Pile foundation structure
The pile foundation structure addresses the issue of insufficient horizontal resistance in liquefied ground by embedding the ground improvement body in a non-liquefaction layer and using an anti-slip portion to transmit forces, enhancing resistance and reducing slipping, thus improving seismic performance.
Patent Information
- Application Number
- JP2023055128
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-30
- Publication Date
- 2024-10-11
AI Technical Summary
Conventional pile foundation structures fail to provide sufficient horizontal resistance in liquefied ground, where the lateral resistance of the ground improvement body is lost or significantly reduced during liquefaction, leading to inadequate performance during earthquakes.
A pile foundation structure with a foundation pile and a ground improvement body, where the ground improvement body is embedded in a non-liquefaction layer, and an anti-slip portion with an uneven shape is provided on the shaft of the foundation pile, transmitting horizontal forces to the improvement body's bottom through a compression truss, utilizing bearing pressure and frictional resistance.
Enhances horizontal resistance and reduces bending moments on the pile cap by leveraging the bearing pressure and frictional resistance of the non-liquefaction layer, even in liquefied ground, while minimizing the diameter of the upper part of the improvement body to prevent slipping and reduce costs.
Smart Images

Figure 2024142797000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a pile foundation structure. [Background technology]
[0002] Conventionally, pile foundation structures equipped with foundation piles that support structures built on the ground are subject to large horizontal forces during major earthquakes, and as such, strict performance requirements are required for both displacement and stress in the pile foundation structure. For this reason, many structures and construction methods have been proposed that combine foundation pile construction methods and ground improvement construction methods, which are originally separate construction methods, with the aim of improving the horizontal resistance of foundation piles.
[0003] For example, a method is known in which a soil improvement body is formed around a foundation pile, thereby increasing the diameter of a composite pile consisting of the pile and the soil improvement body, thereby improving the horizontal resistance. This type of pile foundation structure utilizes the horizontal resistance characteristics of the ground, and by increasing the pile diameter of the composite pile and increasing the horizontal reaction area, it is possible to increase the horizontal resistance of the pile, suppress deformation, and reduce the stress generated in the pile.
[0004] For example, as shown in Patent Documents 1 and 2, a pile foundation structure is known that includes foundation piles and a ground improvement body formed around the foundation pile, and the foundation structure itself is expanded in diameter by the improvement body, thereby providing horizontal pressure resistance. In this case, the depth direction length of the improvement body is made shorter than the length of the foundation pile, and the improvement body is concentrated in the upper part, which contributes more to horizontal resistance, thereby limiting the range of ground improvement and reducing costs. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] JP 2019-065579 A [Patent Document 2] JP 2014-066010 A Summary of the Invention [Problem to be solved by the invention]
[0006] However, the conventional pile foundation structures shown in the above-mentioned Patent Documents 1 and 2 improve horizontal resistance performance by providing an improvement body around the foundation pile, i.e., they utilize the lateral resistance of the improvement body. Such conventional technology is intended for cases where the ground around the foundation pile or the improvement body has a certain strength, and is premised on the ability to exert horizontal resistance. Therefore, in liquefied ground, the horizontal resistance of the ground is lost or significantly reduced upon liquefaction, and there is a risk that the horizontal resistance will not be obtained and the pile foundation structure will not function to achieve the purpose of this technology. As such, in conventional pile foundation structures, improvement bodies are installed in the hope of providing horizontal pressure resistance, but this function is not fully ensured in liquefied ground, leaving room for improvement in this regard.
[0007] The present invention has been made in consideration of the above-mentioned problems, and aims to provide a pile foundation structure that can strengthen the horizontal resistance of foundation piles, where horizontal forces and bending moments act on the pile heads, in liquefied ground where horizontal resistance cannot be expected from the sides of the ground improvement body. [Means for solving the problem]
[0008] (1) A first aspect of the pile foundation structure of the present invention comprises a foundation pile supporting a structure constructed on liquefied ground, and a ground improvement body formed around the foundation pile, wherein the lower end of the ground improvement body is embedded in a non-liquefied layer located below the liquefied ground, the shaft of the foundation pile is provided with an unevenly shaped slip prevention portion which functions as a slip prevention member between the foundation pile and the ground improvement body, at least a part of the slip prevention portion is arranged in an area of the shaft which forms a compression truss between the foundation pile and the bottom of the ground improvement body, and the bottom of the ground improvement body is formed in an uneven shape.
[0009] According to the pile foundation structure of the present invention, a slip prevention part having an uneven shape is provided on the shaft part of the foundation pile, and the ground improvement body is present in the range where the compression truss caused by this slip prevention part is formed, so that the horizontal force acting on the foundation pile is transmitted from the slip prevention part to the bottom part of the ground improvement body (bottom part of the improved body) through the ground improvement body formed around the foundation pile. And, since the bottom part of the improved body is formed in an uneven shape, the friction resistance of the bottom part of the improved body can be efficiently obtained. As a result, the horizontal force transmitted to the bottom part of the improved body can be resisted by the bearing resistance and friction resistance of the bottom part of the improved body embedded in the non-liquefied layer. Therefore, since the present invention utilizes the bearing resistance and friction resistance in the non-liquefied layer, an excellent horizontal resistance effect can be obtained by the bearing resistance and friction resistance of the bottom part of the improved body even when the liquefied ground is liquefied during an earthquake. In this way, with this invention, even in a liquefied layer where horizontal resistance cannot be expected from the sides of the ground improvement body, the horizontal resistance of foundation piles, where horizontal forces and bending moments act on the pile head, can be strengthened by utilizing the bearing resistance and frictional resistance at the bottom of the improvement body.
[0010] In addition, in the pile foundation structure according to the present invention, the bottom of the improvement body has an uneven shape, which maximizes the bearing resistance and friction resistance at the bottom of the improvement body. On the other hand, the upper part of the improvement body can be made smaller in diameter than the bottom of the improvement body, and when the ground improvement body is slimmed down, it is possible to suppress the flow force acting on the foundation piles without impeding the ground slip-through phenomenon between the foundation piles even during liquefaction. In addition, slimming down the ground improvement body leads to a reduction in the volume of the ground improvement body, which also reduces costs.
[0011] (2) In a second aspect of the present invention, in the pile foundation structure of the first aspect, it is preferable that the bottom of the ground improvement body has a higher strength than the other parts.
[0012] In this case, by making the bottom of the improvement body strong, the adhesion between the bottom of the improvement body and the ground of the non-liquefaction layer can be increased, and the frictional resistance of the bottom of the improvement body can be increased.
[0013] (3) A third aspect of the present invention may be characterized in that in the pile foundation structure of the first or second aspect, the foundation piles are steel pipe piles.
[0014] In this case, since the foundation piles are steel pipe piles, it is easy to install and form the anti-slip portion.
[0015] (4) A fourth aspect of the present invention may be characterized in that, in the pile foundation structure of the third aspect, the steel pipe pile is a stepped steel pipe or a dimpled steel pipe.
[0016] In this case, by using stepped steel pipes or dimpled steel pipes, the anti-slip portion provided on the shaft of the steel pipe pile is formed in a concave state, so that the adhesion between the outer periphery of the pile and the ground improvement body ensures the integrity, and the bearing resistance of the bottom of the improvement body and the horizontal resistance due to friction resistance can be fully obtained. Furthermore, in the present invention, when the inner surface of the steel pipe of a steel pipe pile is filled with a filler such as concrete, the integrity of the steel pipe inner surface and the filler can be ensured by adhesion between the steel pipe inner surface and the filler, and the horizontal resistance of the steel pipe pile can be further increased. Furthermore, in the case of dimpled steel pipes, which have dimples on the steel pipe, even if the steel pipe has depressions but no filler is filled inside, it can exhibit the same compressive and bending performance as a straight steel pipe pile, and excellent effects can be enjoyed.
[0017] (5) A fifth aspect of the present invention may be characterized in that, in the pile foundation structure of any one of the first to fourth aspects, the anti-slip portion is formed as a recess in the outer peripheral surface of the foundation pile.
[0018] In this case, the recessed anti-slip section installed on the shaft of the foundation pile ensures the integrity of the pile's outer surface and the soil improvement body through adhesion, and the bearing resistance and friction resistance of the bottom of the improvement body provide horizontal resistance. Also, when the inner surface of the foundation pile is filled with concrete or other filler, the adhesion between the inner surface of the pile and the filler ensures the integrity of the pile, making it possible to further increase the horizontal resistance of the foundation pile. Furthermore, by forming the anti-slip portion as a recess, excellent workability and ease of construction of the pile can be achieved.
