Conveyance task management system and conveyance task management method
The transport task management system addresses delays by calculating delay risks and optimizing robot task allocation, enhancing transport efficiency even in shared human-robot spaces.
Patent Information
- Application Number
- JP2023060014
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-03
- Publication Date
- 2024-10-16
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Conventional transport management systems fail to account for variations in transport time caused by robots sharing movement space with humans, leading to potential delays and inefficiencies.
A transport task management system that calculates delay risks based on probability density distributions of transport time and assigns robots to tasks to minimize delay risks, using methods like the greedy method, A* algorithm, and machine learning to optimize task allocation.
Reduces transport delays by accurately assessing and mitigating the probability of delays when robots share space with humans, ensuring timely article delivery.
Smart Images

Figure 2024147172000001_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a management system and a management method for conveyance tasks by a plurality of conveyance robots.
Background Art
[0002] In manufacturing factories and logistics warehouses, automation of conveyance by conveyance robots such as AGVs (Automated Guided Vehicles) and AMRs (Autonomous Mobile Robots) has been progressing. Along with this, research and development have been conducted on the management of conveyance tasks so that articles can be efficiently conveyed with a minimum number of robots. Examples of conventional management systems and management methods for conveyance tasks are described in Patent Document 1 and Patent Document 2.
[0003] The conveyance management system described in Patent Document 1 includes a reception unit that receives p pieces of conveyance task information indicating conveyance tasks each having a start point and an end point, a connection unit that connects the p pieces of conveyance task information to generate q (q < p) pieces of connected task information, and an allocation unit that allocates the q pieces of connected task information to q conveyance moving devices, respectively. The connection unit generates the q pieces of connected task information such that the total moving distance, which is the sum of the moving distances of the q conveyance moving devices required for the q conveyance moving devices to execute the q pieces of connected task information respectively, becomes short.
[0004] The method described in Patent Document 2 defines a plurality of tasks, merges the plurality of tasks, and implements online minimum performance loss scheduling (OMPLS) technology, thereby first scheduling tasks having higher performance loss values, then scheduling tasks that can be scheduled within a deadline and have low performance loss values among the merged tasks, and finally minimizing the performance loss values of the remaining subsets of tasks that cannot be scheduled within a predefined deadline, to provide optimization of non-preemptive task scheduling in a multi-robot environment.
Prior Art Documents
Patent Documents
[0005] [Patent Document 1] JP 2022-134834 A [Patent Document 2] JP 2020-149675 A Summary of the Invention [Problem to be solved by the invention]
[0006] When a transport robot transports goods in a factory or warehouse, it is important that the transport is not delayed. For example, when a transport robot is introduced for transport between multiple assembly lines in a manufacturing factory, it is required that the transport is not delayed so as not to affect the production process at the destination line. In particular, when a transport robot is introduced into an existing factory, it is difficult to secure a new movement space exclusively for the transport robot, and the movement space of the transport robot will be shared with people. When the movement space is shared between the transport robot and people, the transport robot will slow down or pause when there are people around to ensure safety. This can cause variations in the transport time of the transport robot and delays in transport.
[0007] Conventional techniques, such as the technique described in Patent Document 1, improve transport efficiency by shortening the total travel distance of the transport robot, but do not take into account the variation in transport time of the transport robot as described above, and do not take into account transport delays. Furthermore, conventional techniques, such as the technique described in Patent Document 2, schedule tasks to minimize losses caused by delays beyond the deadline, but do not quantitatively evaluate the variation in transport time of the transport robot or the probability of delays, and are therefore unable to correctly grasp the occurrence of delays.
[0008] As such, conventional technology does not fully take into account the variation in transport time that occurs when people and robots share the same moving space, and there are issues with reducing delays in transport by transport robots.
[0009] An object of the present invention is to provide a transport task management system and a transport task management method that can reduce transport delays even if transport times by transport robots vary. [Means for solving the problem]
[0010] The transportation task management system according to the present invention includes a transportation information receiving unit that inputs task information related to a transportation task and robot information related to a robot that performs the transportation task, a delay risk calculation unit that calculates a delay risk, which is the probability that the transportation task by the robot will be delayed, a task allocation unit that executes a task allocation process that assigns the robot included in the robot information to the transportation task included in the task information so as to minimize the delay risk, and a result output unit that outputs a task allocation result that is the result of the task allocation process.
[0011] The transportation task management method according to the present invention is executed by a transportation task management system equipped with a calculation processing unit, and includes a transportation data input process in which the calculation processing unit inputs task information related to a transportation task and robot information related to a robot that performs the transportation task, a delay risk calculation process in which the calculation processing unit calculates a delay risk, which is the probability that the transportation task by the robot will be delayed, a task allocation process in which the calculation processing unit executes a task allocation process in which the calculation processing unit assigns the robot included in the robot information to the transportation task included in the task information so as to minimize the delay risk, and a result output process in which the calculation processing unit outputs a task allocation result that is the result of the task allocation process. Effect of the Invention
[0012] According to the present invention, it is possible to provide a transport task management system and a transport task management method that can reduce transport delays even if transport times by transport robots vary. [Brief description of the drawings]
[0013] [Figure 1] FIG. 1 is a diagram illustrating an example of the configuration of a transport task management system according to a first embodiment of the present invention. [Diagram 2] FIG. 11 is a diagram illustrating an example of transport data. [Diagram 3] FIG. 13 is a diagram for explaining an example of a delay risk, showing a probability density distribution of a transport time of a transport robot; [Figure 4] FIG. 13 is a diagram illustrating an example of a flowchart of a process in which a task allocation unit allocates a transport robot to any one task. [Figure 5A] 13 is a diagram showing an example of output of a result of a task allocation process, and is a diagram showing an example of task allocation result data. FIG. [Figure 5B] FIG. 5 is a diagram showing an example of output of the results of the task allocation process, specifically, an example of a visualized display 510 of the task allocation results. [Figure 6] FIG. 1 is a diagram illustrating an example of a hardware configuration of a transport task management system according to an embodiment of the present invention. [Figure 7] FIG. 11 is a diagram illustrating an example of the configuration of a transport task management system according to a second embodiment of the present invention. [Figure 8] 1A and 1B are diagrams illustrating an example of the layout of a transport area in which a transport robot performs a transport task. [Figure 9] FIG. 13 is a diagram illustrating an example of a flowchart of a process in which a transportation simulation executing unit obtains a probability density distribution of a transportation time by using a Monte Carlo method. [Figure 10] 11 is a diagram for explaining an example of a method in which a transportation simulation executing unit estimates a probability density distribution of a transportation time. FIG. [Figure 11] FIG. 11 is a diagram illustrating an example of the configuration of a transportation task management system according to a third embodiment of the present invention. [Figure 12] FIG. 11 is a diagram illustrating an example of the configuration of a transportation task management system according to a fourth embodiment of the present invention. [Figure 13] 13 is a diagram illustrating an example of a relationship between the number of transport robots and an evaluation index obtained by an optimization unit. FIG. [Figure 14] FIG. 11 is a diagram illustrating an example of the configuration of a transportation task management system according to a fifth embodiment of the present invention. [Figure 15] FIG. 11 is a diagram illustrating an example of task execution status data. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0014] With the transport task management system and transport task management method of the present invention, even if there is variation in the transport time taken by a transport robot, for example because the transport robot shares its movement space with people, the robot can be assigned to a task so as not to cause delays in the transport of goods, thereby reducing transport delays.
