Control apparatus and power generating system
The control device stabilizes voltage and frequency by managing charging and discharging operations, addressing overvoltage risks during power system restoration, ensuring stable power supply.
Patent Information
- Application Number
- JP2023063064
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-04-03
- Filing Date
- 2023-04-07
- Publication Date
- 2024-10-16
AI Technical Summary
During black start of a power generation system following a large-scale outage, there is a risk of overvoltage and voltage fluctuations due to light load conditions and sudden grid changes, which can lead to instability and equipment damage.
A control device and system that utilizes a charging and discharging device to manage the power supply, controlling voltage and frequency by adjusting the charging and discharging operations based on real-time measurements of voltage and current, thereby maintaining these parameters within predetermined ranges.
The system effectively stabilizes voltage and frequency during trial charging, preventing overvoltage and self-excitation phenomena, ensuring safe and controlled restoration of power supply.
Smart Images

Figure 2024147467000001_ABST
Abstract
Description
[Technical field]
[0001] An embodiment of the present invention relates to a control device and a power generation system. [Background technology]
[0002] When a large-scale power outage occurs in a power grid due to a disaster or the like, it is necessary to black start the power generation system and test charge the grid in order to restore the grid. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2014-128157 A [Patent Document 2] JP 2020-124058 A Summary of the Invention [Problem to be solved by the invention]
[0004] However, when the generator of a power generation system is used for black start, the power grid is lightly loaded, and the generator has a leading power factor, which may result in overvoltage. Also, if the grid condition suddenly changes, the power generation system may not be able to control it in time, which may result in large fluctuations in voltage and frequency.
[0005] Therefore, in this embodiment, a control device and a power generation system are provided that are capable of controlling at least one of the voltage and frequency of the supply power during a trial charge period using the charge / discharge power of the charge / discharge device. [Means for solving the problem]
[0006] The control device according to this embodiment is a control device for a power generation system including a generator that supplies AC power to an output terminal connected to a power grid, a charge / discharge device capable of charging / discharging AC power to the output terminal, and a prime mover control device that controls the output and / or rotational speed of a prime mover that drives the generator. The control device includes an acquisition unit and a control unit. The acquisition unit acquires information relating to at least one of the voltage and current of the output terminal. During a trial charging period, the control unit controls charging and discharging of the charge / discharge device based on the information relating to at least one of the voltage and current of the output terminal, and controls at least one of the voltage and current of the output terminal within a predetermined range. Effect of the Invention
[0007] During the trial charging period, at least one of the voltage and frequency of the supplied power can be controlled within a predetermined range. [Brief description of the drawings]
[0008] [Figure 1] 1 is a conceptual diagram showing an example of the configuration of a power generation system according to a first embodiment. [Diagram 2] FIG. 4 is a block diagram showing an example of a functional configuration of a cooperative control unit. [Diagram 3] FIG. 2 is a schematic diagram showing a generator, a charge / discharge device, and a single-line diagram. [Figure 4] Schematic diagram of the bypass circuit switch in the "open" state. [Diagram 5] 5 is a flowchart showing an example of control of test charging. [Figure 6] FIG. 11 is a conceptual diagram showing an example of the configuration of a power generation system according to a second embodiment. [Figure 7] FIG. 4 is a block diagram showing an example of the functional configuration of a cooperative control unit according to the embodiment. [Figure 8] FIG. 4 is a block diagram showing an example of a functional configuration of a water turbine control command value calculation unit according to the present embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] Hereinafter, a control device, a control method, and a power generation system according to an embodiment of the present invention will be described in detail with reference to the drawings. Note that the embodiment described below is an example of an embodiment of the present invention, and the present invention is not limited to these embodiments. In addition, in the drawings referred to in this embodiment, the same parts or parts having similar functions are given the same or similar symbols, and repeated explanations thereof may be omitted. In addition, the dimensional ratios of the drawings may differ from the actual ratios for the convenience of explanation, and some components may be omitted from the drawings.
[0010] (First embodiment)
[0011] FIG. 1 is a conceptual diagram showing an example of the configuration of a power generation system according to the first embodiment. As shown in FIG. 1, the power generation system 50 includes a power generation device 2 including a prime mover 1, a main circuit 3, a charge / discharge device 4, a charge / discharge circuit 4A, a parallel circuit breaker 5a, a charge / discharge circuit switch 5b, a bypass circuit switch 6, a system control device 10, an instrument current transformer CT1, an instrument voltage transformer VT1, and a main transformer MT. The bypass circuit and the bypass circuit switch 6 may not be provided. The prime mover in this specification and claims does not necessarily refer to a machine itself that converts energy into mechanical work, and may also refer to a device that controls the machine. The prime mover 1 includes a water turbine 11, a water turbine control device 12, a speed governor 13, and a servo motor 14. The system control device 10 according to this embodiment corresponds to a control device.
[0012] One end of a main transformer MT is connected to a power transmission network S of an electric power system, and the other end is connected to an output terminal t1. The output terminal t1 and a power generation device 2 are connected via a main circuit 3. A parallel circuit breaker 5a is also connected to the main circuit 3. The main transformer MT according to this embodiment corresponds to a transformer.
[0013] The output terminal t1 and the charge / discharge device 4 are connected via a charge / discharge circuit 4A. The charge / discharge device 4 is also connected to a charge / discharge circuit switch 5b.
[0014] The power generating device 2 includes a prime mover 1, a synchronous generator 21 (hereinafter sometimes referred to as the "generator 21"), and a rotation speed detector 22. The generator 21 according to this embodiment is, for example, a permanent magnet synchronous generator. The prime mover 1 drives the generator 21 by the rotational driving force of, for example, a water turbine. The generator 21 converts the rotational kinetic energy of the prime mover 1 into electric energy and supplies three-phase AC generated power to an output terminal t1 connected to a power grid. The main transformer MT transforms the three-phase AC power supplied to the output terminal t1 and supplies it to the power transmission network S of the power grid. The instrument current transformer CT1 and the instrument voltage transformer VT1 measure the current and voltage input or output from the output terminal t1.
