Underpass method and underground space structure

The method stabilizes underground spaces by using rectangular box-shaped pipe members with friction cut plates and ground improvement, addressing the instability caused by groundwater in existing construction methods.

JP2024143679AActive Publication Date: 2024-10-11OKUMURA CORP +1
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2023056467
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-30
Publication Date
2024-10-11
Estimated Expiration
2043-03-30

AI Technical Summary

Technical Problem

Existing underpass construction methods using box structures struggle to maintain stability in the presence of groundwater due to buoyancy and inflow, leading to instability in the formed underground spaces.

Method used

A method involving a closed propulsion technique using rectangular box-shaped pipe members with friction cut plates, where the top and side roofs are installed and connected vertically and horizontally, with ground improvement techniques to stabilize the structure and prevent groundwater effects.

Benefits of technology

The method allows for the stable installation and maintenance of underground spaces by effectively suppressing groundwater influence, ensuring the box structure remains stable and secure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024143679000001_ABST
    Figure 2024143679000001_ABST
Patent Text Reader

Abstract

To provide an underpass method enabling a box body structure for forming an underground space to be propelled in a more stabled state into the ground including groundwater below an existing underground structure part.SOLUTION: In a step to propel a box body structure 15 having the same rectangular cross sectional shape as a planned installation region 35 surrounded by a friction cut plate member 18 and a lateral surface box-shaped roofs 22 on both sides toward the ground immediately under an existing underground structure 30 so as to be replaced with a top surface box-shaped roof 21, the box body structure 15 is propelled to the ground immediately under the existing underground structure 30 by replacing only the top surface box-shaped roof 21 with a top surface part 15a so that lateral surface parts 15b on both sides are placed along inner lateral surfaces 22a facing between the lateral surface box-shaped roofs 22 on both sides while leaving the lateral surface box-shaped roofs 22 and the friction cut plate member 18 in the underground.SELECTED DRAWING: Figure 7
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an underpass construction method and an underground space structure, and in particular to an underpass construction method and an underground space structure for forming an underground space using a box structure having a rectangular cross-sectional shape in a ground where groundwater exists below an existing underground structure. [Background technology]

[0002] The underpass method is adopted as a method for forming an underground space that crosses existing structures such as existing railways and roads, and examples of the method include the R&C method (registered trademark) (see, for example, Patent Document 1) and the SFT method (registered trademark) (see, for example, Patent Document 2). The underpass method forms a top box roof and a side box roof that support the existing structure from below by continuously installing box-shaped pipe members having a rectangular hollow cross-sectional shape in the ground below the existing structure, which is the planned location for forming the underground space, and then replaces the formed top box roof and side box roof with a box structure having a rectangular cross-sectional shape made of, for example, precast concrete, at the planned location for forming the underground space, thereby forming an underground space by the replaced box structure.

[0003] Furthermore, for example, when attempting to form an underground space using a box structure that crosses an existing underground structure (existing underground structure) in the ground below an existing structure constructed underground, if the ground including the area where the underground space is planned to be formed is ground containing groundwater, it is considered difficult to advance the box structure in a stable state due to the influence of groundwater inflow, buoyancy, etc. Furthermore, an underground space created by a box structure installed on ground containing groundwater is considered to be susceptible to the influence of buoyancy, etc. due to groundwater, particularly until the box structure is connected to the main structure and integrated. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2007-177553 A [Patent Document 2] JP 2012-144942 A [Patent Document 3] Japanese Patent Application Publication No. 6-167595 Summary of the Invention [Problem to be solved by the invention]

[0005] On the other hand, for example, Patent Document 3 describes a method for constructing a large-section underground structure by providing a starting tunnel and an arrival tunnel on both sides of a planned tunnel, pressing a large number of steel pipes into the ground at an appropriate depth while they are in close contact with each other, constructing a pipe roof protective work made of pipe rows lined up horizontally and vertically, and then excavating a concrete box that will become the underground structure from the starting tunnel to the arrival tunnel into the ground inside the constructed pipe roof protective work. This discloses a technology that enables a large-section underground structure made of a concrete box to be formed in a stable state in the area inside the pipe roof rows, with the surroundings protected by the pipe roof row on the top surface made of a plurality of steel pipes lined up horizontally and connected together on the top surface, and the pipe roof rows on both side surfaces made of a plurality of steel pipes lined up vertically and connected together on both side surfaces.

[0006] However, in the invention described in Patent Document 3, the underground structure made of a concrete box, which is protected on all sides by pipe roof protective work consisting of a pipe roof row on the top surface and a pipe roof row on both side surfaces, is not installed on ground where groundwater exists further below the existing underground structure formed underground, and no consideration is given to the effects of groundwater inflow, buoyancy, etc. Therefore, there is a need for the development of new technology for underpass construction methods that enables the box structure for forming an underground space to be advanced in a more stable state while protecting the ground where groundwater exists further below the existing underground structure so as to effectively suppress the effects of groundwater, and that enables the underground space made of a box structure installed on such ground to be maintained in a more stable state.

[0007] The present invention aims to provide an underpass construction method that enables a box structure for forming an underground space to be advanced in a more stable state in ground where groundwater exists further below an existing underground structure while protecting it so as to effectively suppress the effects of groundwater, and that can maintain the underground space created by the box structure installed in such ground in a more stable state, and an underground space structure created by this method. [Means for solving the problem]

[0008] The present invention is an underpass construction method for forming an underground space by a box structure having a rectangular cross section, crossing under an existing underground structure in the ground below the existing underground structure where groundwater exists, the method comprising the steps of: forming a top box roof crossing the part directly below the existing underground structure by connecting a plurality of rectangular box-shaped pipe members, each having a friction cut plate member disposed on its upper surface, in the width direction along the top surface part of the planned installation area of ​​the box structure, and pushing each of them from a work shaft into the ground below the existing underground structure by a closed jacking construction method; forming a side box roof on both sides crossing the ground directly below the existing underground structure by connecting a plurality of pipe members in the vertical direction along both side parts of the planned installation area, and pushing each of them from a work shaft into the ground below the existing underground structure; and performing ground improvement of at least the ground around the side box roof. The above-mentioned objective has been achieved by providing an underpass construction method including a step of advancing the box structure having a rectangular cross section, the box structure being surrounded by the friction-cut plate member left in the ground and the opposing inner surfaces between the side box roofs on both sides, from the work shaft toward the ground directly below the existing underground structure, with the top surface replaced with the top surface box roof, in the step of advancing the box structure toward the ground directly below the existing underground structure, while leaving the side box roofs on both sides and the friction-cut plate member in the ground, so that the side portions on both sides are aligned with the opposing inner surfaces between the side box roofs on both sides, and only the top surface box roof is replaced with the top surface, thereby advancing the box structure into the ground directly below the existing underground structure.

