Power control plan creation method, power control plan creation program, and power control plan creation system
The power control plan creation method prioritizes power outage, demand, and market-based controls to maintain stable operation and economic efficiency, addressing the need for economical power control in diverse power scenarios.
Patent Information
- Application Number
- JP2023057716
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-31
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2043-03-31
AI Technical Summary
Existing power control systems lack the ability to perform economical power control while maintaining stable operation of power consuming devices, particularly in situations where multiple types of power control are required.
A power control plan creation method that prioritizes power outage control, demand power control, market-based control, and surplus charging control in that order to ensure stable operation and economic efficiency, utilizing grid power, power storage devices, and natural energy generation.
The method enables efficient and economical power control by prioritizing power outage control, reducing future basic charges, obtaining market benefits, and utilizing surplus power effectively, ensuring continuous operation of power consuming devices.
Smart Images

Figure 2024145392000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a power control plan creation method, a power control plan creation program, and a power control plan creation system that includes a power storage device and controls power supplied to a power consuming device. [Background technology]
[0002] In facilities such as business offices and factories, power consuming devices such as electrical appliances and equipment operate on supplied power. The power consuming devices may be supplied with power purchased from an external power system such as a power company, or with power generated from natural energy, and may also be supplied with power stored in a power storage device. These electric powers are controlled so that they are supplied stably and economically.
[0003] For example, Patent Document 1 discloses a demand cut (peak cut) in which a planned power generation amount and a target demand (peak cut amount) are obtained in advance from a demand forecast power amount and a rating of a power storage device. In addition, in the invention disclosed in Patent Document 1, when controlling power, the actual power generation amount and the demand forecast power amount are compared, and the difference is charged and discharged to a storage battery (power storage device).
[0004] Furthermore, Patent Document 2 discloses a configuration in which future market prices (electricity prices) are predicted and the timing of charging and discharging a storage battery is determined so as to optimize the balance of income and expenditure.
[0005] Furthermore, Patent Document 3 discloses a configuration for calculating the urgency indicating the need for charging from information indicating the signs of a power outage due to a typhoon or the like, and controlling the charging and discharging of a storage battery (power storage device) according to the urgency. [Prior art documents] [Patent documents]
[0006] [Patent Document 1] International Publication No. 2013 / 38482 [Patent Document 2] JP 2015-156195 A [Patent Document 3] JP 2012-235541 A Summary of the Invention [Problem to be solved by the invention]
[0007] However, there is a demand for further improvements in the stability and economy of power control. For example, when multiple types of power control are possible, there is a demand for economical power control while maintaining stable operation of power consuming devices.
[0008] An object of the present invention is to perform economical power control while maintaining stable operation of power consuming devices. [Means for solving the problem]
[0009] In order to achieve the above object, a characteristic configuration of a power control plan creation method according to one embodiment of the present invention is a power control plan creation method for creating a control plan for power supplied to a power consumption device that operates on grid power supplied at a rate determined according to past power usage and source power supplied from a power supply device including a power storage device, the method comprising: a prediction step of predicting a unit predicted amount of power consumed by the power consumption device during a demand period of a predetermined length into which a previously set first period is equally divided, in a preset first period; and a power control plan creation step of creating a power control plan for controlling at least one of the grid power and the source power for each demand period during the first period, using a predetermined control criterion based on the unit predicted amount of power, The power control plan includes power outage power control which uses the presence or absence of a predicted outage of the grid power as the control criterion to formulate a plan to promote charging of the power storage device, demand power control which uses a predetermined target demand which is a target value of the grid power amount supplied from the grid power in the demand period as the control criterion to formulate a plan to control the grid power amount in each of the demand periods so that the grid power amount is equal to or less than the target demand, and market responsive control which formulates a plan to suppress the grid power amount using the control criterion determined according to the state of the electricity market, and the power control plan in the power control plan creation process is characterized in that it is determined whether or not the power outage power control, the demand power control, and the market responsive control can be executed, and the power control plan is planned in the order of priority of the power outage power control, the demand power control, and the market responsive control.
[0010] A characteristic configuration of a power control plan creation program according to an embodiment of the present invention is a power control plan creation program that creates a control plan for power supplied to a power consumption device that operates on grid power supplied at a fee determined according to past power usage and source power supplied from a power supply device including a power storage device, the program having a computer execute a prediction function for predicting a unit predicted amount of power consumed by the power consumption device during a demand period of a predetermined length into which a preset first period is equally divided, during the preset first period, and a power control plan creation function for creating a power control plan for controlling at least one of the grid power and the source power for each demand period during the first period using a predetermined control criterion based on the unit predicted amount of power, and The power control plan used includes power outage power control which uses the presence or absence of a predicted outage of the grid power as the control criterion to develop a plan to promote charging of the power storage device, demand power control which uses a predetermined target demand which is a target value of the grid power amount supplied from the grid power during the demand period as the control criterion to develop a plan to control the grid power amount during each of the demand periods so that it is equal to or less than the target demand, and market responsive control which develops a plan to suppress the grid power amount using the control criterion determined according to the state of the electricity market, and the power control plan in the power control plan creation function determines whether or not the power outage power control, the demand power control, and the market responsive control can be executed, and is planned in the order of priority of the power outage power control, the demand power control, and the market responsive control.