[0015] The rotation speed detector 22 detects the rotation speed of the generator 21 and outputs a rotation speed signal including information on the rotation speed to the system control device 10 and the water turbine control device 12. The generator 21 according to this embodiment is a permanent magnet synchronous generator, but is not limited to this. Also, the prime mover 1 according to this embodiment drives the generator 21 by the rotation driving force of a water turbine, but is not limited to this. For example, the generator 21 may be driven by the rotation driving force of a diesel engine, a gas turbine, or the like.
[0016] The charging / discharging device 4 is capable of charging / discharging AC power to / from the output terminal t1. The charging / discharging device 4 includes a power converter 41, a power converter control device 42, a power storage device B, a current transformer CT2, and a voltage transformer VT2. The frequency of the output voltage of the generator 21 according to this embodiment and the frequency of the output voltage of the charging / discharging device 4 are controlled to be the same.
[0017] The parallel circuit breaker 5a switches the main circuit 3 between a conductive state and a non-conductive state in response to a "close" command or an "open" command. The charge / discharge circuit switch 5b switches the charge / discharge circuit 4A between a conductive state and a non-conductive state in response to a "close" command or an "open" command. In this embodiment, the case where two switching means are used is illustrated. However, if the charge / discharge device 4 has a function for turning on and off the current, the charge / discharge circuit switch 5b may not be provided.
[0018] Furthermore, without being limited to the charge / discharge circuit switch 5b or the current ON / OFF function, any other switch than the charge / discharge circuit switch 5b or any other switch than the current ON / OFF function may be used as long as it has a function capable of switching between a conductive state and a non-conductive state between the power converter 41 and the main circuit 3. Similarly, without being limited to the parallel circuit breaker 5a, any other switch than the parallel circuit breaker 5a may be used as long as it has a function capable of switching between a conductive state and a non-conductive state between the generator 21 and the grid side electric wire 3.
[0019] The bypass circuit switch 6 is a switch that bypasses the main transformer MT. The bypass circuit switch 6 switches between a conductive state and a non-conductive state of the bypass path by a "close" command or an "open" command. When the bypass circuit switch 6 is in the closed state, it bypasses the main transformer MT and connects the output terminal t1 to the power transmission network S of the power system. On the other hand, when the bypass circuit switch 6 is in the open state, it connects the output terminal t1 to the power transmission network S of the power system via the main transformer MT.
[0020] The system control device 10 controls the power generation device 2, the charge / discharge device 4, the parallel circuit breaker 5a, the charge / discharge circuit switch 5b, and the bypass circuit switch 6. The system control device 10 has a cooperative control unit 100 and a voltage and current measuring unit 10a. Note that the voltage and current measuring unit 10a according to this embodiment corresponds to an acquisition unit.
[0021] The generator 21 provided in the power generation device 2 is composed of a rotor that generates a field magnet using, for example, a permanent magnet, and a stator that generates an AC voltage. The stator of the generator 21 is composed of a three-phase winding, and outputs a three-phase AC voltage with a phase difference of 120 degrees from each other as the magnetic field crosses the winding.
[0022] The water turbine 11 provided in the prime mover 1 generates a rotational force according to the amount of water adjusted by the opening of the guide vanes driven by the servo motor 14. The water turbine control device 12 gives a guide vane opening / closing signal to the speed governor 13 for controlling the guide vane opening according to the water turbine operation command and water turbine control command value (rotational speed, guide vane opening value, etc.) given by the cooperative control device 100 in the system control device 10. The speed governor 13 drives the servo motor 14 according to the guide vane opening / closing signal given by the water turbine control device 12, changes the guide vane opening, and adjusts the rotational speed and / or output of the water turbine 11. The position value of the servo motor is transmitted to the water turbine control device 12 as a guide vane opening feedback signal, and is also transmitted to the cooperative control device 100 in the system control device 10. The water turbine control device 12 according to this embodiment corresponds to the prime mover control device.
[0023] The power converter 41 of the charging / discharging device 4 charges and discharges the power storage device B and inputs and outputs power to and from the main circuit 3 side (inputs and outputs power to and from the generator 21 and / or the power transmission network S of the power system) in accordance with a power converter control signal (e.g., a signal controlling voltage, current, power, and frequency) given by a power converter control device 42. The power converter 41 performs AC / DC conversion by, for example, controlling the on / off of a plurality of semiconductor switching elements. As the semiconductor switching elements, for example, IGBTs (Insulated Gate Bipolar Transistors) are used.
[0024] The power storage device B has a power storage unit. This power storage unit is composed of, for example, a chargeable and dischargeable secondary battery, an electric double layer capacitor, or the like. The current transformer CT2 and the voltage transformer VT2 are provided in the AC side circuit of the power converter 41, and measure the current and voltage input to or output from the power converter 41. Depending on the control method of the power converter 41, VT2 and / or CT2 may be omitted.
[0025] The power converter control device 42 controls the power converter 41 by providing a power converter control signal (e.g., a signal for controlling a voltage or a frequency) to the power converter 41 in accordance with a charge / discharge command value (e.g., a voltage or a frequency value) provided by the cooperative control unit 100. For example, the power converter control device 42 provides a gate signal to a gate terminal of a semiconductor switching element of the power converter 41 to perform on / off control.
[0026] The value of an electrical quantity (e.g., voltage) on the side of the storage device B is used for the storage amount feedback signal. Instead of the storage amount feedback signal, an integral value of active power calculated from the value of the current measured by the current transformer CT2 and the value of the voltage measured by the voltage transformer VT2 may be used. That is, this power converter control device 42 outputs a power converter control signal to the power converter 41 so as to follow a charge / discharge command value (e.g., voltage, frequency value) according to the current and voltage measured by the current transformer CT2 and the voltage transformer VT2. The instrument current transformer CT1 and the instrument transformer VT1 are provided, for example, on the main transformer MT side of the main circuit 3, and measure the current and voltage at the output terminal t1.
[0027] The voltage and current measuring unit 10a provided in the system control device 10 inputs the current value measured by the instrument current transformer CT1 and the voltage value measured by the instrument voltage transformer VT1, and supplies the input current and voltage values to the cooperative control unit 100.