[0019] (6) A sixth aspect of the present invention may be characterized in that, in the pile foundation structure of any one of the first to fourth aspects, the anti-slip portion is formed by a weld bead fixed to the outer peripheral surface of the foundation pile.
[0020] In this case, the convex portion can be easily formed by providing a weld bead on the outer peripheral surface of the pile, thereby providing excellent workability and ease of construction of the pile.
[0021] (7) A seventh aspect of the present invention may be characterized in that, in the pile foundation structure of any one of the first to fourth aspects, the anti-slip portion is formed by rolling on the outer peripheral surface of the foundation pile.
[0022] In this case, the anti-slip portion provided on the shaft of the foundation pile is formed on the outer peripheral surface of the pile by rolling on the manufacturing line during manufacture, allowing the pile to be processed efficiently and in a stable shape. Effect of the Invention
[0023] According to the pile foundation structure of the present invention, the horizontal resistance of foundation piles, in which horizontal forces and bending moments act on the pile heads, can be strengthened in liquefied ground where horizontal resistance cannot be expected from the sides of the ground improvement body. [Brief description of the drawings]
[0024] [Figure 1] FIG. 1 is a vertical cross-sectional view showing a pile foundation structure according to a first embodiment of the present invention. [Diagram 2] 1(a) to 1(c) are diagrams showing an example of a displacement stopper for a foundation pile. [Diagram 3] FIG. 2 is a diagram for explaining a horizontal force transmission mechanism of the pile foundation structure of FIG. 1. [Figure 4] FIG. 4 is an enlarged view of a main part of FIG. [Diagram 5] 13(a) and 13(b) are diagrams for explaining the range of compression truss forming angles. [Figure 6] 1(a) and 1(b) are diagrams showing a construction procedure of a first construction method for a pile foundation structure. [Figure 7] 6(a) to 6(c) are diagrams showing the construction procedure of the first construction method for the pile foundation structure following FIG. 6(b). [Figure 8] 13(a) and (b) are diagrams showing a construction procedure of a second construction method for a pile foundation structure. [Figure 9] 8(a) to 8(c) are diagrams showing the construction procedure of the second construction method for the pile foundation structure following FIG. 8(b). [Figure 10] FIG. 11 is a vertical cross-sectional view showing the pile foundation structure according to the second embodiment. [Figure 11] FIG. 11 is a vertical cross-sectional view showing a pile foundation structure according to a third embodiment. [Figure 12] FIG. 11 is a vertical cross-sectional view showing a pile foundation structure according to a fourth embodiment. [Figure 13] 13 is a diagram showing an example of a displacement prevention portion of a foundation pile of the pile foundation structure shown in FIG. 12. [Figure 14] 14(a) is a side view showing an example of a displacement prevention portion of a foundation pile according to a first modified example, and (b) is a cross-sectional view taken along line AA shown in FIG. 14(a). [Figure 15] FIG. 11 is a vertical cross-sectional view showing a pile foundation structure having a displacement prevention portion according to a third modified example. [Figure 16] 16(a) and 16(b) are horizontal cross-sectional views showing the displacement stopper of the foundation pile shown in FIG. 15. [Figure 17] FIG. 11 is a vertical cross-sectional view showing a pile foundation structure according to a fifth embodiment. [Figure 18] FIG. 13 is a vertical cross-sectional view showing the pile foundation structure according to the sixth embodiment. [Figure 19] FIG. 13 is a vertical cross-sectional view showing the pile foundation structure according to the seventh embodiment. [Figure 20] FIG. 2 is a side view showing the configuration of an experimental device according to an embodiment. [Figure 21] FIG. 2 is a side view showing the configuration of a test specimen according to the embodiment, where (a) is a comparative example 1, (b) is a comparative example 2, and (c) is an embodiment. [Figure 22]FIG. 13 is a diagram showing the relationship between horizontal load and horizontal displacement according to the experimental results of the embodiment. [Diagram 23] FIG. 13 is a diagram showing bending moment distribution in the depth direction of a pile based on experimental results of an embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0025] Hereinafter, a pile foundation structure according to an embodiment of the present invention will be described with reference to the drawings.
[0026] (First embodiment) The pile foundation structure 1 according to this embodiment shown in Fig. 1 is a foundation structure for a structure (not shown) constructed on liquefied ground G1 consisting of a soft layer such as a sandy layer that is at risk of liquefaction, and is a structure that makes it possible to efficiently strengthen the horizontal resistance of the foundation piles 2 against horizontal forces and bending moments acting on the pile heads. In this embodiment, a footing 13 is provided flush with the ground surface, swallowing the upper part of the foundation piles 2. In this embodiment, a non-liquefied layer G2 is provided below the liquefied ground G1.
[0027] The pile foundation structure 1 includes a foundation pile 2 that supports a structure constructed on liquefied ground G1, and a ground improvement body 3 formed around the foundation pile 2.
[0028] The foundation piles 2 are steel pipe piles such as stepped steel pipes 2A and 2B shown in Fig. 2(a) and (b) and dimpled steel pipes 2C shown in Fig. 2(c). The foundation piles 2 may be cast-in-place piles or prefabricated piles. The material of the foundation piles 2 may be RC (concrete piles) or steel. However, the use of steel pipe piles has the advantage that it is easier to process the installation (formation) of the unevenness of the slip prevention portion 21 described below.
[0029] The stepped steel pipe 2A shown in Fig. 2(a) extends along a circumferential direction perpendicular to the pipe axis O, and has circumferential grooves 21a recessed from the pile outer peripheral surface 2a arranged at intervals in the pipe axial direction. The stepped steel pipe 2B shown in Fig. 2(b) has a shape that is inclined along a direction intersecting the pipe axis O in side view, and has inclined grooves 21b recessed from the pile outer peripheral surface 2a arranged at intervals in the pipe axial direction. The dimpled steel pipe 2C shown in Fig. 2(c) has a shape in which a plurality of recessed grooves 21c are spaced apart in the circumferential and pipe axial directions on the pile outer peripheral surface 2a. The circumferential groove 21a, the inclined groove 21b and the recessed groove 21c are recesses formed during the manufacture of the steel pipe, and correspond to the slippage prevention portion 21 described later.
[0030] As shown in Fig. 1, the foundation pile 2 is buried in liquefied ground G1 and non-liquefied layer G2 and is installed in a state where it has reached the non-liquefied layer G2. The foundation pile 2 is installed perpendicular to the ground surface, for example, using a pile driver (not shown), and is driven into the ground by penetrating it. Part of the horizontal force that the foundation pile 2 receives from the structure and the liquefied ground G1 during an earthquake is transmitted to the non-liquefied layer G2 via the embedded portion 3c (improvement body bottom portion 34) of the ground improvement body 3, as described below, and is borne by the non-liquefied layer G2.
[0031] The ground improvement body 3 is provided over almost the entire area in the vertical direction of the liquefied ground G1, and the lower end (the bottom part 34 of the improvement body) is provided in a state where it is embedded in the non-liquefied layer G2 located below the liquefied ground G1. The ground improvement body 3 is a multi-stage columnar body whose outer diameter increases from top to bottom. The ground improvement body 3 according to this embodiment is a single-stage columnar body. That is, the outer diameter of the top part 3b of the improvement body near the ground surface of the ground improvement body 3 is smaller than the outer diameter of the bottom part 34 of the improvement body. Therefore, the horizontal force F1 applied to the foundation pile 2 is not excessively expected to be a horizontal resistance of the side of the ground improvement body 3. For this reason, it is possible to slim down the ground improvement body 3 provided on the liquefied ground G1 by reducing the cross-sectional area (outer diameter) of the top part 3b of the improvement body near the ground surface, thereby reducing costs. In addition, by slimming down the soil improvement body 3, it is possible to suppress the flow force of the liquefied ground G1 that the foundation pile 2 receives during liquefaction.
[0032] The ground improvement body 3 is formed around the foundation pile 2, for example, by solidifying soil and sand with a cement-based solidifying agent such as cement milk. The ground improvement body 3 has a cylindrical lower columnar body 31 located below approximately the center in the height direction, and a cylindrical upper columnar body 32 located above the lower columnar body 31 and with a smaller diameter than the lower columnar body 31. The outer diameter of the upper columnar body 32 is set to be at least larger than the outer diameter of the foundation pile 2. The lower columnar body 31 includes a bottom 34 of the improvement body.