[0015] In this specification, a task of transporting an article is referred to as a transport task, or simply as a task, and a robot that executes the transport task is referred to as a transport robot, or simply as a robot.
[0016] A transport task management system and a transport task management method according to an embodiment of the present invention will be described below. The transport task management method according to this embodiment is executed by the transport task management system according to this embodiment. In the following embodiment, an example will be described in which the transport task is mainly performed in a manufacturing factory. However, the present invention is applicable to any place where a transport task is performed by a transport robot, such as a logistics warehouse or a restaurant. In the drawings used in this specification, the same or corresponding components are given the same reference numerals, and repeated explanations of these components may be omitted. EXAMPLES
[0017] A transportation task management system and a transportation task management method according to a first embodiment of the present invention will be described.
[0018] 1 is a diagram showing an example of the configuration of a transport task management system 100 according to this embodiment. The transport task management system 100 can be configured by a computer, and includes an arithmetic processing unit 101 and an input / output terminal 120.
[0019] The input / output terminal 120 includes an input unit 121 and an output unit 122, and is connected to the arithmetic processing unit 101. The input unit 121 is a component for inputting instructions, data, and the like to the arithmetic processing unit 101, and may be configured with a keyboard, a mouse, a touch panel, and the like. The output unit 122 is a component for outputting the calculation results of the arithmetic processing unit 101, and may be configured with a device equipped with a screen such as a monitor.
[0020] The calculation processing unit 101 includes a transportation information receiving unit 110 , a delay risk calculation unit 111 , a task allocation unit 112 , and a result output unit 113 .
[0021] The transport information receiving unit 110 receives transport data.
[0022] 2 is a diagram showing an example of the transfer data. The transfer data includes at least task data 200 and robot data 210.
[0023] The task data 200 indicates task information, which is information related to a transport task, and includes a task ID 201, a transport item ID 202, a transportable time 203, a delivery date 204, a start point 205, and an end point 206. The task data 200 is generated by a system higher than the transport task management system 100 or by an operator, and is input to the arithmetic processing unit 101 by the transport information receiving unit 110. For example, in the case of transport in a manufacturing factory, the task data 200 is generated by an MES (Manufacturing Execution System) together with commands to the manufacturing line.
[0024] The task ID 201 is a value that identifies a transport task to be executed by the transport robot.
[0025] The transported item ID 202 is a value that identifies the item transported by the transport robot.
[0026] The available transport time 203 is the time when the transport robot can transport an item, for example, the time when the item to be transported is manufactured and can be transported. The available transport time 203 exists in cases such as transport between facilities performing processes in a factory, but may not be included in the task data 200 when transporting an item from a parts warehouse, etc. In this embodiment, an example in which the available transport time 203 is included in the task data 200 will be described.
[0027] The delivery date 204 is the deadline for the transport robot to transport the item.
[0028] A start point 205 and an end point 206 are respectively a departure point and an arrival point where the transport robot transports an article.
[0029] The robot data 210 indicates robot information, which is information about a transport robot that executes a transport task, and includes a robot ID 211, a type 212, a standard speed 213, and an initial position 214. The robot data 210 is, for example, data generated in advance or data input by an operator via the input / output terminal 120, and is input to the arithmetic processing unit 101 by the transport information receiving unit 110.
[0030] The robot ID 211 is a value that identifies the transport robot.
[0031] The type 212 is a value that specifies the type and model of the transport robot.
[0032] The standard speed 213 is the standard moving speed when the transfer robot moves.
[0033] An initial position 214 is the initial position of the transfer robot expressed in coordinates.
[0034] In this embodiment, only the transport robot transports the item, and the robot data 210 includes data only on the transport robot. If not only the transport robot but also a person transports the item, data on the person transporting the item may be included in the robot data 210. For example, the value of the type 212 can indicate that it is a person transporting the item.
[0035] Returning to the description of the transportation task management system 100 in FIG.
[0036] The delay risk calculation unit 111 calculates a delay risk based on the probability density distribution of the transport time of the transport robot. The delay risk is the probability that the execution of the transport task by the transport robot will be delayed beyond the delivery date 204 set in the task data 200 (i.e., the probability that the transport robot transports an item beyond the delivery date 204 set for each transport task).
[0037] 3 is a diagram for explaining an example of a delay risk, and is a diagram showing a probability density distribution 302 of the transport time of the transport robot. The delay risk is the probability that the transport task by the transport robot will be delayed. In this embodiment 1, the delay risk is expressed by the area of a region 304 where the transport time exceeds the due date 204 in the probability density distribution 302 in which the horizontal axis is the transport time and the vertical axis is the probability density value. The probability density distribution 302 of the transport time is set for each combination of each task included in the task data 200 and each robot included in the robot data 210, and is stored in the delay risk calculation unit 111.