[0028] The cooperative control unit 100 is capable of operating the power generation system 50 by controlling the open / closed state of the parallel circuit breaker 5a and the charge / discharge circuit switch 5b, the operating state of the charge / discharge device 4, and the operating state of the prime mover 1 in a predetermined procedure in accordance with operating commands such as normal operation and trial charging given from outside.
[0029] The "trial charging" according to this embodiment refers to supplying a predetermined voltage from the power generation system 50 to at least a part of the power transmission network S in the power grid that is experiencing a power outage (blackout). In other words, trial charging refers to supplying a predetermined voltage from the power generation system 50 to at least a part of the power transmission network S of the power grid to which power supply has been stopped, either in a case where it is checked whether there is any problem with charging after a power outage (blackout) due to an accident or in a case where a new transmission line is installed in the power transmission network S. Generally, when a power outage (blackout) occurs in the power grid, the scope of trial charging is gradually expanded.
[0030] Fig. 2 is a block diagram showing an example of a functional configuration of the cooperative control unit 100 according to this embodiment. As shown in Fig. 2, the cooperative control unit 100 includes an operation command input / output unit 110, a parallel circuit breaker control unit 111a, a charge / discharge circuit switch control unit 111b, a charge / discharge command value calculation unit 112, and a hydraulic turbine control command value calculation unit 113. Each function constituting the cooperative control unit 100 may be configured as hardware, or a part or all of the functions may be configured as software (a program for realizing the functions on a computer).
[0031] In response to operation commands (such as black start, trial charging, and power generation), the operation command input / output unit 110 provides operation commands in a predetermined procedure to each of the parallel circuit breaker control unit 111a, the charge / discharge circuit switch control unit 111b, the charge / discharge command value calculation unit 112, and the turbine control command value calculation unit 113 within the cooperative control unit 100.
[0032] The parallel circuit breaker control unit 111a issues a "close" or "open" command to the parallel circuit breaker 5a in response to an operation command from the operation command input / output unit 110. The charge / discharge circuit switch control unit 111b issues a "close" or "open" command to the charge / discharge circuit switch 5b in response to an operation command from the operation command input / output unit 110. The bypass circuit switch control unit 111c issues a "close" or "open" command to the bypass circuit switch 6 in response to an operation command from the operation command input / output unit 110.
[0033] The charge / discharge command value calculation unit 112 provides charge / discharge command values (e.g., voltage and frequency values) suitable for operations such as black start and test charging to the power converter control device 42 in the charge / discharge device 4 in response to an operation command from the operation command input / output unit 110. For the charge / discharge command value, a value stored in the charge / discharge command value calculation unit 112 may be used, or a value calculated using a voltage value and / or a current value supplied from the voltage / current measurement unit 10a may be used.
[0034] The turbine control command value calculation unit 113 gives the turbine control device 12 turbine operation commands and turbine control command values (rotation speed, guide vane opening value, etc.) suitable for operations such as black start and test charging in response to the operation command from the operation command input / output unit 110. For the turbine control command value, a value stored in the turbine command value calculation unit 113 may be used, or a value calculated using the rotation speed signal of the generator 21 transmitted from the rotation speed detector 22 and / or the guide vane opening feedback signal may be used. Instead of the rotation speed signal, the frequency of the voltage signal measured by VT1 may be used.
[0035] (Test charging control) FIG. 3 is a diagram showing a single-line diagram between the generator 21 and the charge / discharge device 4. Note that FIG. 3 shows a schematic diagram in the case where the bypass circuit and the bypass circuit switch 6 are not provided, or in the case where the bypass circuit switch 6 is in the "open" state. The induced voltage of the generator 21 is indicated by E1, the current flowing through the generator 21 is indicated by I1, and the terminal voltage of the generator is indicated by V1. The charge / discharge voltage of the charge / discharge device 4 is indicated by voltage V2, the current flowing through the charge / discharge device 4 is indicated by current I2, and the current flowing through the system is indicated by IL. These can be measured by the measurement systems VT1, CT1, VT2, CT2, 10a, 42, etc. shown in FIG. 1. Note that the measurement system may be provided inside the generator 21 to measure the voltage V1 and current I1 of the generator 21. X1 is the internal reactance of the generator, R1 is the internal resistance of the generator, XT is the reactance of the main transformer MT (for convenience, the resistance component is assumed to be 0), and S100 is the transmission line impedance. Note that, since the impedance between the generator 21 and the charge / discharge device 4 is omitted for convenience in Fig. 3, the terminal voltage V1 of the generator 21, the voltage V2 of the charge / discharge device 4, and the voltage Vt1 of the output end t1 (the generator side of the main transformer) of the power generation system 50 are equal.
[0036] In this embodiment, a state in which the phase of the current I1 leads the induced voltage E1 is referred to as a leading current, whereas a state in which the phase of the current I1 lags the induced voltage E1 is referred to as a lagging current.
[0037] The charge / discharge command value calculation unit 112 outputs a charge / discharge command value (e.g., a voltage, a current, and a frequency value) calculated using the voltage value and / or the current value supplied from the voltage and current measurement unit 10a to the power converter control device 42 in the charge / discharge device 4, and controls the voltage V2 of the charge / discharge device so that the deviation between the voltage Vt1 at the output end t1 of the power generation system 50 and the set voltage falls within a predetermined range. For example, the charge / discharge command value calculation unit 112 calculates the induced voltage E1 and the phase of the current I1 relative to the induced voltage E1 based on the values of the reactance X1 and the resistance R1, the voltage Vt1, and the current I1, and controls the voltage V2 so that the values of the voltage Vt1 and / or the current I1 are as command values. Note that in this embodiment, information required to calculate the induced voltage E1 and the phase of the current I1 relative to the induced voltage E1 may be referred to as information related to the voltage Vt1 at the output end t1. For example, this information includes the voltage Vt1, the reactance X1, the resistance R1, the current I1, the current IL, and the current I2.