[0033] The improved body bottom 34 is embedded in the non-liquefied layer G2 to a predetermined thickness as described above. The improved body bottom 34 is formed in an uneven shape with steps going downward. The improved body bottom 34 has a central convex bottom 341 whose radial center is convex downward, and a peripheral bottom 342 located on the peripheral portion of the central convex bottom 341. In other words, the lower surface 341a of the central convex bottom 341 is located deeper than the lower surface 342a of the peripheral bottom 342. A step surface 34a facing radially outward is formed between the lower surface 341a of the central convex bottom 341 and the lower surface 342a of the peripheral bottom 342.
[0034] Friction resistance F3 occurs between the improved body bottom 34 and the ground of the non-liquefaction layer G2. Here, friction resistance F3 is a resistance that takes into account not only the horizontal friction resistance acting on the lower surface 341a of the central convex bottom 341 of the improved body bottom 34 and the lower surface 342a of the peripheral bottom 342, but also the horizontal bearing resistance acting on the step surface 34a that forms the side surface between the central convex bottom 341 and the peripheral bottom 342. Note that friction resistance F3 may be a friction resistance that does not take into account the horizontal bearing resistance of the step surface 34a (as well as 34b, 34c, and 34d described below).
[0035] It is preferable that the step height of the central convex bottom 341 (the height from the lower surface 342a of the outer peripheral bottom 342 to the lower surface 341a of the central convex bottom 341) be 0.1 times or more the maximum diameter part of the ground improvement body 3 (here, the outer diameter of the lower columnar body 31), so that frictional resistance F3 of the improvement body bottom 34 can be efficiently obtained.
[0036] In this embodiment, the outer diameter of the central convex bottom portion 341 is approximately the same as the outer diameter of the upper columnar body 32. Note that the central convex bottom portion 341 and the upper columnar body 32 are not limited to being approximately the same diameter, and for example, the central convex bottom portion 341 may be larger or smaller in diameter than the upper columnar body 32. The depth of the central convex bottom portion 341 and the peripheral bottom portion 342 from the boundary between the liquefaction layer G1 and the non-liquefaction layer G2 at the lower surface 341a of the central convex bottom portion 341 is the embedment depth of the ground improvement body 3 into the non-liquefaction layer G2.
[0037] The strength of the improved body bottom 34 (embedded portion 3c) is higher than that of the other parts, i.e., the part of the lower columnar body 31 excluding the improved body bottom 34 (the area above the embedded portion), and the upper columnar body 32. It is desirable that the improved body bottom 34 has a strength, for example, that is 3 MPa or more higher in uniaxial compressive strength than the other parts. By making the improved body bottom 34 a higher-strength improved body than the other parts in this way, the frictional resistance F3 can be increased. As described later, the ground improvement body 3 is constructed by excavating to a depth that penetrates into the non-liquefaction layer G2, or while excavating, pouring cement milk from the lower end of the drilling rod 4 (see Figs. 6(a) and (b)) into the surrounding area and stirring and mixing it with the excavated soil and sand, while pulling up the drilling rod 4. Therefore, the strength of the ground improvement body 3 can be set according to the depth, and the bottom part 34 of the ground improvement body can be made stronger than other parts as described above. Then, by calculating the average value of, for example, three sampling points in the bottom part 34 of the ground improvement body and the other parts, and comparing them, it can be confirmed that the bottom part 34 of the ground improvement body has a higher strength. Here, the strength of the ground improvement body 3 can be measured, for example, by a general uniaxial compression test in which a cylindrical sample is compressed without applying lateral pressure.
[0038] The ground improvement body 3 has a structure in which the lower columnar body 31 including the bottom part 34 of the ground improvement body is larger in diameter than the upper columnar body 32, and the bearing resistance F2 and friction resistance F3 acting on the bottom part 34 of the ground improvement body can be maximized. Specifically, the bearing resistance F2 acts on the lower surface 341a of the central convex bottom part 341 and the lower surface 342a of the outer periphery bottom part 342. The friction resistance F3 acts as a horizontal friction resistance on the lower surface 341a of the central convex bottom part 341 and the lower surface 342a of the outer periphery bottom part 342, and a horizontal bearing resistance acts on the step surface 34a. In addition, the upper part of the ground improvement body (upper columnar body 32) is reduced in diameter compared to the lower columnar body 31, and the width (diameter) of the ground improvement body is reduced. As a result, the ground improvement body 3 can realize a structure that is not easily subjected to the flow force of the ground without hindering the slip-through phenomenon in which the liquefied ground G1 flows between the foundation piles 2 even during liquefaction.
[0039] When installing the foundation pile 2 in the ground, the soil around the foundation pile 2 is excavated with the excavation blades 41 of the excavation rod 4 (see Figures 6(b) and 8(b)), and the excavated soil is mixed with cement milk and solidified, thereby forming the ground improvement body 3 in a specified ground area.
[0040] In this manner, in the pile foundation structure 1 of this embodiment, the ground improvement body 3 solidified with cement milk is formed on the liquefied ground G1 and non-liquefied layer G2 around the foundation pile 2. The pile foundation structure 1 has high rigidity because the ground improvement body 3 is reinforced with an outer diameter larger than that of the foundation pile 2, and the horizontal force acting on the foundation pile 2 can be sufficiently resisted by the ground improvement body 3 embedded in the non-liquefied layer G2. The mechanism of load transfer (load transfer mechanism) acting on the pile foundation structure 1 at this time will be described in detail later.
[0041] 3 and 4, the pile outer surface 2a of the shaft of the foundation pile 2 is provided with a slip prevention portion 21 having an uneven shape and having a slip prevention function between the foundation pile 2 and the ground improvement body 3, in a certain range from the lower part of the ground improvement body 3. At least a part of the slip prevention portion 21 is arranged in the compression truss forming area Ta where a compression truss T is formed between the foundation pile 2 and the bottom part 34 of the ground improvement body 3.
[0042] The slip prevention portion 21 installed on the outer peripheral surface 2a of the pile shaft of the foundation pile 2 has the function of transmitting the load from the uneven portion of the slip prevention portion 21 to the ground improvement body 3 when a horizontal force F1 or bending moment M acts on the foundation pile 2. The slip prevention portion 21 is disposed in an area (slip prevention functional area 21A described later) below a height located at the intersection P between the compression truss T and the shaft of the foundation pile 2, where the inclination angle (compression truss forming angle θ) with the improved body bottom 34 is 60 degrees or less. The compression truss forming angle θ is preferably in the range of 30 to 60 degrees, and more preferably 45 degrees (see FIG. 5(a)). Here, the compression truss T1 shown in FIG. 5(a) has θ of 45 degrees, the compression truss T2 has θ of 60 degrees, and the compression truss T3 has θ of 30 degrees.
[0043] By setting the compression truss forming angle θ, which is the inclination angle formed by the compression truss T, in the range of 30 to 60 degrees, the compression truss T can be sufficiently formed in the ground improvement body 3, and the horizontal resistance effect due to the bearing resistance F2 and friction resistance F3 of the bottom part 34 of the improvement body can be reliably obtained. Therefore, even if it is not possible to set the compression truss forming angle θ to 45 degrees, which is a general value, due to the conditions of the site and construction equipment, the compression truss T can be reliably formed in the ground improvement body 3. In particular, by setting the compression truss formation angle θ to 45 degrees, a compression truss T can be reliably formed that can transmit the horizontal force F1 acting on the foundation pile 2 from the slip prevention portion 21 to the bottom 34 of the improved body, and a horizontal resistance effect can be obtained due to the bearing resistance F2 and friction resistance F3 of the bottom 34 of the improved body.
[0044] The displacement preventing portion 21 is formed as a recess on the outer peripheral surface 2a of the foundation pile 2 as shown in Figs. 2(a) to (c) described above.
[0045] Next, the load transfer mechanism of the pile foundation structure 1 of this embodiment will be specifically described with reference to Figs. Inside the ground improvement body 3, the horizontal force transmitted from the shaft of the foundation pile 2 and the slip stopper 21 installed on its surface (pile outer surface 2a) is transmitted to the bottom 34 of the improvement body, and is resisted by the bearing resistance F2 and friction resistance F3 in the ground of the non-liquefaction layer G2. At this time, a compression truss T is formed inside the ground improvement body 3 sandwiched between the foundation pile 2 and the bottom 34 of the improvement body. The formation of this compression truss T allows for efficient load transmission. In addition, since the load transmission associated with the compression truss T is based on compressive stress, the load is transmitted reliably even in the ground improvement body 3 which does not have tensile strength.
