Realtime characteristics prediction for unconsolidated composite materials

The system predicts composite material properties in real-time using sensor data and machine learning, addressing inefficiencies in current testing methods by identifying and correcting quality issues during manufacturing, thus enhancing production efficiency and reducing waste.

JP2024144254APending Publication Date: 2024-10-11THE BOEING CO
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
JP2024045061
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Priority Date
2024-01-18
Filing Date
2024-03-21
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

Current methods for quality testing of unconsolidated composite materials, such as prepreg components, are inefficient and unable to identify out-of-tolerance properties without testing multiple portions, leading to time-consuming waste and production halts due to undetected quality issues.

Method used

A property prediction system using real-time sensor data, physical models, and machine learning models to predict the properties of unconsolidated composite materials during manufacturing, allowing for immediate identification of in-tolerance and out-of-tolerance portions and enabling corrective actions.

Benefits of technology

Enables rapid identification of composite material properties in real-time, reducing waste, increasing production efficiency, and ensuring higher quality output by allowing for immediate corrective actions on out-of-tolerance portions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024144254000001_ABST
    Figure 2024144254000001_ABST
Patent Text Reader

Abstract

To provide a method, apparatus, system and computer program product for realtime characteristics prediction for unconsolidated composite materials.SOLUTION: The invention provides a method, apparatus, system and computer program product for predicting a number of characteristics of an unconsolidated composite material. Sensor data is received in real time from a composite material manufacturing system during manufacture of an unconsolidated composite material. Initial predictions are generated for a number of characteristics of the unconsolidated composite material in a completed form in real time during manufacture of the unconsolidated composite material in the composite material manufacturing system using a number of physics-based models and a number of machine learning models trained using data. A final prediction is determined in real time for the number of characteristics based on the initial predictions.SELECTED DRAWING: Figure 30
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] CROSS-REFERENCE TO RELATED APPLICATIONS This application claims the benefit of U.S. Provisional Patent Application No. 63 / 493,118, entitled “Fusion of Process Condition Information, Sensor Data, and Physics Models to Improve Real Time Property Prediction of Unconsolidated Composite Material,” filed March 30, 2023, which is incorporated by reference in its entirety.

[0002] This application is a continuation-in-part (CIP) and claims the benefit of U.S. patent application Ser. No. 17 / 811,433, entitled “Property Prediction for Unconsolidated Composite Materials,” filed July 8, 2022, and is hereby incorporated by reference in its entirety.

[0003] This application is related to the following U.S. patent applications: U.S. application Ser. No. ________, entitled "Real Time Inconsistency Detection During Composite Material Manufacturing," Attorney Docket No. 22-0421-US-CIP[2], filed on even date herewith; U.S. application Ser. No. ________, entitled "Real Time Contaminants Identification During Composite Material Manufacturing via Non-Contact Chemical Sensing," Attorney Docket No. 22-0421-US-CIP[3], filed on even date herewith; and U.S. application Ser. No. ________, entitled "Unconsolidated Composite Material Component Verification via Non-Contact Chemical Sensing," filed on even date herewith, Attorney Docket No. 22-0421-US-CIP[4], which are incorporated herein by reference in their entireties.

[0004] The present disclosure relates generally to composite material manufacturing, and more particularly to uncured composite material manufacturing. Even more particularly, the present disclosure relates to methods, apparatus, systems, and computer program products for predicting properties of an uncured composite material during its manufacturing. [Background technology]

[0005] Aircraft are being designed and manufactured with an increasing percentage of composite materials. Composite materials are used in aircraft to reduce the aircraft's weight and improve its aerodynamic efficiency by design. This weight reduction improves performance capabilities such as increased payload and improved fuel efficiency. Additionally, composite materials extend the service life of various components within the aircraft.

[0006] A composite material is a strong, lightweight material created by combining two or more functional components. For example, a composite material may include reinforcing fibers bound in a polymer resin matrix. The fibers may be unidirectional or may take the form of a woven fabric or cloth. The fibers and resin are arranged and cured to form the composite material.

[0007] Additionally, using composite materials to create aerospace composite structures potentially allows for portions of an aircraft to be manufactured as larger parts or sections. For example, an aircraft fuselage may be created as cylindrical sections and then assembled to form the aircraft fuselage. Other examples include, but are not limited to, wing sections joined to form a wing, or stabilizer sections joined to form a stabilizer.

[0008] In the manufacture of composite structures, plies of composite material are typically laid up on a tool. The plies may be composed of sheets of fiber. These sheets may take the form of woven fabrics, tapes, tows, or other suitable forms. In some cases, resin may be infused or pre-impregnated into the sheets. These types of sheets are commonly referred to as prepregs. Prepregs may be manufactured in long sheets that are stored as rolls until the prepregs are used to manufacture the composite structure.

[0009] Different layers of prepreg may be laid up in different orientations and different numbers of layers may be used depending on the thickness of the composite structure being produced. The layers may be laid up by hand or using automated lay-up equipment such as tape laminators or fiber placement systems.

[0010] After the different composite layers are laid up on the tool, the composite layers may be solidified and cured when exposed to temperature and pressure to form the final composite structure.

[0011] The quality of the final composite structure can be determined using testing, including non-destructive testing. Additionally, components used to manufacture the composite structure can also be monitored and tested for quality purposes. Maintaining a desired quality of the composite components can enhance the quality of the final composite structure. For example, prepregs can be inspected to determine if the thickness is within a specified tolerance. Quality testing of composite components, such as prepreg components, can take more time than desired. Summary of the Invention [Problem to be solved by the invention]

[0012] It would therefore be desirable to have methods and apparatus that take into account at least some of the above-mentioned problems, as well as other possible problems, such as methods, apparatus, systems, and computer program products that overcome the technical problems associated with quality testing of prepreg components. [Means for solving the problem]

[0013] An embodiment of the present disclosure provides a property prediction system comprising a system in a prediction manager disposed in a computer system. The prediction manager is configured to generate an initial prediction of a number of properties of the unconsolidated composite material in a finished form in real time during production of the unconsolidated composite material in the composite manufacturing system using sensor data received in real time from a sensor system for the composite manufacturing system during production of the unconsolidated composite material, a number of physical models, and a number of machine learning models, the number of machine learning models being trained using historical sensor data to generate the number of initial predictions using the sensor data. The prediction manager is configured to determine an uncertainty of the initial prediction of the number of properties of the unconsolidated composite material in a finished form from the number of physical models and the number of machine learning models in real time during production of the unconsolidated composite material. The prediction manager is configured to associate a weight with the initial prediction of the number of properties using the uncertainty. The prediction manager is configured to determine a final prediction of the number of properties based on the initial prediction and the weight associated with the initial prediction.

[0014] In another embodiment of the present disclosure, a property prediction system includes a prediction manager disposed in a computer system. The prediction manager is configured to receive sensor data in real time from a sensor system for a composite manufacturing system during production of the green composite material. The prediction manager is configured to generate initial predictions of a number of properties of the green composite material in finished form in real time during production of the green composite material in the composite manufacturing system using a number of physics models and a number of machine learning models trained to generate the initial predictions using the sensor data. The prediction manager is configured to determine final predictions in real time for the number of properties based on the initial predictions.

[0015] In yet another embodiment of the present disclosure, a method predicts a number of properties of a green composite material. An initial prediction is generated for the number of properties of the green composite material in a finished form in real time during production of the green composite material in the composite manufacturing system using sensor data received in real time from a sensor system for the composite manufacturing system during production of the green composite material, a number of physical models, and a number of machine learning models, the number of machine learning models being trained to generate the initial predictions using the sensor data. Uncertainties are determined for the initial predictions of the number of properties of the green composite material in a finished form from the number of physical models and the number of machine learning models in real time during production of the green composite material. Weights are associated with the initial predictions of the number of properties using the uncertainties. A final prediction is determined for the number of properties based on the initial predictions and the weights associated with the initial predictions.

[0016] In yet another embodiment of the present disclosure, a method predicts a number of properties of a green composite material. Sensor data is received in real-time from a composite manufacturing system during production of the green composite material. A number of machine learning models trained using the number of physics models and the data are used to generate initial predictions for the number of properties of the green composite material in finished form in real-time during production of the green composite material in the composite manufacturing system. A final prediction is determined in real-time for the number of properties based on the initial predictions.

[0017] The features and functions may be achieved independently in various embodiments of the present disclosure or may be combined in yet other embodiments, further details of which may be understood with reference to the following description and drawings.

[0018] The novel features believed characteristic of the illustrative embodiments are set forth in the appended claims. However, the illustrative embodiments, as well as preferred modes of use, further objects and features, will be best understood from the following detailed description of the illustrative embodiments of the present disclosure, read in conjunction with the accompanying drawings. [Brief description of the drawings]

[0019] [Figure 1] 1 is a pictorial representation of a network of data processing systems in which illustrative embodiments may be implemented. [Diagram 2] FIG. 1 is an illustration of a block diagram of a composite manufacturing environment in accordance with an illustrative embodiment. [Diagram 3] 1 is a block diagram of actions that may be taken using predicted properties of portions of unconsolidated composite material in accordance with an illustrative embodiment; [Figure 4] FIG. 1 is an illustration of a manufacturing process flow for producing an unconsolidated composite material according to an illustrative embodiment. [Diagram 5] FIG. 1 is an illustration of a composite manufacturing system configured to perform a film processing process in accordance with an illustrative embodiment. [Figure 6] FIG. 1 is an illustration of a composite manufacturing system configured to perform a prepreg production process in accordance with an illustrative embodiment. [Figure 7] FIG. 1 is an illustration of a block diagram of sensor locations in a composite manufacturing system in accordance with an illustrative embodiment; [Figure 8] FIG. 1 is an illustration of a side view of a portion of a composite manufacturing system in accordance with an illustrative embodiment. [Figure 9] FIG. 1 is an illustration of a top view of a portion of a composite manufacturing system in accordance with an illustrative embodiment. [Figure 10] 10 is an illustration of a flowchart of a process for identifying a quality level of portions of green composite material in accordance with an illustrative embodiment; [Figure 11] 1 is a flowchart of a process for marking an unconsolidated composite material according to an illustrative embodiment. [Figure 12] 1 is a flowchart of a process for marking out-of-tolerance portions of unconsolidated composite material as unusable in accordance with an illustrative embodiment; [Figure 13] 1 is a flowchart of a process for marking an within-tolerance portion of unconsolidated composite material as usable in accordance with an illustrative embodiment. [Figure 14]1 is a flowchart of a process for marking a portion of unconsolidated composite material with a quality level in accordance with an illustrative embodiment. [Figure 15] 10 is an illustration of a flowchart of a process for recording a quality level of each portion of green composite material in accordance with an illustrative embodiment; [Figure 16] 1 is a flowchart of a process for determining predicted properties of a portion of an unconsolidated composite material in accordance with an illustrative embodiment. [Figure 17] 1 is a flowchart of a process for training a machine learning model to predict properties of a green composite material prior to completing fabrication of the green composite material in accordance with an illustrative embodiment; [Figure 18] 10 is an illustration of a flowchart of a process for taking corrective action on portions of unconsolidated composite material in accordance with an illustrative embodiment; [Figure 19] 1 is an illustration of a flowchart of a process for taking corrective action on out-of-tolerance portions of unconsolidated composite material in accordance with an illustrative embodiment. [Figure 20] 10 is a flowchart of a process for adjusting parameters of an out-of-tolerance portion of an unconsolidated composite material in accordance with an illustrative embodiment. [Figure 21] 10 is a flowchart of a process for adjusting parameters of an within-tolerance portion of an unconsolidated composite material in accordance with an illustrative embodiment; [Figure 22] 11 is a flowchart of a process for adjusting parameters such that portions of unconsolidated composite material are within tolerance in accordance with an illustrative embodiment; [Diagram 23] 10 is an illustration of a flowchart of a process for adjusting parameters of a subsequent portion of unconsolidated composite material in accordance with an illustrative embodiment; [Figure 24] 1 is an illustration of a flowchart of a process for modifying raw materials in accordance with an illustrative embodiment; [Diagram 25] 1 is a flowchart of a process for determining predicted properties of an unconsolidated composite material in accordance with an illustrative embodiment. [Figure 26] 1 is a block diagram of a data processing system in accordance with an illustrative embodiment; [Figure 27] FIG. 1 is an illustration of an aircraft manufacturing and service method in accordance with an illustrative embodiment. [Figure 28] FIG. 1 is a block diagram of an aircraft in which an illustrative embodiment may be implemented. [Figure 29] FIG. 1 is a block diagram of a product management system in accordance with an illustrative embodiment. [Diagram 30] FIG. 1 is a block diagram of a property prediction system in accordance with an illustrative embodiment. [Diagram 31] FIG. 2 is a block diagram of an exemplary environmental processing condition. [Diagram 32] FIG. 1 is a block diagram of sensor data in accordance with an illustrative embodiment; [Diagram 33] FIG. 1 is a block diagram of a machine learning model in accordance with an example embodiment. [Diagram 34] FIG. 1 is an illustration of a data flow for real-time prediction of properties of a composite prepreg according to an illustrative embodiment. [Diagram 35] FIG. 13 is a data flow diagram using initial predictions from a model to generate real-time predictions of properties of a composite prepreg according to an illustrative embodiment. [Diagram 36] FIG. 1 is a diagram of data flow for real-time thickness prediction, according to an exemplary embodiment. [Figure 37] FIG. 2 is a diagram of data flow for real-time fiber basis weight prediction according to an exemplary embodiment. [Figure 38] FIG. 2 is a diagram of data flow for real-time fiber basis weight prediction according to an exemplary embodiment. [Figure 39] 1 is a flowchart of a process for predicting several properties of an unconsolidated composite material in accordance with an illustrative embodiment. [Diagram 40] 1 is a flowchart of a process for adjusting process conditions in accordance with an example embodiment. [Diagram 41] 1 is a flowchart of a process for determining a final prediction in accordance with an illustrative embodiment. [Diagram 42]1 is a flowchart of a process for predicting several properties of an unconsolidated composite material in accordance with an illustrative embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0020] Exemplary embodiments recognize and take into account one or more different considerations, as described below. For example, current testing of unconsolidated composite components, such as prepreg rolls produced by a carbon fiber prepreg coating line, can be done using a sample from the prepreg roll. If the sample does not meet the desired quality level, the entire prepreg roll is discarded or recycled. However, it may not be the entire prepreg roll that has an undesirable quality level. It may be that only a portion of the prepreg roll does not meet the desired quality level tolerance. Current technology cannot identify which portions of the prepreg roll may have out-of-tolerance properties unless multiple portions of the entire prepreg roll are tested. Testing multiple portions of the entire prepreg roll is time consuming and inefficient.

[0021] Also, determining the cause of a prepreg roll having undesirable quality level characteristics cannot currently be done during the manufacturing process. Instead, analysis is done after the prepreg roll is manufactured, and testing of a sample of the prepreg roll indicates that the sample does not have the desired quality level. Furthermore, if the cause can be determined, adjustments to the carbon fiber prepreg coating line can be made to ensure that future prepreg rolls have the desired quality level. In some cases, the time required for the determination is not possible until many prepreg rolls are completed and one or more prepreg rolls are determined not to have the desired quality level. As a result, one solution is to stop the production of prepreg rolls using the carbon fiber prepreg coating line that manufactured the prepreg roll until the cause can be determined and adjustments to the carbon fiber prepreg coating line can be made. This unavailability of the carbon fiber prepreg coating line reduces the production capacity of prepreg rolls.

[0022] Exemplary embodiments further recognize and take into account that it is desirable to have the ability to determine the properties of prepreg materials. The manufacturing process can be at least one of resin mixing, resin film processing, resin bath operations, or other operations performed to produce the prepreg during the manufacturing process while the prepreg is being manufactured. Different types of sensor data obtained from different points in the carbon fiber prepreg coating line in real time can be used to predict the properties of the prepreg while it is still being manufactured. This information can be used to determine which portions of the prepreg roll have properties within tolerance and other portions of the prepreg roll that are out of tolerance. This type of determination of the properties of each portion of the prepreg being manufactured can be done in a manner that allows for the marking or recording, in real time, of which portions are within or out of tolerance. As a result, if some portions of the prepreg roll are out of tolerance, the recorded or marked portions will not be used and other portions of the prepreg roll can still be used. As a result, the amount of prepreg that is discarded or recycled can be reduced.

[0023] Referring now to the figures, and in particular to Figure 1, a diagram of a network of data processing systems in which exemplary embodiments may be implemented is depicted. Network data processing system 100 is a network of computers in which exemplary embodiments may be implemented. Network data processing system 100 includes network 102, which is the medium used to provide communications links between various devices and computers connected to each other within network data processing system 100. Network 102 may include connections, such as wires, wireless communication links, or fiber optic cables.

[0024] In the illustrated example, server computer 104 and server computer 106 connect to network 102 along with storage unit 108. Additionally, client device 110 connects to network 102. As illustrated, client device 110 includes client computer 112, client computer 114, and client computer 116. Client device 110 may be, for example, a computer, a workstation, or a network computer. In the illustrated example, server computer 104 provides information to client device 110, such as boot files, operating system images, applications, and the like. Additionally, client device 110 may also include other types of client devices, such as prepreg system 118, tablet computer 120, smart glasses 122, and the like. In this illustrative example, server computer 104, server computer 106, storage unit 108, and client device 110 are network devices that connect to network 102, with network 102 being the communication medium for these network devices. Some or all of the client devices 110 may form an Internet of Things (IoT) in which these physical devices can connect to the network 102 and exchange information with each other via the network 102 .

[0025] Client device 110 is a client to server computer 104 in this example. Network data processing system 100 may include additional server computers, client computers, and other devices not shown. Client device 110 connects to network 102 using at least one of a wired connection, a fiber optic connection, or a wireless connection.

[0026] Program instructions located within network data processing system 100 may be stored on a computer recordable storage medium and downloaded for use to a data processing system or other device. For example, program instructions may be stored on a computer recordable storage medium on server computer 104 and downloaded to client device 110 over network 102 for use on client device 110.

[0027] In the depicted example, network data processing system 100 is the Internet with network 102 representing a worldwide collection of networks and gateways that communicate with each other using the Transmission Control Protocol / Internet Protocol (TCP / IP) suite of protocols. At the heart of the Internet is a backbone of high-speed data communication lines between major nodes or host computers consisting of thousands of commercial, governmental, educational, and other computer systems that route data and messages. Of course, network data processing system 100 may also be implemented using a number of different types of networks. For example, network 102 may be comprised of at least one of the Internet, an intranet, a local area network (LAN), a metropolitan area network (MAN), or a wide area network (WAN). FIG. 1 is intended as an example, and not as an architectural limitation for the different illustrative embodiments.

[0028] As used herein, "several" when used with reference to an item means one or more of the item. For example, "several different types of networks" means one or more different types of networks.

[0029] Furthermore, the phrase "at least one of," when used with a list of items, means that different combinations of one or more of the listed items can be used, and only one of each item in the list may be required. In other words, "at least one of" means any combination of items, and while some items from the list may be used, not all items in the list are required. An item may be a particular object, thing, or category.

[0030] For example, without limitation, "at least one of item A, item B, or item C" may include item A, item A and item B, or item B. This example may also include item A, item B, and item C, or item B and item C. Of course, any combination of these items may be present. In some illustrative examples, "at least one of" may be, for example, without limitation, two items A, one item B, and ten items C, four items B and seven items C, or other suitable combinations.

[0031] In this example, the prepreg system 118 is located at a composite manufacturing facility 130 where the prepreg system 118 is used to produce an unconsolidated composite material, such as prepreg. As shown, a composite manager 132 of the server computer 104 may communicate with the prepreg system 118 at the composite manufacturing facility 130. This communication may include an exchange of information selected from at least one of sensor data 134, commands 136, or other types of information that may be transmitted over the network 102.

[0032] In this example, composites manager 132 may receive sensor data 134 from a sensor system for prepreg system 118. The sensor system may be located at least one of prepreg system 118 or another location within composite manufacturing facility 130.

[0033] In this illustrative example, the sensor data 134 is received in real-time from the prepreg system 118. In other words, receiving the sensor data 134 in real-time means receiving the sensor data 134 while the prepreg system 118 is operating to manufacture the prepreg. When the sensor data 134 is transmitted in real-time, the sensor data 134 is transmitted as quickly as possible without potential delays. In analyzing the sensor data 134 in real-time, the composite material manager 132 can process and analyze the sensor data 134 as the sensor data 134 is being received.

