Control apparatus, method, program, and control system

The control system addresses the limitations of DT and MGDT by dynamically adjusting time series length and using expectile regression to optimize behavior determination under suboptimal data, enhancing task accomplishment in offline reinforcement learning.

JP2024146537APending Publication Date: 2024-10-15OMRON CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
JP2023059507
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-31
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

Existing offline reinforcement learning methods, such as Decision Transformer (DT) and Multi Game Decision Transformer (MGDT), struggle with stitching sub-optimal trajectories to generate near-optimal trajectories due to fixed time series input length and inadequate consideration of trajectory connection timing, especially under semi-optimal data conditions.

Method used

A control system that inputs observation information and revenue to determine the behavior of a controlled object using a model, adjusting the time series length to maximize future profit by varying the input length at each time step, employing expectile regression to prevent overestimation and accurately estimate maximum returns.

Benefits of technology

Enables appropriate determination of the controlled object's behavior even under suboptimal data conditions, effectively selecting the necessary time series length to generate actions that accomplish tasks, as demonstrated by higher average scores in experimental data sets compared to comparative examples.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024146537000001_ABST
    Figure 2024146537000001_ABST
Patent Text Reader

Abstract

To determine properly an action of a control target even when substantially optimum data is used.SOLUTION: A control apparatus according to the present invention includes an activity determination unit for determining an activity of a control target by using observation information on an environment of the control target, a revenue thereof, and an activity thereof as inputs on the basis of a model for determining an activity of the control target. The activity determination unit determines, among plural kinds of time series lengths, a time series length obtained when a profit finally output upon inputting to the model a token of the time series length prior to the current time becomes maximum, and then determines, as the activity of the control target, an activity finally output upon inputting to the model a token of the determined time series length prior to the current time.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a control device, a control method, a control program, and a control system. [Background technology]

[0002] Offline reinforcement learning, which trains an agent using only data given in advance, is effective in fields such as robotics where data acquisition is expensive. In offline reinforcement learning, a method called Decision Transformer (DT) has been proposed to generate future actions from past time-series data (for example, Non-Patent Document 1).

[0003] In addition, a method called Multi Game Decision Transformer (MGDT) for predicting future profits has also been proposed (Non-Patent Document 2). [Prior art documents] [Non-patent literature]

[0004] [Non-Patent Document 1] Chen, Lili, et al. "Decision transformer: Reinforcement learning via sequence modeling." Advances in neural information processing systems 34 (2021): 15084-15097. https: / / arxiv.org / abs / 2106.01345 [Non-Patent Document 2] Lee, Kuang-Huei, et al. "Multi-game decision transformers." arXiv preprint arXiv:2205.15241 (2022). https: / / arxiv.org / abs / 2205.15241 Summary of the Invention [Problem to be solved by the invention]

[0005] In offline reinforcement learning using suboptimal data, the main challenge is stitching suboptimal trajectories together to generate a near-optimal trajectory. The DT described in Non-Patent Document 1 generates future actions from time series of past states, actions, and earnings. However, since DT does not predict what future earnings will be, stitching may not work well. To address this problem, the MGDT described in Non-Patent Document 2 considers predicting future earnings, but the length of the time series input is constant, and the timing of stitching the trajectories cannot be fully considered.

[0006] The present disclosure has been made in consideration of the above points, and aims to appropriately determine the behavior of a controlled object even under suboptimal data. [Means for solving the problem]

[0007] In order to achieve the above-mentioned objective, the control device of the present disclosure includes a behavior decision unit that receives observation information, revenue, and behavior of the controlled object as input and determines the behavior of the controlled object based on a model for determining the behavior of the controlled object, the behavior decision unit inputting tokens of a time series length before the current time into the model at each time step to determine the time series length at which the revenue finally output is maximized, and inputting tokens of the determined time series length before the current time into the model at each time step to determine the behavior finally output as the behavior of the controlled object.

[0008] In addition, the control method according to the present disclosure is a process in which a processor inputs observation information, revenue, and behavior of the environment of the controlled object, determines the behavior of the controlled object based on a model for determining the behavior of the controlled object, and operates the controlled object based on the determined behavior, and executes a process in which tokens of a time series length before the current time are input into the model at each time step to determine the time series length at which the revenue finally output is maximized, and tokens of the determined time series length before the current time are input into the model at each time step to determine the behavior finally output as the behavior of the controlled object.