[0009] The underpass construction method of the present invention includes a step of forming a bottom box-shaped roof that crosses the portion directly below the existing underground structure by connecting a plurality of pipe members in the width direction along the bottom portion of the planned installation area, at least in the area adjacent to the side box-shaped roof on both sides, and pushing each of them from a work shaft into the ground below the existing underground structure, and in the step of advancing the box structure toward the ground directly below the existing underground structure, it is preferable that the box structure is advanced into the ground directly below the existing underground structure while leaving the bottom box-shaped roof in place and aligning the bottom portion with the upper surface of the side box-shaped roof.

[0010] In addition, in the underpass construction method of the present invention, it is preferable that the pipe members forming the side box-shaped roof and / or the pipe members forming the bottom box-shaped roof are rectangular box-shaped pipe members.

[0011] Furthermore, in the underpass construction method of the present invention, it is preferable that the process of improving the ground around the side box-shaped roof is carried out by a low-pressure penetration injection method through work performed from inside the multiple rectangular box-shaped pipe members that make up the side box-shaped roof.

[0012] Furthermore, in the underpass construction method of the present invention, the rectangular box-shaped pipe member forming the top box-shaped roof has an approximately quadrilateral hollow cross-sectional shape and consists of a U-shaped upper flat piece and a U-shaped lower piece that are detachably connected vertically at the upper end portions of each of the side plate portions on both sides, and after the top box-shaped roof is installed on the ground below the existing underground structure, when the box structure is advanced, the U-shaped lower piece is separated from the U-shaped upper flat piece and replaced with the top part of the box structure, and the U-shaped upper flat piece is left in the ground to function as the friction cut plate member.

[0013] In addition, it is preferable that the underpass construction method of the present invention is implemented as an R&C construction method (registered trademark) in which excavation work is carried out at the face at the front portion of the box structure.

[0014] Furthermore, the present invention achieves the above-mentioned object by providing an underground space structure constructed by the above-mentioned underpass construction method, in which a plurality of pipe members are arranged vertically in series along both side portions of the box structure which forms an underground space that crosses beneath the existing underground structure, together with an improved ground.

[0015] Furthermore, the present invention achieves the above-mentioned object by providing an underground space structure formed by the above-mentioned underpass construction method, in which a plurality of pipe members are installed in a vertically connected manner along both side portions of the box structure which forms an underground space crossing beneath the existing underground structure, together with an improved ground, and a plurality of pipe members are installed in a horizontally connected manner along the bottom portion, at least in the area adjacent to the box-shaped roof of the side portions on both sides.

[0016] Furthermore, it is preferable that the underground space structure of the present invention is such that a solidification material is filled and solidified inside the multiple pipe members arranged in series vertically along the side portions on both sides of the box structure, and inside the multiple pipe members arranged in series widthwise along the bottom portion. Effect of the Invention

[0017] According to the underpass construction method or underground space structure of the present invention, it is possible to advance a box structure for forming an underground space in a more stable state in the ground where groundwater exists further below the existing underground structure while protecting it so as to effectively suppress the effects of the groundwater, and it is possible to maintain the underground space created by the box structure installed in such ground in a more stable state. [Brief description of the drawings]

[0018] [Figure 1] FIG. 1A is a schematic longitudinal sectional view illustrating the process of forming a working shaft and the process of performing ground improvement work on the mirror section in an underpass construction method according to a preferred embodiment of the present invention, and FIG. 1B is a schematic transverse sectional view along AA in FIG. [Diagram 2] 10 is a schematic vertical cross-sectional view illustrating a process for forming a box-shaped roof of the top surface portion. FIG. [Diagram 3] FIG. 1A is a schematic longitudinal cross-sectional view illustrating the process of forming a box-shaped roof on the top surface, the process of forming a box-shaped roof 22 on the side surface, and the process of forming a box-shaped roof on the bottom surface. FIG. 1B is a schematic transverse cross-sectional view taken along the line A'-A' in FIG. [Figure 4] FIG. 2 is a simplified perspective view illustrating a roof supporting steel shell installed at the tip of the box structure. [Diagram 5] FIG. 11 is a schematic vertical cross-sectional view illustrating the formation of a box structure inside a work shaft. [Figure 6] FIG. 13 is a simplified perspective view illustrating a situation in which a box structure is formed inside a work shaft. [Figure 7] FIG. 11 is a schematic vertical cross-sectional view illustrating the process of advancing a box structure toward the ground directly below an existing underground structure. [Figure 8] 1 is a simplified oblique view illustrating the process of advancing a box structure toward the ground directly below an existing underground structure. FIG. [Figure 9] 1 is a schematic vertical cross-sectional view illustrating an underground space created by a box structure formed across an existing structure. FIG. [Figure 10] 1 is a simplified perspective view illustrating an underground space created by a box structure formed across an existing structure. FIG. [Figure 11] FIG. 1A is a cross-sectional view of a box-shaped pipe member, and FIG. 1B is a cross-sectional view of a state in which a U-shaped upper flat piece and a U-shaped lower piece are separated. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0019] As shown in Figs. 1(a) and 1(b), the underpass construction method according to a preferred embodiment of the present invention is adopted as a construction method for forming an underground space 26 (see Figs. 9 and 10) for a new subway in the ground below an existing facility structure for a subway as an existing underground structure 30, for example, by using a box structure 15 (see Figs. 7 and 8) installed across the part directly below the existing underground structure 30. In addition, in this embodiment, the R&C construction method (registered trademark) is adopted as the underpass construction method, which advances the box structure 15 while excavating the ground left in the inner area surrounded by the box roof 20 at the face 28 (see Fig. 7), and since the existing facility structure 40 is also formed as an underground structure on the arrival side of the box roof 20 and the box structure 15 sandwiching the existing underground structure 30, only the shaft on the starting side is used as a work shaft 31, and each work process is carried out without providing a shaft on the arrival side. Since only the starting shaft is used as the working shaft 31, the box-shaped pipe members 17 constituting the box-shaped roof 20 are retrieved into the working shaft 31, for example, for each unit U-shaped lower piece 19a described below, as in the underground structure construction method described in, for example, JP-A-2001-72670, while the box structure 15 is advanced into the ground below the existing underground structure 30 so as to replace it (see Figs. 7 and 8). Note that in Figs. 3 to 8, the box-shaped roof 20 is shown in a state in which the ground (earth and sand) left inside it is omitted.