[0046] Here, the symbols shown in FIG. r o : Radius of foundation pile 2 R B : Radius of bottom of improved body 34 R t : Radius of improved body top 3b ΔR: Radius of the penetration part 3c of the ground improvement body 3 into the non-liquefaction layer G2 (ΔR=R B -r o ) h: Height of the ground improvement body 3 (here, the height of the lower columnar body 31) l: the depth direction length where the anti-slip portion 21 is installed (formed) (= the length from the intersection point P described above to the bottom portion 34 of the improved body) θ: Compression truss forming angle (tanθ=l / ΔR) d e :Depth of embedment of ground improvement body 3 into non-liquefaction layer G2
[0047] As shown in Fig. 4, it is preferable that the compression truss T has an inclination angle (compression truss forming angle θ) of 45 degrees with respect to the improved body bottom 34 to be formed. In other words, when the compression truss forming angle θ of the compression truss T is 45 degrees, at least the length range l in the depth direction of the shaft part where the slip prevention part 21 is formed (the length from the intersection point P where the compression truss T passing through the outer edge part 3d of the improved body bottom 34 intersects with the shaft part of the foundation pile 2 to the improved body bottom 34 (the lower surface 341a of the central convex bottom part 341 in this embodiment)) is equivalent to the radial length ΔR of the embedded part 3c of the ground improvement body 3 into the non-liquefaction layer G2.
[0048] Furthermore, for example, when the compression truss angle θ is between 45 degrees and 60 degrees and passes through the outer edge 3d of the improved body bottom 34, the intersection P at the shaft of the foundation pile 2 is located above the intersection P where the compression truss angle θ is 45 degrees, so the upper limit position of the range where at least a part of the slip stopper 21 is provided is also above the upper limit position when the compression truss angle θ is 45 degrees. In other words, the length range l in the depth direction of the shaft where the slip stopper 21 is formed becomes larger.
[0049] The slip stopper 21 may be provided in an area above the installation range (slip stopper functional area 21A) determined by the compression truss forming angle θ of the compression truss T. For example, even if the transmission function of resisting the horizontal force F1 acting on the foundation pile 2 by the compression truss T through the bearing resistance F2 and friction resistance F3 of the improvement body bottom 34 does not work, the slip stopper 21 can be provided outside the slip stopper functional area 21A because it has the effect of exerting a slip stopper function with the ground improvement body 3 or of providing a slip stopper function with the concrete filled inside the foundation pile 2.
[0050] It is preferable that the formation range of the compression truss T formed by the slip prevention portion 21 is certainly included in the ground improvement body 3. For this reason, geometrically, a ground improvement body 3 with a range (radially outward) larger than the triangular portion defined by the bottom part 34 of the improvement body, the slip prevention functional area 21A in the shaft part of the foundation pile 2, and the inclined line of the compression truss T connecting the outer edge part 3d of the bottom part 34 of the improvement body and the shaft part of the foundation pile 2 is required.
[0051] As shown in Figures 5(a) and (b), the compression truss forming angle θ is generally 45 degrees, and the shape and size of the ground improvement body 3 are set based on this. As mentioned above, it is better to limit the compression truss formation angle θ to the range of 30 to 60 degrees as necessary based on the site conditions, construction equipment, etc. Outside this angle, the compression truss T will not be formed sufficiently and will not have a sufficient effect.
[0052] Fig. 5(b) is an example showing a case where the height of the lower columnar body 31 is small. In this case, the compression truss T passes through the inner corner 33a facing the foundation pile 2 of the step 33 of the soil improvement body 3 forming a multi-stage columnar body, and is placed in an area below the height of the intersection P with the axis of the foundation pile 2. This makes it possible to efficiently form the compression truss T in the soil improvement body 3 consisting of a multi-stage columnar body, ensure the bearing resistance and friction resistance of the bottom 34 of the improvement body, and suppress the flow force of the liquefied ground G1 that the foundation pile 2 receives during liquefaction. In Fig. 5(b), the compression truss forming angle θ of the compression truss T1 (solid line in Fig. 5(b)) passing through the outer edge 3d and the inside corner 33a of the bottom 34 of the improvement body is 45 degrees. The 60-degree compression truss T2 (chain double-dashed line in Fig. 5(b)) passing through the outer edge 3d of the bottom 34 of the improvement body is not entirely included in the ground improvement body 3, so part of the compression truss T2 is located outside the ground improvement body 3, and the horizontal force received by the foundation pile 2 at this compression truss T2 is not transmitted to the bottom 34 of the improvement body.
[0053] Next, two construction examples (a first construction method and a second construction method) will be described as a construction method for the above-mentioned pile foundation structure 1. The first construction method will be described with reference to Figures 6(a), (b) and 7(a) to (c). The first construction method is a post-pile construction method.
[0054] First, as shown in Fig. 6(a), the drilling rod 4 is installed above ground at the construction site. The drilling rod 4 includes a rod 40, a drilling blade 41 that is disposed at the lower end of the rod 40 and is expandable and contractible, and a stirring blade 42 that is disposed above the drilling blade 41.
[0055] Next, as shown in FIG. 6(b), the rod 40 is rotated, and the ground is excavated by the rotation of the drilling blade 41 and the stirring blade 42. In this first embodiment, the ground improvement body 3 is a multi-stage columnar body, and is formed of an upper columnar body 32 and a lower columnar body 31. Therefore, in the region of the upper columnar body 32, the drilling blade 41 and the stirring blade 42 are excavated with their diameters reduced to a predetermined length, and in the region of the lower columnar body 31, the drilling blade 41 and the stirring blade 42 are excavated with their diameters expanded to a larger extent than in the region of the upper columnar body 32. Then, after the drilling rod 4 is excavated to a depth at which it is embedded in the non-liquefied layer G2, the drilling rod 4 is pulled up while pouring cement milk into the surrounding area from a pouring outlet (not shown) provided at the lower end of the drilling rod 4 and mixing and stirring it with the excavated soil and sand. As a result, as shown in Fig. 7(a), a ground improvement body 3 of a predetermined shape is constructed, in which an embedded portion 3c is formed in which the bottom portion 34 of the improvement body is embedded in the non-liquefied layer G2. At this time, the central convex bottom portion 341 of the bottom portion 34 of the improvement body is formed in a stepped shape by excavating with the excavation blade 41 and the mixing blade 42 contracted to a predetermined length.
[0056] Next, as shown in FIG. 7(b), the foundation pile 2, which has a slip prevention portion 21 provided in advance in a predetermined area of the pile outer circumferential surface 2a, is driven into the constructed ground improvement body 3. Specifically, the foundation pile 2 is penetrated into the ground below the ground improvement body 3, and the tip of the foundation pile 2 reaches a predetermined depth of the non-liquefaction layer G2 (see FIG. 7(c)). The foundation pile 2 is extended according to the driving length to obtain a predetermined length. As shown in FIG. 7(c), by driving the foundation pile 2 to a predetermined depth, the slip prevention portion 21 of the foundation pile 2 is also positioned at a predetermined height. This completes the construction. By setting up the foundation pile 2 in this manner, the foundation pile 2 can obtain vertical supporting force, and furthermore, the surrounding area of the foundation pile 2 in the liquefied ground G1 is covered by the ground improvement body 3, thereby constructing a pile foundation structure 1 that transmits the horizontal force acting on the foundation pile 2 to the bottom 34 of the ground improvement body 3.
[0057] Next, the second construction method will be described with reference to Figures 8(a), (b) and 9(a) to (c). The second construction method is a simultaneous pile construction method.
[0058] First, as shown in Fig. 8(a), a drilling rod 4 equipped with a foundation pile 2 having a slip-stopper 21 provided in advance in a predetermined area on the outer circumferential surface 2a of the pile is placed above ground at the construction site. The construction of the drilling rod 4 is the same as that used in the first construction method described above. The foundation pile 2 is set at a position above the stirring blade 42 with the rod 40 inserted into the pile. The drilling blade 41 and the stirring blade 42 can pass through the inside of the foundation pile 2 when they are contracted.
