Control device, control method, and work machine

The control device for working machines optimizes switch usage by automating operation determination, addressing space constraints and enhancing usability and productivity.

JP2024144798APending Publication Date: 2024-10-15KOMATSU LTD

Patent Information

Application Number
JP2023056911
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-31
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

The increase in automated driving operations in control devices for working machines necessitates additional switches, leading to space constraints and operational inconvenience, reducing productivity.

Method used

A control device that includes a revolving body and a working machine, which automatically determines executable operations based on input signals, reducing the need for multiple switches by integrating automatic operation control.

Benefits of technology

This solution improves usability by minimizing the number of required switches and preventing erroneous operations, optimizing space utilization and enhancing productivity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024144798000001_ABST
    Figure 2024144798000001_ABST
Patent Text Reader

Abstract

To provide a control device capable of improving the ease of use.SOLUTION: The control device is a control device of a work machine that includes: a rotating body that rotates on a center of rotation; and a working unit with a working tool attached to the rotating body. The control device is configured so as to, when an instruction signal output by the operation unit that outputs an instruction signal related to an automatic operation including the working unit is input, determine which automatic operation is executable among multiple automatic operations based on information on the working tool, and perform the automatic operation determined as executable.SELECTED DRAWING: Figure 3
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a control device, a control method, and a work machine. [Background technology]

[0002] Patent Document 1 describes a control device for a loading machine having a rotating body and a working machine, which is capable of automating the movement of the working machine between a loading position and an excavation position. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2020-41352 A Summary of the Invention [Problem to be solved by the invention]

[0004] In a control device that can automate the movement of a work machine between a loading position and an excavation position, the automatic operation is performed based on a signal from a switch operated by an operator. When the number of automatic operation operations increases, it is necessary to provide switches corresponding to the automatic operation, which makes it difficult to secure the installation space. In addition, an increase in the number of switches requires the operator to operate the switches reliably, which makes it difficult to use and leads to reduced productivity.

[0005] The present disclosure has been made in consideration of the above circumstances, and has an object to provide a control device, a control method, and a work machine that can improve usability. [Means for solving the problem]

[0006] One aspect of the present disclosure is a control device for a work machine that has a rotating body that rotates around a rotation center and a work machine having a work implement attached to the rotating body, and when an instruction signal is input from an operating unit that outputs an instruction signal related to an automatic operation including the work implement, the control device determines which of a plurality of automatic operations is executable based on information about the work implement, and executes the automatic operation determined to be executable.

[0007] One aspect of the present disclosure is a control method for a work machine that has a rotating body that rotates around a rotation center and a work machine having a work implement attached to the rotating body, which includes a step of determining, when an instruction signal is input from an operation unit that outputs an instruction signal related to an automatic operation including the work implement, determining which of a plurality of automatic operations is executable based on information related to the work implement, and executing the automatic operation determined to be executable.

[0008] One aspect of the present disclosure is a work machine comprising a rotating body that rotates around a rotation center, a work machine having a work implement attached to the rotating body, and a control device that controls the rotating body and the work implement, wherein when an instruction signal is input from an operating unit that outputs an instruction signal related to an automatic operation including the work implement, the control device determines which of a plurality of automatic operations is executable based on information related to the work implement, and executes the automatic operation determined to be executable. Effect of the Invention

[0009] The control device, control method, and work machine disclosed herein can improve usability. [Brief description of the drawings]

[0010] [Figure 1] 1 is a schematic diagram showing a configuration of a work machine according to an embodiment of the present disclosure. FIG. [Diagram 2] FIG. 2 is a diagram showing the internal configuration of a driver's cab according to an embodiment of the present disclosure. [Diagram 3] FIG. 1 is a block diagram showing a configuration example of a control system according to an embodiment of the present disclosure. [Figure 4] 5 is a schematic diagram for explaining an example of the operation of the control device according to the embodiment of the present disclosure. FIG. [Diagram 5] 5 is a schematic diagram for explaining an example of the operation of the control device according to the embodiment of the present disclosure. FIG. [Figure 6] 5 is a schematic diagram for explaining an example of the operation of the control device according to the embodiment of the present disclosure. FIG. [Figure 7] 5 is a schematic diagram for explaining an example of the operation of the control device according to the embodiment of the present disclosure. FIG. [Figure 8] 5 is a schematic diagram for explaining an example of the operation of the control device according to the embodiment of the present disclosure. FIG. [Figure 9] 5 is a schematic diagram for explaining an example of the operation of the control device according to the embodiment of the present disclosure. FIG. [Figure 10] 5 is a schematic diagram for explaining an example of the operation of the control device according to the embodiment of the present disclosure. FIG. [Figure 11] 5 is a schematic diagram for explaining an example of the operation of the control device according to the embodiment of the present disclosure. FIG. [Figure 12] 5 is a flowchart illustrating an example of the operation of the control device according to the embodiment of the present disclosure. [Figure 13] 5 is a schematic diagram for explaining an example of the operation of the control device according to the embodiment of the present disclosure. FIG. [Figure 14] 5 is a schematic diagram for explaining an example of the operation of the control device according to the embodiment of the present disclosure. FIG. [Figure 15] 5 is a flowchart illustrating an example of the operation of the control device according to the embodiment of the present disclosure. [Figure 16] 5 is a schematic diagram for explaining an example of the operation of the control device according to the embodiment of the present disclosure. FIG. [Figure 17] 5 is a schematic diagram for explaining an example of the operation of the control device according to the embodiment of the present disclosure. FIG. [Figure 18] 5 is a flowchart illustrating an example of the operation of the control device according to the embodiment of the present disclosure. [Figure 19] 5 is a schematic diagram for explaining an example of the operation of the control device according to the embodiment of the present disclosure. FIG. [Figure 20]5 is a flowchart illustrating an example of the operation of the control device according to the embodiment of the present disclosure. [Figure 21] 5 is a schematic diagram for explaining an example of the operation of the control device according to the embodiment of the present disclosure. FIG. [Figure 22] 5 is a flowchart illustrating an example of the operation of the control device according to the embodiment of the present disclosure. [Figure 23] 5 is a schematic diagram for explaining an example of the operation of the control device according to the embodiment of the present disclosure. FIG. [Figure 24] 5 is a flowchart illustrating an example of the operation of the control device according to the embodiment of the present disclosure. [Diagram 25] 5 is a flowchart illustrating an example of the operation of the control device according to the embodiment of the present disclosure. [Figure 26] 5 is a flowchart illustrating an example of the operation of the control device according to the embodiment of the present disclosure. [Figure 27] 5 is a flowchart illustrating an example of the operation of the control device according to the embodiment of the present disclosure. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0011] Hereinafter, an embodiment of the present disclosure will be described with reference to the drawings. In addition, the same reference numerals are used for the same or corresponding configurations in each drawing, and the description is omitted as appropriate. FIG. 1 is a schematic diagram showing the configuration of a work machine according to an embodiment of the present disclosure. FIG. 2 is a diagram showing the internal configuration of a cab according to an embodiment of the present disclosure. FIG. 3 is a block diagram showing a configuration example of a control system according to an embodiment of the present disclosure. FIGS. 4 to 11 are schematic diagrams for explaining an operation example of a control device according to an embodiment of the present disclosure. FIGS. 12, 15, 18, 20, 22, and 24 to 27 are flowcharts showing an operation example of a control device according to an embodiment of the present disclosure. FIGS. 13, 14, 16, 17, 19, 21, and 23 are schematic diagrams for explaining an operation example of a control device according to an embodiment of the present disclosure.