[0034] As shown, the sensor data 134 can be analyzed by the composite material manager 132 to determine a prediction of the properties of the prepreg when the prepreg production is completed. This prediction of properties is made while the prepreg is being produced by the prepreg system 118. The predicted properties are properties of the several portions of the prepreg being produced in the prepreg system 118. These properties can include, for example, the thickness of the prepreg, the basis weight, and other properties of the finished prepreg. In other words, the composite material manager 132 can make a real-time prediction of the properties of the prepreg being produced by the prepreg system 118 before the prepreg production is completed. Based on the predicted properties, the composite material manager 132 can identify which portions of the prepreg are within tolerance for use in the production of the composite part. Based on the set properties predicted for the prepreg, the composite material manager 132 can record one or more portions that are within tolerance for use in the production of the composite part, as well as portions that may be outside of tolerance. Additionally, the composite material manager 132 can determine the time that each portion will remain within tolerance. In some cases, the unconsolidated composite material may have a shelf life that may vary depending on the properties predicted for the prepreg.

[0035] Additionally, knowing the predicted properties of a portion of the prepreg allows the composite manager 132 to take corrective action if that portion is a finished product within the green composite based on a quality level determined for that portion of the green composite from a prediction of the green composite properties made before manufacturing operations were completed.

[0036] For example, composites manager 132 can determine what adjustments are needed in prepreg system 118 to further process the portion of prepreg so that the portion is within tolerance or has a desired quality level. This determination can cause composites manager 132 to send commands 136 to prepreg system 118 to make the adjustments.

[0037] The composites manager 132 can use commands 136 to make these adjustments while that portion of prepreg is still being produced. These adjustments can be made to each portion of the prepreg system 118 that has not yet processed that portion of prepreg. These adjustments can receive additional sensor data to determine if the actions taken have altered each portion of the prepreg to have a desired quality level. In this manner, the composites manager 132 can manage the production of the green composite in a manner that can increase the portion of green composite that meets the desired quality level and reduce the portion of green composite that is wasted.

[0038] In this illustrative example, this prediction can be made using machine learning model 138. In this example, machine learning model 138 has been trained using historical sensor data generated from prepregs previously produced by prepreg system 118.

[0039] 1 is not intended to limit the manner in which other illustrative examples may be implemented. For example, composite material manager 132 may be located at another location other than server computer 104. For example, composite material manager 132 may be located at client computer 112, prepreg system 118, or at another computer located at composite material manufacturing facility 130. In other illustrative examples, additional prepreg systems may be located at composite material manufacturing facility 130 or at other locations that composite material manager 132 may manage.

[0040] With reference now to Figure 2, an illustration of a block diagram of a composite manufacturing environment is depicted in accordance with an illustrative embodiment. In this illustrative example, composite manufacturing environment 200 includes components that may be implemented in hardware, such as the hardware illustrated in network data processing system 100 in Figure 1.

[0041] In this illustrative example, composite material management system 202 operates to manage the production of unconsolidated composite material 204 for use in manufacturing composite material parts 205 .

[0042] The green composite material 204 is a composite material that has not been processed to form a composite part 205. No processing, such as at least one of pressure, heat, or curing, has been applied to the green composite material 204. In other words, the green composite material 204 has not been processed to form a final composite part.

[0043] The green composite material 204 can be selected from at least one of prepreg, aerospace grade prepreg, thermoset prepreg, thermoplastic prepreg, woven prepreg, fiber tow prepreg, tow prepreg, unidirectional tape prepreg, resin coated film, non-crimp fabric, resin blend, or other suitable green composite material. The fibers in the green composite material 204 can take a number of different forms. For example, the green composite material 204, such as a fiber or fabric, can be selected from at least one of fiberglass, carbon fiber, Kevlar® fiber, para-aramid fiber, hybrid fiber, carbon fabric with glass threads, carbon fiber fabric interwoven with wire, borosilicate fiber, or other suitable type of material. The composite material part 205 can be, for example, a fuselage section, a skin panel, a wing, a rib, a door, or other suitable type of part.

[0044] In another example, the green composite material 204 can be used to manufacture another green composite material. For example, the green composite material 204 can be a filmed paper. The filmed paper can be used to manufacture another green composite material, such as a prepreg.

[0045] For example, the composite material management system 202 may control the operation of a composite material manufacturing system 208 to produce an unconsolidated composite material 204. As shown, the composite material manufacturing system 208 may take a number of forms. For example, the composite material manufacturing system 208 may be selected from at least one of a carbon fiber prepreg coating line, a reinforced fiber resin impregnation line, a resin mixing processing system, a resin film processing line, a prepreg system, a slitting system, and other suitable types of composite material manufacturing systems.

[0046] As shown, the composite material management system 202 includes a computer system 210 and a composite material manager 212. The composite material manager 212 is disposed within the computer system 210.

[0047] The composite material manager 212 may be implemented as software, hardware, firmware, or a combination thereof. If software is used, the operations performed by the composite material manager 212 may be implemented as program instructions configured to run on hardware, such as a processor unit. If firmware is used, the operations performed by the composite material manager 212 may be implemented as program instructions and data to run on a processor unit and stored in persistent memory. If hardware is employed, the hardware may include circuitry that operates to perform the operations in the composite material manager 212.

[0048] In illustrative examples, the hardware may take the form of at least one selected from a circuit system, an integrated circuit, an application specific integrated circuit (ASIC), a programmable logic device, or other suitable type of hardware configured to perform a number of operations. In the case of a programmable logic device, the device may be configured to perform a number of operations. The device may be reconfigured at a later time or may be permanently configured to perform a number of operations. Programmable logic devices include, for example, programmable logic arrays, programmable array logic, field programmable logic arrays, field programmable gate arrays, and other suitable hardware devices. Additionally, the process may be implemented as organic components integrated with inorganic components or may be entirely composed of organic components excluding humans. For example, the process may be implemented as circuitry in organic semiconductors.

[0049] Computer system 210 is a physical hardware system and includes one or more data processing systems. When multiple data processing systems are present in computer system 210, the data processing systems communicate with each other using a communication medium. The communication medium may be a network. The data processing systems may be selected from at least one of a computer, a server computer, a tablet computer, or any other suitable data processing system.

[0050] As shown, the computer system 210 includes a number of processor units 214 capable of executing program instructions 216 that implement the steps of the illustrative example. As used herein, a processor unit in the number of processor units 214 is a hardware device and is comprised of hardware circuits, such as hardware circuits on an integrated circuit, that process in response to instructions and program code to operate a computer. When the number of processor units 214 execute the program instructions 216 for a step, the number of processor units 214 are one or more processor units that may be on the same computer or on different computers. In other words, the steps may be distributed among processor units on the same or different computers in a computer system. Furthermore, the number of processor units 214 may be the same type processor unit or may be different types of processor units. For example, the number of processor units may be selected from at least one of a single core processor, a dual core processor, a multi-processor core, a general-purpose central processing unit (CPU), a graphics processing unit (GPU), a digital signal processor (DSP), or some other type of processor unit.

[0051] In this illustrative example, composite manager 212 is configured to receive sensor data 218 from a sensor system 220 for composite manufacturing system 208. Sensor data 218 can take a number of different forms. For example, sensor data 218 can comprise at least one of a component temperature, a temperature of the unconsolidated composite material, an ambient temperature, humidity, a roller speed, a speed of the unconsolidated composite material, a pressure between a pair of rollers, a gap between a pair of rollers, a thickness of the unconsolidated composite material, a Fourier transform infrared (FTIR) spectrum, Raman spectroscopy data, spectroscopy data, a material width, a fiber web width, a material basis weight, a fiber basis weight, a resin viscosity, an electrical measurement across a dimension of the unconsolidated composite material, a voltage across a dimension of the unconsolidated composite material, an electromagnetic measurement across a dimension of the unconsolidated composite material, an acoustic measurement across a dimension of the unconsolidated composite material, a tension, or an image of a prepreg at a location within the composite manufacturing system.

[0052] In this illustrative example, sensor system 220 for composite material manufacturing system 208 may be considered part of composite material management system 202, composite material manufacturing system 208, or both. Sensor system 220 may be operable to generate sensor data 218 related to at least one of green composite material 204 or composite material manufacturing system 208 during operation of composite material manufacturing system 208. Sensor data 218 may be information related to green composite material 204 being produced by composite material manufacturing system 208. Sensor data 218 is received during production of green composite material 204 by composite material manufacturing system 208. Sensor data 218 is generated in real time by sensor system 220 and transmitted in real time to composite material manager 212.

[0053] The sensor system 220 includes a sensor 222. As shown, the sensor 222 is at a location 209 relative to the composite manufacturing system 208. The location 209 may be on the composite manufacturing system 208, in the composite manufacturing system 208, or near the composite manufacturing system 208. In this example, the sensor 222 may be selected from at least one of a temperature sensor, a camera, an infrared camera, a thermal camera, a line scan camera, a tension sensor, a density sensor, a drop gauge, an infrared sensor, a non-contact laser distance sensor, a beta gauge, a velocity sensor, a Fourier transform infrared (FTIR) spectrometer, a Raman spectrometer, a force detector, a linear variable differential transformer (LVDT) sensor, a rotary third differential transformer (RVDT) sensor, a thickness sensor, a gap width sensor, a viscometer, an optical reflectance sensor, an electrical conductivity sensor, an electrical resistance sensor, a capacitance sensor, an electromagnetic sensor, an acoustic sensor, a humidity sensor, a laser Doppler sensor, or other suitable sensor.

[0054] As shown, the composite material manager 212 uses the sensor data 218 to determine a set of predicted properties 224 of several portions 226 of the finished green composite material 204 resulting from production by the composite material manufacturing system 208 .

[0055] The portions 226 of the green composite material 204 may be some or all of the portions 226 of the green composite material 204. In this illustrated example, the green composite material 204 completed from production by the composite manufacturing system 208 forms a completed product 255, which may be used to manufacture the composite part 205. The portions 226 may be portions of the green composite material 204. For example, the portions 226 may be pieces or portions of prepreg that form a prepreg roll. The portions may have the same length or may be of different lengths.

[0056] In this example, the composite material manager 212 may predict a set of properties 228 that the portion 226 of the green composite material 204 will have when the production of the green composite material 204 is complete. In other words, this prediction is made while the portion 226 of the green composite material 204 is still being produced. Different portions within the portion 226 may be in different states or stages of production in the composite material manufacturing system 208.

[0057] The set of properties 228 can take a number of different forms, for example, the set of properties 228 includes at least one of a prepreg fiber basis weight, a prepreg resin content, a prepreg thickness, a prepreg penetration level, a prepreg tack level, a resin film basis weight, a resin film thickness, a release liner basis weight, a release liner thickness, or a laminate structure property.

[0058] The composite material manager 212 identifies a quality level 230 for the number of portions 226 of the unconsolidated composite material 204 based on the set of predicted properties 224 for the number of portions 226 of the unconsolidated composite material 204. This identification of the quality level 230 is the predicted quality level 232. In other words, the quality level 230 is determined using the predicted properties 224. Actual testing of the number of portions 226 can be performed to determine actual properties to determine the actual quality level.

[0059] In this illustrative example, the set of predicted properties 224 may be determined by composite material manager 212 using a set of models 233. The set of models 233 may include at least one of a set of machine learning models 234, a set of physics models 235, a set of hybrid models 237, or other suitable types of models. In this illustrative example, any combination of models 233 may be used to predict properties 228.

[0060] If a set of machine learning models 234 is used, the set of machine learning models 234 can be trained to predict the properties 228 of a particular type of unconsolidated composite material 204 using the sensor data 218. A machine learning model is a type of artificial intelligence model, a data-driven model that can learn without being explicitly programmed. A machine learning model can learn based on training data inputted into the machine learning model. A machine learning model can be trained using various types of machine learning algorithms. The machine learning algorithms include at least one of supervised and unsupervised learning, feature learning, sparse dictionary learning, anomaly detection, reinforcement learning, recommendation learning, or other types of learning algorithms.

[0061] Examples of machine learning models include artificial neural networks, decision trees, support vector machines, random forest machine learning models, regression machine learning models, classification machine learning models, Bayesian networks, and other types of models. These machine learning models are trained using data and can process additional data to provide a desired output.

[0062] For example, the machine learning model 236 may be trained to determine predicted properties 224 of a green composite material 204, such as a prepreg, using a training dataset 240. The training dataset 240 may be created using historical sensor data 242 received from a composite manufacturing system 208 for manufacturing the green composite material 204 in the form of a prepreg. The training dataset 240 may include labels in the form of historical properties 244. The historical properties 244 may be determined from measurements of the green composite material 204 at different locations within the composite manufacturing system 208. In other words, the historical properties 244 may include the properties 228 of the green composite material 204 when manufacturing of the green composite material 204 is completed.

[0063] Additionally, the training data set 240 can also include historical upstream information 245. The historical upstream information 245 can be associated with historical sensor data 242 generated when a manufacturing process produces the green composite material that includes the historical upstream information. The historical upstream information 245 can include information about components or settings used in producing the green composite material. For example, the historical upstream information 245 can be selected from at least one of reinforcement information, fiber information, reinforcement sizing information, resin information, release liner information, resin film information, or other suitable information that can be measured to generate the historical sensor data 242.

[0064] The property of interest 228 can take a number of different forms depending on the type of green composite material 204. For example, if the green composite material 204 is a prepreg, the property 228 can include at least one of thickness, fiber weight per unit area (FAW), resin weight content (RC), prepreg weight per unit area (PAW), water absorption, tack, wrinkle, or other property of interest for the green composite material 204 in the form of a prepreg.

[0065] By using the machine learning model 236 to determine the predicted properties 224, the composite material manager 212 can predict these properties prior to completing the production of the green composite material 204. In other words, the predicted properties 224 of the finished or produced green composite material 204 can be developed at different times and at different locations during the production of the green composite material 204.

[0066] In another example, a set of physics models 235 can be used to determine predicted properties 224 of the green composite material 204. In this example, physics models 239 in the set of physics models 235 are mathematical models that include equations that can describe, based at least on mathematical equations, the effects of actions taken on the material to produce the green composite material. These actions can be in response to parameters such as heat, tension, pressure, force, or other parameters in the sensor data 218, for example.

[0067] The set of physics models 235 can take a number of different forms, for example, the set of physics models can be selected from at least one of a mechanical dynamics thermal and mechanical model, a resin infiltration model, a Darcy infiltration model including viscosity, a resin flow model, a curing reaction model, a finite element analysis (FEA) model of infiltration, a finite element analysis (FEA) model of layup, and other suitable types of physics models.

[0068] The set of hybrid models 237 are hybrid physics-based, data-driven models that use both physics and machine learning components. In this example, the hybrid models 237 combine physics (real-time software) or measurement data with training / prediction data into a single model, such that the sensor distribution / noise incorporated in the predictions is evaluated along with other items.

[0069] There may also be a statistical model 243 in the model 233. The statistical model 243 may be selected from at least one of a Kalman filter, an extended Kalman filter, an unscented Kalman filter, or other suitable statistical models. For example, a Kalman filter may be used with noisy data to estimate the characteristic of the system being measured in order to improve the accuracy of the estimate of the characteristic being measured.

[0070] When determining the predicted properties 224 for the portions 226 of the unconsolidated composite material 204, the composite material manager 212 may determine a quality level 230 for the portions 226 of the unconsolidated composite material 204 using the set of predicted properties 224 determined for the portions 226 of the unconsolidated composite material 204. In this illustrative example, different portions within the portions 226 may have a different quality level than other portions.

[0071] With the identification of the quality level 230, the composite material manager 212 can take a number of actions 241. Depending on the quality level 230 identified for each portion within the number of portions 226, different actions within the actions 241 can be taken for that portion.

[0072] Further, other information in addition to the sensor data 218 may be used to determine the predicted properties 224 of the portions of the unconsolidated composite material 204. For example, upstream information 246 may be used by the composite material manager 212 in conjunction with the sensor data 218 to determine the predicted properties 224 of the portions 226. The upstream information 246 may be selected from at least one of reinforcement information, fiber information, reinforcement sizing information, resin information, release liner information, resin film information, or other suitable information that may be used in conjunction with the sensor data 218 to determine the predicted properties 224 of the portions 226 of the unconsolidated composite material 204.

[0073] The model 233 can operate as the digital twin 203 and can be used by the composite manager 212 to determine predicted properties 224 of the portions 226 of the unconsolidated composite material 204. As a result, the placement of the sensors 222 in the sensor system 220 at the locations 209 of the composite manufacturing system 208 can provide sensor data 218 that is used to predict the properties 228 of the portions 226 of the unconsolidated composite material 204 by the model 233 of the digital twin 203. Using the model 233 as the digital twin 203 allows for real-time inspection and certification of the portions 226 of the unconsolidated composite material 204 that can identify the properties 228 of the portions 226 of the unconsolidated composite material 204 without the need to sample the portions 226 of the unconsolidated composite material 204. If actual testing is desired, the identification of the portions 226 of the unconsolidated composite material 204 can be tested to verify the predictions as needed.

[0074] Additionally, any combination of different types of models 233 may be used to refine the predicted properties 224. For example, a first set of initial predicted properties 251 may be determined for a portion of the unconsolidated composite material 204 from a machine learning model 236 generated using the sensor data 218. A second set of initial predicted properties 251 may be determined for the same portion of the unconsolidated composite material 204 from a physical model 239 generated using the sensor data 218. A set of predicted properties 224 for the portion of the unconsolidated composite material 204 may be determined from a fusion of the first set of initial predicted properties and the second set of initial predicted properties.

[0075] Upon determining the set of predicted properties, the composite material manager 212 may use the set of predicted properties 224 to determine a quality level 230 of the portions 226 of the green composite material 204. The quality level 230 is a predicted quality level 232 that the portions 226 of the green composite material 204 are predicted or expected to have when manufacturing of the portions 226 is complete and the portions 226 of the green composite material 204 form a finished product 227.

[0076] The composite material manager 212 may take a number of actions 241 based on the predicted quality levels 230 for the number of portions 226 of the unconsolidated composite material 204. In this example, the quality levels 230 are determined using number of predicted properties 224 of the number of portions 226 of the unconsolidated composite material 204. For example, the number of actions 241 may include a corrective action 291. The composite material manager 212 may take the corrective action 291 based on the quality levels 230 of the number of portions 226 of the unconsolidated composite material 204.

[0077] In this depicted example, corrective action 291 may be taken prior to completing manufacturing of some portions 226 of green composite material 204 to form finished product 227. In the illustrative example, manufacturing of some portions 226 of green composite material 204 may be completed before or after other portions within portions 226 of green composite material 204. In other words, some portions 226 of green composite material 204 may be finished products 227, while other portions have not yet become finished products 227 and are continuing to be processed within composite manufacturing system 208.

[0078] As a result, if corrective action 291 is taken, more portions 226 of green composite material 204 may be used to manufacture composite part 205. For example, by taking corrective action 291 prior to completing manufacture of some portions 226 of green composite material 204, at least one of discarding, reworking, and recycling some portions 226 may be avoided.

[0079] 3, a block diagram of actions that may be taken using predicted properties of a portion of unconsolidated composite material is shown, in accordance with an illustrative embodiment. In the illustrative examples, the same reference numbers may be used in multiple figures. This reuse of reference numbers in different figures represents the same elements in the different figures.

[0080] As shown, action 241 can take a number of different forms. For example, action 241 can be performed on some portions 226 of unconsolidated composite material 204 while fabrication of some portions 226 is being completed.

[0081] Actions 241 may include a marking action 300. As shown, marking action 300 may include marking portions 302 of unconsolidated composite material 204 within some portions 226 as unusable 304, usable 306, quality level 308, and composite part type 310.

[0082] In this example, unusable 304 is an action by the composite material manager 212 to mark a portion 302 of the unconsolidated composite material 204 in some portions 226 of the unconsolidated composite material 204 as unusable based on the quality level 230 of the portion 302 being outside of a tolerance 312. In this example, the tolerance 312 may be a range or threshold of one or more characteristics 228 of the portion 302 that are deemed acceptable or within an acceptable range. The one or more characteristics of interest that are within the tolerance 312 may be used to determine whether the quality level 308 of the portion 302 is acceptable.

[0083] As shown, usable 306 is an action by the composite material manager 212 marking a portion 302 of the unconsolidated composite material 204 within the number of portions 226 of the unconsolidated composite material 204 as usable based on the quality level 230 of the portion 302 being within the tolerance 312. Quality level 308 is an action by the composite material manager 212 marking a portion 302 of the unconsolidated composite material 204 within the number of portions 226 of the unconsolidated composite material 204 with the quality level identified for the portion 302.

[0084] As another example, a composite part type is a measure by which composite manager 212 marks portions 302 of unconsolidated composite material 204 within several portions 226 of unconsolidated composite material 204 with an identification of the type of composite part that portion 302 can be used to manufacture. For example, the quality level may be such that portion 302 is not suitable for use in the intended type of composite part. However, the quality level may be such that portion 302 can be used to manufacture another type of composite part. As a result, portion 302 can continue to be used rather than being discarded or recycled.