[0059] Next, as shown in FIG. 8(b), in the drilling rod 4 equipped with the foundation pile 2, the rod 40 is rotated, and the ground is excavated by the rotation of the drilling blade 41 and the mixing blade 42. In this first embodiment, the ground improvement body 3 is a multi-stage columnar body, and is formed of an upper columnar body 32 and a lower columnar body 31. Therefore, in the region of the upper columnar body 32, the drilling blade 41 and the mixing blade 42 are excavated in a state in which they are contracted to a predetermined length, and in the region of the lower columnar body 31, the drilling blade 41 and the mixing blade 42 are excavated to a depth to be embedded in the non-liquefaction layer G2 in a state in which they are expanded in diameter to a larger extent than in the region of the upper columnar body 32. At this time, the foundation pile 2 is also penetrated into the excavated ground together with the penetration of the drilling rod 4 into the ground.
[0060] In the second construction method, simultaneously with excavation using the drilling rod 4, cement milk is poured into the surrounding area from an outlet (not shown) provided at the lower end of the drilling rod 4 and stirred and mixed with the excavated soil, thereby constructing a ground improvement body 3 of a predetermined shape (in the first embodiment, a multi-stage columnar body) in which an embedded portion 3c is formed with the bottom 34 of the improvement body embedded in the non-liquefaction layer G2 as shown in Figure 9(a). Next, while leaving the foundation pile 2 penetrated into the ground together with the drilling rod 4 in place, the drilling rod 4 with the drilling blade 41 and the mixing blade 42 reduced in diameter is passed inside the foundation pile 2 and pulled out to the ground.
[0061] Next, as shown in FIG. 9(b), the foundation pile 2, which has a slip prevention portion 21 provided in advance in a predetermined area of the pile outer surface 2a, is driven into the further constructed ground improvement body 3 and the non-liquefaction layer G2 below it. Specifically, the foundation pile 2 is penetrated into the ground improvement body 3 and the ground below the ground improvement body 3, and the tip of the foundation pile 2 is made to reach a predetermined depth in the non-liquefaction layer G2 (see FIG. 9(c)). The foundation pile 2 is extended according to the driving length to obtain a predetermined length. As shown in FIG. 9(c), by driving the foundation pile 2 to a predetermined depth, the slip prevention portion 21 of the foundation pile 2 is also positioned at a predetermined height. This completes the construction. By setting up the foundation pile 2 in this manner, the foundation pile 2 can obtain vertical supporting force, and furthermore, the surrounding area of the foundation pile 2 in the liquefied ground G1 is covered by the ground improvement body 3, thereby constructing a pile foundation structure 1 that transmits the horizontal force acting on the foundation pile 2 to the bottom 34 of the ground improvement body 3.
[0062] Next, the operation of the above-mentioned pile foundation structure 1 will be described in detail with reference to the drawings. As shown in Figs. 3 and 4, in the pile foundation structure 1 according to this embodiment, a slip prevention part 21 having an uneven shape is provided on the shaft part of the foundation pile 2, and the ground improvement body 3 is present in the range where the compression truss T caused by this slip prevention part 21 is formed, so that the horizontal force acting on the foundation pile 2 is transmitted from the slip prevention part 21 to the bottom part 34 of the improved body via the ground improvement body 3 formed around the foundation pile 2. And, since the bottom part 34 of the improved body is formed in a stepped shape toward the bottom, the friction resistance F3 of the improved body bottom part 34 can be efficiently obtained. As a result, the horizontal force transmitted to the bottom part 34 of the improved body can be resisted by the bearing resistance F2 and friction resistance F3 of the improved body bottom part 34 embedded in the non-liquefied layer G2. Therefore, in this embodiment, since the bearing resistance F2 and friction resistance F3 in the non-liquefied layer G2 are used, an excellent horizontal resistance effect can be obtained by the bearing resistance F2 and friction resistance F3 of the improved body bottom part 34 even when the liquefied ground is liquefied during an earthquake. In this way, in this embodiment, even in a liquefied layer where horizontal resistance from the sides of the ground improvement body 3 cannot be expected, the horizontal resistance of the foundation pile 2, where horizontal forces and bending moments act on the pile head, can be strengthened by utilizing the bearing resistance F2 and friction resistance F3 at the bottom 34 of the improvement body.
[0063] In addition, in this embodiment, the bottom 34 of the improvement body has an uneven shape, so that the bearing resistance F2 and friction resistance F3 at the bottom 34 of the improvement body can be maximized. On the other hand, the upper part of the improvement body can be made smaller in diameter than the bottom 34 of the improvement body. In this case, the ground improvement body 3 has a slimmer configuration. Therefore, when the ground improvement body 3 is slimmed down, it is possible to suppress the flow force acting on the foundation piles 2 without impeding the slip-through phenomenon of the ground between the foundation piles 2 during liquefaction. In addition, the slimming of the ground improvement body 3 leads to a reduction in the volume of the ground improvement body 3, which also reduces costs.
[0064] In addition, in this embodiment, the bottom 34 of the improvement body is stronger than the other parts, so that the adhesion force between the bottom 34 of the improvement body and the ground of the non-liquefaction layer G2 can be increased, and the frictional resistance F3 of the bottom 34 of the improvement body can be increased.
[0065] Furthermore, in this embodiment, since the foundation piles 2 are steel pipe piles, the slip prevention portions 21 can be easily installed and formed.
[0066] In this embodiment, by adopting stepped steel pipes 2A, 2B (see Figs. 2(a) and (b)) or dimpled steel pipe 2C (see Fig. 2(c)), the anti-slip portion 21 provided on the shaft of the foundation pile 2 is formed in a recessed state. Therefore, the adhesion between the outer peripheral surface 2a of the pile and the ground improvement body 3 ensures the integrity, and the effect of horizontal resistance due to the bearing resistance F2 and friction resistance F3 of the bottom 34 of the improvement body can be fully obtained.
[0067] In addition, in this embodiment, when the inner surface of the steel pipe of the foundation pile 2 is filled with a filler material such as concrete, the adhesion between the inner surface of the steel pipe and the filler material can ensure integrity, and the horizontal resistance of the foundation pile 2 can be further increased. In the case of dimpled steel pipe 2C (see Figure 2 (c)), which has dimples on the steel pipe, even though it has dimples and no filler is filled inside the steel pipe, it can exhibit compression and bending performance equivalent to that of a straight steel pipe pile, and excellent effects can be enjoyed.
[0068] In the pile foundation structure 1 of the above-mentioned embodiment, the horizontal resistance of the foundation pile 2, in which horizontal forces and bending moments act on the pile head, can be strengthened in liquefied ground G1 where horizontal resistance cannot be expected from the sides of the ground improvement body 3.
[0069] Second embodiment Next, as shown in Fig. 10, the pile foundation structure 1A according to the second embodiment is configured such that the improvement body bottom 34A of the ground improvement body 3A that is embedded in the non-liquefaction layer G2 has multiple stages (two stages in this case) of central convex bottoms 343, 344 that are successively convex downward at the radial center. That is, the first central convex bottom 343, the second central convex bottom 344, and the outer peripheral bottom 345 are arranged in this order from the foundation pile 2 toward the radial outside.
[0070] The lower surface 343a of the first central convex bottom 343 is located deeper than the lower surface 344a of the second central convex bottom 344. Two step surfaces 34b, 34c are formed on the bottom 34A of the improved body. The height of the two-step central convex bottom 343, 344 (the height from the lower surface 345a of the outer peripheral bottom 345 to the lower surface 343a of the first central convex bottom 343) is desirably set to a height of 0.1 times or more the maximum diameter part of the ground improvement body 3A (here, the outer diameter of the lower columnar body 31). By setting the height in this way, the friction resistance F3 of the improved body bottom 34A can be efficiently obtained.
[0071] In the second embodiment, the outer diameter of first central convex bottom portion 343 is approximately the same as the outer diameter of upper columnar body 32, and the outer diameter of second central convex bottom portion 344 is larger than the outer diameter of upper columnar body 32 and smaller than the outer diameter of lower columnar body 31. The outer diameters of central convex bottom portions 343, 344 can be changed as appropriate.
[0072] The strength of the improved body bottom 34A is higher than that of the other parts, i.e., the part of the lower columnar body 31 excluding the improved body bottom 34A (the area above the embedded part) and the upper columnar body 32. By making the improved body bottom 34A a higher strength improved body than the other parts in this way, the frictional resistance F3 can be increased.