[0038] (Self-excitation phenomenon of generator 21) As described above, trial charging is performed, for example, when the power grid experiences a blackout. When a blackout occurs, the load of the power grid generally stops. For this reason, the impedance S100 of the trial charging range of the power grid S of the power grid generally becomes capacitive. At this time, the current I1 becomes a leading current.
[0039] In this case, when the parallel circuit breaker 5a is closed, the generator 21 is connected to the capacitive impedance system via the terminal t1. This causes a leading current to flow through the armature of the generator 21, and the generator terminal voltage V1 becomes higher than the induced voltage E1. Furthermore, the voltage is further increased by the self-excitation of the generator 21.
[0040] (Overvoltage suppression control by charge / discharge device 4) When the current I1 flowing through the generator 21 is a leading current, the terminal voltage V1 is a composite voltage of the induced voltage E1, the reactance X1, and the voltage that rises due to the resistance R1, and the terminal voltage V1 is in a state higher than the induced voltage E1. Furthermore, when the self-excitation phenomenon occurs, the induced voltage E1 also rises, and the terminal voltage V1 may become an overvoltage that exceeds a specified value. In this embodiment, a state in which the terminal voltage V1 of the generator is higher than the rated voltage of the generator may be referred to as an overvoltage. In general, if a leading current flows when the induced voltage E1 of the generator 21 is equal to or higher than the rated voltage value, an overvoltage state occurs.
[0041] For example, when the terminal voltage Vt1 of the output terminal t1 is higher than a predetermined voltage, the charge / discharge command value calculation unit 112 calculates a charge / discharge command value so that the voltage V2 is lower than the terminal voltage Vt1 of the output terminal t1, and outputs the calculated value to the charge / discharge device 4. In this case, the power converter control device 42 controls the voltage of the power converter 41 according to the charge / discharge command value from the charge / discharge command value calculation unit 112. At this time, the voltage V2 of the charge / discharge device 4 becomes lower than the induced voltage E1, and a delay current flows from the generator 21 to the charge / discharge device 4. As a result, the terminal voltage V1 drops due to a voltage drop caused by the internal impedance (reactance X1 and resistance R1) of the generator 21, and it is possible to keep the terminal voltage V1 within a predetermined range. In this way, overvoltage is suppressed.
[0042] Furthermore, when a leading current flows to the generator 21 and the terminal voltage Vt1 at the output end t1 is higher than a predetermined value (for example, 80% of the rated value), the charge / discharge command value calculation unit 112 calculates a charge / discharge command value so as to increase the lagging current component of the current I1, and outputs the charge / discharge command value to the charge / discharge device 4. In this case, the power converter control device 42 controls the power converter 41 to flow a lagging current in accordance with the charge / discharge command value from the charge / discharge command value calculation unit 112. At this time, the voltage V2 of the charge / discharge device 4 becomes lower than the induced voltage E1, and a lagging current flows from the generator 21 to the charge / discharge device 4. This lagging current causes a voltage drop due to the internal impedance (reactance X1 and resistance R1) of the generator, and the terminal voltage V1 drops, making it possible to keep the terminal voltage V1 within a predetermined range.
[0043] In this way, the cooperative control unit 100 controls the voltage and / or current of the charge / discharge device 4 based on information relating to the voltage of the output terminal t1 (e.g., terminal voltage V1, reactance X1, resistance R1, current I1, current IL, and current I2, etc.), and controls at least one of the voltage Vt1 of the output terminal t1 and the voltage V1 of the generator 21 within a predetermined range. This makes it possible to suppress overvoltage and self-excitation of the generator 21, and perform trial charging at an appropriate voltage. Note that voltage and current are mutually related, and controlling the voltage makes it possible to control the current. Similarly, controlling the current makes it possible to control the voltage.
[0044] (Boost control by charge / discharge device 4) For example, when test charging is performed at a low frequency (lower than the rated rotation speed) and the terminal voltage Vt1 is lower than a predetermined voltage, the charge / discharge command value calculation unit 112 calculates a charge / discharge command value so that the voltage V2 becomes equal to or higher than the predetermined voltage, and outputs the charge / discharge command value to the charge / discharge device 4. In this case, the power converter control device 42 controls the power converter 41 so that the voltage V2 becomes higher than the induced voltage E1 and / or so that the leading current increases, according to the charge / discharge command value from the charge / discharge command value calculation unit 112. At this time, a leading current flows from the generator 21 to the charge / discharge device 4. As a result, the terminal voltage V1 increases due to a voltage increase caused by the internal reactance X1 of the generator.
[0045] Moreover, by controlling the charging / discharging power of the charging / discharging device 4 and the output (active power) of the generator 21 in a coordinated manner, it is also possible to reduce the storage capacity (for example, Ah) of the storage device B.
[0046] 4 shows a schematic diagram of the bypass circuit switch 6 in the "closed" state. When the bypass circuit switch 6 is in the "closed" state, it differs from the "open" state in that the voltage on the primary side (generator side) of the main transformer MT is applied to the system. In this case, it is possible to perform the same control as in the "open" state.
[0047] That is, in the case of a leading current, the voltage Vt1 at the output end t1 becomes higher than the induced voltage E1, so the charge / discharge command value calculation unit 112 calculates a charge / discharge command value so as to lower the voltage V2, and outputs the charge / discharge command value to the charge / discharge device 4. In this case, the power converter control device 42 controls the voltage V2 in accordance with the charge / discharge command value from the charge / discharge command value calculation unit 112. The power converter control device 42 according to this embodiment corresponds to the charge / discharge control device.
[0048] Furthermore, when the voltage Vt1 at the output terminal t1 is higher than a predetermined value, for example, a specified value, the charge / discharge command value calculation unit 112 outputs a voltage value lower than the voltage Vt1 as a voltage command value to the charge / discharge device 4. In this case, the power converter control device 42 performs control to lower the voltage V2 of the power converter 41 in accordance with the charge / discharge command value from the charge / discharge command value calculation unit 112.
[0049] When the terminal voltage V1 is lower than the specified voltage, the charge / discharge command value calculation unit 112 calculates a charge / discharge command value so that the voltage V2 becomes equal to or higher than a predetermined voltage, and outputs the charge / discharge command value to the power converter control device 42. In this case, the power converter control device 42 controls the power converter 41 in response to a command from the charge / discharge command value calculation unit 112 so that the phase of the current I2 leads the phase of the induced voltage E1. In this way, it is possible to perform control similar to that in the "open" state.