[0012] (Configuration of work machine 100) FIG. 1 shows a configuration of a work machine 100 according to an embodiment of the present disclosure. The work machine 100 operates at a construction site and works on a construction target such as soil and sand. The work machine 100 according to an embodiment of the present disclosure is, for example, a hydraulic excavator. However, the work machine according to the present disclosure is not limited as long as it is a work machine equipped with a revolving body and a work machine, which are actuators, and may be, for example, another work machine such as a face shovel or a rope shovel. In addition, the work machine may have an actuator that is not limited to hydraulic and is electrically operated. The work machine 100 includes a traveling body 110, a revolving body 120, a work machine 130, and a cab 140.

[0013] The running body 110 supports the work machine 100 so that it can run. The running body 110 is equipped with two crawler tracks 111 provided on the left and right sides, and two travel motors 112 for driving each crawler track 111. The rotating body 120 is supported on the running body 110 so as to be rotatable around a rotation center.

[0014] The working machine 130 is hydraulically driven. The working machine 130 is supported at the front of the revolving body 120 so as to be drivable in the vertical direction. The cab 140 is a space in which an operator sits and operates the work machine 100. The cab 140 is provided at the left front of the revolving body 120. In this embodiment, as shown in FIG. 1, the vertical direction (Z direction), the horizontal direction (Y direction), and the front-rear direction (X direction) are defined with the revolving body 120 as the reference. In this embodiment, this coordinate system is called a shovel coordinate system. Also, the part of the revolving body 120 to which the working machine 130 is attached is called the front part. Also, with respect to the revolving body 120, the opposite part is called the rear part, the left part is called the left part, and the right part is called the right part, with the front part being the reference.

[0015] (Configuration of rotating body 120) The swing body 120 includes an engine 121, a hydraulic pump 122, an EPC (Electromagnetic Proportional Control) valve 123-1, a main valve 123-2, a swing motor 124, and a fuel injection device 125. The engine 121 is a prime mover that drives the hydraulic pump 122. The engine 121 is an example of a power source. A starter 1211 is provided on the engine 121. The engine 121 is started by the rotation of the starter 1211. The EPC valve 123-1 controls the hydraulic oil flowing to the main valve 123-2 based on an operation command signal output by the control device 61.

[0016] The hydraulic pump 122 is a variable displacement pump driven by the engine 121. The hydraulic pump 122 supplies hydraulic oil to each actuator via a main valve 123-2. Each actuator includes a boom cylinder 131C, an arm cylinder 132C, a bucket cylinder 133C, a travel motor 112, and a swing motor 124. The main valve 123-2 controls the flow rate of the hydraulic oil supplied from the hydraulic pump 122.

[0017] The swing motor 124 is driven by hydraulic oil supplied from the hydraulic pump 122 via a main valve 123-2, and swings the swing body 120 around a swing axis 120C (center of swing). The fuel injection device 125 injects fuel into the engine 121.

[0018] (Configuration of the work machine 130) The work machine 130 includes a boom 131, an arm 132, a bucket 133, a boom cylinder 131C, an arm cylinder 132C, and a bucket cylinder 133C. The boom cylinder 131C, the arm cylinder 132C, and the bucket cylinder 133C are included in the cylinder 130C shown in FIG. 3. In this embodiment, the bucket 133 is one configuration example of the "work tool" in this disclosure. In addition to the bucket, a tiltrotator, a quick coupler, a grapple, a magnet, a breaker, and the like may be attached as the work tool that is an attachment. These are also examples of the "work tool" in this disclosure.

[0019] A base end of the boom 131 is attached to the rotating body 120 via a boom pin. The arm 132 connects the boom 131 and the bucket 133. A base end of the arm 132 is attached to a tip end of the boom 131 via an arm pin. The bucket 133 includes a blade for excavating earth and sand and a storage section for storing the excavated earth and sand. A base end of the bucket 133 is attached to the tip end of the arm 132 via a bucket pin 133P.

[0020] The boom cylinder 131C is a hydraulic cylinder for operating the boom 131. A base end of the boom cylinder 131C is attached to the rotating body 120. A tip end of the boom cylinder 131C is attached to the boom 131. The arm cylinder 132C is a hydraulic cylinder for driving the arm 132. A base end of the arm cylinder 132C is attached to the boom 131. A tip end of the arm cylinder 132C is attached to the arm 132. The bucket cylinder 133C is a hydraulic cylinder for driving the bucket 133. A base end of the bucket cylinder 133C is attached to the arm 132. A tip end of the bucket cylinder 133C is attached to a link member connected to the bucket 133.

[0021] (Configuration of the cab 140) 2 shows the internal configuration of the cab 140 according to the embodiment of the present disclosure. In the cab 140, a driver's seat 142, an operating device 143, and the like are provided.

[0022] The operation device 143 is a device for driving the traveling body 110, the rotating body 120, and the work machine 130 by manual operation by the operator, setting and changing various set values, and providing information to the operator. The operation device 143 is composed of, for example, a lever, a switch, and a pedal. The operation device 143 includes a left operation lever 143LO, a right operation lever 143RO, a left foot pedal 143LF, a right foot pedal 143RF, a left travel lever 143LT, a right travel lever 143RT, and a display input device 143D. In this embodiment, the switch is a component that generates or changes a predetermined signal by being operated by the operator. In this embodiment, the switch is one example of the configuration of the "operation unit" in this disclosure. As the switch, various switches such as a push button switch, a rocker switch, and a toggle switch may be used. In addition, the switch may be provided within a range that can be operated by the operator. The switch is provided around the driver's seat provided in the driver's cab 140 or a remote control room. For example, it may be provided in a console to the side of the driver's seat 142, or in a transmitter that outputs operation commands to the work machine 100 from outside the work machine 100, etc.

[0023] The left operation lever 143LO is provided on the left side of the driver's seat 142. The right operation lever 143RO is provided on the right side of the driver's seat 142.

[0024] The left operation lever 143LO is an operation mechanism for performing the rotation operation of the revolving body 120 and the excavation / dumping operation of the arm 132. Specifically, when the operator of the work machine 100 tilts the left operation lever 143LO forward, the arm 132 performs the dumping operation. When the operator of the work machine 100 tilts the left operation lever 143LO rearward, the arm 132 performs the excavation operation. When the operator of the work machine 100 tilts the left operation lever 143LO to the right, the revolving body 120 rotates to the right. When the operator of the work machine 100 tilts the left operation lever 143LO to the left, the revolving body 120 rotates to the left. Note that in other embodiments, when the left operation lever 143LO is tilted in the front-rear direction, the revolving body 120 may rotate to the right or left, and when the left operation lever 143LO is tilted in the left-right direction, the arm 132 may perform the excavation operation or the dumping operation. The left operation lever 143LO is provided with, for example, an operation switch 1433. The operation switch 1433 is provided on the upper part or on the side of the operation lever. When the operation switch 1433 is turned ON, for example, a horn may sound.

[0025] The right operation lever 143RO is an operation mechanism for performing an excavation / dump operation of the bucket 133 and a raising / lowering operation of the boom 131. Specifically, when the operator of the work machine 100 tilts the right operation lever 143RO forward, a lowering operation of the boom 131 is performed. When the operator of the work machine 100 tilts the right operation lever 143RO rearward, a raising operation of the boom 131 is performed. When the operator of the work machine 100 tilts the right operation lever 143RO to the right, a dump operation of the bucket 133 is performed. When the operator of the work machine 100 tilts the right operation lever 143RO to the left, an excavation operation of the bucket 133 is performed. Note that in other embodiments, when the right operation lever 143RO is tilted in the front-rear direction, the bucket 133 may perform a dump operation or an excavation operation, and when the right operation lever 143RO is tilted in the left-right direction, the boom 131 may perform a raising operation or a lowering operation. The right operation lever 143RO is provided with, for example, operation switches 1431 and 1432. In this embodiment, it is assumed that the operation switch 1431 is set to function as a teaching switch, and the operation switch 1432 is set to function as an automatic start switch (hereinafter, each switch is also referred to as the teaching switch 1431 and the automatic start switch 1432 (or simply "switch")). The switches 1431 and 1432 are provided on the upper part or on the side of the operation lever. The teaching switch and the automatic start switch are examples of switches for automatic control. For example, when the automatic start switch is turned ON, it outputs an instruction signal to the control device 61 to start an automatic operation including the work machine 130. In addition, the switch may be a signal related to an automatic operation other than automatic start, and may be a switch that outputs, for example, an automatic stop signal. In addition, for example, the allocation of the function of the switch is not limited to the automatic control of loading rotation and return rotation, but may be performed for automatic control such as automatic soil removal that automatically performs soil removal operation by the bucket 133 and automatic excavation that automatically performs excavation operation. For example, the automatic operations of automatic excavation, loading rotation, return rotation, and automatic soil removal may be assigned to two or more switches, respectively.In addition, the automatic driving allocation may be performed by providing multiple switches on one operating lever, or by dividing the operating lever into multiple operating levers and providing one or multiple switches on each operating lever.