[0073] In the ground improvement body 3A of the second embodiment, the lower columnar body 31 including the improvement body bottom part 34A has a larger diameter than the upper columnar body 32, and is structured to maximize the bearing resistance F2 and friction resistance F3 acting on the improvement body bottom part 34A. Specifically, the bearing resistance F2 acts on the lower surface 343a of the first central convex bottom part 343, the lower surface 344a of the second central convex bottom part 344, and the lower surface 345a of the outer peripheral bottom part 345. The friction resistance F3 is a horizontal friction resistance acting on the lower surface 343a of the first central convex bottom part 343, the lower surface 344a of the second central convex bottom part 344, and the lower surface 345a of the outer peripheral bottom part 345, and a horizontal bearing resistance acting on the step surfaces 34b and 34c. The configuration of the slip prevention portion 21 of the foundation pile 2, the range in which the compression truss T is formed by the slip prevention portion 21, and the load transfer mechanism in the pile foundation structure 1A are the same as those in the above-described first embodiment.
[0074] Third embodiment Next, as shown in Fig. 11, the pile foundation structure 1B according to the third embodiment is configured such that the outer peripheral convex bottom 346, whose radially outer side is convex downward, is provided at the bottom 34B of the ground improvement body 3B that is embedded in the non-liquefaction layer G2. That is, the central side of the outer peripheral convex bottom 346 is provided with a central bottom 347 that forms the top surface of a recess that is concave upward.
[0075] The lower surface 346a of the outer peripheral convex bottom 346 is located deeper than the lower surface 347a of the central bottom 347. A step surface 34d is formed between the lower surface 346a of the outer peripheral convex bottom 346 and the lower surface 347a of the central bottom 347 in the improved body bottom 34B. It is desirable that the height of the outer peripheral convex bottom 346 (the height from the lower surface 347a of the central bottom 347 to the lower surface 346a of the outer peripheral convex bottom 346) is set to a height of 0.1 times or more the maximum diameter part of the ground improvement body 3B (here, the outer diameter of the lower columnar body 31). By setting such a height, the friction resistance F3 of the improved body bottom 34B can be efficiently obtained.
[0076] In the third embodiment, the outer diameter of the central bottom portion 347 is approximately the same as the outer diameter of the upper columnar body 32, but the outer diameter of the central bottom portion 347 can be changed as appropriate. It is desirable that the strength of the improved body bottom 34B be higher than that of the other parts, i.e., the part of the lower columnar body 31 excluding the improved body bottom 34B (the area above the embedded part) and the upper columnar body 32. By making the improved body bottom 34B a higher strength improved body than the other parts in this way, the frictional resistance F3 can be increased.
[0077] In the ground improvement body 3B of the third embodiment, the lower columnar body 31 including the improvement body bottom part 34B has a larger diameter than the upper columnar body 32, and is structured to maximize the bearing resistance F2 and friction resistance F3 acting on the improvement body bottom part 34B. Specifically, the bearing resistance F2 acts on the lower surface 346a of the outer peripheral convex bottom part 346 and the lower surface 347a of the central bottom part 347. For the friction resistance F3, horizontal friction resistance acts on the lower surface 347a of the central bottom part 347 and the lower surface 346a of the outer peripheral convex bottom part 346, and horizontal bearing resistance acts on the step surface 34d. The configuration of the slip prevention portion 21 of the foundation pile 2, the range in which the compression truss T is formed by the slip prevention portion 21, and the load transfer mechanism in the pile foundation structure 1B are the same as those in the above-described first embodiment.
[0078] (Fourth embodiment) Next, as shown in Fig. 12, the pile foundation structure 1C according to the fourth embodiment is configured such that the unevenly shaped anti-slip portion 22 provided on the shaft of the foundation pile 2 in the above-mentioned first embodiment protrudes outward from the pile outer peripheral surface 2a. The shape of the ground improvement body 3C is a multi-stage columnar body, as in the first embodiment. That is, the ground improvement body 3C is provided with its lower end (the bottom part 34 of the improvement body) embedded in the non-liquefaction layer G2. The foundation pile 2 has the same configuration as that of the first embodiment except for the displacement prevention portion 22, and reaches the non-liquefaction layer G2.
[0079] The dotted line of the compression truss T shown in FIG. 12 is a line where the compression truss forming angle θ at the outer edge 3d at the bottom 34 of the ground improvement body 3C is 45 degrees. The slip stopper 22 is provided in the pile outer surface 2a of the foundation pile 2 in the area (slip stopper functional area 22A) from the intersection P of the compression truss T1 with the shaft of the foundation pile 2 to the bottom 34 of the improvement body. Note that the slip stopper 22 only needs to be provided in at least a part of the slip stopper functional area 22A of the foundation pile 2, and is not limited to being provided over the entire slip stopper functional area 22A, and may be arranged intermittently in the vertical direction. Also, as described above, the slip stopper 22 may also be provided in an area other than the slip stopper functional area 22A (here, an area above the slip stopper functional area 22A).
[0080] As the protruding anti-slip portion 22, for example, a weld bead 22a fixed to the outer circumferential surface 2a of the foundation pile 2 as shown in Fig. 13 can be used. In this case, the protruding portion can be easily formed by providing the weld bead 22a on the outer circumferential surface 2a of the pile, thereby providing excellent workability and ease of construction of the pile.
[0081] (First Modification) 14(a) and (b), the anti-slip portion 22 of the first modified example may be a protrusion 22b formed by rolling on the pile outer circumferential surface 2a of the foundation pile 2. When the protrusion-shaped anti-slip portion 22 is formed by such a rolling production line, the anti-slip portion of the shaft portion of the foundation pile 2 can be efficiently provided with a stable shape. Note that the reference numeral 22c (the line between the protrusions 22b located at the center in the axial direction) in FIG. 14(a) and (b) indicates a weld line when the foundation pile 2 is manufactured using a steel plate having the protrusions 22b formed by rolling.
[0082] (Second Modification) Furthermore, as another protrusion-shaped anti-slip portion 22 in the second modified example, a member made by bending reinforcing bar, round steel, flat steel, etc. into a ring shape may be installed on the outer peripheral surface 2a of the foundation pile 2 and fixed by welding or the like.
[0083] (Third Modification) Furthermore, as shown in Figures 15 and 16(a) and (b), in the pile foundation structure 1D according to the third modified example, it is also possible to adopt, as another protrusion-shaped anti-slip portion 22, a plurality of perforated steel plates 23 extending along the axial direction on the outer peripheral surface 2a of the foundation pile 2 and spaced apart in the circumferential direction. The perforated steel plate 23 is configured such that a plurality of through holes 23a (for example, four in FIG. 16(a) and eight in FIG. 16(b)) are arranged in the extension direction of a strip-shaped steel plate. The perforated steel plate 23 is arranged such that the central axis of the through hole 23a is oriented in a direction perpendicular to the axial direction of the foundation pile 2, and the plate surface of the perforated steel plate 23 is radial to the foundation pile 2.
[0084] Fifth embodiment As shown in Fig. 17, the pile foundation structure 1E according to the fifth embodiment has a columnar shape with a constant outer diameter throughout the depth direction as the shape of the ground improvement body 3E. That is, the outer diameter of the improved body top 3b and the improved body bottom 34 of the ground improvement body 3E are approximately the same. In this case, the ground improvement body 3E also has an embedded portion 3c embedded in the non-liquefaction layer G2. The improved body bottom 34 has a central convex bottom 341 similar to that of the first embodiment.
[0085] The foundation pile 2 has the same configuration as that of the first embodiment described above. That is, on the pile outer peripheral surface 2a of the shaft portion of the foundation pile 2, a slip prevention portion 21 having an uneven shape and having a slip prevention function between the ground improvement body 3A and the ground improvement body 3A is provided in a certain range from the lower part of the ground improvement body 3A. At least a part of the slip prevention portion 21 is arranged in the compression truss forming area Ta where a compression truss T is formed between the ground improvement body bottom part 34 of the ground improvement body 3E.