[0038] The delay risk calculation unit 111 calculates the area of the region 304 by using the probability density distribution 302 for each combination of each task and each robot, thereby calculating the delay risk.
[0039] The probability density distribution 302 of the transport time can be arbitrarily determined. FIG. 3 shows an example in which the probability density distribution 302 is a log-normal distribution. The probability density distribution 302 may be a logarithmic distribution, an exponential distribution, a uniform distribution, or the like. The probability density distribution 302 may also be a distribution obtained by simulation or a distribution obtained from actual measurement data. For example, the delay risk calculation unit 111 can calculate the probability density distribution 302 by estimating, from a simulation result or actual measurement data, how long the transport time would be if each robot were to hypothetically perform each task for a combination of each task in the task data 200 and each robot in the robot data 210.
[0040] An example in which the probability density distribution 302 of the transport time is a distribution obtained by simulation will be described in Example 2. An example in which the probability density distribution 302 of the transport time is a distribution obtained from actual measurement data will be described in Example 3.
[0041] Returning to the description of the transportation task management system 100 in FIG.
[0042] The task allocation unit 112 executes a task allocation process. The task allocation process is a process of allocating a transport robot in the robot data 210 to each task indicated in the task data 200 so as to minimize the risk of delay. The task allocation unit 112 can use any existing method, such as an exact solution method, an approximate solution method, or an A* algorithm (A*ster algorithm), to allocate a transport robot to each task. In this embodiment, as an example, an example will be described in which the task allocation unit 112 uses a greedy method, which is a type of approximate solution method.
[0043] In the following, the assignment of a transport robot to a task is called task assignment.
[0044] 4 is a diagram showing an example of a flowchart of a process in which the task allocation unit 112 allocates a transport robot to any one task using a greedy method. The task allocation unit 112 executes the process shown in FIG. 4, and for one task for which allocation of a transport robot is being considered (allocation consideration task), determines a robot that will execute this task.
[0045] In S401, the task allocation unit 112 starts the processing loop of Fig. 4 for each task. The task allocation unit 112 selects one task according to the order of the transport available time 203 or the delivery date 204 of the task data 200 of the transport data (Fig. 2) and starts the processing loop. The task selected in S401 is the allocation consideration task.
[0046] In S402, the delay risk calculation unit 111 calculates the transfer time (virtual transfer time) and the delay risk in this case for the robots in the robot data 210 of the transfer data, assuming that each transfer robot executes the allocation consideration task. The virtual transfer time can be obtained using a representative value of the probability density distribution 302 of the transfer time. The representative value is, for example, an average value or a median value. The delay risk can be obtained from the probability density distribution 302 of the transfer time and the delivery date 204, as described with reference to FIG. 3. The delay risk calculation unit 111 calculates the virtual transfer time and the delay risk for each transfer robot using an arbitrary method. In this embodiment, the delay risk calculation unit 111 calculates the virtual transfer time and the delay risk for each transfer robot using the route plan and the transfer simulation described in the second embodiment.
[0047] In S403, the task allocation unit 112 determines, for each robot in the robot data 210, whether or not there is a robot available at the transportable time 203 in the task data 200. If the robot is not executing any task at the transportable time 203, the task allocation unit 112 determines that the robot is available. If there is a robot available at the transportable time 203, the task allocation unit 112 executes the process of S404, and if there is no robot available at the transportable time 203, the task allocation unit 112 executes the process of S405.
[0048] In S404, the task allocation unit 112 uses the delay risk calculated in S402 to allocate a robot having the smallest delay risk among available robots to the allocation consideration task.
[0049] In S405, the task allocation unit 112 allocates a robot with the smallest delay risk to the allocation consideration task when the robot executes the allocation consideration task after finishing the execution of the task being executed at the transportable time 203.
[0050] In S406, the task allocation unit 112 ends the processing loop for the one task (allocation consideration task) selected in S401.
[0051] The task allocation unit 112 and the delay risk calculation unit 111 execute the processes from S401 to S406 for all tasks to execute the task allocation process. In this manner, a robot that minimizes the delay risk can be assigned to each task indicated in the task data 200.
[0052] In addition, the delay risk calculation unit 111 may calculate the delay risk for all tasks indicated in the task data 200, and the task allocation unit 112 may allocate robots to each task so as to minimize the sum or maximum value of the delay risk.
[0053] In this embodiment, an example has been described in which the task allocation unit 112 executes a task allocation method using a greedy method (a method of assigning a robot with a minimum risk of delay to a task that is available). The task allocation unit 112 may improve the task allocation determined by the greedy method by using the task allocation determined by the greedy method as an initial solution and further searching for a solution using an approximate solution method such as a local search method or a method such as metaheuristics. Furthermore, when a sufficient amount of data on optimal task allocation is obtained, the task allocation unit 112 may execute task allocation using a method such as machine learning or deep learning.
[0054] 5A and 5B are diagrams showing examples of output results of a process of assigning robots to tasks. The results of the process of assigning robots to tasks are represented, for example, by task assignment result data 500 shown in Fig. 5A and a visualized display 510 of the task assignment result shown in Fig. 5B.
[0055] In the following, the result of the task allocation unit 112 allocating the transport robots to each task, that is, the result of the task allocation process of the task allocation unit 112, is also referred to as a task allocation result.
[0056] The result output unit 113 of the transportation task management system 100 (FIG. 1) outputs the task allocation result of the task allocation unit 112 to the output unit 122 of the input / output terminal 120. Specifically, the result output unit 113 outputs task allocation result data 500 and data used for visual display 510 of the task allocation result. In addition, the result output unit 113 outputs the delay risk calculated by the delay risk calculation unit 111 to the output unit 122.
[0057] The output unit 122 can display on the screen the task assignment result data 500 and a visualized display 510 of the task assignment result. The output unit 122 may display on the screen only the task assignment result data 500. In addition, the output unit 122 can display on the screen the delay risk.
[0058] The task allocation result data 500 shown in FIG. 5A includes a task ID 201 , a robot ID 211 , a scheduled start time 503 , a scheduled end time 504 , and a delay risk 505 .
