Steam turbine nozzle deformation amount management device
The steam turbine nozzle deformation amount management device addresses the challenge of creep deformation by calculating and displaying future deformation and strain amounts, ensuring timely inspections and replacements to prevent nozzle-rotor contact and extend equipment life.
Patent Information
- Application Number
- JP2023045671
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-22
- Publication Date
- 2024-10-16
- Estimated Expiration
- 2043-03-22
AI Technical Summary
The risk of creep deformation in steam turbine nozzles increases due to extended intervals between periodic inspections, especially in thermal power generation facilities shifting to regulated thermal power operation, leading to potential damage from nozzle contact with rotating components, and existing systems lack accurate prediction and optimal inspection timing.
A steam turbine nozzle deformation amount management device that calculates past and future creep deformation and strain amounts based on operating data and future conditions, providing a user interface for display and management of recommended inspection and replacement times.
Enables precise prediction and management of nozzle deformation, allowing for timely inspections and replacements, reducing the risk of nozzle-rotor contact and extending equipment lifespan.
Smart Images

Figure 2024146956000001_ABST
Abstract
Description
[Technical field]
[0001] An embodiment of the present invention relates to a nozzle deformation amount management device for a steam turbine. [Background technology]
[0002] A steam turbine has multiple turbine stages, each including a stator vane cascade and a rotor vane cascade, arranged in the axial direction of the turbine rotor. Among the stator vane cascades, a welded stator vane cascade has a welded structure in which multiple nozzles (stator vanes) are welded in the circumferential direction between a diaphragm outer ring and a diaphragm inner ring.
[0003] A stator vane cascade with such a configuration has a risk of creep deformation over time originating from the joint between the nozzle and the outer diaphragm ring and the joint between the nozzle and the inner diaphragm ring. If creep deformation progresses, the nozzle may come into contact with a rotating body such as a turbine rotor during operation, causing damage to turbine components. Conventionally, the amount of creep deformation of the nozzle has been directly measured during periodic inspections.
[0004] In recent years, the introduction of renewable energy has been accelerated in power generation facilities as a measure to reduce carbon dioxide (CO2) emissions. In power generation using renewable energy, the amount of power generated varies depending on the weather, etc. Therefore, in recent years, thermal power generation facilities have been shifting to operation centered on regulated thermal power in order to compensate for the unstable power supply in power generation using renewable energy. In addition, deregulation has tended to lengthen the intervals between regular inspections. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] JP 2003-303014 A [Patent Document 2] Patent No. 4575176 [Patent Document 3] JP 2002-297710 A Summary of the Invention [Problem to be solved by the invention]
[0006] As described above, in a thermal power plant equipped with a steam turbine, there is a risk that the creep deformation of the nozzle in the steam turbine will progress further as the transition to adjustable thermal power operation is made. However, due to the lengthening of the interval between regular inspections, there are fewer opportunities to inspect the amount of creep deformation in the steam turbine.
[0007] A user who manages a steam turbine in a conventional thermal power plant cannot know information on the predicted amount of creep deformation of a nozzle from past periodic inspections to the present, or information on the predicted amount of creep deformation of a nozzle in the future based on the future operating conditions of the actual machine. In addition, in the conventional steam turbine management system, the user cannot know the optimal time to perform a periodic inspection.
[0008] The problem to be solved by the present invention is to provide a nozzle deformation amount management device for a steam turbine, which is capable of recognizing, in a chronological order, creep deformation amount and strain amount from the past to the present predicted based on operating data, and future creep deformation amount and strain amount predicted based on future operating conditions. [Means for solving the problem]
[0009] The nozzle deformation amount management device for a steam turbine of an embodiment includes a display information generation unit that generates display information to be displayed on a display unit, the display information including past deformation amount related information indicating information regarding the past deformation amount of a nozzle of a steam turbine from the past to the present calculated based on measured information, and future deformation amount related information indicating information regarding the future deformation amount of the nozzle in the future calculated based on future operating conditions input through an operation using a user interface screen and the past deformation amount related information. [Brief description of the drawings]
[0010] [Figure 1]1 is a system diagram illustrating a configuration of a steam turbine facility including a nozzle deformation amount management device according to a first embodiment. [Diagram 2] 1 is a diagram showing a meridian section of a high-pressure turbine, illustrating a part of a configuration of a nozzle of the high-pressure turbine managed by a nozzle deformation amount management device of a first embodiment. [Diagram 3] 1 is a block diagram showing a functional configuration of a nozzle deformation amount management device according to a first embodiment. [Figure 4] 4 is a diagram showing an example of an input screen for future operating conditions displayed on a user interface in the nozzle deformation amount management device of the first embodiment; FIG. [Diagram 5] 4 is a diagram showing an example of an input screen for inputting regular inspection results regarding creep deformation amount to the nozzle deformation amount management device of the first embodiment. FIG. [Figure 6] 5 is a flowchart for explaining a flow of calculation of a past creep deformation amount and a past strain amount in a periodic deformation amount calculation unit of the nozzle deformation amount management device of the first embodiment. [Figure 7] 5 is a flowchart for explaining a flow of calculation of a future creep deformation amount and a future strain amount in a future deformation amount calculation unit of the nozzle deformation amount management device of the first embodiment. [Figure 8] 5A to 5C are diagrams for explaining a calculation method of a recommended replacement time A, a recommended preparation time, and a preparation threshold value in a future deformation amount calculation unit of the nozzle deformation amount management device of the first embodiment. [Figure 9] 5A to 5C are diagrams for explaining a calculation method of a recommended replacement time A, a recommended preparation time, and a preparation threshold value in a future deformation amount calculation unit of the nozzle deformation amount management device of the first embodiment. [Figure 10] 1 is a diagram showing an example of a display screen on which display information is displayed as of the date of introduction of the nozzle deformation amount management device according to the first embodiment; FIG. [Figure 11] 5 is a flowchart for explaining a calculation processing method for a past creep deformation amount and a past strain amount in the nozzle deformation amount management device of the first embodiment. [Figure 12]5 is a flowchart for explaining a calculation processing method for a future creep deformation amount and a future strain amount in the nozzle deformation amount management device of the first embodiment. [Figure 13] 10 is a flowchart for explaining a future deformation amount calculation processing method in a nozzle deformation amount management device according to a second embodiment. [Figure 14] 10 is a flowchart for explaining a future deformation amount calculation processing method in a nozzle deformation amount management device according to a second embodiment. [Figure 15] FIG. 11 is a diagram showing an example of a display screen in the nozzle deformation amount management device according to the second embodiment. [Figure 16] 13 is a diagram showing an example of a selection screen for selecting a comparison calculation result to be displayed on a user interface in the nozzle deformation amount management device according to the second embodiment; FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] Hereinafter, an embodiment of the present invention will be described with reference to the drawings.
[0012] (First embodiment) FIG. 1 is a system diagram that illustrates a configuration of a steam turbine facility 1 that includes a nozzle deformation amount management device 18 according to a first embodiment.
[0013] As shown in FIG. 1, the steam turbine equipment 1 includes a boiler 10, a high-pressure turbine 11, a reheater 12, an intermediate-pressure turbine 13, a low-pressure turbine 14, a generator 15, a condenser 16, a feedwater pump 17, and a nozzle deformation amount management device 18.
[0014] Here, the high-pressure turbine 11 and the intermediate-pressure turbine 13 function as a steam turbine in which the creep deformation amount and the strain amount are managed by the nozzle deformation amount management device 18. Specifically, predetermined nozzles (stationary vanes) of the high-pressure turbine 11 and the intermediate-pressure turbine 13 are managed by the nozzle deformation amount management device 18.
[0015] The steam turbine equipment 1 is equipped with a nozzle deformation amount management device 18 as well as temperature detectors 30A, 30B, pressure detectors 31A, 31B, 31C, 31D, and an output detector 32 as a management system for calculating and managing the creep deformation and strain of the nozzle in the steam turbine.
[0016] The boiler 10 heats feedwater to generate steam, and outputs the steam to a main steam pipe 20. The high-pressure turbine 11 is rotated by steam introduced from the main steam pipe 20, and discharges the steam to a low-temperature reheat steam pipe 21. The reheater 12 reheats the steam introduced from the low-temperature reheat steam pipe 21, and outputs the steam to a high-temperature reheat steam pipe 22.
[0017] The intermediate-pressure turbine 13 is rotated by steam introduced from the high-temperature reheat steam pipe 22, and discharges the steam to a crossover pipe 23. The low-pressure turbine 14 is rotated by steam introduced from the crossover pipe 23, and discharges the steam to an exhaust pipe 24. The generator 15 generates electricity by being driven by the high-pressure turbine 11, the intermediate-pressure turbine 13, and the low-pressure turbine 14. The generator 15 is connected, for example, on the same shaft as the high-pressure turbine 11, the intermediate-pressure turbine 13, and the low-pressure turbine 14.
[0018] The condenser 16 condenses the steam introduced from the exhaust pipe 24 to produce condensed water. The feed water pump 17 supplies the condensed water of the condenser 16 to the boiler 10 via the feed water pipe 25 as feed water.
[0019] The nozzle deformation amount management device 18 is a device for calculating and managing the creep deformation amount and strain amount of a nozzle (stationary blade) in a steam turbine. Details of the nozzle deformation amount management device 18 will be described later.
[0020] The temperature detector 30A detects the temperature of steam introduced into the high-pressure turbine 11. As shown in Fig. 1, the temperature detector 30A is provided, for example, in the main steam pipe 20 and detects the temperature at the inlet of the high-pressure turbine 11. The temperature detector 30B detects the temperature of steam introduced into the intermediate-pressure turbine 13. As shown in Fig. 1, the temperature detector 30B is provided, for example, in the high-temperature reheat steam pipe 22 and detects the temperature at the inlet of the intermediate-pressure turbine 13. The temperature detectors 30A and 30B output detection signals to the nozzle deformation amount management device 18.
[0021] The pressure detector 31A detects the pressure of steam introduced into the high-pressure turbine 11. As shown in Fig. 1, the pressure detector 31A is provided, for example, in the main steam pipe 20 and detects the pressure at the inlet of the high-pressure turbine 11. The pressure detector 31B detects the pressure of steam introduced into the intermediate-pressure turbine 13. As shown in Fig. 1, the pressure detector 31B is provided, for example, in the high-temperature reheat steam pipe 22 and detects the pressure at the inlet of the intermediate-pressure turbine 13.
[0022] The inlets of the high-pressure turbine 11 and the intermediate-pressure turbine 13 refer to the inlets of the first turbine stages.
[0023] The pressure detector 31C detects the steam pressure at the outlet of the moving blade of the first turbine stage in the high-pressure turbine 11. Hereinafter, the steam pressure at the outlet of the moving blade is referred to as the moving blade outlet pressure. The pressure detector 31C may also detect the steam pressure at the inlet of the nozzle of the first turbine stage in the high-pressure turbine 11. Hereinafter, the steam pressure at the nozzle inlet is referred to as the nozzle inlet pressure. Also, the steam pressure at the nozzle outlet is referred to as the nozzle outlet pressure. The pressure detector 31D detects the nozzle outlet pressure of the first turbine stage in the intermediate-pressure turbine 13.
[0024] The pressure detectors 31A, 31B, 31C, and 31D output detection signals to the nozzle deformation amount management device 18.
[0025] The output detector 32 detects the electric output of the generator 15 and outputs a detection signal to the nozzle deformation amount management device 18 .
[0026] Here, the configuration of the nozzle 153 for which the creep deformation amount and strain amount are managed by the nozzle deformation amount management device 18 will be described. Fig. 2 is a diagram showing a meridian section of the high-pressure turbine 11, showing a part of the configuration of the nozzle 153 of the high-pressure turbine 11 managed by the nozzle deformation amount management device 18 of the first embodiment. Here, the configuration of the nozzle 153 of the high-pressure turbine 11 will be described as an example. Note that the configuration of the nozzle of the intermediate-pressure turbine 13 is similar to the configuration of the nozzle 153 of the high-pressure turbine 11.