[0086] The dotted line of the compression truss T shown in FIG. 17 is a line at which the compression truss forming angle θ at the outer edge 3d at the bottom 34 of the improvement body of the ground improvement body 3A is 45 degrees. In the fifth embodiment, the shear stopper 21 is provided in the pile outer peripheral surface 2a of the foundation pile 2 in the region (slip-stopper function region 21A) from the intersection P of the compression truss T with the shaft of the foundation pile 2 to the bottom 34 of the improvement body. Note that the shear stopper 21 only needs to be provided in at least a part of the shear-stopper function region 21A of the foundation pile 2, and is not limited to being provided over the entire shear-stopper function region 21A, and may be arranged intermittently in the vertical direction. In addition, as described above, the shear stopper 21 may also be provided in a region other than the shear-stopper function region 21A (here, the region above the shear-stopper function region 21A).
[0087] In the pile foundation structure 1E of the fifth embodiment, a stepped improvement body bottom 34 is provided on the ground improvement body 3E, and a slip prevention portion 21 is provided on the foundation pile 2, so that bearing resistance F2 and friction resistance F3 are obtained at the improvement body bottom 34 by the compression truss T, and the horizontal force F1 acting on the foundation pile 2 can be borne by the non-liquefaction layer G2.
[0088] In the pile foundation structure 1E according to the fifth embodiment, the upper cross section of the soil improvement body 3 is not reduced in diameter as in the pile foundation structure 1 according to the first embodiment described above. In other words, since a large cylindrical soil improvement body 3E exists on top of the liquefied ground G1, the soil between the foundation piles 2 may hinder the slip-through phenomenon during liquefaction compared to the case where the upper cross section (the cross section of the upper columnar body 32 shown in Fig. 1) is small as in the first embodiment described above, and the structure is susceptible to the flow force of the soil.
[0089] Sixth embodiment As shown in FIG. 18, the pile foundation structure 1F according to the sixth embodiment has a configuration in which soil improvement bodies 3F made of columnar bodies are provided only in the lower part in the depth direction of the liquefied ground G1. That is, the ground improvement body 3F is equivalent to the configuration in which the upper columnar body 32 (see FIG. 1) of the first embodiment described above is omitted and only the lower columnar body 31 is provided, and includes the improvement body bottom 34, and the outer diameter of the improvement body top 3b and the improvement body bottom 34 are approximately the same. In this case, too, the ground improvement body 3F has an embedded portion 3c embedded in the non-liquefaction layer G2. The improvement body bottom 34 has a central convex bottom 341 similar to the first embodiment.
[0090] The foundation pile 2 has the same configuration as that of the first embodiment described above. That is, on the pile outer peripheral surface 2a of the shaft of the foundation pile 2, a slip prevention portion 21 having an uneven shape and having a slip prevention function between the ground improvement body 3B and the ground improvement body 3B is provided in a certain range from the lower part of the ground improvement body 3B. At least a part of the slip prevention portion 21 is arranged in the compression truss forming region Ta where a compression truss T is formed between the improvement body bottom part 34 of the ground improvement body 3F. In FIG. 18, the slip prevention portion 21 is provided in almost the entire area of the shaft of the foundation pile 2 that contacts the ground improvement body 3B.
[0091] The dotted line of the compression truss T1 shown in FIG. 18 is a line where the compression truss forming angle θ is 45 degrees at the outer edge 3d at the bottom 34 of the improvement body of the ground improvement body 3B. In the third embodiment, on the pile outer circumferential surface 2a of the foundation pile 2, the shear stopper 21 is provided in the region (slip-stopper functional region 21A) from the intersection P of the compression truss T with the shaft of the foundation pile 2 to the bottom 34 of the improvement body. Note that the shear stopper 21 only needs to be provided in at least a part of the shear-stopper functional region 21A of the foundation pile 2, and is not limited to being provided over the entire shear-stopper functional region 21A, and may be arranged intermittently in the vertical direction. As described above, the shear stopper 21 may also be provided in regions other than the shear-stopper functional region 21A.
[0092] In the pile foundation structure 1F of the sixth embodiment, an embedded portion 3c embedded in the non-liquefaction layer G2 is formed in the ground improvement body 3F, and a slip prevention portion 21 is provided in the foundation pile 2, so that bearing resistance F2 and friction resistance F3 are obtained from the bottom 34 of the improvement body by the compression truss T, and the horizontal force F1 acting on the foundation pile 2 can be borne by the non-liquefaction layer G2.
[0093] In this way, the pile foundation structure 1F of the sixth embodiment does not have the upper columnar body 32 (see FIG. 1) as in the pile foundation structure 1 of the first embodiment described above, so the bottom 34 of the improved body that exerts the resistance mechanism is secured large, while the pile foundation structure 1F can be significantly slimmed down by omitting the improvement of the upper part, which allows for cost reduction. In addition, since the ground slip-through phenomenon between the foundation piles 2 during liquefaction of the liquefied ground G1 is not hindered, there is also the advantage that the flow force of the ground acting on the foundation piles 2 can be suppressed.
[0094] Seventh embodiment A pile foundation structure 1G according to the seventh embodiment shown in FIG. 19 is provided with a soil improvement body 3G forming a cone-shaped columnar body whose outer diameter gradually increases from the top to the bottom. The ground improvement body 3G is provided over almost the entire area in the vertical direction of the liquefied ground G1, as in the first embodiment described above, with its lower end (the bottom part 34 of the improvement body) embedded in the non-liquefied layer G2. That is, the outer diameter of the top part 3b of the improvement body 3G near the ground surface is smaller than the outer diameter of the bottom part 34 of the improvement body.
[0095] The foundation pile 2 has the same configuration as the embodiment described above. That is, on the pile outer surface 2a of the shaft of the foundation pile 2, a slip prevention portion 21 having an uneven shape and having a slip prevention function between the ground improvement body 3G and the ground improvement body 3G is provided in a certain range from the lower part of the ground improvement body 3G. At least a part of the slip prevention portion 21 is arranged in a compression truss forming area Ta where a compression truss T is formed between the ground improvement body bottom part 34 of the ground improvement body 3G.
[0096] The dotted line of the compression truss T shown in FIG. 19 is a line where the compression truss forming angle θ at the outer edge 3d at the bottom 34 of the improvement body 3C of the ground improvement body is 45 degrees. In the seventh embodiment, the shear stopper 21 is provided in the pile outer peripheral surface 2a of the foundation pile 2 in the region (slip-stopper function region 21A) from the intersection P of the compression truss T with the shaft of the foundation pile 2 to the bottom 34 of the improvement body. Note that the shear stopper 21 only needs to be provided in at least a part of the shear-stopper function region 21A of the foundation pile 2, and is not limited to being provided over the entire shear-stopper function region 21A, and may be arranged intermittently in the vertical direction. In addition, as described above, the shear stopper 21 may also be provided in a region other than the shear-stopper function region 21A (here, the region above the shear-stopper function region 21A).
[0097] In the pile foundation structure 1G of the seventh embodiment, an embedded portion 3c embedded in the non-liquefaction layer G2 is formed in the ground improvement body 3G, and a slip prevention portion 21 is provided in the foundation pile 2, so that a bearing resistance F2 and a frictional resistance F3 are obtained from the bottom 34 of the improvement body by the compression truss T, and the horizontal force F1 acting on the foundation pile 2 can be borne by the non-liquefaction layer G2.
[0098] In addition, in the seventh embodiment of the pile foundation structure 1G, as in the first embodiment of the pile foundation structure 1 described above, the cross-sectional area of the upper part of the ground improvement body 3G is small and the diameter is reduced, so that the ground improvement work required above the liquefied ground G1 can be reduced, thereby enabling costs to be reduced.
[0099] Furthermore, in the pile foundation structure 1G according to the seventh embodiment, since the soil improvement body 3G has a cone shape, the construction can be efficiently carried out while successively expanding the diameter by a constant amount during construction. Furthermore, in this embodiment, since the shape of the ground improvement body 3G consisting of a cone-shaped body is similar to the triangular part of the ground improvement body 3C in which the compression truss T is formed, the ground improvement range can be reduced to match the compression truss formation angle θ, thereby reducing costs.
[0100] Next, examples carried out to verify the effects of the pile foundation structures 1 to 1G according to the above-described embodiments will be described below.