[0026] The left foot pedal 143LF is located on the left side of the floor surface in front of the driver's seat 142. The right foot pedal 143RF is located on the right side of the floor surface in front of the driver's seat 142. The left travel lever 143LT is pivoted to the left foot pedal 143LF and configured so that the tilt of the left travel lever 143LT and the depression of the left foot pedal 143LF are linked. The right travel lever 143RT is pivoted to the right foot pedal 143RF and configured so that the tilt of the right travel lever 143RT and the depression of the right foot pedal 143RF are linked.

[0027] The left foot pedal 143LF and the left traveling lever 143LT correspond to the rotational drive of the left crawler belt of the traveling body 110. Specifically, when the operator of the work machine 100 tilts the left foot pedal 143LF or the left traveling lever 143LT forward, the left crawler belt rotates in the forward direction. Conversely, when the operator of the work machine 100 tilts the left foot pedal 143LF or the left traveling lever 143LT backward, the left crawler belt rotates in the reverse direction.

[0028] The right foot pedal 143RF and the right traveling lever 143RT correspond to the rotational drive of the right crawler belt of the traveling body 110. Specifically, when the operator of the work machine 100 pushes the right foot pedal 143RF or the right traveling lever 143RT forward, the right crawler belt rotates in the forward direction. Conversely, when the operator of the work machine 100 pushes the right foot pedal 143RF or the right traveling lever 143RT backward, the right crawler belt rotates in the reverse direction.

[0029] The display input device 143D is a device that combines a display device with a sensor that detects a touch operation on the display screen. For example, an operator can set or change various setting values ​​using the display input device 143D. Note that the display input device 143D may be a separate device consisting of a display device having a display unit and an input unit consisting of switches and the like that inputs the operator's instruction operations.

[0030] (sensors, etc.) As shown in Fig. 3, the control system 60 of the work machine 100 includes a control device 61, an operation device 143, etc., and various sensors. Note that in Fig. 3, the hydraulic system circuit is indicated by a thick line. In the example shown in Fig. 3, the control system 60 includes an attitude angle sensor 151, a GNSS (Global Navigation Satellite System) sensor 152, and an IMU (Inertial Measurement Unit) 153.

[0031] The attitude angle sensor 151 includes a boom attitude angle sensor, an arm attitude angle sensor, and a bucket attitude angle sensor. The boom attitude angle sensor measures the attitude angle of the boom cylinder 131C. The arm attitude angle sensor measures the attitude angle of the arm cylinder 132C. The bucket attitude angle sensor measures the attitude angle of the bucket cylinder 133C.

[0032] The GNSS sensor 152 calculates the position of the revolving body 120 and the azimuth in which the revolving body 120 faces. The GNSS sensor 152 includes two receivers 161 and 162 that receive positioning signals from artificial satellites that constitute the GNSS. The two receivers 161 and 162 are installed at different positions on the revolving body 120. The GNSS sensor 152 detects the position of a representative point of the revolving body 120 (the origin of the excavator coordinate system) in the site coordinate system based on the positioning signals received by the receivers 161 and 162. The GNSS sensor 152 uses the positioning signals received by the two receivers 161 and 162 to calculate the azimuth in which the revolving body 120 faces as a relationship between the installation position of one receiver and the installation position of the other receiver. The azimuth angle of the rotating body 120 (also called the vehicle body azimuth angle) is the front direction (X direction) of the rotating body 120 and is equal to the horizontal component of the extension direction of a straight line extending from the boom 131 to the bucket 133 of the work machine 130.

[0033] The IMU 153 measures the acceleration and angular velocity of the rotating body 120, and detects the attitude (for example, roll angle and pitch angle) of the rotating body 120 based on the measurement results. The IMU 153 is installed on the underside of the rotating body 120, for example.

[0034] Examples of other sensors equipped on the work machine 100 include a stereo camera, a LiDAR (Light Detection and Ranging) device, a laser scanner, etc. These sensors are installed, for example, so that their detection direction faces forward of the cab 140 of the work machine 100. These sensors identify the three-dimensional position of an object in a coordinate system based on the position of each sensor. These sensors may be installed on either the left or right side of the work machine 100, or on both sides, so as to face laterally of the work machine 100.

[0035] The work machine 100 is also equipped with, for example, a short-range communication device for performing vehicle-to-vehicle communication with other surrounding vehicles, a mobile communication device for communicating with a remote server, etc.

[0036] (Basic operation of the control device) First, with reference to Figs. 4 to 11, a basic operation of the control device 61 according to the embodiment of the present disclosure will be described. In this embodiment, a turning operation in which the bucket 133 is located outside the loading target by excavation of the excavation target, while automatically raising the boom 131, turns to a direction facing the loading target, and moves to the dumping point is called "loading turning". In addition, an operation in which the bucket 133 is located above the loading target by loading, while automatically lowering the boom 131, turns to a predetermined direction, and moves to the excavation start point is called "return turning". "Loading turning" and "return turning" are operations that automatically change the working machine and the rotating body, and are examples of "automatic operations including the working machine" in the present disclosure. In addition, an example of the automatic operation may include automatic operations of either the working machine or the rotating body. The dumping point is a target point where loading or the like is performed, and is set, for example, to the loading platform of a dump truck, which is a transport vehicle, or the inlet of a land improvement machine, a hopper, or the like. However, the present disclosure is not limited thereto, and for example, the destination of excavated soil or the like when it is moved onto another ground surface can also be set as the dumping point. In the present disclosure, the dumping point is an example of a first target point (hereinafter also referred to as a loading rotation target point TLP) corresponding to the target position of unloading the bucket 133 or the like. Also, the excavation start point is a target point of an automatic return operation after completion of dumping, and is set, for example, to a point where excavation starts. In the present disclosure, the excavation start point is an example of a second target point (hereinafter also referred to as a return rotation target point TRP) corresponding to the target position of loading the bucket 133 or the like. Note that, in the present embodiment, the dumping point (loading rotation target point TLP), the excavation start point (return rotation target point TRP), and the interference avoidance point described later are collectively referred to as the reference point. Also, in the present embodiment, the part of the work machine 100 corresponding to the reference point is the bucket pin 133P. The control device 61 sets the position of each reference point as a target value and controls the position of the bucket pin 133P. In addition, the loading turning target point TLP and the return turning target point TRP are collectively referred to as the target points.

[0037] Fig. 4 shows a schematic diagram of a series of steps of manual excavation, loading swing, manual earth removal, and return swing. In the work machine 100 shown in Fig. 4, for example, as shown in the upper left, the operator loads earth and sand into the bucket 133 by manual excavation, and then when the operator operates the automatic start switch 1432, loading swing is started as shown in the upper right, and the machine automatically swings to the loading swing target point TLP by the combined operation of the work implement 130 and the rotating body 120. Here, the operator manually discharges earth and sand from the bucket 133 (lower right diagram). After earth discharge is completed, when the operator operates the automatic start switch 1432, return swing is started as shown in the lower left, and the machine automatically swings to the return swing target point TRP by the combined operation of the work implement 130 and the rotating body 120.