[0027] A diaphragm outer ring 151 is provided on the inner periphery of a casing 150 of the high-pressure turbine 11, and a diaphragm inner ring 152 is provided inside the diaphragm outer ring 151. A plurality of nozzles (stationary vanes) 153 are arranged in the circumferential direction between the diaphragm outer ring 151 and the diaphragm inner ring 152 to form a stator vane cascade. A plurality of moving blades 156 are provided downstream of the stator vane cascade, which are implanted in a rotor wheel 155 of a turbine rotor 154. The plurality of moving blades 156 are arranged in the circumferential direction to form a moving blade cascade.
[0028] A plurality of stages of stator blade cascades are provided alternately with moving blade cascades in the axial direction of the turbine rotor 154. A stator blade cascade and a moving blade cascade located immediately downstream thereof constitute one turbine stage.
[0029] Between the outer diaphragm ring 151 and the inner diaphragm ring 152, an annular steam passage 157 through which steam flows is formed. Note that the flow direction of the steam is indicated by an arrow in Fig. 2. Between the turbine rotor 154 and the inner diaphragm ring 152, a seal portion 158 is provided to prevent steam from passing between them to the downstream side.
[0030] Here, the deformation amount managed by the nozzle deformation amount management device 18 includes the creep deformation amount due to creep deformation and the strain amount calculated based on the creep deformation amount. These deformation amounts will be described later. Here, creep deformation will be described with reference to FIG. 2. In the above-mentioned stator vane cascade, the diaphragm outer ring 151 is the fixed end and the diaphragm inner ring 152 is the free end, and the diaphragm inner ring 152 deforms over time in the steam flow direction. In addition, the nozzle 153 also deforms due to this deformation. Here, such deformation is referred to as creep deformation.
[0031] Creep deformation becomes noticeable when the metal material is used in a temperature environment of about half the melting point. Here, the nozzle deformation amount management device 18 manages the creep deformation amount and strain amount of the nozzle 153 having the above-mentioned configuration used in a temperature environment of, for example, 480°C or higher. The nozzle 153 managed by the nozzle deformation amount management device 18 is a nozzle 153 configured to be disposed between a diaphragm outer ring 151 and a diaphragm inner ring 152 as shown in FIG. 2. The nozzle deformation amount management device 18 also manages the nozzle 153 having the above-mentioned configuration used in a temperature environment of 480°C or higher in the intermediate-pressure turbine 13.
[0032] The nozzle managed by the nozzle deformation amount management device 18 is a welded nozzle 153 fixed to a diaphragm outer ring 151 and a diaphragm inner ring 152 by welding. The stator vane cascade is a welded type stator vane cascade in which a plurality of nozzles 153 are welded in the circumferential direction between the diaphragm outer ring 151 and the diaphragm inner ring 152. Examples of the nozzle managed by the nozzle deformation amount management device 18 include, for example, nozzles at the second to fourth turbine stages in the high-pressure turbine 11, and a nozzle at the second turbine stage in the intermediate-pressure turbine 13. Note that the nozzle managed by the nozzle deformation amount management device 18 is not limited to these nozzles, and may be any nozzle having the above-mentioned configuration that is used in a temperature environment of 480° C. or higher.
[0033] Next, the nozzle deformation amount control device 18 will be described.
[0034] 3 is a block diagram showing the functional configuration of the nozzle deformation amount management device 18 of the first embodiment. The nozzle deformation amount management device 18 is a device that predicts and manages creep deformation amounts and strain amounts from the past to the present based on the operation data of the actual machine, and future creep deformation amounts and strain amounts based on the operation conditions assumed in the future. The nozzle deformation amount management device 18 also generates display information for displaying the prediction results such as creep deformation amounts and strain amounts on a display unit.
[0035] As shown in FIG. 3, the nozzle deformation amount management device 18 includes a measurement data acquisition unit 40, a user interface 50, a storage unit 60, and a calculation unit 70.
[0036] The measurement data acquiring unit 40 is an interface that acquires detection signals related to the steam temperature output from the temperature detectors 30A and 30B, detection signals related to the steam pressure output from the pressure detectors 31A, 31B, 31C, and 31D, and detection signals related to the electrical output output from the output detector 32. The measurement data acquiring unit 40 acquires these detection signals at a predetermined time interval. For example, the measurement data acquiring unit 40 acquires the detection signals at one-hour intervals.
[0037] The measurement data acquisition unit 40 has a function of converting the acquired detection signal related to the steam temperature, the acquired detection signal related to the steam pressure, and the acquired detection signal related to the electrical output into steam temperature information, steam pressure information, and electrical output information, respectively. The measurement data acquisition unit 40 outputs the converted steam temperature information, steam pressure information, and electrical output information to the measurement data storage unit 62 of the storage unit 60.
[0038] The user interface 50 includes a display unit that displays various information to a user (administrator) and an input device through which the user inputs various information. The display unit is, for example, a display. The display unit may be configured with a touch panel that has a function as a display screen and also has a function as an input device that allows direct input to the screen. The input device is, for example, a keyboard, a mouse, etc.
[0039] The storage unit 60 includes an input information storage unit 61, a measurement data storage unit 62, a program storage unit 63, a calculation result storage unit 64, a template storage unit 65, and a display information storage unit 66. The storage unit 60 is realized by, for example, a hard disk drive, a non-volatile memory device, etc. The storage unit 60 may not be physically integrated with the nozzle deformation amount management device 18, but may be connected via a network (not shown).
[0040] The input information storage unit 61 stores, for example, future operating conditions, various setting conditions, and the like, which are input via the user interface 50. The input information storage unit 61 also stores, for example, various setting conditions, design information of the nozzles to be managed, information on periodic inspection results related to the amount of creep deformation, and the like, which are input from an input device at the manufacturer of the nozzle deformation amount management device 18.
[0041] Here, the future operating conditions are used in a calculation to predict the future creep deformation amount and strain amount. The future operating conditions are future operating conditions in the steam turbine equipment 1. The future operating conditions include the operating time in one day (24 hours) for each divided load and the annual availability rate. Examples of the future operating conditions include a preset default operating mode, a customized operating mode in which the operating time and annual availability rate for each divided load are arbitrarily set by the user, and the like. Here, the divided load refers to a load obtained by dividing the load range of the steam turbine (for example, a range from 0% load to 100% load) into a predetermined load unit (for example, 10% load unit). For example, when the load range of the steam turbine from 0% load to 100% load is divided into 10% load units, the divided loads are 10% load, 20% load, 30% load, 40% load, 50% load, 60% load, 70% load, 80% load, 90% load, and 100% load.
[0042] FIG. 4 is a diagram showing an example of an input screen 80 for inputting future operating conditions to be displayed on the user interface 50 in the nozzle deformation amount management device 18 of the first embodiment.
[0043] 4, for example, a past operation performance mode (Same as specific year) 82, a base load operation mode (Base load) 83, and a peak load operation mode (Peak load) 84 are set as default operation modes. A detailed operation setting mode (Detailed operation plan setting) 85 is set as a customized operation mode.
[0044] The input screen 80 shown in FIG. 4 is an example of a screen selected and input by the user via the user interface 50. In the selection pattern 81 in the upper part of FIG. 4, the user selects a white circle in the column of the operation mode to be selected for each year to turn it into a black circle. In the input screen 80 shown in FIG. 4, the past operation performance mode 82 is selected for 2024, the base load operation mode 83 for 2025 and 2026, the peak load operation mode 84 for 2027 and 2028, and the detailed operation setting mode 85 for 2029-2032.
[0045] 4 shows a period up to 2032, but is not limited to this period. For example, a period further into the future, such as 2040, may be set as the period.
[0046] The past operation performance mode 82 is a mode in which operation is performed in the same operation pattern as the operation pattern of the selected year. In the past operation performance mode 82, the operation mode is set based on the 10% load unit sectional load and the operation time at each sectional load calculated from the operation data from January to December of the selected year. In addition, in the past operation performance mode 82, the operation mode is set based on the availability factor of the selected year. Note that in FIG. 4, the operation pattern for 2021 is selected.
[0047] Here, the availability rate is the proportion of the number of days that the steam turbine equipment 1 operates in each year. In other words, the availability rate is a value expressed as a percentage obtained by dividing the number of days that the steam turbine equipment 1 operates in a year by 365 days.
[0048] The base load operation mode 83 is a mode in which the system operates at a high load ranging from 70% load to 100% load, for example. In the base load operation mode 83, for example, a load range is set in 10% load increments from 70% load to 100% load. In the base load operation mode 83, an operating rate is set for each year.
[0049] The base load operation mode 83 is a default value, and is set, for example, by referring to past operation data of the steam turbine equipment 1. The base load operation mode 83 is set, for example, on an annual basis.
[0050] Table 1 shows an example of a baseload operation mode 83.
[0051] [Table 1]
[0052] Table 1 shows an example in which the operation hours per day (24 hours) are set for each classified load for each year from 2024 to 2032. As shown in Table 1, for example, the base load operation mode 83 for 2024 is set as follows: 100% load (rated load): 3 hours, 90% load: 10 hours, 80% load: 9 hours, 70% load: 2 hours. The availability rate is also set to 89%.
[0053] The baseload operation mode 83 is a default value, and is set, for example, by referring to past operation data of the steam turbine equipment 1. Here, an example is shown in which the load range from 100% load to 70% load is divided into 10% load units as the baseload operation mode 83, but the setting is not limited to this. The load range in the baseload operation mode 83 may be set wider or narrower than the range in the above example. The load unit may be set wider or narrower than the 10% load unit. The number of years set may be shorter or longer than the number of years set in Table 1.
[0054] The peak load operation mode 84 is a mode in which the system operates with load fluctuations in the range from low load to rated load (100% load). In the peak load operation mode 84, for example, load divisions are set in 10% load increments from 100% load to 20% load. The peak load operation mode 84 is set on an annual basis. Table 2 shows an example of the peak load operation mode 84.
[0055] [Table 2]
[0056] In Table 2, the operation hours per day (24 hours) are set for each load category for each year from 2024 to 2032. For example, the peak load operation mode 84 for 2024 is set as follows: 100% load (rated load): 1 hour, 90% load: 5 hours, 80% load: 2 hours, 70% load: 1 hour, 60% load: 1 hour, 50% load: 1 hour, 40% load: 4 hours, 30% load: 8 hours, 20% load: 1 hour. The availability rate is also set to 89%.
[0057] The peak load operation mode 84 is a default value, but is set, for example, by referring to past operation data of the steam turbine equipment 1. Here, an example is shown in which the load range from 100% load to 20% load is divided into 10% load units as the peak load operation mode 84, but the setting is not limited to this. The load range in the peak load operation mode 84 may be set wider or narrower than the range in the above example. The load unit may be set wider or narrower than the 10% load unit. The number of years set may be shorter or longer than the number of years set in Table 2.
[0058] In the detailed operation setting mode 85, the operation time in one day (24 hours) is set arbitrarily for each load category shown in the operation data 86 column in the lower part of FIG. 4. The availability rate is also set arbitrarily. The user inputs the operation time for each load category in the year column of the detailed operation setting mode 85. In FIG. 4, the operation time is input in the column for 2029 to 2032 where the detailed operation setting mode 85 is set.
[0059] In addition, an example is shown here in which the load range from 100% load to 20% load is divided into 10% load units as the operation data 86 of the detailed operation setting mode 85, but the setting is not limited to this. The load range in the detailed operation setting mode 85 may be set wider or narrower than the range in the above example. Also, the load unit may be set wider or narrower than the 10% load unit.
[0060] Here, the user who has input the above-mentioned future operating conditions presses the Save button 87 in Fig. 4. The user interface 50 receives the input from the Save button 87 and outputs information related to the future operating conditions to the input information storage unit 61. The input information storage unit 61 inputs and stores the information related to the future operating conditions.
[0061] The input information storage unit 61 also stores a correspondence table for the following items set based on heat balance in correspondence with the load classification under future operating conditions: steam temperature information and steam pressure information at the inlet of the high-pressure turbine 11, steam pressure information relating to the nozzle inlet pressure and nozzle outlet pressure of the nozzle to be managed in the high-pressure turbine 11, steam temperature information relating to the steam temperature at the nozzle inlet of the nozzle to be managed in the high-pressure turbine 11, steam temperature information and steam pressure information at the inlet of the intermediate-pressure turbine 13, steam pressure information relating to the nozzle inlet pressure and nozzle outlet pressure of the nozzle to be managed in the intermediate-pressure turbine 13, steam temperature information relating to the steam temperature at the nozzle inlet of the nozzle to be managed in the intermediate-pressure turbine 13, and electrical output information of the generator 15. Note that hereinafter, the steam temperature at the nozzle inlet will be referred to as the nozzle inlet temperature.