[0101] (Example) In the examples, model experiments were conducted using test specimens simulating the pile foundation structure of the above-mentioned embodiment, and the effects of bearing pressure and friction at the bottom of the improved body were confirmed. As shown in Fig. 20 and Fig. 21, the test specimens 10 (10A, 10B, 10C) were used to simulate a full-scale steel pipe pile with a pile diameter of 800 mm, a plate thickness of 12 mm, and a pile length of 26 m. The experiment was carried out in three cases: Comparative Example 1, in which the first test specimen 10A with only the steel pipe pile 11 was used; Comparative Example 2, in which the steel pipe pile 11 and the ground improvement body 12 were provided and only the bearing resistance F2 was applied to the bottom part 12a of the improvement body; and Example, in which the steel pipe pile 11 and the ground improvement body 12 were provided and the bearing resistance F2 and the friction resistance F3 were applied to the bottom part 12a of the improvement body. The steel pipe pile 11 and the ground improvement body 12 were integrated by adhesion to represent a state in which the steel pipe pile 11 and the ground improvement body 12 were fixed by the slip prevention part.
[0102] As shown in FIG. 20, the experimental apparatus 100 is a rectangular soil tank 101 in plan view, in which Tohoku silica sand No. 6 (dry sand, relative density 90%) is placed as the simulated ground 102, and the test specimens 10A, 10B, and 10C of each case (Comparative Examples 1 and 2, Example) are placed in the center in plan view. At this time, in Comparative Example 2 and Example, the bottom part 12a of the improved body is buried in the simulated ground 102. In Comparative Example 2, a Teflon (registered trademark) sheet is laid on the ground surface, and a Teflon (registered trademark) sheet is also attached to the bottom part 12a of the improved body, so that the bottom friction (friction resistance F3) is eliminated by sliding between the Teflon (registered trademark) sheets, and only the bearing resistance F2 acts. The simulated ground 102 is a simulation of a non-liquefied layer. The ground equivalent to the liquefied layer located above the non-liquefied layer does not contribute to horizontal resistance during liquefaction, so the ground rigidity is considered to be zero and it is omitted in the experiment. The experimental method was to provide a support 103 at the top end of the steel pipe pile 11 in each case of specimens 10A, 10B, and 10C, and to apply load to this support 103 from both sides in the horizontal direction using a wire 104 with a weight 105 attached. The specific loading method was alternating positive and negative loading (load applied twice at each step) in a 1G field, for a total of seven steps. The pile head was allowed to rotate freely. The applied load (N) was increased with each step.
[0103] Figure 22 shows the relationship between horizontal load and horizontal displacement from the experimental results. In Figure 22, the horizontal axis is the standardized horizontal displacement, and the vertical axis is the standardized horizontal load, which show the results at the maximum positive load in the first cycle at each loading step of the positive-negative alternating loading. Here, the standardized horizontal displacement and the standardized horizontal load are shown as relative values to the standard values set to 1, which are the maximum displacement and maximum load of Comparative Example 1, in which only the steel pipe pile 11 was installed. From the experimental results shown in Figure 22, it was confirmed that, compared to Comparison Example 1 in which only steel pipe piles 11 were installed, Comparison Example 2, in which only bearing resistance was applied to the bottom surface of the improvement body, exerted a horizontal resistance that was about 1.9 times greater, while the embodiment in which bearing resistance and frictional resistance were applied to the bottom surface of the improvement body exerted a horizontal resistance that was about 4.7 times greater.
[0104] Fig. 23 shows the bending moment distribution in the depth direction of the steel pipe pile from the experimental results. In Fig. 23, the horizontal axis is the normalized bending moment and the vertical axis is the depth (m), and the results are shown for the maximum positive load in the first cycle in the loading step with alternating positive and negative loads. Here, the normalized bending moment is normalized to the maximum bending moment of Comparative Example 1, in which only the steel pipe pile 11 was provided, set at 1, and the normalized bending moment is shown as a relative value to this standard value. The depth is also shown as a value converted to actual size. From the experimental results shown in Figure 23, it was confirmed that in Comparative Example 2, in which only bearing resistance was applied to the bottom surface of the improvement body, the bending moment generated in the steel pipe pile was reduced by about 0.8 times compared to Comparative Example 1, in which only steel pipe pile 11 was installed, and in the example in which bearing resistance and frictional resistance were applied to the bottom surface of the improvement body, the bending moment generated in the steel pipe pile was reduced by about 0.3 times.
[0105] The results in Figures 22 and 23 confirm that the seismic performance of the steel pipe pile is improved by the bearing resistance and friction resistance at the bottom of the improvement body.
[0106] Although the embodiment of the pile foundation structure according to the present invention has been described above, the present invention is not limited to the above embodiment and can be modified as appropriate without departing from the spirit of the present invention.
[0107] For example, the improved body bottom 34 is not limited to the uneven shape of the configuration of the above-mentioned embodiment, and the configuration of the unevenness formed in a stepped shape toward the bottom, such as the height, number of steps, installation range, and installation number, can be changed. For example, the stepped uneven shape may be a shape in which many protrusions and recesses are arranged, or a ridge or groove shape. In addition, the unevenness may be a shape consisting of only protrusions or only recesses, the number of steps may be one, and further, the uneven shape may be provided locally.
[0108] Furthermore, the outer diameter, length, and material of the foundation pile 2 can be appropriately set according to conditions such as ground conditions and the load of the structure to be supported.
[0109] In addition, in the above-mentioned embodiments, examples of the shape of the ground improvement body include a multi-stage columnar body, a columnar body with one cross section, a cone columnar body, etc., and examples of the uneven-shaped anti-slip portion formed on the shaft of the foundation pile include a depression, a welded bead, a protrusion formed by rolling, and a perforated steel plate, but combinations of ground improvement bodies of various shapes and anti-slip portions of foundation piles of various configurations can be set as appropriate.
[0110] The shape of the ground improvement body is not limited to the above-mentioned embodiment. For example, the ground improvement body 3 consisting of the multi-stage columnar bodies in the first embodiment has a shape in which one stage 33 consisting of the lower columnar body 31 and the upper columnar body 32 is formed, but two stages or three or more stages may be formed.
[0111] In addition, the components in the above-described embodiments can be replaced with well-known components as appropriate without departing from the spirit of the present invention. [Explanation of symbols]
[0112] 1, 1A~1G pile foundation structure 2 Foundation piles 2a Pile outer surface 2A, 2B stepped steel pipe 2C Dimpled steel pipe 21, 22 Anti-slip portion 21A, 22A Anti-slip functional area 21a Circumferential groove 21b Slant groove 21c groove 22a Weld Bead 22b protrusion 23 Perforated steel plate 3, 3A~3G soil improvement body 34, 34A, 34B improved body bottom 34a, 34b, 34c, 34d Step surface 341, 343, 344 Central convex bottom 342, 345 Outer circumference bottom 346 Convex outer periphery bottom 347 center bottom 3b Improved body top 3c Root Part 31 Hypocolumnar 32 Upper columnar body G1 Liquefied ground G2 Non-liquefiable layer T Compression Truss Ta Compression truss forming area
Claims
1. A foundation pile supporting a structure constructed on liquefied ground; A ground improvement body formed around the foundation pile, The ground improvement body is provided in a state in which the lower end of the ground improvement body is embedded in a non-liquefied layer located below the liquefied ground, The shaft portion of the foundation pile is provided with an uneven-shaped anti-slip portion that functions as an anti-slip portion between the foundation pile and the ground improvement body, At least a part of the anti-slip portion is disposed in the region of the shaft portion that forms a compression truss between the bottom of the ground improvement body and the anti-slip portion; The bottom of the ground improvement body is a pile foundation structure formed into an uneven shape.
2. The pile foundation structure according to claim 1 , wherein the bottom of the ground improvement body has a higher strength than the remaining portions.
3. The pile foundation structure according to claim 1 or 2, wherein the foundation pile is a steel pipe pile.
4. The pile foundation structure according to claim 3 , wherein the steel pipe pile is a stepped steel pipe or a dimpled steel pipe.
5. The pile foundation structure according to claim 1 or 2, wherein the anti-slip portion is formed as a recess on an outer peripheral surface of the foundation pile.
6. The pile foundation structure according to claim 1 or 2, wherein the anti-slip portion is formed by a weld bead fixed to an outer peripheral surface of the foundation pile.
7. The pile foundation structure according to claim 1 or 2, wherein the anti-slip portion is formed on an outer peripheral surface of the foundation pile by rolling.
Citation Information
Patent Citations
Friction pile
JP1987268422A
Bearing structure for foundation pile, and method for constructing foundation pile
JP2002356847A
Pile burying work execution method
JP2004204516A
Foundation construction of structure
JP2005023670A
Supporting structure of foundation pile and steel pipe pile
JP2007032044A