[0011] A characteristic configuration of a power control plan creation system according to an embodiment of the present invention is a power control plan creation system that creates a control plan for power supplied to a power consumption device that operates on grid power supplied at a rate determined according to past power usage and source power supplied from a power supply device including a power storage device, the system including: a prediction unit that predicts a unit predicted amount of power consumed by the power consumption device during a demand period of a predetermined length into which a previously set first period is equally divided, and a power control plan creation unit that creates a power control plan for controlling at least one of the grid power and the source power for each demand period during the first period using a predetermined control criterion based on the unit predicted amount of power, The power control plan used includes power outage power control which uses the presence or absence of a predicted outage of the grid power as the control criterion to formulate a plan to promote charging of the power storage device, demand power control which uses a predetermined target demand which is a target value for the amount of grid power supplied from the grid power during the demand period as the control criterion to formulate a plan to control the amount of grid power in each of the demand periods so that it is equal to or less than the target demand, and market responsive control which formulates a plan to suppress the amount of grid power using the control criterion determined according to the state of the electricity market, and the power control plan creation unit determines whether or not to execute the power outage power control, the demand power control, and the market responsive control, and formulates the plans in the order of priority: power outage power control, the demand power control, and the market responsive control.
[0012] Weather conditions such as typhoons can cause the power grid to shut down, resulting in a power outage (blackout), and such power outages can be predicted in advance based on weather conditions. Power grids can also shut down due to equipment maintenance and inspection, resulting in a power outage, and in such cases, it is obvious that a power outage will occur.
[0013] Here, if the grid power is interrupted and the power supply power supplied from the power supply device is not enough to cover the power required to operate the power consuming devices, the power consuming devices will have to be shut down.
[0014] For the above reasons, in a situation in which a power outage is predicted, in order to maintain continuous operation of power consuming devices, it is necessary to perform power outage power control so as to increase the amount of stored electricity in the power supply device in advance.
[0015] In addition, the basic charge for grid power is determined according to the amount of grid power consumed in the past (for example, the previous year). For example, the basic charge for the next year is determined according to the amount of grid power consumed in the demand period with the largest amount of grid power among the demand periods in the past year. In other words, in order to reduce the basic charge, it is necessary to suppress the amount of grid power consumed in each demand period. Therefore, in order to reduce the future basic charge, it is preferable to perform demand power control (demand cut) that controls the amount of grid power in each demand period to be equal to or less than the target demand. However, while power outage power control is essential for maintaining the operation of power consuming devices, demand power control is only intended to ensure economic advantages, so demand power control does not have as high a priority as power outage power control.
[0016] Also, in some cases, economic benefits can be obtained by adjusting the amount of grid power consumed by power consumption devices depending on the state of the power market, such as when power is tight. In such cases, it is preferable to perform market-based control that suppresses the amount of grid power according to a predetermined control standard. However, while demand power control reduces the basic fee for grid power into the future, market-based control is only intended to obtain temporary benefits. Therefore, market-based control does not have as high a priority as demand power control.
[0017] According to each of the above configurations, a power control plan is created in accordance with the above-mentioned priority relationships, so that economical power control can be performed while maintaining stable operation of the power consuming devices.
[0018] The control criterion may include a DR target power amount that is determined in response to a request to suppress the grid power amount when the state of the electricity market is such that suppression of the grid power amount is externally requested, and the market responsive control may include a control plan for suppressing the grid power amount in each of the demand periods to be equal to or lower than the DR target power amount.
[0019] There are cases where the government, electric power companies, related organizations, etc., request that the amount of grid power consumed by power consumption devices be suppressed during periods of tight power supply (demand periods). By satisfying such requests, a predetermined reward may be obtained. Therefore, as market-responsive control, it is preferable to suppress the amount of grid power consumed so that it is equal to or less than the upper limit of the amount of grid power consumed in each demand period (DR target amount of power) required to satisfy the requests. By performing such market-responsive control, a predetermined gain can be obtained, and economical power control can be performed.
[0020] The control criterion may include a market price for procuring the grid power, and the market-responsive control may include a control plan for selecting the demand period for charging the power storage device based on the unit predicted power amount and the market price so as to reduce the cost of the grid power for charging the power storage device.
[0021] A power system that supplies grid power may procure power at a market price determined according to the demand balance. Therefore, a predetermined profit can be obtained by performing market-responsive control in consideration of the market price. Also, a power storage device can be charged by grid power. Therefore, it is advantageous to charge the power storage device during a demand period when the market price is low, and to cover as much of the unit predicted power amount as possible with the power discharged from the power storage device during a demand period when the market price is high, thereby suppressing the amount of grid power.
[0022] According to the above configuration, by planning to charge and discharge the power storage device at appropriate timing, it is possible to perform economical power control.
[0023] The power supply device may include a natural energy power generation device, and power generated by the natural energy power generation device may be supplied to the power consumption device or the power storage device.
[0024] With this configuration, a natural energy power generation device is used as a power supply device in addition to a power storage device, which increases the flexibility of the source of power supplied to the power consumption device, and makes it possible to control the power supplied to the power consumption device more efficiently and stably.
[0025] Moreover, the power control plan may further include surplus charge control planned to charge the power storage device in a demand period during which the power generation amount of the natural energy power generation device is expected to exceed the unit predicted power amount minus the minimum system power amount required to prevent reverse flow, and to discharge the power storage device in a demand period prior to the demand period, and the power control plan in the power control plan creation step may determine whether or not to execute the power outage power control, the demand power control, the market response control, and the surplus charge control, and may be planned in the order of priority of the power outage power control, the demand power control, the market response control, and the surplus charge control.
[0026] When the unit predicted amount of power is smaller than the amount of power that the natural energy power generation device is expected to generate during the demand period, it is preferable to use the surplus power to charge the power storage device. However, if the power storage device does not have enough free capacity to store the surplus power, all of the surplus power cannot be used for charging.