[0009] In addition, a control program according to the present disclosure causes a computer to execute a process in which observation information, revenue, and behavior of the controlled object are input, the computer determines the behavior of the controlled object based on a model for determining the behavior of the controlled object, and the computer operates the controlled object based on the determined behavior, the process including: inputting tokens of a time series length before the current time into the model at each time step to determine the time series length at which the revenue finally output is maximized; inputting tokens of the determined time series length before the current time into the model at each time step to determine the behavior finally output as the behavior of the controlled object.

[0010] Further, a control system according to the present disclosure is a control system including a control device and a controlled object, wherein the control device has an action decision unit that inputs observation information, revenue, and actions of the controlled object's environment and determines the action of the controlled object based on a model for determining the action of the controlled object, the action decision unit inputting tokens of a time series length before the current time into the model at each time step to determine the time series length at which the revenue finally output is maximized, inputting tokens of the determined time series length before the current time into the model at each time step, determining the action finally output as the action of the controlled object and notifying the controlled object, and notifying the controlled object, wherein the controlled object notifies the control device of the observation information of the controlled object's environment at each time step and acts in accordance with the notified action. Effect of the Invention

[0011] According to the control device, method, program, and control system disclosed herein, it is possible to appropriately determine the behavior of a controlled object even with suboptimal data. [Brief description of the drawings]

[0012] [Figure 1] FIG. 2 is a block diagram showing a schematic configuration of a control system. [Diagram 2] FIG. 2 is a block diagram showing a hardware configuration of a control device. [Diagram 3] FIG. 1 illustrates an example of a model. [Figure 4] 13 is a flowchart showing the flow of a control process. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0013] Hereinafter, an example of an embodiment of the present disclosure will be described with reference to the drawings. In each drawing, the same or equivalent components and parts are given the same reference numerals. In addition, the dimensions and ratios of the drawings are exaggerated for the convenience of explanation and may differ from the actual ratios.

[0014] <Overview of the embodiment of the present disclosure> In an embodiment of the present disclosure, future observations, actions, and revenues are predicted from time series data of past observations, actions, and revenues. The input of time series data is variable length, and the length of the time series that produces the highest revenue is determined. With this method, even with suboptimal data, the required time series length can be selected and actions that can achieve the task can be generated.

[0015] <Control system configuration> As shown in FIG. 1, a control system 100 according to this embodiment includes a control device 10 and a controlled object 50.

[0016] The control target 50 is, for example, a moving body, such as an autonomous vehicle in automatic intersection management, an AMR (Autonomous Mobile Robot) or an AGV (Autonomous Guided Vehicle) in a warehouse or factory, a drone in an unmanned delivery system, etc. The control target 50 has a moving mechanism for running, flying, etc., a communication mechanism for communicating with the control device 10, and a moving control mechanism for controlling the moving mechanism so as to move according to a planned route.

[0017] Fig. 2 is a block diagram showing a hardware configuration of the control device 10. As shown in Fig. 2, the control device 10 is a computer having a CPU (Central Processing Unit) 32, a memory 34, a storage device 36, an input device 38, an output device 40, a storage medium reading device 42, and a communication I / F (Interface) 44. Each component is connected to each other via a bus 46 so as to be able to communicate with each other.

[0018] The storage device 36 stores a control program for executing control processing. The CPU 32 is a central processing unit, and executes various programs and controls each component. That is, the CPU 32 reads the program from the storage device 36 and executes the program using the memory 34 as a working area. The CPU 32 controls each component and performs various arithmetic processing according to the program stored in the storage device 36.

[0019] The memory 34 is made up of a RAM (Random Access Memory) and temporarily stores programs and data as a working area. The storage device 36 is made up of a ROM (Read Only Memory), HDD (Hard Disk Drive), SSD (Solid State Drive), etc., and stores various programs including an operating system, and various data.

[0020] The input device 38 is a device for performing various inputs, such as a keyboard, a mouse, etc. The output device 40 is a device for outputting various information, such as a display, a printer, etc. A touch panel display may be used as the output device 40 to function as the input device 38.

[0021] The storage medium reader 42 reads data stored in various storage media such as a CD (Compact Disc)-ROM, a DVD (Digital Versatile Disc)-ROM, a Blu-ray disc, a USB (Universal Serial Bus) memory, etc., and writes data to the storage media. The communication I / F 44 is an interface for communicating with other devices, and uses standards such as Ethernet (registered trademark), FDDI, and Wi-Fi (registered trademark).