[0085] Identification of these measures may be marked on the portion 302 using a marker 314. The marker 314 may be an identifier such as a radio frequency (RFID) identifier, a microdot, a set of quantum dots, an ink mark, a bar code, a quick response (QR) code, or any other suitable type of marker. The marker 314 may identify the measure. The marking measure 300 may also include recording information 316 about the portion 302 using the marker 314. For example, the information may include a length of the portion 302, a location of the portion 302 within the unconsolidated composite material 204, a quality level, a predicted characteristic 224, a shelf life, or other information about the portion 302. The information 316 may be determined from the predicted characteristic 224 of the portion 302. The marker 314 and the marking measure 300 may also include recording the location on the roll or recording the information 316 about the portion 302 in a memory 2606 as shown in FIG. 26 for later correlation of the quality of the portion 302 to the location on the roll. One example of this use is to print out location information at a particular location on the roll that designates the quality on the roll. In other words, the marking can include indicating and / or recording information in a record or log regarding the quality in addition to or instead of the actual marking portion 302 itself. As a result, the result of the marking can also be a printout or thumb drive with a "marking" on each roll.

[0086] In this illustrative example, actions 241 may also include corrective actions 301. Corrective action 301 is an action 241 that may be taken on some of parts 226, including portion 302. In this illustrative example, corrective action 291 in the set of corrective actions 301 may be taken by composites manager 212 in response to a set of predicted properties 224 of some of parts 226 being outside of specified tolerances 312 for unconsolidated composite material 204.

[0087] These corrective actions can be taken to modify the set of predicted properties 224 of the several portions 226 such that when manufacturing of the several portions 226 of the unconsolidated composite material 204 is completed to form a finished product 227, the set of predicted properties 224 is within the tolerance 312 of the several portions 226.

[0088] As shown, corrective action 301 may take a number of different forms. For example, corrective action 301 may include at least one of adjustment action 303, change action 305, or some other suitable corrective action.

[0089] For example, if a corrective action 291 in corrective action 301 takes the form of adjustment action 303, in response to a set of predicted properties 224 of some portions 226 being outside of a specified tolerance 312 for the unconsolidated composite material 204, the composite material manager 212 may adjust a set of parameters 307 in the composite material manufacturing system 208 to change a set of predicted properties of some portions of the unconsolidated composite material.

[0090] In this depicted example, the set of parameters of the composite manufacturing system 208 can take a number of different forms. For example, the set of parameters 307 can be selected from at least one of speed, torque, voltage, current, gap, nip gap, force, tension, thickness at point, pressure, or other suitable parameters that can be set in the composite manufacturing system 208.

[0091] For example, the corrective action 291 may be adjusting a set of parameters 307 in the composite manufacturing system 208. The adjustment of the set of parameters 307 may be such that a set of predicted properties 224 of some portions 226 of the green composite material 204 are within the tolerances 312 of the green composite material 204.

[0092] In yet another example, the adjustments may cause the set of predicted properties 224 to not fall within the tolerances 312 of some portions 226 of the unconsolidated composite material 204 that meet the tolerances 312 for a specified use of the unconsolidated composite material 204. In this illustrated example, the set of predicted properties 224 of some portions 226 of the unconsolidated composite material 204 are outside the first tolerances 309 for the first type of use 311 of the unconsolidated composite material 204.

[0093] In this case, taking corrective action 291 based on the quality level 230 of the several portions 226 of the unconsolidated composite material 204 includes adjusting a set of parameters 307 in the composite manufacturing system 208 such that a set of predicted properties 224 of the several portions 226 of the unconsolidated composite material 204 is within a second tolerance 313 for a second type of use 315 of the unconsolidated composite material 204.

[0094] For example, a first type of use 311 may be for using the unconsolidated composite material 204 in a skin panel. A second type of use 315 may be for using the unconsolidated composite material 204 in a monument within an aircraft.

[0095] This type of corrective action 291 can also be taken to create some portions of the green composite material 204 for the second type of use 315 instead of the first type of use 311. In other words, this action can be taken even when the set of predicted properties 224 is within tolerance 312. As a result, when a need for green composite material 204 for the second type of use 315 arises, some of the green composite material 204 produced for the first type of use 311 can be diverted to the second type of use 315.

[0096] In another illustrative example, the corrective action 291 may include adjusting a set of parameters 307 in the composite manufacturing system 208 in response to the set of predicted properties 224 of the few portions 226 being outside the tolerance 312 specified for the unconsolidated composite material 204, such that the set of predicted properties 224 of the subsequent portions 317 of the few portions 226 of the unconsolidated composite material 204 is within the second tolerance 313 for the unconsolidated composite material 204. This type of corrective action may be taken when the few portions 226 of the unconsolidated composite material 204 do not have a set of predicted properties 224 that falls within the tolerance 312, even after changing the parameters 307. However, the corrective action may be used to cause the subsequent portions of the unconsolidated composite material 204 to have a set of predicted properties 224 that falls within the tolerance 312. As a result, in this example, the marking action continues for the few portions 226.

[0097] In another illustrative example, the corrective action 291 may be a change action within the change action 305. For example, the corrective action 291 may change some of the raw materials 319 used to form the green composite material 204. The change in some of the raw materials 319 may be such that, in response to a set of predicted properties 224 of some of the portions 226 being outside of the tolerances 312 specified for the green composite material 204, the set of predicted properties 224 of the subsequent portions may be some of the portions 226 of the green composite material 204 that are within the tolerances 312 of the green composite material 204.

[0098] In this illustrative example, the raw materials in raw materials 319 may be any material used by composite manufacturing system 208 to produce green composite material 204. For example, some raw materials 319 may be selected from at least one of resin, paper, film, fabric, tow, spread tow fabric, fiber type, tow size, fiber size, or other material used to produce green composite material 204.

[0099] In some illustrative examples, more than one corrective action may be taken, for example, both an adjustment action and a change action may be taken.

[0100] In one illustrative example, there are one or more solutions that overcome the problem of not being able to determine the properties of a green composite material as quickly as desired. One or more illustrative examples may allow the properties of different portions of a green composite material to be predicted before the production of those portions is complete. With this type of prediction, actions such as marking the different portions or taking other actions may be taken more quickly than testing samples after the production of the green composite material is complete.

[0101] The computer system 210 can be configured to perform at least one of the steps, operations, or actions described in the different illustrative examples using software, hardware, firmware, or a combination thereof. As a result, the computer system 210 operates as a dedicated computer system that enables the composite material manager 212 in the computer system 210 to predict properties of the green composite material during the green composite material manufacturing before the green composite material manufacturing is completed. Using real-time data regarding the green composite material during the green composite material manufacturing allows the predicted properties of the green composite material to be determined during the green composite material manufacturing. Furthermore, using a machine learning model allows the predicted properties of the green composite material to be determined before the green composite material manufacturing is completed. In other words, the determination of the predicted properties does not require sampling and testing of the green composite material after the green composite material manufacturing is completed. Furthermore, this determination cannot be made quickly enough for a human operator to obtain a prediction of the properties of the green composite material before the green composite material manufacturing is completed.

[0102] In particular, the composite material manager 212 transforms the computer system 210 into a special-purpose computer system as compared to general-purpose computer systems currently available without the composite material manager 212 .

[0103] In an illustrative example, the use of the composite material manager 212 in the computer system 210 integrates each process into a practical application for manufacturing the green composite material that enhances the performance of the computer system 210 in predicting the properties 228 of the portion 226 of the green composite material 204. In other words, the composite material manager 212 in the computer system 210 is directed to a practical application of each process integrated into the composite material manager 212 in the computer system 210 generating predictions of the properties 228 of the green composite material 204 in real time so that action 241 can be taken more quickly on the green composite material 204. This process of using the composite material manager 212 to generate the predicted properties 224 using the model 233 from the sensor data 218 received in real time can be done in real time to obtain the predicted properties 224 before the manufacturing of the green composite material 204 is completed, which is not possible when a human operator manually analyzes the sensor data 218.

[0104] In this illustrative example, composites manager 212 in computer system 210 allows for prediction of properties of green composites, such as prepregs and resin coated films, prior to completing manufacturing of the green composites, so that actions can be taken on parts while manufacturing of those parts is being completed.

[0105] For example, different portions of the green composite material can be marked as different portions are being completed to indicate suitability or quality of those portions of the green composite material. The composite material manager 212 provides a practical application of using sensor data 218 obtained from different locations within the location 209 for the composite material manufacturing system 208 to manage the green composite material as it is being manufactured. The predicted properties 224 can be used to mark the portions 226 of the green composite material 204. The marking can be based on a predicted quality level 232 using the predicted properties 224.

[0106] This type of control is in contrast to current technology, where samples of prepreg material within a roll may be taken to determine the quality of the entire roll. The composites manager 212 makes this determination for different portions of the prepreg roll and provides remedial measures that can be taken while the prepreg roll is being produced. As a result, a reduction in the time required to produce the green composite material is realized by using the composites manager 212 to predict the quality level portions of the green composite material.

[0107] 4, a diagram of a manufacturing process flow for producing green composite material is shown, according to an exemplary embodiment. In this example, the manufacturing process flow 400 begins with green composite material production process inputs 402 being made to a green composite material production physical plant 404 and data pre-processing 406. These inputs in the green composite material production process inputs 402 include materials and settings 408. In this example, the materials and settings 408 are information identifying materials to be used in producing the green composite material 204. If the green composite material 204 is a prepreg, the materials may be, for example, fiber type, fiber size, resin film specification, reinforcement information, fiber information, reinforcement sizing information, resin information, release liner information, resin film information, or other suitable information regarding the materials used to produce the prepreg.

[0108] The settings may be information such as temperature, pressure, tension, and other information that may be used to set up a green composite production physical plant 404 to produce prepreg or to configure a composite manufacturing system. The materials and settings 408 may be part of the upstream information 246.

[0109] With materials and settings 408 as inputs, the green composite production physical plant 404 can perform manufacturing operations to generate green composite production process output 410 in the form of green composite material 204. These operations can be performed using equipment such as composite manufacturing systems within the plant. In this example, a portion of the green composite material 204 can be output as green composite production process output 410 while manufacturing of the portion of the green composite material 204 is being completed.

[0110] Data pre-processing 406 may be a component located on computer system 210 that processes green composite material production process inputs 402 for use by certain models 233 in determining predicted properties 224. For example, data pre-processing 406 may process materials and settings 408 to form upstream information 246 that is input to certain models 233.

[0111] The sensors 222 monitor the production of the green composite material 204 in real time as the green composite material 204 is being produced and transmit sensor data to the composite material manager 212 in real time as the green composite material 204 is being produced. The composite material manager 212 obtains the sensor data from the sensors 222 and transmits the sensor data to a number of models 233.

[0112] In this example, the sensor data may be sent to a single model in models 233, or to multiple models in models 233. If some of models 233 are single models, the model may be a machine learning model. If some of models 233 are multiple models, the models may be, for example, two machine learning models, a machine learning model and a physics model, or some combination of models. If multiple models in models 233 are used, the outputs of the models may be compared to identify the best prediction of predicted characteristic 224, or the outputs of the models may be combined or fused to form predicted characteristic 224.

[0113] The model 233 generates predicted properties 224. The predictions are made in real time before manufacturing of the green composite material 204 is complete. For example, the predicted properties 224 may be for a portion of the green composite material 204 whose manufacturing has not been completed. In other words, the predicted properties 224 may be determined for a portion of the green composite material 204 before the portion is output as a finished product. The finished product may be used to manufacture the composite part 205.

[0114] In this example, the predicted characteristics 224 can be used to drive an action in actions 241 in the form of a real-time quality record 412. This record can be used to track the portion of green composite material 204 for additional manufacturing operations to produce other green composite material or composite parts.

[0115] The illustration of composite manufacturing environment 200 in Figures 2-4 is not meant to imply physical or architectural limitations to the manner in which an illustrative embodiment may be implemented. Other components may be used in addition to or in place of the illustrated components. Some components may be unnecessary. Also, the blocks are presented to illustrate some functional components. One or more of these blocks may be combined, divided, or combined and divided into different blocks when implemented in an illustrative embodiment.

[0116] For example, composite material manager 212 may be used to predict properties of one or more green composite materials in addition to green composite material 204. These other green composite materials may be produced using other composite manufacturing systems in addition to composite material manufacturing system 208. Furthermore, the additional green composite materials produced using a composite material manufacturing system may be different types of green composite materials produced using different types of composite material manufacturing systems.

[0117] Figures 5 and 6 are examples of composite manufacturing systems that can be used to implement the composite manufacturing system 208 of Figure 2. Sensor systems can be added to these composite manufacturing systems, or existing sensor systems can be augmented to include one or more sensors in an arrangement that can generate the sensor data necessary to predict properties of green composite materials as they are being produced by these composite manufacturing systems.

[0118]

[0031] With reference now to Figure 5, a diagram of a composite manufacturing system configured to perform a film processing process is depicted in accordance with an exemplary embodiment. Composite manufacturing system 500 is shown in block form in Figure 2.

[0119] As shown, the composite manufacturing system 500 is configured to perform a film processing process in which resin is coated onto a film paper.

[0120] In this example, a roll of unfilmed paper 501 feeds paper 503 into a nip 502. The nip comprises a pair of rollers with a gap set between them. As shown, nip 502 comprises roller 504 and roller 506 with a gap 508 between roller 504 and roller 506. The gap can be fixed or can be varied to provide a constant pressure.

[0121] Resin 505 is heated and deposited in resin dam 510 which rests on rollers 504 and 506. Resin dam 510 delivers resin 505 to gap 508 while paper 503 is pulled through gap 508 by paper rewinder 512 onto filmed paper roll 511. Paper 503 becomes filmed paper 514 as resin 505 from resin dam 510 coats paper 503 in gap 508. Filmed paper 514 is collected on filmed paper roll 511.

[0122] In this illustrative example, properties of the filmed paper 514 can be predicted using sensor data generated by a sensor system for the composite manufacturing system 500. For example, the sensor system can measure the tension of the paper 503, the speed at which the paper 503 moves, the gap width of the gap 508, the resin viscosity of the resin 505 in the resin dam 510, the basis weight / area weight, and other parameters. The gap width of the gap 508 and the resin viscosity of the resin in the resin dam 510 can affect how much resin is coated onto the paper 503 to form the filmed paper 514. Resin viscosity is the thickness of the liquid resin and is typically measured in centipoise (cP).

[0123] The resin viscosity of the resin 505 in the resin dam 510 can be measured using a sensor 520 in the resin dam 510. The sensor 520 can be a viscometer. Measurements of the resin viscosity at the gap width of the gap 508 can be used to predict the thickness of the resin 505 on the filmed paper 514. As another example, the resin viscosity can be determined using a dielectric constant measurement. For example, the sensor 520 can apply an oscillating voltage to the resin 505 in the resin dam 510 and measure the current. This type of measurement can be made by a sensor 522 located just after the gap 508 where the sensor 520 applies the oscillating voltage and measures the current. This measurement can be used to predict the amount of resin that will be present on the filmed paper 514 that is collected on the filmed paper roll 511.

[0124] When creating the training data set, the sensor data can be labeled with the actual measurements of resin on the filmed paper 514. For example, paper from each roll can be pre-measured at the beginning of the unfilmed paper roll 501 and the end of the filmed paper roll 511. The weights of the two rolls can be subtracted to get the weight difference to determine the amount of resin. This measurement provides the total resin of the entire filmed paper 514, not just a portion of the filmed paper 514. A certain area of ​​paper can be cut and a sample of the portion taken to weigh the different portions. The weight of the paper is known and its weight can be subtracted and the weight of the sample measured to determine the weight of the resin. The difference between the paper and the resin can be identified to get the amount of resin on the sample.

[0125] Referring to Figure 6, a diagram of a composite manufacturing system configured to perform a prepreg production process is shown in accordance with an exemplary embodiment. In this example, composite manufacturing system 600 is another example implementation of composite manufacturing system 208 shown in block form in Figure 2. Composite manufacturing system 600 is configured to produce green composite material in the form of a prepreg. The prepreg can be produced using a hot melt prepreg process or a solvent-based prepreg process.

[0126] As shown, the composite manufacturing system 600 has two filming rolls, a first filming roll 602 and a second filming roll 604. The filming paper on these rolls is paper with resin. For example, the first filming roll 602 is a source of filming paper 603 and the second filming roll 604 is a source of filming paper 605. These filming rolls can be manufactured using the composite manufacturing system 500 of FIG. 5.

[0127] In this example, composite manufacturing system 600 has four nips. A first nip 606 has roller 608 and roller 610 with a first nip gap 612 between the two rollers. A second nip 614 has roller 616 and roller 618 with a second nip gap 620. A third nip 622 has roller 624 and roller 626 with a third nip gap 628. A fourth nip 630 has roller 632 and roller 634 with a fourth nip gap 636. In this illustrative example, these nips act as squeeze points where pressure can be applied to material moving through the nips.

[0128] As shown, composite manufacturing system 600 includes hot plate 640 and hot plate 642. The system also includes cold plate 644.

[0129] In this illustrative example, first nip 606, second nip 614, third nip 622, fourth nip 630, hot plate 640, and hot plate 642 are maintained at a set temperature. The temperature of each of these components may be set separately from the other components. In other words, the temperature of first nip 606 may be set to a different temperature than second nip 614.

[0130] In this illustrative example, a fiber creel 637 is the source of fibers 638. The fibers are fed through a comb 639 and onto a spreader bar 641 before being moved into the first nip 606.

[0131] As shown, both filmed paper 603 and filmed paper 605 move into a first nip 606 from a first filmed roll 602 and a second filmed roll 604, respectively. A brake 645 on the first filmed roll 602 maintains tension on the filmed paper 603 and a brake 646 on the second filmed roll 604 maintains tension on the filmed paper 605 so that the prepreg 648 does not sag.

[0132] The side of the filmed paper 603 and the side of the filmed paper 605 having the resin face the fibers 638. In this example, temperature and pressure are applied by the first nip 606 to cause the resin to penetrate the filmed paper 603 and the filmed paper 605 into the fibers 638 at the first nip 606.

[0133] For example, the width of the first nip gap 612 in the first nip 606 is selected to apply pressure to the fibers 638 sandwiched between the resin on the filmed paper 603 and the filmed paper 605. Additionally, the rollers 608 and 610 for the first nip 606 have temperatures selected to heat the fibers 638 and the resin on the filmed paper 603 and the filmed paper 605. The heat or pressure at least causes the resin to penetrate the fibers 638 to form the prepreg 648 as the fibers 638, filmed paper 603, and filmed paper 605 exit the first nip 606.

[0134] The other nips, second nip 614, third nip 622, and fourth nip 630, can have nip gaps and roller temperatures set to provide a desired amount of pressure and heating as the prepreg 648 moves through the composite manufacturing system 600 to the prepreg roll 650. The nip gaps and roller temperatures can change the viscosity of the resin and also change the speed of the infiltration process. A hot plate 640 is positioned between the first nip 606 and the second nip 614, and a hot plate 642 is positioned between the second nip 614 and the third nip 622. This hot plate heats the prepreg 648 as it moves between the nips. A cold plate 644 is positioned after the third nip 622 and before the fourth nip 630. This cold plate can reduce the temperature of the prepreg 648. The cold plate 644 reduces the temperature that increases the viscosity of the resin, thereby reducing or stopping the process of resin penetration into the fibers.

[0135] The width of the prepreg 648 can be set by a slitter 656 before the filmed paper 605 is removed. At roller 652, the filmed paper 605 is removed and wound onto a paper roll 654. The prepreg 648 is now comprised of the resin infused fibers 638 on the filmed paper 603 and wound onto a prepreg roll 650.

[0136] In this illustrative example, sensors may be located at different locations between points in composite manufacturing system 600. In this illustrative example, these points may be processing points where steps can be taken to produce prepreg 648. These processing points may be, for example, first nip 606, second nip 614, third nip 622, fourth nip 630. Other processing points may be hot plate 640, hot plate 642, or cold plate 644 where heat or cold is applied to prepreg 648 to heat or cool it.

[0137] These processing points can change the properties of prepreg 648 as it is being manufactured into prepreg 648 until it reaches its final form in prepreg roll 650. Sensors can be placed between these points and used to predict the properties of finished prepreg 648 from the manufacture of prepreg 648 in prepreg roll 650. In other words, sensor data from sensors between these processing points can be used to determine the predicted properties of prepreg 648 in prepreg roll 650 from other locations in composite manufacturing system 600 prior to prepreg roll 650.

[0138] For example, sensor location 660 is located between first nip 606 and second nip 614. As another example, sensor location 662 is located between second nip 614 and third nip 622, and sensor location 664 is located between third nip 622 and hot plate 640. As yet another example, sensor location 666 is located between second nip 614 and hot plate 642. As yet another example, sensor location 667 is located between third nip 622 and cold plate 644.