[0027] According to the above configuration, when surplus power is used to charge a power storage device, by planning to use and consume the power stored in advance in the power storage device for the operation of a power consumption device, it is possible to ensure free capacity for charging the surplus power, thereby enabling economical power control. [Brief description of the drawings]
[0028] [Figure 1]FIG. 1 is a diagram illustrating a schematic configuration for supplying power to a power consuming device; [Diagram 2] FIG. 10 is a diagram illustrating an example of power control performed for each demand period. [Diagram 3] FIG. 1 is a diagram illustrating an example of a configuration of a power control system. [Figure 4] FIG. 13 is a diagram illustrating an example of surplus charge control. [Diagram 5] FIG. 13 is a diagram showing a flow of power control. [Figure 6] FIG. 13 is a diagram illustrating a configuration for performing control using a plurality of DR target power amounts. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0029] As shown in Fig. 1, power consumption devices 1, such as various devices and equipment, are in operation in various facilities such as factories and business offices. The facilities may also be equipped with a power supply device 2 that generates and stores electricity. For example, the power supply device 2 includes a power generation device and a power storage device 4. The power generation device may be, for example, a natural energy power generation device 5 that uses renewable energy such as a solar power generation device, a power generation device including a fuel cell, or a type of power generation device including an engine and a generator driven by the engine.
[0030] The power consuming device 1 operates on system power supplied in return for a fee determined according to past power usage, or on power source power supplied from the power supply device 2. System power is supplied from a power system 7 where the fee varies according to market prices, or from a power system 7 where the fee is set in advance, such as a company-owned power plant. The power supplied to the power consuming device 1 is controlled by a power control system 10 (corresponding to a power control plan creation system).
[0031] As shown in Fig. 2, the power control system 10 predicts (prediction function, prediction step) a unit predicted amount of power 20 consumed by the power consumption device 1 in a demand period PD of a predetermined length into which a preset predetermined first period PA is equally divided, and performs power control plan creation (power control plan creation function, power control plan creation step) to create a power control plan using a predetermined control criterion 24 based on the predicted unit predicted amount of power 20. For example, the first period PA is 24 hours, and the first period PA has 48 demand periods PD of 30 minutes. Then, the power control system 10 predicts the unit predicted amount of power 20 in each demand period PD up to 24 hours later every 30 minutes, and creates a power control plan.
[0032] [Electricity Control System] First, power control plan creation (hereinafter also simply referred to as power control) for creating a plan to control power supplied to a power consuming device 1 will be described with reference to Figures 1 to 4. In the following description, power consuming device 1 does not refer to each individual device, but refers to all devices installed in a facility and operated by power supplied thereto. In other words, power control means creating a control plan for power to operate all devices installed in each facility and power supplied to the facility. In addition, a configuration in which a power storage device 4 and a natural energy power generation device 5 are installed as the power supply device 2 will be described as an example.
[0033] The power control system 10 in this embodiment includes an input unit 12, a prediction unit 13, a reference determination unit 15, a power control plan creation unit 17, and a storage unit 19. The power control system 10 includes a processor (computer) such as a CPU, and each functional block of the power control system 10 is controlled by the processor.
[0034] The input unit 12 accepts various types of information from outside. The input unit 12 can acquire information via the Internet 8, acquire information from the power supply device 2, or accept manual operation input by any method. For example, the input unit 12 acquires the amount of power consumption 22 that the power consumption device 1 consumed in the past in each demand period PD over time, linking it to the date and time of consumption, and stores it in the storage unit 19. The input unit 12 also acquires the amount of stored power 31 of the power storage device 4, the amount of power generated 32 of the natural energy power generation device 5, weather information 29, etc., and stores them in the storage unit 19.
[0035] The prediction unit 13 predicts a future predicted amount of power that the power consuming device 1 will consume for each demand period PD in the first period PA as a unit predicted power amount 20 from a history of power consumption 22 that the power consuming device 1 has consumed in the past. The criterion determination unit 15 compares and determines the unit predicted power amount 20 with a preset control criterion 24.
[0036] The power control plan creation unit 17 determines whether or not each power control can be executed based on the determination result of the standard determination unit 15, and creates a power control plan (power control). At this time, the power control plan creation unit 17 may perform power control in consideration of the stored power amount 31 of the power storage device 4 and the generated power amount 32 of the natural energy power generation device 5, etc. The power control plan creation (power control) is the creation of a control plan for the system power amount 26 (received power amount) of the system power purchased from the power system 7 and supplied to the power consumption device 1, the generated power supply amount of the generated power (generated power amount 32) generated by the natural energy power generation device 5 and supplied to the power consumption device 1, charging the power storage device 4 with at least one of the system power amount 26 and the generated power, the discharge amount 33 supplied (discharged) from the power storage device 4 to the power consumption device 1, etc.
[0037] The storage unit 19 stores information input via the input unit 12, information generated within the power control system 10, and the like.
[0038] Next, a specific example of power control performed by the power control plan creating unit 17 will be described with reference to FIGS.
[0039] [Power Control during Power Outages] In order to stably operate the power consumption device 1, it is necessary to continuously supply power to the power consumption device 1. If a power outage occurs in the power grid 7 and the generated power and the stored power amount 31 of the power storage device 4 do not satisfy the amount of power required to maintain the operation of the power consumption device 1, the operation of the power consumption device 1 cannot be maintained.
[0040] On the other hand, when the grid power is stopped (power grid 7 is powered out), there are cases where it is possible to obtain an outage prediction 24A that predicts the outage in advance. For example, there are cases where it is possible to predict a power outage due to a typhoon or heavy rain using meteorological information 29, and output the outage prediction 24A. Also, some equipment inspections, maintenance, and repairs of the power grid 7 are scheduled in advance, and in these cases, it is possible to obtain the outage prediction 24A.