[0022] 1, the control device 10 functionally includes a learning data storage unit 20, a learning unit 22, a model storage unit 24, a behavior decision unit 26, an operation control unit 28, and a communication unit 30. The control device 10 is an example of a control device of the present disclosure. Each functional configuration is realized by the CPU 32 reading out a control program stored in the storage device 36, expanding it in the memory 34, and executing it.

[0023] The learning data storage unit 20 stores multiple time series of tokens prepared in advance as learning data. Here, the tokens include observation information obtained by observing the environment of the control target 50, revenue, and the behavior of the control target in one time step. Specifically, the time series of tokens is obtained from behavior history data (e.g., movement history data) of the control target 50. Furthermore, the behavior of the control target 50 includes, for example, the movement speed and angular velocity of the control target 50. The observation information is, for example, information obtained by observing the environment of the control target 50 by a sensor provided in the control target 50.

[0024] A reward in reinforcement learning is determined based on whether a task is accomplished or not, or the time required to accomplish a task, in the action history data. For example, a reward in reinforcement learning is determined based on whether a goal point is reached without colliding with an obstacle, the error between the goal point and the current position, or the time required to reach the goal point, in the movement history data.

[0025] The learning unit 22 learns the model by reinforcement learning based on a time series of tokens prepared in advance.

[0026] The model is configured to repeat, for each time step, the following steps: take observation information as input, estimate revenue, take revenue as input, estimate behavior, and take behavior as input.

[0027] Specifically, as shown in FIG. 3, the model 60 includes a decoder 62 and transformation layers 64, 66, 68, and 70.

[0028] The decoder 62 may be a Transformer decoder described in Non-Patent Document 1. t The output when the input is the revenue R t , and the profit R t , and outputs the result to a transformation layer 66 for transforming the result into the maximum value of

[0029] The decoder 62 also calculates the revenue R t The output when the input is t and a transformation layer 68 for transforming the observation information of the next time step o t+1 The decoder 62 also outputs the action a to the transformation layer 70 for transformation into t The input is:

[0030] Also, the decoder 62 receives the observation information o t is used as input to the transformation layers 64 and 66, and the revenue R t to the transformation layer 68 as an input, and the action a tThe method is configured to repeatedly take the following as input.

[0031] More specifically, based on the time series of tokens in the training data, for each time step t, observation information o t With input, the token revenue of the training data R t and the revenue of training data tokens R t With input, the behavior of tokens in the training data a t and observation information t+1 and the behavior of the tokens in the training data a t The parameters of model 60 are trained so that the input is

[0032] Revenue R t is the return-to-go from then on, and is the sum of rewards r obtained from time t onwards.

[0033] In this embodiment, for each time step t up to the current time, the observation information o t , the revenue R transformed by the transformation layer 64 t , the action a transformed by the transformation layer 68 t are repeatedly input to the model 60, and finally the converted action a t is determined as the action of the control target 50 at the current time.

[0034] The model storage unit 24 stores the model 60 learned by the learning unit 22 .

[0035] The behavior determining unit 26 receives as input observation information obtained by observing the environment of the controlled object 50, revenue, and behavior, and determines the behavior of the controlled object 50 based on a model for determining the behavior of the controlled object 50.

[0036] Specifically, the behavior decision unit 26 calculates the observed information o t , Revenue R t , and Action a tThere are multiple types of time series lengths of tokens including the above, and among the multiple types of time series lengths, tokens of the relevant time series lengths before the current time are input into a model 60 for each time step to determine the time series length at which the final output profit is maximized, and tokens of the determined time series length are input into the model 60 for each time step, and the final estimated behavior is determined as the behavior of the control object 50.

[0037] More specifically, the length of the token time series is T, and the time series τ of tokens obtained before the current time t T Based on this, for each time step t, the token observation information o t is input to the decoder 62, and the revenue ^R t is input to the decoder 62, and the action a output from the conversion layer 68 is t The time series of tokens τ T is expressed by the following formula:

[0038] JPEG2024146537000002.jpg13164

[0039] The above process is repeated for each of the multiple time series lengths, and the final estimated profit is t The time series length when is maximized is determined, and the tokens of the determined time series length are input to the model 60 at each time step to obtain the final estimated action a t is determined as the behavior of the controlled object 50.