[0139] In this example, another sensor location, sensor location 671, can be located between the first filmed roll 602 and the first nip 606. As another example, sensor location 669 is located between the fourth nip 630 and the prepreg roll 650. This sensor location is an example of a sensor location that can be used even if the location is not between two processing points. The sensor data for the filmed paper 603 can be used in predicting the properties of the prepreg 648 in the prepreg roll 650.

[0140] In this example, the composite manufacturing system 600 is a hot melt film prepreg system. This exemplary prepreg system is not intended to be limiting as to the types of prepreg systems that may be used. Other examples include other types of prepreg systems that utilize a bath, slurry, spray, or other mechanism to apply resin to the support fibers.

[0141] 7, an illustration of a block diagram of sensor locations in a composite manufacturing system is shown in accordance with an illustrative embodiment. In this illustrative example, a portion 700 of unconsolidated composite material 702 moves in a composite manufacturing system 708 in the direction of arrow 707 from a first point 704 to a second point 706.

[0142] In this illustrative example, a set of actions 710 may be performed on the portion 700 of the green composite material 702 at the first point 704 as the portion 700 of the green composite material 702 passes the first point 704. The set of actions 710 may be one or more actions performed in the manufacture of the green composite material 702. In this example, the set of actions 710 may be selected from at least one of heating, applying pressure, applying tension, applying force, cooling, changing viscosity, or other suitable action.

[0143] For example, if the unconsolidated composite material 702 is a prepreg 712 and the first point 704 is a point component, such as a nip with a roller, the set of measures 710 may be applying pressure and heat to the part 700. As a result of the set of measures 710, a set of properties 714 will exist after the first point 704. The set of properties 714 may change from what existed before the set of measures 710 was performed on the part 700 at the first point 704.

[0144] The set of properties 714 of the portion 700 may be different from the properties that existed before the set of actions were performed on the portion 700 at the first point 704. In other words, the set of actions performed at the first point 704 may change the set of properties 714 of the portion 700 of the unconsolidated composite material 702.

[0145] A set of properties 714 present after performing the set of actions 710 on the portion 700 of the unconsolidated composite material 702 may be detected using a set of sensors 716 at sensor locations 718. The set of sensors 716 may generate sensor data 722. The sensor data 722 may include measurements 723 and metadata 725. If metadata 725 is present in the sensor data 722. The metadata 725 may include, for example, at least one of a timestamp, a sensor location, a sensor identifier, or other suitable information regarding the measurements 723.

[0146] If the green composite material 702 is a prepreg 712, the measurements 723 in the sensor data 722 can be used to determine the amount of resin present in an area, such as part 700. For example, the measurements 723 in the sensor data 722 can be a basis weight. The current amount of resin present can be used to predict the amount of resin that will be present before the manufacturing process for the part 700 of the green composite material 702 is complete.

[0147] This sensor data can be used to predict properties 714 that the portion 700 of the green composite material 702 will have when production of the portion 700 of the green composite material 702 is completed. The set of sensors 716 can be one or more of the sensors 222 in the sensor system 220 for the composite manufacturing system 208.

[0148] In this illustrative example, the sensor location 718 is located after the first point 704 and before the second point 706. The sensor location 718 may be selected to be in a particular location proximate to the first point 704 such that a change in the characteristic 714 caused by taking the action 710 at the first point 704 may be measured by the sensor 716 to generate sensor data 722.

[0149] In this example, the second point 706 is a location within the composite manufacturing system 708 where another set of actions 720 can be performed on the portion 700 of the unconsolidated composite material 702. The set of actions 720 performed at the second point 706 can change the property 714.

[0150] As a result, a set of sensors 716 at sensor locations 718 between the first point 704 and the second point 706 can measure a property 714 that exists after taking action 710 on the portion 700 at the first point 704. The measurements can be made at time intervals 715. For example, measurements can be made every second. By knowing the speed at which the unconsolidated composite material 702 is moving, a property of a particular portion 719, such as portion 700, can be identified. The set of sensors 716 can generate sensor data 722 from the measurements of the set of properties 714 for use in determining a predicted property of the portion 700 of the unconsolidated composite material 702 that will exist when manufacturing of the portion 700 of the unconsolidated composite material 702 is completed.

[0151] 8, an illustration of a side view of a portion of a composite manufacturing system is shown in accordance with an illustrative embodiment. In this illustrative example, first point 800 and second point 802 are examples of first point 704 and second point 706 from FIG. 7. Roller 804 is positioned at first point 800 and roller 806 is positioned at second point 802.

[0152] Unconsolidated composite material in the form of prepreg 807 travels in the direction of arrow 809 from first point 800 to second point 802. The speed of travel is distance / hour, such as feet / second. Knowing the speed at which prepreg 807 travels allows the length and location of part 824 to be known as it travels within the composite manufacturing system.

[0153] In this example, sensor 808 and sensor 810 are positioned at sensor location 812. At sensor location 812, sensor 808 is positioned on top side 814 of prepreg 807. Sensor 808 is positioned on bottom side 816 of prepreg 807.

[0154] In this example, there is tension 820 at first point 800 and tension 822 at second point 802. Additionally, roller 804 applies heat and pressure to prepreg 807 as it moves over roller 804. Sensors 808 and 810 can take real-time measurements of the thickness and reflectivity of portion 824 of prepreg 807 at sensor location 812 resulting from the application of tension, heat, and pressure to prepreg 807 to generate sensor data.

[0155] 9, a top view of a portion of a composite manufacturing system is shown in accordance with an exemplary embodiment. In this example, there is a different sensor positioning compared to the example of FIG. 8. As shown in this top view, a sensor 900 is positioned on a first side 902 of the prepreg 807 at sensor location 812. A sensor 904 is positioned on a second side 906 of the prepreg 807 at sensor location 812, opposite the first side 902.

[0156] In this example, there is a tension 820 at the first point 800 and a tension 822 at the second point 802. Additionally, roller 804 applies heat and pressure to prepreg 807 as it moves over roller 804.

[0157] As shown, sensors 900 and 904 can take real-time measurements of width, conductance, and capacitance of portion 824 of prepreg 807 to generate sensor data. The sensor data of electrical measurements can be used to determine properties of portion 824 of prepreg 807, such as resin uptake and width.

[0158] Sensor data from sensor location 812 or at least one of the other sensor locations can be used to make predictions of properties of portion 824 of prepreg 807 for portion 824 of prepreg 807 when production of portion 824 of prepreg 807 is completed, such as when portion 824 of prepreg 807 is wound onto a prepreg roll. For example, the sensor data can be used to predict properties such as fiber weight per unit area (FAW) and water absorption that portion 824 of prepreg 807 will have.

[0159] The illustration of points, sensor locations, and sensors is provided as an example of one implementation and is not intended to limit how other illustrative examples may be implemented. For example, in another illustrative example, there may be only a single sensor, or there may be more than two sensors. Furthermore, additional sensors may be at sensor location 812 or at other sensor locations between first point 800 and second point 802.

[0160] As yet another example, first point 800 and second point 802 can be locations for other components that perform actions on prepreg 807 other than rollers 804 and 806. For example, collars, spreader bars, combs, collars, nips, unwinders, or other components may be at first point 800 and second point 802.

[0161] Referring to Figure 10, a flow chart of a process for identifying a quality level of a portion of an unconsolidated composite material is illustrated, according to an exemplary embodiment. The process of Figure 10 may be implemented in hardware, software, or both. If implemented in software, the process may take the form of program code executed by one or more processor units located in one or more hardware devices in one or more computer systems. For example, the process may be implemented in composite manager 212 of computer system 210 of Figure 2.

[0162] As shown, the process begins by receiving sensor data from a sensor system for a composite manufacturing system, where the sensor data is received during production of green composite material by the composite manufacturing system (operation 1000). The process uses the sensor data to determine a set of predicted properties of the portions of the green composite material when completed from production by the composite manufacturing system (operation 1002). The process identifies a quality level of the portions of the green composite material based on the set of predicted properties of the portions of the green composite material (operation 1004). The process then ends.

[0163] 11, a flow chart of a process for marking an unconsolidated composite material is shown according to an example embodiment. The acts in this figure are examples of additional acts that may be used within the acts of the process of FIG.

[0164] As shown, the process performs a marking action based on the identified quality level for several portions of the green composite material (operation 1100), after which the process ends.

[0165] 12, a flowchart of a process for marking out-of-tolerance portions of unconsolidated composite material as unusable is depicted in accordance with an illustrative embodiment. The operation in this figure is an example of an implementation for operation 1100 in FIG.

[0166] The process marks portions of green composite material within the portions of green composite material as unusable based on the quality level of the portions being outside the tolerance (operation 1200). The process then ends.

[0167] 13, an illustration of a flow chart of a process for marking an in-tolerance portion of unconsolidated composite material as usable is shown, in accordance with an illustrative embodiment. The operations in this illustration are an example of an implementation of operation 1100 of FIG.

[0168] The process marks the number of portions of green composite material within the number of portions of green composite material as usable based on the quality levels of the portions being within the tolerance (operation 1300), with the process then terminating.

[0169] 14, a flow chart of a process for marking portions of unconsolidated composite material with a quality level is shown, according to an example embodiment. The operations in this figure are an example of an implementation of operation 1100 of FIG. 11.

[0170] The process marks portions of the green composite material within the portions of the green composite material with a quality level (operation 1400), after which the process ends.

[0171] 15, an illustration of a flowchart of a process for recording a quality level of a portion of green composite material is shown in accordance with an illustrative embodiment. The operation in this illustration is an example of an implementation of operation 1100 of FIG. 11.

[0172] The process records the quality levels of the portions of the green composite material (operation 1500), after which the process ends.

[0173] 16, a flowchart of a process for determining predicted properties of a portion of an unconsolidated composite material is shown in accordance with an illustrative embodiment. The operations in this figure are an example of one implementation of operation 1002 of FIG.

[0174] As shown, the process begins by determining a first set of initial predicted properties of the unconsolidated composite material portion from a machine learning model generated using the sensor data (operation 1600). The process determines a second set of initial predicted properties of the unconsolidated composite material portion from a physical model generated using the sensor data (operation 1602). The process determines a set of predicted properties of the unconsolidated composite material portion from a fusion of the first set of initial predicted properties and the second set of initial predicted properties (operation 1604). The process then ends.

[0175] 17, a flow chart of processes for training a machine learning model to predict properties of a green composite material prior to completing fabrication of the green composite material is illustrated, according to an exemplary embodiment. The processes of FIG. 17 may be implemented in hardware, software, or both. If implemented in software, the processes may take the form of program code executed by one or more processor units located in one or more hardware devices in one or more computer systems. For example, the processes may be implemented in composite manager 212 of computer system 210 of FIG. 2.

[0176] The process begins by setting the scope of data collection, operation 1700. In operation 1700, the scope is set such that data is collected at sufficient resolution iterations to train and validate a test model.

[0177] The process collects data (operation 1702). In this operation, historical data is collected from the production of the green composite material. This data can include sensor data, upstream data, and inspection data. The inspection data is generated by sampling and testing the produced green composite material to determine properties of interest. These properties of interest are used to assess the quality of the green composite material and whether the green composite material is suitable for a particular application.

[0178] The process trains a set of machine learning models (operation 1704). At operation 1704, one or more model types can be selected for training. If multiple types of models are selected, an evaluation can be performed to see which machine learning model provides the most accurate predictions.

[0179] In operation 1704, properties and parameters are selected for use in training. The properties are characteristics of the green composite material that are of interest in determining the quality and suitability of the green composite material for use. The parameters are selected as parameters that have a correlation or influence on the selected properties. In other words, when the parameters are changed, those changes may have an effect on the properties obtained for the green composite material.

[0180] Operation 1704 may also include hyperparameter optimization, where hyperparameters in the model may be set as parameters or variables that are set prior to actually optimizing the parameters or variables selected to train the model. Hyperparameters may include model selection, for example.

[0181] The process determines an error in estimating the characteristic (operation 1706). In operation 1706, the validation data may be used to determine an error made in predicting the characteristic.

[0182] The process then determines whether the selected machine learning model has a desired level of accuracy (operation 1708). This desired level of accuracy can be tested using a portion of the partitioned historical data as test data. If the level of accuracy does not exist, the process generates a test data set using a design of experiments (operation 1710). The process then returns to operation 1702 and collects data using a data generation technique generated by the design of experiments. Design of experiments is a statistical method that guides the execution of experiments to generate training.

[0183] Referring back to operation 1708, if the selected machine learning model has a desired level of accuracy, the process predicts properties of the green composite material portion in real time, where properties are predicted for the green composite material portion prior to completing fabrication of the portion (operation 1712). The process then terminates.

[0184] Referring to Figure 18, a flow chart of a process for taking corrective action on a portion of unconsolidated composite material is illustrated, according to an exemplary embodiment. The process of Figure 18 may be implemented in hardware, software, or both. If implemented in software, the process may take the form of program code executed by one or more processor units located in one or more hardware devices in one or more computer systems. For example, the process may be implemented in composite manager 212 of computer system 210 of Figure 2.

[0185] As shown, the process begins with receiving sensor data from a sensor system for a composite manufacturing system, where the sensor data is received by the composite manufacturing system during production of a green composite material (operation 1800). The process uses the sensor data to determine a set of predicted properties for the portions of the green composite material, where the set of predicted properties is for the portions of the green composite material as a finished product (operation 1802). The process takes corrective action based on a quality level of the portions of the green composite material (operation 1804). The process then terminates.

[0186] 19, an illustration of a flowchart of a process for taking corrective action on out-of-tolerance portions of unconsolidated composite material is shown in accordance with an illustrative embodiment. The operations in this illustration are an example of an implementation for operation 1804 of FIG.

[0187] As shown, the process takes corrective action in response to a set of predicted properties of some parts being outside of specified tolerances for the unconsolidated composite material (operation 1900), with the process then terminating.

[0188]

[00146] Referring now to Figure 20, an illustration of a flow chart of a process for adjusting parameters of an out-of-tolerance portion of an unconsolidated composite material is shown in accordance with an illustrative embodiment. The operations in this illustration are an example of an implementation of operation 1804 of Figure 18.

[0189] As shown, the process adjusts a set of parameters in a composite manufacturing system to change a set of predicted properties of the portions of the green composite material in response to the set of predicted properties of the portions being outside of specified tolerances for the green composite material (operation 2000), with the process then terminating.

[0190] 21, an illustration of a flow chart of a process for adjusting parameters of an within-tolerance portion of an unconsolidated composite material is shown, in accordance with an illustrative embodiment. The operations in this illustration are an example of an implementation of operation 1804 of FIG. 18.

[0191] As shown, the process adjusts a set of parameters in a composite manufacturing system such that a set of predicted properties of several portions of the green composite material are within the tolerances of the green composite material (operation 2100), after which the process ends.

[0192] 22, an illustration of a flowchart of a process for adjusting parameters such that a portion of unconsolidated composite material is within tolerance is shown in accordance with an illustrative embodiment. The operations in this illustration are an example of an implementation of operation 1804 of FIG. 18.

[0193] As shown, the process adjusts a set of parameters in a composite manufacturing system such that a set of predicted properties of several portions of the green composite material are within a second tolerance for a second type of use of the green composite material (operation 2200), after which the process ends.

[0194] 23, an illustration of a flow chart of a process for adjusting parameters of a subsequent portion of an unconsolidated composite material is shown, in accordance with an illustrative embodiment. The operations in this illustration are an example of an implementation of operation 1804 of FIG. 18.

[0195] As shown, in response to a set of predicted properties of the number of portions being outside of specified tolerances for the green composite material, the process adjusts a set of parameters in the composite manufacturing system such that a set of predicted properties of a subsequent portion of the number of portions of the green composite material is within the tolerances for the green composite material (operation 2300). The process then terminates.

[0196] With reference now to Figure 24, an illustration of a flow chart of a process for modifying raw materials is shown in accordance with an illustrative embodiment. The acts in this figure are an example of an implementation for act 1804 of Figure 18.

[0197] As shown, in response to a set of predicted properties of the number of portions being outside of specified tolerances for the green composite material, the process modifies a number of raw materials used to form the green composite material such that a set of predicted properties of a subsequent portion of the number of portions of the green composite material is within the tolerances for the green composite material (operation 2400). The process then terminates.

[0198] 25, a flowchart of a process for determining predicted properties of an unconsolidated composite material is shown in accordance with an illustrative embodiment. The operations in this figure are examples of additional operations that may be used within the process operations of FIG.

[0199] As shown, the process uses sensor data, machine learning models, and physics models to determine a set of predicted properties for portions of the unconsolidated composite material (operation 2500), after which the process ends.

[0200] The flowcharts and block diagrams in the different illustrated embodiments illustrate the architecture, functionality, and operation of some possible implementations of the apparatus and methods in the exemplary embodiments. In this regard, each block in the flowcharts or block diagrams may represent at least one of a module, a segment, a function, or a portion of an operation or step. For example, one or more of the blocks may be implemented as program code, hardware, or a combination of program code and hardware. If implemented in hardware, the hardware may take the form of, for example, an integrated circuit that is manufactured or configured to perform one or more operations in the flowcharts or block diagrams. If implemented as a combination of program code and hardware, the implementation may take the form of firmware. Each block in the flowcharts or block diagrams may be implemented using a dedicated hardware system performing different operations, or a combination of dedicated hardware and program code executed by the dedicated hardware.

[0201] In some alternative implementations of the exemplary embodiments, one or more functions noted in the blocks may occur out of the order noted in the figures. For example, in some cases, two blocks shown in succession may occur substantially simultaneously, or the blocks may sometimes occur in the reverse order, depending on the functionality involved. Also, other blocks may be added in addition to the blocks noted in the flowcharts or block diagrams.

[0202] Referring now to Figure 26, a block diagram of a data processing system is shown in accordance with an exemplary embodiment. The data processing system 2600 may be used to implement the server computer 104, the server computer 106, or the client device 110 of Figure 1. The data processing system 2600 may also be used to implement the computer system 210 of Figure 2. In this illustrative example, the data processing system 2600 includes a communications framework 2602 that provides communications between a processor unit 2604, a memory 2606, a persistent storage device 2608, a communications unit 2610, an input / output (I / O) unit 2612, and a display 2614. In this example, the communications framework 2602 takes the form of a bus system.

[0203] The processor unit 2604 is responsible for executing instructions for software that may be loaded into the memory 2606. The processor unit 2604 includes one or more processors. For example, the processor unit 2604 may be selected from at least one of a multi-core processor, a central processing unit (CPU), a graphics processing unit (GPU), a physics processing unit (PPU), a digital signal processor (DSP), a network processor, or some other suitable type of processor. Additionally, the processor unit 2604 may be implemented using one or more heterogeneous processor systems in which a main processor resides on a single chip along with secondary processors. As another illustrative example, the processor unit 2604 may be a symmetric multiprocessor system that includes multiple processors of the same type on a single chip.

[0204] Memory 2606 and persistent storage 2608 are examples of storage devices 2616. A storage device is any hardware that can store information, such as, but not limited to, data, program code in a functional form, or other suitable information, on a temporary, persistent, or both temporary and persistent basis. Storage devices 2616 may also be referred to as computer-readable storage devices in these illustrative examples. Memory 2606, in these examples, may be, for example, a random access memory or any other suitable volatile or non-volatile storage device. Persistent storage 2608 may take various forms depending on the particular implementation.

[0205] For example, persistent storage 2608 may contain one or more components or devices. For example, persistent storage 2608 may be a hard drive, a solid-state drive (SSD), a flash memory, a rewritable optical disk, a rewritable magnetic tape, or some combination of the above. The media used by persistent storage 2608 may also be removable. For example, a removable hard drive could be used for persistent storage 2608.

[0206] Communications unit 2610, in these illustrative examples, provides for communication with other data processing systems or devices. In these illustrative examples, communications unit 2610 is a network interface card.

[0207] The input / output unit 2612 allows for the input and output of data to and from other devices that may be connected to the data processing system 2600. For example, the input / output unit 2612 may provide a connection for user input via at least one of a keyboard, a mouse, or some other suitable input device. Further, the input / output unit 2612 may send output to a printer. The display 2614 provides a mechanism for displaying information to a user.

[0208] Instructions for at least one of the operating system, applications, or programs may be located in storage devices 2616, which are in communication with processor unit 2604 via communications framework 2602. The processes of the different embodiments may be performed by processor unit 2604 using computer-implemented instructions, which may be located in a memory, such as memory 2606.

[0209] These instructions, which may be read and executed by a processor in processor unit 2604, are also referred to as program code, computer usable program code, or computer readable program code. The program code in different embodiments may be embodied on different physical or computer readable storage media, such as memory 2606 and persistent storage 2608.

[0210] The program instructions 2618 are located in a functional form on a selectively removable computer readable medium 2620 and may be loaded onto or transferred to the data processing system 2600 for execution by processor unit 2604. The program instructions 2618 and the computer readable medium 2620 form a computer program product 2622 in these illustrative examples. In the illustrative example, the computer readable medium 2620 is a computer readable storage medium 2624.