[0059] In the task allocation result data 500, a task ID 201 and a robot ID 211 of a transport robot assigned to a task represented by this task ID 201 are associated with each other.
[0060] For the task to which the robot is assigned in the process of S404 in FIG. 4, the delivery available time 203 shown in FIG. 2 is used as the value of the scheduled start time 503, and for the task to which the robot is assigned in the process of S405, the scheduled end time of the task being executed (for example, the time indicated as scheduled end time 504 in the task assignment result data 500) is used.
[0061] The value of the estimated end time 504 is obtained by adding the estimated time required for transportation to the value of the estimated start time 503. The estimated time required for transportation can be calculated using a representative value (e.g., the average value or the median value) of the probability density distribution 302 of the transportation time shown in FIG.
[0062] The visualized display 510 of the task allocation result shown in Fig. 5B shows task information and the tasks assigned to each robot, with the horizontal axis representing time and the vertical axis representing the robot ID 211. The visualized display 510 of the task allocation result shows, as task information, at least the available delivery time 203 and delivery date 204 set for the task (task data 200 in Fig. 2). The visualized display 510 of the task allocation result depicts a double-arrowed line 511 and a box (horizontal bar) 512 for each robot. The double-arrowed line 511 and the box 512 extend along the horizontal axis (time).
[0063] The double-arrow line 511 is a line with arrows on both ends, and indicates task information. As shown in the legend, the number above the double-arrow line 511 indicates the task ID 201. The left end (the earlier end of the time) of the double-arrow line 511 indicates the available delivery time 203. The right end (the later end of the time) of the double-arrow line 511 indicates the due date 204.
[0064] A box 512 indicates a task assigned to the robot. As shown in the legend, the left end of the box 512 indicates a scheduled start time 503. The right end of the box 512 indicates a scheduled end time 504. A color is applied inside the box 512 to indicate the delay risk 505. For example, as shown in the legend, the darker the color inside the box 512, the greater the delay risk 505. In this embodiment, the degree of the delay risk 505 is indicated by the shade of the color, but the degree of the delay risk 505 may also be indicated by using colors such as red and blue.
[0065] For example, a robot with robot ID 211 of "RobotA" is assigned a task with task ID 201 of "001", and the scheduled start time 503 of the task is 9:00 and the scheduled end time 504 is 9:12, as shown in box 512. As shown by double-headed arrow 511, this task has a delivery possible time 203 of 9:00 and a due date 204 of 9:20.
[0066] A robot with a robot ID 211 of "Robot A" can finish transporting the item earlier than the due date 204, so there is no delay in transporting the item. A robot with a robot ID 211 of "Robot B" also does not cause a delay in transporting the item. That is, in this embodiment, robots can be assigned to tasks so that there is no delay in transporting the item.
[0067] 6 is a diagram showing an example of a hardware configuration of the transport task management system 100 according to this embodiment. The transport task management system 100 includes a computer 600 and an input / output terminal 120, which is an input / output device, and is configured by connecting these together.
[0068] The computer 600 includes a CPU 601 , a RAM 602 , a ROM 603 , a HDD 604 , a communication interface 605 , an input / output interface 606 , and a media interface 607 .
[0069] The communication interface 605 is connected to an external communication device 615. The input / output interface 606 is connected to the input / output terminal 120. The media interface 607 reads and writes data from and to a recording medium 617.
[0070] The CPU 601 controls each processing unit of the arithmetic processing unit 101 (FIG. 1) by executing a program (application software) loaded into the RAM 602. This program can be distributed via a communication line or recorded on a recording medium 617 such as a CD-ROM and distributed.
[0071] As described above, the transport task management system 100 and the transport task management method according to this embodiment can assign robots to tasks so as not to cause delays in transporting items by calculating delay risks based on the probability density distribution 302 of the transport time of the transport robot. Therefore, even if there is variation in the transport time of the transport robot, for example, because the transport robot shares its movement space with people, transport delays can be reduced. EXAMPLES
[0072] A transport task management system and a transport task management method according to a second embodiment of the present invention will be described below. The following mainly describes the differences between the management system and the management method according to the second embodiment and the management system and the management method according to the first embodiment.
[0073] In this embodiment, a configuration is described in which the probability density distribution 302 of the transportation time is obtained by a route plan and a transportation simulation. The delay risk calculation unit 111 calculates the delay risk using the probability density distribution 302 of the transportation time obtained by the transportation simulation.
[0074] 7 is a diagram showing an example of the configuration of the transport task management system 100 according to this embodiment. In the transport task management system 100 according to this embodiment, the calculation processing unit 101 further includes a route planning unit 701 and a transport simulation execution unit 702 in the transport task management system 100 according to the first embodiment (FIG. 1).
[0075] Fig. 8 is a diagram showing an example of the layout of a transfer area 800 where a transfer robot performs a transfer task. For example, if the transfer area 800 is a warehouse, the transfer area 800 is divided into a plurality of areas 801 to 805. In Fig. 8, the transfer area 800 is depicted in a plurality of patterns, and areas with the same pattern indicate the same type of area.
[0076] Area 801 indicates an area in which the transport robot and people can move. In the example shown in FIG. 8, there is one type of movable area, but the areas in which people can move and the areas in which the transport robot can move may be separated. Area 802 indicates an area of the production line. Area 803 indicates an area in which workers work. Area 804 indicates an area of the production cell. In this embodiment, the area 804 of the production cell is the start point 205 or the end point 206 of the transport. Area 805 indicates an area of the parts warehouse. In this embodiment, the area 805 of the parts warehouse is the start point 205 of the transport.
[0077] A value such as Cell1-1 is assigned as an ID to a production cell area 804, and a value such as DeptA-1 is assigned to a parts warehouse area 805. These IDs correspond to the values of the start point 205 and the end point 206 of the task data 200 (FIG. 2).
[0078] The layout of the transport area 800 (for example, the positions and sizes of the areas 801 to 805) is given in advance to the transport task management system 100 as layout information.