[0040] The principle of the above action determination will be explained. In the disclosed technique, the final estimated revenue ^R t Determining the time series length at which is maximized is a key factor that allows for comparison of expected returns given token time series of different lengths, as expressed in equation (1) below. JPEG2024146537000003.jpg1564 (1)

[0041] It is possible to control the degree to which a token time series that deviates from the token time series up to the current time is searched for by adjusting the value of the time series length T. For example, by decreasing the value of the time series length T, it becomes possible to search for a token time series that is significantly different from the token time series up to the current time.

[0042] Final estimated revenue^R t To prevent overestimation when determining the time series length at which is maximized, we use expectile regression, a statistical method commonly employed in applied statistics and econometrics to estimate the statistical range of a random variable. Expectile regression allows us to accurately estimate the maximum return of a token time series, even when working with limited data.

[0043] The α ∈ (0,1) expected value of a random variable X is defined as the solution to the asymmetric least squares problem as follows: JPEG2024146537000004.jpg17106 however, JPEG2024146537000005.jpg1388 X is the set of dependent variables, m α is the centre of the distribution of the dependent variable.

[0044] Using expectile regression JPEG2024146537000006.jpg1040 Estimate the following. JPEG2024146537000007.jpg16144 (2)

[0045] ~ Estimating the value of Rt is accomplished in a similar manner to estimating ^Rt, but using equation (2) above.

[0046] The learning method of this embodiment is based on the research described in Non-Patent Document 2, and adds a step of estimating the maximum profit of the token time series using the above equation (2).

[0047] The action control unit 28 notifies the control target 50 of the action determined by the action determination unit 26, and causes the control target 50 to act.

[0048] The communication unit 30 notifies the control target 50 of the action (for example, velocity and angular velocity) of the control target 50 determined for each time step t.

[0049] The communication unit 30 also receives observation information notified from the controlled object 50, the observation information being obtained by observing the surroundings of the controlled object 50 at each time step.

[0050] <Control system action> Next, the operation of the control system 100 according to this embodiment will be described.

[0051] Fig. 4 is a flowchart showing the flow of the control process executed by the CPU 32 of the control device 10. The CPU 32 reads out a control program from the storage device 36, expands it in the memory 34, and executes it, whereby the CPU 32 functions as each functional component of the control device 10, and the control process shown in Fig. 4 is repeatedly executed for each time step. It is assumed that the control target 50 notifies the control device 10 of observation information for each time step. It is also assumed that the learning unit 22 has learned the model 60 by reinforcement learning based on multiple learning data, which are time series of tokens prepared in advance. It is to be noted that the control process is an example of a control method.

[0052] In step S100, the behavior decision unit 26 acquires observation information at the current time.

[0053] In step S102, the behavior determining unit 26 sets one of a plurality of types of time series lengths related to tokens as a time series length T.

[0054] In step S104, the behavior decision unit 26 calculates a time series τ of tokens of the time series length T obtained before the current time. T Based on this, for each time step t, the token observation information o tis input to the decoder 62, and the revenue ^R t is input to the decoder 62, and the action a output from the conversion layer 68 is t is repeatedly input to the decoder 62.

[0055] In step S106, the behavior decision unit 26 judges whether or not the processes of steps S102 to S104 have been executed for all types of time series lengths. If there is a time series length for which the processes of steps S102 to S104 have not been executed, the process returns to step S102 and sets the relevant time series length T. On the other hand, if the processes of steps S102 to S104 have been executed for all types of time series lengths, the process proceeds to step S108.

[0056] In step S108, the behavior decision unit 26 inputs tokens of the time series length before the current time into the model 60 for each time step to obtain the final estimated profit ^R t Determine the length of the time series when is maximized.

[0057] In step S110, the behavior determining section 26 inputs tokens of the time series length determined in step S108 above into the model 60 for each time step, and determines the behavior that is ultimately output as the behavior of the control target 50.

[0058] In step S112, the action control unit 28 notifies the control target 50 of the action determined by the action determination unit 26, causes the control target 50 to act, and ends the control process.

[0059] <Experimental Example> An experiment was carried out to demonstrate the effectiveness of the technique of the control device 10 described in the above embodiment. Here, the DT described in Non-Patent Document 3 was used as a comparative example.

[0060] [Non-Patent Document 3]: Q. Zheng, A. Zhang, and A. Grover. Online decision transformer. In International Conference on Machine Learning, pages 27042-27059. PMLR, 2022.