[0038] In the example shown in Fig. 2 and Fig. 3, one automatic start switch 1432 is used in common for loading and return turns, but two or more switches may be used. For example, the automatic start switch for loading turns may be the automatic start switch 1432 shown in Fig. 2 (hereinafter also referred to as the loading turn automatic start switch 1432), and the automatic start switch for return turns may be the automatic start switch 1433 shown in Fig. 2 (hereinafter also referred to as the return turn automatic start switch 1433), so that two automatic start switches are provided independently. The switches may be provided, for example, so that the operator can set them arbitrarily. The operation switch 1433 may be used for the horn, and a third operation switch may be provided on either the left or right operation lever to serve as the automatic start switch for return turns.

[0039] Next, the interference avoidance point will be described with reference to FIG. 5. FIG. 5 shows a schematic positional relationship between the work machine 100 and the dump truck 200 which is the loading target of the loading of earth and sand. The dump truck 200 includes a cab 201, a loading platform 202, and a tailgate 203. In the example shown in FIG. 5, the work machine 100 moves the bucket 133 (133a) located at the automatic turning start point (SP) at the time of operating the automatic start switch 1432 by loading turning to the loading target point (TLP) via the interference avoidance point (EVP). The posture of the bucket 133 (133b) when it reaches the loading target point (TLP) is the hoisting posture (also referred to as the loading posture in this embodiment). Here, the operator sets the posture of the bucket 133 to the dumping posture (also referred to as the unloading posture in this embodiment) (bucket 133 (133c)) and performs the earth removal work. Here, the interference avoidance point (EVP) is a point (position information) that indicates the boundary of an area set so as not to collide with the loading platform 202 of the dump truck 200 during loading operation (loading rotation). In this embodiment, only a rotation operation is performed on the side of the earth discharge point from this boundary (loading rotation target point TLP). The interference avoidance point (EVP) can be set, for example, based on teaching in which the operator actually operates the work machine 130 to set the position and attitude. At that time, as shown in FIG. 5, for example, the interference avoidance point (EVP) is set with a certain margin in the vertical and horizontal directions with respect to the interference avoidance point (teaching position) registered by the operator. The automatic rotation start point (SP) is the position of the bucket pin 133P at the start of loading rotation or return rotation, and is the position when the operator operates the automatic start switch 1432. In addition, hereinafter, the automatic rotation start point (SP) is also referred to as the start point. The automatic turning start point (SP) may be a specific position of the work implement 130 at the start of the loading turning or the return turning, for example, the left or right end of the bucket 133, the cutting edge, or the like.

[0040] FIG. 6 shows an example of the change in the swing angle and the bucket pin height during loading swing. The horizontal axis is the swing angle, and the vertical axis is the bucket pin height. In FIG. 6, the swing angle of the automatic swing start point (SP) is shown as the start angle, the swing angle of the interference avoidance point (EVP) as the interference avoidance point angle, and the swing angle of the loading swing target point (TLP) as the target angle. Also, the height of the automatic swing start point (SP) is shown as the start height, the height of the interference avoidance point (EVP) as the interference avoidance point height, and the height of the loading swing target point (TLP) as the target height. Also, the interference area with the dump truck is shown shaded. In the example shown in FIG. 6, the control of the swing unit 120 and the control of the work machine 130 are executed in parallel from the automatic swing start point (SP) to the interference avoidance point (EVP), so that the bucket pin height reaches the interference start point height before the swing angle reaches the interference avoidance point angle. Also, after the interference avoidance point is reached, the swing angle reaches the target angle by the sole control of the swing unit 120. The loading rotation operation includes a rotation region in which the rotating body 120 and the boom 131 are simultaneously operated. The operation of the boom 131 in the loading rotation may be a boom-up operation or a boom-down operation. For example, when the height of the automatic rotation start point is higher than the interference avoidance point, the boom-down operation may be performed.

[0041] On the other hand, Fig. 7 and Fig. 8 show examples of changes in the swing angle and bucket pin height during return swing. Fig. 7 shows an example in which the height of the automatic swing start point (SP) is equal to the height of the interference avoidance point (EVP), and Fig. 8 shows an example in which the height of the automatic swing start point (SP) is lower than the height of the interference avoidance point (EVP). In the example shown in Fig. 7, the bucket pin height is maintained at the start height until the interference avoidance point is reached, and the swing angle is changed from the start angle to the interference avoidance point angle by the independent control of the swing body 120. After the interference avoidance point is reached, both the bucket pin height and the swing angle are changed by executing the control of the swing body 120 and the control of the work implement 130 in parallel, and the bucket pin height and the swing angle are changed to the target height and target angle. In the example shown in Fig. 8, the bucket pin height is first changed by the independent control of the work implement 130 until the bucket pin height reaches the interference avoidance point height. After reaching the interference avoidance point height, the bucket pin height is maintained at the start height until the interference avoidance point is reached, and the swing angle is changed from the start angle to the interference avoidance point angle by the sole control of the rotating body 120. After reaching the interference avoidance point, the control of the rotating body 120 and the control of the work implement 130 are executed in parallel, so that both the bucket pin height and the swing angle change, and the target height and the target angle are changed. In this embodiment, in the return swing, the attitude of the work implement 130 (the attitude of the bucket 133) is controlled to become the target attitude before the target angle and the target height are reached. The return swing operation includes a swing region in which the rotating body 120 and the boom 131 are simultaneously operated. The operation of the boom 131 in the return swing may be a boom lowering operation or a boom raising operation. For example, when the target height is higher than the interference avoidance point, the boom raising operation may be performed.

[0042] Fig. 9 is a perspective view showing an example of an operation during loading swing. In addition to the tailgate 203, the dump truck 200 is equipped with a cobo lane (scattering prevention device) 204 and a hinge 205. The cobo lane 204 and the hinge 205 are examples of obstructions. In the example shown in Fig. 9, the trajectory of the bucket pin extends from the automatic swing start point (SP) to the interference avoidance point (EVP) by the operation of both the work machine 130 and the swing unit 120 (hereinafter referred to as combined operation), and continues from the interference avoidance point (EVP) to the loading swing target point (TLP) by the independent operation of the swing unit 120.

[0043] FIG. 10 is an example of a perspective view showing an example of an operation in a return turn. In the example shown in FIG. 10, the height of the automatic turn start point (SP) is higher than the height of the interference avoidance point (EVP). In addition, the positions of the automatic turn start point (SP) and the interference avoidance point (EVP) are different. In this case, in this embodiment, the vertical plane (interference avoidance vertical plane (VS)) including the rotation axis 120C of the revolving body 120 and the interference avoidance point (EVP) is used as a reference to ensure interference avoidance with an interfering object. In this embodiment, the interference avoidance vertical plane (VS) and the interference avoidance plane (HS) described later are collectively called the interference avoidance plane. In this example, the trajectory of the bucket pin extends from the automatic turn start point (SP) until it passes through the interference avoidance vertical plane (VS) by the independent operation of the revolving body 120, and after passing through the interference avoidance vertical plane (VS), it continues to the return turn target point (TRP) by the combined operation of the work machine 130 and the revolving body 120.