[0062] In this way, for example, steam temperature information, steam pressure information, and electrical output information are stored for each load category of future operating conditions, so the future deformation amount calculation unit 72 can calculate the future creep deformation amount and strain amount based on this steam temperature information, steam pressure information, and electrical output information.
[0063] The input information storage unit 61 also stores information on periodic inspection results related to creep deformation amount, etc. Here, FIG. 5 is a diagram showing an example of an input screen 90 for inputting periodic inspection results related to creep deformation amount to the nozzle deformation amount management device 18 of the first embodiment. The periodic inspection results are input, for example, by the manufacturer. The input screen 90 shown in FIG. 5 is displayed, for example, on an operation screen of an input device at the manufacturer. Then, information related to the periodic inspection results from the input device at the manufacturer is output to the input information storage unit 61. The input information storage unit 61 inputs and stores information related to the periodic inspection results. The input device at the manufacturer is set to be accessible to the nozzle deformation amount management device 18.
[0064] "N: Nozzle Tip Side Axial Clearance" shown on the input screen 90 in Figure 5 is the distance between the axially downstream end of the radially inner circumferential surface of the diaphragm outer ring with which the radially outer tip of the nozzle contacts, and the axially upstream end of the shroud at the tip of the rotor blade. "L': Nozzle Root Side Axial Clearance" is the distance between the axially downstream end of the radially outer circumferential surface of the diaphragm inner ring with which the radially inner blade root tip of the nozzle contacts, and the axially upstream end of the platform with which the blade root tip of the effective blade portion of the rotor blade contacts. "Δ: Deformation" is the length obtained by subtracting N from L' (L'-N).
[0065] Note that N and L' are shown in a blade configuration display section 91 which shows a schematic representation of the configuration of the nozzle and the rotor blade. In the blade configuration display section 91, the left side is the nozzle and the right side is the rotor blade. The radial direction is the direction perpendicular to the central axis of the turbine rotor.
[0066] An initial value (Design) and a value based on regular inspection results (As-Found) are entered in the N and L' value fields 92 and 93. When the initial value and a value based on regular inspection results are entered in the N and L' value fields 92 and 93, the creep deformation amount (Amount of Deformation) is displayed. After the values of N and L' are entered, the difference in the creep deformation amount, which is the value "L'-N", is displayed in the Δ(Deformation) value field 94.
[0067] The input device at the manufacturer receives input from the Upload button 95 and outputs information related to the regular inspection results to the input information storage unit 61. The input information storage unit 61 inputs and stores the information related to the regular inspection results. The input device at the manufacturer receives input from the All Delete button 96 and deletes, for example, the numerical values in the numerical value columns 92, 93, and 94.
[0068] Although an example has been shown here in which the manufacturer inputs the regular inspection results, the user may also be able to input them. In this case, the input screen 90 shown in FIG. 5 is displayed on the display unit of the user interface 50. When the user inputs the regular inspection results, the user inputs the regular inspection results and then presses the Upload button 95. Then, the user interface 50 receives the input from the Upload button 95 and outputs information related to the regular inspection results to the input information storage unit 61. The input information storage unit 61 inputs and stores the information related to the regular inspection results. A Back button 97 on the input screen 90 is a button that is pressed when returning to a display screen 100, which will be described later, without pressing the Upload button 95.
[0069] The information on the latest periodic inspection result is used as an initial value when the periodic deformation amount calculation unit 71 calculates the creep deformation amount and the strain amount, for example.
[0070] The input information storage unit 61 stores a replacement threshold A, which is the amount of creep deformation at which a nozzle should be replaced, and a replacement threshold B, which is the amount of strain at which a nozzle should be replaced. Here, it is recommended that a nozzle whose amount of creep deformation has reached the replacement threshold A or whose amount of strain has reached the replacement threshold B be replaced. The replacement threshold A and the replacement threshold B are default values that are set based on, for example, the specifications of the nozzle. Therefore, the replacement threshold A and the replacement threshold B are stored in advance in the input information storage unit 61.
[0071] The manufacturer stores in advance replacement threshold value A and replacement threshold value B in input information storage unit 61. In addition, for example, the manufacturer can change replacement threshold value A and replacement threshold value B in accordance with a change in the management value or the like.
[0072] The input information storage unit 61 stores an inspection threshold A, which is the creep deformation amount at which the nozzle should be inspected, and an inspection threshold B, which is the strain amount at which the nozzle should be inspected. Here, it is recommended that a nozzle whose creep deformation amount has reached the inspection threshold A or whose strain amount has reached the inspection threshold B be inspected. The inspection threshold A and the inspection threshold B are default values that are set based on, for example, the specifications of the nozzle. Therefore, the inspection threshold A and the inspection threshold B are stored in advance in the input information storage unit 61.
[0073] The manufacturer stores the inspection threshold value A and the inspection threshold value B in advance in the input information storage unit 61. In addition, for example, the manufacturer can change the inspection threshold value A and the inspection threshold value B in accordance with a change in the control value or the like.
[0074] When the nozzle deformation amount management device 18 is introduced, the input information storage unit 61 stores an initial value (e.g., three years) of a preparation period for determining a recommended preparation timing, which will be described later. The preparation period is the period necessary to prepare a new nozzle. Note that a user can change the preparation period from the initial value to a specified period by requesting the manufacturer. In this case, information related to the changed preparation period is output from an input device at the manufacturer to the input information storage unit 61 of the nozzle deformation amount management device 18. The input information storage unit 61 then stores the information related to the changed preparation period.
[0075] The measurement data storage unit 62 stores the steam temperature information, steam pressure information, and electrical output information output from the measurement data acquisition unit 40. The measurement data storage unit 62 stores the steam temperature information, steam pressure information, and electrical output information output from the measurement data acquisition unit 40 every hour, for example.
[0076] The program memory unit 63 stores programs for calculating creep deformation amounts, strain amounts, etc. and managing creep deformation amounts and strain amounts in the nozzle deformation amount management device 18, as well as various equations and parameters for calculating creep deformation amounts, strain amounts, etc.
[0077] The calculation result storage unit 64 stores the results of calculations performed by the calculation unit 70. The calculation result storage unit 64 stores, for example, information relating to creep deformation amounts and strain amounts from the past to the present calculated by the fixed period deformation amount calculation unit 71. Here, the calculation result storage unit 64 stores, for example, calculation results of creep deformation amounts and strain amounts from the past to the present as information relating to creep deformation amounts and strain amounts from the past to the present. This information functions as past deformation amount related information.
[0078] The calculation result storage unit 64 stores, for example, information on the future creep deformation amount and strain amount calculated by the future deformation amount calculation unit 72. The calculation result storage unit 64 stores recommended replacement time A when the future creep deformation amount calculated by the calculation of the future deformation amount calculation unit 72 will reach replacement threshold value A, and recommended replacement time B when the strain amount will reach replacement threshold value B. Note that recommended replacement time A and recommended replacement time B are specified by date. The method of calculating these recommended replacement times will be described later.
[0079] Here, the recommended preparation time is the time from the earlier of the recommended replacement time A and the recommended replacement time B to a predetermined preparation period. The recommended preparation time refers to the time when it is recommended to start preparation for a new nozzle for the nozzle for which the recommended replacement time has been identified. Note that the recommended preparation time is also identified by date, similar to the recommended replacement time. For example, if the earlier of the recommended replacement time A and the recommended replacement time B is June 1, 2040, and the preparation period is three years, the recommended preparation time will be June 1, 2037. The preparation period is stored in the input information storage unit 61, as described above.
[0080] The calculation result storage unit 64 stores the future creep deformation amount or strain amount at the recommended preparation time calculated by the future deformation amount calculation unit 72 as the preparation threshold value. In other words, the creep deformation amount or strain amount at the recommended preparation time is the preparation threshold value. The calculation method of the preparation threshold value will be described later.
[0081] The calculation result storage unit 64 also stores the recommended inspection time A when the future creep deformation amount will reach the inspection threshold A and the recommended inspection time B when the future strain amount will reach the inspection threshold B, which are calculated by the future deformation amount calculation unit 72. The recommended inspection time A and the recommended inspection time B are specified by date. The method of calculating these recommended inspection times will be described later.
[0082] The calculation result storage unit 64 stores, as information related to the future creep deformation amount and strain amount, calculation results such as the future creep deformation amount and strain amount, recommended replacement time A, recommended replacement time B, recommended inspection time A, recommended inspection time B, preparation threshold, recommended preparation time, etc. Note that this information functions as future deformation amount related information.
[0083] The template storage unit 65 stores information relating to a template screen that is the basis of a screen that displays the calculation results stored in the calculation result storage unit 64. Information relating to various template screens to be displayed on the display unit of the user interface 50 is stored in advance in the template storage unit 65.
[0084] The display information storage unit 66 stores the display information generated by the display information generation unit 73 of the calculation unit 70 to be displayed on the display unit.
[0085] The calculation unit 70 is a calculation block including a fixed-period deformation amount calculation unit 71, a future deformation amount calculation unit 72, and a display information generation unit 73. The calculation unit 70 reads out a program for executing the nozzle deformation amount management device 18 from the program storage unit 63 in response to a user's input to start execution from the user interface 50. This makes it possible to execute the respective functions of the fixed-period deformation amount calculation unit 71, the future deformation amount calculation unit 72, and the display information generation unit 73.
[0086] The fixed-period deformation amount calculation unit 71 is a calculation block that reads out calculation formulas and parameters for calculating the creep deformation amount and the strain amount from the program storage unit 63, and calculates the creep deformation amount and the strain amount in a fixed period based on the steam temperature information, steam pressure information, and electrical output information stored in the measurement data storage unit 62. The fixed-period deformation amount calculation unit 71 outputs information related to the calculated creep deformation amount and the strain amount to the calculation result storage unit 64.
[0087] Here, the fixed period refers to a period from a specified date in the past to the present, for example, an hourly period. The fixed period deformation amount calculation unit 71 calculates the creep deformation amount and strain amount at fixed periods (for example, every hour) based on the steam temperature information, steam pressure information, and electrical output information, using the creep deformation amount measured in a regular inspection on a specified date in the past as an initial value. The current creep deformation amount is calculated by adding the creep deformation amount that has progressed from a specified date in the past to the present to the creep deformation amount measured in a regular inspection on a specified date in the past. Note that the creep deformation amount and strain amount that have progressed from a specified date in the past to the present, calculated by the fixed period deformation amount calculation unit 71, are predicted values.
[0088] The fixed period deformation amount calculation unit 71 determines whether the calculated creep deformation amount reaches the replacement threshold A based on the replacement threshold A stored in the input information storage unit 61. In addition, the fixed period deformation amount calculation unit 71 determines whether the calculated strain amount reaches the replacement threshold B based on the replacement threshold B stored in the input information storage unit 61.
[0089] The fixed period deformation amount calculation unit 71 determines whether the calculated creep deformation amount reaches the inspection threshold A based on the inspection threshold A stored in the input information storage unit 61. In addition, the fixed period deformation amount calculation unit 71 determines whether the calculated strain amount reaches the inspection threshold B based on the inspection threshold B stored in the input information storage unit 61.
[0090] Furthermore, the periodic deformation amount calculation unit 71 determines whether the calculated creep deformation amount or strain amount has reached the preparation threshold value based on the preparation threshold value stored in the input information storage unit 61. The operations related to these determinations in the periodic deformation amount calculation unit 71 will be described later.
[0091] The future deformation amount calculation unit 72 is a calculation block that reads out calculation formulas and parameters for calculating the creep deformation amount and the strain amount from the program storage unit 63, and calculates the future creep deformation amount and the strain amount based on the future operating conditions stored in the input information storage unit 61. The future deformation amount calculation unit 72 outputs information related to the calculated creep deformation amount and the strain amount to the calculation result storage unit 64.