[0079] A route planning unit 701 and a transportation simulation execution unit 702 use layout information of a transportation area 800 to execute a route plan and a transportation simulation, respectively.
[0080] The path planning unit 701 uses layout information of the transport area 800 for each task indicated by the task data 200, and plans a movement path of the transport robot from the start point 205 to the end point 206 of the task according to a predetermined arbitrary evaluation index. For example, the path planning unit 701 determines the movement path using an evaluation index that the movement distance of the transport robot is the shortest. For this path planning, any existing method such as the A* algorithm can be used.
[0081] The route planning unit 701 outputs the planned movement route to the delay risk calculation unit 111. The movement route planned by the route planning unit 701 is used when the delay risk calculation unit 111 calculates a virtual transfer time for each transfer robot in S402 of Fig. 4. That is, in this embodiment, in S402 of Fig. 4, the virtual transfer time is calculated from the probability density distribution 302 of the transfer time for the movement route planned by the route planning unit 701.
[0082] The transport simulation execution unit 702 performs a transport simulation using layout information of the transport area 800, and obtains a probability density distribution of the transport time for each transport robot using the movement route planned by the route planning unit 701 for each task indicated in the task data 200. In this transport simulation, the transport simulation execution unit 702 performs a detailed simulation that takes into account congestion between robots and between robots and people, including the transport robots and people (e.g., transport workers or other people) present in the transport area 800.
[0083] The transportation simulation execution unit 702 uses, for example, the Monte Carlo method to obtain the probability density distribution of the transportation time.
[0084] FIG. 9 is a diagram showing an example of a flowchart of a process in which the transportation simulation executing unit 702 obtains a probability density distribution of transportation times using the Monte Carlo method.
[0085] In S901, the transport simulation execution unit 702 inputs the probability density distribution of the input parameters. The input parameters are parameters that cause variations in the transport time of the transport robot, and are mainly parameters regarding matters (e.g., people, objects, and the environment) that affect the movement of the transport robot inside the transport area 800. For example, the transport simulation execution unit 702 assumes that the distribution of these input parameters is, for example, a normal distribution, and inputs the mean and standard deviation of this normal distribution.
[0086] Examples of the input parameters include the number of people, the moving speed of the people, the starting point and the ending point of the people's movement, the position of the people, the position of the object (obstacle for the transport robot), the communication environment of the transport robot, and the brightness inside the transport area 800. When the transport robot is controlled by wireless communication, the transport time of the transport robot may depend on the communication environment. When the transport robot moves based on an image captured by a camera, the transport time of the transport robot may be determined by the clarity of the image, which depends on the brightness of the transport area 800.
[0087] In S902, the transportation simulation execution unit 702 estimates a probability density distribution of the transportation time. The process of S902 is composed of processes from S903 to S905.
[0088] In S903, the transportation simulation executing unit 702 generates random numbers a predetermined number of times (for example, 100 times) using the probability density distribution of the input parameters input in S901.
[0089] In S904, the transportation simulation execution unit 702 executes a transportation simulation using the random numbers generated in S903 as input data. The transportation simulation execution unit 702 calculates and obtains a transportation time when an article is transported under the conditions of the input parameters determined by the random numbers.
[0090] In S905, the transportation simulation execution unit 702 estimates the probability density distribution of the transportation time by using the obtained transportation time.
[0091] In S906, the transportation simulation executing unit 702 outputs the estimated probability density distribution of the transportation time to the delay risk calculation unit 111.
[0092] Fig. 10 is a diagram for explaining an example of a method in which the transport simulation execution unit 702 estimates the probability density distribution of the transport time in S905 in Fig. 9. In Fig. 10, a histogram 1001 of the transport time is shown in the left diagram, and a probability density distribution 302 obtained from this histogram 1001 is shown in the right diagram.
[0093] The transportation simulation execution unit 702 uses the calculated transportation times to derive a histogram 1001 of transportation times. Then, the transportation simulation execution unit 702 estimates a probability density distribution 302 of transportation times from the histogram 1001 using a method such as KDE (kernel density estimation).
[0094] Furthermore, when the transport simulation execution unit 702 assumes that the probability density distribution 302 of the transport time is a specific distribution (for example, the log-normal distribution shown in FIG. 3), it can find the parameters of this distribution using the least squares method or the like.
[0095] The delay risk calculation unit 111 calculates the delay risk in S402 of FIG. 4 using the probability density distribution 302 of the transport time estimated as described above.
[0096] In this embodiment, an example has been described in which the route planning unit 701 executes the route planning, and the transport simulation executing unit 702 executes the transport simulation. In the transport task management system 100 according to this embodiment, the transport simulation executing unit 702 (or the route planning unit 701) may execute the route planning together with the transport simulation. In addition, when the movement route of the transport robot is set in advance and fixed, the transport simulation may be executed using the previously set movement route without executing the route planning.
[0097] Alternatively, task allocation may be performed to assign robots to tasks as follows. A route plan is first executed to determine a movement route for the transport robot, and an appropriate probability density distribution of the transport time is assumed. The task allocation unit 112 tentatively assigns the robot to a task using this movement route and the probability density distribution of the transport time. The transport simulation execution unit 702 executes a transport simulation using the task allocation result generated by the task allocation unit 112, and determines the probability density distribution of the transport time. The task allocation unit 112 executes task allocation again using the probability density distribution of the transport time determined by the transport simulation.
[0098] In this embodiment, a probability density distribution 302 of the transfer time is obtained by a transfer simulation that takes into account parameters that affect the movement of the transfer robot, and the obtained probability density distribution 302 is used to calculate the delay risk, so that the delay risk can be determined more accurately and transfer delays can be reduced. EXAMPLES
[0099] A transportation task management system and a transportation task management method according to a third embodiment of the present invention will be described below. In the following, the differences between the management system and the management method according to the third embodiment and the management system and the management method according to the second embodiment will be mainly described.
[0100] In this embodiment, a configuration for obtaining the probability density distribution 302 of the transport time from actual measurement data will be described. The delay risk calculation unit 111 calculates the delay risk using the probability density distribution 302 of the transport time obtained from the actual measurement data.