[0041] For the above reasons, the power control plan creation unit 17 executes power failure power control, which creates a plan to promote charging of the power storage device 4 in a demand period PD prior to the demand period PD in which a power failure is predicted, using the presence or absence of a stoppage prediction 24A as a control criterion 24 for power control. This makes it possible to make the storage amount 31 (charge amount) of the power storage device 4 fully charged or charged to a predetermined storage amount 31 or more in the demand period PD in which a power failure is predicted, and makes it possible to maintain operation of the power consumption device 1 with the power supplied (discharged) from the power storage device 4 even if the grid power is stopped.
[0042] [Demand power control] The purchase price (compensation) for receiving power from the power grid 7 is determined by a basic charge and a metered charge 28 (unit price). The basic charge is determined according to the amount of power used (power consumption 22) in each demand period PD of the previous year. In other words, by suppressing the amount of power used in the demand period PD, the future basic charge can be reduced.
[0043] Therefore, the power control plan creation unit 17 executes demand power control (demand cut) as power control, which creates a plan to control the system power amount 26 in each demand period PD so that it is equal to or less than the target demand 24B, using a predetermined target demand 24B, which is a target value of the system power amount 26 in the demand period PD, as the control criterion 24.
[0044] For example, as shown in Fig. 2, it is assumed that the unit predicted power amount 20 in the demand period PD1 exceeds the target demand 24B. The power control plan creation unit 17 executes demand power control to suppress the system power amount 26 (received power amount) purchased from the power grid 7 to be equal to or less than the target demand 24B in this demand period PD1. Specifically, the power control plan creation unit 17 creates a plan so that the portion of the unit predicted power amount 20 that exceeds the target demand 24B in the demand period PD1 is covered by at least one of the power supplied (discharged) from the power storage device 4 and the power generated by the natural energy power generation device 5.
[0045] By performing the demand power control in this manner, the system power amount 26 is prevented from exceeding the target demand 24B in each demand period PD, and the future base fee can be reduced.
[0046] [Market-based control] In some cases, a reward can be obtained by adjusting the amount of grid power 26 consumed by the power consuming device 1 in response to the state of the power market, such as when power is tight. For example, the government, the power company, related organizations, etc. (external) may request that the amount of grid power 26 consumed by the power consuming device 1 be suppressed during a demand period PD when power is tight. By satisfying this request, a reward can be obtained from the government, etc. In such a case, the power control plan creation unit 17 performs market-responsive control as power control, which creates a plan to suppress the amount of grid power 26 using a control standard 24 determined in response to the state of the power market.
[0047] For example, the power control plan creation unit 17 performs market-responsive control to create a plan to suppress the grid power amount 26 in each demand period PD to be equal to or less than the DR target power amount 24C, with the DR target power amount 24C determined in response to a request to suppress the grid power amount 26 as the control criterion 24. For example, the DR target power amount 24C is determined by subtracting the power amount (command value) that is requested to be suppressed from the baseline calculated by H4of5 (with intraday adjustment).
[0048] In addition, the power control plan creation unit 17 may execute market-responsive control, using the market price as the control criterion 24, to create a plan for selecting a demand period PD for charging the storage device 4, based on the market price, so as to reduce the procurement cost when the power retailer (power system 7) procures power to supply to consumers (facilities, etc.).
[0049] By executing market-based control in this manner, economic benefits can be obtained, such as receiving rewards and reducing the costs associated with purchasing grid power for charging the power storage device 4.
[0050] [Excess charge control] When the power consumption device 1 is unable to use all the power generated by the natural energy power generation device 5, the power generation amount 32 of the natural energy power generation device 5 will be left over. At this time, if the power storage device 4 has available capacity, the power storage device 4 can be charged with the surplus power generation amount 32. Also, in order to provide available capacity in the power storage device 4, power previously stored in the power storage device 4 is discharged. Furthermore, by supplying the discharged power to the power consumption device 1, the use of grid power by that amount is reduced, and the amount of grid power purchased 26 (amount of received power) can be reduced.
[0051] In view of the above, the power control plan creation unit 17 executes surplus charging control as power control, using the presence or absence of surplus power generation amount 24D, which is the surplus power generation amount 32, as control criterion 24, and when it is predicted that there will be a demand period PD in which surplus power generation amount 24D will occur, creating a plan to discharge the storage device 4 in a demand period PD prior to that demand period PD.
[0052] Specifically, as shown in FIG. 4, in each demand period PD, the reference determination unit 15 determines whether or not there is a demand period PD in which the power generation amount 32 of the natural energy power generation device 5 is expected to exceed the power amount (reference power amount) obtained by subtracting the minimum system power amount 26 required to prevent the occurrence of reverse power from the unit predicted power amount 20. That is, it determines whether or not the surplus power generation amount 24D obtained by subtracting the reference power amount, which is the power amount obtained by subtracting the reference power amount from the unit predicted power amount 20, is a positive value from the power generation amount 32 in each demand period PD. If the surplus power generation amount 24D is a positive value, the power control plan creation unit 17 performs surplus charge control. In the example of FIG. 4, the surplus power generation amount 24D is a positive value in the demand periods PD4 to PD6. As the surplus charging control, the power control plan creation unit 17 creates a plan to set the system power amount 26 (received power amount) purchased from the power system 7 in the demand periods PD4 to PD6 to the reference power amount (suppressing power purchases as much as possible) and cover the unit predicted power amount 20 with the power generation amount 32 (surplus power generation amount 24D). Note that the system power amount 26 (received power amount) purchased at this time may be an amount of power that is larger than the reference power amount and smaller than the unit predicted power amount 20. Then, the power control plan creation unit 17 creates a plan to charge the power storage device 4 using the amount of power excluding the amount of power supplied to the power consumption device 1 from the surplus power generation amount 24D. Furthermore, in order to ensure available capacity for charging the power storage device 4 using the surplus power generation amount 24D, the power control plan creation unit 17 creates a plan for discharging the stored power amount 31 equivalent to the amount of power supplied from the power storage device 4 to the power consumption device 1 in the demand periods PD2-PD3, which are demand periods PD prior to the demand periods PD4-PD6, and supplying the power to the power consumption device 1. That is, the plan is created so that in the demand periods PD2-PD3, the discharge amount 33 discharged from the power storage device 4 and the grid power amount 26 (received power amount) to be purchased cover the unit predicted power amount 20, and the grid power amount 26 (received power amount) to be purchased is suppressed by the discharge amount 33.