[0044] FIG. 11 is a perspective view showing an example of an operation example in a return turn. In the example shown in FIG. 11, the height of the automatic turn start point (SP) is lower than the height of the interference avoidance point (EVP). In addition, the positions of the automatic turn start point (SP) and the interference avoidance point (EVP) are different. In this case, in this embodiment, the work machine 130 is controlled based on a horizontal plane (interference avoidance plane (HS)) including the interference avoidance point (EVP) until the height of the bucket pin 133P becomes equal to or higher than the height of the interference avoidance plane (HS). Thereafter, similarly to the example shown in FIG. 10, interference avoidance with an interfering object is ensured based on the interference avoidance vertical plane (VS). In this example, the bucket pin trajectory rises from the automatic rotation starting point (SP) until it reaches the interference avoidance plane (HS), and then extends by the sole movement of the rotating body 120 until it passes the interference avoidance vertical plane (VS), and after passing the interference avoidance vertical plane (VS), it continues to the return rotation target point (TRP) by the combined movement of the work machine 130 and the rotating body 120.

[0045] (Control device configuration) 3, the control device 61 can be configured using a computer such as a microcontroller, and includes an automatic turning control unit 62, a storage unit 63, and an operation command switching unit 64 as a functional configuration configured by a combination of hardware such as a computer, peripheral devices of the computer, and peripheral circuits, and software such as a program executed by the computer. The automatic turning control unit 62 also includes an information input / output unit 621, a reference point setting unit 622, a turning direction setting unit 623, a start instruction receiving unit 624, an operation command switching control unit 625, and an operation command signal generating unit 626. The storage unit 63 also stores information 631 indicating the target working machine attitude and vehicle body azimuth (earth removal target point, interference avoidance point, excavation start point), etc.

[0046] The automatic rotation control unit 62 generates an operation command signal (automatic) and outputs it to the EPC valve 123-1 via the operation command switching unit 64, thereby driving the rotating body 120 and the work machine 130. Note that the actuator that automatically operates by the operation command signal generated by the control device without the operation of the operator is an actuator that corresponds to an automatic operation assigned to an instruction signal output by the operation of an operation switch. In this embodiment, when an instruction signal is input from the automatic start switch 1432 or the like that outputs an instruction signal related to an automatic operation including the work machine, and the automatic operation assigned to the input instruction signal is identical to an executable automatic operation based on information indicating the position, attitude, surrounding conditions, etc. related to the bucket 133 (an example of "information related to the work machine" in this disclosure), the automatic rotation control unit 62 executes the automatic operation of the input instruction signal. In this case, the automatic turning control unit 62 may execute the automatic action of the instruction signal when the automatic action assigned to the instruction signal is the same as the automatic action that can be executed based on the information about the bucket 133, or may not execute the automatic action of the instruction signal when the automatic action assigned to the instruction signal is the same as the automatic action that cannot be executed based on the information about the bucket 133. Note that the automatic turning control unit 62 does not execute the automatic action of the instruction signal when the automatic action assigned to the instruction signal is not the same as the automatic action that can be executed based on the information about the bucket 133.

[0047] The information input / output unit 621 inputs predetermined information output by the operation device 143, the attitude angle sensor 151, the GNSS sensor 152, the IMU 153, etc., and outputs predetermined display information to the display input device 143D. The information input / output unit 621 inputs an instruction signal from an automatic start switch 1432 (operation unit) that outputs an instruction signal regarding an automatic operation including the work machine 130 equipped with work tools such as the boom 131, the arm 132, or the bucket 133.

[0048] The reference point setting unit 622 sets a loading turning target point TLP (earth unloading point), a return turning target point TRP (digging start point), and an interference avoidance point (EVP). In this embodiment, these reference points can be set by the operator through teaching, or a three-dimensional map or the like is created as described in Patent Document 1, and the reference points can be set based on the created three-dimensional map or the like. The method of setting can be, for example, freely selected by the operator. Here, an example of setting by the operator through teaching will be described. The reference point setting unit 622 causes the display input device 143D to display an instruction to move the bucket 133 to the excavation start point. The operator operates the operation device 143 to move the bucket 133 to the excavation start point, and inputs a completion of the movement to the excavation start point to the display input device 143D. Next, the reference point setting unit 622 causes the display input device 143D to display an instruction to move the bucket 133 to the interference avoidance point. The operator operates the operation device 143 to move the bucket 133 to the interference avoidance point, and inputs a completion of the movement to the interference avoidance point to the display input device 143D. Next, the reference point setting unit 622 causes the display input device 143D to display an instruction to move the bucket 133 to the unloading point. The operator operates the operation device 143 to move the bucket 133 to the unloading point, and inputs a completion of the movement to the unloading point to the display input device 143D.

[0049] The reference point setting unit 622 displays an instruction to move to the reference point on the display input device 143D, and stores information on the position and posture of the work implement 130 acquired based on the shovel coordinate system at each reference point, the rotation angle of the rotating body 120, etc., in the storage unit 63 as information 631 based on the operator's input operation on the display input device 143D and the information input by the information input / output unit 621. The reference point setting unit 622 can change the setting of the reference point at any timing. That is, the reference point setting unit 622 can set the loading rotation target point TLP (earth unloading point), the return rotation target point TRP (digging start point), and the interference avoidance point (EVP) once before performing automatic rotation, and can perform the setting at any timing, for example, during work. In this case, for example, fine adjustment of the loading rotation target point TLP (earth unloading point) and the return rotation target point TRP (digging start point) can be performed appropriately.

[0050] The turning direction setting unit 623 sets the turning direction of the work machine 130. The turning direction setting unit 623 sets the turning direction in the loading turning control (first turning control) and the return turning control (second turning control) according to the turning direction of the turning body 120 in which interference with an interfering object may occur in the loading turning control (first turning control) and the return turning control (second turning control).

[0051] The turning direction setting unit 623 sets the turning direction in a direction in which the bucket 133 reaches the loading turning target point TLP (first target point) corresponding to the unloading position (target position for unloading) or the return turning target point TRP (second target point) corresponding to the excavation start position (target position for loading) across the interference avoidance point (EVP), for example. FIG. 12 shows an example of the operation of the turning direction setting unit 623 in this case. The process shown in FIG. 12 is started when the automatic start switch is operated. When the process shown in FIG. 12 is started, the turning direction setting unit 623 first acquires the target angle described with reference to FIG. 6 or FIG. 7 (step S101). Next, the turning direction setting unit 623 acquires the interference avoidance point angle (step S102). Next, the turning direction setting unit 623 determines whether or not the target angle is reached across the interference avoidance point angle when turning left (step S103). If the target angle is reached by crossing the interference avoidance point angle when turning left (step S103: YES), the turning direction setting unit 623 sets the turning direction to left (step S104) and ends the process shown in Fig. 12. If the target angle is not reached by crossing the interference avoidance point angle when turning left (step S103: NO), the turning direction setting unit 623 sets the turning direction to right (step S105) and ends the process shown in Fig. 12. Fig. 13 shows an example when the turning direction is set to left. Fig. 14 shows an example when the turning direction is set to right. In this case, since the loading turning or the return turning is performed in the direction of the taught interference avoidance point, it is possible to prevent the situation where it becomes unclear which way to turn when turning nearly 180 degrees, for example.