[0101] 11 is a diagram showing an example of the configuration of the transport task management system 100 according to this embodiment. In the transport task management system 100 according to this embodiment, the calculation processing unit 101 does not include the transport simulation execution unit 702 in the transport task management system 100 according to the second embodiment (FIG. 7), but includes an actual measurement data evaluation unit 1101.
[0102] In this embodiment, data obtained when the transport robot actually executes a transport task is taken as actual measurement data, and it is assumed that there is sufficient actual measurement data. The actual measurement data includes at least one of the transport time of the transport robot in a transport experiment previously conducted on a moving route planned by the route planning unit 701 and the transport time when the transport robot actually transports an item. The actual measurement data is data on the transport time when the transport robot actually transports an item in the transport area 800 where people and transport robots are mixed.
[0103] The actual measurement data evaluation unit 1101 executes, among the processes shown in FIG. 9, a process of estimating the probability density distribution 302 of the transport time in S905 and a process of outputting the probability density distribution 302 of the transport time to the delay risk calculation unit 111 in S906.
[0104] The actual measurement data evaluation unit 1101 stores the actual measurement data. In the same manner as the transportation simulation execution unit 702 in the second embodiment, the actual measurement data evaluation unit 1101 derives a histogram 1001 ( FIG. 10 ) of the transportation time from the transportation time included in the actual measurement data for the movement route planned by the route planning unit 701 for each task shown in the task data 200 in the process of S905 in FIG. 9 , and obtains a probability density distribution 302 of the transportation time.
[0105] However, when a plurality of almost identical measured data are obtained from a plurality of different states (for example, when the measured data is almost the same but there is variation in the number of people or the moving speed), the probability density distribution 302 of the transport time can be estimated using the measured data in a state to be evaluated from among the plurality of measured data. In this case, the probability density distribution 302 of the transport time may be estimated using a machine learning method such as random forest. EXAMPLES
[0106] A transport task management system and a transport task management method according to a fourth embodiment of the present invention will be described below. The following mainly describes the differences between the management system and the management method according to the fourth embodiment and the management system and the management method according to the first embodiment.
[0107] In this embodiment, a configuration is described in which the number of transport robots that transport objects is optimized using the result of assigning transport robots to tasks (task assignment result). The optimization of the number of transport robots can be performed, for example, in advance consideration of transport.
[0108] 12 is a diagram showing an example of the configuration of the transport task management system 100 according to this embodiment. In the transport task management system 100 according to this embodiment, the calculation processing unit 101 further includes an optimization unit 1201 in the transport task management system 100 according to the first embodiment (FIG. 1).
[0109] The task allocation unit 112 executes the task allocation process (FIG. 4) multiple times while changing the number of transport robots.
[0110] The optimization unit 1201 derives an evaluation index for the delay risk 505 from the task allocation result of the task allocation unit 112 every time the number of transport robots changes (i.e., for each number of transport robots). This evaluation index is an index determined in advance to make the delay risk 505 an acceptable value, and can be, for example, the maximum value or average value of the delay risks 505 of all tasks. In this embodiment, the maximum value of all the delay risks 505 is set as the evaluation index.
[0111] The optimization unit 1201 obtains the relationship between the number of transport robots and the evaluation index, that is, how the evaluation index changes when the number of transport robots changes.
[0112] Fig. 13 is a diagram showing an example of the relationship between the number of transport robots and an evaluation index 1301 obtained by the optimization unit 1201. In the example shown in Fig. 13, the evaluation index 1301 is the maximum value of all delay risks 505. Fig. 13 shows the relationship that as the number of transport robots increases, the evaluation index 1301 decreases.
[0113] 13 also shows a threshold value 1302 that is determined in advance for the evaluation index 1301. The threshold value 1302 can be determined arbitrarily depending on the evaluation index 1301 and the task.
[0114] The optimization unit 1201 compares the derived evaluation index 1301 with a threshold value 1302. The number of transport robots for which the evaluation index 1301 is equal to or greater than the threshold value 1302 or equal to or less than the threshold value 1302 is the preferred number of transport robots. The minimum or maximum number of the preferred numbers of transport robots can then be set as the optimal number of transport robots. The optimization unit 1201 can thus use the evaluation index 1301 to determine the optimal number of transport robots.
[0115] 13, since the evaluation index 1301 is the maximum value of the delay risk 505, the number at which the evaluation index 1301 is equal to or smaller than the threshold value 1302 is the preferable number of transport robots. The minimum number of the preferable numbers of transport robots is the optimal number of transport robots. In the example shown in FIG. 13, the preferable number of transport robots is 37 or more, and the optimal number of transport robots is 37.
[0116] In this manner, the optimization unit 1201 can obtain and optimize the number of transport robots required to bring the delay risk to an acceptable value.
[0117] In addition to optimizing the number of transport robots, the optimization unit 1201 may also use the task allocation results to perform various processes as pre-transport considerations, such as optimizing the layout of the transport area 800, optimizing the amount of goods to be transported at one time, and considering the placement of water marshals (people who load and unload the transport robots).
[0118] In this embodiment, as an example, a case where the optimization unit 1201 optimizes the layout of the transport area 800 (FIG. 8) using the task allocation result of the task allocation unit 112 will be briefly described.
[0119] The task allocation unit 112 executes the task allocation process (FIG. 4) multiple times while changing the layout of the transport area 800.
[0120] The optimization unit 1201 derives an evaluation index every time the layout of the transport area 800 changes (i.e., for each layout of the transport area 800), and determines the relationship between the layout and the evaluation index, i.e., how the evaluation index changes when the layout changes. The optimization unit 1201 then compares the derived evaluation index with a threshold value to determine a preferred layout or an optimal layout. For example, a layout for which the evaluation index 1301 is equal to or greater than the threshold value 1302 or equal to or less than the threshold value 1302 can be determined as a preferred layout, and a layout for which the evaluation index 1301 is minimum or maximum among the preferred layouts can be determined as an optimal layout.
[0121] Changes in the layout include, for example, changes in the position of the item to be transported (position of the parts warehouse), changes in the position of the production equipment (position of the production cell), and changes in the position of the object present in the transport area 800.