[0061] [Table 1]

[0062] As shown in Table 1, the method (EDT) of the control device 10 described in the above embodiment achieved a higher average score than the comparative example in each data set, except for some data sets. Here, a higher score indicates a more successful task.

[0063] As described above, the control system according to this embodiment inputs tokens of a time series length before the current time, among multiple types of time series lengths, into the model for each time step to determine the time series length at which the profit finally output is maximized, and inputs tokens of the determined time series length before the current time into the model for each time step to determine the action finally output as the action of the control target. This makes it possible to select the necessary time series length even with suboptimal data, and to appropriately determine the action of the control target that can achieve the task.

[0064] <Application example: Robot> The technique disclosed herein can be applied to a robot as a control target. In this case, the observation information includes the current state of the robot and various information that captures that state. The current state of the robot includes, for example, the states of the joints and actuators. The various information that captures the state of the robot includes the state of an object targeted by the robot or sensor information. The state of an object targeted by the robot includes, for example, the position of the object in the workspace.

[0065] Behaviors include decisions regarding the operation of the robot, such as motion planning, selecting a grasping or manipulation strategy, or adjusting the robot's joint angles or velocities. Rewards can also be defined in different ways depending on the particular task being addressed: for example, rewards can be based on successful completion of a task, on the accuracy of the robot's movements, or on the energy efficiency of the robot's operations.

[0066] In addition, specific tasks include the following:

[0067] 1. Manipulation Task: The task of grasping and manipulating objects in the robot's workspace. 2. Navigation Task: A task in which the robot must navigate a cluttered environment to reach a desired location. 3. Assembly: Assembling parts and components into a final product. 4. Motion Planning: The task of planning the robot's trajectory through the environment to reach and avoid collisions.

[0068] As an example, it can be used for robot motor learning. Teaching a robot to move can be difficult due to the difference between the human and robot bodies, and it is often impossible to give a teaching that can accomplish a task. By using the method disclosed herein, it is possible to obtain a strategy that can accomplish a task even with limited and non-optimal data.

[0069] <Application example: autonomous vehicles> Furthermore, the technique disclosed herein can be applied to an autonomous vehicle as a control target. In this case, the observation information includes the current state of the autonomous vehicle and various information capturing that state. The current state of the autonomous vehicle includes, for example, the position or speed of the autonomous vehicle. The various information capturing the state of the autonomous vehicle includes the state of other vehicles, the distance to an obstacle, or the surrounding conditions. The state of other vehicles includes, for example, the position or speed of other vehicles. The surrounding conditions include, for example, the weather and road conditions.

[0070] Actions include decisions regarding driving of the autonomous vehicle, such as braking. The reward can be defined in different ways depending on the particular task being undertaken: for example, the reward can be based on the time taken to reach a destination, the number of collisions avoided, or fuel efficiency.

[0071] Specific tasks for autonomous driving include:

[0072] 1. Lane Following: The task of navigating traffic while keeping the vehicle within its lane. 2. Obstacle avoidance: The task of avoiding collisions with other vehicles and obstacles in the environment. 3. Traffic Flow Optimization: The task of optimizing the flow of traffic on a road or highway. 4. Energy Efficient Driving: The task of driving a vehicle in a manner that minimizes fuel consumption or maximizes electricity usage.

[0073] <Application example: Real-time bidding for advertising> The disclosed technique can also be applied to computer-based real-time bidding for advertisements as a control target. In this case, the observation information includes information related to a specific user behavior regarding the target of the advertisement. The information related to a specific user behavior regarding the target of the advertisement is, in particular, various information that affects the likelihood that a user clicks on an advertisement and converts, such as the user's demographic information, browsing history, and current context (location, device, time).

[0074] Actions may include selecting a bid amount, selecting criteria for targeting an ad, or selecting a format for an ad. Compensation is based on the value of a successful bid, e.g., the value of a successful conversion minus the cost of the bid.

[0075] Specific tasks include the following:

[0076] 1. Bid optimization: The task of learning the best bidding strategy that maximizes an advertiser's return on investment. 2. User modeling: The task of capturing a user's interests and preferences and learning the user's expressions. 3. Campaign Optimization: The task of optimizing the performance of the entire advertising campaign, including targeting, bidding, etc. 4. Dynamic Pricing: The task of optimizing pricing in real time to balance supply and demand.