[0211] Computer readable storage medium 2624 is a physical or tangible storage device used to store program instructions 2618, rather than a medium that propagates or transmits program instructions 2618. Computer readable storage medium 2624, as used herein, should not be interpreted as a transitory signal itself, such as radio waves or other freely propagating electromagnetic waves, electromagnetic waves propagating through a waveguide or other transmission medium (e.g., light pulses through a fiber optic cable), or electrical signals transmitted over wires.

[0212] Alternatively, the program instructions 2618 may be transferred to the data processing system 2600 using a computer readable signal medium. The computer readable signal medium is a signal, such as a propagated data signal that includes the program instructions 2618. For example, the computer readable signal medium may be at least one of an electromagnetic signal, an optical signal, or any other suitable type of signal. These signals may be transmitted over a connection, such as a wireless connection, a fiber optic cable, a coaxial cable, a wire, or any other suitable type of connection.

[0213] Additionally, as used herein, "computer readable medium 2620" may refer to either the singular or the plural. For example, the program instructions 2618 may be located on the computer readable medium 2620 in the form of a single storage device or system. In another example, the program instructions 2618 may be located on computer readable medium 2620 distributed across multiple data processing systems. In other words, some instructions within the program instructions 2618 may be located in one data processing system, while other instructions within the program instructions 2618 may be located in multiple data processing systems. For example, a portion of the program instructions 2618 may be located in the computer readable medium 2620 in a server computer, while another portion of the program instructions 2618 may be located in the computer readable medium 2620 located in a set of client computers.

[0214] The different components illustrated for data processing system 2600 are not meant to provide architectural limitations to the manner in which different embodiments may be implemented. In some illustrative examples, one or more of the components may be incorporated into or otherwise form a part of another component. For example, in some illustrative examples, memory 2606, or portions thereof, may be incorporated into processor unit 2604. The different illustrative embodiments may be implemented in a data processing system including components in addition to or in place of the components illustrated for data processing system 2600. Other components depicted in FIG. 26 may differ from the illustrated illustrative example. The different embodiments may be implemented using any hardware device or system capable of executing program instructions 2618.

[0215] An example embodiment of the disclosure may be described in the context of aircraft manufacturing and service method 2700, as shown in Figure 27, and aircraft 2800, as shown in Figure 28. Referring initially to Figure 27, an aircraft manufacturing and service method is illustrated in accordance with an example embodiment. During pre-production, aircraft manufacturing and service method 2700 may include specification and design 2702 and material procurement 2704 of aircraft 2800 in Figure 28.

[0216] During production, component and subassembly manufacturing 2706 and systems integration 2708 of the aircraft 2800 of Figure 28 occurs. The aircraft 2800 of Figure 28 may then undergo certification and delivery 2710 before being placed in service 2712. While in service 2712 by a customer, the aircraft 2800 of Figure 28 is scheduled for routine maintenance and service visits 2714, which may include modifications, reconfigurations, modifications, and other maintenance or service visits.

[0217] Each of the processes of aircraft manufacturing and service method 2700 may be performed or carried out by a system integrator, a third party, an operator, or some combination thereof. In these examples, the operator may be a customer. For purposes of this description, a system integrator may include, but is not limited to, any number of aircraft manufacturers and major system subcontractors, a third party may include, but is not limited to, any number of dealers, subcontractors, and suppliers, and an operator may be an airline, a leasing company, a military entity, a service organization, etc.

[0218] Referring now to Figure 28, an aircraft in which an illustrative embodiment may be implemented is illustrated. In this example, aircraft 2800 may be produced by aircraft manufacturing and service method 2700 of Figure 27 and may include an airframe 2802 having a number of systems 2804 and an interior 2806. Example systems 2804 include one or more of propulsion system 2808, electrical system 2810, hydraulic system 2812, and environmental system 2814. Any number of other systems may be included. Although an aerospace example is shown, different illustrative embodiments may be applied to other industries, such as the automotive industry.

[0219] Apparatus and methods embodied herein may be employed during at least one of the stages of aircraft manufacturing and service method 2700 in FIG.

[0220] In one illustrative example, components or subassemblies produced in component and subassembly manufacturing 2706 of Figure 27 may be fabricated or manufactured in a similar manner as components or subassemblies produced while aircraft 2800 is in service 2712 of Figure 27. As yet another example, one or more apparatus embodiments, method embodiments, or combinations thereof may be utilized during production stages such as component and subassembly manufacturing 2706, system integration 2708 of Figure 27. One or more apparatus embodiments, method embodiments, or combinations thereof may be utilized during maintenance and service 2714 of Figure 27 when aircraft 2800 is in service 2712, or both. Use of different illustrative embodiments may significantly expedite assembly of aircraft 2800 and / or reduce costs of aircraft 2800. Quality improvements in the production of green composite material during component and subassembly manufacturing 2706 or maintenance and service 2714 may reduce at least one of the time or cost required to produce the green composite material. The ability to determine which portions of the green composite material meet a desired quality level may result in less green composite material being scrapped or reworked.

[0221] With reference now to Figure 29, an illustration of a block diagram of a product management system is shown in accordance with an illustrative embodiment. Product management system 2900 is a physical hardware system. In this illustrative example, product management system 2900 includes at least one of a manufacturing system 2902 or a maintenance system 2904.

[0222] Manufacturing system 2902 is configured to manufacture products, such as aircraft 2800 in Figure 28. As shown, manufacturing system 2902 includes manufacturing equipment 2906. Manufacturing equipment 2906 includes at least one of fabrication equipment 2908 or assembly equipment 2910.

[0223] Fabrication equipment 2908 is equipment used to fabricate components for parts used to form aircraft 2800 in FIG. 28. For example, fabrication equipment 2908 can include machines and tools. The machines and tools may be at least one of a drill, a hydraulic press, a furnace, an autoclave, a mold, a composite tape laying machine, an automated fiber placement (AFP) machine, a vacuum system, a robotic pick and place system, a flatbed cutting machine, a laser cutter, a computer numerically controlled (CNC) cutting machine, a lathe, or other suitable type of equipment. Fabrication equipment 2908 may be used to fabricate at least one of a metal part, a composite part, a semiconductor, a circuit, a fastener, a rib, a skin panel, a spar, an antenna, or other suitable type of part.

[0224] Assembly equipment 2910 is equipment used to assemble parts to form aircraft 2800 of FIG. 28. In particular, assembly equipment 2910 is used to assemble components and parts to form aircraft 2800 of FIG. 28. Assembly equipment 2910 may also include machines and tools. These machines and tools may be at least one of a robotic arm, a crawler, a rapid installation system, a rail-based drilling system, or a robot. Assembly equipment 2910 may be used to assemble parts such as seats, horizontal stabilizers, wings, engines, engine housings, landing gear systems, and other parts for aircraft 2800 of FIG. 28.

[0225] In this illustrative example, maintenance system 2904 includes maintenance equipment 2912. Maintenance equipment 2912 may include any equipment necessary to perform maintenance on aircraft 2800, FIG. 28. Maintenance equipment 2912 may include tools for performing different operations on parts of aircraft 2800, FIG. 28. These operations may include at least one of disassembling the part, refurbishing the part, inspecting the part, reworking the part, manufacturing a replacement part, or other operations for performing maintenance on aircraft 2800, FIG. 28. These operations may be for routine maintenance, inspection, upgrade, refurbishment, or other types of maintenance work.

[0226] In illustrative examples, maintenance equipment 2912 may include ultrasonic inspection devices, x-ray imaging systems, vision systems, drills, crawlers, and other suitable devices. In some cases, maintenance equipment 2912 may include fabrication equipment 2908, assembly equipment 2910, or both to produce and assemble parts required for maintenance.

[0227] The product management system 2900 also includes a control system 2914. The control system 2914 is a hardware system and may also include software or other types of components. The control system 2914 is configured to control the operation of at least one of the manufacturing system 2902 or the maintenance system 2904. In particular, the control system 2914 may control the operation of at least one of the production equipment 2908, the assembly equipment 2910, or the maintenance equipment 2912.

[0228] The hardware in control system 2914 may be implemented using hardware that may include computers, circuits, networks, and other types of equipment. The control may take the form of direct control of manufacturing equipment 2906. For example, robots, computer controlled machines, and other equipment may be controlled by control system 2914. In other illustrative examples, control system 2914 may manage work performed by human operators 2916 in manufacturing or maintaining aircraft 2800. For example, control system 2914 may assign tasks, provide instructions, display models, or perform other actions to manage work performed by human operators 2916. In these illustrative examples, composite material manager 212 of FIG. 2 may be implemented in control system 2914 to manage production of unconsolidated composite materials for use in at least one of manufacturing or maintenance of aircraft 2800 of FIG. 28. These unconsolidated composite materials may be used to manufacture composite parts or to rework composite parts in at least one of manufacturing or maintenance of aircraft 2800 of FIG. 28.

[0229] In a different illustrative example, human operator 2916 may operate or interact with at least one of manufacturing equipment 2906, maintenance equipment 2912, or control system 2914. This interaction may occur to manufacture aircraft 2800 in Figure 28.

[0230] Of course, product management system 2900 may be configured to manage other products other than aircraft 2800 of Figure 28. Although product management system 2900 has been described with respect to aerospace manufacturing, product management system 2900 may be configured to manage products for other industries. For example, product management system 2900 may be configured to manufacture products for the automotive industry, as well as other suitable industries.

[0231] Some aspects of the illustrative examples are described in the following appended clauses, which are examples of aspects and are not intended to limit other illustrative examples.

[0232] Additional notes 1 A computer system; a composites manager in a computer system; Equipped with The Composites Manager receiving sensor data from a sensor system for the composite manufacturing system, the sensor data being received during production of the unconsolidated composite material by the composite manufacturing system; Using the sensor data to determine a set of predicted properties of the portions of the unconsolidated composite material as completed from production by the composite manufacturing system; A composite material management system configured to identify a quality level of the number of portions of the green composite material based on a set of predicted characteristics of the number of portions of the green composite material.

[0233] Additional note 2 The Composites Manager performing marking measures on the portions of the green composite material based on the identified quality levels; The composite material management system according to claim 1, configured as follows:

[0234] Additional note 3 performing marking actions based on the identified quality levels for the portions of the green composite material; marking some portions of the unconsolidated composite material as unusable based on the quality level of the portions being out of tolerance; The composite material management system according to claim 2, configured as follows:

[0235] Additional note 4 performing marking actions based on the identified quality levels for the portions of the green composite material; marking some portions of the green composite material as usable based on the quality level of the portions being within tolerance; The composite material management system according to claim 2 or 3, configured as follows:

[0236] Additional note 5 performing marking actions based on the identified quality levels for the portions of the green composite material; Marking some parts of the green composite material with a quality level; The composite material management system according to any one of claims 2 to 4, configured as follows:

[0237] Additional note 6 performing marking actions based on the identified quality levels for the portions of the green composite material; Recording the quality level of several portions of green composite material; The composite material management system according to any one of claims 2 to 5, configured as follows:

[0238] Additional note 7 7. The composite material management system of any one of claims 1 to 6, further comprising a composite material manufacturing system.

[0239] Additional note 8 8. The composite material management system according to any one of claims 3 to 7, wherein the composite material manufacturing system is one of a carbon fiber prepreg coating line, a reinforced fiber resin impregnation line, a resin mixing processing system, a resin film processing line, a prepreg system, and a slit processing system.

[0240] Additional note 9 9. A composite material management system as described in any one of claims 1 to 8, wherein the set of sensors in the sensor system are at sensor locations located between a first point and a second point in the composite material manufacturing system, the first point being a point that performs a set of actions on a portion of the unconsolidated composite material as the portion passes through the first point.

[0241] Additional note 10 Machine learning models, 10. A composite material management system as described in any one of claims 1 to 9, wherein the composite material manager uses sensor data and machine learning models to determine a set of predicted properties of the portion of unsolidified composite material.

[0242] Additional note 11 Machine learning models and A physical model, Further equipped with 11. A composite material management system as described in any one of claims 1 to 10, wherein the composite material manager uses sensor data, machine learning models, and physical models to determine a set of predicted properties of the portion of unsolidified composite material.

[0243] Additional note 12 The Composites Manager In determining a set of predicted properties for a portion of unconsolidated composite material, determining a first set of initial predicted properties of the portion of unconsolidated composite material from the machine learning model generated using the sensor data; determining a second set of initial predicted properties of the portion of the unconsolidated composite material from the generated physical model using the sensor data; determining a set of predicted properties for the portion of the unconsolidated composite material from a blend of the first set of initial predicted properties and the second set of initial predicted properties; The composite material management system according to claim 11, configured as follows:

[0244] Additional note 13 13. The composite management system of any one of appended claims 1 to 12, wherein the unconsolidated composite material is selected from at least one of prepreg, aerospace grade prepreg, thermoset prepreg, thermoplastic prepreg, woven prepreg, fiber tow prepreg, tow prepreg, unidirectional tape prepreg, resin coated film, non-crimp woven fabric, or resin blend.

[0245] Additional note 14 14. The composite management system of any one of claims 1 to 13, wherein the sensor data includes at least one of a component temperature, a temperature of the unconsolidated composite material, an ambient temperature, humidity, a roller speed, a speed of the unconsolidated composite material, a pressure between the pair of rollers, a gap between the pair of rollers, a thickness of the unconsolidated composite material, a Fourier transform infrared (FTIR) spectrum, spectroscopic data, a material width, a fiber web width, a material basis weight, a fiber basis weight, a resin viscosity, an electrical measurement across a dimension of the unconsolidated composite material, a voltage across a dimension of the unconsolidated composite material, an electromagnetic measurement across a dimension of the unconsolidated composite material, an acoustic measurement across a dimension of the unconsolidated composite material, a tension, or an image of a prepreg at a location within the composite manufacturing system.

[0246] Additional note 15 15. A composite material management system according to any one of claims 1 to 14, wherein the composite material manager is configured to receive upstream information selected from at least one of reinforcement information, fiber information, reinforcement sizing information, resin information, release liner information, or resin film information.

[0247] Additional note 16 16. The composite material management system of any one of claims 1 to 15, wherein the set of characteristics includes at least one of prepreg fiber weight per unit area, prepreg resin content, prepreg thickness, prepreg penetration level, prepreg tack level, resin film weight per unit area, resin film thickness, release liner weight per unit area, release liner thickness, or laminate structure characteristics.

[0248] Additional note 17 a carbon fiber prepreg coating line operative to produce a length of prepreg from the fiber and a resin coated film; a sensor system operative to generate sensor data for the carbon fiber prepreg coating line during operation of the carbon fiber prepreg coating line; A composites manager; Equipped with The Composites Manager receiving sensor data from a sensor system for the composite manufacturing system, the sensor data being received during production of the unconsolidated composite material by the composite manufacturing system; Using the sensor data to determine a set of predicted properties of the portions of the prepreg as completed from production by the composite manufacturing system; A composite material management system that identifies a quality level of several portions of prepreg based on a set of predicted properties of the several portions of unconsolidated composite material.

[0249] Additional note 18 The Composites Manager In identifying a quality level of several portions of prepreg based on a set of predicted properties of several portions of unconsolidated composite material, 18. The composite material management system of claim 17, configured to mark a portion of a prepreg within some portions of the prepreg as unusable based on a quality level of the portion being outside of the tolerance.

[0250] Additional note 19 The Composites Manager identifying a quality level of the several portions of the green composite material based on the set of predicted properties of the several portions of the green composite material; 19. The composite material management system of claim 17 or 18, configured to mark some portions of the prepreg as usable based on a quality level of the portions being within a tolerance.

[0251] Additional note 20 The composites manager, in identifying a quality level of the several portions of the prepreg based on a set of predicted properties of the several portions of the prepreg, 20. The composite material management system of any one of claims 17 to 19, configured to mark portions of prepregs within several portions of the prepreg with a quality level.

[0252] Additional note 21 21. The composite material management system according to any one of claims 17 to 20, wherein the fiber is in a form selected from a tow, a tape, and a woven fabric, and the resin-coated film is a resin-coated paper.

[0253] Additional note 22 1. A method for producing an unconsolidated composite material, comprising: The method is: receiving sensor data from a sensor system for a composite manufacturing system, the sensor data being received during production of an unconsolidated composite material by the composite manufacturing system; using the sensor data to determine a set of predicted properties of the portions of the green composite material as completed from production by the composite manufacturing system; identifying a quality level of the portions of the green composite material based on a set of predicted properties of the portions of the green composite material; A method comprising:

[0254] Additional note 23 23. The method of claim 22, further comprising a step of performing a marking action on some portions of the unconsolidated composite material based on the identified quality level.

[0255] Additional note 24 performing a marking action on the portions of the green composite material based on the identified quality level, marking a portion of the green composite material within the several portions of the green composite material as unusable based on a quality level of the portion being outside of the tolerance; The method according to claim 23, comprising:

[0256] Additional note 25 performing a marking action on the portions of the green composite material based on the identified quality level, marking a portion of the green composite material within the number of portions of the green composite material as usable based on a quality level of the portion being within tolerance; 25. The method according to claim 23 or 24, comprising:

[0257] Additional note 26 performing a marking action on the portions of the green composite material based on the identified quality level, marking portions of the green composite material within the portions of the green composite material with a quality level; 26. The method according to any one of claims 23 to 25, comprising:

[0258] Additional note 27 performing a marking action on the portions of the green composite material based on the identified quality level, recording a quality level of the several portions of the green composite material; 27. The method according to any one of claims 23 to 26, comprising:

[0259] Additional note 28 28. The method of any one of clauses 22 to 27, wherein the set of predicted properties of the portion of the unconsolidated composite material is determined using sensor data, a machine learning model, and a physics model.

[0260] Additional note 29 Determining a set of predicted properties for the portions of the unconsolidated composite material includes: determining a first set of initial predicted properties of the portion of the unconsolidated composite material from a machine learning model generated using the sensor data; determining a second set of initial predicted properties of the portion of unconsolidated composite material from a physical model generated using the sensor data; determining a set of predicted properties for the portion of the unconsolidated composite material from a blend of the first set of initial predicted properties and the second set of initial predicted properties; 29. The method according to any one of claims 22 to 28, comprising:

[0261] Additional note 30 30. The method of any one of clauses 22 to 29, wherein the set of predicted properties of the portion of the unconsolidated composite material is determined using sensor data and a machine learning model.

[0262] Additional note 31 31. The method of any one of claims 22 to 30, wherein the composite material manufacturing system is a carbon fiber prepreg coating line.

[0263] Additional note 32 32. The method of any one of claims 22 to 31, wherein the unconsolidated composite material is selected from at least one of a prepreg, a thermosetting prepreg, a woven fabric prepreg, a fiber tow prepreg, a unidirectional tape prepreg, or a resin-coated film.

[0264] Additional note 33 33. The method of any one of claims 22 to 32, wherein the sensor data includes at least one of temperature of the component, temperature of the unconsolidated composite, ambient temperature, humidity, roller speed, speed of the unconsolidated composite, gap between a pair of rollers, thickness of the unconsolidated composite, Fourier transform infrared (FTIR) spectrum, width of the fiber web, fiber basis weight, resin viscosity, voltage across a dimension of the unconsolidated composite, electrical measurements across a dimension of the unconsolidated composite, electromagnetic measurements across a dimension of the unconsolidated composite, acoustic measurements across a dimension of the unconsolidated composite, tension, or an image of the prepreg at a location within the composite manufacturing system.

[0265] Additional note 34 1. A computer program product for manufacturing an unconsolidated composite material, the computer program product including a computer readable storage medium having program instructions embodied therein, the program instructions being for a computer system to: receiving sensor data from a sensor system for the composite manufacturing system, the sensor data being received during production of the unconsolidated composite material by the composite manufacturing system; Using the sensor data to determine a set of predicted properties of the portions of the unconsolidated composite material as completed from production by the composite manufacturing system; A computer program product executable by a computer system to cause the computer system to perform a method of identifying a quality level of portions of a green composite material based on a set of predicted properties of the portions of the green composite material.

[0266] Thus, the illustrative examples provide methods, apparatus, systems, and computer program products for predicting the properties that a green composite material will have when its production is completed while the manufacturing process is taking place. Additionally, the illustrative examples can also use these predictions to take corrective action to change the properties that the green composite material will have when it is completed from production to form a finished product.

[0267] In a different illustrative example, the composite material manager operates to determine a set of predicted properties of the pieces of uncured composite material when completed from manufacturing, in other words, the predictions are for the pieces of uncured composite material when manufacturing of the pieces of uncured composite material is completed to form a completed product.