[0050] In addition, even in the normal operation state where the bypass circuit switch 6 is "open", the operation control of the charging / discharging device 4 can be continued. As described above, the power converter 41 of the charging / discharging device 4 can control the voltage, current, and phase at high speed, for example, by controlling the on / off of multiple semiconductor switching elements. Therefore, the response speed is faster than that of the generator 21, and the response delay of the generator 21 to the change in the state of the power system can be compensated for by the charging / discharging of the charging / discharging device 4. In this way, the charging / discharging of the charging / discharging device 4 can be continued even during normal operation, and the terminal voltage Vt1 can be more stably controlled to the specified voltage. In addition, even if the load suddenly changes due to some factor during system expansion after the trial charge, the terminal voltage V1 can be controlled to the specified voltage.
[0051] The configuration of the power generation system according to this embodiment has been described above. Below, an example of the test charge control process according to this embodiment will be described.
[0052] Fig. 5 is a flowchart showing an example of control for trial charging. Here, an example of trial charging control will be described in which a bypass circuit and a bypass circuit switch 6 are provided and the main transformer MT is bypassed before the turbine starts operating. In response to an operation command (operation command for trial charging control), the operation command input / output unit 110 gives operation commands in a predetermined procedure to each of the parallel circuit breaker control unit 111a, the charge / discharge circuit switch control unit 111b, the charge / discharge command value calculation unit 112, and the turbine control command value calculation unit 113 in the cooperative control unit 100.
[0053] First, the bypass circuit switching control unit 111c issues a "close" command to the bypass circuit switch 6 in response to an operation command from the operation command input / output unit 110. This starts the supply of power with reduced impact on the power transmission network S of the power system (step S100). It is also possible to start with the bypass circuit switch 6 in the "open" state. If a bypass circuit and the bypass circuit switch 6 are not provided, the step (S100) of bypassing the main transformer is unnecessary. The terminal voltage Vt1 may be set to a voltage lower than that during normal operation. This prevents a voltage exceeding a specified voltage from being applied to the power transmission network S of the power system.
[0054] Next, the parallel circuit breaker control unit 111a issues a "close" command to the parallel circuit breaker 5a in response to the operation command from the operation command input / output unit 110, and the turbine control command value calculation unit 113, upon receiving the operation command from the operation command input / output unit 110, calculates command values for the rotation speed and / or guide vane opening of the turbine 11 and outputs them to the turbine controller 12. The turbine controller 12 starts and controls the turbine 11 in response to the command value from the turbine control command value calculation unit 113 (step S102). More specifically, upon receiving the operation command from the operation command input / output unit 110, the turbine control command value calculation unit 113 outputs turbine control command values (rotation speed, guide vane opening value, etc.) to the turbine controller 12. As a result, the turbine controller 12 outputs a guide vane opening / closing signal to the speed governor 13. The governor 13 drives the servo motor 14 according to the guide vane opening / closing signal to change the guide vane opening and adjust the rotation speed of the water turbine 11. This causes the generator 21 to output a voltage of a predetermined frequency (step S104). Note that a "close" command may be given to the parallel circuit breaker 5a after the water turbine 11 starts operating and the generator 21 generates a voltage.
[0055] Next, after the generator 21 starts generating power at a predetermined frequency, the charge / discharge circuit switch control unit 111b issues a "close" command to the charge / discharge circuit switch 5b in response to the operation command from the operation command input / output unit 110. This starts the supply of voltage V2 to the charge / discharge device 4 (step S106). That is, upon receiving the operation command from the operation command input / output unit 110, the charge / discharge command value calculation unit 112 outputs a charge / discharge command value (e.g., voltage and frequency values) calculated using the voltage value and / or current value supplied from the voltage and current measurement unit 10a to the power converter control device 42 in the charge / discharge device 4. This controls the voltage and current at the output terminal t1 to be within a predetermined range.
[0056] The charge / discharge device 4 may be driven and the charge / discharge circuit switch 5b may be set to the "closed" state before the generator 21 starts generating electricity. After the voltage and / or current of the output terminal t1 is controlled to a predetermined value, the bypass circuit switch control unit 111c issues an "open" command to the bypass circuit switch 6 in response to the operation command from the operation command input / output unit 110. This connects the output terminal t1 to the power transmission network S of the power system via the main transformer M, and the voltage supplied to the power transmission network S becomes the normal voltage (step S108). When the voltage supplied to the power transmission network S of the power system becomes a predetermined value, the trial charge is completed. In this way, the charge / discharge device 4 controls the voltage and / or current of the output terminal t1, so that the trial charge to the power transmission network S can be performed while suppressing the leading current of the generator 21, the overvoltage due to the self-excitation phenomenon, etc., and the application of a voltage exceeding a specified voltage to the power transmission network S of the power system is suppressed.
[0057] Even during power generation, the charge / discharge command value calculation unit 112 may continue to output the charge / discharge command value (e.g., voltage and current values) calculated using the voltage value and / or current value supplied from the voltage and current measurement unit 10a to the power converter control device 42 in the charge / discharge device 4, and control the charge / discharge device 4 so that the deviation between the terminal voltage Vt1 and the set voltage falls within a predetermined range. If the generator 21 is a permanent magnet generator, the terminal voltage Vt1 and current IL of the power generation system cannot be controlled when the charge / discharge device 4 is stopped. However, by continuing to operate the charge / discharge device 4 even during power generation, it becomes possible to control the terminal voltage Vt1 and current IL of the power generation system.
[0058] The operation of the charge / discharge device 4 and the "closed" state of the charge / discharge circuit switch 5b may be performed before the generator 21 starts generating power. This allows test charging by the charge / discharge device 4 before the generator 21 generates voltage.