[0052] Furthermore, for example, when the target of unloading (loading, earth removal, etc.) is the dump truck 200 and the interfering object is the cab 201 of the dump truck 200, the turning direction setting unit 623 sets the turning direction in a direction in which interference with the cab 201 of the dump truck 200 does not occur based on the positional relationship between the turning center (turning axis 120C) and the dump truck 200. FIG. 15 shows an example of the operation of the turning direction setting unit 623 in this case. The process shown in FIG. 15 is started when the automatic start switch 1432 is operated. When the process shown in FIG. 15 is started, the turning direction setting unit 623 acquires position information of the earth removal target point P0 and the position coordinates of the four truck contour points P1 to P4 shown in FIG. 16 or FIG. 17 based on the excavator coordinate system (step S201). The position coordinates of the four truck contour points P1 to P4 can be acquired, for example, by vehicle-to-vehicle communication or by using an external sensor such as a LiDAR device, a radar scanner, or a camera provided on the work machine 100. Next, the turning direction setting unit 623 calculates a vector (vector a) connecting the origin (turning axis 120C) of the shovel coordinate system and the earth removal target point P0 (step S202). Next, the turning direction setting unit 623 calculates a vector (vector b) of the X-axis of the truck coordinate system (step S203). The truck coordinate system is a coordinate system based on the position and orientation of the dump truck 200. Next, the turning direction setting unit 623 determines whether the angle between the vector a and the vector b is greater than 0 degrees (step S204). If the angle between the vector a and the vector b is greater than 0 degrees, the turning direction setting unit 623 sets the turning direction to the right (step S205) and ends the processing shown in FIG. 15. If the angle between vector a and vector b is not greater than 0 degrees, the turning direction setting unit 623 sets the turning direction to the left (step S206), and ends the processing shown in Fig. 15. In the example shown in Fig. 16, the angle is greater than 0, so the turning direction is set to the right. In the example shown in Fig. 17, the angle is not greater than 0, so the turning direction is set to the left. In this case, the work machine 130 can approach from the rear side of the bed 202 of the dump truck 200, which is preferable compared to passing over the cab 201.When the angle between vector a and vector b is near 0 degrees within a predetermined range from 0 degrees that is set in advance, the vehicle may automatically turn in a direction that results in a minimum turning angle.

[0053] The turning direction setting unit 623 may be set manually based on an input operation by an operator to the display input device 143D. The turning direction setting unit 623 may set the turning direction in a direction that results in a minimum turning angle, for example, in the case of a hopper or earth dumping work on the ground where there is no obstruction. The setting method may be selected by the operator arbitrarily by touching the input screen, for example.

[0054] When the automatic start switch 1432 is a single operation switch, the start instruction receiving unit 624 receives, when the automatic start switch 1432 (predetermined operation unit) is operated, as an instruction to start loading swing control (first swing control for moving the bucket to a first target point corresponding to the target position for unloading) or as an instruction to start return swing control (second swing control for moving the bucket to a second target point corresponding to the target position for loading). With this configuration, it is possible to instruct the start of swing using a single operation switch.

[0055] In addition, when the automatic start switch 1432 is one operation switch, the start instruction receiving unit 624 receives the operation of the automatic start switch 1432 as an instruction to start the return swing control (second swing control) when the bucket 133 is above the loading platform 202 or the vessel 206 of the dump truck 200 (when the bucket is within a predetermined range from the first target point) as shown in FIG. 19, or receives the operation as an instruction to start the loading swing control (first swing control) when the bucket 133 is not above the loading platform 202 or the vessel 206 of the dump truck 200 (hereinafter, simply referred to as the vessel 206) (when the bucket is not within a predetermined range from the first target point). Note that in FIG. 19, positions P5 and P6 are positions of the ends of the cab 201. FIG. 18 shows an example of the operation of the start instruction receiving unit 624 in this case. The process shown in FIG. 18 is started when the automatic start switch 1432 is operated. When the process shown in FIG. 18 is started, the start instruction receiving unit 624 acquires position information of the vessel 206 (step S301). Next, the start instruction receiving unit 624 acquires position information of the bucket 133 (step S302). For example, the position of the bucket 133 is the position of the bucket pin 133P in the shovel coordinate system, and also includes the orientation in which the revolving body 120 faces. Next, the start instruction receiving unit 624 determines whether or not the bucket 133 is above the vessel 206 (step S303). If the bucket 133 is above the vessel 206 (step S303: YES), the start instruction receiving unit 624 sets the revolving mode (type of revolving control) to return revolving (step S304), and ends the process shown in FIG. 18. If the bucket 133 is not above the vessel 206 (step S303: NO), the start instruction receiving unit 624 sets the swing mode to loading swing (step S305), and ends the process shown in FIG.

[0056] Furthermore, in the case where the automatic start switch 1432 is one operation switch, when the automatic start switch 1432 is operated, for example, as shown in FIG. 21, the start instruction receiving unit 624 receives the operation as an instruction to start return swing control (second swing control) when the bucket 133 is in a dump posture (the bucket 133 is in a predetermined unloading posture), or as shown in FIG. 23, the start instruction receiving unit 624 receives the operation as an instruction to start loading swing control (first swing control) when the bucket 133 is in a hoisting posture (the bucket 133 is in a predetermined loading posture). In this case, the swing mode can be set by the work machine 100 alone. An example of operation in this case is shown in FIG. 20 and FIG. 22. The dump posture is a posture in which the load in the bucket 133 is being discharged. The dump posture is a posture in which the blade tip 133T of the bucket 133 faces in a direction away from the work machine 100 rather than a posture in which the blade tip 133T of the bucket 133 faces in the vertical direction, as shown in FIG. 21 (broken line DL in FIG. 21). The hoarding posture is a posture in which a load is loaded into the bucket 133. The hoarding posture is a posture in which the blade edge 133T of the bucket 133 faces in a direction approaching the work machine 100 rather than a posture in which the blade edge 133T of the bucket 133 points in the vertical direction, as shown by the dashed line DL in Fig. 23, for example. It is preferable that the approaching direction is such that the blade edge 133T faces upward more than perpendicular to the vertical direction, as shown by the dashed line DL in Fig. 21. The posture of the bucket 133 may be corrected by the pitch angle of the work machine 100.

[0057] The process shown in FIG. 20 is started when the automatic start switch 1432 is operated. When the process shown in FIG. 20 is started, the start instruction receiving unit 624 acquires posture information of the bucket 133 (step S401). Next, the start instruction receiving unit 624 determines whether the bucket 133 is in the dump posture (step S402). If the bucket 133 is in the dump posture (step S402: YES), the start instruction receiving unit 624 sets the swing mode to return swing (step S403) and ends the process shown in FIG. 20. If the bucket 133 is not in the dump posture (step S402: NO), the start instruction receiving unit 624 sets the swing mode to loading swing (step S404) and ends the process shown in FIG. 20.

[0058] The process shown in FIG. 22 is started when the automatic start switch 1432 is operated. When the process shown in FIG. 22 is started, the start instruction receiving unit 624 acquires posture information of the bucket 133 (step S501). Next, the start instruction receiving unit 624 determines whether the bucket 133 is in the hoisting posture (step S502). If the bucket 133 is in the hoisting posture (step S502: YES), the start instruction receiving unit 624 sets the swing mode to loading swing (step S503) and ends the process shown in FIG. 22. If the bucket 133 is not in the hoisting posture (step S502: NO), the start instruction receiving unit 624 sets the swing mode to return swing (step S504) and ends the process shown in FIG. 22.

[0059] In addition, when the automatic start switch 1432 is one operation switch, the start instruction receiving unit 624 may not accept the switch operation when the switch is operated, for example, as shown in Fig. 19, even if the bucket 133 is above the bed 202 or the vessel 206 of the dump truck 200 (even if the bucket is within a predetermined range from the first target point) and the bucket 133 is not in the dump posture (when the bucket is not in the predetermined unloading posture), or may not accept the switch operation when the bucket 133 is not above the bed 202 or the vessel 206 of the dump truck 200 (even if the bucket is not within a predetermined range from the first target point) and the bucket 133 is not in the hoisting posture (when the bucket is not in the predetermined loading posture) when the switch is operated. An example of the operation in this case is shown in Fig. 24.