[0077] <Application example: Natural language processing> The disclosed techniques can also be applied to computer-based natural language processing as a control target, where the observation information includes information about the text, specifically the current sentence or document, including various information such as the context of the sentence or document, sentiment of the text, and previously learned representations of the text, such as word embeddings and sentence embeddings.

[0078] Actions include decisions regarding what to do with the text, such as the next word or phrase to generate, the selection of entities to recognize in the text, or whether to classify it into a particular category. Rewards are defined based on accuracy for the particular task being addressed - for example, in sentiment analysis, rewards are based on how accurately the model predicts.

[0079] Specific tasks include the following:

[0080] 1. Text classification: The task of assigning a label or category to a given piece of text. 2. Sentiment Analysis: The task of identifying the sentiment of a given text. 3. Machine Translation: The task of translating text from one language to another. 4. Question Answering: The task of answering questions posed in natural language.

[0081] <Application example: Game processing> The disclosed techniques may also be applied to computer-based game processing, where the observed information includes the current state of the game, such as the positions of game pieces, the score, the time remaining, and previously learned representations of the game, such as feature maps and game embeddings.

[0082] Actions include game decisions. Game decisions include various decisions made during game play, including, for example, choosing a move, choosing a purchasing strategy, or selecting an item or power-up. Depending on the particular game being played, rewards may be based on the score achieved during the game or on whether the player wins or loses. For example, if the game is Atari, rewards may be based on the score achieved during the game, or if the game is Go, rewards may be based on whether the player wins the game.

[0083] Specific tasks include the following:

[0084] 1. Game Playing: The task is to develop a control subject that can play games such as Atari, Chess, Go, etc. 2. Level Generation: The task of generating new levels of the game which are challenging and engaging. 3. Procedural Content Generation: The task of generating content such as characters, items, quests, etc. 4. Game Balancing: The task of adjusting the game parameters to make the game fair and balanced.

[0085] <Application example: Physical systems> The disclosed techniques may also be applied to physical systems as controlled objects, where the observations include the current state of the physical system, e.g., position, velocity, acceleration, other relevant physical properties such as temperature or pressure, or representations of previously learned physical phenomena.

[0086] Actions involve adjusting various control inputs or parameters of a physical system, for example the force applied to an object, the angle of a lever, or the temperature of the system. The reward is based on a metric related to the physical system and can be defined in a variety of ways depending on the particular problem being addressed - for example, in a control problem, the reward is based on the difference between the desired output and the actual output.

[0087] Specific tasks include the following:

[0088] 1. Control of a robotic system: The task of optimizing the control strategy of a robotic system. 2. Simulation-Based Optimization: The task of optimizing the behavior of a physical system using simulation. 3. Energy Management: The task of optimizing energy consumption in a physical system such as a building. 4. Materials discovery: The task of discovering new materials with specific properties, such as high strength.

[0089] <Modification> In the above embodiment, the case where the model is learned based on the behavior history data of the control target 50 itself has been described as an example, but the present invention is not limited to this. The model may be learned using behavior history data of other control targets. Also, the model may be learned using behavior history data obtained by simulating the behavior of the control target.

[0090] In the above embodiment, the control process is executed in a control device separate from the controlled object, but the present invention is not limited to this. The control process may be executed in a control device installed in the controlled object.

[0091] In addition, the control process executed by the CPU by reading the software (program) in the above embodiment may be executed by various processors other than the CPU. In this case, examples of the processor include a PLD (Programmable Logic Device) such as an FPGA (Field-Programmable Gate Array) whose circuit configuration can be changed after manufacture, and a dedicated electric circuit such as an ASIC (Application Specific Integrated Circuit) which is a processor having a circuit configuration designed exclusively for executing a specific process. In addition, the control process may be executed by one of these various processors, or may be executed by a combination of two or more processors of the same or different types (for example, a plurality of FPGAs, a combination of a CPU and an FPGA, etc.). In addition, the hardware structure of these various processors is, more specifically, an electric circuit that combines circuit elements such as semiconductor elements.

[0092] In the above embodiment, the control program is stored (installed) in advance in the storage device, but the present invention is not limited to this. The program may be provided in a form stored in a storage medium such as a CD-ROM, a DVD-ROM, a Blu-ray disc, or a USB memory. The program may be downloaded from an external device via a network.

[0093] The following are additional notes regarding this disclosure.