[0053] In this way, a plan is created so that the unit predicted energy amount 20 is covered by the generated power during the demand periods PD4 to PD6. This makes it possible to suppress the grid energy amount 26 (amount of received power) to be purchased. Also, a plan is created so that the storage amount 31 stored in the storage device 4 covers the unit predicted energy amount 20 during the demand periods PD2 to PD3. This makes it possible to suppress the grid energy amount 26 (amount of received power) to be purchased.
[0054] [Power control priority] The power control system 10 (power control method / power control program) according to this embodiment performs a combination of the various power controls described above. At this time, a priority is set for each power control, and after determining whether each power control can be executed, the power control is executed in the order of the power control with the highest priority. The priority of the power controls will be described below with reference to Figs. 1 to 3.
[0055] When the grid power is stopped (power outage) and the power required to operate the power consuming device 1 (unit predicted power amount 20) cannot be provided by the power supply power supplied from the power supply device 2 alone, the power consuming device 1 will have to be stopped. Maintaining the continuous operation of the power consuming device 1 is of utmost importance, and power outage power control needs to be given the highest priority.
[0056] By performing demand power control (demand cut), it is possible to reduce the future basic fee. However, while power failure power control is essential for maintaining the operation of the power consumption device 1, demand power control is only intended to ensure economic advantages, and therefore demand power control does not have as high a priority as power failure power control.
[0057] Market-based control can provide economic benefits such as incentives and can also alleviate the pressures on the electricity market. However, while demand-based power control (demand cut) reduces the basic fee for grid electricity into the future, market-based control is intended to provide temporary benefits. For this reason, market-based control does not have as high a priority as demand-based power control.
[0058] By carrying out the surplus charge control, the generated power can be used without waste, and the amount of grid power 26 (amount of received power) to be purchased can be suppressed. However, the surplus charge control is intended to obtain a temporary gain, and can be executed only when the situation of the amount of stored power 31 in the power storage device 4 and the amount of generated power 32 is right. Therefore, the priority of the surplus charge control is the lowest.
[0059] From the above, it is appropriate that the priority order of power control is power outage power control, demand power control, market response control, and surplus charge control. Therefore, in a situation where multiple power controls can be performed, the power control plan creation unit 17 performs power control according to this priority order.
[0060] This makes it possible to maintain stable operation of the power consuming device 1 while efficiently performing economically effective power control.
[0061] [Power control plan creation] Next, power control taking the above priority order into consideration will be described with reference to FIGS.
[0062] As described above, the power consuming device 1 operates by receiving supply of grid power, generated power, and discharged power discharged from the power storage device 4. The input unit 12 also acquires the stop prediction 24A, weather information 29, stored power amount 31, generated power amount 32, and the like, and stores them in the storage unit 19. The storage unit 19 also stores a history of the power consumption amount 22 consumed by the power consuming device 1 in the past, and the prediction unit 13 predicts the unit predicted power amount 20 for each demand period PD in the first period PA (e.g., 24 hours) in the future based on the power consumption amount 22 every time the demand period PD elapses (e.g., every 30 minutes). The power control plan creation unit 17 then performs power control plan creation (power control) for each demand period PD in the first period PA (e.g., 24 hours) in the future every time the unit predicted power amount 20 is predicted (every 30 minutes).
[0063] In such a state, first, the criterion determination unit 15 checks the memory unit 19 and determines whether or not a shutdown prediction 24A exists as the control criterion 24 for the first period PA (e.g., 24 hours) ahead, and whether or not a power outage is predicted (step #1 in FIG. 5).
[0064] When the outage prediction 24A exists (step #1 Yes in FIG. 5), the power control plan creation unit 17 performs power outage power control (step #2 in FIG. 5). Specifically, the power control plan creation unit 17 plans to charge the power storage device 4 so that the power storage device 4 is fully charged or so that the storage amount 31 of the power storage device 4 is as large as possible in a demand period PD before the demand period PD in which a power outage is predicted. At least one of the system power purchased from the power system 7 and the power generated by the natural energy power generation device 5 is used as the power to charge the power storage device 4. In a demand period PD after the demand period PD in which a power outage is predicted, the power control plan creation unit 17 determines whether or not each power control can be performed in accordance with the processing in and after step #3 described later, and may perform demand power control (demand cut), market response control, and surplus charge control.
[0065] If there is no stop prediction 24A (step #1 No in FIG. 5), the criterion determination unit 15 checks the unit predicted power amount 20 of each demand period PD and determines whether there is a demand period PD in which the unit predicted power amount 20 exceeds (demand over) the target demand 24B, which is the control criterion 24 (step #3 in FIG. 5).
[0066] If there is a demand over (step #3 Yes in FIG. 5), the standard determination unit 15 checks the unit predicted power amount 20 of each demand period PD and determines whether there is a demand period PD in which the unit predicted power amount 20 exceeds the DR target power amount 24C, which is the control standard 24 (DR over) (step #4 in FIG. 5).