[0060] The process shown in Fig. 24 is started when the automatic start switch 1432 is operated. When the process shown in Fig. 24 is started, the start instruction receiving unit 624 acquires position information of the vessel 206 (step S601) and acquires position and posture information of the bucket 133 (step S602). For example, the position of the bucket 133 is the position of the bucket pin 133P in the shovel coordinate system, and also includes the direction in which the rotating body 120 faces. Next, the start instruction receiving unit 624 determines whether or not the bucket 133 is above the vessel 206 (step S603). If the bucket 133 is above the vessel 206 (step S603: YES), the start instruction receiving unit 624 determines whether or not the bucket 133 is in a dump posture (step S604). If the bucket 133 is in the dump posture (step S604: YES), the start instruction receiving unit 624 sets the swing mode to return swing (step S607) and ends the process shown in Fig. 24. If the bucket 133 is not in the dump posture (step S604: NO), the start instruction receiving unit 624 does not activate automatic swing (step S605), and outputs a display or sound to the display input device 143D that the position or posture of the bucket 133 is inappropriate for, for example, a predetermined time (step S606), and ends the process shown in Fig. 24. Note that step S601 may not be included.

[0061] If the bucket 133 is not above the vessel 206 (step S603: NO), the start instruction receiving unit 624 judges whether the bucket 133 is in the hoisting position (step S608). If the bucket 133 is in the hoisting position (step S608: YES), the start instruction receiving unit 624 sets the swing mode to loading swing (step S609) and ends the process shown in FIG. 24. If the bucket 133 is not in the hoisting position (step S608: NO), the start instruction receiving unit 624 does not activate the automatic swing (step S610), and outputs a display or sound to the display input device 143D for a predetermined time, for example, that the position or posture of the bucket 133 is inappropriate (step S611), and ends the process shown in FIG. 24. This configuration makes it possible to prevent the automatic swing control from being executed when the position or posture of the bucket 133 is inappropriate. In the above example of the automatic start switch with one operation switch, the automatic operations are loading swing control and return swing control, but the automatic start switch may be an automatic start switch for two or more automatic operations. For example, it may further include an excavation operation or an automatic soil discharge operation. Based on the posture of the work implement, including the posture of the arm, boom, etc., which are work implements other than the bucket, it may be determined that the operation is an excavation operation or an automatic soil discharge operation, and the corresponding automatic operation may be started. Also, the combination of automatic operations started by the switch may be any combination of automatic operations, such as a combination of loading swing control and automatic soil discharge.

[0062] Furthermore, when the automatic start switch 1432 is two switches (for example, when the loading swing automatic start switch 1432 and the return swing automatic start switch 1433 are provided), the start instruction receiving unit 624 may receive the operation of the loading swing automatic start switch 1432 or the return swing automatic start switch 1433 (first operation unit or second operation unit) as an instruction to start the loading swing control (first swing control) or an instruction to start the return swing control (second swing control) only when at least one of the position or attitude of the bucket 133 satisfies a predetermined condition (only when at least one of the position or attitude of the bucket satisfies a predetermined condition). For example, when one automatic start switch is provided on the left operation lever and the other automatic start switch is provided on the right operation lever, it is possible to prevent the automatic swing control from being started if the operator mistakenly operates the loading swing automatic start switch 1432 and the return swing automatic start switch 1433. In addition, when multiple automatic start switches are provided on one operating lever, it tends to become more difficult to operate the automatic driving switch, but even in this case, erroneous operation can be suppressed.

[0063] For example, when the return swing automatic start switch 1433 (second operation unit) is operated, the start instruction receiving unit 624 can receive it as an instruction to start return swing control (second swing control) only when the bucket 133 is above the vessel 206 (only when the bucket is within a predetermined range from the first target point), or when the loading swing automatic start switch 1432 (first operation unit) is operated, the start instruction receiving unit 624 can receive it as an instruction to start loading swing control (first swing control) only when the bucket 133 is not above the vessel 206 (only when the bucket is not within a predetermined range from the first target point). An example of the operation in this case is shown in FIG. 25.

[0064] The process shown in FIG. 25 is started when the loading swing automatic start switch 1432 is operated. When the process shown in FIG. 25 is started, the start instruction receiving unit 624 acquires position information of the vessel 206 (step S701) and acquires position information of the bucket 133 (step S702). For example, the position of the bucket 133 is the position of the bucket pin 133P in the shovel coordinate system, and also includes the direction in which the swing body 120 faces. Next, the start instruction receiving unit 624 judges whether the bucket 133 is above the vessel 206 (step S703). If the bucket 133 is above the vessel 206 (step S703: YES), the start instruction receiving unit 624 does not operate the automatic swing (step S704), and outputs a display or sound to the display input device 143D for, for example, a predetermined time to the effect that the position or posture of the bucket 133 is inappropriate (step S705), and ends the process shown in FIG. 25. If the bucket 133 is not above the vessel 206 (step S703: YES), the start instruction receiving unit 624 sets the swing mode to loading swing (step S706) and ends the processing shown in Fig. 25. Note that step S701 may not be included.

[0065] Also, the start instruction receiving unit 624 may, for example, when the loading swing automatic start switch 1432 (first operation unit) is operated, receive the switch operation as an instruction to start loading swing control (first swing control) only when the bucket 133 is in a hoisting position (the bucket is in a predetermined loading position), or when the return swing automatic start switch 1433 (second operation unit) is operated, receive the switch operation as an instruction to start return swing control (second swing control) only when the bucket 133 is in a dump position (the bucket is in a predetermined unloading position). An example of the operation in this case is shown in FIG. 26.

[0066] The process shown in FIG. 26 is started when the loading swing automatic start switch 1432 is operated. When the process shown in FIG. 26 is started, the start instruction receiving unit 624 acquires the attitude information of the bucket 133 (step S801). Next, the start instruction receiving unit 624 judges whether the bucket 133 is in the dump attitude (step S802). If the bucket 133 is in the dump attitude (step S802: YES), the start instruction receiving unit 624 does not operate the automatic swing (step S803), and outputs a display or sound to the display input device 143D that the attitude of the bucket 133 is inappropriate for a predetermined time, for example (step S804), and ends the process shown in FIG. 26. If the bucket 133 is not in the dump attitude (step S802: NO), the start instruction receiving unit 624 sets the swing mode to loading swing (step S805), and ends the process shown in FIG. 26.

[0067] It should be noted that the manner in which the above-mentioned plurality of start instruction receiving sections 624 operate can be arbitrarily selected by the operator, for example.

[0068] The operation command switching control unit 625 controls the operation command switching unit 64 to output from the operation command switching unit 64 either an operation command signal (manual) generated in response to an operation of the operator on the operation device 143 or an operation command signal (automatic) generated by the operation command signal generating unit 626. For example, when the operation command signal generating unit 626 generates and outputs an operation command signal (automatic), the operation command switching control unit 625 selects the operation command signal (automatic) and outputs it from the operation command switching unit 64.

[0069] The operation command signal generating unit 626 is one example of a configuration of a control unit according to the present disclosure. The operation command signal generating unit 626 (control unit) generates and outputs an operation command signal for performing loading swing control or return swing control in response to a predetermined instruction (e.g., operation of the automatic start switch 1432). The operation command signal generating unit 626 controls the movement of the bucket 133 in the loading swing control and return swing control based on, for example, an interference avoidance point.

[0070] In addition, the operation command signal generating unit 626 executes loading turning control when the start instruction receiving unit 624 accepts the operation of the automatic start switch 1432 as an instruction to start loading turning control, and executes return turning control when the start instruction receiving unit 624 accepts the operation of the automatic start switch 1432 as an instruction to start return turning control.

[0071] In addition, the operation command signal generating unit 626 executes loading turning control based on the loading turning target point TLP and the interference avoidance point EVP, and executes return turning control based on the return turning target point TRP and the interference avoidance vertical plane VS (interference avoidance plane) including the interference avoidance point EVP.

[0072] In addition, when the interference avoidance plane is an interference avoidance vertical plane VS including the rotation axis 120C passing through the rotation center and the interference avoidance point EVP, the operation command signal generating unit 626 sets the height of the bucket pin 133P of the bucket 133 (the specified height of the bucket) to be equal to or higher than the height of the interference avoidance point EVP from the start of the return rotation control until passing through the interference avoidance vertical plane VS.