[0094] (Additional note 1) A behavior decision unit that takes as inputs observation information, revenue, and behavior of a controlled object, and decides an action of the controlled object based on a model for deciding an action of the controlled object, a behavior decision unit that inputs tokens of a time series length before the current time into the model at each time step, determines a time series length when a profit that is finally output is maximized, and inputs tokens of the determined time series length before the current time into the model at each time step, and decides the behavior that is finally output as the behavior to be controlled. A control device including:

[0095] (Additional note 2) The control device according to claim 1, further comprising a learning unit that learns the model by reinforcement learning based on a time series of the tokens prepared in advance.

[0096] (Additional note 3) 3. The control device according to claim 2, wherein the reward in the reinforcement learning is determined based on whether or not a task has been accomplished in the behavioral history data of the control target, or based on the time required to accomplish the task.

[0097] (Additional note 4) 4. The control device according to any one of claims 1 to 3, wherein expectile regression is used when determining the time series length when the final output profit is maximized.

[0098] (Additional note 5) 5. The control device according to claim 1, wherein the controlled object is a moving object, a robot, or computer processing.

[0099] (Additional note 6) 6. The control device according to claim 5, wherein the controlled object is a robot, an autonomous vehicle, a bidding process by a computer, a natural language process by a computer, a game process by a computer, or a process related to a physical phenomenon by a computer.

[0100] (Additional note 7) The control target is a robot, The observation information includes a state of the robot, a state of an object targeted by the robot, or sensor information; the actions include decisions regarding the operation of the robot; The control device of claim 5, wherein the reward is determined based on the completion of a task performed by the robot, the accuracy of the robot's movements, or the energy efficiency of the robot's operations.

[0101] (Additional note 8) The control target is an autonomous vehicle, The observation information includes a state of the autonomous vehicle, a state of other vehicles, a distance to an obstacle, and a surrounding situation, the actions include decisions regarding operation of the autonomous vehicle; 7. The control device of claim 6, wherein the reward is based on the time taken to reach the destination, the number of collisions avoided, or fuel efficiency.

[0102] (Additional note 9) The control object is a bidding process for advertisements by a computer, The observation information includes information related to a specific behavior of a user regarding a target of the advertisement, The action may include selecting a bid amount, selecting a target for the advertisement, or selecting a format for the advertisement; The control device according to claim 6, wherein the reward is determined based on the value obtained when the bid is successful.

[0103] (Additional note 10) The control target is natural language processing by a computer, the observation information includes information regarding a text; the action includes a decision regarding a process for the text; 7. The control device of claim 6, wherein the reward is determined based on accuracy regarding the task.

[0104] (Additional note 11) the control object is a game process performed by a computer, the observation information includes a state of the game; the actions include decisions regarding the game; 7. The control device according to claim 6, wherein the reward is determined based on the score obtained in the game or on whether the game was won or lost.

[0105] (Additional note 12) The control object is a physical system, the observation information includes a state of the physical system; the action includes adjusting a control input or parameter for the physical system; 7. The control device according to claim 6, wherein the reward is determined based on an evaluation value relating to the physical system.

[0106] (Additional note 13) The processor: A process of determining an action of a control target based on an input of observation information, revenue, and action of the control target and a model for determining the action of the control target, comprising: A token having a time series length before the current time is input to the model for each time step, and the time series length when the profit finally output is maximized is determined. A token having the determined time series length before the current time is input to the model for each time step, and the action finally output is determined as the action to be controlled. A control method for performing processing.

[0107] (Additional note 14) On the computer, A process of determining an action of a control target based on an input of observation information, revenue, and action of the control target and a model for determining the action of the control target, comprising: A token having a time series length before the current time is input to the model for each time step, and the time series length when the profit finally output is maximized is determined. A token having the determined time series length before the current time is input to the model for each time step, and the action finally output is determined as the action to be controlled. A control program that executes processing.

[0108] (Additional note 15) A control system including a control device and a controlled object, The control device includes: A behavior decision unit that takes as inputs observation information, revenue, and behavior of a control target, and decides an action of the control target based on a model for deciding an action of the control target, a behavior decision unit that inputs tokens having a time series length before the current time into the model at each time step, determines a time series length when a profit that is finally output is maximized, inputs tokens having the determined time series length before the current time into the model at each time step, decides the behavior that is finally output as a behavior of the control object, and notifies the control object; The control object notifies the control device of observation information of the environment of the control object at each time step; act in accordance with said notice; Control system. [Explanation of symbols]