[0067] If the DR is not exceeded (step #4 No in FIG. 5), the power control plan creation unit 17 performs demand power control (demand cut) (step #5 in FIG. 5). Specifically, the power control plan creation unit 17 uses the target demand 24B as the control standard 24 and makes a plan to suppress the system power purchased from the power system 7 by utilizing the generated power and stored power so that the unit predicted power amount 20 in each demand period PD is equal to or less than the target demand 24B. Note that if there is a demand period PD in which the generated power amount 32 exceeds the reference power amount after performing the demand power control (demand cut), the power control plan creation unit 17 may perform surplus charging control in accordance with the processing from step #12 onwards, which will be described later.
[0068] If there is a demand over and a DR over (step #4 Yes in FIG. 5), the reference determination unit 15 determines whether or not the total amount of power that exceeds the demand and the DR in each demand period PD is equal to or greater than the storage amount 31 (SOC) of the power storage device 4 (step #6 in FIG. 5). In other words, the reference determination unit 15 determines whether or not the storage amount 31 of the power storage device 4 is sufficient to allow demand power control (demand cut) and market response control to be executed. Note that the reference determination unit 15 may take into account the expected power generation amount 32 of the natural energy power generation device 5 when making this determination.
[0069] If the stored power amount 31 is sufficient (step #6 No in FIG. 5), the power control plan creation unit 17 performs demand power control (demand cut) (step #7 in FIG. 5) and further performs market response control (step #8 in FIG. 5). Specifically, the power control plan creation unit 17 creates a plan to suppress the grid power amount 26 in each demand period PD to be equal to or less than the target demand 24B and the DR target power amount 24C. At this time, the power control plan creation unit 17 may perform demand power control (demand cut) and market response control in consideration of the expected power generation amount 32 of the natural energy power generation device 5. In addition, if there is a demand period PD in which the power generation amount 32 exceeds the reference power amount after performing the demand power control (demand cut) and the market response control, the power control plan creation unit 17 may perform surplus charging control in accordance with the processing from step #12 onward, which will be described later.
[0070] If the stored power amount 31 is insufficient (Yes in step #6 in FIG. 5), the power control plan creation unit 17 performs only demand power control (demand cut) (step #9 in FIG. 5). In other words, since the stored power amount 31 of the power storage device 4 is not enough to cover the power required for demand power control (demand cut) and market response control, the power control plan creation unit 17 prioritizes demand power control (demand cut).
[0071] At this time, the power control plan creation unit 17 may perform demand power control (demand cutting) and then perform market response control within a range that can be covered by the remaining power storage amount 31. For example, as shown in Fig. 2, in the demand period PD7 to PD8, the unit predicted energy 20 exceeds the target demand 24B and the DR target energy 24C, and in the demand periods PD9 and PDa to PDc, the unit predicted energy 20 does not exceed the target demand 24B but exceeds the DR target energy 24C. In this case, the power control plan creation unit 17 performs demand power control (demand cutting) in the demand periods PD7 to PD9 (step #9 in Fig. 5). Thereafter, the power control plan creation unit 17 determines whether or not power remains in the power storage device 4 even after demand cutting, that is, whether or not there is a demand period PD during which market-responsive control can be performed with the remaining amount of stored power 31 in the power storage device 4 (determines whether execution is possible) (step #9A in FIG. 5, indicated as "SOC>0?" in the diagram). If there is no demand period PD during which market-responsive control can be performed with the remaining amount of stored power 31 (No in step #9A in FIG. 5), the process ends, and if there is a demand period PD during which market-responsive control can be performed with the remaining amount of stored power 31 (Yes in step #9A in FIG. 5), market-responsive control is performed in that demand period PD (step #9B in FIG. 5). In the example shown in FIG. 2, the power required for the demand power control (demand cut) and the market-responsive control is not stored in the storage device 4 for all the demand periods PD, so the power control plan creation unit 17 cannot perform market-responsive control in the demand period PD9 (cannot suppress the grid power amount 26 (received power amount) to be purchased to the DR target power amount 24C or less), but performs market-responsive control (suppress the grid power amount 26 (received power amount) to be purchased to the DR target power amount 24C or less) using the remaining stored power amount 31 in the demand periods PDa to PDc. This allows economical gains to be obtained by performing market-responsive control to the extent possible. Note that, if there is a demand period PD in which the power generation amount 32 exceeds the reference power amount after performing the demand power control (demand cut) or the demand power control (demand cut) and the market-responsive control, the power control plan creation unit 17 may perform surplus charge control in accordance with the processing from step #12 onward, which will be described later.
[0072] If there is no stop prediction 24A and no demand over (step #3 No in FIG. 5), the standard determination unit 15 checks the unit predicted power amount 20 of each demand period PD, as in step #4 in FIG. 5, and determines whether there is a demand period PD in which the unit predicted power amount 20 exceeds the DR target power amount 24C (DR over) (step #10 in FIG. 5).
[0073] If the DR is exceeded (Yes in step #10 in FIG. 5), the power control plan creation unit 17 performs market response control (step #11 in FIG. 5). Note that if there is a demand period PD in which the power generation amount 32 exceeds the reference power amount after performing the market response control, the power control plan creation unit 17 may perform surplus charging control in accordance with the processing from step #12 onward, which will be described later.
[0074] If the DR is not exceeded (No in step #10 of FIG. 5), the reference determination unit 15 determines whether or not there is a demand period PD in which the power generation amount 32 of the natural energy power generation device 5 is expected to exceed the power amount (reference power amount) obtained by subtracting the minimum system power amount 26 required to prevent the occurrence of reverse power from the unit predicted power amount 20 (there is a PV surplus power generation amount 24D) (step #12 of FIG. 5).