[0059] As described above, according to this embodiment, the cooperative control unit 100 of the system control device 10 controls the charging and discharging of the charge / discharge device 4 based on information related to the voltage of the output terminal t1 (e.g., the terminal voltage Vt1, the reactance X1, the resistance R1, the current I1, and the current I2, etc.), and controls at least one of the voltage and the current of the output terminal t1 within a predetermined range. This makes it possible to suppress the leading current of the generator 21, overvoltage due to the self-excitation phenomenon, etc.
[0060] Second embodiment The generator 21 of the power generation system 50 according to the first embodiment is a permanent magnet synchronous generator, whereas the generator 21 according to the present embodiment is an excitation type synchronous generator having a field magnet 23. The differences from the power generation system 50 according to the first embodiment will be described below.
[0061] FIG. 6 is a conceptual diagram showing an example of the configuration of a power generation system according to the second embodiment. As shown in FIG. 6, the generator 21 is an excitation type synchronous generator, and is composed of a field 23 that receives a direct current from the excitation device 15 and generates a rotating magnetic flux by axial rotation of a rotating shaft, and an armature that generates an AC voltage by crossing the generated rotating magnetic flux. For example, this generator 21 is configured as a rotating field type in which the field 23 is the rotor and the armature is the stator. The excitation device 15 has an excitation current supply unit that supplies a field current. The excitation device 15 controls the field current supplied by the excitation current supply unit under the control of the cooperative control unit 100, and controls the magnetic flux generated by the field 23. The excitation device 15 according to this embodiment corresponds to an excitation control device.
[0062] Fig. 7 is a block diagram showing an example of a functional configuration of the cooperative control unit 100 according to this embodiment. As shown in Fig. 7, the cooperative control unit 100 further includes an excitation control command value calculation unit 115. After receiving an operation command, the excitation control command value calculation unit 115 issues an "excitation start" command to the exciter 15. This "excitation start" command also includes command information related to the amount of field current to be passed through the field 23 or command information related to the terminal voltage V1 of the generator 21.
[0063] When the exciter 15 receives an "excitation start" command from the excitation control command value calculation unit 115, it starts excitation, and the field 23 is excited. Then, the generator 21 converts the rotational kinetic energy of the water turbine into electrical energy. As a result, a three-phase AC voltage is supplied to the power transmission network S of the power system via the main transformer MT.
[0064] The power generation system 50 according to this embodiment is capable of controlling the field 23 in addition to the control process of the power generation system 50 according to the first embodiment. As a result, during test charging, the excitation control command value calculation unit 115 controls the amount of magnetic flux generated by the field 23, for example, the field current so that the terminal voltage V1 (see FIG. 3) becomes a lower value (for example, 80%) than during normal operation, compared to during normal operation. As a result, the voltage supplied to the power transmission network S of the power system during test charging is suppressed, and damage to devices in the power transmission network S due to overvoltage can be suppressed.
[0065] Furthermore, the excitation control command value calculation unit 115 controls the field current so as to increase the amount of magnetic flux generated by the field 23 from, for example, 0 percent during normal operation to 80 percent in a time series manner. This makes it possible to increase the voltage, for example, to 80 percent of the voltage during normal operation while controlling the voltage and current of the terminal voltage Vt1 at the output end t1. It becomes possible to suppress a sudden change in voltage and / or current while checking the state of the voltage and / or current supplied to the power transmission network S of the power system during trial charging, and the risk of damage to devices in the power transmission network S can be further suppressed.
[0066] When controlling the field magnet 23, as described above, if the terminal voltage Vt1 of the output end t1 is higher than a predetermined voltage, the charge / discharge command value calculation unit 112 calculates a charge / discharge command value so that the voltage V2 is lower than the terminal voltage Vt1 of the output end t1, and outputs the charge / discharge command value to the charge / discharge device 42. In this case, the power converter control device 42 controls the voltage of the power converter 41 in accordance with the charge / discharge command value from the charge / discharge command value calculation unit 112.
[0067] Furthermore, when a leading current flows through the generator 21 and the terminal voltage Vt1 at the output end t1 is higher than a predetermined value (e.g., 80% of the rated value), the charge / discharge command value calculation unit 112 calculates a charge / discharge command so as to increase the lagging current component of the current I1, and outputs the charge / discharge command to the charge / discharge device 4. In this case, the power converter control device 42 performs control so that a lagging current flows through the power converter 41 in accordance with the charge / discharge command value from the charge / discharge command value calculation unit 112.
[0068] When the terminal voltage Vt1 is lower than a predetermined voltage, such as when trial charging is performed at a low frequency (lower than the rated rotation speed), the charge / discharge command value calculation unit 112 calculates a charge / discharge command value so that the voltage V2 becomes equal to or higher than the predetermined voltage, and outputs the calculated charge / discharge command value to the charge / discharge device 4. In this case, the power converter control device 42 controls the power converter 41 so that the voltage Vt1 becomes higher than the induced voltage E1 and / or so that the leading current increases according to the charge / discharge command value from the charge / discharge command value calculation unit 112. In this way, even when the amount of magnetic flux generated by the field magnet 23 is controlled to increase, for example, from 0% during normal operation to 80% in a time series, the cooperative control unit 100 of the system control device 10 controls the voltage V2 and / or the current I2 of the charge / discharge device 4, so that the terminal voltage Vt1 and the current IL can be controlled to predetermined values.
[0069] As described above, according to this embodiment, the excitation control command value calculation unit 115 coordinates the voltage and / or current of the charger / discharger 4 according to the amount of magnetic flux generated by the field 23 at the start of test charging. This reduces the voltage supplied to the power transmission network S of the power system during test charging, thereby preventing damage to devices in the power transmission network S due to overvoltage.
[0070] Third embodiment The power generation system 50 according to the third embodiment differs from the power generation system 50 according to the second embodiment in that test charging is performed at a frequency lower than the rated frequency (e.g., 50 Hz). The differences from the power generation system 50 according to the second embodiment will be described below.
[0071] Fig. 8 is a block diagram showing an example of a functional configuration of the water turbine control command value calculation unit 113 according to this embodiment. As shown in Fig. 8, the water turbine control command value calculation unit 113 according to this embodiment has a rotation speed command value setting unit 116, a rotation speed command value switching unit 117, and a water turbine rotation speed command value calculation unit 118.