[0020] Furthermore, in this embodiment, groundwater is present in the ground below the existing underground structure 30, and the underpass construction method of this embodiment, even when an underground space 26 using the box structure 15 is formed in ground where such groundwater is present, makes it possible to advance the box structure 15 for forming the underground space 26 in a more stable state while protecting it so as to effectively suppress the effects of the groundwater, and makes it possible to maintain the underground space 26 using the box structure 15 installed in such ground in a more stable state.

[0021] The underpass method of the present embodiment is an underpass method, preferably by the R&C method (registered trademark), for forming an underground space 26 by a box structure 15 having a rectangular cross-sectional shape across an existing underground structure 30 in the ground where groundwater exists below the existing underground structure 30, and includes a process of forming a top box roof 21 across the portion directly below the existing underground structure 30 by pushing a plurality of rectangular box-shaped pipe members 17, each of which has a friction cut plate member 18 disposed on its upper surface, in series in the width direction along a top surface portion 35a of a planned installation area 35 of the box structure 15 from a working shaft 31 into the ground below the existing underground structure 30 by a closed jacking method (see FIG. 2 ); The method includes a step of forming side box-shaped roofs 22 on both sides that cross the ground directly below the existing underground structure 30 by pushing the friction-cut plate members 17' vertically in series and each into the ground below the existing underground structure 30 from the work shaft 31, a step of improving the ground at least around the side box-shaped roof 22 (see Figures 3(a) and (b)), and a step of advancing a box structure 15 having a similar rectangular cross-sectional shape and a planned installation area 35 surrounded by friction-cut plate members 18 left in the ground and the inner surfaces 22a facing each other between the side box-shaped roofs 22 on both sides, from the work shaft 31 toward the ground directly below the existing underground structure 30, with the top surface 15a replaced by the top surface box-shaped roof 21 (see Figures 7 and 8). In the process of advancing the box structure 15 toward the ground directly below the existing underground structure 30, the box-shaped roofs 22 on both sides and the friction-cut plate members 18 are left in the ground, and the side portions 15b (see Figure 10) on both sides are aligned with each inner surface 22a (see Figure 3(b)) facing between the box-shaped roofs 22 on both sides, while only the top box roof 21 is replaced with the top portion 15a, so that the box structure 15 is advanced toward the ground directly below the existing underground structure 30.

[0022] In addition, in this embodiment, the process includes a process in which a plurality of pipe members 17" are arranged in a horizontal direction, preferably along the bottom portion 35c of the planned installation area 35, in at least the area adjacent to the side box roof 22 on both sides, and each is pushed from the work shaft 31 into the ground below the existing underground structure 30 to form a bottom box roof 23 that crosses the portion directly below the existing underground structure 30 (see Figures 3(a) and (b)).In the process of advancing the box structure 15 toward the ground directly below the existing underground structure 30, the box structure 15 is advanced into the ground directly below the existing underground structure 30 while leaving the bottom box roof 23 in place and aligning the bottom portion 15c (see Figure 10) with the upper side surface 23a of the bottom box roof 23.

[0023] Furthermore, in this embodiment, the rectangular box-shaped pipe member 17 which preferably forms the top box-shaped roof 21 has an approximately quadrilateral hollow cross-sectional shape, as shown in Figures 11(a) and (b), and consists of a U-shaped upper flat piece 18 and a U-shaped lower piece 19 which are detachably connected vertically at the upper end portions of the side plate portions 17a on both sides.After the top box-shaped roof 21 is installed on the ground below the existing structure 30, when the box structure 15 is advanced, the U-shaped lower piece 19 is separated from the U-shaped upper flat piece 18 and replaced with the top portion 15a of the box structure 15, while the U-shaped upper flat piece 18 is left in place to function as a friction-cut plate member (see Figure 7).

[0024] In this embodiment, a process of forming a work shaft 31 as a work base is carried out on one side of the existing underground structure 30, preferably by the R&C method, prior to the work of forming an underground space 26 by a box structure 15 in the ground below the existing underground structure 30 (see FIG. 1). In this embodiment, as described above, since an existing facility structure 40 is formed on the other side of the existing underground structure 30, the work shaft 31 is formed only on one side, and each work process of the R&C method is carried out. The work shaft 31 can be easily formed by forming a retaining wall 32 using ground improvement and sheet piles, preferably by the SMW method, which is excellent in water-stopping properties, and excavating the inside of the wall to a predetermined depth while retaining the earth. The surface on the work shaft 31 side is protected by sheet piles and supported by supports such as struts. In the formed work shaft 31, propulsion equipment for propelling the box-shaped pipe member 17 and the box structure 15, equipment for injecting chemical solutions for improving the ground around the side box roof 22, and removal equipment for removing the box-shaped pipe member 17 in units of U-shaped lower pieces 19a will be installed as appropriate (see Figures 7 and 8).