[0092] Here, the future refers to a period from the present to a future year set as the future operating conditions. The future deformation amount calculation unit 72 calculates the future creep deformation amount and strain amount for each predetermined year (for example, every year) based on the future operating conditions stored in the input information storage unit 61, using the current creep deformation amount and strain amount calculated by the fixed period deformation amount calculation unit 71 as initial values. Note that the future creep deformation amount and strain amount calculated by the future deformation amount calculation unit 72 are predicted values.
[0093] The future deformation amount calculation unit 72 determines whether the future creep deformation amount has reached the replacement threshold A, based on the replacement threshold A stored in the input information storage unit 61 and the calculated future creep deformation amount. When the future deformation amount calculation unit 72 determines that the future creep deformation amount has reached the replacement threshold A, the future deformation amount calculation unit 72 calculates the recommended replacement time A at which the future creep deformation amount will reach the replacement threshold A.
[0094] Furthermore, the future deformation amount calculation unit 72 determines whether the future strain amount has reached the replacement threshold B, based on the replacement threshold B stored in the input information storage unit 61 and the calculated future strain amount. When the future deformation amount calculation unit 72 determines that the future strain amount has reached the replacement threshold B, the future deformation amount calculation unit 72 calculates the recommended replacement time B at which the future strain amount will reach the replacement threshold B.
[0095] Furthermore, when the future deformation amount calculation unit 72 determines that the future creep deformation amount has reached the replacement threshold A or determines that the future strain amount has reached the replacement threshold B, it calculates the recommended preparation time and the preparation threshold based on the above-mentioned preparation period.
[0096] For ease of explanation, the creep deformation amount and strain amount from the past to the present calculated by the periodic deformation amount calculation unit 71 are referred to as the past creep deformation amount and the past strain amount, respectively. The creep deformation amount and strain amount from the present to a predetermined future date calculated by the future deformation amount calculation unit 72 are referred to as the future creep deformation amount and the future strain amount, respectively.
[0097] The display information generating unit 73 is a calculation block that generates display information to be displayed on the display unit of the user interface 50. The display information generating unit 73 generates the display information based on the information stored in the calculation result storage unit 64 and the template storage unit 65. Note that the display information generating unit 73 may directly input the calculation results of the periodic deformation amount calculation unit 71 and the future deformation amount calculation unit 72, for example, and generate the display information based on the information stored in the template storage unit 65.
[0098] The display information generating unit 73 outputs the generated display information to the display information storage unit 66. In addition, the display information generating unit 73 outputs the generated display information to the user interface 50.
[0099] Here, the nozzle deformation amount management device 18 described above can be configured as a computer device equipped with an arithmetic device such as a CPU (Central Processing Unit), a memory device such as a ROM (Read Only Memory) or a RAM (Random Access Memory), an external memory device such as a HDD (Hard Disk Drive) or a CD (Compact Disc) drive device, a display device such as a display, and input devices such as a keyboard and a mouse.
[0100] (Calculation in the periodic deformation amount calculation unit 71 and the future deformation amount calculation unit 72) Here, the flow of calculations in the periodic deformation amount calculation unit 71 and the future deformation amount calculation unit 72 will be described.
[0101] Fig. 6 is a flowchart for explaining the flow of calculation of the past creep deformation amount and the past strain amount in the periodic deformation amount calculation unit 71 of the nozzle deformation amount management device 18 of the first embodiment. Fig. 7 is a flowchart for explaining the flow of calculation of the future creep deformation amount and the future strain amount in the future deformation amount calculation unit 72 of the nozzle deformation amount management device 18 of the first embodiment.
[0102] Here, the calculation of the deformation amount related to the nozzle of the high-pressure turbine 11 will be described as an example, but the calculation of the deformation amount related to the nozzle of the intermediate-pressure turbine 13 is also performed in a similar process.
[0103] First, the flow of calculation of the past creep deformation amount and the past strain amount in the periodic deformation amount calculation unit 71 will be described with reference to FIG.
[0104] 6, the fixed-period deformation amount calculation unit 71 reads out information related to the measurement data from the measurement data storage unit 62 (step S1). Here, as information related to the measurement data, the fixed-period deformation amount calculation unit 71 reads out steam temperature information and steam pressure information at the inlet of the high-pressure turbine 11, steam pressure information related to the rotor blade outlet pressure or nozzle inlet pressure at the first turbine stage of the high-pressure turbine 11, and electrical output information related to the electrical output of the generator 15. These pieces of information related to the measurement data function as measured information for calculating the past creep deformation amount and the past strain amount.
[0105] When executing step S1, the periodic deformation amount calculation unit 71 reads out from the program memory unit 63 a program for calculating the past creep deformation amount and the past strain amount, an arithmetic formula and parameters for calculating the past creep deformation amount and the past strain amount, and design information of the nozzle to be managed from the input information memory unit 61.
[0106] Next, the fixed period deformation amount calculation unit 71 calculates the operating environment state quantities of the managed nozzle based on the information related to the read measurement data (step S2). As the operating environment state quantities, the steam pressure, steam flow rate, steam flow velocity, and steam temperature in the turbine stage equipped with the managed nozzle are calculated.
[0107] Next, the fixed periodic deformation amount calculation unit 71 calculates the creep deformation speed V based on the calculated operating environment state amount and the design information of the nozzle to be managed (step S3). Note that the creep deformation speed V calculated here is the deformation speed of the directional component along the central axis of the turbine rotor of the high-pressure turbine 11.
[0108] Next, the fixed period deformation amount calculation unit 71 integrates the calculated creep deformation rate V with respect to the operating time to calculate the creep deformation amount D that has progressed during the operating time (step S4).
[0109] Here, the periodic deformation calculation unit 71 calculates the past creep deformation by adding the creep deformation Di measured in a periodic inspection on a predetermined day in the past to the creep deformation D calculated by the above calculation. In this way, the past creep deformation reflecting the operation of the high-pressure turbine 11 is obtained.
[0110] Next, the fixed periodic deformation amount calculation unit 71 calculates the past strain amount by dividing the past creep deformation amount by the nozzle height (step S5). Note that the nozzle height is the radial height of the nozzle 153 perpendicular to the central axis of the turbine rotor 154 (see FIG. 2). In other words, the nozzle height corresponds to the distance between the radially inner inner wall surface of the diaphragm outer ring 151 and the radially outer outer wall surface of the diaphragm inner ring 152 (see FIG. 2).
[0111] The periodic deformation amount calculation unit 71 outputs the calculation result to the calculation result storage unit 64. The calculation of the past creep deformation amount and the past strain amount in the periodic deformation amount calculation unit 71 is performed, for example, every hour. The most recently calculated past creep deformation amount and past strain amount correspond to the current creep deformation amount and strain amount.
[0112] Next, the flow of calculation of the future creep deformation amount and the future strain amount in the future deformation amount calculation unit 72 will be described with reference to FIG.
[0113] 7, the flow of calculations in the future deformation amount calculation unit 72 is basically the same as the flow of calculations in the fixed-period deformation amount calculation unit 71. That is, the processing in steps S12 to S14 in the calculations in the future deformation amount calculation unit 72 is basically the same as the processing in steps S3 to S5 in the calculations in the fixed-period deformation amount calculation unit 71. Therefore, the processing in steps S10 and S11 in the calculations in the future deformation amount calculation unit 72 will be mainly described here.
[0114] 7, the future deformation amount calculation unit 72 reads out future operating conditions from the input information storage unit 61 (step S10). When executing step S10, the future deformation amount calculation unit 72 reads out a program for calculating the future creep deformation amount and the future strain amount from the program storage unit 63, an arithmetic expression and parameters for calculating the future creep deformation amount and the future strain amount, and design information of the nozzle to be managed from the input information storage unit 61.
[0115] The future deformation calculation unit 72 also reads out from the input information storage unit 61 the steam temperature information and steam pressure information at the inlet of the high-pressure turbine 11, the steam pressure information relating to the nozzle inlet pressure and nozzle outlet pressure of the nozzle to be managed in the high-pressure turbine 11, the steam temperature information relating to the nozzle inlet temperature of the nozzle to be managed in the high-pressure turbine 11, and the electrical output information relating to the electrical output of the generator 15, which are preset corresponding to the categorized loads based on the future operating conditions (step S10). The steam temperature information, steam pressure information, and electrical output information read out from the input information storage unit 61 are treated in the same manner as the steam temperature information and steam pressure information at the inlet of the high-pressure turbine 11, the steam pressure information relating to the rotor blade outlet pressure or nozzle inlet pressure at the first turbine stage of the high-pressure turbine 11, and the electrical output information relating to the electrical output of the generator 15, which are read out from the measurement data storage unit 62 in the calculation of the fixed periodic deformation calculation unit 71 described above.
[0116] Next, the future deformation amount calculation unit 72 calculates the operating environment state quantities of the managed nozzle based on the steam temperature information, steam pressure information, and electrical output information in the same manner as the calculation by the fixed period deformation amount calculation unit 71 (step S11).
[0117] Then, the future deformation amount calculation unit 72 executes the processes from step S12 to step S14 to calculate the creep deformation amount D that will progress during the operation time of the steam turbine plant (from the present to a predetermined future day). When calculating the creep deformation amount D in step S13, the creep deformation rate V is integrated by the operation time from the present to a predetermined future day.
[0118] The future deformation amount calculation unit 72 calculates the future creep deformation amount at a predetermined future date by adding the most recent past creep deformation amount calculated by the periodic deformation amount calculation unit 71 to the calculated creep deformation amount D progressing from the present to a predetermined future date. In this way, the future creep deformation amount reflecting the future operation of the high-pressure turbine 11 is obtained.
[0119] The future deformation calculation unit 72 outputs the calculation results to the calculation result storage unit 64. The calculation results of the future creep deformation and future strain in the future deformation calculation unit 72 are obtained for each year period set as the future operating conditions. That is, the calculation results in the future deformation calculation unit 72 are obtained on an annual basis.
[0120] (Calculation of recommended replacement timing, recommended inspection timing, recommended preparation timing and preparation threshold) Here, a method for calculating the recommended replacement timing, the recommended inspection timing, the recommended preparation timing, and the preparation threshold value will be described.
[0121] As described above, the recommended replacement timing includes recommended replacement timing A and recommended replacement timing B, and the recommended inspection timing includes recommended inspection timing A and recommended inspection timing B. The recommended replacement timing and the recommended inspection timing are basically calculated using the same method, so here, a calculation method for the recommended replacement timing A will be described as an example.
[0122] Here, a case will be described as an example in which the recommended preparation time is calculated based on the recommended replacement time A. Also, a case will be described as an example in which the preparation period is set to three years.
[0123] 8 and 9 are diagrams for explaining a method of calculating the recommended replacement time A, the recommended preparation time, and the preparation threshold value in the future deformation amount calculation unit 72 of the nozzle deformation amount management device 18 of the first embodiment. In Fig. 8 and Fig. 9, the horizontal axis indicates time (year), and the vertical axis indicates the creep deformation amount. Note that here, the expected date in the year on the horizontal axis is January 1st.
[0124] Here, the creep deformation is shown as a creep deformation ratio. The creep deformation ratio is the creep deformation ratio when the creep deformation at the exchange threshold A is set to 1. When the creep deformation ratio is smaller than 1, the creep deformation is below the exchange threshold A. When the creep deformation ratio is larger than 1, the creep deformation exceeds the exchange threshold A.
[0125] First, with reference to FIG. 8, a case where the preparation threshold is reached in the future will be described.
[0126] As shown in FIG. 8, the creep deformation ratio in 2032 is smaller than 1.0, and the creep deformation ratio in 2033 is larger than 1.0. Therefore, the creep deformation ratio reaches the replacement threshold value A of 1.0 between 2032 and 2033. In other words, the recommended replacement time A is between 2032 and 2033.
[0127] The future deformation amount calculation unit 72 expresses the relationship between time and the creep deformation amount ratio as a linear function between the years 2032 and 2033. Then, the future deformation amount calculation unit 72 calculates the date when the creep deformation amount ratio will be 1.0.