[0072] After receiving the operation command, the rotation speed command value setting unit 116 gives a "rotation speed" command to a rotation speed command value switching unit 117. Since the frequency generated by the generator 21 is proportional to the rotation speed of the water turbine 11, the "rotation speed" command can be adjusted to adjust the frequency generated by the generator 21.
[0073] The rotation speed command value switching unit 117 outputs the rotation speed of the water turbine 11 (see FIG. 6) corresponding to the generated frequency to the water turbine rotation speed command value calculation unit 118. The water turbine rotation speed command value calculation unit 118 calculates a water turbine control command value (guide vane opening degree, etc.) that achieves the water turbine rotation speed, and outputs it to the water turbine control device 12.
[0074] In the power generation system 50 according to this embodiment, during test charging, the turbine control command value calculation unit 113 calculates a rotation speed command value so that the generated frequency of the generator 21 is, for example, 50% of that during normal operation, and outputs the calculated rotation speed command value to the turbine control device 12. This lowers the frequency of the power supplied to the power transmission network S of the power system during test charging, making it possible to suppress overvoltage caused by the Ferranti effect.
[0075] Furthermore, the turbine control command value calculation unit 113 controls the turbine control device 12 so as to increase the frequency of the generator 21, for example, from near 0% during normal operation to 100% in a time series manner. This makes it possible to increase the frequency to the normal operation frequency while controlling the voltage, current and / or frequency at the output end t1. It becomes possible to suppress sudden changes in the voltage and / or current while checking the state of the voltage and / or current supplied to the power transmission network S of the power system, and further reduce the risk of damage to devices in the power transmission network S.
[0076] Furthermore, the charge / discharge command value calculation unit 112 can control the charge / discharge device 4 to start charging / discharging the output terminal t1 before the start of test charging by the generator 21. In this case, the charge / discharge device 4 can be controlled at a higher speed than the guide vane opening control of the prime mover 1 and the excitation control of the generator 21, and therefore can suppress voltage fluctuations, current fluctuations, and system frequency fluctuations that occur when a transformer, load, or the like is introduced into the system during test charging at a higher speed.
[0077] Even when the charge / discharge device 4 starts charging / discharging before the start of trial charging by the generator 21, the charge / discharge command value calculation unit 112 issues a command value to the power converter control device 42 so that the frequency generated by the charge / discharge device 4 is, for example, 50 percent of that during normal operation. This lowers the frequency of the power supplied to the power transmission network S of the power system during trial charging, making it possible to suppress overvoltage caused by the Ferranti effect. In this case, the turbine control command value calculation unit 113 calculates a rotation speed command value according to the frequency generated by the charge / discharge device 4 and outputs it to the turbine control device 12. Furthermore, the charge / discharge command value calculation unit 112 controls the charge / discharge device 4 so as to increase the frequency generated by the charge / discharge device 4, for example, from 0 percent (DC) during normal operation to 100 percent in a time series manner. In this case as well, the turbine control command value calculation unit 113 calculates a rotation speed command value according to the frequency generated by the charge / discharge device 4 and outputs it to the turbine control device 12. That is, the frequency generated by the charge / discharge device 4 and the rotation speed of the turbine 11 are controlled in a coordinated manner.
[0078] Furthermore, the charge / discharge command value calculation unit 112 can control the charge / discharge device 4 to supply DC power from the storage device B to the output end t1 during a predetermined period of trial charging. This suppresses the Ferranti effect, and trial charging can be started before the start of operation of the water turbine 11 and the generator 12. After the predetermined period has elapsed, the frequency generated by the charge / discharge device 4 can be increased to supply the voltage generated by the generator 21 to the output end t1, and control can be performed to change the frequency as described above.
[0079] Even when the water turbine 11 and the charge / discharge device 4 are controlled in a coordinated manner to control their frequencies, the charge / discharge device 4 can be used for control to obtain the target terminal voltage Vt1 as described above. That is, when the terminal voltage Vt1 at the output end t1 is higher than a predetermined voltage, the charge / discharge command value calculation unit 112 calculates a charge / discharge command value so that the voltage V2 is lower than the terminal voltage Vt1 at the output end t1, and outputs the charge / discharge command value to the charge / discharge device 4. In this case, the power converter control device 42 controls the voltage of the power converter 41 in accordance with the charge / discharge command value from the charge / discharge command value calculation unit 112.
[0080] Furthermore, when a leading current flows through the generator 21 and the terminal voltage Vt1 at the output end t1 is higher than a predetermined value (e.g., 80% of the rated value), the charge / discharge command value calculation unit 112 calculates a charge / discharge command value so as to increase the lagging current component of the current I1, and outputs the charge / discharge command value to the charge / discharge device 4. In this case, the power converter control device 42 performs control so that a lagging current flows through the power converter 41 in accordance with the charge / discharge command value from the charge / discharge command value calculation unit 112.
[0081] When the terminal voltage Vt1 is lower than a predetermined voltage, such as when a test charge is performed at a low frequency (lower than the rated rotation speed), the charge / discharge command value calculation unit 112 calculates a charge / discharge command value so that the voltage V2 becomes equal to or higher than the predetermined voltage, and outputs the charge / discharge command value to the charge / discharge device 4. In this case, the power converter control device 42 controls the power converter 41 so that the terminal voltage Vt1 becomes higher than the voltage E1 and / or so that the leading current increases according to the charge / discharge command value from the charge / discharge command value calculation unit 112. In this way, even when the generation frequency of the generator 21 is controlled to increase in a time series from, for example, near 0% during normal operation to 100%, the cooperative control unit 100 of the system control device 10 controls the voltage V2 and / or the current I2 of the charge / discharge device 4, so that the terminal voltage Vt1 and the current IL can be controlled to predetermined values.