[0025] In this embodiment, preferably, after the SMW construction method for forming the earth retaining wall 32 of the working shaft 31 is performed, a step of improving the ground of the mirror part is performed prior to excavating the inside of the wall, in order to form the improved ground 33, 34 of the mirror part by ground improvement in the ground at both ends of the planned installation area 35 of the box structure 15 in the direction crossing the underside of the existing structure 30. The mirror part improved ground 33, 34 can be formed in an area including a height portion similar to that of the planned installation area 35 of the box structure 15 in the ground on both sides of the existing underground structure 30. The mirror part improved ground 33, 34 is formed in the starting part of the end of the earth retaining wall 32 side of the working shaft 31 as both ends of the planned installation area 35 of the box structure 15, and the arrival side mirror part improved ground 34 is formed in the arrival part of the end of the existing facility structure 40 side (see FIG. 1). The head section improved ground 33, 34 can be easily formed by vertical ground improvement work by injecting chemicals from above ground with high pressure jets, similar to the head section ground improvement work in the shield tunneling method. The head section ground improvement process can also be carried out before the SMW method for forming the earth retaining wall 32 is carried out. Also, if the groundwater level is lower than the top of the planned installation area 35, it may be carried out instead of the ground improvement of the earth retaining wall 32.

[0026] After the work shaft 31 and the improved ground 33, 34 have been formed, in this embodiment, as shown in Figures 2 and 3(a) and (b), a known thrusting facility (not shown) is installed in the work shaft 31, and, similar to the conventional R&C method, each of the multiple rectangular box-shaped pipe members 17 having friction cut plate members 18 arranged on their upper surfaces is connected in the width direction along the top portion 35a of the planned installation area 35 of the box structure 15, and is pushed from the work shaft 31 into the ground below the existing structure 30 by a consolidation thrusting method, thereby forming a top box-shaped roof 21 that crosses the portion directly below the existing underground structure 30 (see Figure 2). Each of the rectangular box-shaped pipe members 17 forming the top box-shaped roof 21 has a generally quadrilateral hollow cross-sectional shape (a generally square hollow cross-sectional shape in this embodiment) preferably with a horizontal width of about 800 to 1400 mm and a vertical width of about 800 to 1400 mm, and has a space inside large enough for workers to enter and work. In this embodiment, the friction cut plate member 18 disposed on the upper surface of the rectangular box-shaped pipe member 17 is preferably made of a U-shaped upper flat piece 18 of the rectangular box-shaped pipe member 17.

[0027] In addition, in this embodiment, a process is carried out in which a plurality of pipe members 17' are vertically connected along both side portions 35b in the planned installation area 35 of the box structure 15, and are pushed into the ground below the existing underground structure 30 from the work shaft 31, thereby forming both side box roofs 22 that cross the ground directly below the existing underground structure 30. In addition, a plurality of side box roofs 22 are preferably formed along the bottom portion 35c of the planned installation area 35, at least in the area adjacent to the both side box roofs 22. A process of forming a bottom box roof 23 that crosses the portion directly below the existing underground structure 30 is carried out by connecting several pipe members 17" in the width direction and pushing each of them from the work shaft 31 into the ground below the existing underground structure 30 (see Figures 3(a) and (b)). This makes it possible to form a box roof 20 that includes not only the top box roof 21 and the side box roof 22 that cross the portion directly below the existing structure 30, but also preferably the bottom box roof 23 at the corner portions at both ends.

[0028] Here, the pipe members 17', 17" forming the side box roof 22 and the bottom box roof 23 can have a hollow, approximately square cross-sectional shape with dimensions of, for example, approximately 800 to 1400 mm in length and width, similar to the rectangular box-shaped pipe member 17 forming the top box roof 21. In this embodiment, the pipe members 17', 17" forming the side box roof 22 and the bottom box roof 23 are left buried in the ground without being retrieved into the work shaft 31 (see Figure 10). For this reason, the pipe members 17', 17" which form the side box roof 22 and the bottom box roof 23 can also be pipe members having a cross-sectional shape different from the rectangular box-shaped pipe member 17, such as cylindrical pipe members. In this embodiment, these pipe members 17', 17" and the above-mentioned rectangular box-shaped pipe member 17 can be installed underground with an appropriate length, for example, by sequentially adding unit box-shaped pipes divided into lengths of 3 m, with an extension sufficient to cross the ground directly below the existing underground structure 30.

[0029] In addition, in the embodiment, since groundwater is present in the ground below the existing underground structure 30 through which the rectangular box-shaped pipe member 17 and the pipe members 17', 17" are advanced, these pipe members 17, 17', 17" are advanced and pushed into the ground below the existing underground structure 30 by a sealed tunneling method in which a fully sealed drilling device is attached to the tip of the pipe members to prevent groundwater from entering the interior. As an excavation device that seals the entire tip portion of these pipe members 17, 17', 17", for example, the tunneling machines described in JP 2022-134305 A and JP 2022-134306 A can be used. These excavation devices can be removed from the tip portions of the pipe members 17, 17', 17". Therefore, after the tip portion of the propelled pipe member 17, 17', 17" reaches the mirror-improved ground 34 at the tip reach portion, forward in the propulsion direction between the existing underground structure 30, it can be removed from the tip portion and repurposed for use as another pipe member 17, 17', 17".

[0030] In this embodiment, the rectangular box-shaped roof pipe 17 forming the top box-shaped roof 21 has a hollow cross-sectional shape that is approximately quadrilateral (approximately square) as described above, and is formed to a predetermined length by axially connecting and integrating a number of unit box-shaped roof pipes, each having a length of, for example, about 3 m, using known joining means such as bolt joints or pin joints.