[0075] If there is no demand period PD in which the power generation amount 32 exceeds the reference power amount (No in step #12 of FIG. 5), the process ends without performing power control.
[0076] When there is a demand period PD in which the power generation amount 32 exceeds the reference power amount (when there is a surplus power generation amount 24D) (Yes in step #12 in FIG. 5), the power control plan creation unit 17 performs surplus charging control (step #13 in FIG. 5). Specifically, the power control plan creation unit 17 plans to charge the power storage device 4 in the demand period PD in which the power generation amount 32 exceeds the power amount obtained by subtracting the reference power amount from the unit predicted power amount 20, and to discharge the power storage device 4 and supply power to the power consumption device 1 in the demand period PD prior to that demand period PD.
[0077] As described above, by giving priority to power control with a high priority, it is possible to efficiently perform economical power control while maintaining stable operation of the power consuming device 1.
[0078] [Another embodiment] (1) In the above embodiment, the surplus charge control may not be executed. In this case, steps #12 and #13 in Fig. 5 are not executed, and if it is determined in step #10 that the DR is exceeded, the market response control is executed, and if it is determined that the DR is not exceeded, the power control is not executed and the process ends.
[0079] The conditions for executing surplus charge control are not often met, and its effect also depends on the situation. By not executing surplus charge control, the system configuration of the power control system 10 (power control method / power control program) can be simplified.
[0080] (2) In each of the above embodiments, the power control plan creation unit 17 can perform a plurality of types of market response control. For example, the market response control is different for each market response control in terms of the state of the power market that is the reason for the request, such as an increase in power demand or a rise in market price, the period, the number of times it is invoked, various conditions, etc., of the requesting government, power company, related organization, etc.
[0081] An example of executing demand power control and two types of market-based control without acquiring outage prediction 24A will be described with reference to Fig. 6. The control standards 24 of the two types of market-based control are DR target power amount DR1 and DR target power amount DR2, respectively. Note that DR target power amount DR2 is smaller than DR target power amount DR1.
[0082] In the example shown in Fig. 6, there is no demand period PD in which the unit predicted power amount 20 exceeds the target demand 24B. In the demand periods PDd to PDg, the DR target power amount DR1 is requested as the market-responsive control. In the demand periods PDf to PDg, in addition to the DR target power amount DR1, the DR target power amount DR2 is requested as two market-responsive controls.
[0083] The standard determination unit 15 determines that there is no demand period PD in which the unit predicted power amount 20 exceeds the target demand 24B, that the unit predicted power amount 20 exceeds the DR target power amount DR1 in the demand periods PDd to PDg, and that the unit predicted power amount 20 exceeds the DR target power amount DR2 in the demand periods PDf to PDg.
[0084] The power control plan creating unit 17 performs market-responsive control using the smallest DR target energy 24C in each demand period PD. Specifically, the power control plan creating unit 17 makes a plan so that the system energy 26 and the discharge amount 33 of the storage device 4 cover the unit predicted energy 20 so that the system energy 26 is equal to or less than the DR target energy DR1 in the demand periods PDd to PDe. Also, in the demand periods PDd to PDe, the power control plan creating unit 17 makes a plan so that the system energy 26 and the discharge amount 33 of the storage device 4 cover the unit predicted energy 20 so that the system energy 26 is equal to or less than the DR target energy DR2 that is smaller than the DR target energy DR1. In the demand periods PD thereafter (after the demand period PDg), the storage device 4 is charged with the system energy 26 within the range of the energy obtained by subtracting the unit predicted energy 20 from the target demand 24B.
[0085] By performing market-based control in this manner, it is possible to perform power control using a plurality of DR target power amounts 24C.
[0086] The market-responsive control is not limited to using two types of DR target power amounts 24C, and may be performed using three or more types of DR target power amounts 24C.
[0087] In the above case, too, a priority order may be assigned to the market response controls to be executed, and the market response controls may be executed in descending order of priority order. This allows the market response controls to be executed efficiently.
[0088] (3) In each of the above embodiments, the power control to be executed may be selectable. For example, the input unit 12 accepts an operation to select the power control to be executed, and the power control plan creation unit 17 executes the selected power control. This makes it possible to execute the power control required depending on the state of the electricity market, etc.
[0089] (4) In each of the above embodiments, the power control system 10 is not limited to being configured with the functional blocks shown in FIG. 3, and may be configured with any functional blocks. For example, each functional block of the power control system 10 may be further subdivided, or conversely, some or all of the functional blocks may be combined. Furthermore, the functions of the power control system 10 are not limited to the above-mentioned functional blocks, and may be realized by a method executed by any functional block. Furthermore, some or all of the functions of the power control system 10 may be configured with software. A program related to the software is stored in any storage device such as the storage unit 19, and is executed by a processor (computer) such as a CPU included in the power control system 10, or a processor (computer) provided separately. For example, some or all of the processing of the program may be executed by a processor mounted on a device provided separately from the power control system 10, such as a server.