[0122] As described above, in the transport task management system and transport task management method according to this embodiment, the number of transport robots and the layout of the transport area 800 can be optimized using the task allocation results. EXAMPLES
[0123] A transportation task management system and a transportation task management method according to a fifth embodiment of the present invention will be described below. In the following, the differences between the management system and the management method according to the fifth embodiment and the management system and the management method according to the first embodiment will be mainly described.
[0124] In this embodiment, a configuration is described in which the task allocation process (FIG. 4) is dynamically executed and utilized for controlling the transport robot. Dynamic execution of the task allocation process means that the transport robot is assigned to a task according to the execution status of the task of the transport robot.
[0125] 14 is a diagram showing an example of the configuration of the transport task management system 100 according to this embodiment. In the transport task management system 100 according to this embodiment, the arithmetic processing unit 101 further includes a transport robot control command unit 1401 and a task execution status acquisition unit 1402 in the transport task management system 100 according to the first embodiment (FIG. 1).
[0126] A transport robot control command unit 1401 issues a control command to the transport robot based on the task allocation result of the task allocation unit 112, and causes the transport robot to execute the task.
[0127] The task execution status acquisition unit 1402 acquires task execution status data from the transport robot. The task execution status data includes the execution status of the task of the transport robot, i.e., whether or not the transport robot to which a control command is given has actually executed the task, and the start and end times of the executed task.
[0128] 15 is a diagram showing an example of task execution status data. The task execution status data includes a task ID 201, a robot ID 211, a start time 1503, an end time 1504, and a status 1505. The start time 1503 is the start time of the task when the transport robot with the robot ID 211 executes the task with the task ID 201. The end time 1504 is the end time of the task when the transport robot with the robot ID 211 executes the task with the task ID 201. The status 1505 indicates the state of the task. For example, the task with the task ID 201 being 001 is completed, and the task with the task ID 201 being 002 has no end time recorded and is being executed.
[0129] The task allocation unit 112 dynamically executes the task allocation process (FIG. 4). In this embodiment, an example in which the task allocation unit 112 executes the task allocation process at a predetermined time interval (e.g., every 10 minutes) and an example in which the task allocation unit 112 executes the task allocation process at a necessary time will be described.
[0130] First, a case where the task allocation process is executed at a predetermined time interval will be described. The task execution status acquisition unit 1402 acquires task execution status data from the transport robot at this time interval. The task allocation unit 112 acquires the task execution status data from the task execution status acquisition unit 1402, and executes the task allocation process based on the task execution status of the transport robot at this time (for example, the status 1505 or the time from the start time 1503 to the current time) and a task command from the MES or the like, for example, in the same manner as in the first and second embodiments, and assigns the robot to the task. The task allocation unit 112 can obtain the robot that is actually available and the scheduled time when the robot executing the task will finish the task from the task execution status of the transport robot included in the acquired task execution status data.
[0131] Next, a case where the task allocation process is executed at a necessary time will be described. The task allocation unit 112 executes the task allocation process for, for example, one day in advance. The task execution status acquisition unit 1402 acquires the execution status of the tasks of the transport robot at any timing. The task allocation unit 112 re-executes the task allocation process according to the task execution status data acquired from the task execution status acquisition unit 1402. From the task execution status data, it is possible to know whether a task is delayed and whether a task has been executed.
[0132] For example, the task allocation unit 112 compares the task execution status of the transport robot acquired by the task execution status acquisition unit 1402 with a predetermined task plan. If the task execution status deviates from the predetermined plan, the task allocation unit 112 re-executes the task allocation process and reallocates the robot to the task. For example, when the execution status of a task deviates from the planned schedule by a predetermined threshold or more, the task allocation unit 112 determines that the execution status of a task deviates from the planned schedule. In addition, the task allocation unit 112 may re-execute the task allocation process when a task command from an MES or the like is changed from the planned command due to a change in the production plan or the like and is input again.
[0133] Moreover, the transportation task management system 100 according to this embodiment includes the transportation simulation execution unit 702 (FIG. 7) described in the second embodiment, and can dynamically execute task allocation processing. In this case, the transportation simulation execution unit 702 performs a transportation simulation in advance under conditions assuming various situations related to task execution, such as the number of people, to obtain a probability density distribution 302 of transportation time, and stores the obtained probability density distribution 302 of transportation time in a database. The delay risk calculation unit 111 calculates a delay risk using the probability density distribution 302 obtained under a situation closest to the current situation among the probability density distributions 302 of transportation time stored in the database. In this way, it is possible to more accurately calculate a delay risk by reflecting the actual situation.
[0134] Furthermore, when performing a task allocation process in real time according to the task execution status, the transportation simulation execution unit 702 may perform a transportation simulation reflecting the actual task execution status (for example, the task execution status of the transportation robot acquired by the task execution status acquisition unit 1402) to obtain the probability density distribution 302 of the transportation time. In this case, by using a sensor that can acquire the status of the transportation area 800, such as a people flow measurement sensor, the status of the transportation area 800 can be reproduced in the simulation to obtain a probability density distribution 302 of the transportation time that is closer to reality, and the delay risk can be calculated more accurately.
[0135] The present invention is not limited to the above-described embodiments, and various modifications are possible. For example, the above-described embodiments have been described in detail to clearly explain the present invention, and the present invention is not necessarily limited to an embodiment having all of the configurations described. It is also possible to replace a part of the configuration of one embodiment with the configuration of another embodiment. It is also possible to add the configuration of another embodiment to the configuration of one embodiment. It is also possible to delete a part of the configuration of each embodiment, or to add or replace another configuration.
[0136] Further, each component of the transport task management system according to the present invention may be realized in hardware, for example, by designing a part or all of them as an integrated circuit. Further, each component may be realized in software, for example, by having a processor interpret and execute a program that realizes each function. Information such as a program, table, file, measurement information, and calculation information that realizes each function can be recorded in a recording device such as a memory, a hard disk drive, and an SSD (Solid State Drive), or a recording medium such as an IC card, an SD card, and a DVD. Therefore, each component of the control device according to the present invention can realize each function as a processing unit, a processing unit, a program module, etc.