[0031] In this embodiment, the unit box-shaped roof pipe is formed by joining a plurality of unit U-shaped lower pieces 19a (see Figs. 7 and 8) shorter than the unit U-shaped upper flat piece having a predetermined length, for example 3 m, separably above and below the unit U-shaped upper flat piece in an axially integrated state. As a result, as will be described later, the U-shaped lower piece 19 of the rectangular box-shaped roof pipe 17 forming the top box-shaped roof 21 can be sequentially removed from the unit U-shaped lower piece 19a at the rear end to the inside of the box structure 15, while leaving the U-shaped upper flat piece 18 made of the unit U-shaped upper flat piece, which is a friction-cut plate member, in the ground. Before being removed, these unit U-shaped lower pieces 19a can be axially connected and integrated below the unit U-shaped upper flat piece using known joining means such as bolt joints or pin joints.

[0032] After the box roof 20, which includes the top box roof 21 and the side box roof 22, and preferably the bottom box roof 23 at the corners of both ends, is formed, the ground around at least the side box roof 22 is improved by, for example, a low pressure seepage injection method, for example, from the vertical shaft 31. If the pipe members 17' constituting the side box roof 22 have a space inside that workers can enter, this can be preferably done from inside the pipe members 17'. By improving the ground around at least the side box roof 22, it is possible to prevent groundwater from flowing into the inside of the side box roof 22 when the box structure 15 is advanced. It is also possible to effectively improve the ground inside the box roof 20 so that it is hard enough to prevent the ground from collapsing during excavation and to make excavation easy. If the work shaft 31 is small and there is insufficient space to carry out ground improvement work between the area outside the side box-shaped roof 22 and the area outside the side box-shaped roof 22, ground improvement work can be carried out from the pipe member 17' for the area outside the side box-shaped roof 22, and from the work shaft 31 for the planned installation area 35 inside the side box-shaped roof 22.

[0033] In this embodiment, the ground around the top box roof 21 and the bottom box roof 23 can be improved by, for example, working from the working shaft 31, preferably by carrying out a low-pressure seepage injection method. Ground improvement of the ground around the top box roof 21 and the bottom box roof 23 can also be carried out by working from inside the rectangular box roof pipe 17 or pipe member 17". By improving the ground around the top box roof 21 and the bottom box roof 23, it becomes possible to more effectively prevent groundwater from flowing inside the box roof 20 when the box structure 15 is advanced.

[0034] In this embodiment, the pipe members 17, 17', 17" constituting the top box roof 21, the side box roof 22 and the bottom box roof 23 are each pushed into the ground in the presence of groundwater, and the pipe members 17, 17', 17" are driven into the ground by a closed jacking method that does not open the face. Therefore, each of the pipe members 17, 17', 17" does not have a section (joint) on the outer periphery for locking and joining adjacent pipe members, and gaps are likely to occur between them. For this reason, it is preferable that ground improvement be carried out on the surrounding ground around the entire box roof 20 consisting of the top box roof 21, the side box roof 22 and the bottom box roof 23 so that water-stopping treatment can be performed more effectively on the ground in the gaps between them.

[0035] Here, the low-pressure infiltration injection method is known as a low-pressure infiltration injection method using a medium-setting to instant-setting grout, which is gradually injected from the front of the target ground to the back at each stage. The low-pressure infiltration injection method uses a lightweight and small drilling machine and tool, so it is possible to work in narrow places where a boring machine cannot be brought in, and it is a method that can effectively inject into compact sandy ground or complex ground with sand layers. In addition, since a medium-setting to instant-setting grout is injected at low pressure, a low-pressure infiltration effect is obtained, and there is almost no impact on ground uplift or surrounding structures, and since it can be improved at each stage by the downward injection method, it is also possible to carry out construction while checking the injection effect (spring water situation, etc.). Furthermore, the improved ground has a moderate hardness that makes it easy to excavate. As such a low-pressure infiltration injection method, for example, the "stage injection method" manufactured by Japan Sogo Waterproof Co., Ltd. can be adopted.

[0036] In this embodiment, after carrying out a process of improving the ground at least around the side box-shaped roof 22, as shown in Figures 5 to 8, a process is carried out in which a planned installation area 35 with a rectangular cross-section, which is surrounded by friction-cut plate members 18 left in the ground and each of the inner surfaces 21a facing each other between the side box-shaped roofs 22 on both sides, and a box structure 15 having a similar rectangular cross-sectional shape, are advanced from the work shaft 31 toward the ground directly below the existing underground structure 30, with the top surface 15a replaced by the top surface box-shaped roof 21. In addition, in the process of advancing the box structure 15 toward the ground directly below the existing underground structure 30, the box-shaped roofs 22 on both sides and the friction-cut plate members 18 are left in the ground, and the side portions 15b on both sides (see Figure 10) are aligned with each inner surface 22a (see Figure 3(b)) facing between the box-shaped roofs 22 on both sides, while only the top box roof 21 is replaced with the top portion 15a, so that the box structure 15 is advanced toward the ground directly below the existing underground structure 30, thereby forming an underground space 26 by the box structure 15 (see Figures 9 and 10).

[0037] In this embodiment, the box structure 15 is configured by connecting a plurality of precast concrete box pieces 16 for underpasses as unit boxes in the advancing direction. In the process of advancing the box structure 15 toward the ground directly below the existing underground structure 30, the precast concrete box pieces 16 for underpasses are installed one by one in the work shaft 31 (see Figs. 5 and 6), and the installed underpass box pieces 16 are pushed forward together with the previously pushed out box pieces (unit box pieces) 16 for underpasses, so that the box structure 15 is advanced toward the ground directly below the existing underground structure 30 with only the top surface box roof 21 replaced with the top surface 15a. In addition, by excavating the ground below the top box roof 21 (the ground inside the box roof 20) at the face 28 on the working shaft 31 side, the unit U-shaped lower pieces 19a located at the rear end portion of the box-shaped pipe member 17, which is exposed and protrudes rearward, and which face the top surface 16a of the underpass box body piece 16, can be removed successively, starting from the rear end portion, preferably via the roof supporting steel shell 11 (see Figure 4) (see Figures 7 and 8).