[0128] In the example shown in Fig. 8, the creep deformation ratio in 2032 is 0.95, and the creep deformation ratio in 2033 is 1.05. The future deformation calculation unit 72 calculates the recommended replacement time A at which the creep deformation ratio becomes 1.0 based on a linear function. In the example shown in Fig. 8, the calculation results in the recommended replacement time A being July 1, 2032.
[0129] Next, the future deformation amount calculation unit 72 calculates the recommended preparation time based on the recommended replacement time A and the preparation period. If the preparation period is three years, the recommended preparation time is July 1, 2029, three years before the recommended replacement time A.
[0130] Next, the future deformation calculation unit 72 expresses the relationship between time and the creep deformation ratio as a linear function between 2029 and 2030. Then, the future deformation calculation unit 72 calculates the creep deformation ratio on July 1, 2029. In the example shown in FIG. 8, the calculation results in the creep deformation ratio on July 1, 2029 being 0.75. From this result, the preparation threshold value, which is the creep deformation ratio at the recommended preparation period, is 0.75.
[0131] Then, the future deformation amount calculation unit 72 outputs the calculation results of the recommended replacement time A, the recommended preparation time, and the preparation threshold value described above to the calculation result storage unit 64. The calculation result storage unit 64 receives and stores the calculation results of the recommended replacement time A, the recommended preparation time, and the preparation threshold value.
[0132] Next, with reference to FIG. 9, a case where the preparation threshold is reached in the past will be described.
[0133] As shown in Fig. 9, the creep deformation ratio will reach 1.0 between 2032 and 2033. In other words, the recommended replacement time A is between 2032 and 2033. Therefore, the recommended preparation time is in the past than the present (2031).
[0134] As shown in Figure 9, in the same manner as explained with reference to Figure 8, the future deformation calculation unit 72 expresses the relationship between time and the creep deformation ratio as a linear function between the years 2032 and 2033 to calculate the date when the creep deformation ratio will be 1.0.
[0135] In the example shown in Fig. 9, the creep deformation ratio in 2032 is 0.95, and the creep deformation ratio in 2033 is 1.05. In the example shown in Fig. 9, the calculation results in July 1, 2032 being the recommended replacement time A.
[0136] Next, the future deformation amount calculation unit 72 calculates the recommended preparation time based on the recommended replacement time A and the preparation period. If the preparation period is three years, the recommended preparation time is July 1, 2029, three years before the recommended replacement time A.
[0137] Next, the future deformation amount calculation unit 72 reads out the creep deformation amount on July 1, 2029 from the calculation result storage unit 64, and calculates the creep deformation amount ratio. This calculated creep deformation amount ratio is the preparation threshold value.
[0138] Here, the creep deformation amount on July 1, 2029 is a result calculated by the fixed-period deformation amount calculation unit 71. Therefore, the calculation result storage unit 64 stores a plurality of data items every hour as the calculation result for this day. Therefore, as the creep deformation amount on July 1, 2029, the future deformation amount calculation unit 72 refers to, for example, the maximum creep deformation amount among the creep deformation amount data on July 1, 2029.
[0139] Then, the future deformation amount calculation unit 72 outputs the calculation results of the recommended replacement time A, the recommended preparation time, and the preparation threshold value described above to the calculation result storage unit 64. The calculation result storage unit 64 receives and stores the calculation results of the recommended replacement time A, the recommended preparation time, and the preparation threshold value.
[0140] Here, if the calculation of the future creep deformation amount results in the creep deformation amount ratio not reaching 1.0 within the specified future calculation period, the recommended replacement time A, the recommended preparation time, and the preparation threshold value cannot be obtained.
[0141] (Nozzle deformation amount control device 18 at the time of introduction) First, the state of the nozzle deformation amount management device 18 at the time of installation will be described.
[0142] When the nozzle deformation amount management device 18 is introduced, the display information storage unit 66 stores display information on the past creep deformation amount and the future creep deformation amount, and display information on the past strain amount and the future strain amount as of the introduction date. In other words, the nozzle deformation amount management device 18 at the time of introduction is in a state where it can display the past creep deformation amount, the future creep deformation amount, the past strain amount, and the future strain amount as of the introduction date on the display unit of the user interface 50.
[0143] The display information memory unit 66 stores display information as of the introduction date generated by the display information generation unit 73 based on the calculation results calculated by the fixed-period deformation amount calculation unit 71 and the future deformation amount calculation unit 72 stored in the calculation result memory unit 64, and information related to the template screen stored in the template memory unit 65.
[0144] The manufacturer processes the nozzle deformation amount control device 18 so that the nozzle deformation amount control device 18 is in the above-mentioned state on the day of introduction.
[0145] Here, FIG. 10 is a diagram showing an example of a display screen 100 on which display information is displayed as of the date of introduction of the nozzle deformation amount management device 18 according to the first embodiment.
[0146] As shown in FIG. 10, the display screen 100 displays the past creep deformation amount, future creep deformation amount, past strain amount, and future strain amount in the nozzles of the second to fourth turbine stages of the high-pressure turbine 11 and the nozzle of the second turbine stage of the intermediate-pressure turbine 13 in a chronological order. Note that here, the turbine type and turbine stage are displayed via lead lines in the graph 101 due to the display relationship of the lines, but this display method is not limited to this. The lines showing the results in the graph 101 may be displayed in different colors for each turbine type and turbine stage. In this case, an index for each color of the line is displayed on the display screen 100. Also, the readiness threshold is displayed via lead lines in the graph 101, but an index for the line showing the readiness threshold may be displayed.
[0147] In the graph 101 showing the results of the creep deformation amount and the strain amount, the horizontal axis shows time (year, month, and date), and the vertical axis shows the creep deformation amount ratio and the strain amount ratio. In this case, January 1, 2024 is set as the present. Here, the creep deformation amount is shown as the creep deformation amount ratio, and the strain amount is shown as the strain amount ratio. In the display screen 100, the creep deformation amount ratio is the creep deformation amount ratio when the creep deformation amount of the inspection threshold A is set to 1. Also, the strain amount ratio is the strain amount ratio when the strain amount of the inspection threshold B is set to 1.
[0148] 10 shows a time axis from January 1, 2014 to January 1, 2034. The range of this time axis is set by selecting a setting value in the time axis setting section 102 of the display screen 100. Here, an example is shown in which 5 years, 10 years, 15 years, and 20 years are set as the setting values in the time axis setting section 102. Note that 10 years is selected in FIG. 10.
[0149] The time axis shows a set value of the past from the present and a set value of the future from the present. For example, when 10 years is selected as the set value as shown in Fig. 10, the time range of the past 10 years from the present (January 1, 2024) to January 1, 2014 and the time range of the future 10 years from the present (January 1, 2024) to January 1, 2034 are displayed as the time axis.
[0150] In this way, the user can arbitrarily change the range of the time axis by selecting the setting value in the time axis setting section 102 .
[0151] In addition, in Fig. 10, the calculation results for the creep deformation and strain are shown from January 1, 2016 to January 1, 2032. In this case, the creep deformation ratio and strain ratio from January 1, 2016 to January 1, 2024 are creep deformation ratios and strain ratios based on past creep deformation and past strain, and the creep deformation ratio and strain ratio from January 1, 2024 to January 1, 2032 are creep deformation ratios and strain ratios based on future creep deformation and future strain.
[0152] Here, the creep deformation ratio and strain ratio as of January 1, 2016 are shown based on the regular inspection results input from the input screen 90 shown in Fig. 5. In the graph 101 on the display screen 100, the creep deformation ratio and strain ratio based on the regular inspection results are shown with black circles. Note that even if there are calculation results from before the latest regular inspection, for example, the display screen 100 shows the calculation results from the latest regular inspection onwards, and does not show the calculation results from before the latest regular inspection.
[0153] Furthermore, on the display screen 100, the replacement threshold A is shown as "Threshold 1," the replacement threshold B is shown as "Threshold 2," the inspection threshold A is shown as "Threshold 3," and the inspection threshold B is shown as "Threshold 4." Note that on the display screen 100, the preparation threshold is also shown.
[0154] In addition, since replacement threshold A, replacement threshold B, inspection threshold A and inspection threshold B are default values stored in the input information memory unit 61 as initial values, “Threshold 1” to “Threshold 4” are always displayed on the display screen 100.
[0155] An alarm display 103 is displayed on the display screen 100. The alarm display 103 is displayed when the creep deformation amount exceeds the replacement threshold A or the inspection threshold A, and when the strain amount exceeds the replacement threshold B or the inspection threshold B. If these conditions are not met, the alarm display 103 is not displayed on the display screen 100.
[0156] The alarm display 103 may display, for example, the recommended replacement timing based on which of the replacement thresholds A and B is reached first. The alarm display 103 may display, for example, the recommended inspection timing based on which of the inspection thresholds A and B is reached first. The alarm display 103 may also display the recommended preparation timing. As an example shown in FIG. 10, the date from the present until each recommended timing may also be displayed.
[0157] 10, the display screen 100 of the user interface 50 displays the past and future creep deformation amounts and the past and future strain amounts over time in a single graph 101. In addition, the display screen 100 displays the recommended replacement time A or B, the recommended inspection time A or B, and the recommended preparation period.
[0158] (Periodic deformation calculation processing) Next, a calculation process of the past creep deformation amount and the past strain amount in the nozzle deformation amount management device 18 of the first embodiment will be described.
[0159] FIG. 11 is a flowchart for explaining a method for calculating the past creep deformation amount and the past strain amount in the nozzle deformation amount management device 18 of the first embodiment.
[0160] The periodic deformation amount calculation unit 71 executes calculation processing for each of the nozzles to be managed. The calculation processing method is the same for all of the nozzles.
[0161] Here, the fixed-period deformation amount calculation process for a nozzle in a specified turbine stage of the high-pressure turbine 11 will be explained as an example, but a similar calculation process is also performed for the fixed-period deformation amount calculation process for a nozzle of the intermediate-pressure turbine 13.
[0162] 11, the fixed-period deformation amount calculation unit 71 determines whether the steam turbine equipment 1 is operating or not (step S20) based on, for example, information stored in the measurement data storage unit 62. The fixed-period deformation amount calculation unit 71 determines whether the steam turbine equipment 1 is operating or not based on, for example, steam temperature information, steam pressure information, and electrical output information.
[0163] When it is determined in step S20 that the steam turbine equipment 1 is not operating (No in step S20), the fixed periodic deformation amount calculation process ends.
[0164] When it is determined in step S20 that the steam turbine equipment 1 is operating (Yes in step S20), the fixed periodic deformation amount calculation unit 71 reads out from the program storage unit 63 a program for executing calculation of the past creep deformation amount and the past strain amount, an arithmetic expression and parameters for calculating the past creep deformation amount and the past strain amount, design information of the nozzle to be managed from the input information storage unit 61, and measurement data information stored in the measurement data storage unit 62 (step S21). The measurement data information is steam temperature information and steam pressure information at the inlet of the high-pressure turbine 11, steam pressure information related to the rotor blade outlet pressure or the nozzle inlet pressure at the first turbine stage of the high-pressure turbine 11, and electrical output information related to the electrical output of the generator 15.
[0165] Next, the fixed period deformation amount calculation unit 71 calculates the past creep deformation amount and the past strain amount by the calculation method described with reference to Fig. 6, and outputs the calculation results to the calculation result storage unit 64 (step S22). The calculation result storage unit 64 stores the calculation results.
[0166] The display information generating unit 73 generates display information based on the calculation results stored in the calculation result storage unit 64 and the information stored in the template storage unit 65 (step S23). Then, the display information generating unit 73 outputs the generated display information to the display information storage unit 66 and the user interface 50. The display information storage unit 66 stores the display information.
[0167] The user interface 50 displays the display information output from the display information generating unit 73 on the display unit as shown in FIG. 10 (step S24).
[0168] Here, the display information generating unit 73 outputs display information based on the calculation results to the display information storage unit 66 and the user interface 50 every hour. Therefore, the graph 101 showing the calculation results related to the past creep deformation amount and the past strain amount displayed on the display unit is updated every hour. For example, after calculating the past creep deformation amount and the past strain amount, the fixed-period deformation amount calculating unit 71 repeats the processes of steps S20 to S24 every hour.