[0137] In addition, in each drawing, the control lines and information lines are shown as those considered necessary for the explanation, and not all the control lines and information lines necessary for the product are shown. In an actual product, it can be considered that almost all components are connected to each other.
[0138] Furthermore, the communication means connecting the devices is not limited to wired LAN or wireless LAN, and may be changed to other communication means. [Explanation of symbols]
[0139] 100...transportation task management system, 101...arithmetic processing unit, 110...transportation information reception unit, 111...delay risk calculation unit, 112...task allocation unit, 113...result output unit, 120...input / output terminal, 121...input unit, 122...output unit, 200...task data, 201...task ID, 202...transportation item ID, 203...transportation possible time, 204...delivery date, 205...start point, 206...end point, 210...robot data, 211...robot ID, 212...type, 213...standard speed, 214...initial position, 302...probability density distribution, 304...area where transport time exceeds delivery date, 500...task allocation result data, 503...scheduled start time, 504...scheduled end time, 505...delay risk, 510...task allocation and visualizing the results, 511... double-arrow line, 512... box, 600... computer, 601... CPU, 602... RAM, 603... ROM, 604... HDD, 605... communication interface, 606... input / output interface, 607... media interface, 615... communication device, 617... recording medium, 701... path planning unit, 702... transportation simulation execution unit, 800... transportation area, 801-805... area, 1001... histogram, 1101... actual measurement data evaluation unit, 1201... optimization unit, 1301... evaluation index, 1302... threshold, 1401... transportation robot control command unit, 1402... task execution status acquisition unit, 1503... start time, 1504... end time, 1505... status.
Claims
1. a transport information receiving unit for inputting task information related to a transport task and robot information related to a robot that executes the transport task; a delay risk calculation unit that calculates a delay risk, which is a probability that the transport task by the robot will be delayed; a task allocation unit that executes a task allocation process, which is a process of allocating the robot included in the robot information to the transportation task included in the task information in such a way that the delay risk is minimized; a result output unit that outputs a task allocation result that is a result of the task allocation process; Equipped with A transportation task management system comprising:
2. the delay risk calculation unit calculates the delay risk based on a probability density distribution of a transport time of the robot; the probability density distribution is set for each combination of the transportation task included in the task information and the robot included in the robot information; The transportation task management system according to claim 1 .
3. a path planning unit that plans a movement path of the robot for the transportation task; a transportation simulation execution unit that performs a simulation and obtains the probability density distribution for the transportation task by using the movement route planned by the route planning unit; The delay risk calculation unit calculates the delay risk based on the probability density distribution obtained by the transportation simulation execution unit. The transportation task management system according to claim 2 .
4. a path planning unit that plans a movement path of the robot for the transportation task; an actual measurement data evaluation unit that stores actual measurement data when the robot actually executes the transportation task, and calculates the probability density distribution from the transportation time included in the actual measurement data for the movement route planned by the route planning unit for the transportation task, The delay risk calculation unit calculates the delay risk based on the probability density distribution obtained by the actual measurement data evaluation unit. The transportation task management system according to claim 2 .
5. The delay risk calculation unit calculates the delay risk for all of the transport tasks included in the task information, the task allocation unit allocates the robots to the transportation tasks so as to minimize a sum or a maximum value of the delay risks. The transportation task management system according to claim 1 .
6. The delay risk calculation unit calculates the transportation time by using a representative value of the probability density distribution. The transportation task management system according to claim 2 .
7. An optimization unit that determines an optimal number of the robots, the task allocation unit performs the task allocation process a plurality of times while changing the number of the robots; The optimization unit derives an evaluation index related to the risk of delay for each number of the robots, and obtains an optimal number of the robots using the evaluation index. The transportation task management system according to claim 1 .
8. an optimization unit that optimizes a layout of a transport area in which the robot performs the transport task; the task allocation unit performs the task allocation process a plurality of times while changing the layout; The optimization unit derives an evaluation index related to the delay risk for each of the layouts, and obtains an optimal layout using the evaluation index. The transportation task management system according to claim 1 .
9. a control command unit that issues a control command to the robot based on the task allocation result; a task execution status acquisition unit that acquires, from the robot, task execution status data including an execution status of the transport task of the robot; Equipped with The transportation task management system according to claim 1 .
10. the task execution status acquisition unit acquires the task execution status data from the robot at a predetermined time interval; the task allocation unit acquires the task execution status data from the task execution status acquisition unit, and executes the task allocation process based on the acquired task execution status data. The transportation task management system according to claim 9 .
11. the task execution status acquisition unit acquires the task execution status data from the robot; the task allocation unit acquires the task execution status data from the task execution status acquisition unit, and executes the task allocation process in accordance with the acquired task execution status data. The transportation task management system according to claim 9 .
12. an input / output terminal having a screen; the input / output terminal displays the task allocation result and the delay risk on the screen. The transportation task management system according to claim 1 .
13. A transport task management system having a calculation processing unit executes the transport task management system, a transport data input step in which the arithmetic processing unit inputs task information related to a transport task and robot information related to a robot that executes the transport task; a delay risk calculation step in which the calculation processing unit calculates a delay risk, which is a probability that the transport task by the robot will be delayed; a task allocation step of executing a task allocation process in which the arithmetic processing unit allocates the robot included in the robot information to the transportation task included in the task information in such a way that the risk of delay is minimized; a result output step in which the arithmetic processing unit outputs a task allocation result that is a result of the task allocation process; A transport task management method comprising:
14. In the delay risk calculation step, the arithmetic processing unit calculates the delay risk based on a probability density distribution of a transport time of the robot, the probability density distribution is set for each combination of the transportation task included in the task information and the robot included in the robot information; The transport task management method according to claim 13.
Citation Information
Patent Citations
System and method for optimizing scheduling of non-preemptive task in multi-robotic environment
JP2020149675A
System and method for managing transport, and program
JP2022134834A
Cited By
Method and program for determining travel route
JP7854630B1
Transport order processing system and method for determining variable items at the time of transport order execution
KR102910561B1