[0073] In addition, the operation command signal generating unit 626 performs a combination of control of the attitude of the work machine 130 and control of the rotation of the rotating body 120 in one of the first and second areas bounded by the interference avoidance surface, and performs only control of the rotation of the rotating body 120 in the other area.

[0074] In addition, when the start instruction receiving unit 624 receives the operation of the loading rotation automatic start switch 1432 as an instruction to start loading rotation control, the operation command signal generating unit 626 executes loading rotation control, and when the start instruction receiving unit 624 receives the operation of the return rotation automatic start switch 1433 as an instruction to start return rotation control, the operation command signal generating unit 626 executes return rotation control.

[0075] FIG. 27 shows an example of the operation of the operation command signal generating unit 626. The operation shown in FIG. 27 is started when the automatic start switch 1432 is operated and then the turning direction and turning mode are set. When the process shown in FIG. 27 is started, the operation command signal generating unit 626 judges whether the turning mode is set to loading turning (step S901). When the turning mode is set to loading turning (step S901: YES), the operation command signal generating unit 626 executes turning control and working machine control in parallel in the set turning direction up to the interference avoidance point (step S902), and after passing the interference avoidance point, executes turning control alone up to the loading turning target point (step S903), and ends the process shown in FIG. 27.

[0076] If the swing mode is not set to loading swing (step S901: NO), the operation command signal generating unit 626 judges whether the start height is equal to or higher than the interference avoidance point height (step S904). If the start height is not equal to or higher than the interference avoidance point height (step S904: NO), the operation command signal generating unit 626 executes the work machine control alone up to the interference avoidance point height (step S907). After step 907, or if the start height is equal to or higher than the interference avoidance point height (step S904: YES), the operation command signal generating unit 626 executes the swing control alone up to the interference avoidance vertical plane (VS) in the set swing direction (step S905), and after passing the interference avoidance point, executes the swing control and the work machine control in parallel up to the return swing target point (return swing target posture) (step S906), and ends the processing shown in FIG. 27.

[0077] As described above, in this embodiment, the control device 61 is a control device for a work machine 100 including a revolving body 120 that revolves around a revolving center, and a work implement 130 that has a bucket 133 as a work implement and is attached to the revolving body 120. When an instruction signal output by a switch that is an operation unit that outputs an instruction signal related to an automatic operation including the work implement 130 is input, the control device 61 determines an executable automatic operation among a plurality of automatic operations based on information about the bucket 133 (work implement), and executes the automatic operation determined to be executable. Note that the plurality of automatic operations are, for example, automatic operations including a combined operation of the work implement 130 and the revolving body 120. Also, the combined operation is, for example, a loading rotation or a return rotation. Also, the information about the bucket 133 is, for example, information indicating the position or posture of the bucket 133. Also, the determination of the executable automatic operation is, for example, determining whether the bucket 133 is located above the vessel of the transport vehicle. Also, the determination of the executable automatic operation is, for example, a determination as to whether the position of the bucket 133 is either the dump position or the hoisting position.

[0078] (Action and effect) The number of switches operated by the operator is limited by space, but according to this embodiment, the number of operation switches that output a signal to start an automatic driving operation can be made smaller than the number of automatic driving operations. Therefore, according to this embodiment, space can be effectively utilized. In addition, in the automatic turning control, erroneous operation of the operation switch by the operator can be suppressed, and usability can be improved.

[0079] Although the embodiment of the present invention has been described above with reference to the drawings, the specific configuration is not limited to the above embodiment, and design changes and the like within the scope of the gist of the present invention are also included. For example, a remote operation system may be used in which the operation device 143 and a part of the configuration of the control device 61 are installed in a remote location, and an operator at the remote location controls the work machine 130 and the rotating body 120 via wireless communication while watching a monitor screen. In addition, a part or all of the program executed by the computer in the above embodiment can be distributed via a computer-readable recording medium or a communication line.

[0080] [Note] The control device 61 described in the embodiment can be understood as follows.

[0081] (1) A control device according to a first aspect of the present disclosure is a control device for a work machine having a rotating body that rotates around a rotation center and a work machine having a work implement attached to the rotating body, and when an instruction signal is input from an operation unit that outputs an instruction signal related to an automatic operation including the work implement, the control device determines which of a plurality of automatic operations is executable based on information related to the work implement, and executes the automatic operation determined to be executable.

[0082] (2) A control device according to a second aspect of the present disclosure is the control device of (1), in which the operation unit is one.

[0083] (3) A control device according to a third aspect of the present disclosure is the control device according to (1) or (2), wherein the operation portion is provided on an operation lever.

[0084] (4) A control device according to a fourth aspect of the present disclosure is the control device of (1) to (3), wherein the plurality of automatic operations include a combined operation of the work machine and the rotating body.

[0085] (5) A control device according to a fifth aspect of the present disclosure is the control device of (1) to (4), wherein the combined motion is a loading turn or a return turn.

[0086] (6) A control device according to a sixth aspect of the present disclosure is the control device of (1) to (5), wherein the information related to the work tool is information representing a position or an attitude of the work tool.

[0087] (7) A control device according to a seventh aspect of the present disclosure is a control device of (1) to (6), wherein determining the executable automatic operation is determining whether the work tool is located above a vessel of a transport vehicle.

[0088] (8) A control device according to a seventh aspect of the present disclosure is a control device of (1) to (6), wherein the determination of the executable automatic operation is a determination of whether the posture of the work implement is either a dump posture or a hoisting posture. [Explanation of symbols]

[0089] 100...working machine, 110...traveling body, 120...rotating body, 130...working machine, 133...bucket, 140...operator cab, 143D...display input device, 60...control system, 61...control device, 622...reference point setting unit, 623...rotation direction setting unit, 624...start instruction receiving unit, 626...operation command signal generating unit (control unit)

Claims

1. A control device for a work machine including a rotating body that rotates around a rotation center and a work implement having a working tool and attached to the rotating body, When an instruction signal output from an operation unit that outputs an instruction signal related to an automatic operation including the work implement is input, an executable automatic operation is determined from among a plurality of automatic operations based on information about the work implement, and the automatic operation determined to be executable is executed. Control device.

2. The operation unit is one. The control device according to claim 1 .

3. The operating portion is provided on an operating lever. The control device according to claim 2.

4. The plurality of automatic operations include a combined operation of the work machine and the rotating body. The control device according to claim 1 .

5. The composite motion is a loading turn or a return turn. The control device according to claim 4.

6. The information regarding the work tool is information indicating a position or a posture of the work tool. The control device according to claim 1 .

7. The determining of the possible automatic action includes determining whether the work implement is located above a vessel of a transport vehicle. The control device according to any one of claims 1 to 6.

8. The determination of the executable automatic operation is made by determining whether the position of the work implement is one of a dump position and a hoist position. The control device according to any one of claims 1 to 6.

9. A control method for a work machine including a rotating body that rotates around a rotation center and a work implement having a working tool and attached to the rotating body, comprising: a step of determining an executable automatic operation among a plurality of automatic operations based on information about the work implement when an instruction signal output from an operation unit that outputs an instruction signal related to an automatic operation including the work implement is input, and executing the automatic operation determined to be executable. Includes control methods.

10. A rotating body that rotates around a rotation center; A work machine having a work tool and attached to the rotating body; A control device for controlling the rotating body and the work machine; A work machine comprising: When an instruction signal output from an operation unit that outputs an instruction signal related to an automatic operation including the work machine is input, the control device determines an executable automatic operation among a plurality of automatic operations based on information about the work tool, and executes the automatic operation determined to be executable. Working machinery.

Citation Information

Patent Citations

  • Control device and control method for loading machine

    JP2020041352A

Cited By

  • Method and system for performing calibration for automatic swing control of construction machine

    WO2026089090A1