[0038] That is, in this embodiment, preferably the side box-shaped roof 22 and the bottom box-shaped roof 23 are left in the ground, and the unit U-shaped lower piece 19a of the unit box pipe of each rectangular box-shaped pipe member 17 that constitutes the top box-shaped roof 21 is replaced with the top portion 15a of the box structure 15, and the box structure 15 made up of a plurality of connected underpass box pieces 16 is propelled from the work shaft 31 toward the ground directly below the existing structure 30 by a propulsion equipment 27 installed in the work shaft 31, with a roof support steel shell 11 (see Figure 4) for recovering the unit U-shaped lower piece 18b attached to its tip.

[0039] In this embodiment, since each step of the R&C method is carried out in, for example, a narrow space, the work shaft 31, the box structure 15 is formed by underpass box pieces 16, which are multiple unit boxes made of precast concrete that are continuously connected and integrated in the axial direction (propulsion direction) (see Figs. 5, 7, and 9). Each underpass box piece 16 is formed by assembling precast pieces 16b, which are multiple divided pieces divided in the circumferential direction, as a single unit in the work shaft 31 (see Fig. 6), so that it has a thickness, for example, equivalent to the jack stroke of the propulsion equipment 27, preferably about 1 m. That is, each underpass box piece 16 can be formed by assembling the precast pieces 16b, which are multiple divided pieces divided in the circumferential direction, in the work shaft 31, so as to have a rectangular shape in the work shaft 31, behind the box-side rectangular frame 13 that constitutes the roof support steel shell 11 described later and that has been previously assembled in the work shaft 31, as shown in Figs. 5 and 6. The formed underpass box pieces (unit box bodies) 16 are connected in the axial direction and, together with the roof supporting steel shell 11 at the end, are pushed out toward the ground directly below the existing structure 30 as the box structure 15 by a propulsion device 27 installed in the work shaft 31 (see Figure 7).

[0040] That is, for example, the underpass box pieces 16 formed for each jack stroke of the propulsion equipment 27 are successively connected and assembled from the rear side of the box structure 15 in the propulsion direction of the box structure 15 as constituent members of the box structure 15, in the same manner as in the conventional R&C method. The box structure 15 thus formed is propelled together with the roof supporting steel shell 11 installed at the tip from the working shaft 31 toward the ground directly below the existing structure 30, while replacing the unit U-shaped lower pieces 19a of the unit box pipes of the rectangular box pipe members 17 constituting the top box roof 21 with the top surface 15a, and while leaving the U-shaped upper flat pieces 18 of the rectangular box pipes 17 in the ground as friction cut plate members. This makes it possible to form an underground space 26 created by the box structure 15 in the ground directly below the existing structure 30 by traversing the ground directly below it (see Figures 9 and 10).

[0041] Here, in this embodiment, the box structure 15 and the underpass box piece 16 are surrounded by friction cut plate members 18 left in the ground and each of the inner surfaces 22a facing each other between the side box roofs 22 on both sides (see Figure 3 (b)), and have a similar rectangular cross-sectional shape or rectangular front shape to the planned installation area 35 having a rectangular cross-section, and the box structure 15 is adapted to be propelled from the work shaft 31 toward the ground directly below the existing underground structure 30, with the top surface 25a replaced by the top surface box roof 21. In the process of driving the box structure 15 toward the ground directly below the existing underground structure 30, the box roofs 22 on both sides and the friction cut plate members 18 are left in the ground, and the side portions 15b on both sides are aligned with the inner sides 22a facing each other between the box roofs 22 on both sides, while only the top box roof 21 is replaced with the top portion 15a, so that the box structure 15 is driven toward the ground directly below the existing underground structure 30 (see FIG. 10). Preferably, the box roof 23 on the bottom side is left in place, and the bottom portion 15c is aligned with the upper side surface 23a of the bottom box roof 23, while the box structure 15 is driven toward the ground directly below the existing underground structure 30.

[0042] As a result, in this embodiment, the box structure 15 can be advanced in a stable state to the ground directly below the existing underground structure 30 while being guided by the side box roofs 22 on both sides, and preferably the bottom portion 15c is supported by the upper side surface 23a of the bottom box roof 23, and the box structure 15 is advanced along this, so that the box structure 15 can be advanced in a more stable state to the ground directly below the existing underground structure 30. In particular, since the ground around the side box roofs 22 on both sides has been improved and the water-stopping properties have been improved, the box structure 15 for forming the underground space 26 can be effectively protected, and the box structure 15 can be effectively prevented from being affected by the inflow of groundwater, buoyancy, etc.

[0043] Furthermore, in this embodiment, as described above, preferably as an underpass construction method using the R&C method, as shown in Figure 7, the box structure 15 is advanced while excavating the ground inside the box-shaped roof 20 at the face 28, and only the starting shaft is used as the work shaft 31. Therefore, in the process of advancing the box structure 15 toward the ground directly below the existing underground structure 30, the unit U-shaped lower pieces 19a constituting the U-shaped lower pieces 19 of the unit box-shaped pipes of each box-shaped pipe member 17 forming the top box-shaped roof 21 are sequentially retrieved to the work shaft 31 via the roof supporting steel shell 11, while the box structure 15 is advanced into the ground below the existing underground structure 30.

[0044] That is, in this embodiment, a roof supporting steel shell 11 is provided at the leading end of the box structure 15 made of a plurality of underpass box pieces 16 in the propulsion direction, and includes a pair of rectangular frames 12, 13 having an outer peripheral shape that conforms to the cross-sectional shape of the box structure 15, and is interposed between the box roof 20 and the box roof 20 (see Figs. 5 to 7). As shown in Fig. 4, the roof supporting steel shell 11 includes the roof side rectangular frame 12 and the box side rectangular frame 13, and a plurality of connecting steel members 14 that join and integrate these rectangular frame members 12, 13 in a state where they are arranged in parallel. The roof supporting steel shell 11 includes the roof side rectangular frame 12 and the box side rectangular frame 13, and a plurality of connecting steel members 14 that join and integrate these rectangular frame members 12, 13 in a state where they are arranged in parallel. The presence of the roof supporting steel shell 11 maintains a gap between the rectangular frames 12, 13 that allows the unit U-shaped lower piece 19a of the box-shaped roof pipe 17 to pass through and allows workers to enter.

