the gas pipe 4 (which may be the liquid pipe 5) of the refrigerant piping 6. If the continuity is confirmed, it can be confirmed that the arrangement of the third electric wire 13 and the refrigerant piping 6 including the gas pipe 4 and the liquid pipe 5 is appropriate. At this time, the system name and the like on the outdoor unit 2 side may be communicated to each other, and a confirmation tag 31 may be attached to the refrigerant piping 6 on the indoor unit 3 side (see FIG. 8). In this way, by attaching the confirmation tag 31, the installation of the indoor unit 3 can be carried out smoothly, and work efficiency can be improved.
[0034] Furthermore, whether a single indoor unit 3 or multiple indoor units 3 are installed in the target room, if electricity cannot be confirmed in either the wiring continuity check or the refrigerant piping continuity check, the worker in question or a separate specialized person will carry out a detailed inspection to identify defective points, incorrect connections, etc., and take corrective action such as rerouting the piping and wiring.
[0035] As described above in detail, according to the present embodiment, by checking the electrical continuity once with the tester 23 through the wiring continuity checking process, it is possible to check whether the first electric wire 11 and the second electric wire 12 of the three-core cable 7 are properly arranged. Also, by checking the electrical continuity once more with the tester 23 through the refrigerant piping continuity checking process, it is possible to check whether the third electric wire 13 of the three-core cable 7 and the refrigerant piping 6 having the gas pipe 4 and the liquid pipe 5 are properly arranged. That is, after connecting the ends of the gas pipe 4 and the liquid pipe 5 to each other with the copper pipe 21 (on the indoor unit 3 side), it is possible to check the electrical continuity twice in total with the tester 23, in other words, to check the electrical continuity a minimum number of times, thereby checking whether the electric wires 11 to 13 of the three-core cable 7 and the refrigerant piping 6 having the gas pipe 4 and the liquid pipe 5 are properly arranged. Therefore, the workload of the worker can be significantly reduced in the inspection, and the work cost can be reduced, and the work time can be dramatically shortened. Furthermore, there is no need to install additional sensors for measuring temperature or pressure, which also contributes to reducing costs and improving work efficiency.
[0036] Furthermore, since the test can be performed simply by checking electrical continuity, it is possible to prevent external factors such as the outside temperature from affecting the test results, thereby improving the accuracy of the test.
[0037] Furthermore, since the outer diameter of the gas pipe 4 and the outer diameter of the liquid pipe 5 are similar to each other, there is a risk that it will be difficult to distinguish between the pipes 4, 5. In this regard, the ends of the gas pipe 4 and the liquid pipe 5 of the refrigerant pipe 6 are connected to each other by a connecting means (copper pipe 21). Therefore, in the refrigerant pipe continuity check process, accurate check can be performed regardless of whether the test pin 22 is brought into contact with the gas pipe 4 or the liquid pipe 5 on the outdoor unit 2 side, and problems caused by checking the pipes 4, 5 can be prevented.
[0038] Furthermore, in this embodiment, copper pipes 21 are used as the connecting means. Therefore, when connecting, it is possible to easily and reliably connect by welding while maintaining the tubular (cylindrical) state. When there is a period of time until the tenant's construction, the refrigerant pipes 6 on the indoor unit 3 side are often crushed at the pipe ends to prevent the intrusion of dust, etc., and the construction is considered complete, but the crushed refrigerant pipes must be processed again, and if the procedure described here is followed, such trouble is eliminated. Furthermore, even after the inspection is completed and the connecting means is cut off, the cross-sectional shape of each pipe is easily maintained, which makes it easier to perform flaring, for example, and improves workability when connecting to the indoor unit 3.
[0039] The present invention is not limited to the above-described embodiment, and may be implemented as follows: Of course, other applications and modifications not exemplified below are also possible.
[0040] (a) In the above embodiment, the inspection is performed after the refrigerant piping 6 and the three-core cable 7 are installed and before the outdoor unit 2 and the indoor unit 3 are installed. However, as shown in Fig. 7, for example, the inspection may be performed after the outdoor unit 2 is installed (after the outdoor unit 2 is connected to the refrigerant piping 6 and the three-core cable 7). However, during the inspection, it is necessary to expose the objects to be inspected, i.e., the electric wires 11-13 and the gas pipe 4 or liquid pipe 5.
[0041] (b) In the air conditioning system 1 of the above embodiment, for convenience, one indoor unit 3 is installed for one outdoor unit 2, but it is of course possible to install multiple indoor units 3 for one outdoor unit 2. Of course, it is also applicable to the case where multiple outdoor units 2 are installed.
[0042] (c) In the above embodiment, the copper pipe 21 is used as the connecting means, but the material and shape are not particularly limited as long as it is a conductor. For example, it may be made of iron or aluminum.
[0043] (d) In the above embodiment, the gas pipe 4 and the liquid pipe 5 are wound together with the adhesive tape 9, but there is no problem if they are not wound together. In addition, the refrigerant pipe 6 and the three-core cable 7 may be covered.
[0044] (e) In the above embodiment, one worker is stationed on the outdoor unit 2 side and one worker is stationed on the indoor unit 3 side, but two or more workers may be stationed. [Explanation of symbols]
[0045] 1...air conditioning system, 2...outdoor unit, 3...indoor unit, 4...gas pipe, 5...liquid pipe, 6...refrigerant piping, 7...3-core cable, 11...first electric wire, 12...second electric wire, 13...third electric wire, 21...copper tube as connecting means, 22...test pin, 23...tester.
Claims
1. The outdoor unit, An indoor unit; A refrigerant pipe having a conductive gas pipe and a conductive liquid pipe; When constructing an air conditioning system including a three-core cable having a first electric wire, a second electric wire, and a third electric wire, At least in a state where the indoor unit has not been installed or where piping and wiring connections to the indoor unit have not been installed, One end of the refrigerant pipe and one end of the three-core cable are disposed on the outdoor unit side, After arranging the other end of the refrigerant pipe and the other end of the three-core cable on the indoor unit side, A piping and wiring inspection method for inspecting whether the refrigerant piping and the three-core cable are correctly installed, comprising: The other end of the gas pipe and the other end of the liquid pipe of the refrigerant piping are connected to each other in advance by a connecting means made of a conductor, a wiring continuity confirmation process for electrically connecting the first electric wire and the second electric wire of the three-core cable on the indoor unit side, and then confirming electrical continuity by contacting test pins of a tester with each of the first electric wire and the second electric wire of the three-core cable on the outdoor unit side; a refrigerant piping continuity confirmation step of electrically connecting the third electric wire of the three-core cable to the gas pipe, the liquid pipe, or the connecting means on the indoor unit side, and then confirming electrical continuity by contacting the test pin of the tester with the third electric wire of the three-core cable and the gas pipe or the liquid pipe of the refrigerant piping on the outdoor unit side, respectively.
2. The gas pipe and the liquid pipe are each made of a copper pipe, 2. The piping and wiring inspection method according to claim 1, wherein the connecting means is also made of a copper pipe.
3. 3. The piping and wiring inspection method according to claim 1, wherein a diameter of the gas pipe is equal to or larger than a diameter of the liquid pipe and is equal to or smaller than twice the diameter of the liquid pipe.
Citation Information
Patent Citations
Air conditioner
JP2002221348A
Method for determining whether or not connection member is removal object, and removal method for connection member
JP2018159502A
Air conditioner, installation method of air conditioner, and outdoor machine
JP2022189316A
Improper wiring detection method of multi-type air-conditioning equipment
JP1999325538A
Multi-room air conditioner and its inspection method
JP2002213800A