[0169] After the process of step S22, the fixed periodic deformation amount calculation unit 71 also refers to the calculation result storage unit 64 to determine whether or not a preparation threshold value has been stored (step S25).
[0170] Here, for example, in the calculation of the future creep deformation amount and the future strain amount as of the introduction date of the nozzle deformation amount management device 18, if the future creep deformation amount reaches the replacement threshold A or the future strain amount reaches the replacement threshold B within the future calculation designated period, the preparation threshold is stored in the calculation result storage unit 64. Also, in the calculation after the introduction of the nozzle deformation amount management device 18, if the future creep deformation amount reaches the replacement threshold A or the future strain amount reaches the replacement threshold B within the future calculation designated period, the preparation threshold is stored in the calculation result storage unit 64.
[0171] On the other hand, in the calculation of the future creep deformation amount and the future strain amount as of the introduction date of the nozzle deformation amount management device 18, if the future creep deformation amount does not reach the replacement threshold A or the future strain amount does not reach the replacement threshold B within the future calculation designated period, no preparation threshold is stored in the calculation result storage unit 64. Also, in the calculation after the introduction of the nozzle deformation amount management device 18, if the future creep deformation amount does not reach the replacement threshold A or the future strain amount does not reach the replacement threshold B within the future calculation designated period, no preparation threshold is stored in the calculation result storage unit 64.
[0172] If it is determined in step S25 that the preparation threshold value has not been stored (No in step S25), the periodic deformation amount calculation unit 71 determines whether the past creep deformation amount has reached the inspection threshold value A or the past strain amount has reached the inspection threshold value B based on the calculation result of step S22 (step S26).
[0173] In the determination of step S26, when it is determined that the inspection threshold A or the inspection threshold B has not been reached (No in step S26), the periodic deformation amount calculation unit 71 executes the process of step S25 again.
[0174] In the judgment of step S26, when it is judged that the inspection threshold A or the inspection threshold B has been reached (Yes in step S26), the periodic deformation amount calculation unit 71 outputs information on the date when the inspection threshold A or the inspection threshold B was reached (information on the recommended inspection timing) to the calculation result storage unit 64. The calculation result storage unit 64 stores this information.
[0175] The display information generating unit 73 generates display information based on the calculation results stored in the calculation result storage unit 64 and the information stored in the template storage unit 65 (step S27). Then, the display information generating unit 73 outputs the generated display information to the display information storage unit 66 and the user interface 50. The display information storage unit 66 stores the display information.
[0176] The user interface 50 updates the display screen based on the display information output from the display information generating unit 73 (step S28). With this update, information on the recommended inspection time is displayed on the alarm display 103 shown in Fig. 10. After executing step S28, the periodic deformation amount calculating unit 71 executes the process of step S25 again.
[0177] If it is determined in step S25 that the preparation threshold value has been stored (Yes in step S25), the periodic deformation amount calculation unit 71 determines whether the past creep deformation amount or the past strain amount has reached the preparation threshold value based on the calculation result of step S22 (step S29).
[0178] Here, when the past creep deformation amount or past strain amount reaches the preparation threshold value, this means that the past creep deformation amount or past strain amount reaches the preparation threshold value based on the future prediction calculated by the future deformation amount calculation unit 72.
[0179] When it is determined in step S29 that the past creep deformation amount or the past strain amount has not reached the preparation threshold value (No in step S29), the periodic deformation amount calculation unit 71 executes the above-mentioned processes in and after step S26.
[0180] If it is determined in step S29 that the past creep deformation amount or the past strain amount has reached the preparation threshold value (Yes in step S29), the periodic deformation amount calculation unit 71 determines whether the past creep deformation amount has reached the replacement threshold value A or the past strain amount has reached the replacement threshold value B (step S30).
[0181] If it is determined in step S30 that the replacement threshold A or replacement threshold B has not been reached (No in step S30), the periodic deformation amount calculation unit 71 determines whether the past creep deformation amount has reached the inspection threshold A or the past strain amount has reached the inspection threshold B (step S31).
[0182] In the judgment of step S31, when it is judged that the inspection threshold A or the inspection threshold B has not been reached (No in step S31), the fixed period deformation amount calculation unit 71 outputs information on the date when the preparation threshold was reached (information on the recommended preparation timing) to the calculation result storage unit 64. The calculation result storage unit 64 stores this information.
[0183] The display information generating unit 73 generates display information based on the calculation results stored in the calculation result storage unit 64 and the information stored in the template storage unit 65 (step S32). Then, the display information generating unit 73 outputs the generated display information to the display information storage unit 66 and the user interface 50. The display information storage unit 66 stores the display information.
[0184] The user interface 50 updates the display screen based on the display information output from the display information generating unit 73 (step S33). With this update, information on the recommended preparation time is displayed on the alarm display 103 shown in Fig. 10. After executing step S33, the periodic deformation amount calculating unit 71 executes the process of step S25 again.
[0185] When it is determined in step S31 that the inspection threshold A or the inspection threshold B has been reached (Yes in step S31), the periodic deformation amount calculation unit 71 outputs information relating to the date on which the inspection threshold A or the inspection threshold B and the preparation threshold were reached (information relating to the recommended inspection timing A or the recommended inspection timing B and the recommended preparation timing) to the calculation result storage unit 64. The calculation result storage unit 64 stores this information.
[0186] The display information generating unit 73 generates display information based on the calculation results stored in the calculation result storage unit 64 and the information stored in the template storage unit 65 (step S34). Then, the display information generating unit 73 outputs the generated display information to the display information storage unit 66 and the user interface 50. The display information storage unit 66 stores the display information.
[0187] The user interface 50 updates the display screen based on the display information output from the display information generating unit 73 (step S35). With this update, the information on the recommended inspection time A or the recommended inspection time B, and the recommended preparation time is displayed on the alarm display 103 shown in Fig. 10. After executing step S35, the periodic deformation amount calculating unit 71 executes the process of step S25 again.
[0188] When it is determined in step S30 that replacement threshold A or replacement threshold B has been reached (Yes in step S30), the periodic deformation amount calculation unit 71 outputs information relating to the date when replacement threshold A or replacement threshold B, inspection threshold A or inspection threshold B, and preparation threshold were reached (information relating to recommended replacement time A or recommended replacement time B, recommended inspection time A or recommended inspection time B, and recommended preparation time) to the calculation result storage unit 64. The calculation result storage unit 64 stores this information.
[0189] The display information generating unit 73 generates display information based on the calculation results stored in the calculation result storage unit 64 and the information stored in the template storage unit 65 (step S36). Then, the display information generating unit 73 outputs the generated display information to the display information storage unit 66 and the user interface 50. The display information storage unit 66 stores the display information.
[0190] The user interface 50 updates the display screen based on the display information output from the display information generating unit 73 (step S37). With this update, the alarm display 103 shown in Fig. 10 displays information on the recommended replacement time A or the recommended replacement time B, the recommended inspection time A or the recommended inspection time B, and the recommended preparation time.
[0191] Here, the calculation in the periodic deformation amount calculation unit 71 is performed, for example, every hour. Therefore, the information on the past creep deformation amount and the past strain amount on the display screen 100 is updated every hour. Note that, when the time range on the horizontal axis is the same, the information on the past creep deformation amount and the past strain amount on the graph 101 in Fig. 10 increases with the passage of time.
[0192] By the periodic deformation amount calculation process described above, information on the past creep deformation amount and the past strain amount is updated on the display screen 100 shown in Fig. 10. Furthermore, when the past creep deformation amount and the past strain amount have reached their respective set threshold values, the information on the alarm display 103 is updated.
[0193] (Future deformation calculation process) Next, a calculation process of the future creep deformation amount and the future strain amount in the nozzle deformation amount management device 18 of the first embodiment will be described.
[0194] FIG. 12 is a flowchart for explaining a calculation processing method for the future creep deformation amount and the future strain amount in the nozzle deformation amount management device 18 of the first embodiment.
[0195] The future deformation amount calculation unit 72 executes calculation processing for each of the nozzles to be managed. The calculation processing method is the same for all of the nozzles.
[0196] Here, the fixed-period deformation amount calculation process for a nozzle in a specified turbine stage of the high-pressure turbine 11 will be explained as an example, but a similar calculation process is also performed for the fixed-period deformation amount calculation process for a nozzle of the intermediate-pressure turbine 13.
[0197] Here, the future operating conditions shown in Fig. 4 are initially set on the day of installation of the nozzle deformation amount management device 18. After installation, the user inputs the future operating conditions on an annual basis from the input screen 80 shown in Fig. 4 in the user interface 50.
[0198] For example, by pressing a selection button 105 of the selection display unit 104 on the display screen 100 shown in Fig. 10, a selection item of an input screen 80 for future operating conditions is displayed on the selection display unit 104, although this is not shown in the figure. When a selection item of the input screen 80 is selected on the selection display unit 104, the screen of the display unit of the user interface 50 switches to the input screen 80 for future operating conditions shown in Fig. 4. At this time, the display information generating unit 73 inputs information related to the selection of the input screen 80 from the user interface 50, and outputs display information for displaying the input screen 80 on the user interface 50.
[0199] After inputting the future driving conditions, the user presses the Save button 87 in Fig. 4. The user interface 50 receives the input from the Save button 87 and outputs information related to the future driving conditions to the input information storage unit 61. The input information storage unit 61 stores the information related to the future driving conditions. Note that the Back button 88 on the input screen 80 is a button to be pressed when returning to the display screen 100 without pressing the Save button 87.
[0200] Furthermore, the future deformation calculation unit 72 receives information from the user interface 50 in response to pressing of the Save button 87, and determines that future operating conditions have been input.
[0201] As shown in FIG. 12, the future deformation amount calculation unit 72 determines whether or not a future operating condition has been input (step S40).
[0202] When it is determined in step S40 that the future operating conditions have not been input (No in step S40), the future deformation amount calculation unit 72 executes the process of step S40 again.
[0203] If it is determined in step S40 that future operating conditions have been input (Yes in step S40), the future deformation calculation unit 72 reads out from the program memory unit 63 a program for calculating the future creep deformation and future strain, an arithmetic formula and parameters for calculating the future creep deformation and future strain, from the input information memory unit 61 design information for the nozzle to be managed, and the future operating conditions stored in the input information memory unit 61 (step S41).
[0204] Next, the future deformation amount calculation unit 72 refers to the future driving conditions and determines whether or not a detailed driving mode setting is present (step S42).
[0205] In the determination in step S42, when it is determined that the detailed operation mode setting is present (Yes in step S42), the operation time and the availability rate for each load category under the future operating conditions are read out (step S43).
[0206] Next, after the process of step S43, or if it is determined in the determination of step S42 that the detailed operation mode is not set (No in step S42), the future deformation amount calculation unit 72 calculates the future creep deformation amount and the future strain amount by the calculation method described with reference to Fig. 7, and outputs the calculation results to the calculation result storage unit 64 (step S44). The calculation result storage unit 64 stores the calculation results.
[0207] The display information generating unit 73 generates display information based on the calculation results stored in the calculation result storage unit 64 and the information stored in the template storage unit 65 (step S45). Then, the display information generating unit 73 outputs the generated display information to the display information storage unit 66 and the user interface 50. The display information storage unit 66 stores the display information.
[0208] The user interface 50 displays the display information output from the display information generating unit 73 on the display unit as shown in FIG. 9 (step S46).
[0209] Here, the display information generating unit 73 outputs display information based on the calculation results to the display information storage unit 66 and the user interface 50 every time the calculation process is executed in the future deformation amount calculation unit 72. Therefore, the graph 101 showing the calculation results related to the future creep deformation amount and the future strain amount displayed on the display unit is updated every time the calculation process is executed in the future deformation amount calculation unit 72. In other words, the graph 101 showing the calculation results related to the future creep deformation amount and the future strain amount is updated every time information is received in response to pressing the Save button 87 on the input screen 80 for future operating conditions.
[0210] After the process of step S44, the future deformation calculation unit 72 determines whether the future creep deformation amount has reached the replacement threshold A or the future strain amount has reached the replacement threshold B based on the calculation result of step S44 (step S47).
[0211] If it is determined in step S47 that the replacement threshold A or replacement threshold B has not been reached (No in step S47), the future deformation calculation unit 72 determines whether the future creep deformation has reached the inspection threshold A or the future strain has reached the inspection threshold B (step S48).