[0082] As described above, according to this embodiment, the cooperative control unit 100 calculates and outputs a control command value to control the frequency of the generator 21 and / or the charge / discharge device 4 at the start of test charging to be lower than the frequency (e.g., 50 Hz) generated during normal operation. This reduces the frequency of the power supplied to the power grid S of the power system during test charging, making it possible to suppress overvoltage due to the Ferranti effect. [Explanation of symbols]
[0083] 1: prime mover, 4: charging / discharging device, 10: system control device (control device), 12: turbine control device (prime mover control device), 15: excitation device, 21: synchronous generator, 30: power meter, 41: power converter, 50: power generation system, 100: cooperative control unit (control unit), B: power storage device, MT: main transformer, S: power transmission network of power system, t1: output terminal.
Claims
1. A control device for a power generation system including a generator that supplies AC power to an output terminal connected to an electric power grid, a charge / discharge device that can charge / discharge the AC power to the output terminal, and a prime mover control device that controls an output and / or a rotation speed of a prime mover that drives the generator, an acquisition unit that acquires information regarding at least one of a voltage and a current of the output terminal; a control unit that controls charging and discharging of the charging / discharging device based on information regarding at least one of the voltage and current of the output terminal during a trial charging period, and controls at least one of the voltage and current of the output terminal within a predetermined range; A control device comprising:
2. The control device according to claim 1 , wherein the control unit controls the charging / discharging device so as to output a voltage lower than the voltage of the output terminal when the voltage of the output terminal is equal to or higher than a predetermined value.
3. 2. The control device according to claim 1, wherein the control unit controls the charging / discharging device so that a phase of an output current in the generator lags a phase of an induced voltage in the generator when the voltage at the output terminal is equal to or higher than a predetermined value.
4. The control device according to claim 1 , wherein the control unit controls the charging / discharging device to output a voltage higher than the voltage of the output terminal when the voltage of the output terminal is equal to or lower than a predetermined value.
5. 2. The control device according to claim 1, wherein the control unit controls the charging / discharging device so that the phase of the output current in the generator leads the phase of the induced voltage in the generator when the voltage of the output terminal is equal to or lower than a predetermined value and / or is less than the predetermined value.
6. The control device according to claim 2 , wherein the control unit controls the charging / discharging device so that a frequency of a voltage at the output terminal or the generator is the same as a frequency of a voltage at the charging / discharging device.
7. The control device according to claim 6 , wherein the control unit controls the charging / discharging device to start charging / discharging the output terminal before the power supply by the generator when the trial charging is started.
8. The charging / discharging device has an electricity storage device, The control device according to claim 7 , wherein the control unit controls the charging / discharging device so as to supply a DC voltage from a power storage unit of the power storage device during a predetermined period of the trial charging.
9. The charging / discharging device has an electricity storage device, The control device according to claim 2 , wherein the control device converts AC power supplied from the power generation system during the trial charging period into DC power and charges a power storage unit of the power storage device.
10. the power generation system further includes a transformer that transforms a voltage at the output terminal and supplies the voltage to the power grid, and a circuit that bypasses the transformer; The control device according to claim 2 , wherein the control unit is configured to bypass the transformer and supply power to the power grid during a predetermined period of the trial charging.
11. the generator is an excited synchronous generator connected to the prime mover and supplied with a field current from an exciter; The control device according to claim 6 , wherein the control unit controls the charge / discharge device and the excitation device in a coordinated manner when the test charge is performed.
12. The generator is an excitation type synchronous generator supplied with a field current from an excitation device, The control device according to claim 6 , wherein the control unit outputs a control signal for increasing the field current in a time series manner when the trial charging is performed.
13. The control device according to claim 6 , wherein the control unit outputs a control signal for an output frequency to the charging / discharging device so that the output frequency is equal to or lower than a predetermined frequency and / or is less than a predetermined frequency when the trial charging is performed.
14. The control device according to claim 6 , wherein the control unit outputs a control signal to the charging / discharging device to increase an output frequency in a time series manner so that the output frequency is equal to or less than a predetermined frequency and / or less than a predetermined frequency when the trial charging is performed.
15. 15. The control device according to claim 13, wherein the generator is a synchronous generator connected to a prime mover, and the control unit outputs a control signal when performing the test charge so as to match the output frequency of the generator with a frequency of a charging / discharging device by controlling the rotational speed of the prime mover.
16. the generator is a permanent magnet synchronous generator connected to a prime mover; The control device according to claim 6 , wherein the control unit controls a frequency of the output power of the charging / discharging device so as to coincide with a frequency of the output power of the generator.
17. A prime mover that converts energy into rotational force; a generator driven by the prime mover and supplying AC power to an output terminal connected to a power grid; a charging / discharging device capable of charging and discharging AC power to and from the output terminal; a system control device that outputs a control command to at least one of the three control devices, that is, a prime mover control device that controls an output and / or a rotation speed of the prime mover, an excitation control device that controls a field current of the generator, and a charge / discharge control device that controls the charge / discharge device; and A power generation system comprising: The system control device includes: an acquisition unit that acquires information regarding at least one of a voltage, a current, and a frequency of the output terminal; a control unit that outputs a control command to control at least the output of the prime mover, the rotational speed of the prime mover, the field current of the generator, and the charging / discharging of the charging / discharging device based on information regarding at least one of the voltage, current, and frequency of the output terminal during a trial charging period, and controls at least one of the voltage, current, and frequency of the output terminal within a predetermined range; A power generation system having the above structure.
18. The power supply system further includes a transformer that transforms a voltage at the output terminal and supplies the voltage to the power system, and a circuit that bypasses the transformer, The power generation system according to claim 17 , wherein the system control device is capable of bypassing the transformer and starting power supply to the power grid during at least a predetermined period of the trial charging.
19. The power generation system of claim 18, wherein the system control device is capable of controlling the output frequency of the generator by controlling at least one of the output frequency of the charging / discharging device and the rotational speed of the prime mover so that the output frequency is equal to or lower than a predetermined frequency during at least a predetermined period of the trial charging.
Citation Information
Patent Citations
Ac power supply device
JP2002325465A
Combined cycle power generation plant, and control method of combined cycle power generation plant
JP2019027398A
Distributed power supply and control method thereof
JP2022032632A
Pumped storage power generation system, control apparatus, and control method
JP2022146129A
Wind power generation facility, and operation method for the same
JP2014128157A