[0045] In this embodiment, the upper edge steel members 12a, 13a of the roof-side rectangular frame 12 and the box-side rectangular frame 13 in the roof supporting steel shell 11 are preferably installed so that their upper surfaces are located at the same height as the lower surface of the top box-shaped roof 21 installed earlier, so that the rear end portion of the top box-shaped roof 21 is preferably placed on the upper edge steel member 12a of the roof-side rectangular frame 12 (see FIG. 7), which makes it possible for the roof supporting steel shell 11 to firmly and stably support the rear end portion of the top box-shaped roof 21 from below. In addition, the box-side rectangular frame 13 abuts against the front surface of the box structure 15, making it possible for the roof supporting steel shell 11 to smoothly advance together with the box structure 15 as the box structure 15 advances. At the tip portion of the box structure 15, the roof supporting steel shell 11 can be positioned inside the tip cutting edge members attached to both sides of the box structure 15, and it is also possible to attach tip cutting edge members to both sides of the roof supporting steel shell 11 so that the ground at the face 28 can be excavated.

[0046] Furthermore, in this embodiment, as described above, when the box structure 15 is advanced while the ground inside the box roof 20 is excavated at the face 28, each of the unit U-shaped lower pieces 19a constituting the U-shaped lower pieces 19 of the unit box pipes located at the rear ends of each of the rectangular box pipe members 17 forming the top box roof 21, which protrude directly above the gaps between the roof side rectangular frame body 12 and the box side rectangular frame body 13 of the roof supporting steel shell 11, can be sequentially retrieved and removed inside the box structure 15 through these gaps (see Figures 7 and 8).

[0047] Furthermore, in this embodiment, when removing the unit U-shaped lower piece 19a, the load from above on the portion between the tip of the box structure 15 and the face 28 can be supported from below by the U-shaped upper flat piece 18, which functions as a friction-cut plate member and has a tip portion placed on the top surface 15a of the box structure 15 preferably via a load-bearing roller member (see FIG. 7). In this embodiment, as shown in FIGS. 11(a) and 11(b), the U-shaped upper flat piece 18 has a flat U-shaped cross-sectional shape with both side portions bent downward, and therefore has considerable rigidity compared to a flat friction-cut plate, making it possible to support the load from above in a stable state. In addition, in this embodiment, the U-shaped upper flat pieces 18, which remain connected to each other, have band-shaped height adjustment hardware 18a fixed to the underside of the top plate, and these height adjustment hardware 18a further increase the rigidity, making it possible to support loads from above in a more stable state.

[0048] In this embodiment, as described above, in the process of advancing the box structure 15 toward the ground directly below the existing underground structure 30, the box structure 15 made of the underpass box pieces 16 is pushed forward as a whole by the length of the unit U-shaped lower pieces 19a constituting the U-shaped lower pieces 19 arranged in the rear end portions of the rectangular box-shaped pipe members 17 forming the top surface box roof 21, facing the top surface 16a of the underpass box piece 16. By repeating the process of removing these unit U-shaped lower pieces 19a and the process of pushing out the box structure 15, at least the top surface 15a is replaced with the top surface box roof 21, and an underground space 26 (see Figures 9 and 10) made of the box structure 15 obtained by connecting and integrating the multiple underpass box pieces 16 is formed in the ground directly below the existing underground structure 30.

[0049] As a result, the underground space structure 50 of this embodiment, in which a plurality of pipe members 17' constituting the side box-shaped roof 22 are arranged vertically in series along the side portions 15b on both sides of the box structure 15 that forms the underground space 26 that crosses below the existing underground structure 30 and left in place together with the improved ground, is provided in the ground directly below the existing underground structure 30 (see Figure 10).

[0050] In the underground space structure 50 constructed in this manner, the box structure 15 forming the underground space 26 is protected by the surrounding ground that has been improved, particularly by the box-shaped roofs 22 on both sides, and water-stopping properties are improved. This effectively prevents the box structure 15 from being affected by groundwater due to its inflow or buoyancy, making it possible to maintain the underground space 26 formed by the box structure 15 installed on ground where groundwater is present in a more stable state for a long period of time. Furthermore, in the underground space structure 50 of this embodiment, a plurality of pipe members 17" constituting the bottom box-shaped roof 23 are left connected in the width direction together with the surrounding improved ground, at least in the area adjacent to the side box-shaped roof 22 on both sides along the bottom portion 15c of the box structure 15 that forms the underground space 26 that preferably crosses below the existing underground structure 30. This more effectively prevents the box structure 15 from being affected by groundwater due to groundwater inflow, buoyancy, etc., and makes it possible to maintain the underground space formed by the box structure installed on ground where groundwater is present in a more stable state for a long period of time.

[0051] It is preferable to fill the insides of the multiple pipe members 17' that constitute the side box-shaped roof 22, which are connected vertically along the side portions 15b on both sides of the box structure 15, and the multiple pipe members that constitute the bottom box-shaped roof 23, which are connected horizontally along the bottom portion 15c, with a solidifying material and allow it to solidify.

[0052] As a result, according to the underpass construction method or underground space structure 50 of this embodiment, the box structure 15 for forming the underground space 26 in the ground below the existing underground structure 30 where groundwater exists can be advanced in a more stable state while protecting it so as to effectively suppress the effects of the groundwater, and the underground space 26 formed by the box structure 15 installed in such ground can be maintained in a more stable state.

[0053] In this manner, in this embodiment, the box structure 15 is advanced into the ground, and the tip of the box structure 15 reaches, for example, the improved ground 34 at the destination side mirror section on the forward side in the advancing direction across the existing structure 30, thereby forming an underground space 26 by the box structure 15 installed across the portion directly below the existing underground structure 30 (see Figs. 8 and 9). The formed underground space 26 can be used in communication with the existing facility structure 40, for example, by removing the side wall 40a of the other existing facility structure 40 at a portion corresponding to the underground space 26 (see Fig. 9).