[0212] When it is determined in step S48 that the inspection threshold A or the inspection threshold B has not been reached (No in step S48), the future deformation amount calculation unit 72 outputs information about the recommended replacement time A or the recommended replacement time B, and the recommended inspection time A or the recommended inspection time B to the calculation result storage unit 64. That is, the future deformation amount calculation unit 72 outputs information about the absence of the recommended replacement time A or the recommended replacement time B, and the recommended inspection time A or the recommended inspection time B to the calculation result storage unit 64. Here, when the recommended replacement time A or the recommended replacement time B, and the recommended inspection time A or the recommended inspection time B have already been stored in the calculation result storage unit 64, the calculation result storage unit 64 updates the information to the newly input information about the absence of the recommended replacement time A or the recommended replacement time B, and the recommended inspection time A or the recommended inspection time B, and stores the information.
[0213] The display information generating unit 73 generates display information based on the calculation results stored in the calculation result storage unit 64 and the information stored in the template storage unit 65 (step S52). The display information generating unit 73 generates display information in which the alarm display 103 is deleted from the display screen 100 shown in Fig. 10. The display information generating unit 73 also generates display information in which the line indicating the preparation threshold value (the dashed line in Fig. 10) is deleted from the graph 101 on the display screen 100 shown in Fig. 10.
[0214] Then, the display information generating unit 73 outputs the generated display information to the display information storage unit 66 and the user interface 50. The display information storage unit 66 stores the display information.
[0215] The user interface 50 updates the display screen based on the display information output from the display information generating unit 73 (step S53). By this update, the alarm display 103 is deleted from the display screen 100. Furthermore, the line indicating the preparation threshold value (the dashed line in FIG. 10) is deleted from the graph 101.
[0216] If it is determined in step S48 that the inspection threshold A or the inspection threshold B has been reached (Yes in step S48), the future deformation amount calculation unit 72 calculates the recommended inspection time by the method described with reference to Figs. 8 and 9, and outputs the result to the calculation result storage unit 64 (step S49). The calculation result storage unit 64 stores the recommended inspection time. In addition, the future deformation amount calculation unit 72 outputs information that there is no recommended replacement time A or recommended replacement time B to the calculation result storage unit 64.
[0217] The display information generating unit 73 generates display information based on the calculation results stored in the calculation result storage unit 64 and the information stored in the template storage unit 65 (step S50). The display information generating unit 73 generates display information for displaying the recommended inspection time A or the recommended inspection time B in the alarm display 103 on the display screen 100 shown in Fig. 10 and deleting the recommended replacement time A or the recommended replacement time B. The display information generating unit 73 also generates display information for deleting the line indicating the preparation threshold value (the dashed line in Fig. 10) from the graph 101.
[0218] Then, the display information generating unit 73 outputs the generated display information to the display information storage unit 66 and the user interface 50. The display information storage unit 66 stores the display information.
[0219] The user interface 50 updates the display screen based on the display information output from the display information generating unit 73 (step S51). By this update, an alarm display 103 including the recommended inspection time A or the recommended inspection time B based on the current calculation result is displayed on the display screen 100. Note that the graph 101 does not show a line indicating the preparation threshold.
[0220] When it is determined in step S47 that replacement threshold A or replacement threshold B has been reached (Yes in step S47), the future deformation amount calculation unit 72 calculates the recommended replacement time A or replacement time B and the recommended inspection time A or inspection time B by the method described with reference to Figs. 8 and 9, calculates the recommended preparation time and the preparation threshold, and outputs the results to the calculation result storage unit 64 (step S54). The calculation result storage unit 64 stores the recommended replacement time A or replacement time B, the recommended inspection time A or inspection time B, the recommended preparation time, and the preparation threshold. Note that when the calculation result reaches replacement threshold A or replacement threshold B, the calculation result indicates that the inspection threshold A or inspection threshold B has been reached.
[0221] The display information generating unit 73 generates display information based on the calculation results stored in the calculation result storage unit 64 and the information stored in the template storage unit 65 (step S55). The display information generating unit 73 generates display information for displaying the recommended replacement time A or the recommended replacement time B, the recommended inspection time A or the recommended inspection time B, and the recommended preparation time in the alarm display 103 on the display screen 100 shown in Fig. 10. The display information generating unit 73 also generates display information for displaying a preparation threshold line (the dashed line in Fig. 10) in the graph 101.
[0222] Then, the display information generating unit 73 outputs the generated display information to the display information storage unit 66 and the user interface 50. The display information storage unit 66 stores the display information.
[0223] The user interface 50 updates the display screen based on the display information output from the display information generating unit 73 (step S56). With this update, an alarm display 103 including recommended replacement time A or recommended replacement time B, recommended inspection time A or recommended inspection time B, and recommended preparation time based on the current calculation result is displayed on the display screen 100. Note that the graph 101 shows a line (dashed line in FIG. 10) indicating the preparation threshold based on the current calculation result.
[0224] The calculation results in the above-mentioned future deformation amount calculation unit 72 are obtained for each one-year period set as the future operating conditions. That is, the calculation results in the future deformation amount calculation unit 72 are obtained on an annual basis.
[0225] In the future deformation calculation process, the processes of steps S41 to S56 are repeated every time information is received in response to pressing the Save button 87 on the future operating condition input screen 80. The information on the future creep deformation and future strain on the display screen 100 is updated every time information is received in response to pressing the Save button 87 on the future operating condition input screen 80.
[0226] The above-mentioned future deformation amount calculation process updates information on the future creep deformation amount and future strain amount on the display screen 100 shown in Fig. 10. Information on the future creep deformation amount and future strain amount shown in graph 101, for example, changes depending on the future operating conditions. In addition, the recommended replacement time A, the recommended replacement time B, the recommended inspection time A, the recommended inspection time B, the recommended preparation time, and the preparation threshold value also change depending on the future operating conditions.
[0227] According to the nozzle deformation amount management device 18 of the first embodiment described above, the past creep deformation amount and past strain amount from the past to the present predicted based on the operating data of the actual machine, and the future creep deformation amount and future strain amount predicted based on the assumed operating conditions in the future can be displayed in chronological order in a graph 101 on the display section of the user interface 50. This allows the user to visually confirm the change over time in the creep deformation amount and strain amount.
[0228] Here, if creep deformation in the nozzle progresses, there is a risk of contact with the rotor blade rotating downstream of the nozzle. The factors (risk factors) of this contact risk differ depending on the turbine stage. For example, the creep deformation amount has a greater impact as a risk factor on small-sized nozzles (nozzles with low blade height) than on large-sized nozzles (nozzles with high blade height). Therefore, by dividing the creep deformation amount by the nozzle height to obtain a dimensionless strain amount as one of the managed deformation amounts, it is possible to provide a managed deformation amount that includes the element of nozzle size. Here, in small-sized nozzles, the strain amount increases faster over time than the creep deformation amount. On the other hand, in large-sized nozzles, the creep deformation amount increases faster over time than the strain amount.
[0229] In the nozzle deformation amount management device 18, by setting the creep deformation amount and the strain amount as the managed deformation amount, it is possible to execute nozzle deformation amount management taking into consideration the element of the nozzle size. As a result, for example, the alarm display 103 can indicate the recommended replacement timing based on which of the replacement threshold A and the replacement threshold B is reached first. Also, for example, the alarm display 103 can indicate the recommended inspection timing based on which of the inspection threshold A and the inspection threshold B is reached first. Then, in the nozzle deformation amount management device 18, management can be performed to avoid the risk of contact with the moving blade due to the creep deformation of the nozzle.
[0230] Furthermore, in the nozzle deformation amount management device 18, it is possible to display lines of replacement threshold A, replacement threshold B, inspection threshold A, inspection threshold B, and preparation threshold on the graph 101 on the display screen 100. This allows the user to visually confirm the recommended replacement time A, recommended replacement time B, recommended inspection time A, recommended inspection time B, and recommended preparation time.
[0231] Furthermore, in the nozzle deformation amount management device 18, the recommended replacement time A, the recommended replacement time B, the recommended inspection time A, the recommended inspection time B, and the recommended preparation time can be displayed as an alarm display 103 on the display screen 100. This allows the user to specifically recognize these times. And by specifically recognizing the recommended preparation time, the user can appropriately request the production of a replacement nozzle.
[0232] The nozzle deformation amount management device 18 can display the calculation results based on the operating conditions input on the input screen 80 for the future operating conditions. Therefore, by changing the operating conditions on the input screen 80 for the future operating conditions, the user can visually check the difference in the calculation results due to the operating conditions in the graph 101 on the display screen 100.
[0233] (Second embodiment) In the second embodiment, another example of information relating to the future creep deformation amount and the future strain amount displayed on the display unit of the user interface 50 will be described.
[0234] Figures 13 and 14 are flowcharts for explaining a future deformation amount calculation processing method in the nozzle deformation amount management device 18 of the second embodiment. Since the flowchart cannot be shown in one figure due to the configuration of the drawings, a flowchart following No of step S40 in Figure 13 is shown in Figure 14. Figure 15 is a diagram showing an example of a display screen 100A in the nozzle deformation amount management device 18 of the second embodiment. In the second embodiment, components that are the same as those in the nozzle deformation amount management device 18 of the first embodiment are given the same reference numerals, and duplicated explanations are omitted or simplified.
[0235] The second embodiment differs from the nozzle deformation amount management device 18 in the first embodiment in that the display screen 100A showing the calculation results can simultaneously display calculation results under other future operating conditions. This difference will be mainly described here. The periodic deformation amount calculation process in the second embodiment is similar to the periodic deformation amount calculation process in the first embodiment.
[0236] In the future deformation amount calculation process in the second embodiment shown in FIG. 13 and FIG. 14, steps S60 to S65 are added to the future deformation amount calculation process in the first embodiment.
[0237] Here, after inputting the future driving conditions, the user presses the Save button 87 in Fig. 3. In the future deformation amount calculation process in the second embodiment, similarly to the future deformation amount calculation process in the first embodiment, the user interface 50 receives an input from the Save button 87 and outputs information related to the future driving conditions to the input information storage unit 61. The input information storage unit 61 stores the information related to the future driving conditions.
[0238] Furthermore, the future deformation calculation unit 72 receives information from the user interface 50 in response to pressing of the Save button 87, and determines that future operating conditions have been input.
[0239] As shown in FIG. 13, the future deformation amount calculation unit 72 determines whether or not a future operating condition has been input (step S40).
[0240] When it is determined in step S40 that the future operating conditions have been input (Yes in step S40), the processes from step S41 to step S46 are executed as described above. Then, after the process of step S46, the process of step S40 is executed as described above.
[0241] On the other hand, when it is determined in step S40 that the future driving conditions have not been input (No in step S40), as shown in Fig. 14, the display information generating unit 73 determines whether or not there is a request to display the results of the calculation under other future driving conditions (comparison calculation results) (step S60). The comparison calculation results are calculation results that have already been predicted based on other future driving conditions, and are stored in the calculation result storage unit 64. The other future driving conditions function as second future driving conditions, and the comparison calculation results function as second future deformation amount related information.
[0242] Here, FIG. 16 is a diagram showing an example of a selection screen 110 for selecting the comparison calculation results to be displayed on the user interface 50 in the nozzle deformation amount management device 18 of the second embodiment.
[0243] For example, by pressing a selection button 105 of the selection display section 104 on the display screen 100 shown in Fig. 10, selection items of a selection screen 110 are displayed on the selection display section 104, although this is not shown. Then, when a selection item of the selection screen 110 is selected on the selection display section 104, the screen of the display section of the user interface 50 switches to the selection screen 110 shown in Fig. 16. At this time, the display information generating section 73 inputs information related to the selection of the selection screen 110 from the user interface 50, and outputs display information for displaying the selection screen 110 on the user interface 50.
[0244] 16, a list of already calculated calculation results stored in the calculation result storage unit 64 is displayed in the list display unit 111. Also shown here is an example of the list display unit 111 that also displays the date and time stored in the calculation result storage unit 64. In the list display unit 111, for example, the file names of five calculation results are displayed in order of the most recent date and time stored in the calculation result storage unit 64. Note that the configuration displayed in the list display unit 111 is not limited to this. It is sufficient that the list display unit 111 displays a list of already calculated calculation results.