[0109] 100 Control System 10 Control device 20 Learning data storage unit 22 Learning Department 24 Model memory section 26 Action Decision-Making Department 28 Motion control section 30 Communications Department 32 CPU 34 Memory 36 Storage device 38 Input Devices 40 Output Device 42 Storage media reader 44 Communication I / F 46 Bus 50 Control Object 60 Models 62 Decoder 64, 66, 68, 70 conversion layers

Claims

1. A behavior decision unit that takes as inputs observation information, revenue, and behavior of a controlled object, and decides an action of the controlled object based on a model for deciding an action of the controlled object, A behavior decision unit that inputs tokens of a time series length before the current time into the model at each time step, determines a time series length when a profit that is finally output is maximized, and inputs tokens of the determined time series length before the current time into the model at each time step, and decides the behavior that is finally output as the behavior of the control target. Control device.

2. The control device according to claim 1 , further comprising a learning unit that learns the model by reinforcement learning based on a time series of the tokens that is prepared in advance.

3. 3. The control device according to claim 2, wherein the reward in the reinforcement learning is determined based on whether or not a task has been accomplished, or on the time required to accomplish the task, in the behavior history data of the controlled object.

4. 2. The control device according to claim 1, wherein expectile regression is utilized in determining the time series length when the final output profit is maximized.

5. The control device according to claim 1 , wherein the controlled object is a moving object, a robot, or a computer process.

6. 6. The control device according to claim 5, wherein the controlled object is a robot, an autonomous vehicle, a bidding process by a computer, a natural language process by a computer, a game process by a computer, or a process related to a physical phenomenon by a computer.

7. The control target is a robot, The observation information includes a state of the robot, a state of an object targeted by the robot, or sensor information; the actions include decisions regarding the operation of the robot; The control device of claim 6 , wherein a reward is determined based on the completion of a task performed by the robot, the accuracy of the robot's movements, or the energy efficiency of the robot's operations.

8. The control target is an autonomous vehicle, The observation information includes a state of the autonomous vehicle, a state of other vehicles, a distance to an obstacle, and a surrounding situation, the actions include decisions regarding operation of the autonomous vehicle; 7. The control system of claim 6, wherein the reward is based on time taken to reach the destination, number of collisions avoided, or fuel efficiency.

9. The control object is a bidding process for advertisements by a computer, The observation information includes information related to a specific behavior of a user regarding a target of the advertisement, The action may include selecting a bid amount, selecting a target for the advertisement, or selecting a format for the advertisement; 7. The control device according to claim 6, wherein the reward is determined based on a value obtained when the bid is successful.

10. The control target is natural language processing by a computer, the observation information includes information regarding a text; the action includes a decision regarding a process for the text; 7. The control system of claim 6, wherein the reward is based on accuracy with respect to the task.

11. the control object is a game process performed by a computer, the observation information includes a state of the game; the actions include decisions regarding the game; The control device according to claim 6 , wherein the reward is determined based on the score obtained in the game or on whether the game was won or lost.

12. The control object is a physical system, the observation information includes a state of the physical system; the action includes adjusting a control input or parameter for the physical system; The control device according to claim 6 , wherein the reward is determined based on an evaluation value regarding the physical system.

13. The processor: A process of determining an action of a control target based on an input of observation information, revenue, and action of the control target and a model for determining the action of the control target, comprising: A token having a time series length before the current time is input to the model for each time step, and the time series length when the profit finally output is maximized is determined. A token having the determined time series length before the current time is input to the model for each time step, and the action finally output is determined as the action to be controlled. A control method for performing processing.

14. On the computer, A process of determining an action of a control target based on an input of observation information, revenue, and action of the control target and a model for determining the action of the control target, comprising: A token having a time series length before the current time is input to the model for each time step, and the time series length when the profit finally output is maximized is determined. A token having the determined time series length before the current time is input to the model for each time step, and the action finally output is determined as the action to be controlled. A control program that executes processing.

15. A control system including a control device and a controlled object, The control device includes: A behavior decision unit that takes as inputs observation information, revenue, and behavior of a control target, and decides an action of the control target based on a model for deciding an action of the control target, a behavior decision unit that inputs tokens having a time series length before the current time into the model at each time step, determines a time series length when a profit that is finally output is maximized, inputs tokens having the determined time series length before the current time into the model at each time step, decides the behavior that is finally output as a behavior of the control object, and notifies the control object; The control object notifies the control device of observation information of the environment of the control object at each time step; act in accordance with said notice; Control system.