[0054] The present invention is not limited to the above embodiment and can be modified in various ways. For example, the existing underground structure in which an underground space is formed by a box structure in the ground below may be an existing underground structure for a subway or an existing underground structure for a road, or may be various other existing underground structures such as a basement of a building or a sewer pipe. In addition, the pipe members forming the box roof and the box structure may be provided with a work shaft on the arrival side of the existing underground structure, and may be advanced toward the work shaft on the arrival side. When a work shaft is provided on the arrival side, the present invention can also be implemented in the SFT method (registered trademark), which removes the ground and earth left inside the box roof in the work shaft on the arrival side as an underpass construction method. In addition, the existing structure does not necessarily have to be an underground structure. [Explanation of symbols]

[0055] 11 Roof support steel shell 12 Roof side rectangular frame 12a Upper steel material 13 Rectangular frame on box side 13a Upper steel material 14 Connecting steel 15 Box structure 15a Top section 15b Side part 15c bottom part 16 Underpass box piece (unit box) 16a Top section 16b Precast piece 17,17',17” Box pipe members 18 U-shaped upper flat piece (friction cut plate component) 19 U-shaped lower piece 19a Unit U-shaped lower piece 20 Box Roof 21 Top box roof 22 Side box roof 22a Inside surface 23 Bottom box roof 23a Top side 26 Underground space 27 Propulsion equipment 28 Face 30 Existing underground structures 31 Working Shaft 32 Earth retaining wall 33 Improved ground for the launch mirror 34 Reach side mirror section improved ground 35 Planned installation area of ​​box structure 35a Top surface 35b Side part 35c bottom part 40 Existing structures on the approaching side 40a Side walls of the part corresponding to the underground space 50 Underground space structure B Working space width

Claims

1. An underpass construction method for forming an underground space by a box structure having a rectangular cross-sectional shape, crossing under an existing underground structure in a ground where groundwater exists under the existing underground structure, a step of forming a top box-shaped roof that crosses the portion directly below the existing underground structure by pushing a plurality of rectangular box-shaped pipe members, each of which has a friction-cut plate member disposed on its upper surface, in a lateral direction along the top surface of the planned installation area of ​​the box structure from a working shaft into the ground below the existing underground structure by a closed jacking method; A process of forming a box-shaped roof on both sides of the planned installation area by pushing a plurality of pipe members vertically in series along the side portions on both sides of the planned installation area from a work shaft into the ground below the existing underground structure, the box-shaped roof being formed on both sides across the ground directly below the existing underground structure; A step of improving the ground around at least the side box roof; The planned installation area has a rectangular cross section and is surrounded by the friction cut plate member left in the ground and the inner surfaces facing each other between the side box roofs on both sides. The box structure has a similar rectangular cross section, and the top surface of the box roof is replaced with the top surface box roof, and the box structure is advanced from the work shaft toward the ground directly below the existing underground structure. In the process of advancing the box structure toward the ground directly below the existing underground structure, the side box roofs on both sides and the friction cut plate members are left in the ground, and the side portions on both sides are aligned with the opposing inner sides between the side box roofs on both sides, while only the top box roof is replaced with the top part, so that the box structure is advanced toward the ground directly below the existing underground structure.This is an underpass construction method.

2. The method includes a step of forming a bottom box roof that crosses the portion directly below the existing underground structure by pushing a plurality of pipe members in a width direction along the bottom portion of the planned installation area, at least in the area adjacent to the side box roof on both sides, from a work shaft into the ground below the existing underground structure, An underpass construction method as described in claim 1, in which, in the process of advancing the box structure toward the ground directly below the existing underground structure, the box structure is advanced into the ground directly below the existing underground structure while leaving the bottom box-shaped roof in place and aligning the bottom portion with the upper side of the side box-shaped roof.

3. 3. An underpass construction method according to claim 2, wherein the pipe members forming the side box-shaped roof and / or the pipe members forming the bottom box-shaped roof are rectangular box-shaped pipe members.

4. An underpass construction method as described in claim 3, wherein the process of improving the ground around the side box-shaped roof is carried out by a low-pressure seepage injection method through work performed from inside the multiple rectangular box-shaped pipe members that constitute the side box-shaped roof.

5. The rectangular box-shaped pipe member that forms the top box-shaped roof has an approximately quadrilateral hollow cross-sectional shape and consists of a U-shaped upper flat piece and a U-shaped lower piece that are detachably connected vertically at the upper end portions of each of the side plate portions on both sides, and after the top box-shaped roof is installed on the ground below the existing underground structure, when the box structure is advanced, the U-shaped lower piece is separated from the U-shaped upper flat piece and replaced with the top part of the box structure, and the U-shaped upper flat piece is left in the ground to function as the friction cut plate member. An underpass construction method as described in claim 1 or 2.

6. 3. An underpass construction method according to claim 1 or 2, which is carried out as an R&C construction method (registered trademark) in which excavation work is carried out at a face in the front part of the box structure.

7. An underground space structure constructed by the underpass construction method according to claim 1, An underground space structure in which a number of pipe members are installed vertically in series along both side portions of the box structure, which forms an underground space that traverses beneath the existing underground structure, together with improved ground.

8. An underground space structure constructed by the underpass construction method according to claim 2, An underground space structure in which a plurality of pipe members are installed in a vertical direction along both side portions of the box structure, which forms an underground space that crosses beneath the existing underground structure, together with the improved ground, and a plurality of pipe members are installed in a horizontal direction along the bottom portion, at least in the area adjacent to the box-shaped roof of the side portions on both sides.

9. An underground space structure as described in claim 7 or 8, wherein a solidification material is filled and solidified inside the plurality of pipe members arranged in a vertical direction along both side portions of the box structure, and inside the plurality of pipe members arranged in a horizontal direction along the bottom portion.

Citation Information

Patent Citations

  • Method o constructing passage just under underground structure

    JP2000352296A

  • Construction method for underground passage

    JP2007177553A

  • Reactor period measuring device

    JP1994167595A

  • Construction method of underpass

    JP2012144942A