[0268] As a result, the composite material manager 212 can be used to predict the quality level portion of the green composite material to realize a reduction in at least one of the cost or time required to manufacture the green composite material. Additionally, the reduction can also occur by taking corrective actions during the manufacture of the green composite material to produce additional amounts of green material that are within tolerance. As a result, additional manufacture, rework, or waste of green composite material can be reduced.

[0269] In one example, improved real-time prediction of one or more properties of an unconsolidated composite material, such as a prepreg, allows the composite manufacturing system 208 to be more efficiently managed by the composite management system 202. By predicting properties in real-time while the prepreg is still being manufactured or processed in the composite manufacturing system 208, adjustments can be made to the composite manufacturing system 208 so that other portions of the prepreg being manufactured are not out of tolerance. As a result, by predicting one or more properties of an unconsolidated composite material in real-time, the amount of prepreg that is discarded or recycled can be reduced.

[0270] In these examples, data may be received in real-time from the composite manufacturing system 208. In other words, receiving sensor data in real-time means that the sensor data is received while the composite manufacturing system 208 is operating to produce the unconsolidated composite material. The sensor data is transmitted in real-time as quickly as possible without any intentional delays. In analyzing the sensor data in real-time, the data is processed as quickly as possible while the sensor data is being received.

[0271] The property prediction may be performed using a property prediction system, which may be implemented in the composite management system 202 for use by the composite manager 212. The property predicted by the system may also be referred to as a property of the green composite material, such as property 228. The property may be selected from at least one of prepreg fiber weight per unit area, prepreg resin content, material thickness, prepreg thickness, prepreg penetration level, prepreg tack level, resin film weight per unit area, resin film thickness, release liner weight per unit area, release liner thickness, laminate property, or other property.

[0272] In this illustrative example, predictions of several properties of the green composite material can be made in real time.

[0273] 30, a block diagram of a property prediction system is illustrated, according to an exemplary embodiment. In this example, the property prediction system 3000 can be used to predict several properties 3026 of the green composite material 3024 in a finished form 3027 during the production of the green composite material 3024 using the composite manufacturing system 3023. In other words, several properties 3026 are predicted for the green composite material 3024 before the production of the green composite material 3024 is completed. In one illustrative example, the composite manufacturing system 3023 is an example of the composite manufacturing system 208 of FIG. 2, and can be, for example, a carbon fiber prepreg coating line, a reinforced fiber resin impregnation line, a resin mixing processing system, a resin film processing line, a prepreg system, a slitting system, and other suitable composite manufacturing systems.

[0274] In this example, the property prediction system 3000 includes a computer system 3012 and a prediction manager 3014 .

[0275] As shown, the prediction manager 3014 is located within a computer system 3012. The prediction manager 3014 may be implemented as software, hardware, firmware, or a combination thereof. If software is used, the operations performed by the prediction manager 3014 may be implemented as program instructions configured to run on hardware, such as a processor unit. If firmware is used, the operations performed by the prediction manager 3014 may be implemented as program instructions to run on a processor unit and data may be stored in persistent memory. If hardware is employed, the hardware may include circuitry operative to perform the operations in the prediction manager 3014.

[0276] In illustrative examples, the hardware may take the form of at least one selected from a circuit system, an integrated circuit, an application specific integrated circuit (ASIC), a programmable logic device, or other suitable type of hardware configured to perform a number of operations. In the case of a programmable logic device, the device may be configured to perform a number of operations. The device may be reconfigured at a later time or may be permanently configured to perform a number of operations. Programmable logic devices include, for example, programmable logic arrays, programmable array logic, field programmable logic arrays, field programmable gate arrays, and other suitable hardware devices. Additionally, the process may be implemented as organic components integrated with inorganic components or may be entirely composed of organic components excluding humans. For example, the process may be implemented as circuitry in organic semiconductors.

[0277] As used herein, "some" when used in reference to items means one or more of the items. For example, "some operations" means one or several operations.

[0278] Furthermore, the phrase "at least one of," when used with a list of items, means that different combinations of one or more of the listed items can be used, and only one of each item in the list may be required. In other words, "at least one of" means any combination of items, and while some items from the list may be used, not all items in the list are required. An item may be a particular object, thing, or category.

[0279] For example, without limitation, "at least one of item A, item B, or item C" may include item A, item A and item B, or item B. This example may also include item A, item B, and item C, or item B and item C. Of course, any combination of these items may be present. In some illustrative examples, "at least one of" may be, for example, without limitation, two items A, one item B, and ten items C, four items B and seven items C, or other suitable combinations.

[0280] The computer system 3012 is a physical hardware system and includes one or more data processing systems. When multiple data processing systems are present in the computer system 3012, the data processing systems communicate with each other using a communication medium. The communication medium may be a network. The data processing systems may be selected from at least one of a computer, a server computer, a tablet computer, or any other suitable data processing system.

[0281] As shown, computer system 3012 includes a number of processor units 3016 capable of executing program instructions 3018 that implement the operations of the illustrative example. In other words, program instructions 3018 are computer readable program instructions.

[0282] As used herein, a processor unit in the number of processor units 3016 is a hardware device and is composed of hardware circuits, such as hardware circuits on an integrated circuit, that process in response to instructions and program code to operate a computer. When the number of processor units 3016 execute program instructions 3018 for a process, the number of processor units 3016 may be one or more processor units in the same computer or different computers. In other words, a process may be distributed among processor units 3016 on the same or different computers in the computer system 3012.

[0283] Further, some of the processor units 3016 may be the same type processor unit or different types of processor units, for example, some of the processor units 3016 may be selected from at least one of a single core processor, a dual core processor, a multi-processor core, a general purpose central processing unit (CPU), a graphics processing unit (GPU), a digital signal processor (DSP), or some other type of processor unit.

[0284] In this illustrative example, the prediction manager 3014 receives sensor data 3020 in real time from a sensor 3081 in a sensor system 3021 of the composite manufacturing system 3023 during production of an unconsolidated composite material 3024 by the composite manufacturing system 3023 .

[0285] In these examples, the sensor system 3021 includes a number of different types of sensors 3081. For example, the sensor system 3021 may comprise sensors selected from at least one of a beta gauge sensor, a thickness sensor, a width sensor, a temperature sensor, a speed sensor, a gap sensor, an optical sensor, a Fourier transform infrared (FTIR) spectrometer, a tension sensor, a camera, a thermal camera, an optical sensor, a weight sensor, a chemical spectroscopy sensor, or other suitable types of sensors. The sensors 3081 may be selected from at least one of sensors integrated into the composite material manufacturing system 3023 or sensors disposed relative to the composite material manufacturing system 3023.

[0286] The sensor 3081 is at a location 3082 relative to the composite manufacturing system 3023. For example, the sensor 3081 may be positioned at a location 3082 along a path 3083. In this example, the path 3083 is the path that an input material takes within the composite manufacturing system 3023 for processing to produce an unconsolidated composite material 3024 in a finished form 3027.

[0287] In this example, the green composite manufacturing system may be an example of composite manufacturing system 208 of FIG. 2, green composite production physical plant 404 of FIG. 4, composite manufacturing system 500 configured to perform a film processing process in which resin is coated onto film paper of FIG. 5, and composite manufacturing system 600 configured to produce green composite material in the form of a prepreg of FIG. 6, or other types of composite manufacturing systems.

[0288] The prediction manager 3014 uses a model system 3030 to generate initial predictions 3025 of several properties 3026 of the green composite material 3024 in its finished form 3027 in real time during production of the green composite material 3024 in the composite manufacturing system 3023. In this example, the model system 3030 includes several physics models 3031 and several machine learning models 3032 trained using historical sensor data.

[0289] The number of characteristics 3026 are one or more characteristics of the green composite material 3024. In one illustrative example, the number of characteristics 3026 are characteristics or attributes of the green composite material 3024 that are of interest when evaluating the green composite material 3024. These characteristics can be used to determine whether the green composite material 3024 meets a standard or specification for use in the manufacture of a composite component. Depending on the level characteristics, the green composite material 3024 may or may not be suitable for use. Furthermore, depending on the level of the value of the number of characteristics 3026, the green composite material 3024 may be suitable for different applications or for the manufacture of different composite components.

[0290] Moreover, in the illustrative examples, some of the properties 3026 may be determined at different times or places within the composite manufacturing system 3023 during the production of the green composite material 3024. In other words, these properties are not limited to the green composite material 3024 in its finished form 3027.

[0291] In this illustrative example, the number of physical models 3031 can be selected from at least one of a thermal model, a penetration model, a rheological model, a permeability model that calculates the filtration level of the resin, a thickness model that calculates the reduction in thickness of the composite prepreg, or a resin penetration model that calculates the filtration level of the resin.

[0292] The prediction manager 3014 determines a final prediction 3028 in real time for several properties 3026 based on the initial prediction 3025. By generating the final prediction 3028 in real time during the production of the unconsolidated composite material 3024, a controller 3050 can adjust several processing conditions 3051 of the composite manufacturing system 3023 based on the final prediction 3028. In this illustrative example, the controller 3050 can take a number of different forms. For example, the controller 3050 can be a composite material in the composite material manager 212 of FIG. 2.

[0293] In another illustrative example, the prediction manager 3014 uses sensor data 3020 received in real time from a sensor system 3021 for the composite manufacturing system 3023, several physics models 3031, and several machine learning models 3032 to generate initial predictions 3025 of several properties 3026 of the green composite material 3024 in its finished form 3027 in real time during production of the green composite material 3024 in the composite manufacturing system 3023. In this example, the machine learning models 3032 are trained using the historical sensor data to generate the several initial predictions 3025.

[0294] Additionally, the prediction manager 3014 determines, in real-time during the production of the green composite material 3024, uncertainties 3011 in the initial predictions 3025 of certain properties 3026 of the green composite material 3024 in finished form 3027 from certain physics models 3031 and certain machine learning models 3032 trained using the historical sensor data. In other words, the uncertainties 3011 can be determined in real-time in response to receiving the sensor data 3020 in real-time.

[0295] In these illustrative examples, the uncertainty 3011 has a number of different sources. For example, the uncertainty 3011 can be the uncertainty of the initial prediction 3025 generated by the machine learning models 3032. These machine learning models can include a probability that the initial prediction is accurate. This probability indicates a level of certainty of the initial prediction. As another example, the physical model 3031 can also have uncertainty. For example, a physical model of permeability can have a range of different values ​​that can provide different thicknesses. This distribution can be used to identify the uncertainty of the initial prediction 3025 generated by the physical model 3031.

[0296] As another example, uncertainty may exist in the sensor data 3020. For example, a thickness sensor may produce a range of measurements for the same thickness of a material. This range can be used to identify the uncertainty 3011 of the initial prediction 3025.

[0297] The uncertainty 3011 can be from different sources. For example, the uncertainty 3011 can be caused by at least one of the model, the sensor data used by the model, or the input materials. The model may not predict a property that matches the property of the unconsolidated composite material. This prediction may differ from the prediction to an actual measurement of the property, and the difference may be used to determine the uncertainty of the prediction made by the model.

[0298] In another example, a model may be accurate in predicting a property, but the sensor data used by the model may have uncertainty. For example, a temperature sensor may produce a range of temperature measurements that differ from the actual temperature. This variance is an uncertainty that can cause the predictions of properties made by the model to not match the properties of the unconsolidated composite material, even if the model itself is accurate.

[0299] Additionally, the input material may also have uncertainties from the specified values, for example, the weight of a roll of input material in the form of fibers may have uncertainties, for example, there may be uncertainties in at least one of the paper weight or resin weight of the input material.

[0300] Using the uncertainty 3011, the prediction manager 3014 associates an initial prediction 3025 and a weight 3019 for some of the characteristics 3026 using the uncertainty 3011. In this example, the prediction manager 3014 determines a final prediction 3028 for some of the characteristics 3026 based on the initial prediction 3025 and the weight 3019 associated with the initial prediction 3025. For example, the final prediction 3028 for some of the characteristics 3026 can be determined by the prediction manager 3014 based on determining the initial prediction 3025 and the weight 3019 associated with the initial prediction using at least one of a voting regression, a stacking regression, a bagging estimator, or other canopy for amalgamating multiple candidates or selecting a final candidate or choice from multiple candidates.

[0301] Referring now to Figure 31, a block diagram of processing conditions according to an exemplary environment is shown. In the illustrative examples, the same reference numbers may be used in multiple figures. This reuse of reference numbers in different figures represents the same elements in the different figures.

[0302] In this illustrative example, several process conditions 3051 and parameters are set for selection prior to commencing production of green composite material 3024. These process conditions may also be referred to as pre-set conditions.

[0303] In this example, some process conditions 3051 can take a number of different forms. For example, process conditions 3051 can include at least one of input materials 3100 to a composite manufacturing system 3023 or settings 3102 for the composite manufacturing system 3023.

[0304] In these examples, the input material 3100 includes different types of materials that can be used as inputs into the composite manufacturing system 3023 to produce the green composite material 3024. The input material 3100 can include at least one of a resin, certain fibers, a film, some tows, or any other material that can be input into the composite manufacturing system 3023 for use in producing the green composite material 3024.

[0305] The type of fiber used to make the prepreg can affect properties 3026 such as fiber weight per unit area. For example, a fiber with a higher yield (grams per meter) will result in a higher fiber weight per unit area (FAW) compared to a fiber with a lower yield, all other conditions being fixed. As another example, increasing the tow means there are more fibers in a unit area. This increase can change properties 3026 such as thickness, fiber weight per unit area, and resin content of the produced prepreg.

[0306] Further, in this example, the settings 3102 may include at least one of temperature, resin puddle temperature, speed, ambient temperature, nip gap and initial nip gap between nip rollers, pressure, ambient humidity, fiber comb angle, or any other settings that may be made to the composite material manufacturing system 3023.

[0307] In this example, the fiber comb angle is an example of a setting 3102 that determines how close the fiber tows are together before processing begins. As the fiber tows get closer, there are more fibers in a unit area. This increase in fibers in a unit area can result in a higher fiber weight. Setting 3102, temperature, can be set with nip rollers. Nip rollers are a pair of rollers that apply pressure to the prepreg to force the resin through the fibers. These nip rollers are internally heated and the temperature is set prior to the prepreg production run. In these examples, this temperature is fixed throughout the entire run.

[0308] Also in this example, the temperature is set with heating and cooling plates. For example, two heating plates can be used to keep the temperature of the prepreg at a level where the resin can more easily penetrate. Cooling plates can be placed after the last nip roller. These plates cool the prepreg to room temperature before rolling it into the final product.

[0309] Another setting is the line run speed, which can be set in conjunction with setting the set temperatures for the nip rollers and plates. Speed ​​is a measure of how fast the material moves through the composite manufacturing system and is usually constant during the run. Line tension can be set for the film set-off and unwinder. Ambient temperature and humidity can also be set for the run.

[0310] 32, a block diagram of sensor data is shown in accordance with an illustrative embodiment. As shown, the sensor data 3020 generated by the sensor system 3021 can take a number of different forms. For example, the sensor data 3020 can be at least one of property data 3200 or production data 3202. In one illustrative example, the property data is data about a number of properties 3026 that are of interest in evaluating the unconsolidated composite material 3024.

[0311] In this example, the characteristic data 3200 is information about the green composite material 3024 as it is being manufactured. This characteristic data can include materials used to manufacture the green composite material 3024 in its finished form 3027. For example, the characteristic data 3200 can include at least one of basis weight, prepreg fiber basis weight (FAW), prepreg resin content, resin viscosity of the resin material, prepreg thickness, prepreg penetration level, prepreg tack level, resin film basis weight, resin film thickness, release liner basis weight, release liner thickness, or other characteristics of the green composite material 3024 during different stages of manufacturing the green composite material 3024. For example, the characteristic data 3200 can be for the green composite material 3024 at different locations within the composite manufacturing system 3023 in addition to the finished form 3027. These characteristics can be used to evaluate the green composite material 3024. This evaluation can be done to identify the suitability of the green composite material 3024 for use in manufacturing composite parts or other applications.

[0312] The production data 3202 is information about a process used to process material to form the unsolidified composite material 3024 in the finished form 3027. For example, the production data 3202 can include at least one of the following: temperature, tension, pressure, force, thickness of the unsolidified composite material, speed, gap width, resin viscosity of the resin used as an input. In this example, the production data 3202 can be different from the settings 3102 of FIG. 31. The settings 3102 are settings used to configure or set the processing conditions in the composite manufacturing system 3023. The production data 3202 can be measurements of parameters based on the settings 3102. In other words, the production data 3202 can be different from the settings 3102.

[0313] 33, a block diagram of machine learning models is shown, according to an example embodiment. The machine learning models 3331 can include a first machine learning model 3301, a second machine learning model 3302, and a third machine learning model 3303. These machine learning models can be trained by the prediction manager 3014 using different combinations of data in the training dataset 3305.

[0314] As shown, the training data set 3305 includes historical data 3306, such as historical sensor data 3307 and historical process conditions 3308. In this example, the historical sensor data 3307 is data generated or collected from previous manufacturing operations performed to produce the green composite material. For example, the historical data 3307 can be from a number of composite manufacturing systems during the production of the green composite material. The number of composite manufacturing systems can include composite manufacturing systems where additions are made using a trained machine learning model.

[0315] In this illustrative example, historical sensor data 3307 includes historical property data 3330 and historical production data 3332, which may be property data 3200 and production data 3202 in sensor data 3020 of Figure 32 generated from a previous production of the unconsolidated composite material. Historical process conditions 3308 may be historical material inputs 3300 and historical settings 3309, such as material inputs 3100 and settings 3102 in process conditions 3051 of Figure 31 generated from a previous production of the unconsolidated composite material.

[0316] In these examples, the historical data 3306 is for the same type of composite manufacturing system. When training the machine learning model 3331 to predict properties of a deposited prepreg produced by a hot melt prepreg machine, the historical data 3306 can be obtained from other hot melt prepreg machines of the same type as the hot melt prepreg machine for which the prediction of properties is to be made. In other words, the historical data 3306 may not include historical data from solvent-based prepreg machines or other systems that utilize a bath, slurry, spray, or other mechanism to apply resin to supporting fibers.

[0317] This data can be from at least one actual hot melt prepreg machine from which predictions of properties are made for other hot melt prepreg machines of the same type, meaning that those other machines can be from the same make, model, or type of manufacturing process.

[0318] In this illustrative example, a first machine learning model 3301 is trained using historical sensor data 3307. A second machine learning model 3302 is trained using historical sensor data 3307 and historical process conditions 3308. Further, in this example, a third machine learning model 3303 is trained using historical process conditions 3308 and historical property data 3330. In these examples, the historical process conditions 3308 can include at least one of historical input materials 3300 or historical settings 3309. In other words, either or both of these types of process conditions can be used for training.

[0319] The historical characteristic data 3330 indicates some historical characteristics that existed from the use of historical process conditions 3308. In one illustrative example, the training uses the historical process conditions 3308 and some historical characteristics that result from those historical process conditions. In other words, the training data used to train the third machine learning model 3303 includes the historical process conditions 3308 and the historical characteristics that result from the use of those process conditions.

[0320] 34, a data flow for real-time prediction of composite prepreg properties is illustrated, according to an exemplary embodiment, in which property prediction system 3400 can be implemented using property prediction system 3000 of FIG.

[0321] In this example, property prediction system 3400 receives sensor data 3402 from an online physical sensing system 3404. The online physical sensing system 3404 comprises a collection of sensors that generate the sensor data 3402 from a prepreg machine 3406. In this example, the online physical sensing system 3404 is an example of an implementation of sensor system 3021 of FIG.

[0322] An online physical sensing system 3404 can be integrated on or within the prepreg machine 3406. This system can include, for example, beta gauge sensors, thickness sensors, width sensors, temperature sensors, speed sensors, gap sensors, optical sensors, Fourier transform infrared (FTIR) spectrometers, tensile sensors, and other suitable types of sensors. These sensors generate sensor data 3402 as real-time data about the physical state of the composite prepreg 3407 as the material is being produced, including data about the prepreg machine 3406.

[0323] Prepreg machine 3406 is a system that manufactures composite prepreg 3407, and is an example of an implementation of composite material manufacturing system 3023 in Figure 30. Composite prepreg 3407 is an example of unsolidified composite material 3024 in Figure 30.

[0324] In response to receiving the sensor data 3402, the property prediction system 3400 predicts in real time several important properties 3408 of the composite prepreg 3407. In this example, the several important properties 3408 are an example of several properties 3026 of FIG. 30. Furthermore, in this example, the important properties are properties that are selected as relevant or used in evaluating the composite prepreg 3407. In this example, the several important properties 3408 can be used for automated non-destructive evaluation of the composite prepreg 3407. In this illustrative example, the several important properties 3408 can be selected from at least one of fiber weight per unit area (FAW), resin content (RC), thickness, level of penetration, or other properties related to the composite prepreg 3407 that are of interest in evaluating this material.