[0090] In addition, the configurations disclosed in the above embodiments (including other embodiments, the same applies below) can be applied in combination with configurations disclosed in other embodiments, provided that no contradiction arises. Furthermore, the embodiments disclosed in this specification are illustrative, and the embodiments of the present invention are not limited thereto, and can be appropriately modified within the scope that does not deviate from the purpose of the present invention. [Industrial Applicability]
[0091] The present invention can be applied when creating a plurality of power control plans in a configuration in which power is supplied to a power consuming device. [Explanation of symbols]
[0092] 1 Power consuming device 4. Energy storage device 5. Natural energy power generation equipment 7 Power system 10 Power control system (power control planning system) 12 Input section 13 Prediction Department 15 Standard judgment section 17 Power Control Planning Department 19 Memory section 20 Unit forecast energy consumption 24 Control Standards 24A Outage Prediction 24B Target Demand 24C DR target power amount 24D Surplus power generation 26 Grid electricity amount 28 Pay-per-use charges PA 1st Period PD Demand Period
Claims
1. A power control plan creation method for creating a control plan for power supplied to a power consumption device that operates using grid power supplied in return for a fee determined according to a past amount of power usage and power source power supplied from a power source device including a power storage device, the method comprising: a prediction step of predicting a unit predicted amount of power consumed by the power consuming device during a demand period of a predetermined length obtained by equally dividing a preset first period; a power control plan creating step of creating a power control plan for controlling at least one of the grid power and the power source power for each demand period in the first period by using a predetermined control criterion based on the unit predicted power amount, The power control plan using the control criteria in the power control plan creation step is A power outage control that develops a plan to promote charging of the power storage device using the presence or absence of a prediction of an interruption of the grid power as the control criterion; a demand power control that develops a plan to control the amount of grid power in each of the demand periods so that the amount of grid power in each of the demand periods is equal to or less than a predetermined target demand, the target demand being a target value of the amount of grid power supplied from the grid power in each of the demand periods; and market response control for formulating a plan to suppress the amount of grid power by using the control criterion determined according to a state of the electricity market; In the power control plan creation process, the power control plan is planned in the order of priority, that is, the power outage power control, the demand power control, and the market response control, by determining whether or not to execute the power outage power control, the demand power control, and the market response control. This is a power control plan creation method.
2. 2. The power control plan creation method according to claim 1, wherein the control criteria includes a DR target power amount that is determined in response to a request to suppress the grid power amount when the state of the electricity market is such that suppression of the grid power amount is requested from outside, and the market responsive control includes a control plan for suppressing the grid power amount in each of the demand periods to be equal to or less than the DR target power amount.
3. 2. The power control plan creation method according to claim 1, further comprising: a control plan for selecting, as the market-responsive control, the demand period for charging the power storage device, based on the unit predicted power amount and the market price, so as to suppress the cost of the power grid for charging the power storage device.
4. 4. The power control plan creation method according to claim 1, wherein the power supply device includes a natural energy power generation device, and power generated by the natural energy power generation device is supplied to the power consumption device or the power storage device.
5. the power control plan further includes surplus charge control that is planned, when there is a demand period in which the amount of power generated by the natural energy power generation device is predicted to exceed an amount of power obtained by subtracting the minimum amount of system power required to prevent occurrence of reverse flow from the unit predicted power amount, to charge the power storage device in the demand period and to discharge the power storage device in the demand period prior to the demand period, 5. The power control plan creation method according to claim 4, wherein the power control plan in the power control plan creation step determines whether or not the power outage power control, the demand power control, the market response control, and the surplus charge control can be executed, and the power control plan is planned in the order of priority of the power outage power control, the demand power control, the market response control, and the surplus charge control.
6. A power control plan creation program that creates a control plan for power supplied to a power consumption device that operates using grid power supplied in return for a fee determined according to a past amount of power usage and power source power supplied from a power supply device including a power storage device, the program comprising: a prediction function for predicting a unit predicted amount of power consumed by the power consumption device during a demand period of a predetermined length obtained by equally dividing a first period that is set in advance; a power control plan creation function of creating a power control plan for controlling at least one of the grid power and the power source power for each demand period in the first period by using a predetermined control criterion based on the unit predicted power amount; The power control plan using the control criteria in the power control plan creation function is A power outage control that develops a plan to promote charging of the power storage device using the presence or absence of a prediction of an interruption of the grid power as the control criterion; a demand power control that develops a plan to control the amount of grid power in each of the demand periods so that the amount of grid power in each of the demand periods is equal to or less than a predetermined target demand, the target demand being a target value of the amount of grid power supplied from the grid power in each of the demand periods; and market response control for formulating a plan to suppress the amount of grid power by using the control criterion determined according to a state of the electricity market; The power control plan in the power control plan creation function is a power control plan creation program in which the feasibility of executing the power outage power control, the demand power control, and the market response control is determined, and the power control plan is planned in the order of priority of the power outage power control, the demand power control, and the market response control.
7. A power control plan creation system that creates a control plan for power supplied to a power consumption device that operates using grid power supplied in return for a fee determined according to a past amount of power usage and power source power supplied from a power source device including a power storage device, the system comprising: a prediction unit that predicts a unit predicted amount of power consumed by the power consumption device during a demand period of a predetermined length obtained by equally dividing a preset first period; a power control plan creation unit that creates a power control plan for controlling at least one of the grid power and the power source power for each demand period in the first period by using a predetermined control criterion based on the unit predicted power amount, The power control plan using the control criteria in the power control plan creation unit is A power outage control that develops a plan to promote charging of the power storage device using the presence or absence of a prediction of an interruption of the grid power as the control criterion; a demand power control that develops a plan to control the amount of grid power in each of the demand periods so that the amount of grid power in each of the demand periods is equal to or less than a predetermined target demand, the target demand being a target value of the amount of grid power supplied from the grid power in each of the demand periods; and market response control for formulating a plan to suppress the amount of grid power by using the control criterion determined according to a state of the electricity market; The power control plan creation unit determines whether or not to execute the power outage power control, the demand power control, and the market response control, and plans the power outage power control, the demand power control, and the market response control in this order of priority. A power control plan creation system.
Citation Information
Patent Citations
Power storage system
JP2017085852A
Storage battery management device, storage battery management method, and storage battery management program
JP2021184682A
Power control system, power control method, and power control program
JP2022150731A
Charge / discharge control apparatus, charge / discharge control program and charge / discharge control method
JP2012235541A
Storage battery control device and method thereof
JP2015156195A