[0245] Here, Fig. 16 shows an example of a comparison calculation result calculated based on future operating conditions within the past hour. When these comparison calculation results are displayed on the graph 101 of the display screen 100A, the comparison calculation results can be compared in a state where the latest future creep deformation amount and future strain amount are not updated. That is, whichever of these comparison calculation results is displayed on the graph 101, the starting point of the line showing the future creep deformation amount ratio and future strain amount ratio in the comparison calculation result coincides with the starting point of the line showing the latest future creep deformation amount ratio and future strain amount ratio as shown in Fig. 15.
[0246] The comparative calculation result may be a result calculated more than one hour ago. For example, when a comparative calculation result calculated several days ago is selected, the starting points of the lines showing the future creep deformation ratio and future strain ratio in the comparative calculation result will be shifted from the starting points of the lines showing the latest future creep deformation ratio and future strain ratio. Even when the starting points are shifted in this way, the change trends of the lines showing the future creep deformation ratio and future strain ratio in the future can be compared.
[0247] The user selects the file name of the calculation result that the user wishes to display on the display screen 100 shown in Fig. 10 as the comparison calculation result from the list displayed in the list display section 111. Then, the user presses the Load button 112. When the user presses the Load button 112, the screen switches to a display screen 100A showing the calculation result shown in Fig. 15.
[0248] The Back button 114 is a button that is pressed to return to the display screen 100 without pressing the Load button 112 or the Reset button 113.
[0249] The display information generating unit 73 receives a signal based on the pressing of the Load button 112 from the user interface 50, and determines in step S60 that there is a request to display the comparison calculation result.
[0250] When it is determined in step S60 that there is a request to display the comparison calculation result (Yes in step S60), the display information generation unit 73 generates display information based on the calculation result stored in the calculation result storage unit 64 and the information stored in the template storage unit 65 (step S61). Here, the display information generation unit 73 reads out both the calculation result based on the future driving conditions stored in the calculation result storage unit 64 and the selected comparison calculation result. Then, the display information generation unit 73 outputs the generated display information to the display information storage unit 66 and the user interface 50. The display information storage unit 66 stores the display information.
[0251] The user interface 50 displays the display information output from the display information generating unit 73 on the display unit as shown in Fig. 15 (step S62). As shown in Fig. 15, the display screen 100A displays both the calculation result based on the future operating conditions and the comparison calculation result as the future creep deformation amount and the future strain amount.
[0252] Specifically, as the future creep deformation amount and future strain amount, the creep deformation amount ratio and strain amount ratio in each calculation result are displayed in chronological order, and the preparation threshold line in each calculation result is also displayed.
[0253] The comparison calculation result is shown by a dashed line, and the preparation threshold line in the comparison calculation result is shown by a dashed line (the dashed line with a narrower interval). Also, the recommended replacement time A or B, the recommended inspection time A or B, and the recommended preparation time for each calculation result are displayed as an alarm display 103. As shown in Fig. 15, the creep deformation amount and strain amount in the past creep deformation amount and past strain amount are also displayed in chronological order.
[0254] In addition, the preparation threshold in the comparison calculation result functions as a second preparation threshold, the recommended replacement time A or the recommended replacement time B in the comparison calculation result functions as a second recommended replacement time, the recommended preparation time in the comparison calculation result functions as a second recommended preparation time, and the recommended inspection time A or the recommended inspection time B in the comparison calculation result functions as a second recommended inspection time.
[0255] When it is determined in step S60 that there is no request to display the comparison operation result (No in step S60), the display information generating unit 73 determines whether there is a request to delete the display of the comparison operation result (step S63).
[0256] Here, the user can delete the comparison calculation result shown on the display screen 100A of Fig. 15 by pressing the Reset button 113 on the selection screen 110 of Fig. 16. The display information generating unit 73 receives a signal based on the pressing of the Reset button 113 from the user interface 50, and determines in step S63 that there is a request to delete the display of the comparison calculation result. When the user presses the Reset button 113, the screen is switched to a display screen showing the calculation result.
[0257] When it is determined in step S63 that there is a request to delete the display of the comparison calculation result (Yes in step S63), the display information generation unit 73 generates display information based on the calculation result stored in the calculation result storage unit 64 and the information stored in the template storage unit 65 (step S64). Here, the display information generation unit 73 reads out the calculation result based on the future driving conditions stored in the calculation result storage unit 64. Then, the display information generation unit 73 outputs the generated display information to the display information storage unit 66 and the user interface 50. The display information storage unit 66 stores the display information.
[0258] The user interface 50 displays the display information output from the display information generating unit 73 on the display unit as shown in Fig. 10 (step S65). That is, as shown in Fig. 10, the comparison calculation results are deleted from the display screen 100, and only the calculation results based on the future operating conditions are displayed.
[0259] In the determination at step S63, when it is determined that there is no request to delete the display of the comparison operation result (No at step S63), the process returns to step S40.
[0260] 13, after the process of step S44, the future deformation calculation unit 72 determines whether the calculation result of step S44 reaches the replacement threshold A or the replacement threshold B based on the calculation result of step S44 (step S47), as described above. Then, the processes of steps S47 to S56 are executed, as described above.
[0261] The information on future creep deformation and future strain on the display screen 100A is updated each time information is received in response to pressing the Save button 87 on the future operating condition input screen 80 and the Load button 112 or Reset button 113 on the comparison calculation result selection screen 110.
[0262] Although an example in which one operation result is selected as the comparison operation result has been shown here, a setting may be made such that a plurality of comparison operation results can be selected.
[0263] According to the nozzle deformation amount management device 18 of the second embodiment described above, the same effects as those of the nozzle deformation amount management device 18 of the first embodiment can be obtained.
[0264] Furthermore, according to the nozzle deformation amount management device 18 of the second embodiment, both the calculation results predicted based on future operating conditions and the comparative calculation results can be displayed on the display screen 100A as the future creep deformation amount and the future strain amount.
[0265] This allows the user to visually confirm the difference between the calculation result based on the future operating conditions and the comparison calculation result in the graph 101 and the alarm display 103 on the display screen 100A.
[0266] According to the embodiment described above, it is possible to recognize, in chronological order, creep deformation and strain amounts from the past to the present predicted based on operating data, and future creep deformation and strain amounts predicted based on future operating conditions.
[0267] Although some embodiments of the present invention have been described, these embodiments are presented as examples and are not intended to limit the scope of the invention. These novel embodiments can be implemented in various other forms, and various omissions, substitutions, and modifications can be made without departing from the spirit of the invention. These embodiments and their modifications are included in the scope and spirit of the invention, and are included in the scope of the invention and its equivalents described in the claims. [Explanation of symbols]
[0268] 1...steam turbine equipment, 10...boiler, 11...high pressure turbine, 12...reheater, 13...intermediate pressure turbine, 14...low pressure turbine, 15...generator, 16...condenser, 17...feed water pump, 18...nozzle deformation control device, 20...main steam pipe, 21...low temperature reheat steam pipe, 22...high temperature reheat steam pipe, 23...crossover pipe, 24...exhaust pipe, 25...feed water pipe, 30A, 30B...temperature detector, 31A, 31B, 31C, 31D ...pressure detector, 32...output detector, 40...measurement data acquisition unit, 153...nozzle, 50...user interface, 60...storage unit, 61...input information storage unit, 62...measurement data storage unit, 63...program storage unit, 64...calculation result storage unit, 65...template storage unit, 66...display information storage unit, 70...calculation unit, 71...fixed-period deformation amount calculation unit, 72...future deformation amount calculation unit, 73...display information generation unit, 80, 90...input power screen, 81...selection pattern, 82...past operation performance mode, 83...base load operation mode, 84...peak load operation mode, 85...detailed operation setting mode, 86...operation data, 87...save button, 88, 97, 114...back button, 91...blade configuration display section, 92, 93, 94...numerical field, 95...upload button, 96...delete button, 100, 100A...display screen, 101...graph, 102...time axis setting section, 103...alarm display, 104...selection display section, 105...selection button, 110...selection screen, 111...list display section, 112...load button, 113...reset button, 150...casing, 151...diaphragm outer ring, 152...diaphragm inner ring, 154...turbine rotor, 155...rotor wheel, 156...moving blade, 157...steam path, 158...seal section.
Claims
1. 2. A nozzle deformation management device for a steam turbine, comprising: a display information generating unit that generates display information for displaying on a display unit: past deformation related information indicating information regarding the past deformation of a nozzle of a steam turbine from the past to the present calculated based on measured information; and future deformation related information indicating information regarding a future deformation of the nozzle in the future calculated based on future operating conditions and the past deformation related information input through an operation using a user interface screen.
2. The display information generating unit 2. The nozzle deformation amount management device for a steam turbine according to claim 1, further comprising: a display unit that displays, on the display unit, both the information regarding the past deformation amount and the information regarding the future deformation amount in chronological order.
3. The display information generating unit 2. The nozzle deformation amount management device for a steam turbine according to claim 1, wherein the display information is generated to display the past deformation amount related information on the display unit at predetermined time intervals.
4. The display information generating unit 2. The nozzle deformation amount management device for a steam turbine according to claim 1, wherein the display information for displaying the future deformation amount related information on the display unit is generated every time the future operating conditions are input.
5. The display information generating unit 2. The nozzle deformation amount management device for a steam turbine according to claim 1, wherein the display information is generated to display on the display unit information related to a preparation threshold value, the preparation threshold value indicating a deformation amount at which it is recommended to start preparation for a new nozzle, the preparation threshold value being calculated based on the future deformation amount.
6. The display information generating unit 2. The nozzle deformation amount management device for a steam turbine according to claim 1, wherein the display information is generated to display on the display unit a preparation recommendation time when it is recommended to start preparation for a new nozzle, the preparation time being calculated based on the future deformation amount.
7. The display information generating unit 2. The nozzle deformation amount management device for a steam turbine according to claim 1, wherein the display information is generated to display on the display unit a recommended replacement time for the nozzle, the recommended replacement time being calculated based on the future deformation amount.
8. The display information generating unit 2. The nozzle deformation amount management device for a steam turbine according to claim 1, wherein the display information is generated to display on the display unit a recommended inspection time for inspecting the nozzle, the recommended inspection time being calculated based on the future deformation amount.
9. The display information generating unit 2. The nozzle deformation management device for a steam turbine according to claim 1, further comprising: second future deformation related information indicating information regarding a second future deformation of the nozzle in the future calculated based on second future operating conditions and the past deformation related information inputted in an operation using a user interface screen, the second future deformation related information being further displayed on the display unit.
10. The display information generating unit 10. The nozzle deformation amount management device for a steam turbine according to claim 9, further comprising: a display unit configured to display information relating to a second preparation threshold value that indicates a deformation amount at which it is recommended to start preparation for a new nozzle, the second preparation threshold value being calculated based on the second future deformation amount.
11. The display information generating unit 10. The nozzle deformation amount management device for a steam turbine according to claim 9, further comprising: a display unit configured to display, on the display unit, a second recommended preparation time at which it is recommended to start preparation for a new nozzle, the second recommended preparation time being calculated based on the second future deformation amount.
12. The display information generating unit 10. The nozzle deformation amount management device for a steam turbine according to claim 9, further comprising: a display unit configured to display, on the display unit, a second recommended replacement time at which it is recommended to replace the nozzle, the second recommended replacement time being calculated based on the second future deformation amount.
13. The display information generating unit 10. The nozzle deformation amount management device for a steam turbine according to claim 9, further comprising: a display unit that displays, on the display unit, a second recommended inspection time when inspection of the nozzle is recommended, the second recommended inspection time being calculated based on the second future deformation amount.
Citation Information
Patent Citations
Method and apparatus for maintenance control of structure part
JP1992282455A
Device for supporting maintenance and management of equipment
JP1996044421A
Maintenance control device and manintenance control method for structural part
JP1998062313A
Maintenance managing device and method for gas turbine high temperature components
JP1999141352A
Method and apparatus for controlling life cycle maintenance of steam turbine member
JP2001303909A