[0325] Prediction of certain key properties 3408 allows the operation of the prepreg machine 3406 to be adjusted in real-time while the composite prepreg 3407 is being produced. In this example, the property prediction system 3400 can take certain actions 3450. In this example, the certain actions 3450 can include at least one of sending instructions to the prepreg machine 3406 to adjust the operation of the prepreg machine 3406, issuing an alert, stopping a production process performed by the prepreg machine 3406, or taking some other suitable action.

[0326] As a result, making these adjustments in real time as composite prepreg 3407 is being manufactured can increase the portion of composite prepreg 3407 that meets the desired properties relative to critical property 3408.

[0327] 35, a data flow is illustrated for generating real-time predictions of properties of a composite prepreg using initial predictions from a model, according to an exemplary embodiment. In this example, this data flow can be implemented in a property prediction system 3400 to generate real-time predictions of key properties 3408.

[0328] In this example, the model includes a physics model 3500, a first machine learning model trained on sensor data 3402, a second machine learning model 3502 trained on sensor data and process conditions, and a third machine learning model trained on process conditions 3530. As shown, the first machine learning model 3501 trained on sensor data is an example of the first machine learning model 3301 of FIG. 33, the second machine learning model 3502 trained on sensor data and process conditions is an example of the second machine learning model 3302 of FIG. 33, and the third machine learning model trained on process conditions 3503 is an example of the third machine learning model 3303 of FIG. 33.

[0329] In this example, sensor data 3402 is input to a physics model 3500, a first machine learning model 3501 trained on the sensor data, and a second machine learning model 3502 trained on the sensor data and process conditions. In this example, process conditions 3530 are input to a second machine learning model 3502 trained on the sensor data and process conditions, and a third machine learning model trained on process conditions 3503.

[0330] In this example, the process conditions 3530 may be preset conditions that reflect the overall settings of the prepreg machine 3406. These conditions may be set before the production of the composite prepreg 3407 begins. These settings may be set or adjusted during the production of the composite prepreg 3407 by the prepreg machine 3406. In this example, these settings may be settings such as the temperature of the resin puddle, the initial gap between the nip rollers, the ambient temperature, the ambient humidity, and the angle of the fiber comb. These process conditions are typically fixed for a particular prepreg production run. These settings may significantly affect important properties 3408 of the composite prepreg 3407, such as higher comb angle values, which may result in higher fiber weights.

[0331] The process conditions 3530 do not need to be tracked with sensors. These process conditions do not typically change during the production of the composite prepreg. The process conditions 3530 can be, for example, the input materials or settings of a prepreg machine.

[0332] In these examples, data collected from multiple runs from the manufacture of composite prepregs where there are several different processing conditions can be used. The data can be for key properties resulting from the several processing conditions. The key properties detected for the composite material and the several processing conditions can form a training data set for use in training a third machine learning model trained on the processing conditions 3530.

[0333] For example, the fiber weights of the composite prepregs from runs using different numbers of fiber tows can be used in training a third machine learning model trained with process condition 3530. In this example, the number of tows and the fiber weights of the composite prepregs from the runs form a training data set. For example, the fiber weights of the composite prepregs resulting from using 34 fiber tows, 32 fiber tows, and 40 fiber tows in different runs can be collected as training data in a training data set used to train the machine learning model.

[0334] In another example, training data can be collected for properties of composite prepregs resulting from runs using different fiber comb angles. For example, properties of composite prepregs can be determined from runs producing composite prepregs using a fiber comb angle of 0 degrees and a fiber comb angle of 31 degrees. Further, a third machine learning model trained on the resulting process conditions 3530 trained on these training data sets can receive the process conditions as inputs and output predictions of properties based on the input one or more process conditions.

[0335] Using these inputs, the models generate initial predictions. For example, physics model 3500 outputs initial prediction 3561, a first machine learning model trained on sensor data 3402 outputs initial prediction 3561, a second machine learning model trained on sensor data and process conditions 3502 outputs initial prediction 3562, and a third machine learning model trained on process conditions 3403 outputs initial prediction 3563.

[0336] The physics model 3500 does not rely on data from previous runs for the production of the composite prepreg. For example, the physics model 3500 can implement a permeability equation. This equation is used to calculate the level of permeation or reduction in thickness of the composite prepreg as an initial prediction 3561. The level of permeation provides a compression or reduction in thickness of the prepreg. The level of permeation is the amount of resin that has permeated into the dry fibers. This characteristic of thickness can be defined as a distance or a percentage of thickness. This type of model uses real-time sensor data and differential equations that govern the permeation phenomenon.

[0337] In this example, a first machine learning model 3501 trained on sensor data has been trained using historical sensor data collected during previous composite prepreg production runs. For example, the machine learning model has been trained using historical basis weight sensor data collected during previous prepreg runs and fiber-based weight (FAW) values ​​obtained from analysis of previous composite prepregs. Once trained, the model can receive basis weight values ​​in real-time from a beta gauge sensor in the prepreg machine 3406 and output a fiber-based weight prediction in real-time as an initial prediction 3562.

[0338] Further, in this illustrative example, a second machine learning model 3502 trained on sensor data and process conditions is trained using both sensor data from a previously run composite prepreg run and preset conditions. For example, this machine learning model can be trained on both fiber comb angle and slitting preset conditions, and historical sensor data for basis weight. This training enables the machine learning model to take the preset conditions of fiber comb angle and real-time sensor data of basis weight as inputs and output an initial prediction 3562 of fiber basis weight in real time.

[0339] Further, in these examples, a third machine learning model trained on process condition 3530 has been trained using important characteristics of the process conditions and history to be predicted. For example, previous measurements of fiber basis weight from previously run composite prepreg production can be used to train this machine learning model, along with different fiber comb angles from those runs.

[0340] The machine learning model outputs an initial prediction 3563 of the fiber weight for the selected fiber comb angle.

[0341] These initial predictions are sent to a fusion component 3506, which may be implemented in the property prediction system 3400. This component may merge, fuse, combine, or otherwise use these initial predictions to generate a real-time prediction 3507, which is an example of the final prediction 3028 of FIG.

[0342] In this example, the fusion unit 3506 can use any combination of two or more initial predictions from different models. In other words, the fusion unit 3506 can use a combination of all or part of the initial predictions from these models to generate the real-time prediction 3507.

[0343] For example, real-time predicted fiber basis weight and resin content may be the desired properties. In this example, the sensor data 3402 is the output of a beta gauge sensor. The beta gauge sensor data is used in the physics model 3500 along with the weight of the paper and resin used in the prepreg process to obtain a real-time source of information on fiber basis weight and resin content. Additionally, in this example, a third machine learning model trained on the process conditions 3530 can be built between fiber basis weight and fiber comb angle of an end item inspection of a previously performed prepreg run. The initial prediction of the fiber basis weight prediction from this machine learning model is based on the fiber comb angle and fiber basis weight. The resin content prediction from the physics model 3500 is based on the basis weight sensor data. These predictions are fused together at this stage to obtain a real-time prediction of fiber basis weight and resin content.

[0344] The fusion unit 3506 implements a number of different techniques to generate a real-time prediction 3507 from these initial predictions. For example, but not limited to, the fusion operation can generate a real-time prediction 3507 from multiple models and can include a number of different fusion methods.

[0345] For example, the average of the initial predictions of the values ​​of the important properties form different models of that form. For example, two machine learning models and one physics model can be used to obtain an initial prediction of the fiber basis weight. These predictions can be called FAW_(ML_1), FAW_(ML_2), FAW_PB. The fusion operation can be FAW_final=(FAW_(ML_1)+FAW_(ML_2)+FAW_PB) / 3. Fusion is an operation that combines different predictions from different models into a single prediction.

[0346] Additionally, each prediction can be weighted to give different predictions different levels and influences in generating the real-time prediction 3507. This can be useful when an initial prediction from one model is deemed more accurate and reliable than an initial prediction from another model. These weights can be determined in a number of ways. For example, the weighting can be based on user experience or uncertainty calculated from the model. For example, a Bayesian machine learning model, such as Bayesian linear regression or Gaussian process regression, provides not only a prediction but also the uncertainty associated with the prediction.

[0347] These uncertainties can be used in weighting the predictions. For example, inverse variance weighting can use these uncertainties in the fusion of multiple model predictions. Inverse variance weighting weights each model's prediction inversely proportional to its uncertainty. This means that the more uncertain a prediction from a model is, the lower the weight given to that model's prediction.

[0348] In the fusion of two model predictions, if the uncertainty of the first model is lower than that of the second model, the result of the fusion will be closer to the result of the first model. Also, the fusion of results from different models does not have to be done in a single operation: different fusion operations can be performed in succession, and each fusion operation can use a different algorithm.

[0349] For example, if initial predictions of fiber basis weight are from two machine learning models and one physics model, the results of the machine learning models can be fused into a single fiber basis weight prediction using inverse variance weighting, which can then be fused with the fiber basis weight prediction from the physics model using a Kalman filter.

[0350] In other words, fusion is an operation in which predictions from different models are combined together to obtain a final prediction. Thus, the prediction by the fusion unit 3506 can include at least one of averaging, inverse variance weighting, Kalman filter, voting regressor, bagging regressor, stacking regressor, or other suitable techniques. Furthermore, in this example, the selected fusion technique implemented by the fusion unit 3506 can be applied to predictions of all models, or multiple types of fusion techniques can be applied successively to subsets of models.

[0351] The data flow diagrams of Figures 34 and 35 are presented as an example of data flows that can be implemented in a property prediction system and are not intended to limit how data flows can be implemented in other examples. For example, the fusion unit 3506 can fuse the sensor data 3402 with one of the initial predictions made by one of the models. For example, a real-time prediction 3507 of thickness can be obtained by fusing the raw thickness in the sensor data 3402 with a physical model of permeability 3500 that predicts thickness reduction.

[0352] 36, a data flow is illustrated for real-time thickness prediction, according to an example embodiment. In this example, the compression model 3600 is a physics model and the thickness machine learning model 3601 is a machine learning model trained using historical processing conditions.

[0353] Compression model 3600 uses sensor data in the form of temperature 3611 to output initial thickness prediction 3661. Thickness machine learning model 3601 is a machine learning model trained using process conditions in the form of fiber comb angle 3621. Thickness machine learning model 3601 takes fiber comb angle 3621 as input and outputs initial thickness prediction 3662.

[0354] In this example, these initial thickness predictions are sent to a fusion unit 3670 for processing to generate a real-time thickness prediction 3671.

[0355] Additionally, sensor data such as temperature 3611 used to generate initial thickness prediction 3661 can be created by temperature sensors at different locations within prepreg machine 3406 between start 3681 and end 3682 of path 3680. In this example, fiber 3886 is introduced at start 3681 of path 3680 and composite prepreg 3407 is output at end 3682 of path 3680.

[0356] By measuring the temperature 3611 at different points along the path 3680, the compression model 3600 can generate initial thickness predictions of the fiber for those points along the path 3680.

[0357] For example, compression model 3600 can generate initial thickness predictions 3661 for different points along a path 3680 in prepreg machine 3406. These different predictions can be fused with different measurements of thickness from sensors that may be placed at points along the path to success.

[0358] In this example, there may be different amounts of uncertainty in the initial thickness prediction 3661 generated by the compression model 3600 depending on where along the path 3680 the temperature 3611 is measured. For example, the uncertainty may decrease as the measurements used by the model are taken closer to the endpoint 3682 of the path 3680 as the fibers being processed get closer to the finished form of the composite prepreg 3407.

[0359] In this example, thickness 3612 can be used by fusion unit 3670 to determine the certainty of initial thickness predictions 3661 made by compression model 3600. For example, thickness sensors are used to generate measurements of thickness 3612 at one or more locations corresponding to the locations where temperature 3611 was measured. These thicknesses can be compared by fusion unit 3670 to the initial thickness predictions generated by compression model 3600 to determine the uncertainty of those initial predictions.

[0360] As another example, the uncertainty may also vary as the accuracy of measurements made by different sensors along path 3680 varies. In other words, different sensors along path 3680 may have different levels of accuracy resulting in different levels of uncertainty in the sensor data generated by the sensors. In this example, a sensor operating outside of tolerance will result in an initial prediction having a higher level of uncertainty as compared to an initial prediction generated using sensor data operating within tolerance.

[0361] Additionally, the thickness machine learning model 3601 can also output a probability that the initial thickness prediction 3662 is correct. This probability can also be used as the uncertainty of that prediction. As a result, the fuser 3670 can use the uncertainty of the initial thickness prediction 3661 and the initial thickness prediction 3662 when fusing these predictions to form the real-time thickness prediction 3671.

[0362] Thus, real-time thickness prediction 3671 is generated by fusing initial thickness prediction 3661 and initial thickness prediction 3662 by fusing unit 3670. In these examples, the fusing of these predictions takes into account prediction uncertainty, which may affect at least one of the uncertainty caused by the model or the certainty of the sensor data used in the prediction.

[0363] 37, a data flow is illustrated for real-time fiber basis weight prediction according to an exemplary embodiment. In this example, fiber basis weight physics model 3700 is a physics model and fiber basis weight machine learning model 3702 is a machine learning model trained using historical process conditions in the form of fiber comb angles.

[0364] In this example, the fiber weight physics model 3700 outputs an initial fiber weight prediction 3761 in real time in response to receiving basis weight 3711 from a beta gauge sensor 3750. The model subtracts the weight of the resin and paper from the basis weight 3711 to generate the initial fiber weight prediction.

[0365] A fiber basis weight machine learning model 3702 is trained using the fiber comb angles and the resulting fiber angle weights measured using those angles. In response to receiving process conditions in the form of fiber comb angles 3721 as input, the fiber basis weight machine learning model 3702 outputs an initial fiber basis weight prediction 3762.

[0366] These initial basis weight predictions are received by the fusing component 3670. The fusing component uses these initial predictions to generate a real-time fiber basis weight prediction 3771.

[0367] In this example, the reading of the beta gauge sensor has an uncertainty. The reading and uncertainty of the beta gauge sensor are β and

number

number

number

[0368] 38, a data flow is illustrated for real-time fiber basis weight prediction according to an exemplary embodiment. In this example, fiber basis weight machine learning model 3800 and fiber basis weight machine learning model 3801 are used to generate an initial fiber basis weight prediction.

[0369] As shown, fiber basis weight machine learning model 3800 has been trained to output an initial fiber basis weight prediction 3861 in response to receiving as input basis weight 3711. Basis weight 3711 is received in real time from a beta gauge sensor 3650. In this example, fiber basis weight machine learning model 3801 has been trained to output an initial fiber basis weight prediction 3862 in response to receiving prepreg width 3616 in real time from camera 3651.

[0370] These initial predictions are sent to the fuser 3670. This component uses these initial predictions to generate a real-time fiber weight prediction 3871.

[0371] In this example, beta gauge sensor 3650 and camera 3651 may be at different locations along path 3680 in prepreg machine 3406. In this example, beta gauge sensor 3650 is at beta gauge sensor location 3850 and camera 3651 is at camera location 3851 along path 3680. In this example, camera 3651 is positioned earlier in path 3680 than beta gauge sensor 3650.

[0372] In this example, initial predictions are made in real time by these models and can be correlated to each other using timestamps. For example, the location of a particular portion of path 3680 can be tracked with the speed at which the resin moves along path 3680. As a result, the initial predictions of the fibers in that portion of resin made by fiber basis weight machine learning model 3800 and fiber basis weight machine learning model 3801 for that particular portion of the fiber can be correlated to each other. As a result, the fusion of the initial predictions made by fusion unit 3670 to form real time fiber basis weight prediction 3871 is made for the same portion of the fiber.

[0373] The machine learning model data flow diagrams in Figures 36-38 are examples of some combinations of bottles that can be used to generate real-time predictions of properties such as caliper and fiber basis weight. These diagrams are not intended to limit how other illustrative examples can be implemented.

[0374] For example, a combination of models can be used to predict other types of properties. For example, two physical models and one machine learning model can be used to predict a property of interest. In another example, four physical models and two machine learning models can be used to predict a property of interest.

[0375] In yet another illustrative example, the model may predict more than one important property, and may also predict other types of important properties in addition to or instead of fiber basis weight and caliper, including resin viscosity and resin content.

[0376] Referring to Figure 39, a flow chart of processes for predicting several properties of an unconsolidated composite material is illustrated, according to an exemplary embodiment. The processes of Figure 39 may be implemented in hardware, software, or both. If implemented in software, the processes may take the form of program code executed by one or more processor units located in one or more hardware devices in one or more computer systems. For example, the processes may be implemented in a prediction manager 3014 in computer system 3012 of Figure 30.

[0377] The process generates initial predictions of some properties of the green composite material in finished form in real time during production of the green composite material in the composite manufacturing system using sensor data received in real time from a sensor system for the composite manufacturing system during production of the green composite material, the some physics model, and the some machine learning model trained to generate the some initial predictions using the sensor data (operation 3900). The process determines uncertainty of the initial predictions of some properties of the green composite material in finished form from the some physics model and the some machine learning model in real time during production of the green composite material (operation 3902).

[0378] The process associates a weight with an initial prediction of the number of characteristics using the uncertainty (operation 3904). The process determines a final prediction of the number of characteristics based on the initial prediction and the weight associated with the initial prediction (operation 3906). The process then terminates.

[0379] Referring now to Figure 40, a flow chart of steps for adjusting process conditions is shown, according to an example embodiment. The steps shown in this figure are an example of additional operations that may be performed in conjunction with the operations of Figure 39.

[0380] The process adjusts certain processing conditions of the composite manufacturing system based on the final prediction (operation 4000). The process then terminates. In operation 4000, the certain processing conditions may be selected from at least one of materials input to the composite manufacturing system and settings of the composite manufacturing system.

[0381] 41, a flowchart of a process for determining a final prediction is shown, according to an example embodiment. The process in this figure is an example of an implementation for operation 3906 of FIG.

[0382] The process determines a final prediction of some property based on the initial prediction and weights associated with the initial prediction using at least one of a voting regression, a stacking regression, or a bagging estimator (operation 4100). The process then terminates.

[0383] Referring now to Figure 42, a flow chart of processes for predicting several properties of an unconsolidated composite material is illustrated, according to an exemplary embodiment. The processes of Figure 42 may be implemented in hardware, software, or both. If implemented in software, the processes may take the form of program code executed by one or more processor units located in one or more hardware devices in one or more computer systems. For example, the processes may be implemented in a prediction manager 3014 in computer system 3012 of Figure 30.

[0384] The process receives sensor data in real time from a composite manufacturing system during production of the green composite material (operation 4200). The process uses a number of physics models, and a number of machine learning models trained using the data, to generate initial predictions of a number of properties of the green composite material in finished form in real time during production of the green composite material in the composite manufacturing system (operation 4202).

[0385] The process determines a final prediction in real time for some characteristics based on the initial prediction (operation 4204), after which the process ends.

[0386] Some aspects of the illustrative examples are described in the following appended clauses, which are examples of aspects and are not intended to limit other illustrative examples.

[0387] Additional notes 1 A computer system; a prediction manager disposed in the computer system; Equipped with The forecast manager: generating initial predictions of a number of properties of the green composite material in a finished form in real time during production of the green composite material in the composite manufacturing system using sensor data received in real time from a sensor system for the composite manufacturing system during production of the green composite material, the number of physical models, and the number of machine learning models, the number of machine learning models being trained to generate the number of initial predictions using the sensor data; determining, in real time during production of the green composite material, from the physical model and the machine learning model, an initial prediction uncertainty of a number of properties of the green composite material in a finished form; Use the uncertainty to associate initial predictions and weights for some properties, determining a final prediction of the number of characteristics based on the initial prediction and a weight associated with the initial prediction; The characteristic prediction system is configured to:

[0388] Additional note 2 and a controller configured to adjust certain processing conditions of the composite manufacturing system based on the final prediction. The property prediction system according to claim 1, further comprising:

[0389] Additional note 3 3. The property prediction system of claim 2, wherein the processing conditions are selected from at least one of a material input to the composite material manufacturing system and a setting of the composite material manufacturing system.

[0390] Additional note 4 The property prediction system according to any one of claims 1 to 3, wherein the several physical models are selected from at least one of a thermal model, a penetration model, a rheological model, a permeability model for calculating a resin filtration level, a thickness model for calculating a reduction in the thickness of a composite prepreg, or a resin penetration model for calculating a resin filtration level.

[0391] Additional note 5 The property prediction system of any one of claims 1 to 4, wherein the number of machine learning models are selected from at least one of a first machine learning model trained using historical sensor data from the number of composite material manufacturing systems during production of the unconsolidated composite material, a second machine learning model trained using historical sensor data and historical processing conditions, or a third machine learning model trained using historical processing conditions and the number of historical properties.

[0392] Additional note 6 6. The property prediction system of any one of claims 1 to 5, wherein the uncertainty is generated by several machine learning models as part of generating the initial prediction.

[0393] Additional note 7 The forecast manager: In determining the final forecast, determining a final prediction of the number of properties based on the initial predictions and weights associated with the initial predictions using at least one of a voting regression, a stacking regression, or a bagging estimator; The property prediction system according to any one of claims 1 to 6, wherein the property prediction system is configured as follows.

[0394] Additional note 8 The property prediction system of any one of claims 1 to 7, wherein the several properties are selected from at least one of fiber basis weight, resin content, prepreg thickness, prepreg penetration level, prepreg tack level, prepreg fiber basis weight, resin film basis weight, resin film thickness, release liner basis weight, release liner thickness, or laminate structure properties.

[0395] Additional note 9 The characteristic prediction system according to any one of claims 1 to 8, wherein the sensor data includes characteristic data and production data.

[0396] Additional note 10 10. The property prediction system according to any one of claims 1 to 9, wherein the composite material manufacturing system is one of a carbon fiber prepreg coating line, a reinforced fiber resin impregnation line, a resin mixing processing system, a resin film processing line, a prepreg system, and a slit processing system.

[0397] Additional note 11 A property prediction system, comprising: A computer system; a prediction manager disposed in the computer system; Equipped with The forecast manager: receiving sensor data in real time from a sensor system for the composite manufacturing system during production of the unconsolidated composite material; generating an initial prediction of a number of properties of the green composite material in a finished form in real time during production of the green composite material in the composite manufacturing system using a number of physical models and a number of machine learning models trained to generate the initial predictions using the sensor data; Determine final predictions in real time for some properties based on the initial predictions; The characteristic prediction system is configured to:

[0398] Additional note 12 The forecast manager: receiving, in real time during production of the green composite material, initial prediction uncertainty of a number of properties of the green composite material from the number of physical models and the number of machine learning models; using the uncertainties to associate initial predictions and weights for some characteristics; The forecast manager: In determining the final forecast, 12. The property prediction system of claim 11, configured to determine a final prediction for some properties based on the initial prediction and a weight associated with the initial prediction.

[0399] Additional note 13 The property prediction system according to claim 11 or 12, wherein the several physical models are selected from at least one of a thermal model, a penetration model, a rheological model, a permeability model for calculating a resin filtration level, a thickness model for calculating a reduction in the thickness of a composite prepreg, or a resin penetration model for calculating a resin filtration level.

[0400] Additional note 14 The property prediction system of any one of claims 11 to 13, wherein the number of machine learning models are selected from at least one of a first machine learning model trained using historical sensor data from the number of composite material manufacturing systems during production of the unconsolidated composite material, a second machine learning model trained using historical sensor data and historical processing conditions, or a third machine learning model trained using historical processing conditions and the number of historical properties.

[0401] Additional note 15 1. A method for predicting several properties of an unconsolidated composite material, the method comprising: generating initial predictions of certain properties of the green composite material in finished form in real time during production of the green composite material in the composite manufacturing system using sensor data received in real time from a sensor system for the composite manufacturing system during production of the green composite material, a number of physics models, and a number of machine learning models, the number of machine learning models being trained using historical sensor data to generate the number of initial predictions using the sensor data; determining, in real time during production of the green composite material, from a number of physical models and a number of machine learning models, an initial prediction uncertainty of a number of properties of the green composite material in a finished form; using the uncertainties to associate initial predictions and weights for some characteristics; determining a final prediction of a number of characteristics based on the initial prediction and a weight associated with the initial prediction; A method comprising:

[0402] Additional note 16 16. The method of claim 15, further comprising adjusting certain processing conditions of the composite manufacturing system based on the final prediction.

[0403] Additional note 17 17. The method of claim 16, wherein the several processing conditions are selected from at least one of a material input to the composite material manufacturing system and a setting of the composite material manufacturing system.

[0404] Additional note 18 The method according to any one of claims 15 to 17, wherein the several physical models are selected from at least one of a thermal model, a penetration model, a rheological model, a permeability model for calculating the filtration level of the resin, a thickness model for calculating the reduction in thickness of the composite prepreg, or a resin penetration model for calculating the filtration level of the resin.

[0405] Additional note 19 19. The method of any one of claims 15 to 18, wherein the number of machine learning models is selected from at least one of a first machine learning model trained using historical sensor data, a second machine learning model trained using historical sensor data and historical processing conditions, or a third machine learning model trained using historical processing conditions and some historical characteristics.

[0406] Additional note 20 20. The method of claim 19, wherein the historical sensor data includes historical data and production data.

[0407] Additional note 21 21. The method of any one of clauses 15 to 20, wherein the uncertainty is generated as part of generating the initial prediction by some machine learning model.

[0408] Additional note 22 The step of determining the final prediction comprises: determining a final prediction for a number of properties based on the initial predictions and weights associated with the initial predictions using at least one of a voting regression, a stacking regression, or a bagging estimator; 22. The method according to any one of claims 15 to 21, comprising:

[0409] Additional note 23 23. The method of any one of claims 15 to 22, wherein the several properties are selected from at least one of fiber basis weight, resin content, prepreg thickness, prepreg penetration level, prepreg tack level, prepreg fiber basis weight, resin film basis weight, resin film thickness, release liner basis weight, release liner thickness, or laminate structure properties.

[0410] Additional note 24 24. The method of any one of claims 15 to 23, wherein the sensor data includes characteristic data and production data.

[0411] Additional note 25 25. The method according to any one of claims 15 to 24, wherein the composite material manufacturing system is a carbon fiber prepreg coating line, a reinforced fiber resin impregnation line, a resin mixing processing system, a resin film processing line, a prepreg system, and a slit processing system.

[0412] Additional note 26 1. A method for predicting certain properties of an unconsolidated composite material, comprising: The method is: receiving real-time sensor data from a composite manufacturing system during production of an unconsolidated composite material; using a number of machine learning models trained using a number of physical models and data to generate initial predictions of a number of properties of the green composite material in finished form in real time during production of the green composite material in the composite manufacturing system; determining a final prediction in real time for some characteristics based on the initial prediction; A method comprising:

[0413] The description of the different exemplary embodiments is presented for purposes of illustration and description, and is not intended to be exhaustive or to limit the embodiments in the disclosed form. The different exemplary examples describe components that perform actions or operations. In the exemplary embodiments, the components can be configured to perform the described actions or operations. For example, the components can have a configuration or design of structure that provides the components with the ability to perform the actions or operations described as being performed by the components in the exemplary examples. Furthermore, the terms "includes," "including," "has," "contains," and variations thereof, as used herein, are intended to be inclusive, as is the term "comprises," an open transitional term that does not exclude any additional or other elements.

[0414] Many modifications and variations will be apparent to those skilled in the art. Furthermore, different exemplary embodiments may provide different configurations compared to other preferred embodiments. The selected embodiment or embodiments have been chosen and described to best explain the principles, practical applications of the embodiments, and to enable those skilled in the art to understand the present disclosure for various embodiments with various modifications suitable for the particular applications contemplated. [Explanation of symbols]

[0415] 100 network data processing system, 102 network, 104 server computer, 106 server computer, 108 storage unit, 110 client device, 112 client computer, 114 client computer, 116 client computer, 118 prepreg system, 120 tablet computer, 122 smart glasses, 130 composite manufacturing facility, 132 composite manager, 134 sensor data, 136 command, 138 machine learning model, 200 composite manufacturing environment, 202 composite management system, 203 digital twin, 204 unconsolidated composite material, 205 composite part, 208 composite manufacturing system, 209 part, 210 computer system, 212 composite manager, 214 processor unit, 216 program instructions, 218 sensor data, 220 sensor system, 222 sensor, 224 predicted properties, 226 part, 227 finished product, 228 characteristic, 230 quality level, 232 predicted quality level, 233 model, 234 machine learning model, 235 physical model, 236 machine learning model, 237 hybrid model, 239 physical model, 240 training data set, 241 action, 242 historical sensor data, 243 statistical model, 244 historical characteristic, 245 historical upstream information, 246 upstream information, 251 initial predicted characteristic, 255 finished product, 291 corrective action, 300 marking action, 301 corrective action, 302 part, 303 adjustment action, 304 unusable, 305 change action, 306 usable, 307 parameter, 308 quality level, 309 first tolerance, 310 composite part type, 311 first type use, 312 tolerance, 313 second tolerance, 314 marker, 315 second type of use, 316 information, 317 subsequent parts, 319 raw materials, 400 manufacturing process flow, 402 green composite production process inputs, 404 green composite production physical plant, 406 data pre-processing, 408 materials and settings, 410 green composite production process outputs, 412 real-time quality records, 500 composite manufacturing system, 501 unfilmed paper roll, 502 nip, 503 paper, 504 rollers, 505 resin, 506 rollers, 508gap, 510 resin dam, 511 filmed paper roll, 512 paper rewinder, 514 filmed paper, 520 sensor, 522 sensor, 600 composite manufacturing system, 602 first filmed roll, 603 filmed paper, 604 second filmed roll, 605 filmed paper, 606 first nip, 608 roller, 610 roller, 612 first nip gap, 614 second nip, 616 roller, 618 roller, 620 second nip gap, 622 third nip, 624 roller, 626 roller, 628 third nip gap, 630 fourth nip, 632 roller, 634 roller, 636 fourth nip gap, 637 fiber creel, 638 fiber, 639 comb, 640 hot plate, 641 spreader bar, 642 hot plate, 644 cold plate, 645 brake, 646 brake, 648 prepreg, 650 prepreg roll, 652 roller, 654 paper roll, 656 slitter, 660 sensor location, 662 sensor location, 664 sensor location, 666 sensor location, 667 sensor location, 669 sensor location, 671 sensor location, 700 part, 702 unconsolidated composite, 704 first point, 706 second point, 707 arrow, 708 composite manufacturing system, 710 measure, 712 prepreg, 714 characteristic, 715 time interval, 716 sensor, 718 sensor location, 719 specific part, 720 measure, 722 sensor data, 723 measurement, 725 metadata, 800 1st point, 802 2nd point, 804 roller, 806 roller, 807 prepreg, 808 sensor, 809 arrow, 810 sensor, 812 sensor location, 814 top side of prepreg, 816 bottom side of prepreg, 820 pull at 1st point, 822 pull at 2nd point, 824 part, 900 sensor, 902 first side of prepreg, 904 sensor, 906 second side of prepreg, 2600 data processing system, 2602 communication framework, 2604 processor unit, 2606 memory, 2608 persistent storage, 2610 communication unit, 2612 input / output unit, 2614 display, 2616 storage device, 2618 program instructions, 2620Computer readable media, 2622 Computer program products, 2624 Computer readable storage media, 2700 Aircraft manufacturing and maintenance methods, 2702 Specification and design, 2704 Material procurement, 2706 Component and subassembly manufacturing, 2708 System integration, 2710 Certification and delivery, 2712 In-service, 2714 Maintenance and maintenance, 2800 Aircraft, 2802 Airframe, 2804 Systems, 2806 Interiors, 2808 Propulsion systems, 2810 Electrical systems, 2812 Hydraulic systems, 2814 Environmental systems, 2900 Product management systems, 2902 Manufacturing systems, 2904 Maintenance systems, 2906 Manufacturing equipment, 2908 Fabrication equipment, 2910 Assembly equipment, 2912 Maintenance equipment, 2914 Control systems, 2916 Human operators, 3000 Performance prediction systems, 3011 uncertainty, 3012 computer system, 3014 prediction manager, 3016 processor unit, 3018 program instructions, 3019 weights, 3020 sensor data, 3021 sensor system, 3023 composite manufacturing system, 3024 unconsolidated composite material, 3025 initial prediction, 3026 properties, 3027 finished form, 3028 final prediction, 3030 model system, 3031 physical model, 3032 machine learning model, 3050 controller, 3051 processing conditions, 3081 sensor, 3082 location, 3083 path, 3100 input material, 3102 settings, 3200 properties data, 3202 production data, 3300 historical input material, 3301 first machine learning model, 3302 second machine learning model, 3303 third machine learning model, 3305 training data set, 3306; historical data, 3307; historical sensor data, 3308; historical process conditions, 3309; historical settings, 3330; historical property data, 3331; machine learning model, 3332; historical production data, 3400; property prediction system, 3402; sensor data, 3404; online physical sensing system, 3406; prepreg machine, 3407; composite prepreg, 3408; critical properties, 3450; measures, 3500; physical model, 3501; first machine learning model trained on sensor data, 3502; second machine learning model trained on sensor data and process conditions, 3503third machine learning model trained on process condition, 3506 fusion section, 3507 real-time prediction, 3530 process condition, 3561 initial prediction, 3562 initial prediction, 3563 initial prediction, 3600 compression model, 3601 thickness machine learning model, 3611 temperature, 3616 prepreg width, 3612 thickness, 3621 fiber comb angle, 3650 beta gauge sensor, 3651 camera, 3661 initial prediction, 3661 initial thickness prediction, 3662 initial thickness prediction, 3670 fusion section, 3671 real-time thickness prediction, 3680 path, 3681 path start point, 3682 path end point, 3700 fiber basis weight physical model, 3702 fiber basis weight machine learning model, 3711 basis weight, 3721 fiber comb angle, 3750 beta gauge sensor, 3761 initial fiber weight prediction, 3762 initial fiber weight prediction, 3771 real-time fiber weight prediction, 3800 fiber weight machine learning model, 3801 fiber weight machine learning model, 3850 beta gauge sensor location, 3851 camera location, 3861 initial fiber weight prediction, 3862 initial fiber weight prediction, 3871 real-time fiber weight prediction, 3886 fiber

Claims

1. A computer system; a prediction manager disposed on the computer system; Equipped with The prediction manager: generating an initial prediction of a plurality of properties of the green composite material in a finished form in real time during production of the green composite material in the composite manufacturing system using sensor data received in real time from a sensor system for a composite manufacturing system during production of the green composite material, a plurality of physics models, and a plurality of machine learning models, wherein the plurality of machine learning models are trained to generate the plurality of initial predictions using the sensor data; determining, in real time during production of the green composite material, uncertainty in the initial predictions of the properties of the green composite material in the finished form from the physical models and the machine learning models; using the uncertainties to associate weights with the initial predictions of a plurality of the characteristics; and determining a final prediction of the plurality of characteristics based on the initial prediction and the weights associated with the initial prediction; A characteristic prediction system configured to:

2. The property prediction system of claim 1 , further comprising a controller configured to adjust a plurality of processing conditions of the composite manufacturing system based on the final prediction.

3. The property prediction system of claim 2 , wherein the plurality of process conditions are selected from at least one of materials input to the composite material manufacturing system and settings of the composite material manufacturing system.

4. 2. The property prediction system of claim 1, wherein the plurality of physical models are selected from at least one of a thermal model, a penetration model, a rheological model, a permeability model for calculating a filtration level of a resin, a thickness model for calculating a reduction in thickness of a composite prepreg, and a resin penetration model for calculating a filtration level of the resin.

5. 2. The property prediction system of claim 1 , wherein the plurality of machine learning models are selected from at least one of a first machine learning model trained using historical sensor data from a plurality of composite manufacturing systems during production of an unconsolidated composite material, a second machine learning model trained using the historical sensor data and historical processing conditions, and a third machine learning model trained using the historical processing conditions and a plurality of historical properties.

6. The system of claim 1 , wherein the uncertainty is generated by a plurality of the machine learning models as part of generating the initial prediction.

7. The prediction manager: In determining said final forecast, determining the final predictions of the plurality of features based on the initial predictions and the weights associated with the initial predictions using at least one of a voting regression, a stacking regression, and a bagging estimator; The property prediction system according to claim 1 ,

8. 2. The property prediction system of claim 1, wherein the plurality of properties are selected from at least one of fiber basis weight, resin content, prepreg thickness, prepreg penetration level, prepreg tack level, prepreg fiber basis weight, resin film basis weight, resin film thickness, release liner basis weight, release liner thickness, and laminate structure properties.

9. The characteristic prediction system according to claim 1 , wherein the sensor data includes characteristic data and production data.

10. 2. The property prediction system of claim 1, wherein the composite material manufacturing system is one of a carbon fiber prepreg coating line, a reinforced fiber resin impregnation line, a resin mixing processing system, a resin film processing line, a prepreg system, and a slit processing system.

11. A computer system; a prediction manager disposed on the computer system; Equipped with The prediction manager: receiving sensor data in real time from a sensor system for the composite manufacturing system during production of the unconsolidated composite material; generating initial predictions of a plurality of properties of the green composite material in as-built in real-time during production of the green composite material in the composite manufacturing system using a plurality of physics models and a plurality of machine learning models trained to generate initial predictions using the sensor data; determining a final prediction in real time for a plurality of said characteristics based on said initial predictions; The characteristic prediction system is configured to:

12. The prediction manager: receiving, in real time during production of the green composite material, uncertainty in the initial predictions of the properties of the green composite material from the physical models and the machine learning models; Using the uncertainties to associate weights with the initial predictions of a plurality of the characteristics. It is structured as follows: The prediction manager: In determining said final forecast, determining the final prediction of the plurality of characteristics based on the initial prediction and the weights associated with the initial prediction; The property prediction system according to claim 11 ,

13. 12. The property prediction system of claim 11, wherein the plurality of physical models are selected from at least one of a thermal model, a penetration model, a rheological model, a permeability model for calculating a filtration level of a resin, a thickness model for calculating a reduction in thickness of a composite prepreg, and a resin penetration model for calculating a filtration level of the resin.

14. 12. The property prediction system of claim 11, wherein the plurality of machine learning models are selected from at least one of a first machine learning model trained using historical sensor data from a plurality of composite manufacturing systems during production of an unconsolidated composite material, a second machine learning model trained using the historical sensor data and historical processing conditions, and a third machine learning model trained using the historical processing conditions and a plurality of historical properties.

15. 1. A method for predicting a plurality of properties of an unconsolidated composite material, comprising: The method comprises: generating an initial prediction of a plurality of properties of the green composite material in a finished form in real time during production of the green composite material in the composite manufacturing system using sensor data received in real time from a sensor system for a composite manufacturing system, a plurality of physics models, and a plurality of machine learning models during production of the green composite material, wherein a plurality of the machine learning models are trained to generate a plurality of initial predictions using the sensor data; determining, in real time during production of the green composite material, uncertainty of the initial prediction of a plurality of the properties of the green composite material in the finished form from a plurality of the physical models and a plurality of the machine learning models; using said uncertainties to associate weights with said initial predictions of a plurality of said characteristics; determining a final prediction for a plurality of said characteristics based on said initial prediction and said weights associated with said initial prediction; A method comprising:

16. The method of claim 15 , further comprising adjusting a plurality of processing conditions of the composite manufacturing system based on the final prediction.

17. The method of claim 16 , wherein the plurality of process conditions are selected from at least one of materials input to the composite manufacturing system and settings of the composite manufacturing system.

18. 16. The method of claim 15, wherein the plurality of physical models are selected from at least one of a thermal model, a penetration model, a rheological model, a permeability model that calculates a filtration level of a resin, a thickness model that calculates a reduction in thickness of a composite prepreg, and a resin penetration model that calculates a filtration level of the resin.

19. 16. The method of claim 15, wherein the plurality of machine learning models are selected from at least one of a first machine learning model trained using historical sensor data, a second machine learning model trained using the historical sensor data and historical process conditions, and a third machine learning model trained using the historical process conditions and a plurality of historical characteristics.

20. The method of claim 19 , wherein the historical sensor data includes historical data and production data.

21. The method of claim 15 , wherein the uncertainty is generated by a plurality of the machine learning models as part of generating the initial prediction.

22. The step of determining a final prediction comprises: determining the final predictions of the plurality of features based on the initial predictions and the weights associated with the initial predictions using at least one of a voting regression, a stacking regression, and a bagging estimator; 16. The method of claim 15, comprising:

23. 16. The method of claim 15, wherein the plurality of properties are selected from at least one of fiber basis weight, resin content, prepreg thickness, prepreg penetration level, prepreg tack level, prepreg fiber basis weight, resin film basis weight, resin film thickness, release liner basis weight, release liner thickness, and laminate structure properties.

24. The method of claim 15 , wherein the sensor data includes characteristic data and production data.

25. 16. The method of claim 15, wherein the composite manufacturing system is a carbon fiber prepreg coating line, a reinforced fiber resin impregnation line, a resin mixing processing system, a resin film processing line, a prepreg system, and a slitting system.

26. 1. A method for predicting a plurality of properties of an unconsolidated composite material, comprising: The method comprises: receiving real-time sensor data from a composite manufacturing system during production of an unconsolidated composite material; using a plurality of machine learning models trained using a plurality of physical models and data to generate initial predictions of a plurality of properties of the green composite material in finished form in real time during production of the green composite material in the composite manufacturing system; determining a final prediction in real time for a plurality of said characteristics based on said initial predictions; A method comprising: